Accropode prefabrication construction method and prefabrication mold
By dividing prefabricated work stations and alternating production steps at the construction site, combined with detachable prefabricated molds and positioning mechanisms, the problem of messy production processes of Niuwang blocks and damage to concrete blocks during the removal of formwork has been solved, achieving efficient construction management and good Molding quality.
Patent Information
- Application Number
- CN202410839410.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-26
- Publication Date
- 2024-10-22
AI Technical Summary
During the prefabricated pouring process of twisted king blocks, the production process is messy, which affects the construction progress. Moreover, the form removal process requires high proficiency of construction personnel, which can easily cause the concrete blocks to lose corners or missing corners, affecting the molding quality.
The construction site is divided into four groups of prefabricated workstations, maintenance areas and transfer areas. Each group of workstations alternately perform mold support, concrete pouring, maintenance and removal steps. Detachable prefabricated molds and positioning mechanisms are used to reduce frictional resistance and improve transportation. Convenience.
It improves the efficiency of construction management, reduces the possibility of concrete block damage, ensures the good molding quality of the twisted king blocks, and reduces transportation costs.
Smart Images

Figure CN118809761A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of slope protection, and in particular to a prefabrication construction method and a prefabrication mold for twist king blocks. Background Art
[0002] The twist block is a kind of face protection block, which is usually placed on the outermost layer of the breakwater to protect the breakwater by weakening the impact of waves. The shape of the twist block is basically the most complex component among the precast concrete components. It consists of three rods, with the two end rods parallel and the middle rod orthogonal to the two end rods; the material is concrete, which is cast in one time through a fixed mold. The twist block is currently used in large quantities in offshore engineering docks and other projects, ranging from a few thousand to hundreds of thousands of pieces, and the precast production volume is huge.
[0003] During the prefabrication and pouring process of the twist king block, a series of processes are required, including mold building, concrete pouring, maintenance, mold removal, and secondary maintenance. There are many and complicated production links, and confusion is inevitable during manual operations, which in turn affects the overall construction progress. Moreover, the demolding process of the twist king block also has high requirements for the proficiency of the construction workers. If the manual operation is not skilled, the concrete blocks are easily collided during the demolding process, resulting in corners or missing corners of the concrete blocks, affecting the molding quality and normal use of the twist king block. Summary of the invention
[0004] Based on this, the present application provides a prefabrication construction method and prefabrication mold for a torsion block, which can plan the production process in an orderly manner, and the corresponding processes are responsible for the corresponding personnel, which can effectively improve the proficiency of the personnel's work skills and ensure that the manufactured torsion block maintains good molding quality.
[0005] In the first aspect, the present application provides a method for prefabricating a twist block using the following technical solution: A method for prefabricating a twist block comprises the following steps: Step S1, prefabrication site layout: pouring the floor at the construction site, dividing the prefabrication area, maintenance area and transfer area, and the prefabrication area includes four groups of prefabrication stations; Step S2, mold support: the prefabricated mold is supported at the prefabrication station, and the prefabricated molds are arranged equidistantly along the length direction of the prefabrication station; Step S3, concrete pouring; Step S4, concrete block curing; Step S5, removing the mold; At the same time point, the four groups of prefabrication stations perform operations and alternations in the order of steps S2, S3, S4, and S5; Step S6: concrete block transfer and secondary curing.
[0006] By adopting the above technical solution, this application divides the construction site into four groups of prefabrication stations, a maintenance area, and a transfer area. Each group of prefabrication stations performs four steps of mold support, concrete pouring, concrete block maintenance, and mold removal. Each step is performed alternately, and finally the prefabrication station is sent to the maintenance area for maintenance and transported to the transfer area for transportation. This is convenient for management and suitable for mass production of twist king blocks. In addition, during specific construction operations, the corresponding team members only need to master the skills of the corresponding steps, which can effectively reduce the construction personnel's mastery of each skill and focus on improving the skill proficiency of the corresponding steps, thereby reducing the possibility of concrete blocks being damaged during the operation, so that the obtained twist king blocks maintain good molding quality.
[0007] Optionally, step S2 includes the following steps: S21, check the two side molds and remove the debris and water inside the side molds; S22, spraying a release agent onto the inner sides of the two side molds; S23, the two side molds are assembled and fixed by connecting parts to form a prefabricated mold, and the assembled prefabricated mold is placed on the foam board.
[0008] By adopting the above technical solution, cleaning the inner side of the side mold can reduce the adhesion of impurities or dirt, which is conducive to the flatness of the surface of the twist block after molding; the release agent is attached to the inner wall of the side mold by spraying, which can make the release agent more evenly distributed, which is conducive to subsequent demolding. In addition, by placing the assembled prefabricated mold on the foam board, the prefabricated mold presses on the foam board to cause the foam board to undergo elastic deformation, thereby sealing the gap at the bottom of the prefabricated mold and reducing the occurrence of slurry leakage.
[0009] Optionally, step S5 includes the following steps: S51, removing the connecting piece used to connect the two side molds; S52, placing a forklift under the side form, and applying an upward force to the side form; at the same time, placing a jack on the concave frame rod outside the side form, and aligning the top of the jack with the through hole of the side form; the jack applies a force to the concrete block through the through hole, forcing the side form to move outward a short distance; S53, after the concrete is completely solidified, the side formwork is removed by a mobile forklift; S54, flush the inner wall of the opposite mold to wash away the release agent and residue.
[0010] By adopting the above-mentioned technical solution, in S52, when the side mold is forced to move outward by using a jack, an upward force is applied to the side mold by using a forklift, so that the side mold can be gradually separated from the foam board, reducing the friction resistance between the side mold and the foam board, thereby reducing the possibility of the side mold being tilted or colliding with the torsion block due to the force, and reducing the occurrence of damage to the torsion block.
[0011] In the second aspect, the present application provides a prefabricated mold adopting the following technical solution: A prefabricated mold, comprising two sets of half molds, each of which comprises a side mold, a concave frame rod, a baffle and a support frame; the two side molds are connected to each other through a connecting piece, and the support frame is detachably connected to the side of the side mold; The side mold is provided with an outer convex portion, and the concave frame rod is detachably connected to the outer convex portion for fixing the jack; the side surface of the outer convex portion is provided with a through hole for the jack to enter, and the baffle is detachably installed on the outer convex portion and blocks the through hole.
[0012] By adopting the above technical solution, the two side molds are connected to each other through the connecting piece and then placed on the foam board, which can form a casting space for the twist block to be formed; after the through hole is blocked by the baffle, concrete is poured inward from the top of the prefabricated mold, and the twist block can be formed after the concrete solidifies. In this application, the concave frame rod and the support frame are both detachable. After the concave frame rod and the support frame are removed, the side molds can be stacked on each other, occupying less space, thereby improving the convenience of transportation when transporting the prefabricated mold to the construction site, greatly reducing transportation costs.
[0013] Optionally, a walking wheel set is installed at the bottom of the support frame, and the prefabrication station is provided with a fixed movable track. When pouring concrete, the walking wheel set is located inside the movable track; the prefabrication station is also provided with a fixed positioning mechanism, and the support frame is provided with a locking mechanism for cooperating with the positioning mechanism to lock; Among them, the support frame is fixed with two mounting plates, the two mounting plates are arranged at intervals, and each mounting plate is provided with an inclined inclined slide groove; the locking mechanism includes a locking piece slidably installed on the inclined slide groove and a first elastic piece arranged between the locking piece and the support frame, the first elastic piece forces the locking piece to normally stay at the end of the inclined slide groove away from the side form, that is, the high side end of the inclined slide groove; when pouring concrete, the locking piece cooperates with the positioning mechanism to lock and maintain positioning.
[0014] By adopting the above technical solution, after the side form is transported to the construction site, the construction workers can use the walking wheel group to push the side form to move, which is convenient for the assembly and disassembly of the side form; and after the walking wheel group of the side form enters the moving track, the locking piece can finally stay above the positioning mechanism, and the side form can be kept fixed when the two side forms are assembled and closed through the cooperation and positioning between the locking piece and the positioning mechanism. After the connecting piece is removed and the side form is forced to move away from the adjacent side form, the locking piece and the positioning mechanism remain fixed and move along the inclined slide, so that the side form and the locking piece can move relative to each other; the side form can move upward for a distance along the inclined direction of the inclined slide, and then automatically lift the side form, reducing the possibility of the side form tilting and damaging the concrete block due to friction resistance during the demolding process, ensuring that the twist block has good molding quality.
[0015] Optionally, the positioning mechanism includes a fixed base fixed to the prefabrication station and a sliding frame slidably arranged on the fixed base, the fixed base is provided with a limit seat for the mounting plate to abut against and limit the position, and when the mounting plate abuts against the limit seat, the locking member is located directly above the sliding frame; The inner side surface of the sliding frame is protrudingly provided with a hooking portion, and the outer peripheral surface of the locking member is partially provided with a hooking groove adapted to be hooked with the hooking portion; a second elastic member is provided between the sliding frame and the fixed base, and when the locking member enters the inner circle of the sliding frame and the hooking portion is arranged opposite to the hooking groove, the second elastic member forces the hooking portion to be normally locked in the hooking groove; The locking mechanism further comprises an unlocking member for forcing the hooking portion to be disengaged from the hooking groove.
[0016] By adopting the above technical solution, after the walking wheel group enters the moving track, it pushes the side mold to move to the position where the mounting plate and the limit seat are in contact, and the locking member can be located directly above the sliding frame, forcing the support frame to move downward as a whole. After the locking member moves downward together, it pushes open the sliding frame and squeezes the second elastic member; when the locking member continues to move downward and the hooking part is in a position directly opposite to the hooking groove, the elastic force of the second elastic member forces the hooking part to match and snap into the hooking groove, so that the locking member and the positioning mechanism remain fixed. After the concrete block is cast and formed, the side mold is removed, and the unlocking member can be controlled to separate the hooking part from the hooking groove, so that the side mold can be removed and cleaned smoothly.
[0017] Optionally, the locking member comprises a locking base and a rotating locking block, wherein two opposite sides of the locking base are respectively provided with sliding parts, and the sliding parts are slidably arranged in the inclined sliding groove; the locking base is partially provided with an extension part, and when the locking base stays at the high side end of the inclined sliding groove, the extension part abuts against the bottom of the mounting plate; the rotating locking block is rotatably connected to the bottom of the locking base, and the hooking groove is opened on the outer peripheral surface of the rotating locking block; The top surface of the locking base is provided with a first slot hole which passes vertically through, the top surface of the rotating lock block is provided with a second slot hole, and the unlocking piece is inserted into the first slot hole and the second slot hole; the top end of the unlocking piece is passed through to the side of the support frame away from the mounting plate, and the support frame is provided with a clearance hole for the unlocking piece to move out of position; a guide structure is provided between the unlocking piece and the rotating lock block, and when the unlocking piece moves to the bottom of the second slot hole, the guide structure can be used to force the rotating lock block to rotate.
[0018] By adopting the above-mentioned technical scheme, after the concrete block is cast and formed, the unlocking piece is forced to move downward and the rotating locking block can be rotated by utilizing the guide structure. Since the hooking groove is only provided in a local position of the rotating locking block, the hooking block can be smoothly disengaged from the hooking groove after the rotating locking block rotates circumferentially for a certain angle, thereby separating the locking piece from the positioning mechanism. The locking piece can automatically reset to the high side end of the inclined slide groove under the elastic force of the first elastic piece, so as to facilitate the next use of the precast mold.
[0019] Optionally, the guide structure includes a guide post and a spiral groove slidably adapted thereto, the guide post is fixed to the outer circumferential surface of the unlocking member or the inner circumferential wall of the second slot hole, and the spiral groove is correspondingly clamped on the inner circumferential wall of the second slot hole or the outer circumferential surface of the unlocking member; A third elastic member is provided between the unlocking member and the inner bottom wall of the second slot hole, and the third elastic member is used to force the guide column to stay at the top of the spiral groove. At this time, the direction of the hooking groove is directly opposite to the direction of the hooking portion.
[0020] By adopting the above technical solution, by setting the third elastic member to generate elastic force acting on the unlocking member, the unlocking member can be forced to move upward to the limit position. At this time, the guide column stays at the top of the spiral groove, and the direction of the hooking groove can be kept opposite to the direction of the hooking part, which is conducive to the construction personnel forcing the support frame to move downward and locking the locking member and the positioning mechanism. In addition, after the construction personnel force the unlocking member to move downward, the guide column can move along the spiral extension direction of the spiral groove, thereby forcing the rotating lock block to rotate automatically, so as to achieve the smooth separation of the hooking part from the hooking groove, thereby achieving the smooth separation of the locking member and the positioning mechanism.
[0021] Optionally, the support frame is provided with a vertically through-mounted mounting hole, the walking wheel group includes a connecting rod member movably inserted in the mounting hole and a universal wheel fixed to the bottom end of the connecting rod member, the top end of the connecting rod member is provided with an anti-slip block, the outer diameter of the anti-slip block is larger than the inner diameter of the mounting hole; a fourth elastic member is provided between the support frame, the fourth elastic member forces the anti-slip block to normally press against the side of the support frame away from the universal wheel, and when concrete is poured, the fourth elastic member is in a stressed and compressed state.
[0022] By adopting the above-mentioned technical solution, the setting of the universal wheel can facilitate the construction workers to push the support frame and the entire side mold to move; when the two side molds are assembled and connected to each other and the locking part is fixed to the positioning mechanism, the fourth spring is in a stressed and compressed state, which can allow the support frame and the entire side mold to have room to move upward, which is conducive to the side mold moving upward and gradually separating from the foam board after demolding.
[0023] Optionally, two ear plates are fixed to the side of the outer protrusion, and the ear plates are provided with sockets; the concave frame rod includes two arm parts, each of the arm parts is fixed with a plug, and the two plugs are respectively plugged and adapted with the two sockets.
[0024] By adopting the above technical solution, by inserting the plug post of the arm part into the plug hole of the ear plate, the concave frame rod can be quickly connected to the ear plate, so that construction workers can quickly install the jack and perform the demolding operation of the side mold.
[0025] In summary, the present application includes at least one of the following beneficial technical effects: 1. Please divide the construction site into four groups of prefabrication stations, maintenance area and transfer area. Each group of prefabrication stations will carry out four steps: mold support, concrete pouring, concrete block maintenance and mold removal. Each step is carried out alternately, which is conducive to management and suitable for mass production of twist king blocks; 2. By making the concave frame rod and the support frame both detachable, the side molds can be stacked on each other after the concave frame rod and the support frame are removed, which occupies less space, thereby improving the convenience of transportation when transporting the prefabricated mold to the construction site, and greatly reducing the transportation cost; 3. By setting a locking piece to cooperate with the positioning mechanism for positioning, after removing the connecting piece and forcing the side form to move toward the adjacent side form, the side form can move upward for a certain distance along the inclined direction of the inclined slide groove, thereby automatically lifting the side form, reducing the possibility of the side form tilting due to friction resistance and damaging the concrete block during the demolding process. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 is a flow chart of the construction method in Example 1; Figure 2 is a schematic diagram of the locations of the prefabrication area, the curing area, and the transfer area in step S1 of Example 1; Figure 3 is a schematic diagram of the positions of concrete pouring in stages in step S3 of Example 1; Figure 4 is a schematic diagram of the overall structure of the prefabricated mold in Example 2; Figure 5 is a schematic diagram of disassembly and assembly of the stopper and the concave frame rod in Embodiment 2; Figure 6 yes Figure 4 Enlarged view of point C in the middle; Figure 7 is a schematic diagram of the overall structure of the prefabricated mold in Example 3; Figure 8 yes Figure 7 The enlarged view of point D in the middle; Fig. 9 is a schematic structural diagram of the positioning mechanism in Example 3; Fig.10 is a schematic structural diagram of the locking mechanism in Example 3; Fig.11 It is a half-section schematic diagram of the locking base and the rotating locking block in Example 3.
[0027] Explanation of reference numerals: 1. prefabrication area; 11. prefabrication station; 12. moving track; 2. curing area; 3. transfer area; 4. half mold set; 41. side mold; 411. protrusion; 412. through hole; 413. L-shaped plate; 414. ear plate; 415. plug hole; 416. first connecting plate; 417. second connecting plate; 42. concave frame rod; 421. connecting part; 422. arm rod; 423. plug column; 43. baffle; 44. support frame; 441. base frame; 442. stand frame; 443. mounting plate; 444. inclined slide groove; 445. clearance hole; 5. Walking wheel assembly; 51. Connecting rod; 511. Anti-slip block; 52. Universal wheel; 53. Fourth elastic member; 6. Positioning mechanism; 61. Fixed base; 611. Limiting seat; 612. Movable slot; 613. Connecting slot; 62. Sliding frame; 621. Hooking part; 63. Second elastic member; 7. Locking mechanism; 71. Locking base; 711. Sliding part; 712. Extension part; 713. First slot hole; 72. Rotating locking block; 721. Hooking slot; 722. Second slot hole; 723. Third elastic member; 73. First elastic member; 74. Unlocking member; 8. Guide structure; 81. Spiral slot. DETAILED DESCRIPTION
[0028] The following is combined with Figure 1-11 This application is described in further detail.
[0029] Example 1 The embodiment of the present application discloses a method for prefabricating a twist block.
[0030] Reference Figure 1 A method for prefabricating a twist block comprises the following steps: Step S1, prefabrication site layout; meanwhile, refer to Figure 2, pour concrete floor at the construction site, divide it into prefabrication area 1, maintenance area 2 and transfer area 3, the prefabrication area 1 includes four groups of prefabrication stations 11; wherein the prefabrication stations 11 are arranged in a long strip shape, and the length directions of the four groups of prefabrication stations 11 are parallel to each other. The maintenance area 2 and transfer area 3 are arranged outside all the prefabrication stations 11.
[0031] Step S2, mold support; the prefabricated mold is supported at the prefabrication station 11, and the number of prefabricated molds arranged in a group of prefabrication stations 11 is set to multiple groups, and all the prefabricated molds are arranged equidistantly along the length direction of the prefabrication station 11.
[0032] Specifically, the process includes: S21, inspecting the two side molds 41, and removing debris and accumulated water in the molds.
[0033] S22, spraying a release agent onto the inner sides of the two side molds 41; the release agent is sprayed instead of brushed, so that the release agent can be more evenly distributed on the inner sides of the side molds 41.
[0034] S23, the two side molds 41 are assembled and fixed by connecting parts to form a prefabricated mold, and the assembled prefabricated mold is placed on the foam board; the connecting parts are bolts, and the side molds 41 are placed on the foam board after being connected by bolts. Since the foam board is elastic, it can seal the gap at the bottom of the side mold 41, reduce leakage of slurry, and facilitate demoulding.
[0035] It should be noted that the prefabricated mold is a special combined steel mold, welded with 4mm thick steel plates. Each set of prefabricated molds is assembled from multiple large pieces of fixed steel molds. 5mm thick steel strips are welded around the perimeter of the prefabricated mold to strengthen the peripheral rigidity, and holes are drilled on the steel strips at a certain interval to fasten the pieces with bolts. The top of the mold is not sealed and serves as the pouring port for concrete.
[0036] Step S3, concrete pouring. The pouring is carried out by direct pouring with a tank truck, with the tail of the tank truck facing the precast mold to be poured and the head facing the precast mold of the adjacent precast station 11, so that the distance between two adjacent groups of precast stations 11 is at least greater than the length of the tank truck. The pouring team cooperates with the tank truck to work, one person stands on the trolley and vibrates the concrete with a vibrating rod, one person moves the trolley, and another person is responsible for operating the material guide chute at the tail of the tank truck.
[0037] It should be noted that concrete must be poured in layers, with each layer no thicker than 50cm, and the pouring of the next layer of concrete can only be carried out after each layer of concrete has been fully vibrated. The pouring of the upper layer of concrete must be completed before the lower layer of concrete begins to set. To ensure the integrity of the upper and lower layers of concrete, the vibrator should be inserted into the lower layer of concrete by 5cm-10cm.
[0038] Reference Figure 3, concrete is poured into the assembled mold, and multiple pouring is adopted. The first pouring is to the horizontal plane A position, and the bubbles in the mud are pounded out by vibration. If the pouring is done once and then vibrated, the bubbles will be blocked by the inner wall of the side mold 41 during the upward movement due to the inclined inner wall of the middle part of the side mold 41, making it difficult for the bubbles to be discharged. Pouring to the horizontal plane A position facilitates the removal of bubbles.
[0039] The second pouring is to the horizontal plane B, and then vibrating and tamping are performed for the same reason as above; the third pouring is to complete the pouring of the concrete inside the entire mold, and then vibrating and tamping are performed. Through multiple pouring, it is easy to remove the bubbles in the mud. When the pouring is completed, the top surface needs to be trimmed.
[0040] Step S4, concrete block curing.
[0041] a. During the initial setting stage of concrete, it is necessary to protect the concrete from adverse effects such as sunlight and dry airflow. After the concrete is poured and initially set, cover it with a layer of burlap, straw mats or similar absorbent materials, and keep the concrete moist by spraying water. The wet curing time should be no less than 15 days.
[0042] b. The water used for maintenance should meet the requirements for concrete water, and the water should not contain chemicals or other substances that may contaminate the concrete surface.
[0043] c. If the mold cannot be removed within 12 hours after concrete pouring, the mold can be covered if necessary to prevent direct sunlight and minimize the moisture loss of the concrete.
[0044] Step S5, mold removal, including: S51, removing the connecting piece used to connect the two side molds 41.
[0045] S52, place a forklift under the side form 41, and apply an upward force to the side form 41; at the same time, place a jack on the concave frame rod 42 outside the side form 41, and align the top of the jack with the through hole 412 of the side form 41; the jack applies a force to the concrete block through the through hole 412, and under the reaction force, the side form 41 will move outward a short distance.
[0046] S53, after the concrete is completely solidified, the side formwork 41 is removed by a mobile forklift.
[0047] S54, flushing the inner wall of the side mold 41 to wash away the release agent and residues.
[0048] The function of the forklift is to apply an upward force to the side mold 41. Since the lower side of the side mold 41 is in contact with the foam board, the friction force at the bottom of the side mold 41 is greater than that at the top. If there is no forklift to apply an upward force to the side mold 41, and it is directly pushed out with a jack, the side mold 41 is prone to tilt due to the difference in friction, which in turn causes damage to the torsion block of the side mold 41.
[0049] It should be noted that at the same time point, the four groups of prefabrication stations 11 respectively operate and alternate in the order of steps S2 mold setting, S3 concrete pouring, S4 concrete block maintenance, and S5 mold removal, and the corresponding construction personnel are divided into 4 teams to carry out construction full-time.
[0050] Step S6: concrete block transfer and secondary curing.
[0051] The maintenance area 2 is used for temporary storage and is paved with stone ballast. It is required to be flat and solid so that the concrete blocks will not be damaged when stacked. The concrete blocks are transferred by forklifts and need to be continuously watered while placed in the maintenance area 2. The concrete blocks can only be transported out of the site for use when their strength reaches 75%.
[0052] The implementation principle of a method for prefabricating a twist block in the embodiment of the present application is as follows: By dividing the construction site into four groups of prefabrication stations 11, a maintenance area 2, and a transfer area 3, each group of prefabrication stations 11 respectively performs four steps of mold support, concrete pouring, concrete block maintenance, and mold removal, and each step is performed alternately, and finally pre-delivered to the maintenance area 2 for maintenance and transported to the transfer area 3 for transfer and transportation, which can facilitate management and is suitable for mass production of twist king blocks. In addition, during specific construction operations, the corresponding team members only need to master the skills of the corresponding steps, which can effectively reduce the construction personnel's mastery of each skill, focus on improving the skill proficiency of the corresponding steps, and thus reduce the possibility of concrete blocks being damaged during the operation, so that the obtained twist king blocks maintain good molding quality.
[0053] Example 2 The embodiment of the present application also discloses a prefabricated mold.
[0054] Reference Figure 4 A prefabricated mold includes two groups of half molds 4, each half mold 4 includes a side mold 41, a concave frame rod 42, a baffle 43 and a support frame 44, and the two side molds 41 are detachably connected by a connecting piece, and the connecting piece is specifically selected from bolts.
[0055] The side mold 41 is provided with an outer protrusion 411 protruding from the side surface away from the other side mold 41. The outer protrusion 411 is located in the middle of the side mold 41 and is integrally formed with the side mold 41; Figure 5 A through hole 412 is formed on the side of the outer protrusion 411, and two L-shaped plates 413 are fixed thereto. The two L-shaped plates 413 are respectively arranged on two opposite sides of the through hole 412. A placement space for placing the baffle 43 is formed between the two L-shaped plates 413, and after the baffle 43 is placed in the placement space, the side of the baffle 43 can be pressed against the outer side of the outer protrusion 411, thereby blocking the through hole 412.
[0056] The concave frame rod 42 is detachably connected to the outer protrusion 411. Specifically, two ear plates 414 are welded and fixed to the side of the outer protrusion 411, and the two ear plates 414 are respectively arranged at the upper and lower sides of the outer protrusion 411, and each ear plate 414 is provided with a plug hole 415; the concave frame rod 42 includes a connecting portion 421 and two arm rod portions 422 respectively arranged at both ends of the connecting portion 421, and the connecting portion 421 and the two arm rod portions 422 are integrally formed; each arm rod portion 422 is fixed with a plug column 423 at one end away from the connecting portion 421, and the two plug columns 423 are respectively plugged into the two plug holes 415, so that the concave frame rod 42 is hung on the outer protrusion 411.
[0057] After the baffle 43 is taken out from the placement space, the concave frame rod 42 is hung on the outer protrusion 411, and the jack is fixed to the side of the connecting part 421 close to the outer protrusion 411, and the jack's head is facing the through hole 412. The jack is controlled to move so that the head can enter the through hole 412 and press against the concrete block. The reaction force can be used to move the concave frame rod 42 and the entire side mold 41 outward by an end distance to realize the demolding of the side mold 41.
[0058] Reference Figure 6 , the support frame 44 is detachably mounted on the side mold 41. Specifically, the support frame 44 includes a bottom frame 441 and a vertical frame 442 fixed to the top of the bottom frame 441. A first connecting plate 416 is fixed to the bottom of the side mold 41, and the bottom frame 441 and the first connecting plate 416 are detachably connected by fasteners; a second connecting plate 417 is fixed to the side of the outer protrusion 411, and the vertical frame 442 and the second connecting plate 417 are detachably connected by fasteners. It can be understood that the fasteners mentioned above can be bolts, screws, etc.
[0059] The implementation principle of a prefabricated mold in the embodiment of the present application is: By making the concave frame rod 42 and the support frame 44 detachably connected to the side mold 41, when the prefabricated mold is transported to the construction site for casting and forming the torsion block, the side molds 41 can be stacked on each other, occupying less space, which can improve the convenience of transportation. In addition, a larger number of side molds 41 can be transported in a single transportation, which can shorten the transportation time and greatly reduce the transportation cost of the prefabricated mold.
[0060] Example 3 The embodiment of the present application also discloses a prefabricated mold.
[0061] Reference Figure 7 , Figure 8, a prefabricated mold disclosed in an embodiment of the present application, the remaining components are the same as those in Example 2, and will not be described one by one here; the difference from Example 2 is that in this embodiment, the support frame 44 is equipped with a walking wheel group 5, and the walking wheel group 5 is provided with multiple groups. In this embodiment, the specific number of the walking wheel group 5 is set to six groups, and the six walking wheel groups 5 are divided into two groups and evenly arranged on the base frame 441.
[0062] Specific reference Figure 8 , wherein the running wheel set 5 includes a connecting rod 51 and a universal wheel 52; the bottom frame 441 is provided with a vertically penetrating mounting hole, the inner diameter of the mounting hole is equal to the outer diameter of the connecting rod 51, the connecting rod 51 can be inserted into the mounting hole and move vertically in the mounting hole; the universal wheel 52 is fixedly mounted on the bottom end of the connecting rod 51. The top end of the connecting rod 51 is provided with an integrally formed anti-dropping block 511, the anti-dropping block 511 is located above the bottom frame 441, and the outer diameter of the anti-dropping block 511 is greater than the inner diameter of the mounting hole; the anti-dropping block 511 is provided to prevent the connecting rod 51 from directly detaching from the mounting hole.
[0063] A fourth elastic member 53 is also sleeved on the outer peripheral side of the connecting rod member 51. The fourth elastic member 53 in this embodiment is configured as a compression spring. One end of the fourth elastic member 53 abuts against the bottom surface of the base frame 441, and the other end abuts against the universal wheel 52. The fourth elastic member 53 can always generate an elastic force acting on the universal wheel 52, thereby forcing the anti-slip block 511 to normally abut against the top surface of the base frame 441.
[0064] In addition, a movable track 12 is fixed to the concrete floor surface of the prefabrication station 11. In the present embodiment, the cross-sectional shape of the movable track 12 is a concave shape. After the universal wheel 52 enters the movable track 12, it can only move back and forth along the length direction of the movable track 12. When the two side molds 41 are fixedly connected by bolts and concrete is poured, the universal wheel 52 will be located inside the movable track 12.
[0065] The prefabrication station 11 is also provided with a fixed positioning mechanism 6, and the base frame 441 is provided with a locking mechanism 7 that cooperates with the positioning mechanism 6 to lock. Through the cooperation between the positioning mechanism 6 and the locking mechanism 7, the side form 41 can be automatically raised when the side form 41 is removed, reducing the possibility of the side form 41 colliding with the concrete block.
[0066] Reference Fig. 9 The positioning mechanism 6 includes a fixed base 61 and a sliding frame 62. The fixed base 61 is fixed to the concrete floor surface of the prefabrication station 11. The side of the fixed base 61 is provided with an integrally formed limit seat 611. The top surface of the limit seat 611 is higher than the top surface of the fixed base 61. A movable groove 612 is provided inside the fixed base 61. The inner top wall of the movable groove 612 is provided with a connecting groove 613 that passes through the top surface of the fixed base 61.
[0067] The sliding frame 62 is slidably arranged inside the movable groove 612, and the moving direction of the sliding frame is perpendicular to the extension direction of the movable track 12; the sliding frame 62 of this embodiment is a hollow frame structure, and a hooking portion 621 is protrudingly arranged on the inner side surface of the sliding frame 62, and the hooking portion 621 is integrally formed with the sliding frame 62. In addition, a second elastic member 63 is also arranged inside the movable groove 612. The second elastic member 63 of this embodiment is set as a compression spring, one end of the second elastic member 63 abuts against the sliding frame 62, and the other end abuts against the inner wall of the movable groove 612; the second elastic member 63 can always generate an elastic force acting on the sliding frame 62, so that the inner circle of the sliding frame 62 is always directly below the connecting groove 613.
[0068] Reference Fig.10 Two mounting plates 443 are fixed to the bottom of the base frame 441, and the two mounting plates 443 are spaced apart and arranged side by side; each mounting plate 443 is provided with an inclined slide 444, and the inclined slide 444 is arranged in an inclined manner as a whole, and the distance between the inclined slide 444 and the bottom surface of the base frame 441 gradually decreases from one end of the inclined slide 444 close to the side mold 41 to the other end. It should be noted here that in the present application, the end of the inclined slide 444 away from the side mold 41 is higher and is set as the high side end of the inclined slide 444; the other end is set as the low side end.
[0069] The locking mechanism 7 includes a locking piece, a first elastic piece 73 and an unlocking piece 74, wherein the locking piece includes a locking base 71 and a rotating locking block 72; the two opposite side surfaces of the locking base 71 are respectively integrally formed with sliding parts 711, and the two sliding parts 711 are respectively slidably arranged inside the two inclined sliding grooves 444, so that the locking base 71 can move along the extension direction of the inclined sliding groove 444.
[0070] The first elastic member 73 of this embodiment is a tension spring, one end of which is hooked and fixed to the bottom of the base frame 441, and the other end is hooked and fixed to the locking base 71; the first elastic member 73 can always generate elastic force acting on the locking base 71, so that the locking base 71 normally stays at the high side end of the inclined slide 444. In addition, the outer peripheral surface of the locking base 71 is also provided with an integrally formed extension part 712, the outer diameter of the extension part 712 is larger than the distance between the two mounting plates 443, and the extension part 712 is located at the bottom end of the locking base 71; under the elastic force of the first elastic member 73, the top end surface of the extension part 712 can be kept against the bottom surface of the mounting plate 443.
[0071] Reference Fig.11 The rotating lock block 72 and the locking base 71 remain coaxial; the rotating lock block 72 is rotatably connected to the bottom of the locking base 71 and can rotate circumferentially around the central axis of the locking base 71; a hooking groove 721 is provided on the outer peripheral surface of the rotating lock block 72, and the hooking groove 721 is hooked and adapted with the hooking portion 621.
[0072] Reference Figure 8-Figure 11 It should be noted that when the universal wheel 52 enters the moving track 12, the limit seat 611 will be located on the moving path of the mounting plate 443; when the mounting plate 443 abuts against the limit seat 611, the rotating lock block 72 can stay just above the sliding frame 62. At this time, a force is applied to the support frame 44 to force it to move downward, and the rotating lock block 72 moves downward to a position where the hook portion 621 is directly opposite to the hook groove 721. The elastic force of the second elastic member 63 can force the hook portion 621 to automatically snap into the hook groove 721, so that the sliding frame 62 is hooked and fixed with the rotating lock block 72, thereby keeping the locking member and the positioning mechanism 6 fixed. It should also be noted that in the locked state, that is, when the concrete is poured, the fourth elastic member 53 will be in a compressed state, and the anti-slip block 511 is spaced apart from the top of the bottom frame 441.
[0073] Back to Fig.11 A first slot hole 713 is vertically penetrated on the top surface of the locking base 71, and the first slot hole 713 and the locking base 71 are coaxial; a second slot hole 722 is provided on the top surface of the rotating lock block 72, and the second slot hole 722 and the rotating lock block 72 are coaxial; the inner diameter of the first slot hole 713 and the inner diameter of the second slot hole 722 are both equal to the outer diameter of the unlocking member 74, and the unlocking member 74 can be inserted into the first slot hole 713 and the second slot hole 722.
[0074] Also refer to Fig.10 The bottom frame 441 is provided with a vertically penetrating clearance hole 445, which is a waist-shaped hole. The top of the unlocking member 74 is passed through the clearance hole 445 and exposed at the top of the bottom frame 441, so that the construction personnel can apply force to the unlocking member 74 to move the unlocking member 74 downward, and the unlocking member 74 can move and make way inside the clearance hole 445. A third elastic member 723 is also provided between the unlocking member 74 and the inner bottom wall of the second slot 722. The third elastic member 723 is a compression spring, which can always generate elastic force acting on the unlocking member 74, so that the unlocking member 74 is normally exposed at the top of the bottom frame 441.
[0075] A guide structure 8 is provided between the unlocking member 74 and the rotating lock block 72. Fig.11 The guide structure 8 includes a spiral groove 81 and a guide column (not shown in the figure), and the guide column and the spiral groove 81 are slidably adapted. In the present embodiment, the guide column is fixed to the outer peripheral surface of the unlocking member 74, and the spiral groove 81 is provided on the inner peripheral wall of the second slot 722. When the construction personnel apply force to the unlocking member 74 to move it downward, the movement of the guide column in the spiral groove 81 can automatically rotate the rotating lock block 72, and then the hooking portion 621 automatically disengages from the hooking groove 721, thereby realizing the mutual separation of the locking member and the positioning mechanism 6.
[0076] It is understandable that in another practicable embodiment, the guide post can also be fixed to the inner peripheral wall of the second slot 722, and the spiral groove 81 is correspondingly opened on the outer peripheral surface of the unlocking member 74, and the automatic rotation of the rotating lock block 72 can also be achieved by forcing the unlocking member 74 to move downward. In addition, in this embodiment, the elastic force of the third elastic member 723 can force the guide post to always stay at the top of the spiral groove 81, and at this time, the direction of the hooking groove 721 can be set to be opposite to the direction of the hooking portion 621, so that the rotating lock block 72 can be smoothly hooked and positioned with the rotating lock block 72 after entering the inner circle of the slider frame.
[0077] The implementation principle of a prefabricated mold in the embodiment of the present application is: When the prefabricated mold is assembled, the universal wheel 52 enters the sliding track, moves inward until the mounting plate 443 and abuts against the limit seat 611, and the rotating locking block 72 can be located directly above the sliding frame 62; downward force is applied to the support frame 44, and the rotating locking block 72 can enter the inner circle of the sliding frame 62, so that the locking piece is hooked and fixed to the positioning mechanism 6.
[0078] After the concrete pouring is completed, the bolts used to connect the two side molds 41 are removed, and the side molds 41 are forced to move outward using a jack. At this time, since the locking piece and the positioning mechanism 6 remain fixed, the locking piece can move in the inclined slide groove 444, that is, the side mold 41 can move relative to the locking piece through the inclined slide groove 444, so that the side mold 41 can automatically rise a certain distance while moving outward. No forklift assistance is required, and only one construction worker is needed to complete the mold removal operation, which is conducive to reducing costs and increasing efficiency.
[0079] After the side mold 41 moves outward to the extreme position, that is, the locking base 71 abuts against the lower side end of the inclined slide 444, the construction personnel apply force to the unlocking member 74 to move it downward, which can cause the rotating lock block 72 to rotate, thereby automatically disengaging from the positioning mechanism 6; finally, the construction personnel can push out the side mold 41 to clean the inner side and spray the mold release agent. It should be noted that when the locking member is separated from the positioning mechanism 6, the fourth elastic member 53 forces the anti-detachment block 511 to abut against the top of the bottom frame 441, and the side mold 41 can still remain out of contact with the concrete block to ensure the molding quality of the torsion block.
[0080] The above are preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A method for prefabricating a torsion block, characterized in that: The following steps are involved: Step S1, prefabrication site layout; pouring the floor at the construction site, dividing it into a prefabrication area (1), a maintenance area (2) and a transfer area (3), wherein the prefabrication area (1) includes four groups of prefabrication stations (11); Step S2, mold support: the prefabricated mold is supported on the prefabrication station (11), and the prefabricated molds are arranged equidistantly along the length direction of the prefabrication station (11); Step S3, concrete pouring; Step S4, concrete block curing; Step S5, removing the mold; At the same time point, the four groups of prefabrication stations (11) perform operations and alternations in the order of steps S2, S3, S4, and S5 respectively; Step S6: concrete block transfer and secondary curing.
2. The method for prefabricating a torsion block according to claim 1 is characterized in that: Step S2 includes the following steps: S21, inspecting the two side molds (41) and removing debris and accumulated water inside the side molds (41); S22, spraying a release agent onto the inner sides of the two side molds (41); S23, the two side molds (41) are assembled and fixed by connecting pieces to form a prefabricated mold, and the assembled prefabricated mold is placed on the foam board.
3. The method for prefabrication of twist blocks according to claim 1, characterized in that: Step S5 includes the following steps: S51, removing the connecting piece used to connect the two side molds (41); S52, placing a forklift under the side form (41), and applying an upward force to the side form (41); at the same time, placing a jack on the concave frame rod (42) outside the side form (41), and aligning the top of the jack with the through hole (412) of the side form (41); the jack applies a force to the concrete block through the through hole (412), forcing the side form (41) to move outward a short distance; S53, after the concrete is completely solidified, the side form (41) is removed by a mobile forklift; S54, flushing the inner wall of the side mold (41) to wash away the release agent and residue.
4. A prefabricated mold, based on the prefabrication construction method of the twist block according to any one of claims 1 to 3, characterized in that: The invention comprises two groups of half-mold sets (4), each of the half-mold sets (4) comprising a side mold (41), a concave frame rod (42), a baffle (43) and a support frame (44); the two side molds (41) are connected to each other via a connecting piece, and the support frame (44) is detachably connected to the side of the side mold (41); The side mold (41) is provided with an outer convex portion (411), and the concave frame rod (42) is detachably connected to the outer convex portion (411) for fixing a jack; a through hole (412) for the jack to enter is provided on a side surface of the outer convex portion (411), and the baffle (43) is detachably mounted on the outer convex portion (411) and blocks the through hole (412).
5. The prefabricated mold according to claim 4, characterized in that: A walking wheel group (5) is installed at the bottom of the support frame (44); the prefabrication station (11) is provided with a fixed movable track (12); during concrete pouring, the walking wheel group (5) is located inside the movable track (12); the prefabrication station (11) is also provided with a fixed positioning mechanism (6); the support frame (44) is provided with a locking mechanism (7) for cooperating with the positioning mechanism (6) to lock; The support frame (44) is fixed with two mounting plates (443), the two mounting plates (443) are spaced apart, and each mounting plate (443) is provided with an inclined slide groove (444) arranged obliquely; the locking mechanism (7) comprises a locking piece slidably mounted on the inclined slide groove (444) and a first elastic piece (73) arranged between the locking piece and the support frame (44), the first elastic piece (73) forces the locking piece to normally stay at one end of the inclined slide groove (444) away from the side mold (41), that is, the high side end of the inclined slide groove (444); when pouring concrete, the locking piece cooperates with the positioning mechanism (6) to lock and maintain positioning.
6. The prefabricated mold according to claim 5, characterized in that: The positioning mechanism (6) comprises a fixed base (61) fixed to the prefabrication station (11) and a sliding frame (62) slidably arranged on the fixed base (61), the fixed base (61) being provided with a limit seat (611) for the mounting plate (443) to abut against for limiting position, and when the mounting plate (443) abuts against the limit seat (611), the locking member is located directly above the sliding frame (62); The inner side surface of the sliding frame (62) is provided with a hooking portion (621) protruding therefrom, and the outer peripheral surface of the locking member is partially provided with a hooking groove (721) adapted to be hooked with the hooking portion (621); a second elastic member (63) is provided between the sliding frame (62) and the fixed base (61); when the locking member enters the inner circle of the sliding frame (62) and the hooking portion (621) and the hooking groove (721) are arranged opposite to each other, the second elastic member (63) forces the hooking portion (621) to be normally locked in the hooking groove (721); The locking mechanism (7) further comprises an unlocking member (74) for forcing the hooking portion (621) to disengage from the hooking groove (721).
7. The prefabricated mold according to claim 6, characterized in that: The locking member comprises a locking base (71) and a rotating locking block (72); two opposite side surfaces of the locking base (71) are respectively provided with sliding portions (711), and the sliding portions (711) are slidably arranged in the inclined sliding groove (444); the locking base (71) is partially provided with an extension portion (712), and when the locking base (71) stays at the high side end of the inclined sliding groove (444), the extension portion (712) abuts against the bottom of the mounting plate (443); the rotating locking block (72) is rotatably connected to the bottom of the locking base (71), and the hooking groove (721) is opened on the outer peripheral surface of the rotating locking block (72); The top surface of the locking base (71) is provided with a first slot hole (713) which passes vertically through, the top surface of the rotating lock block (72) is provided with a second slot hole (722), and the unlocking member (74) is inserted into the first slot hole (713) and the second slot hole (722); the top end of the unlocking member (74) is passed through a side of the support frame (44) away from the mounting plate (443), and the support frame (44) is provided with a clearance hole (445) for the unlocking member (74) to move out of position; a guide structure (8) is provided between the unlocking member (74) and the rotating lock block (72), and when the unlocking member (74) moves toward the bottom of the second slot hole (722), the rotating lock block (72) can be forced to rotate by utilizing the guide structure (8).
8. The prefabricated mold according to claim 7, characterized in that: The guide structure comprises a spiral groove (81) and a guide column slidably adapted thereto, the guide column being fixed to the outer circumferential surface of the unlocking member (74) or the inner circumferential wall of the second slot hole (722), and the spiral groove (81) being correspondingly clamped on the inner circumferential wall of the second slot hole (722) or the outer circumferential surface of the unlocking member (74); A third elastic member (723) is provided between the unlocking member (74) and the inner bottom wall of the second slot hole (722), and the third elastic member (723) is used to force the guide column to stay at the top of the spiral groove (81), at which time the direction of the hooking groove (721) is arranged to be opposite to the direction of the hooking portion (621).
9. The prefabricated mold according to claim 5, characterized in that: The support frame (44) is provided with a vertically penetrating mounting hole, the walking wheel assembly (5) comprises a connecting rod (51) movably inserted into the mounting hole and a universal wheel (52) fixed to the bottom end of the connecting rod (51), the top end of the connecting rod (51) is provided with an anti-slip block (511), the outer diameter of the anti-slip block (511) is larger than the inner diameter of the mounting hole; a fourth elastic member (53) is provided between the universal wheel (52) and the support frame (44), the fourth elastic member (53) forces the anti-slip block (511) to normally abut against the side of the support frame (44) away from the universal wheel (52), and when concrete is poured, the fourth elastic member (53) is in a stressed and compressed state.
10. The prefabricated mold according to claim 4, characterized in that: Two ear plates (414) are fixed to the side of the outer protrusion (411), and the ear plates (414) are provided with insertion holes (415); the concave frame rod (42) includes two arm rods (422), and each arm rod (422) is fixed with an insertion column (423), and the two insertion columns (423) are respectively plugged and adapted with the two insertion holes (415).