Bridgeless totem pole PFC control system and method
By introducing a 0.5Hz LFS signal frequency division into the bridgeless totem pole PFC topology to generate a low-frequency square wave, high-frequency and low-frequency alternating control is achieved, solving the current stress and heating problems of high-frequency tubes, extending the life of the switching tube and maintaining the input Sinusoidal characteristics of current.
Patent Information
- Application Number
- CN202411043842.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-31
- Publication Date
- 2024-10-22
AI Technical Summary
In the existing bridgeless totem pole PFC topology, the high-frequency tubes are continuously switched at high frequencies, which causes current stress and heat generation and shortens the service life of the high-frequency tubes.
A full-bridge circuit composed of four switching tubes is used, and a 0.5Hz LFS signal is introduced and divided by a phase-locked loop to generate a low-frequency square wave, which is used to switch high-frequency and low-frequency tubes to achieve high-frequency and low-frequency alternating control to avoid power frequency cycles. Forced switching within.
The four switch tubes are allowed to withstand current stress and heat evenly, extending the service life of the switch tubes and maintaining the sinusoidal wave characteristics of the input current.
Smart Images

Figure CN118826465A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a rectifier circuit of a switching power supply input stage, and in particular to a bridgeless totem pole PFC control system and method. Background Art
[0002] At the input stage of a switching power supply, AC-DC conversion, also known as rectification, is generally required. When the input stage of the power supply uses uncontrolled rectification, although the circuit working mode is simple, the uncontrollability of the diode causes the input current to be non-sinusoidal and contain a large number of harmonic components, and the power factor of the circuit decreases. PFC (Power Factor Correction) is a power factor correction technology that can make the input current sinusoidal and close in phase to the input voltage, thereby improving the power factor.
[0003] In the existing technology, the bridgeless totem pole PFC is a mainstream PFC topology, which has the advantages of low cost and low loss. Figure 1 Its structure is similar to that of a full bridge, but the two bridge arms are a pair of high-frequency tubes and a pair of low-frequency tubes. The low-frequency tubes operate at around 50Hz, and the high-frequency tubes are controlled by PWM.
[0004] like Figure 2 As shown in the figure, when the input voltage Uac is in the positive half cycle, D2 is in the on state, S1 and S2 switch at high speed, if S1 is on and S2 is off, the power supply and inductor jointly supply power to the capacitor and the load, if S2 is on and S1 is off, the power supply is short-circuited, and the inductor stores energy; when the input voltage Uac is in the negative half cycle, D1 is in the on state, S1 and S2 switch at high speed, if S1 is on and S2 is off, the power supply is short-circuited, and the inductor stores energy, if S2 is on and S1 is off, the power supply and inductor jointly supply power to the capacitor and the load. In essence, it is two boost circuits working in the positive and negative half cycles respectively.
[0005] In order to further reduce the switching loss, the two diodes D1 and D2 can be replaced with switching tubes, and low-frequency PWM that changes simultaneously with the input voltage can be applied to them for control.
[0006] Existing technology and defects:
[0007] In the prior art, one bridge arm is fixed as a pair of high-frequency tubes, and the other bridge arm is fixed as a low-frequency tube. This causes the high-frequency tube to continuously switch at high frequency, bear current stress, and generate heat, resulting in a shortened life of the high-frequency tube.
[0008] In view of this, the present invention is proposed. Summary of the invention
[0009] The purpose of the present invention is to provide a bridgeless totem pole PFC control solution to solve the above technical problems existing in the prior art.
[0010] The objective of the present invention is achieved through the following technical solutions:
[0011] The bridgeless totem pole PFC control system of the present invention comprises a full-bridge circuit composed of four switch tubes, the input voltage is connected to the input end of the full-bridge circuit through a series input resistor and an inductor, and the output end of the full-bridge circuit is connected in parallel with an output resistor and a capacitor.
[0012] In the control method of the bridgeless totem pole PFC control system, the control system introduces an LFS signal, which is a 0.5 Hz sinusoidal signal;
[0013] The input voltage signal is divided by the phase-locked loop, and the LFS signal is zero-crossed to obtain a low-frequency square wave with a frequency of 0.5Hz, which is used to switch the high-frequency tube and the low-frequency tube, which is equivalent to switching once every 100 low-frequency cycles;
[0014] Since the LFS signal is generated by dividing the input voltage signal, the zero crossing point of the LFS signal is consistent with the input voltage signal, and the switching of the high and low frequency tubes will occur simultaneously with the switching of the power frequency cycle, avoiding the impact that may be caused by forced switching during the power frequency cycle.
[0015] Compared with the prior art, the bridgeless totem pole PFC control system and method provided by the present invention adopts a high-frequency and low-frequency alternating control method, which can make the four switch tubes evenly bear the current stress and heat, thereby increasing the service life of the switch tubes. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a bridgeless totem pole PFC topology structure of a group of passive tubes in the prior art;
[0017] Figure 2 It is the working mode of the bridgeless totem pole PFC in the prior art;
[0018] Figure 3 The all-active-bridgeless totem-pole PFC topology structure provided by the embodiment of the present invention;
[0019] Figure 4 It is a trigger pulse of a bridgeless totem pole PFC switch tube in the prior art;
[0020] Figure 5 This is a control scheme block diagram of the present invention;
[0021] Figure 6 It is the switch tube trigger pulse of the control scheme of the present invention;
[0022] Figure 7 The voltage and current results of the control scheme simulation of the present invention. DETAILED DESCRIPTION
[0023] The following is a clear and complete description of the technical solutions in the embodiments of the present invention in conjunction with the drawings in the embodiments of the present invention; it is obvious that the described embodiments are only part of the embodiments of the present invention, not all of the embodiments, which does not constitute a limitation of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0024] First, the terms that may be used in this article are explained as follows:
[0025] The term “and / or” means that either or both of them can be realized at the same time. For example, X and / or Y means both “X” or “Y” and “X and Y”.
[0026] The terms "include", "comprises", "contains", "has" or other descriptions with similar semantics should be interpreted as non-exclusive inclusion. For example, including certain technical feature elements (such as raw materials, components, ingredients, carriers, dosage forms, materials, dimensions, parts, components, mechanisms, devices, steps, procedures, methods, reaction conditions, processing conditions, parameters, algorithms, signals, data, products or products, etc.) should be interpreted as including not only certain technical feature elements explicitly listed, but also other technical feature elements known in the art that are not explicitly listed.
[0027] The term "consisting of..." means excluding any technical feature elements not explicitly listed. If this term is used in a claim, it will make the claim closed, so that it does not contain technical feature elements other than the technical feature elements explicitly listed, except for the conventional impurities related to them. If this term only appears in a clause of a claim, it only limits the elements explicitly listed in the clause, and the elements recorded in other clauses are not excluded from the overall claim.
[0028] The contents not described in detail in the examples of the present invention belong to the prior art known to professionals in the field. If no specific conditions are specified in the examples of the present invention, the conditions are carried out according to the conventional conditions in the field or the conditions recommended by the manufacturer. If the manufacturer is not specified in the reagents or instruments used in the examples of the present invention, they are all conventional products that can be purchased commercially.
[0029] The bridgeless totem pole PFC control system of the present invention comprises a full-bridge circuit composed of four switch tubes, the input voltage is connected to the input end of the full-bridge circuit through a series input resistor and an inductor, and the output end of the full-bridge circuit is connected in parallel with an output resistor and a capacitor.
[0030] Among the four switch tubes, S3 and S4 are low-frequency tubes or high-frequency tubes, and S1 and S2 are high-frequency tubes or low-frequency tubes, depending on the LFS control signal;
[0031] The control logic directions of S1 and S4 are the same, and the control logic directions of S2 and S3 are the same. When switching the high-frequency tube and the low-frequency tube, the trigger pulses of S1 and S4 must be exchanged, and the trigger pulses of S2 and S3 must also be exchanged.
[0032] In the control method of the bridgeless totem pole PFC control system, the control system introduces an LFS signal, which is a 0.5 Hz sinusoidal signal;
[0033] The input voltage signal is divided by the phase-locked loop, and the LFS signal is zero-crossed to obtain a low-frequency square wave with a frequency of 0.5Hz, which is used to switch the high-frequency tube and the low-frequency tube, which is equivalent to switching once every 100 low-frequency cycles;
[0034] Since the LFS signal is generated by dividing the input voltage signal, the zero crossing point of the LFS signal is consistent with the input voltage signal, and the switching of the high and low frequency tubes will occur simultaneously with the switching of the power frequency cycle, avoiding the impact that may be caused by forced switching during the power frequency cycle.
[0035] After the high-frequency and low-frequency tubes are switched, the trigger pulse of the switch tube is:
[0036] When the LFS signal is high, S3 and S4 are low-frequency tubes, and S1 and S2 are high-frequency tubes;
[0037] When the LFS signal is at a low level, S3 and S4 are high-frequency tubes, and S1 and S2 are low-frequency tubes.
[0038] In summary, the bridgeless totem pole PFC control system and method of the embodiments of the present invention adopt a high-frequency and low-frequency alternating control method, which can make the four switch tubes evenly bear the current stress and heat, thereby increasing the service life of the switch tubes.
[0039] In order to more clearly demonstrate the technical solution and technical effects provided by the present invention, the embodiments of the present invention are described in detail with specific embodiments below.
[0040] Example 1
[0041] The principle of the invention is as follows Figure 3 , Figure 5 , Figure 6 , Figure 7 As shown:
[0042] When using Figure 3 When the bridgeless totem pole PFC topology is shown, the trigger pulse of the traditional switch tube is as follows Figure 4 As shown, S3 and S4 are fixed as low-frequency tubes, and S1 and S2 are fixed as high-frequency tubes. This will cause the high-frequency tubes to continuously switch at high frequency, bear current stress, and generate heat, resulting in a reduction in the life of the high-frequency tubes.
[0043] The present invention introduces an LFS signal into the control system. This signal is a 0.5Hz sinusoidal signal. It can be generated by dividing the input voltage signal through a phase-locked loop. By performing zero-crossing detection on the LFS, a low-frequency square wave with a frequency of 0.5Hz can be obtained, which is used to switch the high-frequency tube and the low-frequency tube, which is equivalent to switching once every 100 low-frequency cycles. Since the LFS signal is generated by dividing the input voltage signal, the zero-crossing point of the LFS signal is consistent with the input voltage signal, and the high- and low-frequency tube switching will occur simultaneously with the power frequency cycle switching, avoiding the impact that may be caused by forced switching during the power frequency cycle.
[0044] In the present invention, the four switch tubes can be low-frequency tubes or high-frequency tubes, depending on the LFS control signal. Figure 6 As shown, when the LFS signal is at a high level, S3 and S4 are low-frequency tubes, and S1 and S2 are high-frequency tubes; when the LFS signal is at a low level, S3 and S4 are high-frequency tubes, and S1 and S2 are low-frequency tubes;
[0045] according to Figure 3 It can be seen that the control logic direction of S1 and S4 is the same, and so is that of S2 and S3. Therefore, when switching between high-frequency tubes and low-frequency tubes, you only need to exchange the trigger pulses of S1 and S4, and also exchange S2 and S3. For the specific switching method, please refer to Figure 5 .
[0046] After switching between high and low frequency tubes, the trigger pulse of the switch tube is as follows: Figure 6 As shown, when the LFS signal is at a high level, S3 and S4 are low-frequency tubes, and S1 and S2 are high-frequency tubes; when the LFS signal is at a low level, S3 and S4 are high-frequency tubes, and S1 and S2 are low-frequency tubes.
[0047] This solution allows the four switching tubes to evenly withstand current stress and heat, thereby increasing the service life of the switching tubes.
[0048] Testing and experimental verification
[0049] The solution proposed in the present invention is simulated and the current and voltage results are shown in Figure 7 As shown in the figure, the input current Iac is sinusoidal and in phase with the input voltage Uac, and the output voltage Udc can reach the given 100V. After switching, there is no abnormality in the current and voltage, which verifies the theoretical feasibility of this solution.
[0050] The above is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by any technician familiar with the technical field within the technical scope disclosed in the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims. The information disclosed in the background technology section of this article is only intended to deepen the understanding of the overall background technology of the present invention, and should not be regarded as an admission or in any form that the information constitutes prior art known to those skilled in the art.
Claims
1. A bridgeless totem pole PFC control system, It is characterized in that The invention comprises a full-bridge circuit composed of four switch tubes, wherein the input voltage is connected to the input end of the full-bridge circuit through a series input resistor and an inductor, and the output end of the full-bridge circuit is connected in parallel with an output resistor and a capacitor.
2. The bridgeless totem pole PFC control system according to claim 1, It is characterized in that Among the four switch tubes, S3 and S4 are low-frequency tubes or high-frequency tubes, and S1 and S2 are high-frequency tubes or low-frequency tubes, depending on the LFS control signal; The control logic directions of S1 and S4 are the same, and the control logic directions of S2 and S3 are the same. When switching the high-frequency tube and the low-frequency tube, the trigger pulses of S1 and S4 must be exchanged, and the trigger pulses of S2 and S3 must also be exchanged.
3. A control method for a bridgeless totem pole PFC control system according to claim 1 or 2, It is characterized in that The control system introduces the LFS signal, which is a 0.5Hz sinusoidal signal; The input voltage signal is divided by the phase-locked loop, and the LFS signal is zero-crossed to obtain a low-frequency square wave with a frequency of 0.5Hz, which is used to switch the high-frequency tube and the low-frequency tube, which is equivalent to switching once every 100 low-frequency cycles; Since the LFS signal is generated by dividing the input voltage signal, the zero crossing point of the LFS signal is consistent with the input voltage signal, and the switching of the high and low frequency tubes will occur simultaneously with the switching of the power frequency cycle, avoiding the impact that may be caused by forced switching during the power frequency cycle.
4. The bridgeless totem pole PFC control method according to claim 3, It is characterized in that After the high-frequency and low-frequency tubes are switched, the trigger pulse of the switch tube is: When the LFS signal is high, S3 and S4 are low-frequency tubes, and S1 and S2 are high-frequency tubes; When the LFS signal is at a low level, S3 and S4 are high-frequency tubes, and S1 and S2 are low-frequency tubes.