Blast furnace iron notch oxygen burning operation auxiliary tool and blast furnace iron notch oxygen burning operation method

By designing auxiliary tooling for the oxygen burning operation of the blast furnace taphole, and using the sliding rail and motor drive system to automatically connect the oxygen burning tube, the safety risks, labor intensity and burning deviation problems in the oxygen burning operation of the blast furnace taphole are solved, and an efficient and safe operation is achieved. The opening process of the iron gate channel.

CN118835013AActive Publication Date: 2024-10-25SGIS SONGSHAN CO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202410975654.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-10-25
Estimated Expiration
2044-07-19

AI Technical Summary

Technical Problem

Oxygen burning operations in blast furnace tapholes have problems such as high safety risks for operators, high labor intensity, serious burning deviation, serious diffusion of dust and toxic gases, personnel who are easily injured if they do not respond in time, and frequent docking of metal pipes resulting in waste.

Method used

An auxiliary tooling for oxygen-burning operations at the blast furnace taphole was designed, including a casing, a gantry, and a motor drive system. The automatic docking and movement of metal oxygen-burning pipes was realized through sliding rails and locking screws, ensuring that the pipes were aligned with the center of the blast furnace taphole. , reduce manual operations and reduce the risk of exposure to dust and toxic gases.

Benefits of technology

It improves the safety and efficiency of the taphole oxygen burning operation, reduces the working time of operators in high-temperature areas, reduces labor intensity and cost, and avoids the problems of partial burning and waste.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118835013A_ABST
    Figure CN118835013A_ABST
Patent Text Reader

Abstract

The invention discloses a blast furnace iron notch oxygen burning operation auxiliary tool and a blast furnace iron notch oxygen burning operation method. The oxygen burning operation auxiliary tool for the blast furnace taphole comprises a sleeve fixed above a slag skimmer, a slag skimmer, a slag skimmer and a slag skimmer, the first portal frame and the second portal frame are connected with the two first rails, a first through hole is formed in the center of a cross beam of the first portal frame, and a second through hole and a first lock hole penetrating through the hole wall of the second through hole are formed in the center of a cross beam of the second portal frame; the third portal frame is connected with the second rails in a sliding mode, and a third through hole and a second lock hole penetrating through the hole wall of the third through hole are formed in the third portal frame; the first track is located between the second tracks, the axes of the first through hole, the second through hole, the sleeve and the third through hole are parallel to the horizontal plane, the heights of the first through hole, the second through hole, the sleeve and the third through hole are sequentially increased, and the height of the first through hole is higher than the central point position of the blast furnace iron notch. According to the invention, the oxygen burning operation process of the iron notch is safe and easy, and the phenomenon that the iron notch is burnt obliquely in the original oxygen burning operation can be eliminated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of smelting, and in particular to auxiliary tooling for blast furnace iron mouth oxygen burning operation and a blast furnace iron mouth oxygen burning operation method. Background Art

[0002] Burning oxygen at the iron mouth is a routine operation at the iron mouth of a blast furnace. Generally, when the iron mouth cannot be opened (the taphole mud is hard, or the opening equipment has insufficient kinetic energy, or the equipment fails), the drill rod is stuck at the iron mouth, there are foreign objects blocking the iron mouth channel, or the temperature of the slag and iron in the blast furnace hearth is low (the slag and iron have poor fluidity, and are heated by burning oxygen), etc., the iron mouth needs to organize oxygen burning operations in order to open the iron mouth and allow the slag and iron inside the hearth to flow out smoothly.

[0003] The metal oxygen burning pipe for the iron mouth is generally about 6 meters long (depending on the demand, the length of some oxygen burning pipes can be set according to the operation content), the main trench of the blast furnace is about 20 meters long, and the oxygen burning process requires multiple pipes to be connected through large and small joints. The conventional operation process of the iron mouth oxygen burning operation is as follows: Figure 1 Operator A stands outside the main groove 2' of the blast furnace 1' and uses a metal oxygen-burning pipe 3' to introduce high-pressure oxygen. The high temperature in the channel of the iron mouth 4' and the help of external sparks to generate high temperature, burn and melt the refractory artillery mud in the channel of the iron mouth 4' and make it flow out of the iron mouth 4'. The metal oxygen-burning pipe 3' continues to burn section by section, and finally the channel of the iron mouth 3' is burned through, so that the slag and iron of the blast furnace 1' can flow smoothly through the iron mouth 4' into the main groove 2', and the slag and molten iron are separated under the action of the slag skimmer 5' in the main groove 2'.

[0004] In the prior art, the oxygen burning operation at the iron mouth of a blast furnace has the following problems:

[0005] (1) Operators stand on both sides of the main trench to work, and a large amount of high-temperature slag iron is stored in the main trench. Both sides are high-temperature, dusty, and toxic gas areas. The operating risks of operators are extremely high. They need to wear high-temperature protective clothing, protective gloves, protective masks, etc. during the oxygen burning operation. Oxygen burning operations require manual pressure to press the oxygen pipe along the iron mouth channel according to the melting speed of the iron mouth channel, which requires a lot of physical strength; wearing high-temperature protective clothing, protective shoes, etc. has a great impact on the operator's position and walking, and is not conducive to work safety; wearing a mask affects the operator's vision, which is not conducive to work safety. Therefore, the existing oxygen burning operation is a very risky physical labor.

[0006] (2) Under the existing technical conditions, the iron mouth of the blast furnace is led out from the blast furnace at the front end of the main groove, facing the center line of the main groove. The width of the main groove is generally about 1.2 meters or even wider. The operators stand on both sides of the main groove, holding dozens of meters long oxygen burning pipes in their hands. It is difficult to align the iron mouth when passing it into the iron mouth (it needs to be aligned with the center of the iron mouth). In many cases, the iron mouth is burned off-center, which can easily cause the iron mouth channel to burn out or burn out, and even burn out the carbon bricks in the iron mouth area.

[0007] (3) During the oxygen burning operation, a dedicated person (the person at the front) is required to control the metal oxygen burning pipe. On the one hand, he needs to control the forward direction of the metal oxygen burning pipe, and on the other hand, he needs to compact it with force, which consumes a lot of labor. In the back, one person is required to control the oxygen interface and one person to control the oxygen switch. In order to prevent the oxygen burning pipe from falling off, generally one person holds each section of the oxygen burning pipe, and there are many people involved in the operation.

[0008] (4) Operators work on both sides of the main trench. The dust, toxic gases, and smoke generated during the oxygen burning process inevitably spread to the personnel area, causing the operators to inhale and feel unwell.

[0009] (5) In the existing oxygen burning process, the operator manually operates the oxygen burning pipe. When the iron mouth is burned through, the slag and iron inside the furnace are quickly ejected under high pressure. The oxygen burning operator needs to react and evacuate quickly. If the operator fails to react in time, he or she may be easily scalded by the high-temperature slag and iron.

[0010] (6) During the oxygen burning process, after the first section of the oxygen burning metal tube near the tap hole is melted, the metal tube behind is pushed forward. When the metal tube approaches the operator's position, the oxygen needs to be stopped and the metal tube needs to be installed. Then, according to the melting speed of the metal tube, the oxygen needs to be turned on and off frequently and the metal tube needs to be installed until the tap hole is burned through. When docking the oxygen burning tube, the front oxygen burning tube is very likely to be offset, and the alignment needs to be re-calibrated. The oxygen burning operation is stopped intermittently. The tap hole channel that was melted in the early stage condenses and needs to be reheated, melted, and blown out, resulting in a waste of metal tubes and oxygen, which is not conducive to reducing production costs. Summary of the invention

[0011] The purpose of the present invention is to provide an auxiliary tooling for blast furnace iron mouth oxygen burning operation and a blast furnace iron mouth oxygen burning operation method, which can make the iron mouth oxygen burning operation process safe and easy, and can eliminate the original phenomenon of burning the iron mouth off-center during oxygen burning operation.

[0012] To achieve this object, the present invention adopts the following technical solutions:

[0013] On the one hand, a blast furnace iron mouth oxygen burning operation auxiliary tool is provided, comprising:

[0014] a casing, fixed above the center of the skimmer, the skimmer being located in the main ditch;

[0015] Two first rails located at both sides of the main groove and extending along the length direction of the main groove, a first gantry and a second gantry slidably connected to the two first rails, a crossbeam of the first gantry having a first through hole at the center position along the length direction thereof, a crossbeam of the second gantry having a second through hole at the center position along the length direction thereof and a first locking hole penetrating through the wall of the second through hole, a first locking screw being installed in the first locking hole;

[0016] Two second rails extending along the length direction of the main groove at both sides of the main groove and a third gantry slidably connected to the second rails, a third through hole and a second locking hole penetrating through the wall of the third through hole are opened at a central position of the crossbeam of the third gantry along its length direction, and a second locking screw is installed in the second locking hole;

[0017] The two first rails are located between the two second rails, the axes of the first through hole, the second through hole, the sleeve, and the third through hole are all parallel to the horizontal plane, and the heights of the axes of the first through hole, the sleeve, the second through hole, and the third through hole increase successively, and the height of the axis of the first through hole is higher than the center point of the outlet side of the blast furnace iron mouth.

[0018] As a further solution of the auxiliary tooling for oxygen burning operations at the iron mouth of a blast furnace, the end of the first rail close to the iron mouth of the blast furnace does not exceed the main groove, and each of the first rails is provided with a first limit buckle and a second limit buckle at intervals along its length direction, the first limit buckle is located at the end of the first rail close to the iron mouth of the blast furnace, the second limit buckle is adjacent to the slag skimmer, the first gantry is located between the first limit buckle and the second limit buckle, and the second gantry is located on the side of the second limit buckle away from the first limit buckle.

[0019] As a further solution of auxiliary tooling for blast furnace iron mouth oxygen burning operation, the position of the first limit buckle does not exceed the landing point of the slag flowing out of the iron mouth during normal slag discharge from the blast furnace iron mouth.

[0020] As a further solution of auxiliary tooling for blast furnace iron mouth oxygen burning operation, the end of the second rail close to the blast furnace iron mouth does not exceed the slag skimmer, and a third limit buckle is provided at the end of each second rail close to the blast furnace iron mouth.

[0021] As a further solution of the auxiliary tooling for blast furnace iron mouth oxygen burning operation, the height of the crossbeam of the third gantry is 100-200 mm higher than the height of the crossbeam of the second gantry.

[0022] As a further solution of the auxiliary tooling for blast furnace iron mouth oxygen burning operations, the lower ends of the support frames of the first gantry and the second gantry are rollingly connected to the first rail via a first fixed pulley, and the lower end of the support frame of the third gantry is rollingly connected to the second rail via a second fixed pulley, and the first fixed pulley and the second fixed pulley can be separated from the first rail and the second rail, respectively.

[0023] As a further solution of the auxiliary tooling for blast furnace iron mouth oxygen burning operations, the auxiliary tooling for blast furnace iron mouth oxygen burning operations also includes a high temperature resistant rubber skin. After the first fixed pulley and the second fixed pulley are respectively separated from the first rail and the second rail, the high temperature resistant rubber skin can be laid on the first rail and the second rail.

[0024] As a further solution of the auxiliary tooling for blast furnace iron mouth oxygen burning operation, the auxiliary tooling for blast furnace iron mouth oxygen burning operation also includes:

[0025] A first motor is installed on the furnace platform and connected to a first fixed pulley at the lower end of the first gantry through a first chain, wherein the outer periphery of the first fixed pulley is provided with meshing teeth that mesh with the first chain, and the first motor can drive the first gantry to move along the length direction of the first track through the first chain;

[0026] a second motor, mounted on the furnace platform and connected to the first fixed pulley at the lower end of the second gantry through a second chain, the outer periphery of the first fixed pulley being provided with meshing teeth that mesh with the second chain, and the second motor being able to drive the second gantry to move along the length direction of the first track through the second chain;

[0027] A third motor is installed on the furnace platform and connected to the second fixed pulley at the lower end of the third gantry through a third chain. The outer periphery of the second fixed pulley is provided with engaging teeth that mesh with the third chain. The third motor can drive the third gantry to move along the length direction of the second track through the third chain.

[0028] On the other hand, a blast furnace iron mouth oxygen burning operation method is provided, using the blast furnace iron mouth oxygen burning operation auxiliary tooling as described above, and the blast furnace iron mouth oxygen burning operation method comprises the following steps:

[0029] S10, take 2-3 sections of metal oxygen burning pipes, connect them in sequence, and pass them through the sleeve on the skimmer and the first through hole on the first gantry;

[0030] S20, pushing the first gantry to move toward the iron mouth of the blast furnace to a position not exceeding and close to a position where slag flows out of the iron mouth during normal slag tapping of the iron mouth of the blast furnace;

[0031] S30, take a number of metal oxygen-burning pipes and connect them in sequence, and pass them through the second through hole of the second gantry, and then use the first locking screw to lock them for standby; the metal oxygen-burning pipes on the second gantry are respectively connected with the metal oxygen-burning pipes and the oxygen delivery hose on the first gantry, and the metal oxygen-burning pipes are directly opposite and adjacent to the center point of the blast furnace iron mouth, and the oxygen delivery hose is connected to the oxygen source; open the valve of the oxygen source, and pass oxygen into the oxygen delivery hose. After the metal oxygen-burning pipe adjacent to the blast furnace iron mouth is burned, push the second gantry to move toward the blast furnace iron mouth, so that the metal oxygen-burning pipe extends into the blast furnace iron mouth and continues to burn;

[0032] S40, take a number of metal oxygen-burning pipes and connect them in sequence, pass them through the third through hole, and then use the second locking screw to lock them for standby use; when the second gantry moves to the skimmer, loosen the first locking screw that fixes the metal oxygen-burning pipe, push the second gantry back to the initial position in the opposite direction, separate the metal oxygen-burning pipe from the second gantry, and then connect the metal oxygen-burning pipe with the metal oxygen-burning pipe on the third gantry; close the valve of the oxygen source, connect the oxygen delivery hose with the metal oxygen-burning pipe on the third gantry, and open Open the valve of the oxygen source, introduce oxygen into the oxygen delivery hose, push the third gantry to move toward the direction close to the blast furnace iron mouth, so that the metal oxygen burning pipe extends into the blast furnace iron mouth and continues to burn; when the third gantry moves to the slag skimmer, loosen the second locking screw that fixes the metal oxygen burning pipe, push the third gantry in the reverse direction to return to the initial position, return to step S30, and alternately dock the metal oxygen burning pipes pre-installed on the second gantry and the third gantry until the blast furnace iron mouth is burned through.

[0033] As a further scheme of the blast furnace iron mouth oxygen burning operation method, in step S30, in step S30, if the conditions are met at the channel of the blast furnace iron mouth: the temperature is above 700°C and there are sparks, then the valve opening of the oxygen source is adjusted to ensure that oxygen is blown out of the metal oxygen burning pipe. When the metal oxygen burning pipe burns, the valve opening of the oxygen source is gradually increased; if the conditions are not met at the channel of the blast furnace iron mouth, a burning fire source is placed at the center point of the blast furnace iron mouth, and then the valve of the oxygen source is opened and the valve opening is gradually increased until the metal oxygen burning pipe burns.

[0034] As a further scheme of the blast furnace iron mouth oxygen burning operation method, when the blast furnace iron mouth is burned through, close the valve of the oxygen source, loosen the first locking screw at the second through hole and the second locking screw at the third through hole, and take out the metal oxygen burning pipes on the second gantry and the third gantry; then push the first gantry back to the slag skimmer position, and evacuate the first gantry and the second gantry from the first rail and the third gantry from the second rail, and finally lay high temperature resistant rubber skins on the first rail and the second rail.

[0035] Beneficial effects of the present invention:

[0036] The use of the blast furnace iron mouth oxygen burning operation auxiliary tooling of the present invention can make the iron mouth oxygen burning operation process safe and easy, and the operator does not need to stand in the high-temperature slag and iron area of ​​the main groove, which basically eliminates the safety risks of the operation. Moreover, with the help of the blast furnace iron mouth oxygen burning operation auxiliary tooling, the iron mouth oxygen burning operation can be completed by only one person, reducing labor costs and labor intensity.

[0037] During the oxygen burning operation at the iron mouth of a blast furnace of the present invention, after the metal oxygen burning pipe passes through the first through hole of the first gantry, the sleeve on the slag skimmer and the second through hole with the first locking screw of the second gantry or the third through hole with the second locking screw of the third gantry, it can be aligned with the center point of the iron mouth of the blast furnace, thereby eliminating the phenomenon of burning the iron mouth off-center in the original oxygen burning operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings required for use in the embodiments of the present invention. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0039] Figure 1 This is a schematic diagram of the existing blast furnace iron mouth oxygen burning operation.

[0040] Figure 2 It is a schematic diagram of the auxiliary tooling for blast furnace iron mouth oxygen burning operation according to the first embodiment of the present invention.

[0041] Figure 3 It is a schematic diagram of the installation of the sleeve on the skimmer described in the first embodiment of the present invention.

[0042] Figure 4 It is a schematic diagram of the first gantry described in Example 1 of the present invention.

[0043] Figure 1 middle:

[0044] 1', blast furnace; 2', main trench; 3', metal oxygen-burning pipe; 4', taphole; 5', slag skimmer; A. operator.

[0045] Figure 2-4 middle:

[0046] 100, blast furnace iron mouth; 200, main trench; 300, metal oxygen burning pipe;

[0047] 1. Casing; 2. Skimmer; 3. First track; 31. First limit buckle; 32. Second limit buckle; 4. First gantry; 41. First through hole; 5. Second gantry; 51. Second through hole; 6. Second track; 61. Third limit buckle; 7. Third gantry; 71. Third through hole; 8. First fixed pulley; 9. Second fixed pulley; 10. Frame. DETAILED DESCRIPTION

[0048] The technical solution of the present invention is further described below with reference to the accompanying drawings and through specific implementation methods.

[0049] Among them, the drawings are only used for illustrative explanations, and they only represent schematic diagrams rather than actual pictures, and should not be understood as limitations on this patent; in order to better illustrate the embodiments of the present invention, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of the actual product; for those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.

[0050] The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right", "inner", "outer", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation. Therefore, the terms describing the position relationship in the drawings are only used for illustrative purposes and cannot be understood as a limitation on this patent. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.

[0051] In the description of the present invention, unless otherwise clearly specified and limited, if the term "connection" or the like appears to indicate the connection relationship between components, the term should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two components or the interaction relationship between two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0052] Embodiment 1

[0053] like Figure 2-4 As shown, this embodiment provides a blast furnace iron mouth oxygen burning operation auxiliary tooling, including:

[0054] The casing 1 is fixed above the center of the skimmer 2, and the skimmer 2 is located in the main trench 200;

[0055] Two first rails 3 located on both sides of the main groove 200 and extending along the length direction of the main groove 200, a first gantry 4 and a second gantry 5 slidably connected to the two first rails 3, a crossbeam of the first gantry 4 is provided with a first through hole 41 at the center position along the length direction thereof, a crossbeam of the second gantry 5 is provided with a second through hole 51 at the center position along the length direction thereof and a first locking hole penetrating through the hole wall of the second through hole 51, and a first locking screw is installed in the first locking hole;

[0056] Two second rails 6 extending along the length direction of the main groove 200 on both sides of the main groove 200 and a third gantry 7 slidably connected to the second rails 6, a third through hole 71 and a second locking hole penetrating through the wall of the third through hole 71 are opened at the center position of the crossbeam of the third gantry 7 along the length direction thereof, and a second locking screw is installed in the second locking hole;

[0057] The two first rails 3 are located between the two second rails 6, and the axes of the first through hole 41, the second through hole 51, the sleeve 1, and the third through hole 71 are all parallel to the horizontal plane, and the heights of the axes of the first through hole 41, the sleeve 1, the second through hole 51, and the third through hole 71 increase successively, and the height of the axis of the first through hole 41 is higher than the center point of the outlet side of the blast furnace iron mouth 100.

[0058] The present embodiment makes full use of the skimmer 2 on the main ditch 200, fixes a sleeve 1 above the skimmer 2 by a support frame, and simultaneously lays a relatively inner first track 3 and a relatively outer second track 6 on both sides of the main ditch 200 on the furnace platform, and sets a first gantry 4 and a second gantry 5 movable along the first track 3 on the first track 3, and sets a third gantry 7 movable along the second track 6 on the second track 6, and sets a first through hole 41 on the crossbeam of the first gantry 4, a second through hole 51 with a first locking screw on the crossbeam of the second gantry 5, and a third through hole 71 with a second locking screw on the crossbeam of the third gantry 7. The metal oxygen-burning tube 300 is respectively inserted into the three through holes for backup (the metal oxygen-burning tube 300 at the second through hole 51 is locked by the first locking screw, and the metal oxygen-burning tube 300 at the third through hole 71 is locked by the second locking screw), and then the metal oxygen-burning tube 300 at the first through hole 41 passes through the sleeve 1 and docks with the metal oxygen-burning tube 300 at the second through hole 51. Since the metal oxygen-burning tube 300 at the second through hole 51 is locked by the first screw, the second gantry 5 and the metal oxygen-burning tube 300 can be pushed together to move toward the iron mouth 100 of the blast furnace. By pressing the second gantry 5, the metal oxygen-burning tube 300 Always aim at the center of the blast furnace iron mouth 100, and the metal oxygen-burning tube 300 moves toward the channel of the blast furnace iron mouth 100 during the combustion process; when the second gantry 5 moves to the side of the slag skimmer 2, loosen the first locking screw, take out the metal oxygen-burning tube 300 at the first through hole 41, and dock with the metal oxygen-burning tube 300 on the third gantry 7; because the metal oxygen-burning tube 300 at the third through hole 71 is locked by the second screw, the third gantry 7 and the metal oxygen-burning tube 300 can be pushed together to move toward the blast furnace iron mouth 100, and the third gantry 7 is always pressed to make the metal oxygen-burning tube 300 against the blast furnace iron mouth 100. Since there is a height difference between the second gantry 5 and the third gantry 7, the second gantry 5 and the third gantry 7 can be used alternately to reduce the time of docking the metal oxygen-burning tube 300, and avoid the metal oxygen-burning tube 300 burning The suspension time is too long and affects the oxygen burning effect of the blast furnace iron mouth 100.

[0059] The three through holes and the sleeve 1 in this embodiment are all located at the center, so that the metal oxygen-burning tube 300 can be aligned with the center point of the blast furnace iron mouth 100, eliminating the original phenomenon of oxygen-burning being biased towards the iron mouth.

[0060] Since the metal oxygen-fired pipe rack 300 will be bent to a certain extent after being installed on the gantry, in this embodiment, the heights of the axes of the first through hole 41, the sleeve 1, the second through hole 51, and the third through hole 71 are increased successively, and the height of the axis of the first through hole 41 is higher than the center point of the outlet side of the blast furnace iron mouth 100, so that the metal oxygen-fired pipe 300 can be bent and aligned with the center point of the blast furnace iron mouth 100.

[0061] In addition, since the first track 3 and the second track 6 are a certain distance away from the main ditch 200, the operator can perform oxygen burning operations while standing in the non-high-temperature slag iron area of ​​the main ditch 200, which basically eliminates the safety risks of the operation. The operation can be completed by only one person.

[0062] Furthermore, one end of the first rail 3 close to the blast furnace iron mouth 100 does not exceed the main groove 200. Specifically, the distance between the one end of the first rail 3 close to the blast furnace iron mouth 100 and the blast furnace iron mouth 100 can be determined according to actual conditions; and each first rail 3 is provided with a first limit buckle 31 and a second limit buckle 32 at intervals along its length direction, the first limit buckle 31 is located at one end of the first rail 3 close to the blast furnace iron mouth 100, the second limit buckle 32 is adjacent to the slag skimmer 2, the first gantry 4 is located between the first limit buckle 31 and the second limit buckle 32, and the second gantry 5 is located on the side of the second limit buckle 32 away from the first limit buckle 31.

[0063] Among them, the second limit buckle 32 can be designed to be located exactly next to the slag skimmer 2. The operator only needs to push the second gantry 5 to move to the position of the second limit buckle 32, thereby preventing the operator from accidentally entering the high-temperature slag and iron area of ​​the main ditch 200 to operate, thereby improving the safety of oxygen burning operations.

[0064] Furthermore, the position of the first limit buckle 31 does not exceed the landing point of the slag flowing out of the blast furnace iron mouth 100 during the normal slag discharge process of the blast furnace iron mouth 100.

[0065] Optionally, the end of the second rail 6 close to the blast furnace iron mouth 100 does not exceed the slag skimmer 2, and each second rail 6 is provided with a third limit buckle 61 at one end close to the blast furnace iron mouth 100. Specifically, the installation position of the third limit buckle 61 on the second rail 6 is consistent with the installation position of the second limit buckle 32 on the first rail 3, and both are located next to the slag skimmer 2, that is, in the non-high-temperature slag area of ​​the main ditch 200. Similarly, when the third gantry 7 is used, it can prevent the operator from accidentally entering the high-temperature slag area of ​​the main ditch 200 for operation, thereby improving the safety of oxygen burning operation.

[0066] In this embodiment, the first limit buckle 31, the second limit buckle 32 and the third limit buckle 61 can be baffle structures fixed on the track to limit the gantry from moving forward, and the specific structure is not limited.

[0067] Furthermore, the height of the crossbeam of the third gantry 7 is 100-200 mm higher than that of the crossbeam of the second gantry 5, which can avoid mutual interference between the second gantry 5 and the third gantry 7 during movement. In this embodiment, the height of the crossbeam of the third gantry 7 is 120 mm higher than that of the crossbeam of the second gantry 5.

[0068] In order to reduce the labor intensity of operators performing oxygen-burning operations, in this embodiment, a first fixed pulley 8 is respectively installed at the lower end of the support frame of the first gantry 4 and the second gantry 5, so that the first gantry 4 and the second gantry 5 are respectively connected to the first track 3 in a rolling manner through the first fixed pulley 8, and a second fixed pulley 9 is respectively installed at the lower end of the support frame of the third gantry 7, so that the third gantry 7 is connected to the second track 6 in a rolling manner through the second fixed pulley 9. The first fixed pulley 8 and the second fixed pulley 9 can be separated from the first track 3 and the second track 6 by lifting up.

[0069] The first track 3 and the second track 6 are similar to conventional train tracks. Optionally, the first track 3 and the second track 6 are respectively recessed on the furnace platform. The widths of the first track 3 and the second track 6 are respectively 30-50 mm. In this embodiment, the widths of the first track 3 and the second track 6 are both 40 mm. The first fixed pulley 8 is in rolling cooperation with the first track 3, and the second fixed pulley 9 is in rolling cooperation with the second track 6. Therefore, the operator can easily push the first gantry 4 and the second gantry 5 to move along the first track 3 and the third gantry 7 to move along the second track 6.

[0070] When the blast furnace iron mouth oxygen burning operation is not required in daily production, the first gantry 4, the second gantry 5 and the third gantry 7 are lifted upwards, so that the first fixed pulley 8 is separated from the first track 3, and the second fixed pulley 9 is separated from the second track 6, so that the first gantry 4, the second gantry 5 and the third gantry 7 can be lifted out of the track and placed separately.

[0071] Furthermore, the auxiliary tooling for the blast furnace iron mouth oxygen burning operation of the present embodiment also includes a high temperature resistant rubber skin (not shown in the figure). After the first fixed pulley 8 and the second fixed pulley 9 are separated from the first rail 3 and the second rail 6 respectively, the first gantry 4, the second gantry 5 and the third gantry 7 can be lifted out of the rail and placed separately, and then the high temperature resistant rubber skin is laid on the first rail 3 and the second rail 6 to prevent the first rail 3 and the second rail 6 from accumulating dust.

[0072] The auxiliary tooling for oxygen burning operation at the blast furnace iron mouth of this embodiment also includes a frame plate 10 installed on the furnace platform, and the ends of the first track 3 and the second track 6 away from the blast furnace iron mouth 10 are respectively connected to the frame plate 10, and the frame plate 10 can also play a limiting role.

[0073] The embodiment of the present invention further provides a blast furnace iron mouth oxygen burning operation method, using the blast furnace iron mouth oxygen burning operation auxiliary tooling in the above embodiment. Specifically, the blast furnace iron mouth oxygen burning operation method of this embodiment includes the following steps:

[0074] S10, take 2-3 sections of metal oxygen burning pipe 300, connect them in sequence, and pass through the casing 1 on the skimmer 2 and the first through hole 41 on the first gantry 4;

[0075] S20, pushing the first gantry 4 to move toward the blast furnace iron mouth 100 to a position not exceeding and close to a landing point of slag iron flowing out of the blast furnace iron mouth 100 during normal slag iron discharge from the blast furnace iron mouth 100;

[0076] S30, take a number of metal oxygen-burning pipes 300 and connect them in sequence, and pass them through the second through hole 51 of the second gantry 5, and then use the first locking screw to lock them for standby; the metal oxygen-burning pipes 300 on the second gantry 5 are respectively connected with the metal oxygen-burning pipes 300 on the first gantry 4 and the oxygen delivery hose (not shown in the figure), and the metal oxygen-burning pipes 300 are directly opposite and adjacent to the center point of the blast furnace iron mouth 100, and the oxygen delivery hose is connected to the oxygen source; open the valve of the oxygen source, and introduce oxygen into the oxygen delivery hose. After the metal oxygen-burning pipes 300 adjacent to the blast furnace iron mouth 100 are burned, push the second gantry 5 to move toward the blast furnace iron mouth 100, so that the metal oxygen-burning pipes 300 extend into the blast furnace iron mouth 100 and continue to burn;

[0077] S40, take a number of metal oxygen-burning pipes 300 and connect them in sequence, and pass them through the third through hole 71, and then use the second locking screw to lock them for standby use; when the second gantry 5 moves to the slag skimmer 2, loosen the first locking screw that fixes the metal oxygen-burning pipe 300, push the second gantry 5 back to the initial position in the reverse direction, separate the metal oxygen-burning pipe 300 from the second gantry 5, and then connect the metal oxygen-burning pipe 300 with the metal oxygen-burning pipe 300 on the third gantry 7; close the valve of the oxygen source, connect the oxygen delivery hose to the metal oxygen-burning pipe on the third gantry 7, and then connect the oxygen delivery hose to the metal oxygen-burning pipe on the third gantry 7. The third gantry 7 is connected to the slag skimmer 2, and the metal oxygen-burning pipe 300 is connected to the slag skimmer 2. The valve of the oxygen source is opened, and oxygen is introduced into the oxygen delivery hose, and the third gantry 7 is pushed to move toward the direction close to the blast furnace iron mouth 100, so that the metal oxygen-burning pipe 300 extends into the blast furnace iron mouth 100 and continues to burn; when the third gantry 7 moves to the slag skimmer 2, the second locking screw fixing the metal oxygen-burning pipe 300 is loosened, and the third gantry 7 is pushed back to the initial position in the reverse direction, and step S30 is repeated, and the metal oxygen-burning pipe 300 on the second gantry 5 and the third gantry 7 are connected alternately until the blast furnace iron mouth 100 is burned through.

[0078] Furthermore, before step S10, it is necessary to open the high temperature resistant rubber covering the first rail 3 and the second rail 6, and install the first gantry 4 starting from the direction of the slag skimmer 2 close to the blast furnace iron mouth 100.

[0079] Specifically, in step S10, firstly, three sections of metal oxygen-burning pipes 300 are docked, passed through the sleeve 1 on the fixed support frame of the skimmer 2, and then passed through the first through hole 41 on the first gantry 4, and the first gantry 4 is pushed to move toward the blast furnace iron mouth 100. When the first fixed pulley 8 at the lower end of the first gantry 4 moves to the first limit buckle 31 at the front end, the first gantry 4 on the inner first track 3 is moved into place. Then dock other metal oxygen-burning pipes 300, pass through the second through hole 51 on the inner second gantry 5 and tighten with the first locking screw, dock with the metal oxygen-burning pipe 300 at the sleeve 1 above the skimmer 2, and complete the installation of the metal oxygen-burning pipe 300. At this time, the metal oxygen-burning pipe 300 is facing the center point of the blast furnace iron mouth 100. Simultaneously, several sections of metal oxygen-burning pipes 300 are docked as backup. After the metal oxygen-burning pipe 300 is butted, an oxygen delivery hose connected to an oxygen source is butted with an end of the metal oxygen-burning pipe 300 away from the blast furnace iron mouth 100 .

[0080] When burning oxygen, the channel of the blast furnace iron mouth 100 is at more than 700°C and there are sparks. Therefore, the oxygen valve of the oxygen source can be slowly opened first to introduce a very small amount of oxygen to keep oxygen blowing out of the metal oxygen burning pipe 300. The oxygen encounters the sparks and high temperature at the blast furnace iron mouth 100 and starts to burn. As the combustion temperature increases, the oxygen flow rate is gradually increased. After the combustion of the metal oxygen burning pipe 300 is stable, the second gantry 5 on the inside is pressed and moved toward the blast furnace iron mouth 100. The second gantry 5 drives the locked metal oxygen burning pipe 300 to move forward. The second gantry 5 is continuously pressed and moved according to the combustion speed of the metal oxygen burning pipe 300 at the blast furnace iron mouth 100.

[0081] As the oxygen burning operation of the blast furnace iron mouth 100 proceeds, the metal oxygen burning pipe 300 extends into the channel of the blast furnace iron mouth 100, continuously produces high-temperature molten taphole mud in the channel of the blast furnace iron mouth 100, and blows the molten taphole mud out of the iron mouth under the action of oxygen, and the metal oxygen burning pipe 300 also continuously melts and shortens during the combustion process. When the second gantry 5 on the inside moves to the second limit buckle 32 at the slag skimmer 2, the second gantry 5 is returned to the initial starting position, the first locking screw is loosened, the metal oxygen burning pipe 300 at the second through hole 51 is taken out, and the metal oxygen burning pipe 300 is quickly docked with the metal oxygen burning pipe 300 on the second track 6 on the outside, and then the valve of the oxygen source is closed, the oxygen delivery hose is docked with the metal oxygen burning pipe 300 on the third gantry 7, the valve of the oxygen source is opened, and the third gantry 7 is continued to move toward the slag skimmer 2 and burn the blast furnace iron mouth 100. According to the melting speed, the second gantry 5 and the third gantry 7 are cyclically and alternately replaced to move until the blast furnace iron mouth 100 is burned through.

[0082] In the early stage of the blast furnace iron mouth 100 burning through, the resistance in the channel of the blast furnace iron mouth 100 will be greatly reduced. When the second gantry 5 or the third gantry 7 (herein referred to as the gantry) is pushed to move, the degree of burning through of the blast furnace iron mouth 100 can be predicted according to the moving speed of the gantry under the same thrust: when the moving speed of the gantry increases rapidly, that is, the blast furnace iron mouth 100 is about to burn through, at this time, slowly close the valve opening of the oxygen source, reduce the amount of oxygen introduced by the burning oxygen, and control the red-hot combustion products and the blown exhaust gas blown out from the blast furnace iron mouth 100 not to exceed the farthest blowing position in the previous burning oxygen process. When the blast furnace iron mouth 100 is burned through, slag iron flows out of the blast furnace iron mouth 100, close the valve of the oxygen source, loosen the locking screw at the corresponding through hole, and take out the metal burning oxygen pipe 300 behind the slag skimmer 2. Then withdraw the first gantry 4 on the first track 3 to the position of the skimmer 2, that is, close to the second limit buckle 32, take out the front end metal oxygen-burning tube 300 from the sleeve 1 of the skimmer 2, then lift all the gantries out of the track, and lay high-temperature resistant rubber skin on the track.

[0083] During the oxygen burning operation, first burn from the outside of the blast furnace iron mouth 100 to the inside of the blast furnace iron mouth 100 toward the furnace. At the beginning, after the metal oxygen burning tube 300 burns, the oxygen flow rate begins to gradually increase. When the diameter of the channel of the blast furnace iron mouth 100 melted and expanded reaches 1 / 2 of the diameter of the taphole mud in the iron mouth channel, stop increasing the oxygen flow rate and pressure. Continue to press the gantry to burn the blast furnace iron mouth 100 inside. As the melting depth of the channel of the blast furnace iron mouth 100 gradually increases, the ejected high-temperature slag and gas continuously flush the channel of the blast furnace iron mouth 100; and, as the burn-through length of the blast furnace iron mouth 100 gradually increases, it is necessary to control the valve opening to gradually reduce the oxygen flow rate, so as to control the ejected gas to flush the outermost expansion hole of the blast furnace iron mouth 100 so as not to exceed the maximum diameter of the taphole mud when the blast furnace iron mouth 100 is blocked, so as to prevent the sprayed high-temperature gas from burning the brick lining and other refractory materials outside the channel of the blast furnace iron mouth 100. For example, after the taphole 100 of the blast furnace is blocked with taphole mud, the diameter of the taphole mud is 80 mm. The diameter after oxygen burning and expansion should be controlled to be less than 80 mm to ensure that the oxygen burning does not exceed the taphole mud blocking area. If it exceeds the taphole mud blocking area, the brick lining and other refractory materials outside the blast furnace taphole 100 will be burned.

[0084] The diameter of the metal oxygen-fired pipe 300 is 20-32 mm, preferably not exceeding 1 / 3 of the diameter of the blast furnace iron mouth 100.

[0085] In this embodiment, the diameter of the metal oxygen-burning tube 300 is 25 mm.

[0086] In this embodiment, the valve of the oxygen source is installed on the oxygen delivery hose and adjacent to the interface of the oxygen delivery hose, which is convenient for single-person operation.

[0087] Embodiment 2

[0088] This embodiment is basically the same as the above-mentioned embodiment 1, except that:

[0089] 1) When burning oxygen, the temperature at the iron mouth 100 of the blast furnace is below 600°C and there is no spark. Place a ignited wooden stick at the center of the iron mouth 100 of the blast furnace, slowly open the valve of the oxygen source to introduce oxygen to assist combustion, until the metal oxygen burning pipe 300 burns violently.

[0090] 2) This embodiment improves the auxiliary tooling for blast furnace iron mouth oxygen burning operation on the basis of the above-mentioned embodiment 1 (the improved structure is not shown in the figure, this embodiment can refer to the drawings of embodiment 1, and the same component names use the same figure marks).

[0091] Specifically, the auxiliary tooling for the blast furnace iron mouth oxygen burning operation of this embodiment also includes:

[0092] A first motor is installed on the furnace platform and connected to a first fixed pulley 8 at a lower end of the first gantry 4 through a first chain. The outer periphery of the first fixed pulley 8 is provided with meshing teeth that mesh with the first chain. The first motor can drive the first gantry 4 to move along the length direction of the first track 3 through the first chain.

[0093] A second motor is installed on the furnace platform and connected to the first fixed pulley 8 at the lower end of the second gantry 5 through a second chain. The outer periphery of the first fixed pulley 8 is provided with meshing teeth that mesh with the second chain. The second motor can drive the second gantry 5 to move along the length direction of the first track 3 through the second chain.

[0094] The third motor is installed on the furnace table and connected to the second fixed pulley 9 at the lower end of the third gantry 7 through the third chain. The outer periphery of the second fixed pulley 9 is provided with meshing teeth that mesh with the third chain. The third motor can drive the third gantry 7 to move along the length direction of the second track 6 through the third chain.

[0095] In this embodiment, the gantry is driven to move by a motor, and no manual operation is required. The operator only needs to alternately connect the metal oxygen-burning pipes 300 on the second gantry 5 and the third gantry 7 .

[0096] Furthermore, the first motor, the second motor and the third motor are respectively connected to the controller, and the start and stop of the first motor, the second motor and the third motor are controlled by the controller.

[0097] Furthermore, the valve of the oxygen source may also be configured as an electric valve, which is connected to a controller, and the opening of the electric valve is controlled by the controller to adjust the oxygen flow rate.

[0098] It should be noted that the above specific implementations are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art should understand that various modifications, equivalent substitutions, changes, etc. can be made to the present invention. However, as long as these changes do not deviate from the spirit of the present invention, they should be within the scope of protection of the present invention. In addition, some terms used in the specification and claims of this application are not restrictive, but are only for the convenience of description.

Claims

1. A kind of auxiliary tooling for blast furnace iron mouth oxygen burning operation, It is characterized in that include: a casing, fixed above the center of the skimmer, the skimmer being located in the main ditch; Two first rails located at both sides of the main groove and extending along the length direction of the main groove, a first gantry and a second gantry slidably connected to the two first rails, a crossbeam of the first gantry having a first through hole at the center position along the length direction thereof, a crossbeam of the second gantry having a second through hole at the center position along the length direction thereof and a first locking hole penetrating through the wall of the second through hole, a first locking screw being installed in the first locking hole; Two second rails extending along the length direction of the main groove at both sides of the main groove and a third gantry slidably connected to the second rails, a third through hole and a second locking hole penetrating through the wall of the third through hole are opened at a central position of the crossbeam of the third gantry along its length direction, and a second locking screw is installed in the second locking hole; The two first rails are located between the two second rails, the axes of the first through hole, the sleeve, the second through hole, and the third through hole are all parallel to the horizontal plane, and the heights of the axes of the first through hole, the second through hole, the sleeve, and the third through hole increase successively, and the height of the axis of the first through hole is higher than the center point of the outlet side of the blast furnace iron mouth.

2. The auxiliary tooling for blast furnace iron mouth oxygen burning operation according to claim 1, It is characterized in that One end of the first rail close to the blast furnace iron mouth does not exceed the main groove, and each of the first rails is provided with a first limit buckle and a second limit buckle at intervals along its length direction, the first limit buckle is located at one end of the first rail close to the blast furnace iron mouth, the second limit buckle is adjacent to the slag skimmer, the first gantry is located between the first limit buckle and the second limit buckle, and the second gantry is located on the side of the second limit buckle away from the first limit buckle.

3. The auxiliary tooling for blast furnace iron mouth oxygen burning operation according to claim 2, It is characterized in that The position of the first limit buckle does not exceed the landing point of the slag flowing out of the iron mouth during the normal slag discharge from the iron mouth of the blast furnace.

4. The auxiliary tooling for blast furnace iron mouth oxygen burning operation according to claim 1, It is characterized in that One end of the second rail close to the blast furnace iron mouth does not exceed the slag skimmer, and one end of each of the second rails close to the blast furnace iron mouth is provided with a third limiting buckle.

5. The auxiliary tooling for blast furnace iron mouth oxygen burning operation according to claim 1, It is characterized in that The height of the crossbeam of the third gantry is 100-200 mm higher than the height of the crossbeam of the second gantry.

6. The auxiliary tooling for blast furnace iron mouth oxygen burning operation according to any one of claims 1 to 5, It is characterized in that The lower ends of the support frames of the first gantry and the second gantry are rollingly connected to the first track via a first fixed pulley, respectively, and the lower end of the support frame of the third gantry is rollingly connected to the second track via a second fixed pulley, and the first fixed pulley and the second fixed pulley can be separated from the first track and the second track, respectively.

7. The auxiliary tooling for blast furnace iron mouth oxygen burning operation according to claim 6, It is characterized in that It also includes a high temperature resistant rubber skin, which can be laid on the first track and the second track after the first fixed pulley and the second fixed pulley are separated from the first track and the second track respectively.

8. A method for burning oxygen at the iron mouth of a blast furnace, It is characterized in that Using the auxiliary tooling for blast furnace iron mouth oxygen burning operation according to any one of claims 1 to 7, the blast furnace iron mouth oxygen burning operation method comprises the following steps: S10, take 2-3 sections of metal oxygen burning pipes, connect them in sequence, and pass them through the sleeve on the skimmer and the first through hole on the first gantry; S20, pushing the first gantry to move toward the iron mouth of the blast furnace to a position not exceeding and close to a position where slag flows out of the iron mouth during normal slag tapping of the iron mouth of the blast furnace; S30, take a number of metal oxygen-burning pipes and connect them in sequence, and pass them through the second through hole of the second gantry, and then use the first locking screw to lock them for standby; the metal oxygen-burning pipes on the second gantry are respectively connected with the metal oxygen-burning pipes and the oxygen delivery hose on the first gantry, and the metal oxygen-burning pipes are directly opposite and adjacent to the center point of the blast furnace iron mouth, and the oxygen delivery hose is connected to the oxygen source; open the valve of the oxygen source, and pass oxygen into the oxygen delivery hose. After the metal oxygen-burning pipe adjacent to the blast furnace iron mouth is burned, push the second gantry to move toward the blast furnace iron mouth, so that the metal oxygen-burning pipe extends into the blast furnace iron mouth and continues to burn; S40, take a number of metal oxygen-burning pipes and connect them in sequence, pass them through the third through hole, and then use the second locking screw to lock them for standby use; when the second gantry moves to the skimmer, loosen the first locking screw that fixes the metal oxygen-burning pipe, push the second gantry back to the initial position in the opposite direction, separate the metal oxygen-burning pipe from the second gantry, and then connect the metal oxygen-burning pipe with the metal oxygen-burning pipe on the third gantry; close the valve of the oxygen source, connect the oxygen delivery hose with the metal oxygen-burning pipe on the third gantry, and open Open the valve of the oxygen source, introduce oxygen into the oxygen delivery hose, push the third gantry to move toward the direction close to the blast furnace iron mouth, so that the metal oxygen burning pipe extends into the blast furnace iron mouth and continues to burn; when the third gantry moves to the slag skimmer, loosen the second locking screw that fixes the metal oxygen burning pipe, push the third gantry in the reverse direction to return to the initial position, return to step S30, and alternately dock the metal oxygen burning pipes pre-installed on the second gantry and the third gantry until the blast furnace iron mouth is burned through.

9. The blast furnace iron mouth oxygen burning operation method according to claim 8, It is characterized in that In step S30, if the conditions are met at the passage of the blast furnace iron mouth: the temperature is above 700°C and there are sparks, then the valve opening of the oxygen source is adjusted to ensure that oxygen is blown out of the metal oxygen burning pipe. When the metal oxygen burning pipe burns, the valve opening of the oxygen source is gradually increased. If the conditions are not met at the passage of the blast furnace iron mouth, a burning fire source is placed at the center point of the blast furnace iron mouth, and then the valve of the oxygen source is opened and the valve opening is gradually increased until the metal oxygen burning pipe burns.

10. The blast furnace iron mouth oxygen burning operation method according to claim 8, It is characterized in that After the iron mouth of the blast furnace is burned through, the valve of the oxygen source is closed, the first locking screw at the second through hole and the second locking screw at the third through hole are loosened, and the metal oxygen burning pipes on the second gantry and the third gantry are taken out; then the first gantry is pushed back to the slag skimmer position, and the first gantry and the second gantry are evacuated from the first track and the third gantry is evacuated from the second track, and finally, high temperature resistant rubber skins are laid on the first track and the second track.

Citation Information

Patent Citations

  • Oxygen pipe connecting device for blast furnace iron burning notch

    CN116555507A

  • Novel iron notch of blast furnace burns oxygen rifle

    CN208346209U

  • Oxygen pipe connector in front of blast furnace ironmaking furnace

    CN215335056U

  • Iron notch burning device suitable for blast furnace

    CN216073884U