Vacuum defoaming and steam curing combined device for prefabricated T-beam and using method of vacuum defoaming and steam curing combined device
By using vacuum defoaming and low-temperature steam curing devices in the manufacturing process of precast T-beams, the problems of damage to the formwork by the vibrator and long waiting time for steam curing are solved, achieving efficient concrete quality improvement and production efficiency improvement, and are suitable for intelligent Hualiang Factory.
Patent Information
- Application Number
- CN202411021544.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-29
- Publication Date
- 2024-10-22
AI Technical Summary
During the manufacturing process of prefabricated T-beams, the vibrators in the prior art cause damage to the formwork, and the vibrating depth is insufficient and cannot be applied to thicker areas. The waiting time for steam curing is long and takes up a lot of space, which affects production efficiency.
A prefabricated T-beam vacuum defoaming combined steam curing device is designed, which includes a low-temperature steam generator, a vacuum device and an annular air bag. It removes bubbles through vacuum, shortens the steam curing time, automatically controls the steam ejection speed and temperature, and eliminates the need for demoulding. Steam curing can be performed to reduce manual sealing links.
It improves the compactness and strength of concrete, shortens steam curing time, saves space and labor costs, improves production efficiency, and is suitable for the construction of intelligent beam factories.
Smart Images

Figure CN118809803A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of prefabricated T-beam manufacturing, and more specifically, to a prefabricated T-beam vacuum degassing combined with steam curing device and a use method thereof. Background Art
[0002] In the manufacturing process of prefabricated T-beams, concrete vibration is an important part, usually using attached vibrators, inserted vibrators or a combination of the two. However, long-term use of high-frequency vibration of attached vibrators will damage the formwork and reduce its service life, and the effective vibration depth is only 10cm, which is not suitable for thicker web areas; inserted vibrators cannot be inserted into areas with dense steel bars (such as diaphragms, etc.), resulting in poor concrete quality in this area, and manual operation in conventional areas is also prone to touching the corrugated pipes and steel bars, causing damage to core components and affecting the quality of prefabricated T-beams. In order to prevent the concrete T-beam diaphragm and the steel bar holes on the end mold from leaking during vibration, they are usually sealed by manual glue injection. Not only does it take a long time to construct, but the residual glue needs to be manually cleaned after each demolding, which greatly affects the production efficiency of the prefabricated T-beam factory.
[0003] At the same time, during the production process of precast concrete T-beams, steam curing of concrete T-beams through high temperature and high humidity external surface environment can improve the early strength of concrete and achieve rapid tensioning and transportation, which is a necessary step. However, after the precast T-beam concrete is poured, it is generally necessary to stand for 10 hours, wait until it reaches a certain strength for demoulding, and then move it to the steam room for steam curing. The waiting time is too long, and the steam room takes up more space in the precast beam factory.
[0004] Therefore, the existing technology has obvious shortcomings in the vibration and steam curing of prefabricated T-beam concrete. It is very necessary to carry out technical research and develop a device and its use method with good vibration effect, small impact, short steam curing interval and small space occupation. Summary of the invention
[0005] The purpose of the present invention is to address the deficiencies of the prior art and to provide a prefabricated T-beam vacuum degassing combined with steam curing device and a method for using the same.
[0006] In a first aspect, a prefabricated T-beam vacuum degassing combined with steam curing device is provided, comprising:
[0007] Prefabricated T-beam casting template and steam curing device; the prefabricated T-beam casting template is formed by a cover plate, a side mold, an end mold, a diaphragm, a diaphragm bottom plate and a base; the steam curing device includes a low-temperature steam generator, a steam pipe, a water tank, a water pump, a first water pipe, a second water pipe
[0008] Among them, a steam pipe is installed on the cover plate, one end of the low-temperature steam generator is connected to the steam pipe, and the other end is connected to the water tank through the first water pipe; a second water pipe is also installed on the cover plate, a water valve is provided on the second water pipe, and the end of the second water pipe away from the cover plate is connected to the water pump; the water pump is also connected to the water tank.
[0009] Preferably, it further comprises a vacuum device; the vacuum device comprises a vacuum pump, a vacuum pressure relief valve, a vacuum tube, a pressure relief valve and a vacuum gauge;
[0010] One end of the vacuum tube is connected to the cover plate, and the other end is connected to the vacuum pump. The vacuum pressure relief valve is arranged on the vacuum tube; the pressure relief valve and the vacuum gauge are both arranged on the cover plate.
[0011] Preferably, the prefabricated T-beam casting template is provided with tied steel bars, and a plurality of steel bar holes are respectively opened on the end template and the cross partition to expose the steel bars; annular air bags are installed on the side walls of the steel bar holes, and the annular air bags are connected by air bag connecting pipes; a valve is installed on the air bag connecting pipe, and the air bag connecting pipe is connected to the air compressor through a pressure pipe; and a pressure regulating valve is provided on the pressure pipe.
[0012] Preferably, the steam curing device further comprises a temperature sensor and a humidity sensor arranged on the cover plate; a central controller is also provided, and the vacuum pump, temperature sensor, humidity sensor, low-temperature steam generator and water pump are all connected to the central controller via wires.
[0013] Preferably, the annular airbag is provided with an air nozzle with an external thread, and the airbag connecting pipe is pre-buried in the diaphragm and the end mold, and the interface thereof is provided with an internal thread.
[0014] Preferably, slurry-stopping sealing components are provided at the joints of the cover plate, side molds, end molds, diaphragms, diaphragm bottom plates and base components.
[0015] Preferably, the outside of the prefabricated T-beam casting template is covered with a layer of insulation board.
[0016] In a second aspect, a method for using the prefabricated T-beam vacuum degassing combined with steam curing device as described in the first aspect is provided, comprising:
[0017] Step 1: Process the components of the prefabricated T-beam casting template;
[0018] Step 2: hoisting the steel bars and closing the prefabricated T-beam casting formwork;
[0019] Step 3: Start the air compressor to ensure that the annular airbag contacts all the steel bars without leaking air or mortar;
[0020] Step 4, pouring concrete and evacuating the concrete using a vacuum device;
[0021] Step 5: Perform steam curing through a steam curing device, and control the temperature in the prefabricated T-beam template and the steam ejection speed through a central controller;
[0022] Step 6: Turn off the air compressor, low-temperature steam generator, and water pump, then disconnect all connecting valves, loosen the fixing bolts of the cover plate, side mold, end mold and diaphragm, separate them through the gantry crane, and check the quality of the prefabricated T-beam after demolding.
[0023] In a third aspect, a prefabricated T-beam prepared by using the prefabricated T-beam vacuum degassing combined with steam curing device as described in the second aspect is provided.
[0024] The beneficial effects of the present invention are:
[0025] 1. The present invention can perform steam curing after the initial setting of concrete, which saves the waiting time for demoulding and improves the efficiency of beam making. At the same time, there is no need to build an additional steam room, which saves money and reduces the area occupied by the prefabricated beam site.
[0026] 2. The present invention uses vacuuming to remove bubbles from concrete, which can replace the traditional vibrator, and the appearance and internal quality of the prefabricated T-beam are improved. At the same time, the vacuum can be automatically controlled without manual labor, which meets the construction requirements of modern intelligent beam factories.
[0027] 3. The annular airbag of the present invention can be inflated to achieve sealing between the exposed steel bars of the prefabricated T-beam and the formwork, and deflated to achieve smooth demoulding. It is also reusable and easy to replace. Most importantly, it does not require conventional manual gluing and sealing steps, thus saving labor costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a structural schematic diagram of a prefabricated T-beam vacuum degassing combined with steam curing device;
[0029] Figure 2 It is a front view of a prefabricated T-beam vacuum degassing combined with steam curing device;
[0030] Figure 3 for Figure 2 A magnified schematic diagram of the middle A area;
[0031] Figure 4 for Figure 2 A magnified schematic diagram of the middle B area;
[0032] Figure 5 It is a side view of a prefabricated T-beam vacuum degassing combined with steam curing device;
[0033] Figure 6It is a schematic diagram of the connection between the side mold, the cover plate and the end mold;
[0034] Figure 7 It is a schematic diagram of the connection between the side mold, the base and the end mold;
[0035] Explanation of reference numerals: 1 cover plate; 2 side mold; 3 end mold; 4 diaphragm; 5 vacuum pump; 6 vacuum pressure valve; 7 vacuum tube; 8 central controller; 9 pressure relief valve; 10 vacuum gauge; 11 temperature sensor; 12 humidity sensor; 13 low-temperature steam generator; 14 steam regulating valve; 15 steam pipe; 16 water tank; 17 water pump; 181 first water pipe; 182 second water pipe; 19 water valve; 20 wire; 21 air compressor; 22 pressure gauge; 23 pressure regulating valve; 24 pressure pipe; 25 wing plate longitudinal reinforcement; 26 wing plate prestressing 1. web longitudinal reinforcement; 27. web longitudinal reinforcement; 28. web reinforcing longitudinal reinforcement; 29. prestressed tendon corrugated pipe; 30. PVC pipe; 31. diaphragm transverse reinforcement; 32. diaphragm reinforcing transverse reinforcement; 33. rectangular ear box; 34. insulation board; 35. diaphragm bottom plate; 36. air bag connecting pipe; 37. first valve; 38. second valve; 39. wing plate annular reinforcement; 40. wing plate top plate elevation line; 41. annular air bag; 42. air nozzle; 43. end mold rubber strip; 44. base rubber strip; 45. base; 46. square steel; 47. cover plate rubber strip; 48. stop slurry strip; 49. comb teeth. DETAILED DESCRIPTION
[0036] The present invention is further described below in conjunction with embodiments. The description of the following embodiments is only used to help understand the present invention. It should be noted that for ordinary persons in the art, without departing from the principle of the present invention, the present invention can also be modified in some ways, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.
[0037] Embodiment 1:
[0038] In order to solve the problem of long waiting time for steam curing in the prior art, Example 1 of the present application provides a prefabricated T-beam vacuum degassing combined with steam curing device, such as Figure 1 As shown, including:
[0039] Prefabricated T-beam casting template and steam curing device; the prefabricated T-beam casting template is formed by a cover plate 1, a side mold 2, an end mold 3, a diaphragm 4, a diaphragm bottom plate 35 and a base 45, and there are tied steel bars in the template. The end mold 3 and the diaphragm 4 are respectively provided with a plurality of steel bar holes so that the steel bars are exposed; the steam curing device includes a low-temperature steam generator 13, a steam pipe 15, a water tank 16, a water pump 17, a first water pipe 181, and a second water pipe 182
[0040] Among them, a steam pipe 15 is installed on the cover plate 1, one end of the low-temperature steam generator 13 is connected to the steam pipe 15, and the other end is connected to the water tank 16 through the first water pipe 181; a second water pipe 182 is also installed on the cover plate 1, and a water valve 19 is provided on the second water pipe 182, and the end of the second water pipe 182 away from the cover plate 1 is connected to the water pump 17; the water pump 17 is also connected to the water tank 16.
[0041] The present application adopts a steam curing device connected to the prefabricated T-beam casting formwork, which can provide a uniform and controllable temperature and humidity environment for concrete without demolding, shorten the curing cycle and improve production efficiency.
[0042] In addition, a vacuum device can also be included, which can effectively remove bubbles in the concrete, reduce the porosity inside the concrete, and improve the density and strength of the concrete, thereby significantly improving the overall quality of the prefabricated T-beam.
[0043] Specifically, the vacuum device is composed of a vacuum pump 5, a vacuum pressure relief valve 6, a vacuum tube 7, a pressure relief valve 9 and a vacuum gauge 10. One end of the vacuum tube 7 is connected to the cover plate 1, and the other end is connected to the vacuum pump 5. The vacuum tube 7 is provided with a vacuum pressure relief valve 6; the pressure relief valve 9 and the vacuum gauge 10 are both provided on the cover plate 1.
[0044] The steam curing device further includes a temperature sensor 11 and a humidity sensor 12 arranged on the cover plate 1; a central controller 8 is also provided, and the vacuum pump 5, the temperature sensor 11, the humidity sensor 12, the low-temperature steam generator 13, and the water pump 17 are all connected to the central controller 8 through a wire 20. The present application combines the central controller to achieve precise control of steam temperature, humidity, and vacuum degree, avoiding the inaccuracy and waste of resources in traditional manual adjustment, and improving the stability and reliability of the curing process.
[0045] Embodiment 2:
[0046] Based on Example 1, Example 2 of the present application provides a more specific prefabricated T-beam vacuum degassing and steam curing device, which is composed of a prefabricated T-beam casting template, a steam curing device and a vacuum device.
[0047] Among them, Figure 2-Figure 5 As shown, annular airbags 41 are installed on the side walls of the steel bar holes of the end mold 3 and the diaphragm 4, and the annular airbags 41 are connected by an airbag connecting pipe 36; valves are installed on the airbag connecting pipe 36, for example, a first valve 37 is installed on the airbag connecting pipe 36 of the diaphragm 4, and a second valve 38 is installed on the airbag connecting pipe 36 of the end mold 3; the airbag connecting pipe 36 is connected to the air compressor 21 through a pressure pipe 24; and a pressure regulating valve 23 is provided on the pressure pipe 24.
[0048] Specifically, the annular airbag 41 is provided with an air nozzle 42 with external threads, and the airbag connecting pipe 36 is pre-buried in the diaphragm 4 and the end mold 3, and the interface thereof is provided with internal threads.
[0049] In addition, stop-slurry sealing components are provided at the joints of the cover plate 1, the side form 2, the end form 3, the diaphragm 4, the diaphragm bottom plate 35 and the base 45. The annular airbag 41 and the stop-slurry sealing components effectively prevent the leakage of concrete during the pouring process, and ensure the dimensional accuracy and appearance quality of the prefabricated T-beam.
[0050] Comb teeth 49 are arranged on the side form 2, and a rectangular ear box 33 is welded outside the comb teeth 49, the width of which is slightly larger than the exposed wing plate annular reinforcement 39, and the top is open.
[0051] The height of the wing plate part of the side mold 2 is 5 to 15 cm higher than the wing plate top plate elevation line 40, the bottom of the water valve 19 is 2 to 3 cm away from the wing plate top plate elevation line 40, and the bottoms of the remaining vacuum and air conditioning valves 6 and steam regulating valves 14 on the cover plate 1 are flush with the bottom surface of the cover plate 1.
[0052] The low-temperature steam generator 13, the water pump 17 and the central controller 8 are fixed in a specific area, and the steam pipe 15, the water pipe 18 and the conductor 20 are pre-buried under the ground until they are near the prefabricated T-beam side form 2, and the vacuum pump 5 and the air compressor 21 have wheels and are moved to the vicinity of the prefabricated T-beam side form 2 by the wheels.
[0053] The outside of the prefabricated T-beam casting template is covered with a layer of insulation board 34, which can keep the temperature in the template relatively stable and reduce the impact of external temperature fluctuations on the quality of concrete. In addition, the insulation board 34 can also protect the template and concrete.
[0054] It should be noted that the parts in this embodiment that are the same or similar to those in Embodiment 1 can be referenced to each other and will not be described in detail in this application.
[0055] Embodiment 3:
[0056] Based on Example 2, Example 3 of the present application provides a method for using a prefabricated T-beam vacuum degassing combined with steam curing device, including:
[0057] Step 1: Process the components of the prefabricated T-beam casting formwork.
[0058] Step 1 includes:
[0059] Step 1.1, the cover plate 1, the side mold 2, the end mold 3, the diaphragm 4, the diaphragm bottom plate 35, etc. are shaped according to the designed dimensions. After the shaping is completed, the end mold rubber strip 43, the base rubber strip 44, the cover plate rubber strip 47, etc. are installed at the joints of each component to stop the slurry and prevent air leakage.
[0060] Step 1.2, fine processing of the diaphragm 4 and the end mold 3. According to the positioning of the wing plate longitudinal reinforcement 25, the wing plate prestressed longitudinal reinforcement 26, the web longitudinal reinforcement 27, the web reinforced longitudinal reinforcement 28, the prestressed reinforcement corrugated tube 29, the diaphragm transverse reinforcement 31, and the diaphragm reinforced longitudinal reinforcement 32, holes are opened in the diaphragm 4 and the end mold 3 respectively, and the holes are connected by slots. The airbag connecting pipe 36 with internal threads is embedded in the opened grooves. The valves I 37 and II 38 are installed on the diaphragm 4 and the airbag connecting pipe 36 of the end mold 3 to facilitate the later connection with the pressure pipe 24. Then, the valves are fixed and filled with glue to ensure that the surface is flush. Finally, the annular airbag 41 with the external threaded air nozzle 42 is fixed to the inner wall of the hole with glue to ensure a tight connection without air leakage. The diameter of the hole is 5 to 10 mm larger than the diameter of the steel bar to facilitate the installation of the annular airbag 41. The diameter of the airbag connecting pipe 36 is consistent with the thickness of the end mold 3 and the diaphragm 4.
[0061] Step 1.3, perform fine processing on the side mold 2 and the cover plate 1. Rectangular ear boxes 33 are welded to the outer sides of the wing comb teeth 49 of the side mold 2, which are open at the top and closed in other directions. Cover plate rubber strips 47 are attached around the open parts to facilitate subsequent sealing with the cover plate 1. Holes are opened at the designed positions of the cover plate 1, and the pressure relief valve 9, vacuum gauge 10, temperature sensor 11, humidity sensor 12, vacuum pressure relief valve 6, steam regulating valve 14, and water valve 19 are installed respectively, and it is necessary to ensure that the joints are tight and leak-proof.
[0062] Step 2: Lift the steel bars and close the prefabricated T-beam casting formwork.
[0063] Specifically, first spray the release agent on the surface of the prefabricated T-beam base 45, the side form 2, the end form 3, the diaphragm 4, and the cover plate 1. Then, tie the steel bars and hoist them on the base 45 in turn, and check the tying and position alignment. Next, close the side form 2, and tightly connect the bottom of the side form 2 with the base rubber strip 44, and fix it with the bottom screw. Finally, install the diaphragm 4 and the end form 3, pay attention to the connection between the steel bars and the opening, do not damage the annular airbag 41, and tightly fix the end form rubber strip 43 at the connection with the side form 2 with bolts.
[0064] Step 3: Start the air compressor to ensure that the annular airbag 41 does not leak air or mortar when in contact with all the steel bars.
[0065] Specifically, first, paste the mortar stopper strip 48 inside and outside the comb teeth 49 to prevent the flange annular steel bar 39 from leaking mortar, seal the hole side of the prestressed corrugated pipe 29 with glue, and plug the hole with a rubber plug to prevent air leakage. Then connect one end of the air compressor 21 to the valve I 37 and valve II 38 of the diaphragm 4 and the end mold 3 through the pressure pipe 24. Finally, start the air compressor 21 to ensure that the annular airbag 41 contacts all steel bars without air leakage or mortar leakage. The output pressure of the air compressor 21 is 0.015Mpa.
[0066] Step 4: pour concrete and evacuate the concrete using a vacuum device.
[0067] Step 4 includes:
[0068] Step 4.1: The concrete is transported to the concrete placing boom by a torpedo tank. The concrete placing boom moves horizontally to pour the concrete in layers into the prefabricated T-beam formwork until the wing plate top plate elevation line 40.
[0069] Step 4.2, close the cover plate 1, connect the vacuum tube 7, close the pressure relief valve 9, the steam regulating valve 14, and the water valve 19, and use the central controller 8 to control the start and duration of the vacuum pump 5. The negative pressure of the vacuum pump 5 is -95 kPa, and the vacuuming time is 35 minutes.
[0070] Step 4.3, open the pressure relief valve 9, and then close it after the negative pressure on the vacuum gauge 10 shows zero.
[0071] Step 5: Steam curing is performed by means of a steam curing device, and the temperature inside the prefabricated T-beam template and the steam ejection speed are controlled by means of a central controller 8.
[0072] Specifically, the low-temperature steam generator 13, the steam regulating valve 14, and the water valve 19 are turned on for steam curing. The temperature in the 8 prefabricated T-beam template and the steam ejection speed are controlled by the central controller, so that the template's heating, constant temperature, cooling and other parameters are automatically operated according to the set parameters. Steam curing is divided into three stages. The heating stage starts from the ambient temperature and reaches a constant temperature of 53°C after 2 hours. The constant temperature stage maintains a constant temperature for 6 hours. The cooling stage is naturally cooled for 2 hours. The prefabricated T-beam is cured for 10 hours before demolding.
[0073] Step 6: Turn off the air compressor 21, the low-temperature steam generator 13, and the water pump 17, then disconnect all connecting valves, loosen the fixing bolts of the cover plate 1, the side mold 2, the end mold 3 and the diaphragm 4, separate them by the gantry crane, and check the quality of the prefabricated T-beam after demolding.
[0074] Specifically, the method provided in this embodiment is a method corresponding to the device provided in Example 2. Therefore, the parts in this embodiment that are the same or similar to those in Example 2 can be referenced to each other and will not be repeated in this application.
Claims
1. A prefabricated T-beam vacuum degassing combined with steam curing device, characterized in that: include: A prefabricated T-beam casting template and a steam curing device; the prefabricated T-beam casting template is formed by a cover plate (1), a side mold (2), an end mold (3), a diaphragm (4), a diaphragm bottom plate (35) and a base (45); the steam curing device comprises a low-temperature steam generator (13), a steam pipe (15), a water tank (16), a water pump (17), a first water pipe (181) and a second water pipe (182); The cover plate (1) is provided with a steam pipe (15); one end of the low-temperature steam generator (13) is connected to the steam pipe (15), and the other end is connected to the water tank (16) via a first water pipe (181); a second water pipe (182) is also installed on the cover plate (1); a water valve (19) is provided on the second water pipe (182); an end of the second water pipe (182) away from the cover plate (1) is connected to the water pump (17); and the water pump (17) is also connected to the water tank (16).
2. The prefabricated T-beam vacuum degassing combined with steam curing device according to claim 1 is characterized in that: It also includes a vacuum device; the vacuum device is composed of a vacuum pump (5), a vacuum pressure relief valve (6), a vacuum tube (7), a pressure relief valve (9) and a vacuum gauge (10); One end of the vacuum tube (7) is connected to the cover plate (1), and the other end is connected to the vacuum pump (5); the vacuum tube (7) is provided with the vacuum pressure relief valve (6); the pressure relief valve (9) and the vacuum gauge (10) are both provided on the cover plate (1).
3. The prefabricated T-beam vacuum degassing combined with steam curing device according to claim 1 or 2, characterized in that: The prefabricated T-beam casting template is provided with tied steel bars, and a plurality of steel bar holes are respectively opened on the end mold (3) and the cross partition (4) so that the steel bars are exposed; an annular air bag (41) is installed on the side wall of the steel bar hole, and the annular air bags (41) are connected through an air bag connecting pipe (36); a valve is installed on the air bag connecting pipe (36), and the air bag connecting pipe (36) is connected to the air compressor (21) through a pressure pipe (24); and a pressure regulating valve (23) is provided on the pressure pipe (24).
4. The prefabricated T-beam vacuum degassing combined with steam curing device according to claim 3 is characterized in that: The steam curing device further comprises a temperature sensor (11) and a humidity sensor (12) arranged on the cover plate (1); a central controller (8) is also provided, and the vacuum pump (5), the temperature sensor (11), the humidity sensor (12), the low-temperature steam generator (13), and the water pump (17) are all connected to the central controller (8) via a wire (20).
5. The prefabricated T-beam vacuum degassing combined with steam curing device according to claim 4 is characterized in that: The annular airbag (41) is provided with an air nozzle (42) with external threads, and the airbag connecting pipe (36) is pre-buried in the diaphragm (4) and the end mold (3), and the interface thereof is provided with internal threads.
6. The prefabricated T-beam vacuum degassing combined with steam curing device according to claim 5 is characterized in that: The joints of the cover plate (1), the side mold (2), the end mold (3), the transverse partition (4), the transverse partition bottom plate (35) and the base (45) are all provided with slurry-stopping sealing components.
7. The prefabricated T-beam vacuum degassing combined with steam curing device according to claim 6 is characterized in that: The outer surface of the prefabricated T-beam casting template is covered with a layer of insulation board (34).
8. A method for using the vacuum degassing combined with steam curing device for prefabricated T-beams as claimed in claim 1, characterized in that: include: Step 1: Process the components of the prefabricated T-beam casting template; Step 2: hoisting the steel bars and closing the prefabricated T-beam casting formwork; Step 3, starting the air compressor to ensure that the annular air bag (41) does not leak air or mortar when in contact with all the steel bars; Step 4, pouring concrete and evacuating the concrete using a vacuum device; Step 5, steam curing is performed by a steam curing device, and the temperature inside the prefabricated T-beam template and the steam ejection speed are controlled by a central controller (8); Step 6: Turn off the air compressor (21), the low-temperature steam generator (13), and the water pump (17), then disconnect all the connecting valves, loosen the fixing bolts of the cover plate (1), the side mold (2), the end mold (3), and the diaphragm (4), separate them by the gantry crane, and check the quality of the prefabricated T-beam after demolding.
9. A prefabricated T-beam prepared by using the method of the prefabricated T-beam vacuum degassing combined with steam curing device as claimed in claim 8.