Working platform suitable for urban bridge updating
By arranging sliding components and cantilever operating platforms at the bottom of the bridge, combined with counterweight components, the problem of safety and limited movement range of the hanging basket is solved, improving the safety and stability of bridge construction and adapting to different bridge lengths and widths. construction needs.
Patent Information
- Application Number
- CN202411264029.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2024-10-25
AI Technical Summary
In the existing bridge construction technology, the safety of the hanging basket is not high and the range of movement is limited, resulting in safety hazards and low stability when constructing at different locations on the bridge.
Design a working platform that includes a working platform at the bottom of the bridge and a sliding component. The fixed frame is connected to the top wall of the bridge, and the sliding component and cantilevered working platform are used to realize the sliding of the working platform along the width and length of the bridge to expand the construction scope. At the same time, the weight is adjusted through the counterweight component to ensure the stability of the platform.
It improves the safety and movement range of bridge construction, enhances the stability between the working platform and the bridge, adapts to the construction needs of bridges of different lengths and widths, and expands the construction scope.
Smart Images

Figure CN118835540A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of bridge construction, and in particular to an operating platform suitable for urban bridge renewal. Background Art
[0002] In recent years, with the continuous growth of our social economy, my country's bridge construction has achieved leapfrog development. For early urban bridges, as their service life continues to increase, urban bridges will have functional and non-functional defects to varying degrees, such as the appearance of the bridge being dilapidated and aging, cracks appearing at the bottom of the beam, and damage to the bridge deck pavement.
[0003] In the related art, a hanging basket is generally used for high-altitude operations, but the hanging basket has the problems of low safety and difficulty in moving. When using an aerial work platform, if construction needs to be carried out at different positions of the bridge, the work platform needs to be lifted by lifting equipment and then moved to the required position for the operation.
[0004] Regarding the above-mentioned related technologies, there will be certain safety hazards in the process of lifting the work platform, and the range during movement is limited, and the stability between the work platform and the bridge is low. Therefore, there is an urgent need for a work platform that can increase the range of movement while ensuring stability. Summary of the invention
[0005] In order to ensure stability while increasing the range of movement, the present application provides a work platform suitable for urban bridge renewal.
[0006] This application provides an operating platform suitable for urban bridge renewal, which adopts the following technical solutions: A working platform suitable for urban bridge renewal, comprising a first working platform arranged at the bottom of the bridge; The first working platform is installed on the bridge, and the first working platform is parallel to the first direction; A fixing frame is provided on one side of the first working platform, the fixing frame is in contact with the top wall of the bridge, a sliding assembly is connected between the fixing frame and the bridge, and the first working platform is slidably connected to the bridge along a second direction through the sliding assembly, and the second direction is perpendicular to the first direction.
[0007] By adopting the above technical solution, during bridge construction, by setting up a first working platform, personnel can stand on the first working platform to work, and abut against the bridge through a fixed frame, thereby fixing the fixed frame and the bridge. When it is necessary to work along the width direction of the bridge, by setting up a sliding component, the sliding component drives the first working platform to slide along the width direction of the bridge through the fixed frame, and at the same time realizes the movement of the first working platform along the width and length directions of the bridge, thereby further expanding the construction scope of the bridge.
[0008] Optionally, the fixing frame is overlapped on a protective member of the bridge, and the sliding assembly is located between the protective member and the fixing frame.
[0009] By adopting the above technical solution, in order to support the fixing frame, the fixing frame is overlapped on the protective member on the bridge so that the fixing frame is more stably fixed to the bridge, thereby achieving the fixation of the first working platform and the bridge.
[0010] Optionally, a cantilever work platform is provided on both sides of the first work platform, and each of the cantilever work platforms is connected to the fixed frame.
[0011] By adopting the above technical solution, in order to further expand the working range of personnel, cantilever working platforms are set on both sides of the first working platform so that personnel can stand on the cantilever working platforms to work.
[0012] Optionally, a counterweight assembly is further included, wherein the counterweight assembly is arranged on a side of the fixing frame away from the cantilever working platform, and the counterweight assembly is pressed onto the bridge.
[0013] By adopting the above technical solution, since the first working platform is located at the bottom of the bridge and the cantilever working platform is located on both sides of the first working platform, in order to further ensure the stability of the overall device, a counterweight assembly is set to adjust the weight of the first working platform and the cantilever working platform to maintain balance and stability.
[0014] Optionally, the counterweight assembly includes a counterweight rod and a counterweight block, the counterweight rod is parallel to the first direction, one end of the counterweight rod is fixedly connected to the fixing frame, and the counterweight block is arranged on the counterweight rod.
[0015] By adopting the above technical solution, a counterweight rod is provided, the counterweight rod is connected to the fixed frame, and the counterweight block is located on the counterweight rod, so as to further improve the stability of the first working platform and the cantilever working platform on the bridge.
[0016] Optionally, the counterweight rod is a telescopic structure, and the telescopic direction of the counterweight rod is parallel to the first direction.
[0017] By adopting the above technical solution, due to the differences in the lengths of the bridge sections, if the bridge section is longer, the position of the counterweight block needs to be moved to the side away from the fixed frame to keep the first working platform balanced. To this end, the counterweight rod is set as a telescopic structure to move the position of the counterweight block on the counterweight rod.
[0018] Optionally, the fixed section of the counterweight rod is fixedly connected to the fixed frame, and a first sliding groove is opened at one end of the fixed section along the first direction for the movable section to slide, and a second sliding groove is opened on the bottom wall of the fixed section along a third direction, and the third direction is perpendicular to both the first direction and the second direction, the second sliding groove is connected to the first sliding groove, and the bottom wall of the fixed section is flush with the bottom wall of the movable section.
[0019] By adopting the above technical solution, when the counterweight block is placed on the counterweight rod, in order to make the counterweight rod of the telescopic structure always in contact with the bridge, a second through groove is provided on the bottom wall of the fixed section of the counterweight rod so that the bottom wall of the fixed section of the counterweight rod is flush with the bottom wall of the movable section. Regardless of whether the counterweight block is placed on the fixed section or the movable section, the fixed section or the movable section can be in contact with the bridge, so that the gravity of the counterweight block is applied to the bridge, thereby achieving the stability of the first working platform.
[0020] Optionally, the sliding assembly includes a sliding rail and a first roller, the sliding rail is parallel to the second direction, the sliding rail is fixedly connected to the protective member, the first roller slides along the second direction on the sliding rail, and the first roller is connected to the fixed frame on a side away from the protective member.
[0021] By adopting the above technical solution, in order to drive the first working platform to slide along the second direction, a slide rail and a first roller are provided so that the first roller moves on the slide rail to drive the first working platform to slide along the second direction through the fixed frame.
[0022] Optionally, the first roller and the fixed frame may be slidably connected, two slide rails are provided, the other slide rail is connected to the fixed frame, and the first roller is located between the two slide rails.
[0023] By adopting the above technical solution, two slide rails are set up, and the first roller slides along the slide rail connected to the protective member, driving the other slide rail to slide relative to the first roller, and further driving the first working platform to slide along the second direction.
[0024] The first roller and the fixing frame may be rotatably connected, and the first roller is parallel to the third direction along the rotation axis of the fixing frame.
[0025] By adopting the above technical solution, through the rotational connection between the first roller and the fixing member, if the slide rail needs to be offset according to actual construction requirements, the first roller can adapt to slide rails laid in different directions, making it more adaptable.
[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. This application provides a first working platform and a sliding assembly, so that personnel can work along the length direction of the bridge on the first working platform, and the sliding assembly drives the first working platform to slide along the second direction, thereby enabling personnel to work along the width direction of the bridge, further expanding the working range of personnel on the bridge; 2. This application can adapt to the counterweight requirements of bridges of different lengths by setting the counterweight rod as a telescopic rod structure; 3. In the present application, one end of the fixing member is overlapped on the protective member of the bridge, and the other end is abutted against the top wall of the bridge, thereby further improving the stability of the connection between the first working platform and the bridge. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] Figure 1 It is a schematic diagram of the structure of the bridge and the protective member of the present application; Figure 2 This is a schematic diagram of the overall structure of an operating platform suitable for urban bridge renewal in the present application; Figure 3 It is a top view of a working platform suitable for urban bridge renewal in the present application; Figure 4 It is a structural schematic diagram of the first working platform and the cantilever working platform of the present application; Figure 5 It is a structural schematic diagram of an embodiment of the sliding assembly and the counterweight assembly of the present application; Figure 6 is a structural schematic diagram of another embodiment of the sliding assembly of the present application; Figure 7 is a structural schematic diagram of another embodiment of the counterweight assembly of the present application; Figure 8 It is a structural schematic diagram of the counterweight rod of the present application; Fig. 9 It is a structural schematic diagram of another embodiment of the counterweight assembly of the present application.
[0028] Explanation of the accompanying drawings: 01, bridge; 02, protective part; 1, first working platform; 11, first fixed rod; 12, protective net; 13, connecting rod; 2, fixed frame; 21, second fixed rod; 3, sliding assembly; 31, slide rail; 32, first roller; 33, mounting seat; 4, cantilever working platform; 5, counterweight assembly; 51, counterweight rod; 511, fixed section; 5111, first slide slot; 5112, second slide slot; 512, movable section; 52, counterweight block; 53, second roller. DETAILED DESCRIPTION
[0029] The following is combined with Figure 1-9 This application is described in further detail.
[0030] The embodiment of the present application discloses a work platform suitable for urban bridge renewal. For the convenience of description, the present application introduces directional words such as a first direction, a second direction, and a third direction to form a three-dimensional reference direction. The directional words used, such as "a first direction, a second direction, and a third direction", can be specifically shown with reference to the figure, where X represents the first direction X, Y represents the second direction Y, and Z represents the third direction Z. The first direction X, the second direction Y, and the third direction Z are perpendicular to each other.
[0031] Reference Figure 1 When designing and constructing the bridge 01, in order to prevent vehicles from crossing the boundary, protective parts 02 are installed on both sides of the bridge 01.
[0032] Reference Figure 2 and Figure 3 The working platform suitable for the renewal of the urban bridge 01 includes a first working platform 1 arranged at the bottom of the bridge 01, the first working platform 1 is installed at both ends of the bridge 01, the first working platform 1 is parallel to the first direction, and a fixed frame 2 is provided on one side of the first working platform 1. Specifically, the fixed frame 2 and the first working platform 1 are fixedly connected through a connecting rod 13, the fixed frame 2 abuts against the top wall of the bridge 01, and a sliding component 3 is connected between the fixed frame 2 and the bridge 01. The first working platform 1 is slidably connected to the bridge 01 along the second direction through the sliding component 3, and the second direction is perpendicular to the first direction; personnel stand on the first working platform 1 to perform construction work on the bridge 01. If construction is required at other positions in the lateral direction of the bridge 01, the sliding component 3 is set, and the first working platform 1 is moved along the second direction by a jack or other lifting equipment.
[0033] Reference Figure 4 In order to adapt to the construction work of different lengths of bridges 01, in this embodiment, the first working platform 1 includes a plurality of first fixing rods 11. The first working platform 1 is a frame structure formed by overlapping a plurality of first fixing rods 11. Specifically, a plurality of first fixing rods 11 are spliced together to form a rectangular parallelepiped of the frame structure. During construction, the number of first fixing rods 11 can be set accordingly according to the actual length of the bridge 01. In order to protect the first working platform 1, a protective net 12 is installed on the rectangular surfaces of the side walls and the bottom wall of the first working platform 1 among the plurality of rectangular surfaces formed by splicing the first fixing rods 11.
[0034] Reference Figure 5In order to further support the fixed frame 2, the fixed frame 2 is overlapped on the protective member 02, and the sliding assembly 3 is arranged between the fixed frame 2 and the protective member 02. In this embodiment, the fixed frame 2 includes a plurality of second fixing rods 21, and the fixed frame 2 is a frame structure formed by overlapping a plurality of second fixing rods 21. Specifically, a plurality of second fixing rods 21 are spliced together to form a rectangular parallelepiped of the frame structure, which is supported by the protective member 02 and the fixed frame 2. The second fixing rods 21 are abutted against the bridge 01, so that the first working platform is fixed to the bridge 01 through the fixed frame 2.
[0035] Reference Figure 4 In order to further expand the construction scope, a cantilever work platform 4 is set on both sides of the first work platform 1. Each cantilever work platform 4 is connected to the fixed frame 2. One side of the cantilever work platform 4 is set flush with the top wall of the bridge 01, so that personnel can stand on the cantilever work platform 4 to construct the bridge 01.
[0036] Reference Figure 5 Since a cantilevered working platform is provided, in order to further improve the stability of the working platform, the working platform suitable for updating the urban bridge 01 also includes a counterweight assembly 5. The counterweight assembly 5 is arranged on the side of the fixed frame 2 away from the cantilevered working platform, and the counterweight assembly 5 is pressed against the top wall of the bridge 01, so that the counterweight assembly 5 improves the stability of the first working platform 1.
[0037] Reference Figure 5 The counterweight assembly 5 includes a counterweight rod 51 and a counterweight block 52. The counterweight rod 51 is arranged parallel to the first direction. One end of the counterweight rod 51 is fixedly connected to the fixed frame 2. The counterweight block 52 is located above the counterweight rod 51. In some embodiments, the counterweight block 52 can be a sand and gravel bag, a water tank, or concrete. In this embodiment, the counterweight block 52 is a sand and gravel bag.
[0038] Reference Figure 5 In order to drive the first working platform 1 to slide along the second direction, the sliding assembly 3 includes a slide rail 31 and a first roller 32. In this embodiment, two slide rails 31 are provided, the slide rails 31 are parallel to the second direction, and the two slide rails 31 are spaced apart along the third direction, the third direction is perpendicular to both the first direction and the second direction, one of the slide rails 31 is fixedly connected to the protective member 02, the other slide rail 31 is fixed to the second fixed rod 21 of the fixed frame 2, the first roller 32 is connected to the first roller 32 and is located between the two slide rails 31, the first roller 32 slides along the length direction of the slide rail 31, the first roller 32 drives the slide rail 31 connected to the second fixed rod 21 to move relative to the other slide rail 31, and further drives the first working platform 1 to slide along the second direction.
[0039] Reference Figure 6In some other embodiments, the slide rail 31 may be provided with one, the slide rail 31 is fixedly connected to the protective member 02, the first roller 32 is rotatably connected to the second fixed rod 21 of the fixed frame 2 through the mounting seat 33, the first roller 32 is parallel to the third direction along the rotation axis of the second fixed rod 21, the first roller 32 slides on the slide rail 31 to drive the first working platform 1 to slide along the second direction through the fixed frame 2, and by setting a movable first roller 32, when it is necessary to change the direction of the slide rail 31 according to actual work requirements, since the first roller 32 is rotatably connected to the fixed frame 2, the first roller 32 can adapt to the slide rail 31 set in any direction.
[0040] Reference Figure 7 and Figure 8 In some other embodiments, due to the difference in the length of the bridge 01 section, if the length of the bridge 01 section is longer, the position of the counterweight block 52 needs to be moved toward the side away from the fixed frame 2 to keep the first working platform 1 balanced. To this end, the counterweight rod 51 can be a telescopic structure, and the telescopic direction of the counterweight rod 51 is parallel to the first direction. Specifically, the fixed section 511 of the counterweight rod 51 is fixedly connected to the second fixed rod 21 of the fixed frame 2, and the end of the fixed section 511 away from the fixed frame 2 is provided with a first sliding groove 5111 for sliding the movable section 512 along the first direction, and the movable section 512 is fixedly connected to the end close to the fixed section 511; Reference Figure 7 and Figure 8 In order to make the counterweight rod 51 always in contact with the top wall of the bridge 01, a second slide groove 5112 is opened along the third direction on the bottom wall of the fixed section 511 of the counterweight rod 51 to accommodate the movable section 512 of the counterweight rod 51. The second slide groove 5112 is connected to the first slide groove 5111. The bottom wall of the movable section 512 of the counterweight rod 51 is flush with the bottom wall of the fixed section 511, and the counterweight block 52 can be placed on the movable section 512 of the counterweight rod 51.
[0041] Reference Fig. 9 In the present embodiment, the counterweight rod 51 is in direct contact with the bridge 01. However, before the first working platform is moved by the sliding assembly 3, the counterweight block 52 needs to be removed first and then moved. This process is relatively cumbersome. For this reason, in some other embodiments, the bottom wall of the counterweight rod 51 is rotatably connected to a second roller 53. Specifically, the first roller 32 is rotatably connected to the movable part of the counterweight rod 51.
[0042] The implementation principle of a working platform suitable for urban bridge renewal in the embodiment of the present application is as follows: during construction, the fixing frame 2 is overlapped on the protective member 02, and the fixing frame 2 is abutted against the top wall of the bridge 01. A person standing on the first working platform 1 or the cantilevered working platform can work along the length direction of the bridge 01; When it is necessary to work along the width direction of the bridge 01, by setting up a slide rail 31 and a pulley, the slide rail 31 can drive the first working platform 1 and the cantilever beam working platform to move along the width direction of the bridge 01 through the fixed frame 2. When the bridge 01 section is longer, the movable section 512 of the counterweight rod 51 can be slid along the first direction, and the counterweight block 52 can be placed on the movable section 512 of the counterweight rod 51.
[0043] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A working platform suitable for urban bridge renewal, characterized by: It comprises a first working platform (1) arranged at the bottom of the bridge (01); The first working platform (1) is installed on the bridge (01), and the first working platform (1) is parallel to the first direction; A fixing frame (2) is provided on one side of the first working platform (1), the fixing frame (2) is in contact with the top wall of the bridge (01), a sliding assembly (3) is connected between the fixing frame (2) and the bridge (01), and the first working platform (1) is slidably connected to the bridge (01) along a second direction via the sliding assembly (3), the second direction being perpendicular to the first direction.
2. The working platform suitable for urban bridge renewal according to claim 1, characterized in that: The fixing frame (2) is overlapped on the protection member (02) of the bridge (01), and the sliding assembly (3) is located between the protection member (02) and the fixing frame (2).
3. The working platform suitable for urban bridge renewal according to claim 1 is characterized by: A cantilever working platform (4) is provided on both sides of the first working platform (1), and each of the cantilever working platforms (4) is connected to the fixed frame (2).
4. The working platform suitable for urban bridge renewal according to claim 3 is characterized by: It also includes a counterweight assembly (5), which is arranged on a side of the fixed frame (2) away from the cantilever work platform (4), and the counterweight assembly (5) is pressed onto the bridge (01).
5. The working platform suitable for urban bridge renewal according to claim 4 is characterized by: The counterweight assembly (5) comprises a counterweight rod (51) and a counterweight block (52); the counterweight rod (51) is parallel to the first direction, one end of the counterweight rod (51) is fixedly connected to the fixing frame (2), and the counterweight block (52) is arranged on the counterweight rod (51).
6. The working platform suitable for urban bridge renewal according to claim 5 is characterized by: The counterweight rod (51) is a telescopic structure, and the telescopic direction of the counterweight rod (51) is parallel to the first direction.
7. The working platform suitable for urban bridge renewal according to claim 6 is characterized by: The fixed section (511) of the counterweight rod (51) is fixedly connected to the fixed frame (2); a first sliding groove (5111) is provided at one end of the fixed section (511) along the first direction for the movable section (512) to slide; a second sliding groove (5112) is provided on the bottom wall of the fixed section (511) along a third direction, the third direction being perpendicular to both the first direction and the second direction; the second sliding groove (5112) is connected to the first sliding groove (5111); and the bottom wall of the fixed section (511) is flush with the bottom wall of the movable section (512).
8. A work platform suitable for urban bridge renewal according to any one of claims 1 to 7, characterized in that: The sliding assembly (3) comprises a sliding rail (31) and a first roller (32), wherein the sliding rail (31) is parallel to the second direction, the sliding rail (31) is fixedly connected to the protective member (02), the first roller (32) slides along the second direction on the sliding rail (31), and the first roller (32) is connected to the fixed frame (2) on a side away from the protective member (02).
9. The working platform suitable for urban bridge renewal according to claim 8, characterized in that: The first roller (32) and the fixed frame (2) may be rotatably connected, and the first roller (32) is parallel to the third direction along the rotation axis of the fixed frame (2).
10. The working platform suitable for urban bridge renewal according to claim 8, characterized in that: The first roller (32) and the fixed frame (2) may be slidably connected, two slide rails (31) are provided, the other slide rail (31) is connected to the fixed frame (2), and the first roller (32) is located between the two slide rails (31).