Method suitable for judging damage of tuyere small sleeve of blast furnace and measuring process loss

Through the cooperation of industrial water pipelines and drainage branches, it is possible to accurately determine the damage to the blast furnace tuyere sleeve and calculate the amount of leaking water, solving the problems of misjudgment and cooling water leakage in the existing technology, and improving the safety and production efficiency of the blast furnace.

CN118835012APending Publication Date: 2024-10-25WUHAN IRON & STEEL GRP ECHENG IRON & STEEL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410849885.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2024-10-25

AI Technical Summary

Technical Problem

The existing technology has the problem of misjudgment in determining the damage of the blast furnace tuyere sleeve, especially when the flow meter fails or the reading is distorted, which leads to cooling water leakage and affects the safety and efficiency of blast furnace production.

Method used

Through the cooperation of industrial water pipelines and drainage branches, monitor whether the flow rate exceeds the preset range. If it exceeds the preset range, switch the water supply mode, observe the water outlet phenomenon to determine damage, calculate the leakage amount of water through the flow difference, and adjust the coke replenishment.

Benefits of technology

It improves the accuracy of fault diagnosis, avoids cooling water leakage, enhances the safety of blast furnace production, reduces process losses and economic losses, and ensures the stable operation of the blast furnace.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118835012A_ABST
    Figure CN118835012A_ABST
Patent Text Reader

Abstract

The invention discloses a blast furnace tuyere small sleeve damage judgment and process loss measurement method, which can accurately and quickly judge whether a tuyere small sleeve is damaged or not through mutual cooperation of an industrial water pipeline and a drainage branch and combination of observation of a water outlet phenomenon of the drainage branch, effectively avoids misjudgment caused by flowmeter faults or reading distortion, and improves the measurement accuracy of the blast furnace tuyere small sleeve damage. Meanwhile, damage of the tuyere small sleeve can be found in time, safety risks possibly caused by the fact that cooling water rapidly leaks into the blast furnace are avoided, and after it is judged that the tuyere small sleeve is damaged, the amount of coke needing to be supplemented into the blast furnace can be calculated by accurately measuring the total amount of the cooling water leaked from the tuyere small sleeve; therefore, the process loss caused by the leakage of the cooling water is effectively reduced, the stable operation and the product quality of the blast furnace are guaranteed, the production interruption time is favorably reduced, the economic loss of an enterprise is favorably reduced, and the economic benefit is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of blast furnace smelting, and in particular to a method suitable for judging damage of a blast furnace tuyere sleeve and measuring process loss. Background Art

[0002] The blast furnace tuyere jacket is an indispensable part of the blast furnace smelting process. Its operating status directly affects the production safety and efficiency of the blast furnace. The traditional cooling method in small blast furnaces mostly adopts industrial water open-circuit circulation cooling, while modern large blast furnaces generally adopt soft water closed-circulation high-pressure soft water cooling system. The structural design of the blast furnace tuyere jacket usually adopts cavity cross-flow type, and the high-pressure cooling water is circulated and cooled in the tuyere jacket by water inlet at one end and water outlet at the other end.

[0003] At present, the monitoring and judgment of whether the tuyere sleeve of the blast furnace is damaged mainly relies on the flow meter installed on the water inlet pipe of the tuyere sleeve. The flow difference between the water inlet and the water outlet is compared, and a comprehensive analysis is performed in combination with the temperature difference. However, in the actual production process, this method has many disadvantages. When the flow meter fails, it will send out an abnormal signal. At this time, it is difficult to distinguish whether the flow meter fails or the tuyere sleeve is damaged. The cause of the failure cannot be quickly determined, affecting the blast furnace production.

[0004] Secondly, under high pressure and high flow rate conditions, the flow meter readings may be distorted and abnormal signals may be issued. At this time, it is also difficult to distinguish whether the flow meter readings are distorted or the air outlet sleeve is damaged.

[0005] However, once the tuyere sleeve is damaged, cooling water will quickly leak into the blast furnace, causing process losses and affecting the blast furnace condition. If the damage of the tuyere sleeve cannot be quickly discovered and the total amount of cooling water leaked from the tuyere sleeve cannot be calculated, the charging parameters of the blast furnace cannot be adjusted accordingly, thereby affecting the recovery speed of the blast furnace condition and causing greater economic losses to the enterprise. Summary of the invention

[0006] The purpose of the present invention is to provide a method suitable for judging the damage of a blast furnace tuyere sleeve and measuring the process loss in view of the problems existing in the prior art.

[0007] To achieve the above object, the technical solution adopted by the present invention is:

[0008] A method for judging damage of a blast furnace tuyere sleeve and measuring process loss comprises the following steps:

[0009] Monitor whether the flow rate of the soft water pipeline supplying water to the tuyere small sleeve exceeds the preset range 1;

[0010] If the flow rate of the soft water pipeline exceeds the preset range 1, the soft water pipeline is closed, and the industrial water pipeline is opened to supply water to the tuyere small sleeve;

[0011] When the water supply of the industrial water pipeline reaches a peak value, the drainage branch of the return pipeline is opened to reduce the water supply of the industrial water pipeline to 8% to 15% of the peak value within a preset time;

[0012] Observe whether the drainage branch has a false water outflow phenomenon or a false water outage phenomenon. If the false water outflow phenomenon occurs, it is determined that the tuyere sleeve is damaged. If the false water outage phenomenon occurs, it is determined that the tuyere sleeve is not damaged.

[0013] If it is determined that the tuyere sleeve is damaged, the water supply of the industrial water pipeline is restored to the peak value, and the total flow of the water leaking from the tuyere sleeve is calculated according to the flow difference between the water supply of the industrial water pipeline and the flow of the drainage branch within the preset time two;

[0014] The amount of coke to be added to the blast furnace is calculated based on the total flow of water leaking from the tuyere sleeve.

[0015] The present invention cooperates with the industrial water pipeline and the drainage branch, and combined with the observation of the water outlet phenomenon of the drainage branch, can accurately and quickly determine whether the tuyere sleeve is damaged, effectively avoiding misjudgment caused by flow meter failure or distorted readings, improving the accuracy of fault judgment, and at the same time can timely discover the damage of the tuyere sleeve, avoiding the safety risks that may be caused by the rapid leakage of cooling water into the blast furnace, thereby enhancing the safety of blast furnace production.

[0016] According to the method provided by the present invention, after determining that the tuyere sleeve is damaged, the amount of coke that needs to be added to the blast furnace can be calculated by accurately measuring the total amount of cooling water leaked from the tuyere sleeve, thereby effectively reducing the process loss caused by cooling water leakage, ensuring the stable operation of the blast furnace and product quality, helping to reduce production interruption time, helping to reduce the economic losses of the enterprise and improving economic benefits.

[0017] Preferably, the return water pipeline includes a return water branch and a drainage branch, the return water branch and the drainage branch are respectively connected to the return water port of the tuyere sleeve through a three-way valve, and a rubber tube is connected to the water outlet end of the drainage branch.

[0018] Preferably, when the drainage branch is connected to the tuyere sleeve via the three-way valve, the return water branch and the tuyere sleeve are cut off by the three-way valve.

[0019] By arranging the return branch and the drainage branch in the return pipe and using the three-way valve for switching, the water flow can be conveniently directed to the drainage branch when needed, so as to observe and judge whether the tuyere sleeve is damaged.

[0020] Preferably, the method for observing whether the false water outlet phenomenon occurs at the water outlet is as follows:

[0021] After the water supply of the industrial water pipeline is reduced, intermittent water discharge will occur at the water outlet. When the water supply of the industrial water pipeline is restored to the peak value, if white gas can be observed ejected from the water outlet along with the water flow, it can be determined that the false water discharge phenomenon occurs.

[0022] Preferably, the white gas includes coal gas leaking from a blast furnace and evaporated water vapor.

[0023] The appearance of false water leakage is evidence of damage to the tuyere sleeve, which helps to promptly discover damage to the tuyere sleeve. By observing white gas, it can be determined that the gas in the blast furnace has leaked into the return water pipeline, thereby improving the reliability of the judgment.

[0024] Preferably, the method for observing whether the false water outage phenomenon occurs at the water outlet is as follows:

[0025] After the water supply of the industrial water pipeline is reduced, the water flow rate at the water outlet end will also decrease, but the water flow rate is always greater than zero. Then, the water supply of the industrial water pipeline is restored to the peak value, and the water flow rate at the water outlet end will also increase to the peak value and continue to discharge water, thereby determining that the false water outage phenomenon occurs.

[0026] By observing that the flow at the water outlet decreases but is always greater than zero after the water supply is reduced, and that the flow increases after the water supply is restored, it can be determined that the tuyere sleeve is not damaged, providing a clear basis for judgment for operators.

[0027] Preferably, the method for calculating the total flow rate of water leaking from the tuyere sleeve is as follows:

[0028] The moment when the flow of the soft water pipeline exceeds the preset range one is set as the starting moment. When the blast furnace is shut down for maintenance, the moment when the water supply to the damaged tuyere sleeve is stopped is set as the ending moment. The total duration of the cooling water leakage of the tuyere sleeve is calculated based on the starting moment and the ending moment. According to the ratio of the total duration to the preset time two, the ratio of the total flow rate to the flow rate difference is obtained, and then the total flow rate is obtained.

[0029] Since the water supply of the industrial water pipeline remains stable, the flow rate difference between the water supply of the industrial water pipeline and the flow rate of the drainage branch within the preset time two is calculated, and the cooling water flow rate of the tuyere sleeve that stably leaks into the blast furnace within the preset time two is obtained. The flow rate difference reflects the cooling water volume that stably leaks from the tuyere sleeve per unit time; then the total duration is compared with the duration of the preset time two, and the ratio of the total duration to the preset time two is calculated to obtain the ratio of the total flow rate to the flow rate difference per unit time. Since the leakage amount per unit time is already known, the total flow rate of cooling water leaked from the tuyere sleeve during the entire leakage period can be calculated by multiplying the leakage amount per unit time by the ratio of the total duration to the preset time two.

[0030] Preferably, the method for calculating the amount of coke to be added to the blast furnace is as follows:

[0031] Based on the heat required to heat 1kg of water to boiling and the total flow rate, the total heat required to heat the leaked water to boiling is calculated. Based on the heat released by the combustion of 1kg of coke and the total heat, the amount of coke required to release the total heat is calculated, thereby obtaining the amount of coke that needs to be added to the blast furnace.

[0032] Through this method, the heat loss caused by the leakage of cooling water from the tuyere sleeve can be accurately calculated, thereby accurately calculating the amount of coke that needs to be added to the blast furnace. Timely replenishment of coke helps maintain the temperature and pressure inside the blast furnace stable, improves production efficiency and product quality, and helps ensure the thermal balance inside the blast furnace and maintains the normal operation of the blast furnace.

[0033] Preferably, the preset time 1 is 10-20 seconds, and the preset time 2 is 0.5-1.5 hours.

[0034] Preferably, if it is determined that the tuyere sleeve is not damaged, the water supply of the industrial water pipeline is restored to a peak value, and it is checked whether a flow meter measuring the flow of the soft water pipeline is faulty.

[0035] If it is determined that the tuyere sleeve is not damaged, the water supply of the industrial water pipeline is restored to the peak value to maintain the cooling effect of the tuyere sleeve and prevent the tuyere sleeve from being damaged due to high temperature. After the fault of the soft water pipeline is checked and resolved, the industrial water pipeline is switched back to the soft water pipeline.

[0036] Compared with the prior art, the present invention has the following beneficial effects:

[0037] (1) The present invention can accurately and quickly determine whether the tuyere sleeve is damaged by cooperating with the industrial water pipeline and the drainage branch, combined with the observation of the water outlet phenomenon of the drainage branch, effectively avoiding misjudgment caused by flow meter failure or distorted readings, improving the accuracy of fault judgment, and at the same time, timely discovering the damage of the tuyere sleeve, avoiding the safety risks that may be caused by the rapid leakage of cooling water into the blast furnace, thereby enhancing the safety of blast furnace production.

[0038] (2) According to the method provided by the present invention, after determining that the tuyere sleeve is damaged, the amount of coke that needs to be added to the blast furnace can be calculated by accurately measuring the total amount of cooling water leaked from the tuyere sleeve, thereby effectively reducing the process loss caused by cooling water leakage, ensuring the stable operation of the blast furnace and product quality, helping to reduce production interruption time, helping to reduce the economic losses of the enterprise and improving economic benefits. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 It is a flow chart of the method for judging the damage of the tuyere sleeve and measuring the process loss in the embodiment of the present invention;

[0040] Figure 2 This is a schematic diagram of the structure of a cooling water supply pipeline in an embodiment of the present invention;

[0041] In the figure: 1. Small air outlet sleeve; 2. Soft water pipeline; 3. Industrial water pipeline; 4. Return pipeline; 5. Return branch; 6. Drainage branch; 7. Rubber hose; 8. Ball valve; 9. Butterfly valve; 10. Three-way valve one; 11. Three-way valve two; 12. Three-way valve three; 13. Three-way valve four; 14. Flow meter one; 15. Flow meter two; 16. Flow meter three. DETAILED DESCRIPTION

[0042] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0043] In the description of the present invention, it should be noted that the directions or positional relationships indicated by terms such as "middle", "upper", "lower", "left", "right", "inside" and "outside" are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

[0044] like Figure 1~2As shown, the specific scheme of the embodiment is as follows: the structural design of the blast furnace tuyere jacket 1 adopts a cavity flow type, and the circulation cooling of high-pressure cooling water in the tuyere jacket 1 is realized by water inlet at one end and water outlet at the other end. The cooling water supply pipeline of the tuyere jacket 1 includes a soft water pipeline 2, an industrial water pipeline 3 and a return water pipeline 4. When the tuyere jacket 1 works normally, the soft water pipeline 2 and the return water pipeline 4 constitute a high-pressure soft water cooling system. When the soft water pipeline 2 fails, in order to maintain the cooling effect of the tuyere jacket 1, it is necessary to switch the soft water pipeline 2 to the industrial water pipeline 3. The industrial water pipeline 3 and the return water pipeline 4 constitute a high-pressure industrial water cooling system, which gives priority to ensuring the normal operation of the tuyere jacket 1 and provides time for eliminating the failure of the soft water pipeline 2.

[0045] The soft water pipeline 2 and the industrial water pipeline 3 are connected to the water inlet of the air outlet sleeve 1 through a three-way valve 10 respectively. The soft water pipeline 2 is provided with a flow meter 14, a ball valve 8, a butterfly valve 9 and a three-way valve 11, wherein the flow meter 14, the butterfly valve 9, the three-way valve 11 and the ball valve 8 are arranged in sequence along the water flow direction of the soft water pipeline 2. One outlet of the three-way valve 11 is blocked by a blind plate, so that when troubleshooting the soft water pipeline 2, the blind plate can be removed and the cooling water in the soft water pipeline 2 can be discharged for detection.

[0046] The industrial water pipeline 3 is provided with a flow meter 15 and a ball valve 8, wherein the ball valve 8, the flow meter 15, and the ball valve 8 are arranged in sequence along the water flow direction of the industrial water pipeline 3.

[0047] The return water pipeline 4 includes a return water branch 5 and a drainage branch 6, and the return water branch 5 and the drainage branch 6 are respectively connected to the return water port of the tuyere sleeve 1 through a three-way valve 12.

[0048] The return water branch 5 is provided with a three-way valve four 13, a ball valve 8 and a butterfly valve 9, wherein the ball valve 8, the three-way valve four 13 and the butterfly valve 9 are arranged in sequence along the water flow direction of the return water branch 5.

[0049] The drainage branch 6 is provided with a ball valve 8 and a flow meter 16, wherein the ball valve 8 and the flow meter 16 are arranged in sequence along the water flow direction of the drainage branch 6, and a rubber tube 7 is connected to the water outlet end of the drainage branch 6.

[0050] The preset time one is 10-20s, and the preset time one is preferably 15s, the preset time two is 0.5-1.5h, and the preset time two is preferably 1h.

[0051] A method for judging damage of a blast furnace tuyere sleeve and measuring process loss comprises the following steps:

[0052] (1) Use a flow meter 14 to monitor the flow of the soft water pipe 2 supplying water to the tuyere sleeve 1, and determine whether the reading of the flow meter 14 exceeds a preset range 1.

[0053] (2) If the reading of the flow meter 14 exceeds the preset range 1, it is judged that an abnormality occurs in the soft water pipeline 2, and the ball valve 8 on the soft water pipeline 2 is closed. The three-way valve 10 is operated to cut off the soft water pipeline 2 and the tuyere sleeve 1, while connecting the tuyere sleeve 1 with the industrial water pipeline 3, and supplying water to the tuyere sleeve 1 through the industrial water pipeline 3.

[0054] (3) When the water supply of the industrial water pipeline 3 reaches the peak value, wait for the reading of the flow meter 2 15 to stabilize, operate the three-way valve 3 12, cut off the return water branch 5 and the tuyere sleeve 1, and supply water to the drainage branch 6 through the tuyere sleeve 1. The cooling water after use in the tuyere sleeve 1 is sprayed out through the rubber tube 7.

[0055] (4) Operate the ball valve 8 of the industrial water pipeline 3 to reduce the water supply of the industrial water pipeline 3 to 10% of the peak value within 15 seconds, and observe whether the drainage branch 6 has a false water outflow phenomenon or a false water outage phenomenon.

[0056] The method to observe whether there is false water discharge at the water outlet is as follows:

[0057] After the water supply of the industrial water pipeline 3 is reduced, intermittent water discharge will occur at the water outlet, that is, the reading of the flow meter 3 16 will fluctuate greatly in a short period of time. It is preliminarily judged that the air outlet sleeve 1 is damaged. Then operate the ball valve 8 of the industrial water pipeline 3 to restore the water supply of the industrial water pipeline 3 to the peak value within 2 to 3 seconds. If white gas can be observed to be ejected with the water flow at the water outlet, it is determined that false water discharge occurs.

[0058] The white gas includes the coal gas overflowing from the blast furnace and the evaporated water vapor. The white gas refers to the high-pressure coal gas in the blast furnace entering the cooling water system through the damaged part of the tuyere sleeve 1 when the tuyere sleeve 1 is damaged during the operation of the blast furnace. When these coal gases are mixed with the cooling water and sprayed out of the rubber tube 7 together, a visible white gas line will be formed due to the rapid overflow of the coal gas and the evaporation of the high-temperature water vapor.

[0059] Therefore, if a false water outflow phenomenon occurs, it is determined that the tuyere sleeve 1 is damaged.

[0060] The method to observe whether there is a false water outage at the water outlet is as follows:

[0061] After the water supply of the industrial water pipeline 3 is reduced, the water flow rate at the water outlet end will also decrease, but the water flow rate is always greater than zero, that is, the reading of the flow meter 3 16 is always greater than zero. It is preliminarily judged that the air outlet sleeve 1 is not damaged, and then the ball valve 8 of the industrial water pipeline 3 is operated to restore the water supply of the industrial water pipeline 3 to the peak value within 2 to 3 seconds. The water flow rate at the water outlet end will also increase to the peak value and continue to discharge water, thereby determining that a false water outage phenomenon has occurred.

[0062] Therefore, if a false water outage occurs, it is determined that the tuyere sleeve 1 is not damaged.

[0063] (5) If it is determined that the tuyere sleeve 1 is damaged, the water supply of the industrial water pipeline 3 is restored to the peak value within 2 to 3 seconds, and the cooling water flow of the industrial water pipeline 3 and the drainage flow of the drainage branch 6 in 1 hour are measured using flow meter 2 15 and flow meter 3 16. The cooling water flow leaked from the tuyere sleeve 1 per hour is obtained based on the flow difference between the cooling water flow and the drainage flow in 1 hour. In this embodiment, the cooling water flow leaked from the tuyere sleeve 1 per hour is 3t.

[0064] The method for calculating the total flow of water leakage from the outlet small set 1 is as follows:

[0065] The moment when the flow of the soft water pipeline 2 exceeds the preset range 1 is set as the starting moment, and a blast furnace shutdown maintenance plan is formulated. When the blast furnace is shut down for maintenance, the moment when the water supply to the damaged tuyere sleeve 1 is stopped is set as the ending moment. The total duration of the cooling water leakage of the tuyere sleeve 1 is calculated according to the starting moment and the ending moment. According to the ratio of the total duration to 1h, the ratio of the total flow rate to the flow rate difference is obtained, and the ratio of the total flow rate to the flow rate difference is multiplied by the flow rate difference to obtain the total flow rate of the leaked water of the tuyere sleeve 1. In this embodiment, the total duration is 4h, and the total flow rate is 4*3t=12t=12000kg.

[0066] (6) Measure the temperature of the cooling water in the industrial water pipeline 3. If the measured temperature is 20°C, calculate that the heat required to heat 1 kg of water from 20°C to boiling is 334.88 kJ. Based on the total flow rate of water leaking from the tuyere sleeve 1, calculate that the total heat required to heat the leaking water to boiling is 334.88 kJ*12000 kg=4018560 kJ.

[0067] The heat released by the combustion of 1kg of coke is 30000kJ. According to the total heat, the mass of coke needed to be added to the blast furnace is calculated to be 4018560kJ / 30000kJ=133.952kg. The amount of coke that needs to be added to the blast furnace is obtained, and the corresponding mass of coke is added to the blast furnace to maintain the heat balance in the blast furnace, ensure sufficient heat in the furnace cylinder, and speed up the recovery of the furnace condition.

[0068] (7) If it is determined that the tuyere sleeve 1 is not damaged, restore the water supply of the industrial water pipeline 3 to the peak value within 2 to 3 seconds to check whether the flow meter measuring the flow of the soft water pipeline 2 is faulty, or eliminate other faults in the soft water pipeline 2.

[0069] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for judging damage of a blast furnace tuyere sleeve and measuring process loss, characterized in that: The following steps are involved: Monitor whether the flow rate of the soft water pipeline supplying water to the tuyere small sleeve exceeds the preset range 1; If the flow rate of the soft water pipeline exceeds the preset range 1, the soft water pipeline is closed, and the industrial water pipeline is opened to supply water to the tuyere small sleeve; When the water supply of the industrial water pipeline reaches a peak value, the drainage branch of the return pipeline is opened to reduce the water supply of the industrial water pipeline to 8% to 15% of the peak value within a preset time; Observe whether the drainage branch has a false water outflow phenomenon or a false water outage phenomenon. If the false water outflow phenomenon occurs, it is determined that the tuyere sleeve is damaged. If the false water outage phenomenon occurs, it is determined that the tuyere sleeve is not damaged. If it is determined that the tuyere sleeve is damaged, the water supply of the industrial water pipeline is restored to the peak value, and the total flow of the water leaking from the tuyere sleeve is calculated according to the flow difference between the water supply of the industrial water pipeline and the flow of the drainage branch within the preset time two; The amount of coke to be added to the blast furnace is calculated based on the total flow of water leaking from the tuyere sleeve.

2. A method for judging damage of a blast furnace tuyere sleeve and measuring process loss according to claim 1, characterized in that: The return water pipeline includes a return water branch and a drainage branch. The return water branch and the drainage branch are respectively connected to the return water port of the air outlet sleeve through a three-way valve. The water outlet end of the drainage branch is connected with a rubber tube.

3. A method for judging damage of a blast furnace tuyere sleeve and measuring process loss according to claim 2, characterized in that: When the drainage branch is connected to the tuyere sleeve through the three-way valve, the return water branch and the tuyere sleeve are cut off by the three-way valve.

4. A method for judging damage of a blast furnace tuyere sleeve and measuring process loss according to claim 1, characterized in that: The method for observing whether the false water outlet phenomenon occurs at the water outlet is as follows: After the water supply of the industrial water pipeline is reduced, intermittent water discharge will occur at the water outlet. When the water supply of the industrial water pipeline is restored to the peak value, if white gas can be observed ejected from the water outlet along with the water flow, it can be determined that the false water discharge phenomenon occurs.

5. A method for judging damage of a blast furnace tuyere sleeve and measuring process loss according to claim 4, characterized in that: The white gas includes coal gas escaping from a blast furnace and evaporated water vapor.

6. A method for judging damage of a blast furnace tuyere sleeve and measuring process loss according to claim 1, characterized in that: The method for observing whether the false water outage phenomenon occurs at the water outlet is as follows: After the water supply of the industrial water pipeline is reduced, the water flow rate at the water outlet end will also decrease, but the water flow rate is always greater than zero. Then, the water supply of the industrial water pipeline is restored to the peak value, and the water flow rate at the water outlet end will also increase to the peak value and continue to discharge water, thereby determining that the false water outage phenomenon occurs.

7. The method for judging damage of a blast furnace tuyere sleeve and measuring process loss according to claim 1 is characterized in that: The method for calculating the total flow rate of water leakage from the tuyere sleeve is as follows: The moment when the flow of the soft water pipeline exceeds the preset range one is set as the starting moment. When the blast furnace is shut down for maintenance, the moment when the water supply to the damaged tuyere sleeve is stopped is set as the ending moment. The total duration of the cooling water leakage of the tuyere sleeve is calculated based on the starting moment and the ending moment. According to the ratio of the total duration to the preset time two, the ratio of the total flow rate to the flow rate difference is obtained, and then the total flow rate is obtained.

8. A method for judging damage of a blast furnace tuyere sleeve and measuring process loss according to claim 7, characterized in that: The method for calculating the amount of coke to be added to the blast furnace is as follows: Based on the heat required to heat 1kg of water to boiling and the total flow rate, the total heat required to heat the leaked water to boiling is calculated. Based on the heat released by the combustion of 1kg of coke and the total heat, the amount of coke required to release the total heat is calculated, thereby obtaining the amount of coke that needs to be added to the blast furnace.

9. The method for judging damage of a blast furnace tuyere sleeve and measuring process loss according to claim 1 is characterized in that: The preset time 1 is 10-20 seconds, and the preset time 2 is 0.5-1.5 hours.

10. The method for judging damage of a blast furnace tuyere sleeve and measuring process loss according to claim 1, characterized in that: If it is determined that the air inlet sleeve is not damaged, the water supply of the industrial water pipeline is restored to the peak value, and the flow meter measuring the flow of the soft water pipeline is checked for failure.