Antenna parameter determination method and device, electronic equipment and storage medium

The LSTM model is used to predict the future PRB occupancy information of 5G sites and adjust antenna parameters, which solves the problem of inability to predict capacity load changes in advance in the existing technology, realizes flexible parameter adjustment and adaptability optimization of the 5G network, and improves communication quality and load. balanced.

CN118804084APending Publication Date: 2024-10-18CHINA MOBILE GROUP DESIGN INST +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202311540289.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-11-17
Publication Date
2024-10-18

AI Technical Summary

Technical Problem

Existing 5G network load balancing optimization methods cannot predict future capacity load changes in advance, making it difficult to achieve flexible parameter adjustment and adaptive optimization, which affects communication quality.

Method used

By obtaining the hourly historical data of PRB occupancy of 5G sites, using the LSTM model to predict future PRB occupancy information, the antenna weight combination with the smallest mean square error of PRB utilization is screened out, and the antenna parameters are adjusted based on this combination to achieve the optimal combination of antenna weights. Adaptive optimization.

Benefits of technology

Adjust parameters in advance to adapt to capacity load changes, improve network load balancing, ensure effective use of resources, and improve communication quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118804084A_ABST
    Figure CN118804084A_ABST
Patent Text Reader

Abstract

The invention relates to an antenna parameter determination method and device, electronic equipment and a storage medium, and the method comprises the steps: obtaining the PRB historical data of a target cell, and predicting the PRB occupation information of the target cell based on the PRB historical data; determining a target antenna weight combination from the candidate antenna weight combinations under the condition that the target cell is determined to have the to-be-optimized area based on the PRB occupation information; wherein the PRB utilization rate mean square error of the target antenna weight combination is smaller than that of other antenna weight combinations in the candidate antenna weight combinations; and adjusting antenna parameters of a target base station corresponding to the target cell based on the target antenna weight combination. The antenna parameter determination method provided by the invention can cope with future potential capacity load changes and various actual network coverage requirements, and realizes flexible adjustment and adaptive optimization of parameters, thereby effectively improving the load balancing condition of a communication network.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present disclosure relates to the field of communication technology, and in particular to a method, device, electronic device and storage medium for determining antenna parameters. Background Art

[0002] With the continuous development of 5G technology, 5G networks are carrying more and more services, and the number of users and traffic per 5G site are also rising rapidly, resulting in a relatively high load on 5G base stations. Therefore, capacity load balancing optimization between 5G sites has become an important direction to promote the development of 5G services.

[0003] In the related art, network load balancing optimization mainly improves network load balancing by manually adjusting radio frequency parameters and base station parameters on the base station, so as to optimize the use of network resources, reduce congestion, improve network performance, and better meet user needs.

[0004] However, since relevant technologies cannot predict possible capacity load changes in the future, it is difficult for engineers to adjust 5G network parameters in advance to adapt to possible capacity load changes. As a result, when facing possible capacity load changes and complex and diverse actual network coverage requirements, 5G networks are difficult to achieve flexible parameter adjustment and adaptive optimization. This will reduce the communication quality of the 5G network and fail to meet users' demand for high-quality communication services. Summary of the invention

[0005] According to a first aspect of the present disclosure, there is provided a method for determining antenna parameters, comprising:

[0006] Acquire physical resource block (PRB) history data of the target cell, and predict PRB occupancy information of the target cell based on the PRB history data;

[0007] In the case where it is determined based on the PRB occupancy information that the target cell has an area to be optimized, determining a target antenna weight combination from the candidate antenna weight combinations; wherein a mean square error of PRB utilization of the target antenna weight combination is less than that of other antenna weight combinations in the candidate antenna weight combinations;

[0008] The antenna parameters of the target base station corresponding to the target cell are adjusted based on the target antenna weight combination.

[0009] According to a second aspect of the present disclosure, there is provided an antenna parameter determination device, including:

[0010] A data acquisition module, used to acquire PRB historical data of a target cell, and predict PRB occupancy information of the target cell based on the PRB historical data;

[0011] A data processing module, configured to determine a target antenna weight combination from the candidate antenna weight combinations when it is determined based on the PRB occupancy information that the target cell has an area to be optimized; wherein the mean square error of the PRB utilization of the target antenna weight combination is less than that of the remaining antenna weight combinations in the candidate antenna weight combination;

[0012] The data processing module is further used to adjust the antenna parameters of the target base station corresponding to the target cell based on the target antenna weight combination.

[0013] According to a third aspect of the present disclosure, there is provided an electronic device, including:

[0014] processor; and,

[0015] A memory for storing programs;

[0016] The program includes instructions, which, when executed by the processor, cause the processor to perform the method according to the exemplary embodiment of the present disclosure.

[0017] According to a fourth aspect of the present disclosure, a non-transitory computer-readable storage medium is provided, wherein the non-transitory computer-readable storage medium stores computer instructions, wherein the computer instructions are used to cause the computer to execute the method according to the exemplary embodiments of the present disclosure.

[0018] One or more technical solutions provided in the embodiments of the present disclosure obtain the PRB historical data of the physical resource block of the target cell, and predict the PRB occupancy information of the target cell based on the PRB historical data; when it is determined that there is an area to be optimized in the target cell based on the PRB occupancy information, a target antenna weight combination is determined from the candidate antenna weight combinations; wherein the mean square error of the PRB utilization of the target antenna weight combination is less than that of the remaining antenna weight combinations in the candidate antenna weight combinations; and the antenna parameters of the target base station corresponding to the target cell are adjusted based on the target antenna weight combination. The antenna parameter determination method provided in the present disclosure predicts the future PRB occupancy information of the target cell through the PRB historical data, so as to adjust the parameters in advance to adapt to the future capacity load changes. By screening out the target antenna weight combination with the smallest mean square error of PRB utilization from multiple candidate antenna weight combinations, and adjusting the antenna parameters based on the target antenna weight combination, the adaptive optimization of the antenna weight combination is realized, the load balancing of the communication network is improved, and the effective utilization of network resources is ensured. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Further details, features and advantages of the present disclosure are disclosed in the following description of exemplary embodiments in conjunction with the accompanying drawings, in which:

[0020] Figure 1A schematic diagram of the process of determining antenna parameters is shown;

[0021] Figure 2 An exemplary LSTM algorithm structure diagram of the present disclosure is shown;

[0022] Figure 3 An exemplary 5G cell load prediction flow chart of the present disclosure is shown;

[0023] Figure 4 An example diagram showing the number of PRB occupancy in a cell predicted by the LSTM model is shown;

[0024] Figure 5 The schematic diagram of 5G MR sampling point coverage and antenna angle is shown;

[0025] Figure 6 A schematic diagram of the angle between the 5G MR sampling grid points and the antenna is shown;

[0026] Figure 7 A diagram showing a combination of multi-vendor multi-beam solutions;

[0027] Figure 8 A schematic diagram showing the allowable adjustment range determination within a 5G cell is shown;

[0028] Fig. 9 A schematic diagram of antenna downtilt angle and antenna coverage is shown;

[0029] Fig.10 A schematic diagram of the beam optimization target principle is shown;

[0030] Fig.11 The particle swarm 5G beam equalization solution optimization flow chart is shown;

[0031] Fig.12 A flow chart showing a method for determining antenna parameters according to an exemplary embodiment of the present disclosure is shown;

[0032] Fig.13 A schematic block diagram of functional modules of a method and apparatus for determining antenna parameters according to an exemplary embodiment of the present disclosure is shown;

[0033] Fig.14 A schematic block diagram of a chip according to an exemplary embodiment of the present disclosure is shown;

[0034] Fig.15 A structural block diagram of an exemplary electronic device that can be used to implement the embodiments of the present disclosure is shown. DETAILED DESCRIPTION

[0035] Embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although certain embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be construed as being limited to the embodiments described herein, which are instead provided for a more thorough and complete understanding of the present disclosure. It should be understood that the drawings and embodiments of the present disclosure are only for exemplary purposes and are not intended to limit the scope of protection of the present disclosure.

[0036] It should be understood that the various steps described in the method embodiments of the present disclosure may be performed in different orders and / or in parallel. In addition, the method embodiments may include additional steps and / or omit the steps shown. The scope of the present disclosure is not limited in this respect.

[0037] The term "including" and its variations used in this document are open inclusions, that is, "including but not limited to". The term "based on" means "based at least in part on". The term "one embodiment" means "at least one embodiment"; the term "another embodiment" means "at least one other embodiment"; the term "some embodiments" means "at least some embodiments". Relevant definitions of other terms will be given in the description below. It should be noted that the concepts of "first", "second", etc. mentioned in this disclosure are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units.

[0038] It should be noted that the modifications of "one" and "plurality" mentioned in the present disclosure are illustrative rather than restrictive, and those skilled in the art should understand that unless otherwise clearly indicated in the context, it should be understood as "one or more".

[0039] It is understandable that before using the technical solutions disclosed in the embodiments of the present disclosure, the types, scope of use, usage scenarios, etc. of the personal information involved in the present disclosure should be informed to the user and the user's authorization should be obtained in an appropriate manner in accordance with relevant laws and regulations.

[0040] For example, in response to receiving an active request from a user, a prompt message is sent to the user to clearly prompt the user that the operation requested to be performed will require obtaining and using the user's personal information. Thus, the user can autonomously choose whether to provide personal information to software or hardware such as an electronic device, application, server, or storage medium that performs the operation of the technical solution of the present disclosure according to the prompt message.

[0041] As an optional but non-limiting implementation, in response to receiving an active request from the user, the method of sending a prompt message to the user may be, for example, a pop-up window, in which the prompt message may be presented in text. In addition, the pop-up window may also carry a selection control for the user to choose "agree" or "disagree" to provide personal information to the electronic device. It is understandable that the above notification and the process of obtaining user authorization are only illustrative and do not constitute a limitation on the implementation of the present disclosure. Other methods that meet relevant laws and regulations may also be applied to the implementation of the present disclosure.

[0042] Before introducing the embodiments of the present disclosure, the following definitions are given for the terms involved in the embodiments of the present disclosure:

[0043] Multibeam: A communications technology that is commonly used in satellite communications, radio frequency communications, and 5G mobile communications. It involves splitting a signal into multiple independent beams or channels, each of which can transmit data independently. This technology helps improve the capacity, efficiency, and performance of communication systems.

[0044] Physical Resource Block (PRB): In 5G communication systems, PRB is the basic physical resource unit allocated to user equipment for transmitting data and control information. The number of PRB occupancy is usually used to measure the utilization of network resources and provide information about network traffic and congestion. The hourly historical data of PRB occupancy can be used to analyze network performance and plan resource allocation.

[0045] Long short-term memory (LSTM): LSTM is a deep learning model and a variant of recurrent neural network (RNN). It is particularly suitable for processing sequence data and time series data. LSTM is designed to solve the problem that long sequence dependencies in traditional RNN are difficult to capture.

[0046] Antenna weight quadruple: used to describe the weight distribution in a multi-antenna system, including the antenna's horizontal beam width, vertical beam width, azimuth angle offset, and downtilt angle offset.

[0047] Horizontal beam width: Indicates the width of the antenna beam in the horizontal direction, that is, the angle range over which the antenna receives or transmits signals.

[0048] Vertical beamwidth: Indicates the width of the antenna beam in the vertical direction, similar to horizontal beamwidth, but in the vertical direction.

[0049] Azimuth offset: Indicates the horizontal angle offset of the antenna beam relative to the reference direction (usually due north). It is used to adjust the direction of the beam.

[0050] Downtilt offset: Indicates the angular offset of the antenna beam relative to the vertical direction. It is used to control the vertical direction of the beam.

[0051] With the continuous development of 5G technology, optimizing 5G network load balancing has become an important direction to promote the development of 5G services. However, the current 5G network load balancing optimization methods have the following problems: First, it is impossible to predict in advance the excessive capacity load that may occur in the future, resulting in unnecessary impact on customer experience. Second, in the face of complex and diverse scenarios, accurate load balancing cannot be achieved, and there is a lack of sufficient flexibility to adapt to different network environments. Finally, the 5G antenna weights contain too many adjustable parameters, which far exceeds the ability of manual processing, so it is necessary to introduce intelligent parameter tuning strategies.

[0052] In order to solve the above problems, the present invention proposes a method for determining antenna parameters. By collecting historical data of hourly PRB occupancy in 5G sites and combining it with the LSTM model, the tidal law in the time series period of the 5G cell is found, and the PRB occupancy of future 5G sites is predicted. It is determined whether the 5G site will have a problem of overload in the future, so as to raise early warning and optimization. Using the predicted PRB occupancy and the total number of PRBs in the cell, the PRB utilization rate of the cell is calculated, and then the coverage range of the 5G cell beam is confirmed based on the manufacturer type and station spacing of the site in the cell engineering parameter data, combined with the geographical distribution of the grid longitude and latitude of the 5G MR data sampling points. Finally, a particle swarm is used to perform contiguous optimization to find the capacity balancing solution corresponding to the minimum mean square error of PRB utilization.

[0053] For example, Figure 1 A schematic diagram of the antenna parameter determination method flow chart is shown. Figure 1 As shown, the antenna parameter determination method specifically includes four steps:

[0054] Step 1: Obtain 5G cell-related data, which may include the manufacturer's network management KPI database, 5G cell engineering parameter database, and 5G cell MR database. The manufacturer's network management KPI database, 5G cell engineering parameter database, and 5G cell MR database can be obtained through the operator's data system, and then associated and corresponded according to the cell CELLID or cell name.

[0055] The manufacturer's network management KPI database usually includes various data related to network performance and operating indicators, which are used to monitor, evaluate and optimize the performance of 5G cells.

[0056] Exemplarily, the manufacturer network management KPI database may include the following data:

[0057] Signal quality data: including signal strength, signal-to-noise ratio, uplink and downlink signal quality, etc.

[0058] Data throughput: includes uplink and downlink data rates, throughput, transmission success rate, etc.

[0059] Cell load: includes the cell load conditions, such as the number of connected users, the number of active users, the number of simultaneously connected devices, etc.

[0060] Interference data: including interference levels between and within cells, channel quality interference, etc.

[0061] Connection and call drop rate: connection establishment success rate, call drop rate, switching success rate, etc.

[0062] Coverage and edge coverage: coverage rate, edge coverage rate, coverage blind spots and other information.

[0063] Capacity management: number of data connections, cell load, spectrum utilization, etc.

[0064] Operator service quality: call quality, data transmission quality, service quality report, etc.

[0065] Fault and event logs: Information about faults, events, and alarms to support troubleshooting and maintenance.

[0066] Manufacturer network management KPI data can help operators and network administrators monitor network operation, track problems and take measures to improve performance and user experience. Different manufacturers and systems may provide different KPIs to meet the needs of specific networks.

[0067] Exemplarily, 5G cell engineering parameter data may include: base station name, cell name, cell CELLID, cell global identity (CGI), latitude and longitude, center frequency, frequency band, physical-layer cell identity (PCI), tracking area code (TAC), station type, scene, etc. Among them, the frequency band may include: 2.6GHZ, 700MHZ, 4.9GHz. An example of engineering parameter data is shown in Table 1 below.

[0068] Table 1 Example of industrial parameter data

[0069]

[0070] Exemplarily, 5G cell MR data may include: MR identification, CGI, NRScSSRSRP (SSB reference signal received power of NR service cell), NRScTadv (NRScTadv is MRO field, calculates user access distance), horizontal angle of incidence (Horizontal AoA, HAOA), vertical angle of incidence (Vertical AoA, VAOA), etc. The CGI of each MR data can be associated and corresponded with the CGI or base station number + CELLID in the engineering parameter data. An example of 5G cell MR data is shown in Table 2 below.

[0071] Table 2 5G cell MR data example

[0072]

[0073] In order to associate and correspond the 5G cell with each PRB data, the network load PRB performance index data can be sorted out. The network load PRB performance index may include: base station name, cell name, average number of uplink Physical Resource Blocks used, number of uplink and downlink available PRBs, average number of downlink Physical Resource Blocks used, number of downlink available PRBs, number of premature handovers, maximum number of RRC connected users, total traffic (GB), etc.

[0074] Illustratively, an example of network load PRB performance indicator is shown in Table 3.

[0075] Table 3 Network load PRB performance indicator example

[0076]

[0077]

[0078] In order to correlate and correspond the 5G cell with each PRB data, it is necessary to obtain the 5G cell beam data. The 5G cell beam data may include: version time, CGI, equipment manufacturer, coverage scenario, beam azimuth, beam downtilt, horizontal beam width, vertical beam width, and antenna type. The 5G cell beam data helps to correlate the characteristics of the 5G cell with the actual PRB data, so as to better understand and analyze network performance and optimize load balancing.

[0079] Exemplarily, examples of 5G cell beam data are shown in Table 4.

[0080] Table 4 5G cell beam data example

[0081] Field Description Field variables Type and length Version time version_time timestamp cgi cgi varchar(30) Equipment manufacturers manufacturer varchar(30) Covering scenes scenario varchar(30) Beam azimuth beam_azimuth integer Beam downtilt beam_downtilt integer Horizontal beam width hor_beam_width integer Vertical beam width vert_beam_width integer Antenna Type antenna_type varchar(30)

[0082] Based on this, by obtaining the manufacturer's network management KPI database, 5G cell engineering parameter database and 5G cell MR database, a rich data source can be obtained, covering multiple aspects of information, including performance indicators, cell parameters, coverage conditions, etc., which helps to fully understand the status of the 5G network.

[0083] By associating and corresponding the data in different databases according to the cell CELLID or cell name, the collaborative use of data is achieved. This association can help network operation and maintenance personnel access and analyze relevant data more easily, improving efficiency. In addition, by integrating and associating data, the consistency and accuracy of the data can be ensured. This helps avoid problems caused by inconsistent or erroneous data, and helps to better manage and optimize 5G networks.

[0084] Step 2: 5G cell load prediction based on LSTM algorithm.

[0085] Currently, capacity adjustment and balancing are mainly performed based on the PRB load status of the current cell, but this method cannot predict the high load problems that may occur in the future, resulting in a negative impact on customer experience. Secondly, this method does not have the ability to dynamically optimize loads and cannot adapt to rapid changes in network loads.

[0086] To solve the above problems, the present invention performs 5G cell load prediction based on LSTM algorithm.

[0087] Specifically, the collected historical data of PRB occupancy at the hourly level of 5G sites can be input into a pre-trained LSTM model, and the input historical PRB data can be used to predict the future PRB occupancy of each 5G cell in a time series to determine whether the 5G site will be overloaded in the future, so as to provide early warning and optimization.

[0088] For example, Figure 2 The LSTM algorithm structure diagram of the present disclosure is shown. The LSTM model can be constructed by the following formulas (1)-(7), where the input data (x t =PRB_Cell_N t ) passes through the input gate (Forget Gate), forget gate (Input Gate) and output gate (Output Gate) in sequence. The result update process after each 5G cell PRB historical data model training is as follows:

[0089] Update the forget gate output:

[0090] f t =sigmoid(W f ·[h t-1 ,PRB_Cell_N t ]+bf ) t ∈[0,1] (1)

[0091] C′=sigmoid(W f ·[h t-1 , PRB_Cell-N t ]+b f )·C t-1 (2)

[0092] Update the first part of the input gate output:

[0093] i t =sigmoid(W i ·[h t-1 ,PRB_Cell_N t ]+b i ) (3)

[0094] Update the second part of the input gate output:

[0095]

[0096] Update the output gate to output the first part:

[0097] o t =sigmoid(W o ·[h t-1 ,PRB_Cell_N t ]+b o ) (5)

[0098] Update the output gate to output the second part:

[0099] h t =sigmoid(W o ·[h t-1 ,PRB_Cell_N t ]+b o )*tanh(C t ) (6)

[0100] Status update output:

[0101]

[0102] Where, t is time; f t is the output value of the forget gate; h t-1 is the output of the hidden layer at the previous moment; PRB-Cell_N t is the input vector at this moment; is the output of cell update, which can be regarded as the information brought by the new input; Ct is the output value of the new state obtained by combining the past information and the new information; Wf , W i , W c , W o and b f , b i , b c , b o All are output dimensions. i, f, c, o are input gate, forget gate, cell state, and output gate, respectively. W and b are the corresponding weight coefficient matrix and bias term, respectively. σ and tanh are sigmoid and hyperbolic tangent activation functions, respectively.

[0103] For example, by introducing an LSTM model to predict the load of the 5G network, using the historical PRB occupancy data of the 5G cell, the PRB occupancy of the 5G cell is predicted by using the input 5G cell PRB data in a time series, and then it is predicted whether the 5G cell will have high or low load problems in the future. Figure 3 An exemplary 5G cell load prediction flow chart of the present disclosure is shown, as shown in Figure 3 As shown:

[0104] The input layer is used to collect hourly PRB data of 5G cells, normalize and aggregate the PRB data, and organize it into time series input data (X1, Y1), (X2, Y2)…(X m , Y n ).

[0105] Specifically, the 24-hour continuous hourly data of the same cell name can be aggregated into daily data, where the hourly and daily data are accessed separately. The hourly PRB data combined with the LSTM model can predict the hourly load plan, that is, the cell can have different load plans at different time periods in a day, realizing "multiple measurements in one day". At the same time, the daily PRB data can be used to predict the daily plan, that is, each cell can have different plans every day from Monday to Sunday, realizing "one test per day". For example, the 7 days of a week can be divided into two dimensions for prediction: working days (Monday to Friday) and non-working days (holidays, weekends). The "one test per day" prediction plan can cope with the regular high load that occurs on weekends. For example, in a day, school dormitories and canteens will have regular high loads during meal times and rest times. The "multiple measurements per day" prediction plan can scientifically cope with the communication load at different time periods every day.

[0106] The hidden layer of LSTM is used to process time series data in 5G cell load forecasting to predict future PRB occupancy. The main role of the hidden layer in LSTM is to maintain and learn long-term dependencies in time series data. It can capture the time dependency in the data and help the model remember the information of previous time points to make accurate predictions in the future.

[0107] In 5G cell load forecasting, the hidden layer of LSTM analyzes historical PRB occupancy data, including hourly data, which changes over time. The hidden layer learns how to establish associations between different time points in order to predict PRB occupancy at future time points. This time series modeling can help the model identify load trends and periodic changes, thereby predicting in advance whether there will be excessive load in the future.

[0108] Iterative training takes the hidden layer as the research object.

[0109] Specifically, first in the LSTM neural network input layer, the original 5G cell RRB data time series is defined as RPB o = {RPB1, RPB2, ..., RPB N}, divide it into training set RPB train = {RPB1, RPB2, ..., RPB M} and test set RPB test ={RPB M+1 , RPB M+2 , …, RPB M+N}. Then all elements PRB in the training set and test set are normalized.

[0110] Furthermore, the time step is set to L, and the training set is cut. The model input after cutting can be expressed as:

[0111] X={X1,X2,…,X L}, X PRB = {PRB′ n , PRB′ n+1 ,…,PRB′ m-L+n+1} (8)

[0112] Then X is input into the LTSM model as training data, and the output of the LTSM output layer can be expressed as:

[0113] F={F1,F2,…,F L}, F n =LSTM forward (X n , C n-1 , H n-1 ) (9)

[0114] Among them, C in formula (9) n-1 and H n-1 is the state and output of the previous LSTM neuron, which can be obtained by formula (7) to formula (6).

[0115] For the loss function in the training process, the root mean square error can be used as the error calculation formula. The training goal is to minimize the loss function. The Adam algorithm can be used to adapt the learning rate of all parameters of the LSTM model (such as W, b, etc.).

[0116] Finally, the trained model is used for prediction. The prediction adopts an iterative process. First, the final output result of the LSTM model is used as the input data. The input data can be expressed by the following formula (10). Input the input data into the trained LSTM model (referred to as LTSM train ), the predicted value at time m+1 is PRB m+1 Delete Data t The value of the first time point in PRB m-L+1 , PRB m+1 With Data t Merge into a new data set. By analogy, the final prediction result can be obtained, and the final prediction result can be expressed by the following formula (11):

[0117] Data t = {PRB′ m-L+1 , PRB′ m-L+2 ,…,PRB′ m2} (10)

[0118] Data PRB = {PRB m+1 , PRB m+2 , …, PRB n} (11)

[0119] The output layer is used to iteratively predict the PRB load of the 5G cell, compare it with the test set data and predict the PRB load of the 5G cell.

[0120] After getting the prediction results, PRB Perform denormalization to obtain the same RPB as the test set test The corresponding prediction sequence can be expressed by the following formula (12):

[0121] Data test ={PRB″ m+1 ,PRB″ m+2 ,…,PRB″ m+n} (12)

[0122] When using the PRB occupancy number of the 5G cell to perform LSTM prediction of future PRBs, the input data can be the PRB acquisition time series of a certain cell, such as the PRB data on the 1st, 2nd, 3rd, 4th, and 5th of a certain month. First, use the LSTM model to predict the PRB load on the 6th, and then use the data on the 1st, 2nd, 3rd, 4th, 5th, and 6th as input to predict the PRB load on the 7th, and continue to predict the future. In this process, since each prediction needs to re-enter the entire sequence. Therefore, in order to improve efficiency, it is possible to consider storing the current information (h, c) at each step to avoid repeating the previous steps, thereby achieving more effective recursive prediction and improving real-time performance and resource utilization efficiency.

[0123] Figure 4 An example diagram showing the LSTM model predicting the number of PRB occupancy in a cell is shown in FIG. Figure 4 As shown in the figure, the LSTM future PRB load prediction is performed based on the PRB occupancy number of 5G cells in a certain experimental area, and the predicted value is basically consistent with the original value.

[0124] Based on this, the LSTM model can capture long-term dependencies in time series, allowing LSTM to comprehensively consider trends and periodicity in historical data when predicting future cell loads, thereby providing more accurate prediction results. In addition, LSTM is dynamic and can continuously update predictions based on the latest data, thereby achieving real-time load forecasting. This helps to promptly identify potential high-load problems and take measures in advance to optimize load, thereby improving customer experience. Training the LSTM model based on different historical data can make the LSTM model adapt to load changes in different cells and regions, enhance the robustness of the LSTM model, and make it suitable for different prediction scenarios.

[0125] Step 3: Calculate the coverage range of the 5G cell beam.

[0126] Exemplarily, the longitude and latitude coordinate data of each grid center point can be calculated through 5G MR data, and the grid center point position is used as the sampling point. Then, the three objects of PRB occupancy number, sampling point grid distribution and 5G beam coverage area at the same historical moment of the cell level are associated and mapped respectively. Combined with the predicted PRB occupancy of each 5G cell and the manufacturer type and station spacing of the site in the cell engineering parameter data, various coverage areas can be derived by trying different 5G base station custom weight beam combinations. Finally, combined with the overlapping area of ​​adjacent cells and the proportion of the total coverage area, the beam adjustable area based on 5G antenna weight optimization in each 5G cell is determined, thereby reducing the iterative rounds of the optimization process and greatly improving the optimization efficiency.

[0127] Among them, in order to determine the relative position of the sampling point and the base station, and to determine which grid to place the sampling point in, a correspondence between the AOA value (incident angle) and the azimuth deviation can be established. By analyzing the 5G cell MR data acquisition results, the adjustable range of the HAOA value can be divided into 72 equal parts, namely AOA00 to AOA71, where each equal part represents a 5-degree angle, with the antenna normal angle as HA0A00. The subdivided HAOA value can be used to indicate the angular position of the user in the cell. For example, Table 5 shows a table of the correspondence between the AOA value and the azimuth deviation:

[0128] Table 5 Correspondence between AOA value and azimuth deviation

[0129] AOA value Azimuth deviation AOA value Azimuth deviation AOA value Azimuth deviation AOA value Azimuth deviation AOA00 5 AOA18 95 AOA36 185 AOA54 275 AOA01 10 AOA19 100 AOA37 190 AOA55 280 AOA02 15 AOA20 105 AOA38 195 AOA56 285 AOA03 20 AOA21 110 AOA39 200 AOA57 290 AOA04 25 AOA22 115 AOA40 205 AOA58 295 AOA05 30 AOA23 120 AOA41 210 AOA59 300 AOA06 35 AOA24 125 AOA42 215 AOA60 305 AOA07 40 AOA25 130 AOA43 220 AOA61 310 AOA08 45 AOA26 135 AOA44 225 AOA62 315 AOA09 50 AOA21 140 AOA45 230 AOA63 320 AOA10 55 AOA28 145 AOA46 235 AOA64 325 AOA11 60 AOA29 150 AOA47 240 AOA65 330 AOA12 65 AOA30 155 AOA48 245 AOA66 335 AOA13 70 AOA31 160 AOA49 250 AOA67 340 AOA14 75 AOA32 165 AOA50 255 AOA68 345 AOA15 80 AOA33 170 AOA51 260 AOA69 350 AOA16 85 AOA34 175 AOA52 265 AOA70 355 AOA17 90 AOA35 180 AOA53 270 AOA71 360

[0130] Since HAOA reflects the counterclockwise offset value with reference to the true north direction, in actual optimization and adjustment, it is necessary to adjust the counterclockwise result to the clockwise result before performing optimization. For example, when the location with the largest number of users corresponds to HAOA 300 degrees, it means that the actual location is around 60 degrees.

[0131] In order to facilitate subsequent calculation and analysis, the input MRO (Measurment Report Object) sampling point-level data can be rasterized.

[0132] Specifically, grid construction can take stereo into account, that is, create multiple layers in the vertical dimension to capture information at different heights. This is very useful for multi-level coverage and multi-level network optimization in 5G networks. Each three-dimensional grid layer can represent a different height range to provide a more comprehensive understanding of signal coverage and interference.

[0133] Secondly, user information mapping can be achieved by matching user location data with grid coordinate data. This helps determine the distribution of users within each grid, so that the service quality of different users can be evaluated later.

[0134] Finally, hierarchical spatial raster data is output, that is, the raster data is further divided into different levels to distinguish different types of information. For example, you can create a level for coverage information, another for interference information, and another for user distribution data. This helps to analyze and visualize network performance more clearly.

[0135] For example, Table 6 shows 5G MR example data, and Table 7 shows 5G cell grid modeling output example data:

[0136] Table 6 5G MR example data

[0137]

[0138] Table 7 5G cell grid modeling output sample data

[0139]

[0140]

[0141] By measuring the horizontal arrival angle mr.haoa and the vertical arrival angle mr.vaoa, a spatial grid is established according to the following conversion formula, and MR is converted into longitude and latitude. MR is mapped using point projection, and the grid data is hierarchically classified to achieve data modeling. TA: Timing Advance.

[0142] First, obtain all sampling point-level MRO data of a cell in one day, process the MRO raw data, and obtain the timing advance (TA):

[0143] TA=(NRScTadv*39+(NRScTadv+1)*39) / 2 (13)

[0144] Among them, NRScTadv is the MRO field, and the above formula (13) is applicable to 2.6GHz cells

[0145] Base station reference signal level strength (Reference Signal Received Power, RSRP):

[0146] RSRP j =NRScSSRSRP-157 (14)

[0147] Among them, NRScSSRSRP is the SSB reference signal received power of the NR service cell, which can assist in evaluating the effective grid coverage.

[0148] Then, after obtaining the haoa, vaoa, and TA calculated for a cell, the maximum and minimum values ​​of each field are obtained, and the MRO data is aggregated into grid data based on a step size of 5° for haoa, 1° for vaoa, and 20m for TA, and the CGI, grid center HAOA, grid center VAOA, grid center TA, number of sampling points in the grid, and average RSRP fields in the grid are output.

[0149] Based on this, rasterizing the sampled data can provide more information and clearer network analysis tools, which can help optimize 5G network performance and provide better user experience. These rasterized data can provide strong support for network planning, optimization and troubleshooting.

[0150] After the MRO data is rasterized, the rectangular coordinates of the grid center can be calculated. Figure 5 The schematic diagram of 5G MR sampling point coverage and antenna angle is shown in Figure 1. Figure 5 As shown in FIG. 1 , assuming that the physical downtilt angle of the antenna is β, the antenna height is H, and the sampling point height is h2, the sampling point height h2 can be calculated using the following formulas (15)-(18):

[0151] α=VAOA (15)

[0152] φ=α+β (16)

[0153] h1=TA*sinφ (17)

[0154] h2=H-h1 (18)

[0155] Furthermore, in order to map the sampling points to the grid, the latitude and longitude coordinates of the sampling points need to be calculated. Figure 6 FIG. 4 shows a schematic diagram of the angle between the 5G MR sampling grid points and the antenna. Figure 6 As shown, the calculation method of the longitude and latitude (long1, lat1) of the 5G cell MR sampling point can be expressed by the following formulas (19)-(21):

[0156] ω=γ+θ (19)

[0157]

[0158]

[0159] Among them, R1 and R2 are constants related to the radius of the earth, generally R1=111320 and R2=110540; γ is the total azimuth of the antenna, including the mechanical azimuth and the electronic azimuth; (long0, lat0) is the longitude and latitude of the antenna.

[0160] Furthermore, through the longitude and latitude coordinate conversion formula, the longitude and latitude coordinates can be converted into the two-dimensional rectangular coordinates (x, y) of each grid center point. Thus, the grid can be drawn on the plane and subsequent analysis can be performed, such as network performance evaluation, interference analysis, and user distribution visualization. This step can be expressed by the following formulas (22)-(23):

[0161] x=lon*20037508.34 / 180 (22)

[0162]

[0163] Based on this, the purpose of rasterizing the MRO data and calculating the rectangular coordinates of the grid center is to better obtain 5G network performance, signal coverage, interference, and user distribution.

[0164] By mapping the sampling points to a grid and calculating the coordinates of the grid center, a spatial raster dataset can be created to visualize network performance and user distribution in geographic space. This helps network engineers, planners, and operators understand the status of the network more clearly. Raster data provides high-resolution network performance information, making network planning and optimization more targeted. Areas with insufficient signal coverage can be determined, interference sources can be accurately identified, and base station placement can be optimized to meet user needs. Secondly, raster data can also locate interference sources and identify areas with severe interference. This helps to take measures to reduce interference and improve network performance. In addition, raster data can be used to analyze user distribution and signal strength in different regions to improve user experience and ensure high-quality communication services.

[0165] 5G antenna weight optimization solutions can include: default weight beam solution and custom weight beam solution. The default weight beam solution is provided by mainstream equipment manufacturers and is suitable for common coverage scenarios, but lacks accuracy when facing complex and diverse scenarios. The custom weight beam solution provides a larger weight adjustment space, including sub-beam level weight adjustment, which can be used to finely optimize complex and diverse scenarios.

[0166] By customizing the weighted beam scheme, more flexible weight configuration can be achieved, including parameters such as horizontal beam width, vertical beam width, and beam direction angle. By adjusting these parameters, different beams can be defined, which affects the coverage range and direction of the antenna. Therefore, the configuration of antenna weights is closely related to the range of horizontal beam width and azimuth angle, which can achieve more accurate coverage and optimization.

[0167] For example, Figure 7 The figure shows the combination of multi-vendor multi-beam solutions. Figure 7 As shown in the figure, manufacturer 1 provides a default beam solution and a custom beam solution. In the custom beam solution, manufacturer 1 provides two sub-solutions, namely the 1+X beam solution and the M+N beam solution. Manufacturer 2 provides a default beam solution and a custom beam solution, and the custom beam solution it provides is the M+N beam solution. Beam solutions from different manufacturers can be combined according to actual needs to meet specific coverage and capacity requirements.

[0168] Exemplarily, the antenna beam configuration library can be determined according to different manufacturers and their corresponding beam schemes. The antenna beam configuration library may contain scene types, as well as antenna radiation patterns (Pattern), horizontal beam width, vertical beam width, downtilt angle adjustment range, and azimuth angle adjustment range corresponding to the scene types. The antenna beam configuration library collects and organizes the beam configuration information of each manufacturer so that network operators or optimizers can select the most suitable beam configuration according to their network requirements. Exemplarily, Table 8 shows an example of an antenna beam configuration library:

[0169] Table 8 Antenna beam configuration library example

[0170]

[0171] Exemplarily, after obtaining the two-dimensional coordinates of each grid center point, the allowable adjustment range within the 5G cell can be determined.

[0172] The allowable adjustment range within a 5G cell refers to the adjustment of the coverage range of the 5G cell without degrading the performance of the 5G cell. In the process of optimizing the contiguous 5G cells, the allowable adjustment range can be limited in advance by considering factors such as the station spacing with adjacent cells and the site height of adjacent cells, so as to avoid serious problems such as 5G cell cross-area coverage, 5G site coverage holes, and a sharp increase in 5G site interference after adjustment. Figure 8 A schematic diagram showing the allowable adjustment range determination within a 5G cell is shown.

[0173] For example, Fig. 9 The figure shows the antenna downtilt angle and antenna coverage diagram. Fig. 9 As shown, the overlapping coverage area of ​​the neighboring cells in the opposite direction can be calculated according to the height of the adjacent sites, the site spacing and the beam coverage range. This step can be expressed by the following formulas (24)-(26):

[0174] Cell coverage radius D radius =H / [tan(α+β)-tan(5)] (24)

[0175] Cell coverage area S total =π{H / [tan(α+β)-tan(5)]} 2 ×N / 360 (25)

[0176] Overlapping coverage area S of the cells over =π{H×tan(95-α-β)} 2 ×N / 360-π{H / [tan(α+β)-tan(5)]} 2 ×N / 360 (26)

[0177] Among them, antenna downtilt angle (α+β) = arc tan (H / D) + vertical half-power angle / 2, antenna downtilt angle refers to the angle between the antenna and the vertical direction (mechanical angle α) plus the electronic downtilt angle (β); H is the antenna height, D is the cell coverage radius; vertical half-power angle refers to the vertical half-power angle of the antenna, and the vertical half-power angle of the antenna is generally 10 degrees; antenna downtilt angle, electronic downtilt angle and station height can all be obtained from 5G cell engineering parameter data; N is the antenna horizontal lobe width; S over Overlapping coverage area.

[0178] Exemplarily, the vertical beam width and downtilt angle value range of the cell can be confirmed based on the overlapping coverage ratio, the overlapping coverage of the non-opposing adjacent cells can be calculated, and the horizontal beam width and azimuth angle value range of the cell can be confirmed. This step can be expressed by the following formulas (27)-(29):

[0179]

[0180] Q1={x|x=[vbw i , tilt i ],i∈n,a≤p o ≤b} (28)

[0181] Q2={y|y=[hbw i ,azimuth i ],i∈n,p n =0} (29)

[0182] Where p is the overlap coverage; S over is the overlapping coverage area; S total The total coverage area of ​​this cell; Q1 is the set of vertical beams and downtilt angles for confirming the direction of the attack; p o is the overlapping coverage ratio in the hitting direction; vbw i is the vertical beam width of the ith cell; tilt i is the downtilt angle of the ith cell; Q2 is the overlapping coverage between the left and right adjacent cells; hbw i is the horizontal wave width of the ith cell; azimuth i is the azimuth of the ith cell; p n is the overlapping coverage ratio in adjacent directions.

[0183] Based on this, by calculating the longitude and latitude coordinates of each grid center point and associating and mapping with 5G MR data, the solution can provide more accurate spatial information, which helps to achieve a more accurate analysis of network performance and coverage. The cell-level historical PRB occupancy data, the grid distribution of sampling points, and the beam coverage area are comprehensively associated and mapped to draw a comprehensive network performance diagram, which helps engineers to fully understand the network situation. At the same time, by trying different 5G base station custom weight beam combinations to meet the needs of different geographical areas and scenarios. By determining the adjustable beam area based on the 5G antenna weight optimization, the number of iterations in the optimization process is reduced and the optimization efficiency is improved. This helps to reduce the workload of engineers and speed up the improvement of network performance.

[0184] Step 4: Particle swarm performs optimal search in the solution space.

[0185] In practical applications, the main indicator for measuring network load is the PRB utilization of the cell. This paper predicts the future PRB occupancy of 5G cells and the total number of PRBs in the cell through the LSTM model, and calculates the future PRB utilization of 5G network cells. By calculating the mean square error of the PRB utilization of each 5G cell, the balance of the network load can be measured. The smaller the mean square error of PRB utilization, the more evenly the load is shared between cells, which is one of the goals of optimizing network performance.

[0186] Through the particle swarm algorithm, the optimal weight configuration can be searched in the solution space to minimize the mean square error of PRB utilization, thereby achieving load balancing. If after the initial optimization, it is found that the mean square error of PRB utilization still does not meet the requirements, the particle swarm algorithm can be used for continuous optimization again to continuously improve the beam weight configuration until the required network performance and load balancing are achieved. Once the load capacity balancing solution corresponding to the minimum mean square error of PRB utilization is found, the optimal beam balancing solution can be determined, thereby optimizing the load distribution between cells to achieve network load balancing.

[0187] Exemplarily, the 5G beam optimization objective formula can be expressed by the following formula (30):

[0188]

[0189] Among them, target is the 5G beam optimization target, prb i is the prb utilization rate of the ith cell, prb avg It is the average value of PRB utilization of 5G cells in a contiguous area.

[0190] Exemplarily, the pairing mapping model of 5G MR users and beam coverage areas can be used to calculate two benchmark values, namely, the number of PRB occupancy per grid and the number of MR users per grid, based on the grid area. The two benchmark values ​​include: the number of PRB occupancy and the number of MR users per grid. In the optimization process, the coverage area of ​​each beam is calculated according to different beam candidate schemes. Based on the coverage area and the grid benchmark value, the number of PRB occupancy for each beam is estimated, and the PRB occupancy reflects the resource occupancy under different beam configurations. By comparing the estimated PRB occupancy with the benchmark value, the estimated PRB utilization can be calculated, and the PRB utilization is the effective utilization of network resources. The mean square error of the PRB utilization of all grids is calculated to measure the load balancing degree of the network. The smaller the mean square error of PRB utilization, the more uniform the resource allocation of the network and the more stable the network performance.

[0191] The specific calculation process may include:

[0192] Cell coverage radius D radius It can be expressed by the following formula (31):

[0193] D radius =H / [tan(α+β)-tan(5)] (31)

[0194] Cell coverage area S total It can be expressed by the following formula (32):

[0195] S total =π{H / [tan(α+β)-tan(5)]} 2 ×N / 360 (32)

[0196] For example, a horizontal grid of m*m can be set (m represents the length, which can be set according to the actual situation, such as m is 50 meters, that is, a grid of 50 meters*50 meters is set), and the grid area is S g =m 2 , the number of grids in the cell coverage area is equivalent to N g Grid number N g It can be expressed by the following formula (33):

[0197] N g =S tota / S g (33)

[0198] Among them, the antenna downtilt angle (α+β) = arctan(H / D) + vertical half-power angle / 2, the antenna downtilt angle refers to the angle between the antenna and the vertical direction (mechanical angle α) plus the electronic downtilt angle (β); H is the antenna height; D refers to the cell coverage radius; the vertical half-power angle refers to the vertical half-power angle of the antenna, and the vertical half-power angle of the antenna is generally 10 degrees; the antenna downtilt angle, electronic downtilt angle and station height can be obtained from 5G engineering parameter data; N is the horizontal lobe width of the antenna.

[0199] By obtaining the PRB historical data of a certain time range in the cell history, the PRB occupancy number of the cell can be obtained, which is recorded as P l By obtaining the historical MR data of the cell within a certain time range, the number of MR users in the cell can be obtained, denoted as U l ; Through the obtained cell engineering parameter data, the total number of PRBs in the cell can be known g .

[0200] Number of PRBs occupied per grid It can be expressed by the following formula (34):

[0201]

[0202] Number of MR users per grid It can be expressed by the following formula (35):

[0203]

[0204] Different beam candidate solutions in the optimization process can be different combinations of azimuth angle, downtilt angle, sub-beam horizontal beam width, and sub-beam vertical beam width. For different beam candidate solutions, the coverage area S of the cell can be calculated according to formulas (31) and (32): total , the grid number N corresponding to the beam candidate solution is calculated by formula (33) g In this embodiment, the default number of PRBs occupied per grid is and the number of MR users per grid Keeping the same, the PRB occupancy number P′ corresponding to the beam candidate solution can be calculated by the following formula (36):

[0205]

[0206] The PRB utilization rate prb′ can be estimated by the following formula (37):

[0207] prb′=P / PRB g (37)

[0208] Furthermore, the PRB utilization mean square error target is calculated by the above formula (30).

[0209] For example, the number of covered MR users U = the number of MR users per grid *Number of grids g ,Right now:

[0210]

[0211] For example, Fig.10 The schematic diagram of the beam optimization objective principle is shown in FIG. Fig.10 As shown in the figure, the goal of beam optimization is to minimize the mean square error of PRB utilization while covering as many users as possible in the 5G cell, so as to achieve load balancing between cells. At the same time, within the beam coverage area, the more sampling points after 5G MR conversion, it does mean that there are more MR users per grid in the cell and more target covered MR users, where more sampling points represent more user data. Within the beam coverage area, the more PRBs are occupied, the more PRBs are occupied per grid in the cell, and the smaller the mean square error of the target PRB utilization.

[0212] Exemplarily, the objective function value f(t) of the contiguous region optimization is expressed by formula (39):

[0213]

[0214] in, is the mean square error of PRB utilization in the contiguous area; prb i is the prb utilization rate of the ith cell; prb avg is the average value of PRB utilization of 5G cells in a contiguous area; Indicates the number of users covered in the contiguous area; U i is the number of MR users covered in the i-th cell; wl and w2 represent the mean square error of PRB utilization and the weight of the number of MR covered users, respectively, w1+w2=100%.

[0215] For example, the particle swarm algorithm can be introduced to find the best antenna weight combination to achieve maximum user coverage and load balancing in 5G cells. The particle swarm algorithm optimizes the beam configuration by searching for the best configuration in the antenna weight parameter space to adjust the weight combination according to the objective function and constraints to achieve the required performance in the actual network. This can improve the coverage and resource utilization efficiency of the network while ensuring load balancing between cells.

[0216] The speed and position of each particle in the particle swarm algorithm can be expressed by the following formulas (40)-(41):

[0217] v i (t+1)=ω*v i (t)+c1*rand()*(Pi (t)-x i (t))+c2×rand()×(G(t)_x i (t)) (40)

[0218] x i (t+1)=x i (t)+v i (t+1) (41)

[0219] Where: V i (t) is the velocity of the particle at the beginning of the tth iteration, X i (t) is the position vector of the particle at the beginning of the t-th iteration, i = 1, 2, ..., N, N is the number of particles in this particle group; P i (t) represents the best historical solution of the particle itself; G(t) represents the best historical solution of the particle group; X i represents the position vector corresponding to the optimal value of the contiguous area optimization objective function f(t); ω is the inertia factor, which determines the degree of influence of the previous velocity of the particle on the current velocity, thereby balancing the global search and local search capabilities of the algorithm; c1 and c2 represent learning factors, which are two non-negative values ​​that enable particles to have cognitive ability and the ability to learn from excellent individuals in the group, and to approach the individual optimal point and the group optimal point; rand() is a random number between (0, 1).

[0220] ω can be calculated using a linear decreasing weight strategy, namely:

[0221]

[0222] Among them, t∈[1,T], T is the maximum number of iterations.

[0223] The particle speed is limited to a range [V min , V max ]Inside, V max is a constant that limits the maximum value of the speed. That is, if v i Greater than V max , then v i =V max , if v i Less than V min , then v i =V min .

[0224] For example, Fig.11 The particle swarm 5G beam equalization solution optimization flow chart is shown as follows: Fig.11 As shown, the particle swarm 5G beam equalization solution optimization method may include the following steps:

[0225] Step S1101: input the cell to be adjusted.

[0226] Exemplarily, the input data may include: N weight combinations corresponding to M cells and the number of PRB occupancy.

[0227] Step S1102: Initialize particle swarm algorithm parameters.

[0228] Exemplarily, the particle swarm algorithm parameters may include initializing the particle swarm individuals, the number of particle numbers corresponding to the number of weight combinations, the position vector dimension d, the acceleration constants c1 and c2, the inertia coefficient w, the random function rand(), and the maximum number of iterations T. Among them, the position vector dimension d = M*K, M is the number of cells to be adjusted, k is the number of beam parameters, and currently there are 4 beam parameters: azimuth, downtilt, horizontal beam width, and vertical beam width, that is, k = 4. The initial setting values ​​corresponding to other parameters are shown in Table 9:

[0229] Table 9 Initial setting values ​​of particle swarm algorithm parameter settings

[0230] Parameter name Initial setting value The number of particles in the particle swarm N 100 Maximum number of iterations T 1000 Learning factor c1 2 Learning factor c2 2 Maximum inertia factor ω_max 0.9 Minimum value of inertia factor ω_min 0.4 Maximum speed Vmax 10 Minimum speed Vmin -10

[0231] Step S1103: Obtain the initialization position vector x of each particle from the weight combination sub-library i and the velocity vector v i .

[0232] Exemplarily, the initialization position vector x of each particle is obtained from the weight combination sub-library i and the velocity vector v i Through the advance processing of the adjustable space of the previous weight combination full library, the antenna weight combination sub-library is obtained, and then the weight combination is obtained from the antenna weight combination sub-library and assigned to the position vector x(i) of each particle for assignment. Use random numbers to initialize the velocity vector v i .

[0233] The weight combination sub-library is a pre-built library that contains various possible antenna weight combinations, which represent different beam configuration schemes. The weight combination sub-library is usually constructed by discretizing and combining the adjustable range of the weight parameters. Each weight combination corresponds to a possible beam configuration.

[0234] The random initialization of the velocity vector is to ensure that the algorithm explores a variety of solutions in the search space, which increases the chances of the algorithm finding the global optimal solution rather than just the local optimal solution.

[0235] Based on this, by using the weight combination sub-library and random initialization, each particle is assigned an initial beam weight combination. Next, the particle swarm algorithm begins to iterate, continuously updating the position and velocity of the particles according to the objective function and algorithm rules to find the optimal beam configuration.

[0236] Step S1104: For each particle i, calculate the objective function value f(t) according to the position vector x(t).

[0237] In the embodiment, the position vector x(t) includes the cell weight combination information, and the beam coverage area of ​​the cell antenna weight can be calculated based on the cell weight combination information, and the beam coverage area can be calculated by formulas (24) and (25).

[0238] For each cell, the PRB utilization of the cell can be simulated and calculated according to its beam configuration. The mean square error of the current PRB utilization of the M cells can be calculated according to the above formulas (30), (31) and (32).

[0239] The number of 5G MR users within the coverage area can be calculated according to the above formulas (37) and (38).

[0240] The mean square error of PRB utilization and the number of MR users within the coverage area are weighted and standardized according to formula (39) to obtain the objective function value f(t). The mean square error of PRB utilization and the number of 5G MR users within the coverage area are weighted to reflect the importance of different performance indicators. Then, standardization is performed to ensure that they are on the same scale for reasonable comparison.

[0241] By calculating the objective function value f(t), the particle swarm algorithm can compare between different beam configurations and select the most promising beam weight combination to optimize the performance of the cell and achieve beam balancing and network load balancing.

[0242] Step S1105: For each particle i, calculate the historical optimal value of f(t) and record the corresponding position vector as P i (t).

[0243] In the embodiment, for each particle i, the historical optimal value of f(t) is calculated and the corresponding position vector is recorded as P i (t). In each round of iteration, for each particle, its objective function value is compared with the local historical optimal value. If the current objective function value is better than the local historical optimal value, the corresponding position vector x(t) is used as the current best position pbest.

[0244] Step S1106: Calculate the historical optimal values ​​of all particles and record the corresponding position vector as G(t).

[0245] In the embodiment, the historical optimal values ​​of all particles are calculated, and the corresponding position vector is recorded as G(t). For all particles, their objective function values ​​are compared with the global historical optimal values. If the current objective function value is better than the global historical optimal value, the corresponding position vector x(t) is used as the current best position gbest.

[0246] In each round of iteration, the particle compares the current objective function value with the global historical optimal value. If the current performance is better, the current position vector x(t) will become the global historical optimal value gbest, thereby guiding the entire particle swarm to move in a more promising direction to find the global optimal solution.

[0247] Step S1107: Update the particle position vector x(i) and velocity vector v(i).

[0248] Exemplarily, the particle updates its velocity and position using equations (43) and (44).

[0249] v i (t+1)=ω*v i (t)+c1*rand()*(P i (t)-x i (t))+c2×rand()×(G(t)-x i (t)) (43)

[0250] x i (t+1)=x i (t)+v i (t+1) (44)

[0251] Step S1108: Determine whether the maximum number of iterations T has been reached. If the maximum number of iterations T has not been reached, return to step S1104; if the maximum number of iterations T has been reached, execute step S1109 to output the optimal weight combination.

[0252] In the embodiment, it is determined whether the maximum number of iterations is reached. If the number of iterations T is not reached, the process returns to step S1104. If the maximum number of iterations is reached, step S1109 is executed to output the best position gbest. The weight combination corresponding to the best position gbest is the optimal weight combination, that is, the optimal weight combination is finally obtained in the contiguous area, which makes the number of users covered by the cell as large as possible and the mean square error of PRB utilization as small as possible. This weight combination can achieve load balancing between cells.

[0253] In the particle swarm algorithm, a maximum number of iterations T is usually set to control the algorithm running time and the number of iterations.

[0254] Step S1109: output the optimal weight combination.

[0255] The best position gbest contains the optimal weight combination, that is, the optimal weight configuration in the contiguous area is found to achieve load balancing between cells, cover as many users as possible in the cell and reduce the mean square error of PRB utilization.

[0256] Based on this, by using the weight combination sub-library and random initialization, each particle is assigned an initial beam weight combination. Next, the particle swarm algorithm begins to iterate, and according to the objective function and algorithm rules, the particle position and velocity are continuously updated to find the best beam configuration. In each round of iteration, by comparing the current objective function value corresponding to each particle with the global historical optimal value, the entire particle swarm is guided to move in a more promising direction to find the global optimal solution.

[0257] In addition, the particle swarm algorithm has the characteristics of simple implementation and strong parallel processing capabilities, making it easy to deploy and capable of handling large-scale networks. Therefore, it is suitable for 5G beam equalization scenarios that balance the number of covered users and reduce the mean square error of PRB utilization. The particle swarm algorithm gradually converges to the optimal solution through iteration, reducing manual intervention and helping to improve 5G network performance and resource utilization efficiency.

[0258] In order to further prove the effectiveness of the antenna parameter determination method proposed in the present disclosure, the 5G antenna beam load balancing strategy is verified in the current network in this embodiment. Specifically, a 5G macro station area is selected from the current network. The number of 5G cells in the test area is 102, and the coverage scenario is the core urban area. The load balancing strategy is applied, the beam scheme is calculated for the 5G site, the 5G beam balancing scheme is output, and the current network is modified. The average daily 5G traffic, average daily number of users, busy hour PRB utilization, PRB mean square error and other indicators of the 5G cell before and after the modification are compared, and their changes are observed. The verification results are shown in Table 10.

[0259] Table 10 5G antenna beam load balancing solution live network verification results

[0260]

[0261]

[0262] It can be seen from Table 10 that after the antenna parameters are applied in the test area, the total uplink and downlink traffic increases by 3.70%, the number of 5G cells with overload and underload decreases significantly, the uplink PRB utilization mean square error decreases by 8.1, and the downlink PRB utilization mean square error decreases by 7.26, indicating that the 5G network achieves capacity balance between cells while maintaining the original coverage level, effectively reducing the frequency of high-load and low-traffic cells, thereby further improving the quality of the 5G network.

[0263] One or more technical solutions provided in the exemplary embodiments of the present disclosure provide a method for determining antenna parameters. By collecting historical data on the number of PRB occupancy at the hourly level in 5G sites and combining it with the LSTM model, the tidal law within the time series period of the 5G cell is found, and the PRB occupancy of future 5G sites is predicted to determine whether the 5G site will have problems with overload in the future, thereby raising early warnings and optimizations. Using the predicted number of PRB occupancy and the total number of PRBs in the cell, the PRB utilization rate of the cell is calculated, and then the coverage range of the 5G cell beam is confirmed based on the manufacturer type and station spacing of the site in the cell engineering parameter data, combined with the geographical distribution of the grid longitude and latitude of the 5G MR data sampling points. Finally, a particle swarm is used to perform contiguous optimization to find the capacity balancing solution corresponding to the minimum mean square error of PRB utilization.

[0264] Therefore, the antenna parameter determination method provided in the exemplary embodiment of the present disclosure solves the problem of untimely adjustment of 5G network parameters due to the inability to predict future capacity load changes. At the same time, the method ensures that the 5G network signal can cover as many users as possible, and the mean square error of PRB utilization is as small as possible, so as to achieve load balancing between cells to meet the complex and diverse actual network coverage requirements, thereby improving the communication quality of the 5G network and meeting the user's demand for high-quality communication services.

[0265] Based on the above embodiments, the present disclosure also provides a method for determining antenna parameters. Fig.12 A flow chart of a method for determining antenna parameters according to an exemplary embodiment of the present disclosure is shown. Fig.12 As shown, the method may include the following steps:

[0266] Step S1210: Acquire PRB history data of the target cell, and predict PRB occupancy information of the target cell based on the PRB history data.

[0267] In an embodiment, the target cell may be a 5G cell that needs to improve the load balancing of the communication network. The PRB historical data of the target cell may refer to information about the PRB usage of the target cell in the past period of time collected and stored from the communication network. These data include information such as the allocation and utilization of PRBs, the occupancy rate of PRBs, and possible load fluctuations. The PRB historical data can provide an in-depth understanding of the PRB utilization of the target cell in different historical time periods, so as to perform subsequent load balancing and performance optimization.

[0268] In an embodiment, the PRB historical data can be accessed at the hourly level, daily level, weekly level or other time scales to predict the PRB occupancy information of different time scales in the future. For example, when the PRB historical data is accessed at the hourly level, the PRB occupancy information at the hourly level can be predicted to achieve "multiple measurements in one day". For example, during a day, school dormitories and canteens will have regular high loads during meal times and rest times. The prediction scheme of "multiple measurements in one day" can scientifically cope with the communication loads in different time periods every day. When the PRB historical data can be accessed at the daily level, the PRB occupancy information at the daily level can be predicted to achieve "one measurement per day". For example, among the 7 days of a week, it can be divided into two dimensions of prediction: working days (Monday to Friday) and non-working days (holidays, weekends). Each cell can have different schemes every day from Monday to Sunday. The prediction scheme of "one measurement per day" can cope with the regular high loads that occur on weekends.

[0269] Predicting the PRB occupancy information of the target cell based on PRB historical data means using the temporal data and temporal change trends in the historical data to estimate the future PRB usage, so as to help network operators make better network resource planning and adjustment decisions and ensure that users obtain high-quality communication services.

[0270] Step S1220: when it is determined based on the PRB occupancy information that there is an area to be optimized in the target cell, a target antenna weight combination is determined from the candidate antenna weight combinations; wherein the PRB utilization mean square error of the target antenna weight combination is smaller than that of the remaining antenna weight combinations in the candidate antenna weight combinations.

[0271] In an embodiment, a target threshold may be formulated. When the PRB occupancy information reaches the target threshold, it may be considered that there is a high load problem in the period, and it may be determined that there is an area to be optimized in the target cell. The area to be optimized is an area whose PRB occupancy needs to be optimized to improve network performance, reduce congestion, or meet different communication requirements.

[0272] In the embodiment, in order to improve the load balancing of the target cell, multiple candidate antenna weight combinations may be defined, which may include different configurations of parameters such as horizontal and vertical beam widths, beam direction angles, downtilt angles, and beam numbers.

[0273] In an embodiment, the mean square error of PRB utilization can be used to measure the effects of different candidate antenna weight combinations. The mean square error of PRB utilization can be obtained by calculating the utilization of each PRB in the target cell and comparing it with the antenna weight combinations before and after optimization.

[0274] After calculating the mean square error of PRB utilization of different candidate antenna weight combinations, the combination with the smallest mean square error of PRB utilization can be selected as the target antenna weight combination. The target antenna weight combination can be considered to provide the best performance and load balancing in the current situation.

[0275] Step S1230: adjusting antenna parameters of the target base station corresponding to the target cell based on the target antenna weight combination.

[0276] In an embodiment, after determining the target antenna weight combination, the antenna parameters of the target base station corresponding to the target can be adjusted according to the target antenna weight combination, such as the direction of the antenna, beam width, downtilt angle and other parameters. The adjustment method may include: sending a corresponding configuration command to the target base station to change specific parameters. The adjustment process may involve multiple rounds of iterations to achieve optimal performance. After the adjustment is completed, the network performance can be evaluated. The evaluation means may include monitoring PRB occupancy, throughput, coverage and user experience again. The evaluation results can be used to verify the effect of the parameter adjustment.

[0277] One or more technical solutions provided in the embodiments of the present disclosure obtain the PRB historical data of the physical resource block of the target cell, and predict the PRB occupancy information of the target cell based on the PRB historical data; when it is determined that there is an area to be optimized in the target cell based on the PRB occupancy information, a target antenna weight combination is determined from the candidate antenna weight combinations; wherein the mean square error of the PRB utilization of the target antenna weight combination is less than that of the remaining antenna weight combinations in the candidate antenna weight combinations; and the antenna parameters of the target base station corresponding to the target cell are adjusted based on the target antenna weight combination. The antenna parameter determination method provided in the present disclosure predicts the future PRB occupancy information of the target cell through the PRB historical data, so as to adjust the parameters in advance to adapt to the future capacity load changes. By screening out the target antenna weight combination with the smallest mean square error of PRB utilization from multiple candidate antenna weight combinations, and adjusting the antenna parameters based on the target antenna weight combination, the adaptive optimization of the antenna weight combination is realized, the load balancing of the communication network is improved, and the effective utilization of network resources is ensured.

[0278] Based on the above embodiment, in another embodiment provided by the present disclosure, the above step S1220 may include:

[0279] Calculate the signal coverage areas corresponding to the multiple candidate antenna weight combinations;

[0280] Determine the beam adjustable area of ​​the target cell based on the PRB occupancy information and multiple signal coverage areas;

[0281] By using a particle swarm algorithm, a target adjustment region is determined in a beam adjustable region, and a target antenna weight combination for adjusting the target adjustment region is determined from candidate antenna weight combinations.

[0282] In an embodiment, the definition of multiple candidate antenna weight combinations may include: a default weight beam scheme and a custom weight beam scheme. The default weight beam scheme is provided by mainstream equipment manufacturers and is suitable for common coverage scenarios, but lacks accuracy when facing complex and diverse scenarios. The custom weight beam scheme provides a larger weight adjustment space, including sub-beam level weight adjustment, which can be used to finely optimize complex and diverse scenarios.

[0283] Among them, a more flexible weight configuration can be achieved through the custom weight beam scheme, which includes parameters such as horizontal beam width, vertical beam width, and beam direction angle. By adjusting these parameters, different beams can be defined, thereby affecting the coverage range and direction of the antenna. Therefore, the configuration of antenna weights is closely related to the range of horizontal beam width and azimuth angle, which can achieve more accurate coverage and optimization.

[0284] For example, the above Figure 7 and its related contents explain the corresponding different beam scheme combination schemes among different manufacturers. Table 8 and its related contents explain the method of determining the antenna beam configuration library according to different manufacturers and their corresponding beam schemes, wherein the antenna beam configuration library contains multiple candidate antenna weight combinations.

[0285] In the embodiment, after determining a plurality of candidate antenna weight combinations, the signal coverage area of ​​the target base station corresponding to the target cell can be estimated according to the parameters such as Pattern, horizontal beam width, vertical beam width, downtilt angle adjustment range and azimuth angle adjustment range in the candidate antenna weight combinations. Furthermore, according to the PRB occupancy information and these signal coverage areas, the beam adjustable area of ​​the target cell is determined.

[0286] In the beam adjustable area, the target adjustment area can be found by particle swarm algorithm, where the target adjustment area needs to meet the target condition. In this embodiment, the target condition is to minimize the mean square error of PRB utilization on the basis of maximizing the number of covered users. Finally, the corresponding target antenna weight combination is determined according to the target adjustment area.

[0287] The purpose of this process is to improve the performance and load balancing of the target cell by optimizing the antenna weight combination. This method can be used in 5G networks to achieve better network performance and resource utilization according to different requirements and conditions.

[0288] Based on the above embodiment, in another embodiment provided by the present disclosure, the above step of determining the beam adjustable area of ​​the target cell based on the PRB occupancy information and multiple signal coverage areas may include:

[0289] Obtain the measurement report MR data of the target cell and the current signal coverage area;

[0290] Based on the MR data, the PRB occupancy information and the current signal coverage area are respectively rasterized to obtain the association information of the PRB occupancy information and the current signal coverage area corresponding to each grid;

[0291] A beam adjustable area of ​​the target cell is determined based at least on the associated information.

[0292] In the embodiment, the MR data of the target cell and the current signal coverage area are obtained to analyze the network performance and resource utilization. Rasterization is to divide the geographical area into small blocks so as to understand the performance of different regions in more detail. After rasterization of the PRB occupancy information and the current signal coverage area based on the MR data, the following information can be obtained:

[0293] PRB occupancy information corresponding to each grid: Gridding divides the PRB occupancy information into grids according to geographical location, so as to conduct a more detailed analysis of the PRB occupancy in different regions. Understanding the PRB occupancy in each grid helps to determine the areas to be optimized that need to be adjusted to improve load balancing.

[0294] Similarly, after the signal coverage area is rasterized, the signal coverage conditions in different grids can be clearly understood, thereby obtaining the current signal coverage area corresponding to each grid.

[0295] After rasterization, the data association information between PRB occupancy information and signal coverage area is obtained. For example:

[0296] When the PRB occupancy information overlaps with the signal coverage area, it may indicate that a certain area is highly loaded and more resources are needed to meet user needs. This may require adjusting the beam configuration or adding resources to improve performance.

[0297] When the PRB occupancy information does not overlap with the signal coverage area, it may indicate that resources in a certain area are wasted because its PRB occupancy is low. In this case, resource utilization can be improved by reducing resource allocation or reconfiguring beams.

[0298] Therefore, the beam adjustable area of ​​the target cell can be determined according to the associated information, thereby improving the load condition of the entire target cell.

[0299] In the embodiment, the longitude and latitude coordinate data of each grid center point can be calculated through 5G MR data, and the grid center point position is used as the sampling point. Then, the three objects of the number of PRB occupancy, the grid distribution of sampling points and the 5G beam coverage area at the same time in the cell level history are associated and mapped respectively.

[0300] Among them, in order to determine the relative position of the sampling point and the base station, and to determine which grid to place the sampling point in, the corresponding relationship between the AOA value (incident angle) and the azimuth deviation can be established. By analyzing the 5G cell MR data collection results, the adjustable range of the HAOA value can be divided into 72 equal parts, namely AOA00 to AOA71, where each equal part represents a 5-degree angle, with the antenna normal angle as HA0A00. The subdivided HAOA value can be used to indicate the angular position of the user in the cell.

[0301] In order to facilitate subsequent calculation and analysis, the input MRO (Measurment Report Object) sampling point-level data can be rasterized.

[0302] Specifically, grid construction can take stereo into account, that is, create multiple layers in the vertical dimension to capture information at different heights. This is very useful for multi-level coverage and multi-level network optimization in 5G networks. Each three-dimensional grid layer can represent a different height range to provide a more comprehensive understanding of signal coverage and interference.

[0303] Secondly, user information mapping can be achieved by matching user location data with grid coordinate data. This helps determine the distribution of users within each grid, so that the service quality of different users can be evaluated later.

[0304] Finally, hierarchical spatial raster data is output, that is, the raster data is further divided into different levels to distinguish different types of information. For example, you can create a level for coverage information, another for interference information, and another for user distribution data. This helps to analyze and visualize network performance more clearly.

[0305] In the embodiment, by measuring the horizontal arrival angle mr.haoa and the vertical arrival angle mr.vaoa, a spatial grid is established according to the following conversion formula, MR is converted into longitude and latitude, and MR is mapped using point projection, and the grid data is hierarchically classified to achieve data modeling. This step can be represented by the above formulas (13)-(14).

[0306] Then, after obtaining the haoa, vaoa, and TA calculated for a cell, the maximum and minimum values ​​of each field are obtained, and the MRO data is aggregated into grid data based on a step size of 5° for haoa, 1° for vaoa, and 20m for TA, and the CGI, grid center HAOA, grid center VAOA, grid center TA, number of sampling points in the grid, and average RSRP fields in the grid are output.

[0307] In an embodiment, after the PRB occupancy information and the current signal coverage area are rasterized based on the MR data, the rectangular coordinates of the center of the grid can be calculated. Furthermore, in order to map the sampling point to the grid, the longitude and latitude coordinates of the sampling point need to be calculated. Further, the longitude and latitude coordinates can be converted into two-dimensional rectangular coordinates (x, y) of the center point of each grid through the longitude and latitude coordinate conversion formula. Thus, the grid is drawn on the plane and subsequent analysis is performed, such as network performance evaluation, interference analysis, and user distribution visualization. This step can be represented by the above formulas (15)-(23).

[0308] Based on this, by calculating the longitude and latitude coordinates of each grid center point and associating and mapping with 5G MR data, the solution can provide more accurate spatial information, which helps to achieve more accurate analysis of network performance and coverage. The historical PRB occupancy data at the cell level, the grid distribution of sampling points, and the beam coverage area are comprehensively associated and mapped to draw a comprehensive network performance map, which helps engineers fully understand the network situation.

[0309] Based on the above embodiment, in another embodiment provided by the present disclosure, the above step of determining the beam adjustable area of ​​the target cell based at least on the association information may include:

[0310] Obtaining the engineering parameter data of the target base station corresponding to the target cell; the engineering parameter data includes the manufacturer type of the target base station and the spacing information between the target base station and multiple adjacent base stations; the engineering parameter data is used to determine the signal overlap coverage area between the target base station and multiple adjacent base stations when multiple candidate antenna weight combinations are applied;

[0311] Eliminate signal repeated coverage areas from signal coverage areas corresponding to multiple candidate antenna weight combinations to obtain candidate adjustable areas;

[0312] Based on the engineering parameter data and the associated information, a beam adjustable area is determined in the candidate adjustable areas.

[0313] In the embodiment, after the two-dimensional coordinates of each grid center point are obtained, the beam adjustable area can be determined based on the engineering parameter data and the associated conditions.

[0314] In the embodiment, the beam adjustable area refers to the adjustment of the coverage range of the 5G cell on the basis of not degrading the performance of the 5G cell. In the process of optimizing the contiguous 5G cell, the allowable adjustment range can be limited in advance by considering factors such as the station spacing with the adjacent cell and the site height of the adjacent cell, so as to avoid serious problems such as 5G cell cross-area coverage, 5G site coverage holes and a sharp increase in 5G site interference after adjustment.

[0315] In an embodiment, by obtaining the engineering parameter data of the target base station corresponding to the target cell, including the manufacturer type of the base station and the spacing information between multiple adjacent base stations, a more accurate determination of the signal repetition coverage area can be achieved. These engineering parameter data provide information about the physical characteristics and relative positions of the base stations, thereby helping to determine the signal overlap between base stations. The differences in spacing and signal characteristics between different base stations may lead to conflicts or interference in signal coverage. Therefore, through the analysis of the engineering parameter data, it is possible to better understand which areas have signal repetition coverage. After obtaining the signal repetition coverage, the beam adjustable area can be further determined.

[0316] In an embodiment, the height of adjacent sites, the site spacing, and the beam coverage range can be obtained based on the engineering parameter data to calculate the overlapping coverage area of ​​the adjacent areas in the opposite direction. This step can be expressed by the above formulas (24)-(26).

[0317] In the embodiment, when the target base station applies multiple candidate antenna weight combinations, each combination may result in a different signal coverage area. In the network load balancing optimization, in order to avoid signal duplication and interference, the signal coverage under different antenna weight combinations can be analyzed, and the duplication coverage areas between multiple combinations can be eliminated, thereby obtaining candidate adjustable areas.

[0318] In this embodiment, the purpose of eliminating the signal duplicate coverage area is to optimize signal distribution, reduce interference, and improve network performance and resource utilization, which can help ensure that each area has appropriate signal coverage under different weight combinations to meet user needs.

[0319] Exemplarily, the vertical beam width and downtilt angle value range of the cell can be confirmed based on the overlapping coverage rate, the overlapping coverage of non-overlapping adjacent cells can be calculated, and the horizontal beam width and azimuth angle value range of the cell can be confirmed. This step can be expressed by the above formulas (27)-(29).

[0320] Based on this, different candidate antenna weight combinations are tried to meet the needs of different geographical areas and scenarios. By determining the beam adjustable area based on 5G antenna weight optimization, the number of iterations in the optimization process is reduced and the optimization efficiency is improved. This helps reduce the workload of engineers and speed up the improvement of network performance.

[0321] Based on the above embodiment, in another embodiment provided by the present disclosure, the above step of determining the target adjustment area in the beam adjustable area by using a particle swarm algorithm may include:

[0322] By using a particle swarm algorithm, the initial position information corresponding to each of the plurality of candidate antenna weight combinations is determined;

[0323] Calculate the local target data corresponding to the multiple initial position information respectively; the local target data includes the number of covered users and the mean square error of PRB utilization, the local target data is positively correlated with the number of covered users, and the local target data is negatively correlated with the mean square error of PRB utilization;

[0324] Through the particle swarm algorithm, multiple rounds of iterations are performed on the position information of multiple candidate antenna weight combinations;

[0325] Obtaining local target data corresponding to multiple candidate antenna weight combinations after multiple rounds of iterations; the local target data represents the local target position found by the corresponding candidate antenna weight combination in its neighborhood;

[0326] Determine global target data based on multiple local target data; the global target data represents the global target position found by the corresponding candidate antenna weight combination in its neighborhood;

[0327] The position information corresponding to the global target data is determined as the target adjustment area.

[0328] In the embodiment, the local target data is a local optimal solution, and the global target data is a global optimal solution.

[0329] In the embodiment, after determining the target cell, the particle swarm individuals can be initialized, and each particle corresponds to a candidate antenna weight combination. The initialized parameters may include: position vector dimension d, acceleration constants c1 and c2, inertia coefficient w, random function rand(), and maximum number of iterations T. Position vector dimension d = M*K, M is the number of cells to be adjusted, k is the number of beam parameters, and currently there are 4 beam parameters: azimuth, downtilt, horizontal beam width, and vertical beam width, that is, k = 4.

[0330] In the embodiment, the initial position information corresponding to the multiple candidate antenna weight combinations is the initialization position vector x of each particle. i Through the advance processing of the adjustable space of the previous weight combination full library, the antenna weight combination sub-library is obtained, and then the weight combination is obtained from the antenna weight combination sub-library and assigned to the position vector x(i) of each particle for assignment. Use random numbers to initialize the velocity vector v i .

[0331] The weight combination sub-library is a pre-built library that contains various possible antenna weight combinations, which represent different beam configuration schemes. The weight combination sub-library is usually constructed by discretizing and combining the adjustable range of the weight parameters. Each weight combination corresponds to a possible beam configuration.

[0332] The random initialization of the velocity vector is to ensure that the algorithm explores a variety of solutions in the search space, which increases the chances of the algorithm finding the global optimal solution rather than just the local optimal solution.

[0333] Based on this, by using the weight combination sub-library and random initialization, each particle is assigned an initial beam weight combination. Next, the particle swarm algorithm begins to iterate, continuously updating the position and velocity of the particles according to the objective function and algorithm rules to find the optimal beam configuration.

[0334] In the embodiment, for each particle i, the local target data f(t) can be calculated according to the initial position vector x(t). The local target data f(t) can be expressed by the above formula (39). It can be seen from formula (39) that the local target data includes the number of covered users and the mean square error of PRB utilization, wherein the local target data is positively correlated with the number of covered users, and the local target data is negatively correlated with the variance of PRB utilization.

[0335] In an embodiment, the particle swarm algorithm can be used to perform multiple rounds of iterations on the position information of multiple candidate antenna weight combinations, and obtain the local target data corresponding to the multiple candidate antenna weight combinations after multiple rounds of iterations.

[0336] For each particle, the local historical optimal value can be obtained from the local target data corresponding to all iterations. At the end of each iteration, the local historical optimal value and the local target data are updated. At the same time, the updated local historical optimal value and the local target data are compared. When the local target data is greater than the local historical optimal value, the position vector corresponding to the local target data is used as the current best position pbest.

[0337] In the embodiment, for each particle i, the objective function value f(t) is calculated according to the position vector x(t).

[0338] In the embodiment, the position vector x(t) includes the cell weight combination information, and the beam coverage area of ​​the cell antenna weight can be calculated based on the cell weight combination information, and the beam coverage area can be calculated by formulas (24) and (25).

[0339] For each cell, the PRB utilization of the cell can be simulated and calculated according to its beam configuration. The mean square error of the current PRB utilization of the M cells can be calculated according to the above formulas (30), (31) and (32).

[0340] The number of 5G MR users within the coverage area can be calculated according to the above formulas (37) and (38).

[0341] The mean square error of PRB utilization and the number of MR users within the coverage area are weighted and standardized according to formula (39) to obtain the objective function value f(t). The mean square error of PRB utilization and the number of 5G MR users within the coverage area are weighted to reflect the importance of different performance indicators. Then, standardization is performed to ensure that they are on the same scale for reasonable comparison.

[0342] By calculating the objective function value f(t), the particle swarm algorithm can compare between different beam configurations and select the most promising beam weight combination to optimize the performance of the cell and achieve beam balancing and network load balancing.

[0343] In the embodiment, for each particle i, the historical optimal value of f(t) is calculated and the corresponding position vector is recorded as P i (t). In each round of iteration, for each particle, its objective function value is compared with the local historical optimal value. If the current objective function value is better than the local historical optimal value, the corresponding position vector x(t) is used as the current best position pbest.

[0344] In an embodiment, the global target data may be determined based on a plurality of local target data. The global target data represents the global target position found by the corresponding candidate antenna weight combination in its neighborhood.

[0345] Calculate the global historical optimal value of all particles and record the corresponding position vector as G(t). For all particles, compare their local target data with the global historical optimal value. If the current local target data is greater than the global historical optimal value, then the corresponding position vector x(t) is used as the current global target position gbest.

[0346] In the embodiment, the particle position vector x(i) and velocity vector v(i) may also be updated according to the global target data. The particle updates its velocity and position through formulas (43) and (44).

[0347] In the embodiment, it can be determined whether the maximum number of iterations has been reached. If the maximum number of iterations has been reached, the global target position gbest of the last iteration is output, and the position information corresponding to the global target position gbest is determined as the target adjustment area.

[0348] In the embodiment, the best position gbest includes a target antenna weight combination, that is, the optimal weight configuration in the contiguous area is found to achieve load balancing between cells, cover as many users as possible in the cell, and reduce the mean square error of PRB utilization.

[0349] Based on this, by using the weight combination sub-library and random initialization, each particle is assigned an initial beam weight combination. Next, the particle swarm algorithm begins to iterate, and according to the objective function and algorithm rules, the particle position and velocity are continuously updated to find the best beam configuration. In each round of iteration, by comparing the current objective function value corresponding to each particle with the global historical optimal value, the entire particle swarm is guided to move in a more promising direction to find the global optimal solution.

[0350] In addition, the particle swarm algorithm has the characteristics of simple implementation and strong parallel processing capabilities, making it easy to deploy and capable of handling large-scale networks. Therefore, it is suitable for 5G beam equalization scenarios that balance the number of covered users and reduce the mean square error of PRB utilization. The particle swarm algorithm gradually converges to the optimal solution through iteration, reducing manual intervention and helping to improve 5G network performance and resource utilization efficiency.

[0351] Based on the above embodiment, in another embodiment provided by the present disclosure, the above step S1210 may include:

[0352] Convert PRB historical data into time series data;

[0353] Input the time series data into the PRB occupancy prediction model to obtain the PRB occupancy information of the target cell; the PRB occupancy prediction model includes an input gate, a forget gate and an output gate;

[0354] The training process of the PRB occupancy prediction model includes: taking PRB historical data as training samples; inputting the training samples into the input gate, the forget gate and the output gate in sequence to obtain the training sample prediction data; updating the parameters of the PRB occupancy prediction model based on the training sample prediction data to obtain the trained PRB occupancy prediction model.

[0355] In an embodiment, the PRB occupancy prediction model can use past PRB occupancy data to identify potential trends, seasonality, and periodicity through a time series analysis algorithm, and then use this information for future predictions. The PRB occupancy prediction model can also use a deep neural network to process large-scale time series data to achieve more accurate PRB occupancy predictions. The PRB occupancy prediction model can also identify future trends and patterns of PRB occupancy by analyzing patterns and associations in historical data.

[0356] In an embodiment, the predicted PRB occupancy information includes first PRB occupancy information and second PRB occupancy information, wherein the target time periods corresponding to the first PRB occupancy information and the PRB occupancy information are adjacent. For example, the time period corresponding to the PRB occupancy information is from Monday to Tuesday of next week, the target time period corresponding to the first PRB occupancy information may be Monday, and the target time period corresponding to the second PRB occupancy information may be Tuesday.

[0357] In an embodiment, the PRB historical data may be the PRB data of this week. The PRB data of this week may be input into the PRB occupancy prediction model to predict the PRB occupancy information for next Monday. Furthermore, the PRB data of this week and the PRB occupancy information predicted for next Monday may be used as input data and input into the PRB occupancy prediction model to predict the PRB occupancy information for next Tuesday.

[0358] In this embodiment, the PRB occupancy prediction model may be an LSTM model, wherein the LSTM model may be constructed by the above formulas (1)-(7). The PRB historical data may be the PRB historical occupancy data collected at the hourly level of the 5G site, and the PRB historical occupancy data is normalized and aggregated, and is sorted into the input data (X1, Y1), (X2, Y2)...(X m , Y n ). The LSTM model analyzes the historical PRB occupancy numbers and captures the time dependency in the historical PRB occupancy numbers, thereby predicting the PRB occupancy information in the future target time period.

[0359] Specifically, first in the input layer of the LSTM model, the PRB historical occupancy time series is defined as RPB o = {RPB1, RPB2, ..., RPB N} and divide it into training set RPB train = {RPB1, RPB2, ..., RPB M} and test set RPB test ={RPB M+1 , RPB M+2 , …, RPB M+N}. Then all elements PRB in the training set and test set are normalized.

[0360] Furthermore, the time step can be set to L, and the training set can be segmented. The model input after segmentation can be expressed as the above formula (8).

[0361] Then X is input into the LTSM model as training data, and the output of the LTSM output layer can be expressed as the above formula (9).

[0362] For the loss function in the training process, the root mean square error can be used as the error calculation formula. The training goal is to minimize the loss function. The Adam algorithm can be used to adaptively learn all parameters of the LSTM model.

[0363] Finally, the trained model is used for prediction. The prediction adopts an iterative process. First, the final output result of the LSTM model is used as the input data. The input data can be expressed by the above formula (10). The input data is input into the trained LSTM model (denoted as LTSM train ), the predicted value at time m+1 is PRB m+1 Delete Data t The value of the first time point in PRB m-L+1 , PRB m+1 With Data t Merge into a new data set. By analogy, the final prediction result can be obtained, and the final prediction result can be expressed by the above formula (11).

[0364] The output layer is used to iteratively predict the PRB load of the 5G cell, compare it with the test set data and predict the PRB load of the 5G cell.

[0365] After getting the prediction results, PRB Perform denormalization to obtain the same RPB as the test set test The corresponding prediction sequence can be expressed by the above formula (12).

[0366] Based on this, the LSTM model can capture long-term dependencies in time series, allowing LSTM to comprehensively consider trends and periodicity in historical data when predicting future cell loads, thereby providing more accurate prediction results. In addition, LSTM is dynamic and can continuously update predictions based on the latest data, thereby achieving real-time load forecasting. This helps to promptly identify potential high-load problems and take measures in advance to optimize load, thereby improving customer experience. Training the LSTM model based on different historical data can make the LSTM model adapt to load changes in different cells and regions, enhance the robustness of the LSTM model, and make it suitable for different prediction scenarios.

[0367] Based on the above embodiment, in another embodiment provided by the present disclosure, the above antenna parameter determination method may also include a PRB utilization mean square error determination method:

[0368] Obtaining multiple corresponding grids in the target cell;

[0369] Taking a single grid as a unit, determining grid PRB occupancy information and grid MR user data corresponding to a plurality of grids respectively based on the MR data;

[0370] Based on the grid PRB occupancy information and the grid MR user data, determine the PRB utilization rate corresponding to each grid and the overall average PRB utilization rate of multiple grids;

[0371] A PRB utilization mean square error is determined based on the PRB utilizations corresponding to the multiple grids and the overall average PRB utilization.

[0372] In an embodiment, multiple grids corresponding to the target cell can be obtained, and two benchmark values ​​of the number of PRB occupancy per grid and the number of MR users per grid can be calculated based on the grid area. The two benchmark values ​​include: the number of PRB occupancy and the number of MR users per grid. In the optimization process, the coverage area of ​​each beam is calculated according to different beam candidate schemes. Based on the coverage area and the grid benchmark value, the number of PRB occupancy of each beam is estimated, and the PRB occupancy reflects the resource occupancy under different beam configurations. By comparing the estimated PRB occupancy with the benchmark value, the estimated PRB utilization can be calculated, and the PRB utilization is the effective utilization of network resources. The mean square error of the PRB utilization of all grids is calculated to measure the load balancing degree of the network. The smaller the mean square error of the PRB utilization, the more uniform the resource allocation of the network and the more stable the network performance.

[0373] Exemplarily, this step can be represented by the above formulas (30)-(39).

[0374] One or more technical solutions provided in the exemplary embodiments of the present disclosure provide a method for determining antenna parameters. By collecting historical data on the number of PRB occupancy at the hourly level in 5G sites and combining it with the LSTM model, the tidal law within the time series period of the 5G cell is found, and the PRB occupancy of future 5G sites is predicted to determine whether the 5G site will have problems with overload in the future, thereby raising early warnings and optimizations. Using the predicted number of PRB occupancy and the total number of PRBs in the cell, the PRB utilization rate of the cell is calculated, and then the coverage range of the 5G cell beam is confirmed based on the manufacturer type and station spacing of the site in the cell engineering parameter data, combined with the geographical distribution of the grid longitude and latitude of the 5G MR data sampling points. Finally, a particle swarm is used to perform contiguous optimization to find the capacity balancing solution corresponding to the minimum mean square error of PRB utilization.

[0375] Therefore, the antenna parameter determination method provided in the exemplary embodiment of the present disclosure solves the problem of untimely adjustment of 5G network parameters due to the inability to predict future capacity load changes. At the same time, the method ensures that the 5G network signal can cover as many users as possible, and the mean square error of PRB utilization is as small as possible, so as to achieve load balancing between cells to meet the complex and diverse actual network coverage requirements, thereby improving the communication quality of the 5G network and meeting the user's demand for high-quality communication services.

[0376] The above mainly introduces the solution provided by the embodiment of the present disclosure from the perspective of the method. It can be understood that in order to achieve the above functions, the device corresponding to the method of the exemplary embodiment of the present disclosure includes a hardware structure and / or software module corresponding to the execution of each function. It should be easily appreciated by those skilled in the art that, in combination with the units and algorithm steps of each example described in the embodiments disclosed herein, the present disclosure can be implemented in the form of hardware or a combination of hardware and computer software. Whether a function is executed in the form of hardware or computer software driving hardware depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to exceed the scope of the present disclosure.

[0377] The embodiments of the present disclosure may divide the server into functional units according to the above method examples. For example, each functional module may be divided corresponding to each function, or two or more functions may be integrated into one processing module. The above integrated modules may be implemented in the form of hardware or in the form of software functional modules. It should be noted that the division of modules in the embodiments of the present disclosure is schematic and is only a logical functional division. There may be other division methods in actual implementation.

[0378] In the case of dividing each functional module according to each function, an exemplary embodiment of the present disclosure provides an antenna parameter determination method device, which may be a server or a chip applied to a server. Fig.13 FIG. 1 is a schematic block diagram showing the functional modules of an antenna parameter determination method and apparatus according to an exemplary embodiment of the present disclosure. Fig.13 As shown, the antenna parameter determination method device 1300 includes:

[0379] The data acquisition module 1310 is used to acquire the PRB historical data of the target cell, and predict the PRB occupancy information of the target cell based on the PRB historical data;

[0380] The data processing module 1320 is used to determine a target antenna weight combination from the candidate antenna weight combinations when it is determined based on the PRB occupancy information that the target cell has an area to be optimized; wherein the mean square error of the PRB utilization of the target antenna weight combination is less than that of the remaining antenna weight combinations in the candidate antenna weight combination;

[0381] The data processing module 1320 is further configured to adjust antenna parameters of a target base station corresponding to the target cell based on the target antenna weight combination.

[0382] In another embodiment provided by the present disclosure, the data processing module 1320 is also used to calculate the signal coverage areas corresponding to the multiple candidate antenna weight combinations respectively; determine the beam adjustable area of ​​the target cell based on the PRB occupancy information and the multiple signal coverage areas; determine the target adjustment area in the beam adjustable area through the particle swarm algorithm, and determine the corresponding target antenna weight combination based on the target adjustment area.

[0383] In another embodiment provided by the present disclosure, the data processing module 1320 is also used to obtain the measurement report MR data of the target cell and the current signal coverage area; based on the MR data, the PRB occupancy information and the current signal coverage area are rasterized to obtain the association information of the PRB occupancy information and the current signal coverage area corresponding to each grid; and the beam adjustable area of ​​the target cell is determined at least based on the association information.

[0384] In another embodiment provided in the present disclosure, the data processing module 1320 is also used to obtain the engineering parameter data of the target base station corresponding to the target cell; the engineering parameter data includes the manufacturer type of the target base station and the spacing information between the target base station and multiple adjacent base stations; the engineering parameter data is used to determine the signal overlapping coverage area between the target base station and multiple adjacent base stations when applying multiple candidate antenna weight combinations; the signal overlapping coverage area is eliminated from the signal coverage areas corresponding to the multiple candidate antenna weight combinations to obtain a candidate adjustable area; based on the engineering parameter data and the associated information, the beam adjustable area is determined in the candidate adjustable area.

[0385] In another embodiment provided by the present disclosure, the data processing module 1320 is also used to determine the initial position information corresponding to the multiple candidate antenna weight combinations respectively through the particle swarm algorithm; calculate the local target data corresponding to the multiple initial position information respectively; the local target data includes the number of covered users and the mean square error of PRB utilization, the local target data is positively correlated with the number of covered users, and the local target data is negatively correlated with the mean square error of PRB utilization; through the particle swarm algorithm, perform multiple rounds of iterations on the position information of the multiple candidate antenna weight combinations; obtain the local target data corresponding to the multiple candidate antenna weight combinations after multiple rounds of iterations; the local target data represents the local target position found by the corresponding candidate antenna weight combination in its neighborhood; determine the global target data based on the multiple local target data; the global target data represents the global target position found by the corresponding candidate antenna weight combination in its neighborhood; determine the position information corresponding to the global target data as the target adjustment area.

[0386] In another embodiment provided by the present disclosure, the data processing module 1320 is also used to convert the PRB historical data into time series data; input the time series data into a PRB occupancy prediction model; the PRB occupancy prediction model includes an input gate, a forget gate and an output gate; the time series data is sequentially input into the input gate, the forget gate and the output gate to obtain the PRB occupancy information of the target cell.

[0387] In another embodiment provided by the present disclosure, the data processing module 1320 is also used to obtain multiple corresponding grids in the target cell; determine the grid PRB occupancy information and grid MR user data corresponding to the multiple grids respectively based on the MR data in units of a single grid; determine the PRB utilization corresponding to each grid and the overall average PRB utilization of the multiple grids based on the grid PRB occupancy information and the grid MR user data; determine the PRB utilization mean square error based on the PRB utilization corresponding to the multiple grids and the overall average PRB utilization.

[0388] Fig.14 Schematic block diagram of a chip according to an exemplary embodiment of the present disclosure is shown. Fig.14 As shown, the chip 1400 includes one or more (including two) processors 1401 and a communication interface 1402. The communication interface 1402 can support the server to perform the data sending and receiving steps in the above method, and the processor 1401 can support the server to perform the data processing steps in the above method.

[0389] Optional, such as Fig.14 As shown, the chip 1400 also includes a memory 1403, which may include a read-only memory and a random access memory, and provides operation instructions and data to the processor. A portion of the memory may also include a non-volatile random access memory (NVRAM).

[0390] In some embodiments, Fig.14As shown, the processor 1401 performs corresponding operations by calling the operation instructions stored in the memory (the operation instructions may be stored in the operating system). The processor 1401 controls the processing operations of any one of the terminal devices, and the processor may also be called a central processing unit (CPU). The memory 1403 may include a read-only memory and a random access memory, and provides instructions and data to the processor. A portion of the memory 1403 may also include NVRAM. For example, in an application, the memory, the communication interface, and the memory are coupled together through a bus system, wherein the bus system may include a power bus, a control bus, and a status signal bus in addition to a data bus. However, for the sake of clarity, in Fig.14 Various buses are labeled as bus system 1404.

[0391] The method disclosed in the above embodiment of the present invention can be applied to a processor or implemented by a processor. The processor may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by an integrated logic circuit of hardware in the processor or an instruction in the form of software. The above processor may be a general-purpose processor, a digital signal processor (digital signal processing, DSP), an ASIC, a field-programmable gate array (field-programmable gate array, FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The methods, steps and logic block diagrams disclosed in the embodiments of the present invention can be implemented or executed. The general-purpose processor may be a microprocessor or the processor may also be any conventional processor, etc. The steps of the method disclosed in the embodiment of the present invention can be directly embodied as being executed by a hardware decoding processor, or executed by a combination of hardware and software modules in the decoding processor. The software module may be located in a mature storage medium in the field such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory, and the processor reads the information in the memory and completes the steps of the above method in combination with its hardware.

[0392] The exemplary embodiment of the present disclosure also provides an electronic device, comprising: at least one processor; and a memory connected to the at least one processor in communication. The memory stores a computer program that can be executed by the at least one processor, and the computer program is used to cause the electronic device to perform the method according to the embodiment of the present disclosure when executed by the at least one processor.

[0393] The exemplary embodiments of the present disclosure also provide a non-transitory computer-readable storage medium storing a computer program, wherein the computer program, when executed by a processor of a computer, is used to cause the computer to perform the method according to the embodiments of the present disclosure.

[0394] The exemplary embodiments of the present disclosure further provide a computer program product, including a computer program, wherein when the computer program is executed by a processor of a computer, the computer is used to enable the computer to perform the method according to the embodiments of the present disclosure.

[0395] refer to Fig.15 , a block diagram of an electronic device 1500 that can be used as a server or client of the present disclosure will now be described, which is an example of a hardware device that can be applied to various aspects of the present disclosure. The electronic device is intended to represent various forms of digital electronic computer devices, such as laptop computers, desktop computers, workbenches, personal digital assistants, servers, blade servers, mainframe computers, and other suitable computers. The electronic device can also represent various forms of mobile devices, such as personal digital processing, cellular phones, smart phones, wearable devices, and other similar computing devices. The components shown herein, their connections and relationships, and their functions are merely examples and are not intended to limit the implementation of the present disclosure described and / or required herein.

[0396] like Fig.15 As shown, the electronic device 1500 includes a computing unit 1501, which can perform various appropriate actions and processes according to a computer program stored in a read-only memory (ROM) 1502 or a computer program loaded from a storage unit 1508 into a random access memory (RAM) 1503. In the RAM 1503, various programs and data required for the operation of the device 1500 can also be stored. The computing unit 1501, the ROM 1502, and the RAM 1503 are connected to each other via a bus 1504. An input / output (I / O) interface 1505 is also connected to the bus 1504.

[0397] Multiple components in the electronic device 1500 are connected to the I / O interface 1505, including: an input unit 1506, an output unit 1507, a storage unit 1508, and a communication unit 1509. The input unit 1506 can be any type of device that can input information to the electronic device 1500, and the input unit 1506 can receive input digital or character information, and generate key signal input related to the user settings and / or function control of the electronic device. The output unit 1507 can be any type of device that can present information, and can include but is not limited to a display, a speaker, a video / audio output terminal, a vibrator, and / or a printer. The storage unit 1508 can include but is not limited to a disk, an optical disk. The communication unit 1509 allows the electronic device 1500 to exchange information / data with other devices through a computer network such as the Internet and / or various telecommunication networks, and can include but is not limited to a modem, a network card, an infrared communication device, a wireless communication transceiver, and / or a chipset, such as a Bluetooth™ device, a WiFi device, a WiMax device, a cellular communication device, and / or the like.

[0398] The computing unit 1501 may be a variety of general and / or special processing components with processing and computing capabilities. Some examples of the computing unit 1501 include, but are not limited to, a central processing unit (CPU), a graphics processing unit (PU), various dedicated artificial intelligence (AI) computing chips, various computing units running machine learning model algorithms, digital signal processors (DSPs), and any appropriate processors, controllers, microcontrollers, etc. The computing unit 1501 performs the various methods and processes described above. Each of the methods described above may be implemented as a computer software program, which is tangibly included in a machine-readable medium, such as a storage unit 1508. In some embodiments, part or all of the computer program may be loaded and / or installed on the electronic device 1500 via the ROM 1502 and / or the communication unit 1509.

[0399] The program code for implementing the method of the present disclosure may be written in any combination of one or more programming languages. These program codes may be provided to a processor or controller of a general-purpose computer, a special-purpose computer, or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code may be executed entirely on the machine, partially on the machine, partially on the machine and partially on a remote machine as a stand-alone software package, or entirely on a remote machine or server.

[0400] In the context of the present disclosure, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, an electronic, magnetic, optical, electromagnetic, infrared, or semiconductor system, device, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0401] As used in this disclosure, the terms "machine-readable medium" and "computer-readable medium" refer to any computer program product, apparatus, and / or device (e.g., disk, optical disk, memory, programmable logic device (PLD)) for providing machine instructions and / or data to a programmable processor, including a machine-readable medium that receives machine instructions as a machine-readable signal. The term "machine-readable signal" refers to any signal for providing machine instructions and / or data to a programmable processor.

[0402] To provide interaction with a user, the systems and techniques described herein can be implemented on a computer having: a display device (e.g., a CRT (cathode ray tube) or LCD (liquid crystal display) monitor) for displaying information to the user; and a keyboard and pointing device (e.g., a mouse or trackball) through which the user can provide input to the computer. Other types of devices can also be used to provide interaction with the user; for example, the feedback provided to the user can be any form of sensory feedback (e.g., visual feedback, auditory feedback, or tactile feedback); and input from the user can be received in any form (including acoustic input, voice input, or tactile input).

[0403] The systems and techniques described herein may be implemented in a computing system that includes back-end components (e.g., as a data server), or a computing system that includes middleware components (e.g., an application server), or a computing system that includes front-end components (e.g., a user computer with a graphical user interface or a web browser through which a user can interact with implementations of the systems and techniques described herein), or a computing system that includes any combination of such back-end components, middleware components, or front-end components. The components of the system may be interconnected by any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include: a local area network (LAN), a wide area network (WAN), and the Internet.

[0404] A computer system may include clients and servers. Clients and servers are generally remote from each other and usually interact through a communication network. The relationship of client and server is generated by computer programs running on respective computers and having a client-server relationship to each other.

[0405] In the above embodiments, it can be implemented in whole or in part by software, hardware, firmware or any combination thereof. When implemented by software, it can be implemented in whole or in part in the form of a computer program product. The computer program product includes one or more computer programs or instructions. When the computer program or instruction is loaded and executed on a computer, the process or function described in the embodiment of the present disclosure is executed in whole or in part. The computer may be a general-purpose computer, a special-purpose computer, a computer network, a terminal, a user device or other programmable device. The computer program or instruction may be stored in a computer-readable storage medium, or transmitted from one computer-readable storage medium to another computer-readable storage medium, for example, the computer program or instruction may be transmitted from one website site, computer, server or data center to another website site, computer, server or data center by wired or wireless means. The computer-readable storage medium may be any available medium that a computer can access or a data storage device such as a server, data center, etc. that integrates one or more available media. The available medium may be a magnetic medium, for example, a floppy disk, a hard disk, a tape; it may also be an optical medium, for example, a digital video disc (DVD); it may also be a semiconductor medium, for example, a solid state drive (SSD).

[0406] Although the present disclosure has been described in conjunction with specific features and embodiments thereof, it is apparent that various modifications and combinations may be made thereto without departing from the spirit and scope of the present disclosure. Accordingly, this specification and the drawings are merely exemplary illustrations of the present disclosure as defined by the appended claims, and are deemed to have covered any and all modifications, variations, combinations or equivalents within the scope of the present disclosure. Obviously, those skilled in the art may make various modifications and variations to the present disclosure without departing from the spirit and scope of the present disclosure. Thus, if these modifications and variations of the present disclosure fall within the scope of the claims of the present disclosure and their equivalents, the present disclosure is also intended to include these modifications and variations.

Claims

1. A method for determining antenna parameters, characterized in that: The method comprises: Acquire physical resource block (PRB) history data of the target cell, and predict PRB occupancy information of the target cell based on the PRB history data; In the case where it is determined based on the PRB occupancy information that the target cell has an area to be optimized, a target antenna weight combination is determined from the candidate antenna weight combinations; wherein the mean square error of the PRB utilization of the target antenna weight combination is less than the mean square error of the PRB utilization of the remaining antenna weight combinations in the candidate antenna weight combinations; The antenna parameters of the target base station corresponding to the target cell are adjusted based on the target antenna weight combination.

2. The method according to claim 1, characterized in that: The step of determining a target antenna weight combination from the candidate antenna weight combinations includes: Calculating signal coverage areas corresponding to a plurality of candidate antenna weight combinations respectively; Determine a beam adjustable area of ​​the target cell based on the PRB occupancy information and the plurality of signal coverage areas; By using a particle swarm algorithm, a target adjustment region is determined in the beam adjustable region, and a target antenna weight combination for adjusting the target adjustment region is determined from the candidate antenna weight combinations.

3. The method according to claim 2, characterized in that The determining, based on the PRB occupancy information and the plurality of signal coverage areas, a beam adjustable area of ​​the target cell includes: Obtaining measurement report MR data of the target cell and a current signal coverage area; Based on the MR data, the PRB occupancy information and the current signal coverage area are respectively subjected to rasterization processing to obtain association information of the PRB occupancy information and the current signal coverage area respectively corresponding to each grid; A beam adjustable area of ​​the target cell is determined based at least on the association information.

4. The method according to claim 3, characterized in that The determining the beam adjustable area of ​​the target cell at least based on the association information includes: Acquire the engineering parameter data of the target base station corresponding to the target cell; the engineering parameter data includes the manufacturer type of the target base station and the spacing information between the target base station and multiple adjacent base stations; the engineering parameter data is used to determine the signal overlap coverage area between the target base station and multiple adjacent base stations when applying multiple candidate antenna weight combinations; Eliminate the signal repeated coverage area from the signal coverage areas respectively corresponding to the plurality of candidate antenna weight combinations to obtain a candidate adjustable area; The beam adjustable area is determined in the candidate adjustable areas based on the engineering parameter data and the associated information.

5. The method according to claim 2, characterized in that: Determining the target adjustment area in the beam adjustable area by using a particle swarm algorithm includes: Determine the initial position information corresponding to each of the plurality of candidate antenna weight combinations by using the particle swarm algorithm; Calculate the local target data corresponding to the multiple initial position information respectively; the local target data includes the number of covered users and the mean square error of PRB utilization, the local target data is positively correlated with the number of covered users, and the local target data is negatively correlated with the mean square error of PRB utilization; Performing multiple rounds of iterations on the position information of the plurality of candidate antenna weight combinations by using the particle swarm algorithm; Obtaining local target data corresponding to each of the plurality of candidate antenna weight combinations after multiple rounds of iterations; the local target data represents a local target position found by the corresponding candidate antenna weight combination in its neighborhood; Determine global target data based on the plurality of local target data; the global target data represents the global target position found by the corresponding candidate antenna weight combination in its neighborhood; The position information corresponding to the global target data is determined as the target adjustment area.

6. The method according to claim 1, characterized in that The predicting the PRB occupancy information of the target cell based on the PRB historical data includes: Converting the PRB historical data into time series data; Inputting the time series data into a PRB occupancy prediction model to obtain PRB occupancy information of the target cell; the PRB occupancy prediction model includes an input gate, a forget gate and an output gate; Among them, the training process of the PRB occupancy prediction model includes: taking the PRB historical data as training samples; inputting the training samples into the input gate, forgetting gate and output gate in sequence to obtain training sample prediction data; updating the parameters of the PRB occupancy prediction model based on the training sample prediction data to obtain the trained PRB occupancy prediction model.

7. The method according to claim 1, characterized in that The method further comprises: Acquire a plurality of corresponding grids in the target cell; Taking a single grid as a unit, determining grid PRB occupancy information and grid MR user data respectively corresponding to the multiple grids based on the MR data; Determine, based on the grid PRB occupancy information and the grid MR user data, a PRB utilization rate corresponding to each grid and an overall average PRB utilization rate of the multiple grids; The PRB utilization mean square error is determined based on the PRB utilizations respectively corresponding to the multiple grids and the overall average PRB utilization.

8. An antenna parameter determination device, characterized in that: include: A data acquisition module, used to acquire PRB historical data of a target cell, and predict PRB occupancy information of the target cell based on the PRB historical data; A data processing module, configured to determine a target antenna weight combination from the candidate antenna weight combinations when it is determined based on the PRB occupancy information that the target cell has an area to be optimized; wherein the mean square error of the PRB utilization of the target antenna weight combination is less than that of the remaining antenna weight combinations in the candidate antenna weight combination; The data processing module is further used to adjust the antenna parameters of the target base station corresponding to the target cell based on the target antenna weight combination.

9. An electronic device, characterized in that: include: processor; as well as, A memory for storing programs; The program includes instructions, which, when executed by the processor, cause the processor to perform the method according to any one of claims 1 to 7.

10. A non-transitory computer-readable storage medium, characterized in that The non-transitory computer-readable storage medium stores computer instructions for causing the computer to execute the method according to any one of claims 1-7.

Citation Information

Cited By

  • Optimization method and device for overlapping coverage problem, electronic equipment and storage medium

    CN119854907A