A prestressed double T-plate positioning and installation process and construction device

By designing a prestressed double T-plate construction device including rotating frame, lifting rod and transmission components, the problem of the inability to provide transverse tension during installation of the double T-plate is solved, the precise positioning and efficient installation of the double T-plate are achieved, and the construction is enhanced Stability and safety.

CN118815215BActive Publication Date: 2024-11-15SHANXI NO 8 CONSTR GRP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411283336.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-13
Publication Date
2024-11-15
Estimated Expiration
2044-09-13

AI Technical Summary

Technical Problem

In the prior art, prestressed double T-plate cannot accurately provide tension in transversely when installed, resulting in increased construction difficulty and safety risks.

Method used

A prestressed double T-plate construction device including a guide mechanism and a crane is designed to achieve precise positioning of the double T-plate through a rotating frame, a lifting rod and a transmission assembly, and to provide stable clamping force, dynamic pulley and wire rope using hydraulic cylinders and jaws. Adjust the tension to ensure accurate installation of the dual T-plate in complex environments.

Benefits of technology

It realizes accurate positioning and efficient installation of dual T-boards, enhances construction stability and safety, improves installation efficiency and adaptability, and can flexibly adjust and adapt to different installation angles and positions in complex environments.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118815215B_ABST
    Figure CN118815215B_ABST
Patent Text Reader

Abstract

The invention relates to a prestressed double T-plate positioning and installation process and a construction device, belonging to the technical field of engineering construction; the construction device comprises a guiding mechanism and a crane, a lifting rope is arranged on the lifting hook of the crane, the lifting rope is connected with the lifting ring on the prestressed double T-plate, and the crane places the two ends of the prestressed double T-plate on the supporting beams on both sides through the lifting rope; a group of guiding mechanisms are respectively arranged on the supporting beams on both sides, the guiding mechanism comprises a fixed frame, a rotating frame, and a lifting rod, the fixed frame is detachably arranged on the supporting beam, a rotating frame is rotatably arranged on the fixed frame, the lifting rod is slidably inserted into the rotating frame along the vertical direction, the rotating frame is driven to rotate by a driving component, and when the rotating frame rotates, the lifting rod is driven to be lifted and lowered by a transmission component, a movable pulley is slidably arranged on the lifting rod, and the movable pulley is connected with the lifting rope through a steel wire rope; the problem that the current prestressed double T-plate cannot provide lateral pulling force during positioning and installation is solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of engineering construction, and in particular relates to a prestressed double T-plate positioning and installation process and a construction device. Background Art

[0002] In the field of construction engineering, prestressed concrete double T-slab is an important prefabricated component. Due to its unique structural form (consisting of two upper wings and one lower wing, shaped like the letter "T"), it has high bearing capacity and seismic resistance. It is widely used in floor slabs, roofs and large-span structures of single-story, multi-story and high-rise buildings.

[0003] In the prior art, the installation of the double T-plate is mainly carried out by crane and manual adjustment. However, in some special cases, the crane arm cannot accurately move the prestressed double T-plate to the specified position (for example, Figure 1 In the case of a steel structure being constructed in a lateral direction, construction workers are unable to provide lateral pulling force, which increases construction difficulty and safety risks.

[0004] Therefore, it is necessary to provide a new prestressed double T-plate positioning and installation process and construction device to solve the above technical problems. Summary of the invention

[0005] The present invention overcomes the shortcomings of the prior art, and proposes a prestressed double T-plate positioning and installation process and a construction device, and solves the problem that the current prestressed double T-plate cannot provide lateral tension during positioning and installation.

[0006] In order to achieve the above object, the present invention is implemented through the following technical solutions.

[0007] A construction device for a prestressed double T-plate comprises a guiding mechanism and a crane, wherein a lifting rope is arranged on the lifting hook of the crane, and the lifting rope is connected with the lifting ring on the prestressed double T-plate, and the crane places the two ends of the prestressed double T-plate on the supporting beams on both sides through the lifting rope; a group of guiding mechanisms are respectively arranged on the supporting beams on both sides, and the guiding mechanism comprises a fixed frame, a rotating frame, and a lifting rod, wherein the fixed frame is detachably arranged on the supporting beam, a rotating frame is rotatably arranged on the fixed frame, and the lifting rod is slidably inserted into the rotating frame along a vertical direction, a driving assembly is arranged on the fixed frame, and the rotating frame is driven to rotate by the driving assembly, and a transmission assembly is arranged between the rotating frame and the lifting rod, and when the rotating frame rotates, the lifting rod is driven to be lifted and lowered by the transmission assembly, and a movable pulley is slidably arranged on the lifting rod, and the movable pulley is connected to the lifting rope through a steel wire rope.

[0008] Furthermore, a lifting ring is fixedly provided at each of the four corners of the upper end surface of the prestressed double T plate.

[0009] Furthermore, the fixed frame is an L-shaped rod structure, including a vertical section and a horizontal section, the upper end of the vertical section is fixedly connected to one end of the horizontal section; a vertical first slide groove is provided on the inner side surface of the vertical section of the fixed frame, a vertical hydraulic cylinder is fixedly provided inside the first slide groove, and a clamp is fixedly provided at the end of the piston rod of the hydraulic cylinder.

[0010] Furthermore, two upper and lower ear plates are fixedly arranged on the outer side surface of the vertical section of the fixed frame; one end of the rotating frame is rotatably arranged between the upper and lower ear plates.

[0011] Furthermore, the driving assembly includes a cylinder and a first lever; an action hole with an opening at the lower end is provided at the lower end surface of the rotating frame, the action hole is located at the rotation axis of the rotating frame, and a spiral groove is provided on the inner wall of the action hole; a cylinder is also fixedly provided on the outer side surface of the vertical section of the fixed frame, and the piston rod of the cylinder vertically upward passes through the lower ear plate and then extends into the action hole of the rotating frame; a first lever is fixedly provided on the piston rod of the cylinder, and the first lever extends into the spiral groove of the action hole.

[0012] Furthermore, the transmission assembly includes track wheels, tracks, fan-shaped plates, second levers, and support rods; a mounting groove is provided on the upper end surface of the rotating frame, and multiple track wheels are rotatably arranged inside the mounting groove along the extension direction thereof, and the same track is transmission-sleeved on the outer sides of the multiple track wheels; a vertical second lever is fixedly provided on the outer side of the track; a horizontal fan-shaped plate is fixedly provided at the upper ear plate, and an arc groove is fixedly provided at the lower end surface of the fan-shaped plate, and the center of the arc groove is located between the track wheels at both ends; the upper end of the second lever is inserted into the arc groove at the lower end of the fan-shaped plate.

[0013] Furthermore, the lifting rod is an L-shaped rod structure, including a vertical rod and a horizontal rod, and the vertical rod and the horizontal rod are both square rod structures; the upper end of the vertical rod is fixedly connected to one end of the horizontal rod, the horizontal rod is located above the rotating frame, and the horizontal rod is parallel to the rotating frame; a square plug-in hole that passes through the upper and lower parts is provided at the end of the rotating frame away from the two ear plates, and the vertical rod of the lifting rod is slidably plugged into the plug-in hole of the rotating frame; a support rod is also rotatably provided on the outer side surface of the track, the lower end of the support rod is hinged to the track, and the upper end of the support rod is hinged to the lower end surface of the horizontal rod of the lifting rod.

[0014] Furthermore, a second slide groove is arranged at the upper end surface of the horizontal rod of the lifting rod, and the second slide groove extends along the length direction of the horizontal rod; a slidable slider and a return spring are arranged inside the second slide groove, one end of the return spring is connected to the slider, and the other end of the return spring is connected to an end of the second slide groove away from the vertical rod.

[0015] Furthermore, the rotating shaft of the movable pulley is rotatably arranged at the upper end of the slider, a fixed block is fixedly arranged at one end of the upper end surface of the horizontal rod of the lifting rod close to the vertical rod, one end of the active pull rope is fixedly arranged on the fixed block, and the other end of the active pull rope passes around the movable pulley and extends toward one side of the vertical rod; the end of the wire rope away from the suspension rope is connected to the rotating shaft of the movable pulley;

[0016] Furthermore, a positioning and installation process of a construction device for a prestressed double T-plate is adopted, comprising the following steps:

[0017] Step 1: The piston rod of the control cylinder extends upward, and the piston rod of the cylinder drives the first lever to move upward. Since the first lever cooperates with the spiral groove, the rotating frame is driven to rotate 120° outward around its rotation axis; the rotating frame drives the second lever to rotate synchronously during the outward rotation. Since the second lever is plugged into the inside of the circular arc groove, when the second lever rotates with the rotating frame, the second lever slides inside the circular arc groove at the same time, and the second lever drives the crawler to move, and the crawler drives all the crawler wheels to rotate at the same time. During the movement, the crawler drives the lower end of the support rod to move, so that the support rod rotates upward relative to the rotating frame, and the upper end of the support rod moves upward, thereby driving the lifting rod to slide upward inside the plug-in hole of the rotating frame, that is, the rotating frame drives the lifting rod to rise synchronously during the outward rotation; when the rotating frame has completed its rotation, the lifting rod also stops rising, and at this time the lifting rod drives the movable pulley, the active pull rope, and the wire rope to rise to a specified height;

[0018] Step 2: Move the crane to the designated construction site, and then fix the lifting ropes on the crane to the lifting rings at the four corners of the prestressed double T-plate, and then lift the prestressed double T-plate to the designated position. The worker stands on the support beam and connects the lifting rope to the movable pulley through the wire rope;

[0019] Step 3: At this time, the construction workers pull the active pull rope, and the active pull rope drives the movable pulley to compress the reset spring, so that the prestressed double T-plate moves away from the construction site. After positioning, the construction workers selectively pull the wire rope according to the position of the prestressed double T-plate, so that the prestressed double T-plate moves to the specified position, thereby completing the final positioning of the prestressed double T-plate.

[0020] The beneficial effects of the present invention compared with the prior art are as follows:

[0021] (1) Precise positioning and efficient installation: This device can achieve precise positioning of the prestressed double T-plate through precise mechanical structure design, especially the transmission components between the rotating frame and the lifting rod and support rod. During the lifting process, even if there are construction environment restrictions, such as one end cannot be flush with the construction position, the balance adjustment can be achieved by moving the movable pulley and the lifting rope to ensure that the double T-plate is accurately positioned, which greatly improves the installation efficiency and accuracy. The design of the movable pulley reduces the pulling force, thereby achieving a labor-saving effect.

[0022] (2) Enhanced stability and safety: The anti-slip rubber layer covering the inner side of the clamping jaws in the device effectively increases the friction when in contact with the prestressed double T-plate, preventing it from sliding or falling off during clamping and movement, significantly improving the stability and safety during construction. At the same time, the stable clamping force provided by the hydraulic cylinder further ensures the stability of the double T-plate during lifting and positioning.

[0023] (3) Flexible adjustment and strong adaptability: The cylinder drives the first lever to slide in the spiral groove to achieve flexible rotation of the rotating frame. Through the cooperation of the transmission components, the rotating frame can drive the lifting rod to rise while rotating, so that it can adapt to the needs of different installation angles and positions. This design makes the device more adaptable and flexible in complex and changeable construction environments. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] The present invention will be further described in detail below in conjunction with the accompanying drawings:

[0025] Figure 1 is a schematic diagram of the present invention when installed;

[0026] Figure 2 It is a schematic diagram of the structure of the guiding mechanism;

[0027] Figure 3 is a schematic diagram of the cooperation between the first lever and the spiral groove;

[0028] Figure 4 It is a structural schematic diagram of the arc slot;

[0029] Figure 5 It is a schematic diagram of the structure between the movable pulley and the active pull rope and wire rope;

[0030] Figure 6 It is a structural diagram of the lifting rod;

[0031] Among them, 1 is a fixed frame; 2 is a hydraulic cylinder; 3 is a clamp; 4 is a rotating frame; 5 is a lifting rod; 6 is a support beam; 7 is an active pull rope; 8 is a movable pulley; 9 is a prestressed double T plate; 10 is a crane; 11 is a lifting rope; 12 is a wire rope; 21 is an ear plate; 22 is a cylinder; 23 is a first lever; 24 is an action hole; 25 is a spiral groove; 31 is a crawler; 32 is a second lever; 33 is a fan-shaped plate; 34 is an arc groove; 35 is a support rod; 41 is a reset spring; 42 is a slider; 43 is a fixed block. DETAILED DESCRIPTION

[0032] In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention clearer, the present invention is further described in detail in conjunction with the embodiments and the accompanying drawings. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. The technical solutions of the present invention are described in detail below in conjunction with the embodiments and the accompanying drawings, but the scope of protection is not limited thereto.

[0033] like Figure 1 As shown in FIG. 6 , the present invention provides a construction device for a prestressed double T-plate, comprising a guiding mechanism and a crane 10, wherein a lifting rope 11 is arranged on the lifting hook of the crane 10, and the lifting rope 11 is connected to the lifting ring on the prestressed double T-plate 9, and the crane 10 places the two ends of the prestressed double T-plate 9 on the supporting beams 6 on both sides through the lifting rope 11; a group of guiding mechanisms are respectively arranged on the supporting beams 6 on both sides, and the guiding mechanism comprises a fixed frame 1, a rotating frame 4, and a lifting rod 5, the fixed frame 1 is detachably arranged on the supporting beam 6, the rotating frame 4 is rotatably arranged on the fixed frame 1, the lifting rod 5 is slidably inserted into the rotating frame 4 along the vertical direction, a driving assembly is arranged on the fixed frame 1, and the rotating frame 4 is driven to rotate by the driving assembly, and a transmission assembly is arranged between the rotating frame 4 and the lifting rod 5, and when the rotating frame 4 rotates, the lifting rod 5 is driven to be lifted and lowered by the transmission assembly, and a movable pulley 8 is slidably arranged on the lifting rod 5, and the movable pulley 8 is connected to the lifting rope 11 through a steel wire rope 12.

[0034] A lifting ring is fixedly provided at each of the four corners of the upper end surface of the prestressed double T plate 9 , and a lifting rope 11 is connected to the four lifting rings.

[0035] The fixed frame 1 is an L-shaped rod structure, including a vertical section and a horizontal section, and the upper end of the vertical section is fixedly connected to one end of the horizontal section. A vertical first slide groove is arranged on the inner side surface of the vertical section of the fixed frame 1, and a vertical hydraulic cylinder 2 is fixedly arranged inside the first slide groove. The piston rod of the hydraulic cylinder 2 is vertically downward, and a clamp 3 is fixedly arranged at the end of the piston rod of the hydraulic cylinder 2. The clamp 3 is parallel to the horizontal section of the fixed frame 1, and the clamp 3 slides inside the first slide groove. When the piston rod of the hydraulic cylinder 2 shrinks, the lower end surface of the horizontal section of the fixed frame 1 and the upper end surface of the clamp 3 are in close contact with the upper and lower end surfaces of the support beam 6 on the same side, thereby fixing the guiding mechanism as a whole on the support beam 6; the lower end surface of the horizontal section of the fixed frame 1 and the upper end surface of the clamp 3 are fixedly arranged with an anti-slip rubber layer.

[0036] Two upper and lower ear plates 21 are fixedly arranged on the outer side of the vertical section of the fixed frame 1. The rotating frame 4 is a horizontally arranged linear rod-shaped structure, one end of the rotating frame 4 is rotatably arranged between the upper and lower ear plates 21, and the rotating axis of the rotating frame 4 remains vertical.

[0037] The driving assembly includes a cylinder 22 and a first lever 23. An action hole 24 with an opening at the lower end is provided at the lower end surface of the rotating frame 4. The action hole 24 is located at the rotation axis of the rotating frame 4. A spiral groove 25 is provided on the inner wall of the action hole 24. A cylinder 22 is also fixedly provided on the outer side surface of the vertical section of the fixed frame 1. The piston rod of the cylinder 22 vertically passes through the lower ear plate 21 and then extends into the action hole 24 of the rotating frame 4. A first lever 23 is fixedly provided on the piston rod of the cylinder 22. The first lever 23 is provided along the radial direction of the piston rod of the cylinder 22. The first lever 23 extends into the spiral groove 25 of the action hole 24. When the piston rod of the cylinder 22 is extended, the first lever 23 cooperates with the spiral groove 25, thereby driving the rotating frame 4 to rotate around its rotation axis.

[0038] The transmission assembly includes a track wheel, a track 31, a sector plate 33, a second lever 32, and a support rod 35. A mounting groove is provided on the upper end surface of the rotating frame 4, and the mounting groove is extended along the length direction of the rotating frame 4. A plurality of track wheels are rotatably provided inside the mounting groove along the extension direction thereof, and the rotation axis of the track wheels is perpendicular to the length direction of the rotating frame 4, wherein the two track wheels at both ends are located at the two ends inside the mounting groove. The same track 31 is transmission sleeved on the outer sides of the plurality of track wheels. A vertical second lever 32 is fixedly provided on the outer side of the track 31. A horizontal sector plate 33 is fixedly provided on the upper ear plate 21, and a circular arc groove 34 is fixedly provided on the lower end surface of the sector plate 33, and the center of the circular arc groove 34 is located between the track wheels at both ends. The upper end of the second lever 32 is plugged into the circular arc groove 34 at the lower end of the sector plate 33.

[0039] The lifting rod 5 is an L-shaped rod structure, including a vertical rod and a horizontal rod, both of which are square rod structures; the upper end of the vertical rod is fixedly connected to one end of the horizontal rod, the horizontal rod is located above the rotating frame 4, and the horizontal rod is parallel to the rotating frame 4. A square plug hole that passes through the rotating frame 4 from top to bottom is provided at one end away from the two ear plates 21, and the vertical rod of the lifting rod 5 is slidably plugged into the plug hole of the rotating frame 4, and the outer side surfaces of the vertical rod are in sliding contact with the inner wall of the plug hole.

[0040] A support rod 35 is rotatably arranged on the outer side of the crawler 31, the lower end of the support rod 35 is hinged to the crawler 31, and the upper end of the support rod 35 is hinged to the lower end surface of the horizontal rod of the lifting rod 5. The hinge axes at both ends of the support rod 35 are perpendicular to the length direction of the rotating frame 4.

[0041] A second slide groove is provided at the upper end surface of the horizontal rod of the lifting rod 5, and the second slide groove extends along the length direction of the horizontal rod. A slidable slider 42 and a reset spring 41 are provided inside the second slide groove, one end of the reset spring 41 is connected to the slider 42, and the other end of the reset spring 41 is connected to the end of the second slide groove away from the vertical rod. The rotating shaft of the movable pulley 8 is rotatably provided at the upper end of the slider 42, and the rotating shaft of the movable pulley 8 remains vertical. A fixed block 43 is fixedly provided at one end of the upper end surface of the horizontal rod of the lifting rod 5 close to the vertical rod, one end of the active pull rope 7 is fixedly provided on the fixed block 43, and the other end of the active pull rope 7 passes around the movable pulley 8 and extends toward one side of the vertical rod. The end of the wire rope 12 away from the suspension rope 11 is connected to the rotating shaft of the movable pulley 8.

[0042] The positioning and installation process of a construction device using a prestressed double T plate includes the following steps:

[0043] Step 1: The piston rod of the control cylinder 22 extends upward, and the piston rod of the cylinder 22 drives the first lever 23 to move upward. Since the first lever 23 cooperates with the spiral groove 25, the rotating frame 4 is driven to rotate outward 120° around its rotation axis. In the process of rotating outward, the rotating frame 4 drives the second lever 32 to rotate synchronously. Since the second lever 32 is plugged into the inside of the arc groove 34, when the second lever 32 rotates with the rotating frame 4, the second lever 32 slides inside the arc groove 34 at the same time, and the second lever 32 drives the crawler 31 to move, and the crawler 31 drives all the crawler wheels to rotate at the same time. In the process of the crawler 31 moving, the lower end of the support rod 35 is moved, so that the support rod 35 rotates upward relative to the rotating frame 4, and the upper end of the support rod 35 moves upward, thereby driving the lifting rod 5 to slide upward inside the plug-in hole of the rotating frame 4, that is, the rotating frame 4 drives the lifting rod 5 to rise synchronously in the process of rotating outward. When the rotating frame 4 has finished rotating, the lifting rod 5 also stops rising. At this time, the lifting rod 5 drives the movable pulley 8, the active pull rope 7 and the wire rope 12 to rise to a specified height.

[0044] Step 2: Move the crane 10 to the designated construction site, and then fix the lifting rope 11 on the crane 10 to the lifting rings at the four corners of the prestressed double T-plate 9, and then lift the prestressed double T-plate 9 to the designated position. Due to environmental restrictions, one end of the prestressed double T-plate 9 cannot be exactly flush with the construction site. At this time, the worker stands on the support beam 6 and connects the lifting rope 11 to the movable pulley 8 through the wire rope 12.

[0045] Step three: At this time, the construction personnel pull the active pull rope 7, and the active pull rope 7 drives the movable pulley 8 to compress the reset spring 41, so that the prestressed double T-plate 9 moves away from the construction site. After positioning, the construction personnel selectively pull the steel wire rope 12 according to the position of the prestressed double T-plate 9, so that the prestressed double T-plate 9 moves to the specified position. At this time, the prestressed double T-plate 9 is subjected to downward gravity, upward tension, positioning tension and alignment tension, thereby ensuring that the prestressed double T-plate 9 completes the final positioning.

[0046] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.

Claims

1. A construction device for a prestressed double T-plate, characterized in that: The invention comprises a guiding mechanism and a crane (10); a lifting rope (11) is arranged on the lifting hook of the crane (10); the lifting rope (11) is connected to the lifting ring on the prestressed double T plate (9); the crane (10) places the two ends of the prestressed double T plate (9) on the supporting beams (6) on both sides through the lifting rope (11); a group of guiding mechanisms are respectively arranged on the supporting beams (6) on both sides; the guiding mechanisms comprise a fixed frame (1), a rotating frame (4), and a lifting rod (5); the fixed frame (1) is detachably arranged on the supporting beam (6); A rotating frame (4) is rotatably arranged on the frame (1), a lifting rod (5) is slidably inserted into the rotating frame (4) along a vertical direction, a driving component is arranged on the fixed frame (1), and the rotating frame (4) is driven to rotate by the driving component, a transmission component is arranged between the rotating frame (4) and the lifting rod (5), and when the rotating frame (4) rotates, the lifting rod (5) is driven to rise and fall by the transmission component, and a movable pulley (8) is slidably arranged on the lifting rod (5), and the movable pulley (8) is connected to the suspension rope (11) through a steel wire rope (12); The lifting rod (5) is an L-shaped rod structure, comprising a vertical rod and a horizontal rod, both of which are square rod structures; the upper end of the vertical rod is fixedly connected to one end of the horizontal rod, the horizontal rod is located above the rotating frame (4), and the horizontal rod is parallel to the rotating frame (4); a square plug-in hole that passes through the rotating frame (4) is provided at one end of the rotating frame (4), and the vertical rod of the lifting rod (5) is slidably plugged into the plug-in hole of the rotating frame (4); A second slide groove is provided at the upper end surface of the horizontal rod of the lifting rod (5), and the second slide groove extends along the length direction of the horizontal rod; a slidable slider (42) and a return spring (41) are provided inside the second slide groove, one end of the return spring (41) is connected to the slider (42), and the other end of the return spring (41) is connected to an end of the second slide groove away from the vertical rod; The rotating shaft of the movable pulley (8) is rotatably arranged at the upper end of the slider (42); a fixed block (43) is fixedly arranged at one end of the upper end surface of the horizontal rod of the lifting rod (5) close to the vertical rod; one end of the active pull rope (7) is fixedly arranged on the fixed block (43); the other end of the active pull rope (7) passes around the movable pulley (8) and extends toward one side of the vertical rod; the end of the wire rope (12) away from the suspension rope (11) is connected to the rotating shaft of the movable pulley (8).

2. A construction device for a prestressed double T-plate according to claim 1, characterized in that: A lifting ring is fixedly provided at each of the four corners of the upper end surface of the prestressed double T plate (9).

3. A construction device for a prestressed double T-plate according to claim 2, characterized in that: The fixing frame (1) is an L-shaped rod-shaped structure, comprising a vertical section and a horizontal section, wherein the upper end of the vertical section is fixedly connected to one end of the horizontal section; a vertical first sliding groove is provided on the inner side surface of the vertical section of the fixing frame (1), a vertical hydraulic cylinder (2) is fixedly provided inside the first sliding groove, and a clamping claw (3) is fixedly provided at the end of the piston rod of the hydraulic cylinder (2).

4. A construction device for a prestressed double T-plate according to claim 3, characterized in that: Two upper and lower ear plates (21) are fixedly arranged on the outer side surface of the vertical section of the fixed frame (1); one end of the rotating frame (4) is rotatably arranged between the upper and lower ear plates (21).

5. A construction device for a prestressed double T-plate according to claim 4, characterized in that: The driving assembly comprises a cylinder (22) and a first lever (23); an action hole (24) with a lower end opening is provided at the lower end surface of the rotating frame (4), the action hole (24) is located at the rotation axis of the rotating frame (4), and a spiral groove (25) is provided on the inner wall of the action hole (24); a cylinder (22) is also fixedly provided on the outer side surface of the vertical section of the fixed frame (1), and a piston rod of the cylinder (22) vertically upwardly passes through the lower ear plate (21) and then extends into the action hole (24) of the rotating frame (4); a first lever (23) is fixedly provided on the piston rod of the cylinder (22), and the first lever (23) extends into the spiral groove (25) of the action hole (24).

6. A construction device for a prestressed double T-plate according to claim 5, characterized in that: The transmission assembly comprises a track wheel, a track (31), a sector plate (33), a second lever (32), and a support rod (35); a mounting groove is provided on the upper end surface of the rotating frame (4); a plurality of track wheels are rotatably provided inside the mounting groove along the extension direction thereof; the same track (31) is transmission-sleeved on the outer sides of the plurality of track wheels; a vertical second lever (32) is fixedly provided on the outer side of the track (31); a horizontal sector plate (33) is fixedly provided on the upper ear plate (21); a circular arc groove (34) is fixedly provided on the lower end surface of the sector plate (33); the center of the circular arc groove (34) is located between the track wheels at both ends; the upper end of the second lever (32) is plugged into the circular arc groove (34) at the lower end of the sector plate (33).

7. A construction device for a prestressed double T-plate according to claim 6, characterized in that: A support rod (35) is rotatably arranged on the outer side surface of the crawler belt (31), the lower end of the support rod (35) is hinged to the crawler belt (31), and the upper end of the support rod (35) is hinged to the lower end surface of the horizontal rod of the lifting rod (5).

8. A positioning and installation process for a construction device of a prestressed double T-plate according to claim 7, characterized in that: The following steps are included: Step 1: The piston rod of the control cylinder (22) extends upward, and the piston rod of the cylinder (22) drives the first lever (23) to move upward. Since the first lever (23) cooperates with the spiral groove (25), the rotating frame (4) is driven to rotate outward 120 degrees around its rotation axis. In the process of rotating outward, the rotating frame (4) drives the second lever (32) to rotate synchronously. Since the second lever (32) is inserted into the arc groove (34), when the second lever (32) rotates with the rotating frame (4), the second lever (32) slides in the arc groove (34) at the same time, and the second lever (32) drives the crawler (31) to move. The crawler belt (31) drives all the crawler wheels to rotate simultaneously. During the movement, the crawler belt (31) drives the lower end of the support rod (35) to move, so that the support rod (35) rotates upward relative to the rotating frame (4). The upper end of the support rod (35) moves upward, thereby driving the lifting rod (5) to slide upward inside the plug-in hole of the rotating frame (4), that is, the rotating frame (4) drives the lifting rod (5) to rise synchronously during the process of rotating outward; when the rotating frame (4) completes its rotation, the lifting rod (5) also stops rising. At this time, the lifting rod (5) drives the movable pulley (8), the active pull rope (7), and the wire rope (12) to rise to a specified height; Step 2: Move the crane (10) to the designated construction position, then fix the lifting rope (11) on the crane (10) to the lifting rings at the four corners of the prestressed double T plate (9), then lift the prestressed double T plate (9) to the designated position, and the worker stands on the support beam (6) and connects the lifting rope (11) to the movable pulley (8) through the steel wire rope (12); Step 3: At this time, the construction personnel pull the active pull rope (7), and the active pull rope (7) drives the movable pulley (8) to compress the reset spring (41), so that the prestressed double T plate (9) moves away from the construction position. After positioning, the construction personnel selectively pull the steel wire rope (12) according to the position of the prestressed double T plate (9), so that the prestressed double T plate (9) moves to the specified position, thereby completing the final positioning of the prestressed double T plate (9).