Scientific and technological achievement transformation risk assessment system based on big data

Through the risk assessment system based on big data, repetitive work caused by changes in data projects is solved, efficient risk assessment and management are achieved, and the success rate of scientific and technological achievements transformation and scientific decision-making are improved.

CN118822263APending Publication Date: 2024-10-22SHANDONG MINGTANG TECH CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410918724.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2024-10-22

AI Technical Summary

Technical Problem

The existing scientific and technological achievements transformation risk assessment system needs to be re-collected, screened, analyzed and evaluated when data projects change, resulting in a huge waste of manpower and time. In addition, in the rapidly developing network economic environment, the amount of data is huge and difficult to effectively manage.

Method used

A risk assessment system for the transformation of scientific and technological achievements based on big data is designed, including a server, a deep learning model, an assessment model, a risk indicator system, a data processing module and an Internet data acquisition module. Through basic data collection, language analysis, data cleaning, data Transformation, big data analysis and risk assessment, build risk assessment models, and extrapolate change data through data integration and visual display to reduce the need for re-collection.

Benefits of technology

It significantly saves risk assessment time, improves assessment efficiency, provides timely and accurate risk assessment results, reduces the workload of the management team, and visually displays risk correlations through data visualization to help adjust assessment indicators.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118822263A_ABST
    Figure CN118822263A_ABST
Patent Text Reader

Abstract

The invention provides a scientific and technological achievement transformation risk assessment system based on big data, relates to the technical field of scientific and technological achievement transformation, and comprises a server used for processing data, a system construction method used for constructing the risk assessment system and a prediction method used for optimizing the risk assessment system. Component modules used in the method are designed according to the types of data to be processed, internet data are accessed in the data analysis process, a risk index system and a risk assessment model are constructed in a big data auxiliary verification mode, and the design of other data is calculated according to changed data, so that the risk assessment efficiency is improved. The data acquisition difficulty can be greatly reduced, the workload of a management team is reduced, the risk assessment time is greatly saved, the risk assessment result has timeliness compared with a risk assessment result acquired in a general mode, and a positive promotion effect is provided for successful transformation of scientific and technological achievements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of scientific and technological achievement transformation, and in particular to a scientific and technological achievement transformation risk assessment system based on big data. Background Art

[0002] The transformation of scientific and technological achievements is the activity of transforming scientific and technological achievements with practical value generated by scientific research and technological development into new technologies, new processes, new materials, new products, and new industries through subsequent experiments, development, application, and promotion. The transformation of scientific and technological achievements is a high-investment, high-risk process, and the effective control and resolution of its risks are important factors that restrict the successful transformation of achievements. Therefore, it is crucial to conduct a comprehensive and systematic risk assessment, which not only helps to improve the success rate of transformation, but also provides a scientific basis for decision-making. The risk assessment of the transformation of scientific and technological achievements is a systematic analysis and evaluation of the uncertainties in technology, market, input, and intellectual property rights that may be encountered in the process of transforming scientific and technological achievements into actual products or services. The risk assessment of the transformation of scientific and technological achievements is a systematic work involving uncertainty assessment in multiple aspects.

[0003] Through scientific evaluation methods, various risks can be effectively identified and prevented, thereby improving conversion rates.

[0004] Most of the existing risk assessments for the transformation of scientific and technological achievements are completed by manually collecting data and using various deep learning models to analyze various data and risk assessment contents. During this process, the need for intervention from the management team is very high. Due to the wide variety of data items involved in the risk assessment of the transformation of scientific and technological achievements, and the changes in data items, the difficulty of the risk assessment of the transformation of scientific and technological achievements is further increased. When a data item changes, the existing processing method is to collect each data item again, and it is necessary to re-screen, analyze, and evaluate the data, which is very manpower and time-consuming. In the rapidly developing network economy environment, the amount of data collected is also very large. This situation makes it more difficult to obtain data for the transformation of scientific and technological achievements, and there are technical defects. Summary of the invention

[0005] The purpose of the present invention is to solve the shortcomings of the prior art, alleviate the situation of re-acquisition and processing of data due to changes in data items, save time for risk assessment of scientific and technological achievements transformation, and improve the efficiency of risk assessment.

[0006] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a risk assessment system for the transformation of scientific and technological achievements based on big data, comprising a server for completing data processing, a deep learning model of the server, an assessment model construction module, a risk indicator system construction module, a data processing module, a data storage module and an Internet data acquisition module, the server is connected to a basic data collection module, a manual operation module, a risk assessment module and a result reporting module; the data processing module comprises a data cleaning module, a data conversion module and a data integration module; the deep learning model comprises a language analysis module, a data comparison module, a big data analysis module, a basic data analysis module, a prediction module and a module for matching risk assessment items with data; the risk assessment module comprises a technical risk assessment module, a market risk assessment module, an investment risk assessment module, a management risk assessment module and an environmental risk assessment module;

[0007] It also includes the construction of a risk assessment system based on servers, risk assessment modules, result reporting modules, basic data collection modules, and manual operation modules: first, basic data collection, then language analysis, then data cleaning and data conversion, then big data analysis and basic data analysis, then building an assessment model and risk indicator system, then data matching and risk assessment, and finally result reporting.

[0008] As a preferred implementation, the data types collected by the basic data collection module include technical feature data, market demand data, competitive environment data, policy and regulation data, intellectual property data, economic environment data, similar case data, capital investment data and management team data.

[0009] As a preferred implementation, the result reporting module includes an evaluation report overview module, an evaluation index display module, a detailed risk display module, a countermeasure display module and a data visualization module.

[0010] As a preferred implementation, the construction of the risk assessment system specifically includes the following steps:

[0011] S1. Basic data collection: collect technical feature data, market demand data, competitive environment data, policy and regulation data, intellectual property data, economic environment data, similar case data, capital investment data, and management team data through the manual operation module and the Internet, and classify the basic data into the basic data collection module;

[0012] S2, language analysis: retrieve basic data from the basic data collection module, and analyze the data through the language analysis module to obtain data after language analysis;

[0013] S3, data cleaning and data conversion: the data after language analysis is processed by the data cleaning module and the data conversion module to obtain usable basic data that eliminates errors and redundant content and improves data availability;

[0014] S4. Big data analysis and basic data analysis: Use the basic data analysis module to analyze the association between the available basic data, and obtain the association relationship between the basic data. At the same time, according to the basic data items, the corresponding Internet data is obtained through the big data analysis module. Based on the association relationship between the basic data, the Internet data and the basic data are analyzed through the big data analysis module to obtain the association relationship between the data of the corresponding basic data items in the Internet data;

[0015] S5. Construct an assessment model and risk indicator system: According to the correlation between the data of the corresponding basic data items in the Internet data and the correlation between the data of the corresponding basic data items in the Internet data, clarify the goals of the risk assessment system, plan the different stages and assessment goals of the scientific and technological achievement transformation process, select different assessment indicators, assign indicator weights, and construct a scientific and technological achievement transformation risk indicator system. Then, based on the constructed scientific and technological achievement transformation risk indicator system, construct a scientific and technological achievement transformation risk assessment model;

[0016] S6. Data matching and risk assessment: Use the risk assessment model to create a risk assessment module based on the risk indicator system. Then, according to different risk assessment projects, use the data matching module to match the corresponding data analysis model. Then, based on the data matching results of the risk assessment project, use the risk assessment module to derive the risk assessment content.

[0017] S7. Result report: The risk assessment content is simplified and summarized through the evaluation report overview module; the scientific and technological achievement transformation evaluation index system is displayed through the evaluation index display module; the detailed scientific and technological achievement transformation risk assessment content is displayed through the detailed risk display module; the risk response measures display module displays the risk response measures proposed by the management team; the basic data and risk assessment content are visualized through the data visualization module.

[0018] As a preferred implementation, in step S7, the timeline-based data visualization performed by the data integration module and the result reporting module specifically includes the following steps:

[0019] S7.1. First, starting from the time of completion of scientific and technological achievements, establish a timeline that grows with time. Then, through the data integration module, summarize the basic data and risk assessment content in the same time period to one location, establish a data set at the corresponding time point, mark the data set at the corresponding position of the timeline, and name the data set according to the batch of data entry. The data set content includes basic data items covering basic data and risk assessment items covering risk assessment content. Basic data items establish subsets based on technical feature data, market demand data, competitive environment data, policy and regulation data, intellectual property data, economic environment data, similar case data, capital investment data and management team data. Risk assessment items establish subsets based on technical risk assessment, market risk assessment, investment risk assessment, management risk assessment and environmental risk assessment. Subsets under corresponding data items and subsets under risk assessment items are then established one by one to record change records;

[0020] S7.2. When the basic data or risk assessment data changes for the first time, the prediction model infers the changes of other basic data based on the changed data, uses the inferred basic data to evaluate the transformation of scientific and technological achievements, and then integrates the changed basic data and risk assessment content. Based on the first data entry format, the second data entry data set is regenerated, and a change record mark is added under the corresponding basic data project subset and risk assessment subset. A change content subset is created under the corresponding change record, and the changed technical data and risk assessment content classification number are placed under the corresponding project. Finally, the second data entry data set is associated with the corresponding timeline node of the visualization data set.

[0021] S7.3. When the basic data or risk assessment changes again, repeat step S7.2, delete the data entry subsets except the first data entry subset, and regenerate a new data entry data set.

[0022] As a preferred embodiment, it also includes a prediction method for optimizing the risk assessment system, and the prediction method includes the following steps:

[0023] 1) When the changed data is obtained, the changed items are first determined through the data comparison module, and then the changed items are analyzed through the language analysis model. Then, the prediction module is used to combine the correlation relationship between the data of the basic data items corresponding to the Internet data in the big data analysis module and the basic data analysis module and the correlation relationship between the basic data to obtain the estimated basic data;

[0024] 2) While the prediction module is calculating changes in other data items based on the changed basic data or risk assessment data, it is also collecting basic data again and performing language analysis. Then, it is used to obtain usable basic data through data cleaning and data conversion.

[0025] 3) Use the basic data analysis module to compare the differences between the re-collected basic data and the estimated basic data. When the difference of any basic data item is greater than the threshold, the risk assessment is re-performed based on the re-collected basic data. When the difference of any basic data item is less than the threshold, the risk assessment content based on the estimated basic data is directly used.

[0026] As a preferred embodiment, in the step 3):

[0027] 3.1) When the difference between the estimated basic data and the available basic data is less than the threshold: the re-collected data is retained, and the estimated risk assessment content is directly adopted in combination with the estimated basic data, and data visualization is performed through the result reporting module and the data integration module to obtain the estimated visualization data;

[0028] 3.2) When the difference between the estimated basic data and the available basic data is greater than the threshold, the available basic data is retained, the estimated change data and the estimated risk assessment content are deleted, and the risk assessment and data visualization are re-performed using the available basic data. Among them, because the basic data contains uncontrollable and unquantifiable data, it is necessary to re-analyze the correlation relationship between the available basic data; when the data correlation has not changed, the original risk assessment model is used for risk assessment; when the data correlation has changed, the risk indicator system and assessment model are re-constructed, and then risk assessment is performed again.

[0029] As a preferred implementation, in the step 3.2), when the difference between the calculated basic data and the available basic data is greater than a threshold, the prediction module algorithm is also replaced, and a new prediction model is constructed using the replaced prediction model algorithm, and the new prediction model is used to perform data inference on the changed data to obtain new calculated basic data, and then the data comparison module is used to re-compare the new calculated basic data and the available basic data. When the difference between the two data is less than the threshold, the operation ends; when the difference between the two data is greater than the threshold, the operation of replacing the prediction module algorithm is repeated.

[0030] As a preferred implementation, the threshold value in step 3) is set as follows: taking 5% as the basic value, according to the weight of the risk assessment indicator corresponding to each basic data, the specific error threshold of each basic data is reallocated on the basis of 5%.

[0031] Compared with the prior art, the advantages and positive effects of the present invention are:

[0032] 1. The constituent modules used in the present invention are designed according to the type of data to be processed, and are connected to Internet data during the data analysis process. A risk indicator system and a risk assessment model are constructed in a way of big data-assisted verification. The risk assessment content obtained under the verification of a large amount of data is also accurate.

[0033] 2. The present invention can greatly reduce the difficulty of data acquisition by inferring other data based on the changed data, which not only reduces the workload for the management team, but also greatly saves the time for risk assessment, making the risk assessment results more timely than the risk assessment results obtained by general methods, and providing a positive effect of promoting the success of scientific and technological achievements transformation.

[0034] 3. The present invention verifies the accuracy of the calculated data predicted by the prediction model through the calculated change data and the re-collected basic data, so as to continuously optimize the prediction model. When the accuracy and stability of the calculated data meet the requirements, when subsequent data changes occur, the process of re-collecting and analyzing the basic data can be saved. It is only necessary to re-verify the prediction model from time to time to confirm its accuracy and stability.

[0035] 4. The present invention integrates and visualizes the basic data and risk assessment content so that the management team can intuitively feel the relationship between the basic data and the risk assessment content, which can provide inspiration for adjusting the risk assessment indicators to a certain extent. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 A module diagram of a risk assessment system for transformation of scientific and technological achievements based on big data is proposed for the present invention;

[0037] Figure 2 A flowchart of a risk assessment system for transformation of scientific and technological achievements based on big data is proposed for the present invention;

[0038] Figure 3 A system construction flow chart of a risk assessment system for transformation of scientific and technological achievements based on big data is proposed for the present invention;

[0039] Figure 4 The present invention proposes a change data prediction and system optimization flow chart of a risk assessment system for transformation of scientific and technological achievements based on big data;

[0040] Figure 5 A data visualization architecture diagram based on a timeline is proposed for the present invention for a risk assessment system for transformation of scientific and technological achievements based on big data;

[0041] Figure 6The present invention proposes a data entry content architecture diagram for the first time in a data visualization architecture based on a timeline for a risk assessment system for transformation of scientific and technological achievements based on big data;

[0042] Figure 7 The present invention proposes a second data entry content architecture diagram in a data visualization architecture based on a timeline for a risk assessment system for transformation of scientific and technological achievements based on big data;

[0043] Figure 8 The present invention proposes a content architecture diagram of the Nth data entry in a data visualization architecture based on a timeline for a risk assessment system for transformation of scientific and technological achievements based on big data. DETAILED DESCRIPTION

[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0045] Embodiment 1

[0046] like Figure 1 As shown, a risk assessment system for transformation of scientific and technological achievements based on big data includes a server for completing data processing, wherein the server includes a deep learning model constructed based on a deep learning model, a data processing module for processing data, a data storage module for storing data, and an Internet data acquisition module for acquiring Internet data, and the server is connected to a basic data collection module for basic data collection, a manual operation module, a risk assessment module for risk assessment, and a result reporting module for displaying the assessment results;

[0047] The data types collected by the basic data collection module include technical feature data, market demand data, competitive environment data, policy and regulation data, intellectual property data, economic environment data, similar case data, capital investment data and management team data;

[0048] Furthermore, when constructing the risk indicator system, the risk indicator system construction module establishes the entire process of scientific and technological achievement transformation through the management team, and then clarifies the goals of the evaluation system. Different evaluation indicators are selected according to the different stages and evaluation goals of the scientific and technological achievement transformation process. The degree of influence of each evaluation indicator on the scientific and technological achievement transformation is analyzed, and different weights are assigned to each evaluation indicator to establish a risk indicator system. When constructing the evaluation model, the evaluation model construction module analyzes and selects a suitable evaluation model for the product type based on the evaluation indicators and indicator items with different weights. The types of evaluation models include but are not limited to: hierarchical analysis model, fuzzy comprehensive evaluation model, etc.

[0049] In the above content, data related to scientific and technological achievements and products are obtained through the basic data collection module. Based on this data, after data processing by the data processing module, the deep learning model is used to perform data analysis and data matching, and then the risk assessment module is used to assess the risk of scientific and technological achievement transformation, and the risk assessment results are reported by the result reporting module.

[0050] Embodiment 2

[0051] like Figure 1 As shown, the data processing module includes a data cleaning module for eliminating errors and redundant contents in the data, a data conversion module for improving the availability of the data, and a data integration module for aggregating data from different sources into one location;

[0052] In the above content, due to the diversity of basic data sources and the complexity of the data itself, unprocessed data usually has problems such as missing values, outliers, duplicate records and inconsistent formats. Using data cleaning modules and data conversion modules to clean the data can filter out useful information from a large amount of raw data, eliminate errors and redundant content, and thus lay a solid foundation for subsequent data analysis and model building;

[0053] The data integration module is used to aggregate data from different sources into one location to provide a unified data view and support data analysis and decision-making.

[0054] Embodiment 3

[0055] like Figure 1 As shown, the deep learning model includes a language analysis module for analyzing the language in the basic data, a data comparison module for comparing and analyzing the newly acquired basic data with the original basic data, a big data analysis module for analyzing the basic data based on the continuously acquired Internet data, a basic data analysis module for analyzing the basic data, a prediction module for predicting other basic data based on the changed basic data, and a data matching module for matching risk assessment items with basic data;

[0056] In the above content, the language analysis module aims to analyze the language and mathematical content in the data, and can use a large language model to accurately analyze the meaning of text language;

[0057] The main purpose of the basic data analysis module is to associate various basic data and analyze the relationship between various data. Since the basic data sources are various, the basic data analysis module can be built on the basis of a multimodal learning model to analyze data from different sources of basic data;

[0058] The big data analysis module is used to provide the function of analyzing basic data based on big data. Since a large amount of data needs to be analyzed and the causal relationship between each data item needs to be extracted from the massive data, the big data analysis module can be completed using the Kumtz model. The Kumtz model includes a deep learning model layer. With this deep learning model layer, abstract high-level features are extracted from the original data through convolutional neural networks or recurrent neural networks, such as management team data that cannot be quantified, competitive environment data, policy and regulatory data, etc.

[0059] The data matching module is used to provide the function of matching risk assessment items and basic data items for different risk assessment contents. For the basic data related to different types of risk assessment items, it is necessary to adopt targeted data analysis models one by one. Therefore, in the data matching module, based on the deep learning model, the corresponding data analysis models are automatically matched for different risk assessment items and different project basic data, and then the corresponding data matching is performed;

[0060] The prediction module is used in conjunction with the big data analysis module and the basic data analysis module when the basic data changes. The prediction module uses the data association relationship between the big data analysis module and the basic data analysis module as the inference logic, and infers other basic data based on the changed basic data.

[0061] Embodiment 4

[0062] like Figure 1 As shown, the risk assessment module includes a technical risk assessment module for assessing technical risks in the process of scientific and technological achievement transformation, a market risk assessment module for assessing market risks after scientific and technological achievement transformation, an investment risk assessment module for assessing investment conditions in the process of scientific and technological achievement transformation, a management risk assessment module for assessing management conditions during scientific and technological achievement transformation, and an environmental risk assessment module for assessing the market environment;

[0063] In the above content, the risk assessment module is based on the results of the data comparison module, big data analysis module, basic data analysis module and data matching module in the deep learning model, based on the scientific and technological achievement transformation risk assessment model constructed by the assessment model construction module, and based on the scientific and technological achievement transformation risk indicator system constructed by the risk indicator system construction module, to evaluate the technical risks, market risks, investment risks, management risks and environmental risks respectively.

[0064] Embodiment 5

[0065] like Figure 1 As shown, the result report module includes an evaluation report overview module for simplifying the evaluation report, an evaluation index display module for displaying risk evaluation indexes for transformation of scientific and technological achievements, a detailed risk display module for displaying detailed risk information for transformation of scientific and technological achievements, a countermeasure display module for displaying countermeasures for risk of transformation of scientific and technological achievements, and a data visualization module for visually integrating data based on the data integration module;

[0066] In the above contents, each result is displayed in a different form, so a corresponding display window is formulated according to the risk assessment index of scientific and technological achievement transformation, detailed risk information of scientific and technological achievement transformation, risk response measures of scientific and technological achievement transformation and visualization data, and displayed on the same display device;

[0067] Among them, the visualization data generated by the data visualization module is integrated by the data integration module with the basic data and risk assessment content, and the integrated data set is displayed on the timeline. In addition, according to the changed basic data and risk assessment content, a new data set is generated and displayed on the same timeline. This design enables the generated visualization data to intuitively and clearly observe the changed basic data and risk assessment content records, providing convenience for viewing the assessment results of the risks of scientific and technological achievements transformation.

[0068] Embodiment 6

[0069] like Figure 2 and Figure 3 As shown in the figure, the construction process of the risk assessment system for the transformation of scientific and technological achievements based on big data is as follows:

[0070] S1. Basic data collection: collect technical feature data, market demand data, competitive environment data, policy and regulation data, intellectual property data, economic environment data, similar case data, capital investment data, and management team data through the manual operation module and the Internet, and classify the basic data into the basic data collection module;

[0071] Specifically, technical feature data is obtained by the management team through basic parameter collection and performance data testing of products. Combined with intellectual property data, it can reflect the basic technical features of products. Market demand data is obtained by analyzing market demand based on performance data in technical feature data. Competitive environment data, economic environment data and similar case data are collected from relevant data of similar products in the market based on market demand data. Combined with policy and regulatory data and investment data, it can provide data support for marketing planning. Management team data can reflect the stability of product production and marketing. After comprehensive analysis, the above data content can fully provide strong data support for risk assessment of manufacturing, marketing and other aspects of scientific and technological achievement products.

[0072] S2, language analysis: retrieve basic data from the basic data collection module, and analyze the data through the language analysis module to obtain data after language analysis;

[0073] Specifically, due to differences in the source and form of expression of basic data, the language analysis module needs to meet the understanding and analysis requirements of textual language, mathematical language, programming language, etc. The large language model can be used to analyze the specific meanings of different language types of basic data and provide data support for subsequent data processing;

[0074] S3, data cleaning and data conversion: the data after language analysis is processed by the data cleaning module and the data conversion module to obtain usable basic data that eliminates errors and redundant content and improves data availability;

[0075] Specifically, the data after language analysis can be cleaned to a certain extent through the data conversion module, but its main function is to convert the data to ensure the availability of data from different sources, while the data cleaning module can further remove errors and honorary content in the data to further improve the availability of the data;

[0076] S4. Big data analysis and basic data analysis: Use the basic data analysis module to analyze the association between the available basic data, and obtain the association relationship between the basic data. At the same time, according to the basic data items, the corresponding Internet data is obtained through the big data analysis module. Based on the association relationship between the basic data, the Internet data and the basic data are analyzed through the big data analysis module to obtain the association relationship between the data of the corresponding basic data items in the Internet data;

[0077] Specifically, the correlation between basic data analyzed by the basic data analysis module built on the basis of the multimodal model can not only reflect the causal relationship between the basic data, but also serve as a basis for the big data analysis module to establish a correlation between the data of the corresponding basic data items in the Internet data, thereby obtaining the correlation between the data of the corresponding basic data items in the Internet data.

[0078] S5. Construct an assessment model and risk indicator system: According to the correlation between the data of the corresponding basic data items in the Internet data and the correlation between the data of the corresponding basic data items in the Internet data, clarify the goals of the risk assessment system, plan the different stages and assessment goals of the scientific and technological achievement transformation process, select different assessment indicators, assign indicator weights, and construct a scientific and technological achievement transformation risk indicator system. Then, based on the constructed scientific and technological achievement transformation risk indicator system, construct a scientific and technological achievement transformation risk assessment model;

[0079] Specifically, the goal of the risk assessment system includes the planning of various risk projects, and in the planning process of risk projects, basic data is needed to provide data support. There is also a correlation between the goals of various risk assessment projects, so the correlation between basic data projects and the correlation between data of corresponding basic data projects in Internet data are also needed to judge the correlation between risk assessment projects, so as to clarify the goal of the risk assessment system, and then plan the different stages and evaluation goals of the scientific and technological achievements transformation process, and then select different evaluation indicators according to the different importance of basic data, and assign weights to the indicators, so as to construct a risk indicator system for the transformation of scientific and technological achievements. According to the different plans of risk projects in the risk indicator system, the evaluation algorithm of the corresponding risk assessment project is selected through the evaluation model construction module to construct a risk assessment model for the transformation of scientific and technological achievements;

[0080] S6. Data matching and risk assessment: Use the risk assessment model to create a risk assessment module based on the risk indicator system. Then, according to different risk assessment projects, use the data matching module to match the corresponding data analysis model. Then, based on the data matching results of the risk assessment project, use the risk assessment module to derive the risk assessment content.

[0081] Specifically, the data matching module built on the basis of the deep learning model can automatically match the corresponding data analysis model according to the basic data and risk assessment items of different projects, so as to serve as the preparatory work for the risk assessment of the risk assessment module, and the risk assessment content can be obtained by matching the risk assessment items with the available basic data under the evaluation of the risk assessment module;

[0082] Among them, the risk assessment model is used as the basis, and the risk indicator system is used as the standard for risk assessment. The resulting risk assessment module can accurately assess the risk of scientific and technological achievements transformation based on risk indicators;

[0083] S7. Result report: The risk assessment content is simplified and summarized through the evaluation report overview module, the evaluation indicator display module displays the scientific and technological achievement transformation evaluation indicator system, the detailed risk display module displays the detailed scientific and technological achievement transformation risk assessment content, the response measure display module displays the risk response measures formulated by the management team, and the data visualization module visualizes the basic data and risk assessment content;

[0084] Specifically, in the process of result reporting, the risk assessment content and basic data need to be visualized together. The risk assessment content will be divided and displayed according to the corresponding risk assessment items under the classification of the result reporting module, and the exact risk assessment item content will be integrated with the available basic data through the data integration module. The timeline-based presentation created in this way can also be displayed together with the data changes, which is convenient for the management team to view;

[0085] In the above steps, the association relationship between the determined basic data pieces, the association relationship between the data corresponding to the basic data items in the Internet data, the risk indicator system, the risk assessment model, the risk assessment content and the visualization data can be obtained to determine the composition of the system of the present invention.

[0086] Embodiment 7

[0087] like Figure 4 As shown, the prediction method comprises the following steps:

[0088] 1) When the changed data appears, the changed data is first processed preliminarily, and then the prediction module is used to infer the remaining basic project data based on the correlation between the changed data and the basic data;

[0089] 2) While the prediction module is calculating changes in other data items based on the changed basic data or risk assessment data, the basic data is re-collected;

[0090] 3) Use the basic data analysis module to compare the difference between the re-collected basic data and the estimated basic data. When the difference of any basic data item is greater than the threshold, the risk assessment is re-performed based on the re-collected basic data. When the difference of any basic data item is less than the threshold, the risk assessment content based on the estimated basic data is directly used;

[0091] Specifically, when the change data is obtained, the change items are first determined through the data comparison module, and then the change items are analyzed through the language analysis model. Then, the prediction module is used to combine the correlation relationship between the data of the basic data items corresponding to the Internet data in the big data analysis module and the basic data analysis module and the correlation relationship between the basic data to obtain the inferred basic data, and then the risk analysis module and the risk assessment module are used to obtain the inferred risk assessment content based on the inferred basic data;

[0092] Among them, while predicting the inferred basic data based on the changed data, the basic data is collected again and language analysis is performed, and then the available basic data is obtained through data cleaning and data conversion. The inferred basic data is then compared with the available basic data using the data comparison module to calculate the difference between the two;

[0093] Furthermore, a difference threshold is set: taking 5% as the basic value, according to the weight of the risk assessment index corresponding to each basic data, the specific error threshold of each basic data is reallocated on the basis of 5%. When the difference between the estimated basic data and the available basic data is less than the threshold, the re-collected data is retained, and the estimated risk assessment content is directly adopted in combination with the estimated basic data. The data is visualized through the result report module and the data integration module to obtain the estimated visualization data;

[0094] Furthermore, when the difference between the estimated basic data and the available basic data is greater than a threshold, the available basic data is retained, the estimated change data and the estimated risk assessment content are deleted, and the risk assessment and data visualization are re-performed using the available basic data. In particular, since the basic data contain uncontrollable and unquantifiable data, it is necessary to re-analyze the correlation relationship between the available basic data. When the data correlation has not changed, the original risk assessment model is used for risk assessment. When the data correlation has changed, the risk indicator system and assessment model are re-constructed, and then the risk assessment is performed again.

[0095] Furthermore, when the difference between the estimated basic data and the available basic data is greater than a threshold, the prediction module algorithm is also replaced, a new prediction model is constructed using the replaced prediction model algorithm, and the new prediction model is used to perform data inference on the changed data to obtain new estimated basic data, and then the data comparison module is used to re-compare the new estimated basic data and the available basic data. When the difference between the two data is less than the threshold, the operation ends; when the difference between the two data is greater than the threshold, the operation of replacing the prediction module algorithm is repeated;

[0096] In the above content, since the re-collected basic data needs to be re-processed and analyzed when conducting risk assessment, it takes a lot of computer resources and time costs, and the risk assessment results are inefficient. The basic data inferred by the prediction module does not need data processing and data analysis, and can be directly generated in the processed data format, thereby saving a lot of computer resources and time costs. By setting the basic data difference threshold, the prediction module is continuously trained with new basic data or risk assessment content to improve the accuracy of the prediction, the number of verifications can be gradually reduced, cost savings can be achieved, and the efficiency of risk assessment can be improved.

[0097] Embodiment 8

[0098] like Figure 5 , Figure 6 , Figure 7 and Figure 8 As shown, in step S7, the timeline-based data visualization completed by the data integration module and the result reporting module specifically includes the following steps:

[0099] S7.1. First, starting from the time of completion of scientific and technological achievements, establish a timeline that grows with time. Then, through the data integration module, summarize the basic data and risk assessment content in the same time period to one location, establish a data set at the corresponding time point, mark the data set at the corresponding position of the timeline, and name the data set according to the batch of data entry. The data set content includes basic data items covering basic data and risk assessment items covering risk assessment content. Basic data items establish subsets based on technical feature data, market demand data, competitive environment data, policy and regulation data, intellectual property data, economic environment data, similar case data, capital investment data and management team data. Risk assessment items establish subsets based on technical risk assessment, market risk assessment, investment risk assessment, management risk assessment and environmental risk assessment. Subsets under corresponding data items and subsets under risk assessment items are then established one by one to record change records;

[0100] S7.2. When the basic data or risk assessment data changes for the first time, the prediction model infers the changes of other basic data based on the changed data, uses the inferred basic data to evaluate the transformation of scientific and technological achievements, and then integrates the changed basic data and risk assessment content. Based on the first data entry format, the second data entry data set is regenerated, and a change record mark is added under the corresponding basic data project subset and risk assessment subset. A change content subset is created under the corresponding change record, and the changed technical data and risk assessment content classification number are placed under the corresponding project. Finally, the second data entry data set is associated with the corresponding timeline node of the visualization data set.

[0101] S7.3. When the basic data or risk assessment changes again, repeat step S7.2, delete the data entry subsets except the first data entry subset, and regenerate a new data entry data set;

[0102] In the above content, the data items in the timeline-based data visualization only include basic data items and risk assessment items. The former are data that can be directly obtained and viewed, and the latter are risk assessment results analyzed based on the basic data. When the two are in the same interface, the relationship between the basic data and the risk assessment content can be intuitively viewed, providing great help to the management team for the transformation of scientific and technological achievements and their commercialization planning.

[0103] The above description is only a preferred embodiment of the present invention and does not limit the present invention in other forms. Any technician familiar with the profession may use the technical content disclosed above to change or modify it into an equivalent embodiment with equivalent changes and apply it to other fields. However, any simple modification, equivalent change and modification made to the above embodiment based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still falls within the protection scope of the technical solution of the present invention.

Claims

1. A risk assessment system for scientific and technological achievements transformation based on big data, characterized by: It includes a server for completing data processing, a deep learning model of the server, an evaluation model construction module, a risk indicator system construction module, a data processing module, a data storage module and an Internet data acquisition module, and the server is connected to a basic data collection module, a manual operation module, a risk assessment module and a result reporting module; the data processing module includes a data cleaning module, a data conversion module and a data integration module; the deep learning model includes a language analysis module, a data comparison module, a big data analysis module, a basic data analysis module, a prediction module and a module for matching risk assessment items with data; the risk assessment module includes a technical risk assessment module, a market risk assessment module, an investment risk assessment module, a management risk assessment module and an environmental risk assessment module; It also includes the construction of a risk assessment system based on servers, risk assessment modules, result reporting modules, basic data collection modules, and manual operation modules: first, basic data collection, then language analysis, then data cleaning and data conversion, then big data analysis and basic data analysis, then building an assessment model and risk indicator system, then data matching and risk assessment, and finally result reporting.

2. According to the big data-based scientific and technological achievement transformation risk assessment system of claim 1, it is characterized by: The data types collected by the basic data collection module include technical feature data, market demand data, competition environment data, policy and regulation data, intellectual property data, economic environment data, similar case data, capital investment data and management team data.

3. According to the big data-based scientific and technological achievement transformation risk assessment system of claim 1, it is characterized by: The result reporting module includes an evaluation report overview module, an evaluation index display module, a detailed risk display module, a response measure display module and a data visualization module.

4. According to the big data-based scientific and technological achievement transformation risk assessment system of claim 1, it is characterized by: The construction of the risk assessment system specifically includes the following steps: S1. Basic data collection: collect technical feature data, market demand data, competitive environment data, policy and regulation data, intellectual property data, economic environment data, similar case data, capital investment data, and management team data through the manual operation module and the Internet, and classify the basic data into the basic data collection module; S2, language analysis: retrieve basic data from the basic data collection module, and analyze the data through the language analysis module to obtain data after language analysis; S3, data cleaning and data conversion: the data after language analysis is processed by the data cleaning module and the data conversion module to obtain usable basic data that eliminates errors and redundant content and improves data availability; S4. Big data analysis and basic data analysis: Use the basic data analysis module to analyze the association between the available basic data, and obtain the association relationship between the basic data. At the same time, according to the basic data items, the corresponding Internet data is obtained through the big data analysis module. Based on the association relationship between the basic data, the Internet data and the basic data are analyzed through the big data analysis module to obtain the association relationship between the data of the corresponding basic data items in the Internet data; S5. Construct an assessment model and risk indicator system: According to the correlation between the data of the corresponding basic data items in the Internet data and the correlation between the data of the corresponding basic data items in the Internet data, clarify the goals of the risk assessment system, plan the different stages and assessment goals of the scientific and technological achievement transformation process, select different assessment indicators, assign indicator weights, and construct a scientific and technological achievement transformation risk indicator system. Then, based on the constructed scientific and technological achievement transformation risk indicator system, construct a scientific and technological achievement transformation risk assessment model; S6. Data matching and risk assessment: Use the risk assessment model to create a risk assessment module based on the risk indicator system. Then, according to different risk assessment projects, use the data matching module to match the corresponding data analysis model. Then, based on the data matching results of the risk assessment project, use the risk assessment module to derive the risk assessment content. S7. Result report: The risk assessment content is simplified and summarized through the evaluation report overview module; the scientific and technological achievement transformation evaluation index system is displayed through the evaluation index display module; the detailed scientific and technological achievement transformation risk assessment content is displayed through the detailed risk display module; the risk response measures display module displays the risk response measures proposed by the management team; the basic data and risk assessment content are visualized through the data visualization module.

5. According to the big data-based scientific and technological achievement transformation risk assessment system of claim 4, it is characterized by: In step S7, the timeline-based data visualization completed by the data integration module and the result reporting module specifically includes the following steps: S7.

1. First, starting from the time of completion of scientific and technological achievements, establish a timeline that grows with time. Then, through the data integration module, summarize the basic data and risk assessment content in the same time period to one location, establish a data set at the corresponding time point, mark the data set at the corresponding position of the timeline, and name the data set according to the batch of data entry. The data set content includes basic data items covering basic data and risk assessment items covering risk assessment content. Basic data items establish subsets based on technical feature data, market demand data, competitive environment data, policy and regulation data, intellectual property data, economic environment data, similar case data, capital investment data and management team data. Risk assessment items establish subsets based on technical risk assessment, market risk assessment, investment risk assessment, management risk assessment and environmental risk assessment. Subsets under corresponding data items and subsets under risk assessment items are then established one by one to record change records; S7.

2. When the basic data or risk assessment data changes for the first time, the prediction model infers the changes of other basic data based on the changed data, uses the inferred basic data to evaluate the transformation of scientific and technological achievements, and then integrates the changed basic data and risk assessment content. Based on the first data entry format, the second data entry data set is regenerated, and a change record mark is added under the corresponding basic data project subset and risk assessment subset. A change content subset is created under the corresponding change record, and the changed technical data and risk assessment content classification number are placed under the corresponding project. Finally, the second data entry data set is associated with the corresponding timeline node of the visualization data set. S7.

3. When the basic data or risk assessment changes again, repeat step S7.2, delete the data entry subsets except the first data entry subset, and regenerate a new data entry data set.

6. According to the big data-based scientific and technological achievement transformation risk assessment system of claim 1, it is characterized by: Also included is a prediction method for optimizing the risk assessment system, the prediction method comprising the following steps: 1) When the changed data is obtained, the changed items are first determined through the data comparison module, and then the changed items are analyzed through the language analysis model. Then, the prediction module is used to combine the correlation relationship between the data of the basic data items corresponding to the Internet data in the big data analysis module and the basic data analysis module and the correlation relationship between the basic data to obtain the estimated basic data; 2) While the prediction module is calculating changes in other data items based on the changed basic data or risk assessment data, it is also collecting basic data again and performing language analysis. Then, it is used to obtain usable basic data through data cleaning and data conversion. 3) Use the basic data analysis module to compare the differences between the re-collected basic data and the estimated basic data. When the difference of any basic data item is greater than the threshold, the risk assessment is re-performed based on the re-collected basic data. When the difference of any basic data item is less than the threshold, the risk assessment content based on the estimated basic data is directly used.

7. The risk assessment system for transformation of scientific and technological achievements based on big data according to claim 6 is characterized by: In the step 3): 3.1) When the difference between the estimated basic data and the available basic data is less than the threshold: the re-collected data is retained, and the estimated risk assessment content is directly adopted in combination with the estimated basic data, and data visualization is performed through the result reporting module and the data integration module to obtain the estimated visualization data; 3.2) When the difference between the estimated basic data and the available basic data is greater than the threshold, the available basic data is retained, the estimated change data and the estimated risk assessment content are deleted, and the risk assessment and data visualization are re-processed using the available basic data. Since the basic data contains uncontrollable and unquantifiable data, it is necessary to re-analyze the correlation between the available basic data. When the data correlation has not changed, the original risk assessment model is used for risk assessment. When the data correlation changes, the risk indicator system and assessment model are rebuilt and then the risk assessment is carried out.

8. The risk assessment system for transformation of scientific and technological achievements based on big data according to claim 7 is characterized by: In the step 3.2), when the difference between the calculated basic data and the available basic data is greater than a threshold, the prediction module algorithm is also replaced, and a new prediction model is constructed using the replaced prediction model algorithm, and the new prediction model is used to perform data calculation on the changed data to obtain new calculated basic data, and then the data comparison module is used to re-compare the new calculated basic data and the available basic data. When the difference between the two data is less than the threshold, the process ends, and when the difference between the two data is greater than the threshold, the process of replacing the prediction module algorithm is repeated.

9. The risk assessment system for technology achievement transformation based on big data according to claim 6 is characterized by: The setting of the threshold in step 3) is as follows: taking 5% as the basic value, according to the weight of the risk assessment index corresponding to each basic data, the specific error threshold of each basic data is reallocated on the basis of 5%.

Citation Information

Cited By

  • Scientific and technological achievement transformation evaluation model construction method oriented to industry-university-research cooperation

    CN121072823A