Tensioning device, system and method for stay cable

By setting up a cable-stayed tensioning device at the end of the bridge box girder, and using the cooperation of the connecting component and the push component, the difficulty in tensioning caused by the small space of the main tower is solved, and efficient cable-stayed tensioning operation is achieved to meet the needs of construction needs.

CN118814618AInactive Publication Date: 2024-10-22CHINA RAILWAY MAJOR BRIDGE ENG GRP CO LTD +2
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
CN202410929364.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-10-22
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The reduced space of the main tower of the bridge makes it difficult to meet the construction requirements of the tensioning device and affects the tensioning process of the stay cables.

Method used

A cable-stayed tensioning device is designed, including a connecting component and a pushing component, which is installed in the anchor box at the end of the bridge box girder. Through the cooperation of the anchor pad and the pushing component, the cable-stayed tensioning is realized to ensure Construction operations proceed smoothly.

Benefits of technology

This device facilitates the installation and tensioning operation of the cable stay, avoids the space restrictions of the main tower, meets the requirements of tensioning construction, and improves construction efficiency and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118814618A_ABST
    Figure CN118814618A_ABST
Patent Text Reader

Abstract

The embodiment of the invention provides a stay cable tensioning device, system and method, and relates to the technical field of bridge construction, the tensioning device comprises a connecting assembly and a plurality of pushing assemblies, the connecting assembly is arranged in an anchor box at the bridge box girder end and is connected with the end of a cable body penetrating in the anchor box, an anchor backing plate is arranged in the anchor box, and the pushing assemblies are connected with the anchor backing plate. The multiple pushing assemblies are annularly arranged between the anchor bearing plate and the connecting assembly at intervals, the two ends of each pushing assembly are attached to the anchor bearing plate and the connecting assembly correspondingly, and the multiple pushing assemblies are used for pushing the connecting assembly to stretch the cable body. The anchor box is arranged at the box girder end of the bridge, the connecting assembly and the pushing assembly are arranged in the anchor box, the pushing assembly in the anchor box pushes the connecting assembly to stretch and draw the stay cable body, and the anchor box, the connecting assembly and the pushing assembly arranged at the box girder end of the bridge are convenient for operators to install and stretch and draw the stay cable body. And the influence of space reduction of a bridge main tower is avoided, and the requirements of tensioning construction are met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of bridge construction, and in particular to a tensioning device, system and method for a stay cable. Background Art

[0002] The cable is an important part of the cable-stayed bridge. It serves as a link between the main tower and the main beam and is the "lifeline" of the cable-stayed bridge. The key process of cable installation during padlocking is divided into three stages: on-site hoisting, traction and cable tensioning. Among them, cable tensioning affects the design performance and safety of the bridge.

[0003] During the construction process of the bridge cable tensioning, the cable is tensioned using a tensioning device, the fixed end of the cable is arranged at the end of the box girder, and the tensioning device is set in the main tower to tension the cable. However, with the improvement of the bridge design and construction level, the space of many newly built bridge main towers is more compact, and the small space of the bridge main tower is difficult to meet the construction requirements of conventional tensioning devices. Summary of the invention

[0004] The embodiments of the present invention provide a tensioning device, system and method for a stay cable to solve the technical problem in the related art that the space of the main tower of the bridge is reduced and it is difficult to meet the construction requirements of the tensioning device.

[0005] In a first aspect, a tensioning device for a stay cable is provided, comprising:

[0006] A connecting assembly, which is arranged in an anchor box at the end of a bridge box girder and connected to an end of a cable body bundled in the anchor box, wherein an anchor pad is arranged in the anchor box;

[0007] A plurality of pushing assemblies are provided between the anchor plate and the connecting assembly at an annular interval, and two ends of each pushing assembly are respectively fitted with the anchor plate and the connecting assembly, and the plurality of pushing assemblies are used to push the connecting assembly to tension the cable body.

[0008] In some embodiments, the connection assembly includes: a tension end anchor cup, a tension rod, a tension end anchor cup nut, a reaction seat and a tension rod nut;

[0009] The tensioning end anchor cup is arranged in the anchor box and connected to the end of the cable body bundled in the anchor box, one end of the tension rod is connected to the end of the tensioning end anchor cup away from the cable body, the outer periphery of the other end of the tension rod is threadedly connected to the tension rod nut, the reaction seat is sleeved on the outer periphery of the tensioning end anchor cup, one end of the reaction seat is connected to each of the pushing assemblies, the other end of the reaction seat is fitted with the tension rod nut, and the tensioning end anchor cup nut is threadedly connected to the outer periphery of the tensioning end anchor cup.

[0010] In some embodiments, each of the push assemblies comprises: a pad, a support column and a jack;

[0011] The pad, support column and jack are arranged between the anchor plate and the connecting assembly, one end of the pad is fitted with the anchor plate, and the other end is connected to one end of the support column, the other end of the support column is fitted with one end of the piston of the jack, and the other end of the jack is fitted with the reaction seat.

[0012] In some embodiments, the other end of the jack is detachably connected to the reaction seat.

[0013] In some embodiments, it also includes:

[0014] A plurality of pull-wire sensors corresponding to the plurality of jacking assemblies one by one, one end of each of the pull-wire sensors being connected to the corresponding jack and the other end being connected to the cushion block.

[0015] In some embodiments, the invention includes:

[0016] A guide device, one end of which is against the inner side of the anchor box and the other end is connected to the reaction seat. When the pushing assembly pushes the reaction seat, the reaction seat drives the guide device to move.

[0017] In some embodiments, the guide device includes: a guide frame and two guide rods;

[0018] The guide frame is sleeved on the outer periphery of the anchor pad and abuts against the inner side of the anchor box. One ends of the two guide rods are respectively connected to the guide frame, and each guide rod is slidably connected to the guide frame. The other ends of the two guide rods are connected to the reaction seat.

[0019] In some embodiments, the guide device also includes four connecting rods; the four connecting rods are respectively arranged on both sides of the two guide rods, one end of each connecting rod is slidably connected to the corresponding side of the corresponding guide rod, and the other end is slidably connected to the guide frame.

[0020] In a second aspect, a stay cable tensioning system is provided, comprising the aforementioned stay cable tensioning device.

[0021] In a third aspect, a method for tensioning a stay cable is provided, comprising the following steps:

[0022] Step S10: installing a tensioning device at the end of the box beam, and connecting the tensioning device to the cable body;

[0023] Step S20: tensioning the cable body by a tensioning device;

[0024] Step S30: obtaining the measured cable force value of the cable body, and determining whether the measured cable force value reaches the preset cable force value;

[0025] Step S40: If yes, the tensioning operation on the cable body is completed; if no, steps S20 to S30 are repeated until the measured cable tension value of the cable body reaches the preset cable tension value.

[0026] The beneficial effects brought about by the technical solution provided by the present invention include:

[0027] The embodiment of the present invention provides a tensioning device, system and method for a cable-stayed cable, the tensioning device comprising a connecting assembly and a plurality of pushing assemblies, the connecting assembly being arranged in an anchor box at the end of a bridge box girder and being connected to the end of a cable body bundled in the anchor box, an anchor pad being arranged in the anchor box, a plurality of pushing assemblies being arranged in an annular interval between the anchor pad and the connecting assembly, and the two ends of each pushing assembly being respectively fitted with the anchor pad and the connecting assembly, and a plurality of pushing assemblies being used to push the connecting assembly to tension the cable body. The anchor box of the present invention is arranged at the end of a bridge box girder, the connecting assembly and the pushing assembly are arranged in the anchor box, the pushing assembly in the anchor box pushes the connecting assembly to tension the cable body of the cable-stayed cable, the anchor box, the connecting assembly and the pushing assembly arranged at the end of the bridge box girder are convenient for operators to install and perform tensioning operations on the cable body of the cable-stayed cable, are not affected by the reduction in space of the bridge main tower, and meet the requirements of tensioning construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0029] Figure 1 A schematic cross-sectional view of a tensioning device for a stay cable provided in an embodiment of the present invention;

[0030] Figure 2 An overall schematic diagram of a tensioning device for a stay cable provided in an embodiment of the present invention;

[0031] Figure 3 A partial schematic diagram of a tensioning device for a stay cable provided in an embodiment of the present invention;

[0032] Figure 4 Another partial schematic diagram of a tensioning device for a stay cable provided in an embodiment of the present invention;

[0033] Figure 5 A flow chart of a method for tensioning a stay cable provided in an embodiment of the present invention;

[0034] Reference numerals:

[0035] 1. Anchor box; 11. Anchor pad;

[0036] 2. Connecting assembly; 21. Anchor cup at tension end; 22. Tension rod; 23. Anchor cup nut at tension end; 24. Reaction seat; 25. Tension rod nut;

[0037] 3. Push assembly; 31. Cushion block; 32. Support column; 33. Jack;

[0038] 4. Cable body;

[0039] 5. Pull wire sensor;

[0040] 6. Guide device; 61. Guide frame; 62. Guide rod; 63. Connecting rod.

[0041] 7. A first guide slider;

[0042] 8. Second guide slider. DETAILED DESCRIPTION

[0043] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0044] The embodiments of the present invention provide a tensioning device, system and method for a stay cable, which can solve the technical problem in the prior art that the space of the main tower of the bridge is reduced and it is difficult to meet the requirements of the tensioning device construction.

[0045] See also Figure 1 and Figure 2 As shown, an embodiment of the present invention provides a tensioning device for a stay cable, which is provided with a connecting component 2 and a plurality of pushing components 3.

[0046] The connecting assembly 2 is arranged in the anchor box 1 at the end of the box girder of the bridge and is connected to the end of the cable body 4 bundled in the anchor box 1. An anchor pad 11 is arranged in the anchor box 1. A plurality of the pushing assemblies 3 are arranged in annular intervals between the anchor pad 11 and the connecting assembly 2, and the two ends of each pushing assembly 3 are respectively fitted with the anchor pad 11 and the connecting assembly 2. A plurality of pushing assemblies 3 are used to push the connecting assembly 2 to tension the cable body 4. The anchor box of the present invention is arranged at the box girder end of the bridge, and the connecting assembly and the pushing assembly are arranged in the anchor box. The pushing assembly in the anchor box pushes the connecting assembly to tension the cable body of the cable. The anchor box, the connecting assembly and the pushing assembly arranged at the box girder end of the bridge facilitate the installation and tensioning operation of the cable body of the cable for the operators, are not affected by the reduction of the space of the main tower of the bridge, and meet the requirements of tensioning construction.

[0047] The anchor box of the present invention is arranged at the box girder end of the bridge, an anchor pad is arranged in the anchor box, a connecting assembly is connected to the cable body in the anchor box, a plurality of pushing assemblies are arranged between the anchor pad and the connecting assembly, and the plurality of pushing assemblies push the connecting assembly to drive the cable body to be tensioned. The anchor box type tensioning device installed at the box girder end is convenient for operators to install and perform tensioning operations on the inclined cable body, is not affected by the reduction of the space of the main tower of the bridge, and meets the requirements of tensioning construction.

[0048] As an optional implementation, in an embodiment of the invention, see Figure 1 and Figure 2 As shown, the connection assembly 2 is provided with a tensioning end anchor cup 21 , a tensioning rod 22 , a tensioning end anchor cup nut 23 , a reaction seat 24 and a tensioning rod nut 25 .

[0049] The tensioning end anchor cup 21 is arranged in the anchor box 1 and connected to the end of the cable body 4 bundled in the anchor box 1. One end of the tension rod 22 is connected to the end of the tensioning end anchor cup 21 away from the cable body 4. The outer periphery of the other end of the tension rod 22 is threadedly connected to the tension rod nut 25. During the tensioning process, after the tension rod 22 is screwed into the inner thread of the tensioning end anchor cup 21, the tension rod nut 25 is screwed into the tension rod 22 to ensure that the tension rod nut 25 is tightly fitted with the reaction seat 24. The reaction seat 24 is sleeved on the outer periphery of the tensioning end anchor cup 21. The reaction seat 24 is arranged in the jacking assembly 3 and the tension rod nut 25. One end of the reaction seat 24 is connected to each of the jacking assemblies 3. The other end of the reaction seat 24 fits with the tension rod nut 25. The tensioning end anchor cup nut 23 is threadedly connected to the outer periphery of the tensioning end anchor cup 21. When the pushing assembly 3 pushes, the reaction seat 24 moves away from the pushing assembly 3, and the reaction seat 24 fits with the tension rod nut 25. When the reaction seat 24 moves, it pushes the tension rod nut 25 to drive the tension rod 22, the tensioning end anchor cup 21 and the tensioning end anchor cup nut 23 to move, so as to tension the cable body 4. After one stage of tensioning is completed, the tensioning end anchor cup nut 23 is tightened to fit the anchor pad 11, and the tensioning rod nut 25 is tightened to fit the reaction seat 24 again, so as to carry out the next stage of tensioning operation, until the measured cable force value of the cable body reaches the preset cable force value, and the tensioning is completed.

[0050] As an optional implementation, in an embodiment of the invention, see Figure 1 , Figure 2 and Figure 3 As shown, each of the pushing assemblies 3 is provided with a cushion block 31, a support column 32 and a jack 33. After the cable body 4 is passed through the anchor box 1 and is in place, the cushion block 31 and the support column 32 are installed with the anchor plate 11 on the anchor box 1 as the installation reference surface, the reaction seat 24 is hoisted and concentrically passed through the tensioning end anchor cup 21, and the piston rod end face of the jack 33 is aligned with the matching end face of the support column 32 to ensure fit, so that the cushion block 31, the support column 32 and the jack 33 are firmly arranged between the anchor plate 11 and the connecting assembly 2, one end of the cushion block 31 is fit with the anchor plate 11, and the other end is connected to one end of the support column 32, the other end of the support column 32 is fit with one end of the piston of the jack 33, and the other end of the jack 33 is fit with the reaction seat 24. When the jack 33 pushes, the jack 33 moves in a direction away from the cushion block 31 , driving the reaction seat 24 to move in a direction away from the pushing assembly 3 , so as to complete the tensioning operation.

[0051] As an optional implementation, in one embodiment of the invention, the other end of the jack 33 is detachably connected to the reaction seat 24. In this embodiment, each of the jacks 33 is fixed to the reaction seat 24 by bolts to facilitate maintenance and replacement operations.

[0052] As an optional implementation, in an embodiment of the invention, see Figure 3 As shown, there are also provided a plurality of wire sensors 5 corresponding to the plurality of jacking assemblies 3 one by one. The wire sensors 5 are installed in a magnetic manner. One end of each of the wire sensors 5 is connected to the corresponding jack 33 and fixed to the cylinder end face of the jack 33, and the other end is fixed to the side face of the cushion block 31. After installation, the initial value needs to be calibrated due to installation error to ensure that the initial value of each wire sensor 5 is consistent. The wire of the wire sensor 5 monitors the jacking process simultaneously as the piston rod stroke increases, so as to facilitate the synchronous jacking of each jack.

[0053] As an optional implementation, in an embodiment of the invention, see Figure 4 As shown, a guide device 6 is provided, one end of which is against the inner side of the anchor box 1 and the other end is connected to the reaction seat 24. When the push assembly 3 pushes the reaction seat 24, the reaction seat 24 drives the guide device 6 to move. The guide device is used to ensure that the anchor pad and the reaction seat are subjected to uniform force when each jack pushes synchronously, eliminating the influence of unfavorable factors such as uneven push force and push point slip during multi-jack tensioning, and ensuring a stable and reliable tensioning process.

[0054] As an optional implementation, in an embodiment of the invention, see Figure 4 As shown, the guide device 6 is provided with a guide frame 61 and two guide rods 62. The guide frame 61 is sleeved on the outer periphery of the anchor pad 11 and abuts against the inner side of the anchor box 1. One end of the two guide rods 62 is respectively connected to the guide frame 61, and each guide rod 62 is slidably connected to the guide frame 61. The other ends of the two guide rods 62 are connected to the reaction seat 24. The guide device 6 is a connecting rod slider mechanism, which is used to stabilize the tensioning process. When the tensioning operation starts, the synergistic effect ensures that the position of each push assembly is stable and the force is balanced during tensioning. When the push assembly is unloaded and reset, the guide device also ensures that the reset action is smooth and without jumping, so as to better ensure the repeatability of the tensioning operation and high reset accuracy.

[0055] As an optional implementation, in an embodiment of the invention, see Figure 4As shown, the guide device 6 is also provided with four connecting rods 63, and the four connecting rods 63 are respectively arranged on both sides of the two guide rods 62, one end of each connecting rod 63 is slidably connected to the corresponding side of the corresponding guide rod 62, and the other end is slidably connected to the guide frame 61, and the connecting rod 63 is slidably connected through the first guide slider 7 and the second guide slider 8, and the first guide slider 7 and the second guide slider 8 slide along the guide rod 62 and the guide frame 61 respectively, so as to further ensure the smoothness of the reset action.

[0056] An embodiment of the present invention further provides a stay cable tensioning system, comprising the aforementioned stay cable tensioning device, wherein the stay cable tensioning device is provided with a connecting component 2 and a plurality of jacking components 3.

[0057] An anchor box 1 is provided at the box girder end of the bridge, an anchor pad 11 is provided in the anchor box 1, the connection assembly 2 is provided in the anchor box 1 and connected to the end of the cable body 4 bundled in the anchor box 1, a plurality of the jacking assemblies 3 are provided between the anchor pad 11 and the connection assembly 2 at annular intervals, and the two ends of each of the jacking assemblies 3 are respectively fitted with the anchor pad 11 and the connection assembly 2, and a plurality of the jacking assemblies 3 are used to jack the connection assembly 2 to tension the cable body 4. The anchor box of the present invention is installed at the box girder end of the bridge, the connection assembly and the jacking assemblies are provided in the anchor box, the jacking assemblies in the anchor box push the connection assembly to tension the cable body of the cable, and the anchor box, the connection assembly and the jacking assemblies provided at the box girder end of the bridge facilitate the installation and tensioning operation of the cable body of the cable by the operators, are not affected by the reduction of the space of the main tower of the bridge, and meet the requirements of tensioning construction.

[0058] The present invention also provides a method for tensioning a stay cable, see Figure 5 As shown, the following steps are included:

[0059] Step S10, installing a tensioning device at the end of the box beam, and connecting the tensioning device to the cable body.

[0060] Specifically, after the cable body 4 is bundled into the anchor box 1 and in place, each cushion block 31 and each support column 32 are installed with the anchor pad 11 on the anchor box 1 as the installation reference surface, each jack 33 is bolted to the upper end face of the reaction seat 24, the reaction seat 24 is hoisted and concentrically passed through the tensioning end anchor cup 21, the piston rod end face of each jack 33 is aligned with the corresponding support column 32 end face to ensure fit, the tension rod 22 is screwed into the internal thread of the tensioning end anchor cup 21 of the cable body 4, and the tension rod nut 25 is screwed into the tension rod 22 to ensure that the upper end face of the tension rod nut 25 is tightly fitted with the lower end face of the reaction seat 24. The wire sensor 5 is installed by magnetic suction, with one end fixed to the cylinder end face of the jack 33 and the other end fixed to the side of the cushion block 31. After installation, the initial value needs to be calibrated due to installation error to ensure that the initial values ​​of each wire sensor 5 are consistent. The upper and lower sides of the anchor plate 11, the side threaded holes of the pad 31, and the through-hole position of the reaction seat 24 are used to install the fixed guide device 6. The guide device 6 is used to ensure that the anchor plate 11 and the reaction seat 24 are evenly stressed when each jack 33 is pushed synchronously, so as to ensure that the tensioning process is stable and reliable. The signal line of the wire sensor 5 and the hydraulic oil pipe of the jack 33 are connected to the hydraulic pump station to complete the equipment installation. Installing the tensioning device at the end of the box girder is convenient for operators to install and perform tensioning operations. At the same time, operators at the box girder end of the bridge can avoid high-altitude operations during construction, improve operation safety, and facilitate real-time observation of the cable body status and cable force monitoring.

[0061] Step S20, tensioning the cable body by using a tensioning device.

[0062] Specifically, the steps include:

[0063] Step S201, multiple jacks start to push synchronously;

[0064] Step S202, obtaining the travel data of the wire sensor corresponding to each jack;

[0065] Step S203, judging whether the stroke of each jack is consistent according to each stroke data;

[0066] Step S204: If yes, stretch until the jack piston rod reaches the maximum stroke;

[0067] Step S205: If not, close the oil supply valve of the jack with the largest stroke, and continue to push the remaining jacks until the strokes of each jack are consistent.

[0068] Step S30, obtaining the measured cable tension value of the cable body, and determining whether the measured cable tension value reaches a preset cable tension value.

[0069] Step S40: If yes, the tensioning operation of the cable body is completed; if no, steps S20 to S30 are repeated until the measured cable tension value of the cable body reaches the preset cable tension value.

[0070] In the description of the present invention, it should be noted that the terms "upper", "lower", etc. indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as a limitation on the present invention. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to the specific circumstances.

[0071] It should be noted that, in the present invention, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0072] The above description is only a specific embodiment of the present invention, so that those skilled in the art can understand or implement the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but should conform to the widest scope consistent with the principles and novel features of the present invention.

Claims

1. A tensioning device for a stay cable, characterized in that: include: A connecting assembly (2), the connecting assembly (2) being arranged in an anchor box (1) at the end of a bridge box girder and connected to an end of a cable body (4) threaded through the anchor box (1), an anchor pad (11) being arranged in the anchor box (1); A plurality of pushing assemblies (3) are arranged in an annular manner between the anchor plate (11) and the connecting assembly (2), and two ends of each pushing assembly (3) are respectively in contact with the anchor plate (11) and the connecting assembly (2), and the plurality of pushing assemblies (3) are used to push the connecting assembly (2) to tension the cable body (4).

2. The tensioning device for the stayed cable according to claim 1, characterized in that: The connection assembly (2) comprises: a tension end anchor cup (21), a tension rod (22), a tension end anchor cup nut (23), a reaction seat (24) and a tension rod nut (25); The tensioning end anchor cup (21) is arranged in the anchor box (1) and is connected to the end of the cable body (4) bundled in the anchor box (1); one end of the tension rod (22) is connected to the end of the tensioning end anchor cup (21) away from the cable body (4); the outer periphery of the other end of the tension rod (22) is threadedly connected to the tension rod nut (25); the reaction seat (24) is sleeved on the outer periphery of the tensioning end anchor cup (21); one end of the reaction seat (24) is connected to each of the jacking assemblies (3); the other end of the reaction seat (24) is fitted with the tension rod nut (25); the tensioning end anchor cup nut (23) is threadedly connected to the outer periphery of the tensioning end anchor cup (21).

3. The tensioning device for the inclined cable according to claim 2, characterized in that: Each of the pushing assemblies (3) comprises: a cushion block (31), a support column (32) and a jack (33); The cushion block (31), the support column (32) and the jack (33) are arranged between the anchor plate (11) and the connecting assembly (2); one end of the cushion block (31) is in contact with the anchor plate (11), and the other end is connected to one end of the support column (32); the other end of the support column (32) is in contact with one end of the piston of the jack (33); and the other end of the jack (33) is in contact with the reaction seat (24).

4. The tensioning device for the stay cable according to claim 3, characterized in that: The other end of the jack (33) is detachably connected to the reaction seat (24).

5. The tensioning device for the stayed cable according to claim 3, characterized in that: Also includes: A plurality of pull-wire sensors (5) corresponding one to one to the plurality of push assemblies (3), one end of each of the pull-wire sensors (5) being connected to the corresponding jack (33) and the other end being connected to the cushion block (31).

6. The tensioning device for the stayed cable according to claim 2, characterized in that: include: A guide device (6), one end of the guide device (6) is in contact with the inner side of the anchor box (1), and the other end is connected to the reaction seat (24); when the pushing assembly (3) pushes the reaction seat (24), the reaction seat (24) drives the guide device (6) to move.

7. The tensioning device for a stay cable according to claim 6, characterized in that: The guide device (6) comprises: a guide frame (61) and two guide rods (62); The guide frame (61) is sleeved on the outer periphery of the anchor pad (11) and abuts against the inner side of the anchor box (1), one end of the two guide rods (62) are respectively connected to the guide frame (61), and each guide rod (62) is slidably connected to the guide frame (61), and the other ends of the two guide rods (62) are connected to the reaction seat (24).

8. The tensioning device for the stayed cable according to claim 7, characterized in that: The guide device (6) further comprises four connecting rods (63); The four connecting rods (63) are respectively arranged on both sides of the two guide rods (62); one end of each connecting rod (63) is slidably connected to a corresponding side of the corresponding guide rod (62), and the other end is slidably connected to the guide frame (61).

9. A tensioning system for a stay cable, characterized in that: A tensioning device for a stay cable comprising the stay cable described in claims 1-8.

10. A method for tensioning a stay cable, using the stay cable tensioning device according to claim 1, characterized in that: The following steps are involved: Step S10: installing a tensioning device at the end of the box beam, and connecting the tensioning device to the cable body; Step S20: tensioning the cable body by a tensioning device; Step S30: obtaining the measured cable force value of the cable body, and determining whether the measured cable force value reaches the preset cable force value; Step S40: If yes, the tensioning operation on the cable body is completed; if no, steps S20 to S30 are repeated until the measured cable tension value of the cable body reaches the preset cable tension value.

Citation Information

Patent Citations

  • Multifunctional anchor pipe-type anchor pulling plate

    CN106930188A

  • Jacking device and method for short tower cable-stayed bridge

    CN112064517A

  • Scaffold opening protection adjustable device

    CN118187492A

  • Stay cable hanging and tension construction device

    CN203782575U

  • Stay cable tensioning device in limited space

    CN210597036U