Construction method for resisting upheaval deformation during excavation of foundation pit above existing tunnel
By using the installation channel and auxiliary rod structure during the construction of the foundation pit above the tunnel, a spherical reinforcement surface and an adaptive adjustment system are formed, which solves the problem of uplift deformation caused by stress release during the construction of the foundation pit and improves the stability of the soil above the tunnel. properties and the support capacity of the foundation pit bottom.
Patent Information
- Application Number
- CN202411193498.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-10-25
AI Technical Summary
In urban underground tunnel projects, the construction of foundation pits causes the stress release of the geological structure above the tunnel, causing uplift deformation and structural cracking, which affects the safe operation of the tunnel. It is difficult for existing technology to adaptively adjust according to local stress.
A construction method is adopted to form an installation channel by drilling holes in the center of the foundation pit, placing a hemispherical spherical base and a hollow auxiliary rod, injecting mud to form a spherical reinforcement surface, and using steel balls and spring structures to perform self-starting operations according to the rebound of the bottom of the foundation pit. Adapt to adjustment, release stress, and ensure support at the bottom of the foundation pit.
It effectively reinforces the soil above the tunnel, increases stability, releases stress through adaptive adjustment, slows down vibration and external force transmission, ensures support at the bottom of the foundation pit, and prevents uplift and deformation.
Smart Images

Figure CN118835582A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of foundation pit construction, in particular to a construction method for anti-uplift deformation of foundation pit excavation above an existing tunnel. Background Art
[0002] With the development of urbanization, the number of urban underground tunnel projects is increasing, and the underground space of the city is gradually decreasing. It is inevitable that foundation pit construction work will be carried out above the original tunnel. Since the foundation pit construction work will destroy the geological structure above the original tunnel, stress will be released during the foundation pit construction process, causing the tunnel to bulge, deform, and crack. In severe cases, it will affect the safe operation of the tunnel.
[0003] At present, traditional foundation pit construction methods adopt large-area soil reinforcement and structural reinforcement. Large-area soil reinforcement and structural reinforcement often form an overall supporting structure, but cannot be adapted and adjusted according to local stress. Summary of the invention
[0004] The purpose of the present invention is to provide a construction method for anti-uplift deformation of foundation pit excavation above an existing tunnel, which can perform adaptive adjustment according to the rebound of the bottom of the foundation pit, thereby releasing part of the stress and ensuring the support of the device to the bottom of the foundation pit.
[0005] In order to achieve the above object, the technical solution of the present invention is as follows: A construction method for excavating a foundation pit above an existing tunnel to resist uplift deformation comprises the following steps:
[0006] S1. Drill a hole in the center of the pre-excavated foundation pit to form an installation channel, place a semi-spherical base at the bottom of the installation channel, and insert the hollow auxiliary rods through the base into the soil in a radial pattern, and inject mud into the soil along the auxiliary rods;
[0007] S2. Place the steel ball into the base so that the steel ball abuts against the auxiliary rod; arrange the baffle in a ring shape on the inner wall of the installation channel, and then push one end of the pressure rod fixing spring into the installation channel and abut against the steel ball;
[0008] S3. Select the compressed length of the spring according to the pressure applied, press the pressure rod into the hollow channel, and then fix the pressure rod to the baffle.
[0009] The following beneficial effects are achieved by adopting the above scheme:
[0010] During the foundation pit construction process, the soil above the tunnel can be reinforced by forming an installation channel and installing the device for support; then mud is injected into the soil through auxiliary rods to form a spherical reinforcement surface, thereby increasing the soil reinforcement area and improving the stability of the device.
[0011] At the same time, when stress is released during the foundation pit construction, the stress is released with the installation channel as the center, and the stress is transmitted to the steel ball along the auxiliary rod, so that the steel ball pushes the spring to move upward. It can be adaptively adjusted according to the rebound of the bottom of the foundation pit, thereby releasing part of the stress and ensuring the support of the device to the bottom of the foundation pit.
[0012] As a further improvement of the technical solution of the invention, in S2, the baffle is composed of two adjacent arc-shaped plates, and a bracket is fixedly connected between the arc-shaped plates.
[0013] The following beneficial effects are achieved by adopting the above scheme: a buffer space is formed by the support of the bracket, which is convenient for alleviating the vibration or other external force during the foundation pit construction process from being directly transmitted to the pressure rod, thereby ensuring the support of the device to the bottom of the foundation pit.
[0014] As a further improvement to the technical solution of the invention, the shape of the bracket is triangular.
[0015] The following beneficial effects are achieved by adopting the above solution: the triangular bracket can improve the supporting stability of the adjacent baffles.
[0016] As a further improvement of the technical solution of the invention, in S3, the pressing block is vertically pressed on the installation channel, and the pressing rod is threadedly connected to the center of the pressing block.
[0017] The following beneficial effects are achieved by adopting the above solution: when the pressing rod rotates on the pressing block, the pressing length of the pressing rod can be adjusted and the pressing length of the pressing rod can be kept unchanged.
[0018] As a further improvement of the technical solution of the invention, in S3, a gap is provided between the pressure rod and the baffle plate, and the pressure rod and the baffle plate are fixedly connected by injecting mud into the gap.
[0019] The following beneficial effects are achieved by adopting the above solution: by injecting mud into the gap to fix the pressure rod and the baffle, the stability of the pressure rod can be improved and the pressing length of the pressure rod will not change.
[0020] As a further improvement of the technical solution of the invention, in S2, a cavity is provided between the pressure rod and the base, and the spring and the steel ball are both located in the cavity.
[0021] The following beneficial effects are achieved by adopting the above solution: the cavity can provide space for the movement of the spring and the steel ball, and provide space for stress release.
[0022] As a further improvement of the technical solution of the invention, the diameter of the pressing block is larger than the diameter of the hollow channel.
[0023] The following beneficial effects are achieved by adopting the above solution: the diameter of the pressing block is larger than the diameter of the hollow channel, so that the pressing block can keep the pressing length of the pressing rod unchanged.
[0024] As a further improvement of the technical solution of the invention, in S1, the auxiliary rod is clearance-matched with the base.
[0025] The following beneficial effects are achieved by adopting the above solution: the clearance between the auxiliary rod and the base is matched, so that part of the stress is transferred to the spring and the steel ball through the auxiliary rod, providing space for stress release.
[0026] Compared with the prior art, the present invention has the following beneficial effects:
[0027] During the foundation pit construction process, the present invention can reinforce the soil above the tunnel by forming an installation channel to support the installation device; then the mud is injected into the soil through the auxiliary rod to form a spherical reinforcement surface, which increases the soil reinforcement area and improves the stability of the device. At the same time, when stress is released during the foundation pit construction process, the stress is released with the installation channel as the center, and the stress is transmitted to the steel ball along the auxiliary rod, so that the steel ball pushes the spring to move upward, and can be adaptively adjusted according to the rebound of the bottom of the foundation pit, thereby releasing part of the stress and ensuring the support of the device to the bottom of the foundation pit. The present invention can be adaptively adjusted according to the rebound of the bottom of the foundation pit, thereby releasing part of the stress and ensuring the support of the device to the bottom of the foundation pit. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0029] Figure 1 It is a schematic diagram of the installation of a construction method for anti-uplift deformation of a foundation pit excavation above an existing tunnel according to an embodiment of the present invention.
[0030] Figure 2 for Figure 1 Cross-sectional view of the compression rod.
[0031] The figure numbers in the drawings of the specification include: 1-foundation pit plate 1; 2-tunnel body; 3-pressure rod; 31-pressure block; 32-spring; 33-steel ball; 4-baffle; 41-bracket; 5-auxiliary rod; 51-grouting area; 52-base. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] The present invention is further described in detail below in conjunction with the accompanying drawings.
[0034] A construction method for excavating a foundation pit above an existing tunnel to resist uplift deformation comprises the following steps:
[0035] S1. Drill a hole in the center of the pre-excavated foundation pit to form an installation channel, place a semi-spherical base at the bottom of the installation channel, and insert the hollow auxiliary rods through the base into the soil in a radial pattern, and inject mud into the soil along the auxiliary rods;
[0036] S2. Place the steel ball into the base so that the steel ball abuts against the auxiliary rod; arrange the baffle in a ring shape on the inner wall of the installation channel, and then push one end of the pressure rod fixing spring into the installation channel and abut against the steel ball;
[0037] S3. Select the compressed length of the spring according to the pressure applied, press the pressure rod into the hollow channel, and then fix the pressure rod to the baffle.
[0038] The following beneficial effects are achieved by adopting the above scheme:
[0039] During the foundation pit construction process, the soil above the tunnel can be reinforced by forming an installation channel and installing the device for support; then mud is injected into the soil through auxiliary rods to form a spherical reinforcement surface, thereby increasing the soil reinforcement area and improving the stability of the device.
[0040] At the same time, when stress is released during the foundation pit construction, the stress is released with the installation channel as the center, and the stress is transmitted to the steel ball along the auxiliary rod, so that the steel ball pushes the spring to move upward. It can be adaptively adjusted according to the rebound of the bottom of the foundation pit, thereby releasing part of the stress and ensuring the support of the device to the bottom of the foundation pit.
[0041] Specifically, in the solution of this embodiment, in S2, the baffle is composed of two adjacent arc-shaped plates, and a bracket is fixedly connected between the arc-shaped plates.
[0042] The following beneficial effects are achieved by adopting the above scheme: a buffer space is formed by the support of the bracket, which is convenient for alleviating the vibration or other external force during the foundation pit construction process from being directly transmitted to the pressure rod, thereby ensuring the support of the device to the bottom of the foundation pit.
[0043] Specifically, in this embodiment, the shape of the bracket is a triangle.
[0044] The following beneficial effects are achieved by adopting the above solution: the triangular bracket can improve the supporting stability of the adjacent baffles.
[0045] Specifically, in the solution of this embodiment, in S3, the pressing block is vertically pressed on the installation channel, and the pressing rod is threadedly connected to the center of the pressing block.
[0046] The following beneficial effects are achieved by adopting the above solution: when the pressing rod rotates on the pressing block, the pressing length of the pressing rod can be adjusted and the pressing length of the pressing rod can be kept unchanged.
[0047] Specifically, in the solution of this embodiment, in S3, a gap is provided between the pressure rod and the baffle plate, and the pressure rod and the baffle plate are fixedly connected by injecting mud into the gap.
[0048] The following beneficial effects are achieved by adopting the above solution: by injecting mud into the gap to fix the pressure rod and the baffle, the stability of the pressure rod can be improved and the pressing length of the pressure rod will not change.
[0049] Specifically, in the present embodiment, in S2, a cavity is provided between the pressure rod and the base, and the spring and the steel ball are both located in the cavity.
[0050] The following beneficial effects are achieved by adopting the above solution: the cavity can provide space for the movement of the spring and the steel ball, and provide space for stress release.
[0051] Specifically, in this embodiment, the diameter of the pressing block is larger than the diameter of the hollow channel.
[0052] The following beneficial effects are achieved by adopting the above solution: the diameter of the pressing block is larger than the diameter of the hollow channel, so that the pressing block can keep the pressing length of the pressing rod unchanged.
[0053] Specifically, in the solution of this embodiment, in S1, the auxiliary rod is loosely matched with the base.
[0054] The following beneficial effects are achieved by adopting the above solution: the clearance between the auxiliary rod and the base is matched, so that part of the stress is transferred to the spring and the steel ball through the auxiliary rod, providing space for stress release.
[0055] Embodiment 1:
[0056] The embodiment is basically as shown in the attached Figure 1 and attached Figure 2As shown: A construction method for excavating a foundation pit above an existing tunnel to resist uplift deformation, comprising the following steps: S1, drilling a hole in the center of a pre-excavated foundation pit 1 to form an installation channel, placing a semi-spherical base 52 at the bottom of the installation channel, and inserting a hollow auxiliary rod 5 through the base 52 into the soil in a radial manner, the auxiliary rod 5 and the base 52 are in clearance fit, and slurry is injected into the soil along the auxiliary rod 5;
[0057] During the construction of the foundation pit 1, the soil above the tunnel can be reinforced by forming an installation channel and installing the device for support; then mud is injected into the soil through the auxiliary rod 5 to form a spherical reinforcement surface, thereby increasing the soil reinforcement area and improving the stability of the device, and part of the stress is transmitted to the spring 32 and the steel ball 33 through the auxiliary rod 5 to provide a release space for the stress.
[0058] S2, put the steel ball 33 into the base 52, so that the steel ball 33 and the auxiliary rod 5 are against each other; and the baffle 4 is arranged in a ring shape on the inner wall of the installation channel, and the baffle 4 is composed of two adjacent arc plates, and a triangular bracket 41 is fixedly connected between the arc plates; then push one end of the fixing spring 32 of the pressure rod 3 into the installation channel and against the steel ball 33, and a cavity is provided between the pressure rod 3 and the base 52, and the spring 32 and the steel ball 33 are both located in the cavity;
[0059] A buffer space is formed by the support of the bracket 41 , which is convenient for alleviating vibration or other external forces during the construction of the foundation pit 1 from being directly transmitted to the pressure rod 3 , thereby ensuring the support of the bottom of the foundation pit 1 by the device.
[0060] S3. Select the compressed length of the spring 32 according to the pressure strength, first vertically press the pressure block 31 on the installation channel, then spirally rotate the pressure rod 3 on the pressure block 31, and inject mud through the gap between the pressure rod 3 and the baffle 4 to fix the pressure rod 3 and the baffle 4.
[0061] When stress is released during the construction of the foundation pit 1, the stress is released with the installation channel as the center, and the stress is transmitted to the steel ball 33 along the auxiliary rod 5, so that the steel ball 33 pushes the spring 32 to move upward, and can be adaptively adjusted according to the rebound of the bottom of the foundation pit 1, so as to release part of the stress, and ensure that the device supports the bottom of the foundation pit 1, so that the tunnel does not produce anti-uplift deformation.
[0062] Compared with the existing technology, the present invention has the following beneficial effects:
[0063] During the foundation pit construction process, the present invention can reinforce the soil above the tunnel by forming an installation channel to support the installation device; then the mud is injected into the soil through the auxiliary rod to form a spherical reinforcement surface, which increases the soil reinforcement area and improves the stability of the device. At the same time, when stress is released during the foundation pit construction process, the stress is released with the installation channel as the center, and the stress is transmitted to the steel ball along the auxiliary rod, so that the steel ball pushes the spring to move upward, and can be adaptively adjusted according to the rebound of the bottom of the foundation pit, thereby releasing part of the stress and ensuring the support of the device to the bottom of the foundation pit. The present invention can be adaptively adjusted according to the rebound of the bottom of the foundation pit, thereby releasing part of the stress and ensuring the support of the device to the bottom of the foundation pit.
[0064] The technical solutions provided by the embodiments of the present invention are described in detail above. Specific examples are used herein to illustrate the principles and implementation methods of the embodiments of the present invention. The description of the above embodiments is only applicable to help understand the principles of the embodiments of the present invention. At the same time, for those skilled in the art, there will be changes in the specific implementation methods and application scopes according to the embodiments of the present invention. In summary, the content of this specification should not be construed as limiting the present invention. Although the present invention is described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solutions of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solutions, which should be included in the scope of the claims of the present invention.
Claims
1. A construction method for anti-uplift deformation of foundation pit excavation above an existing tunnel, characterized in that: The following steps are involved: S1. Drill a hole in the center of the pre-excavated foundation pit to form an installation channel, place a semi-spherical base at the bottom of the installation channel, and insert the hollow auxiliary rods through the base into the soil in a radial pattern, and inject mud into the soil along the auxiliary rods; S2. Place the steel ball into the base so that the steel ball abuts against the auxiliary rod; arrange the baffle in a ring shape on the inner wall of the installation channel, and then push one end of the pressure rod fixing spring into the installation channel and abut against the steel ball; S3. Select the compressed length of the spring according to the pressure applied, press the pressure rod into the hollow channel, and then fix the pressure rod to the baffle.
2. The construction method for anti-uplift deformation of foundation pit excavation above an existing tunnel according to claim 1, characterized in that: In S2, the baffle is composed of two adjacent arc-shaped plates, and a bracket is fixedly connected between the arc-shaped plates.
3. The construction method for anti-uplift deformation of foundation pit excavation above an existing tunnel according to claim 2, characterized in that: The shape of the bracket is triangle.
4. The construction method for anti-uplift deformation of foundation pit excavation above an existing tunnel according to claim 1, characterized in that: In S3, the pressing block is vertically pressed on the installation channel, and the pressing rod is threadedly connected to the center of the pressing block.
5. The construction method for anti-uplift deformation of foundation pit excavation above an existing tunnel according to claim 1, characterized in that: In S3, a gap is provided between the pressure rod and the baffle plate, and the pressure rod and the baffle plate are fixedly connected by injecting mud into the gap.
6. The construction method for anti-uplift deformation of foundation pit excavation above an existing tunnel according to claim 1, characterized in that: In S2, a cavity is provided between the pressure rod and the base, and the spring and the steel ball are both located in the cavity.
7. The construction method for anti-uplift deformation of foundation pit excavation above an existing tunnel according to claim 4, characterized in that: The diameter of the compact is greater than the diameter of the hollow channel.
8. The construction method for anti-uplift deformation of foundation pit excavation above an existing tunnel according to claim 1, characterized in that: In S1, the auxiliary rod is clearance-fitted with the base.