By using the structure of connecting components and supporting components in the foundation reinforcement of the teaching building, the unsupported problem caused by the spacing between adjacent steel upsettings in the static pressure pile method is solved, the stability and reinforcement effect of the foundation are improved, and the integrity of the foundation structure is ensured. Reinforcement effect.
Patent Information
- Application Number
- CN202411060677.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-10-25
AI Technical Summary
When the static pressure pile method is used to reinforce the foundation of the teaching building, the spacing between adjacent steel upsetting components causes some areas to be unable to be effectively supported and reinforced, reducing the overall reinforcement effect.
Adopt a structure including ground foundation, supporting steel piles, foundation steel piles and pressure rods. By installing connecting components between adjacent steel upsetting components, the second supporting plate and supporting components are used for close support, and through double-headed threaded rods and nut locking to ensure the stability and positional constraints of the steel heading assembly.
It effectively makes up for the unsupported problem of the spacing between adjacent steel upsetting components, improves the support effect, enhances the stability of the foundation structure, avoids the separation of steel upsetting components caused by geological changes, and ensures the overall reinforcement effect of the foundation.
Smart Images

Figure CN118835656A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of foundation reinforcement, and in particular to an earthquake-resistant reinforcement structure for a teaching building foundation. Background Art
[0002] Teaching buildings are buildings used for teaching activities. Usually, classrooms, laboratories, lecture halls, offices and other functional areas are set up in teaching buildings to support the teaching needs of students and teachers. The foundation reinforcement of teaching buildings aims to enhance the stability and earthquake resistance of buildings. Common causes include unstable geological conditions, building reconstruction or expansion, groundwater level changes and foundation aging and damage. Currently, among the foundation reinforcement methods, the static pressure pile method is a widely used one with wide applicability. The static pressure pile method can be used to reinforce the foundation soil and transfer the upper load to the deep soil at the same time to achieve an effective foundation reinforcement effect.
[0003] At present, when the static pressure pile method is used to reinforce the foundation of a teaching building or other existing buildings, a foundation pit is usually excavated at the edge of the outer wall to expose the bottom foundation of the building. Then, multiple steel upsettings are arranged at the bottom of the building and supported and reinforced with pressed steel piles. However, there is a large gap between adjacent steel upsettings, resulting in the inability to effectively support and reinforce the gapped parts, thereby reducing the overall reinforcement effect.
[0004] Therefore, we proposed an earthquake-resistant reinforcement structure for the foundation of a teaching building in order to solve the problems raised above. Summary of the invention
[0005] The purpose of the present invention is to provide a seismic reinforcement structure for the foundation of a teaching building to solve the problem proposed in the above-mentioned background technology that there is a large distance between adjacent steel upsettings, resulting in the inability to effectively support and reinforce the distance part, thereby reducing the overall reinforcement effect.
[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a teaching building foundation seismic reinforcement structure, comprising a foundation, supporting steel piles, foundation steel piles and compression rods, a wall is arranged on the top of the foundation, a plurality of steel upsetting assemblies are arranged on the outer surface of the wall, a connecting assembly is arranged between two adjacent steel upsetting assemblies, a compression steel assembly is arranged on the top of the steel upsetting assembly, a foundation pit is opened at the top of the foundation near the bottom edge of the wall, a plurality of steel sleeves are arranged on the inner bottom of the foundation pit, a precast concrete layer is laid on the inner bottom of the foundation pit, a support assembly is arranged on the top of the precast concrete layer, and the support assembly includes a bottom plate, and the bottom plate is arranged on the precast concrete layer. The top of the bottom plate is arranged and fixedly connected with a plurality of threaded columns, the outer surface of the threaded column is threadedly connected with an adjusting nut near the middle position, the outer surface of the threaded column is located at the position of the top of the adjusting nut and a threaded sleeve is movably provided, and the top of the threaded sleeve is rotatably provided with a top plate, and the plurality of connecting components all include a second wall panel, the second wall panel is fixedly connected to the wall through bolts, the bottom of the second wall panel is fixedly connected with a second support plate, the bottom of the second support plate is fitted with the top of the top plate, the second wall panel is symmetrically fixedly connected with second side panels on both sides, the outer surface of the second side panel is penetrated by a second straight slot, and the inside of the second straight slot is provided with a double-headed threaded rod.
[0007] Preferably, the plurality of steel upsetting assemblies all include a first wall plate, which is fixedly connected to the wall by bolts, a first support plate is fixedly connected to the rear surface of the first wall plate near the middle, the bottom of the first support plate is fitted with the top of the top plate, and reinforcing ribs are provided between the bottom of the first support plate and the rear surface of the first wall plate.
[0008] Preferably, first side panels are symmetrically fixedly connected to the outer surfaces of both sides of the first wall panel, and a first straight slot is penetrated through the outer surface of the first side panel, and the first straight slot cooperates with the double-headed threaded rod.
[0009] Preferably, a support block is fixedly connected to the front surface of the first wall panel, a guide hole is penetrated through the top of the support block near the middle, threaded holes are symmetrically opened at the top of the support block near the edge, and first wing panels are symmetrically fixedly connected to the outer surfaces on both sides of the support block.
[0010] Preferably, the pressed steel assembly includes a bracket, a through hole is formed through the inner bottom of the bracket, second wing plates are symmetrically fixedly connected to the outer surfaces on both sides of the bracket, the surface of the second wing plate is connected to the first connecting seat via a pin shaft, the bottom of the first connecting seat is fixedly connected to a hydraulic jack, the bottom of the hydraulic jack is fixedly connected to a second connecting seat, and the second connecting seat is connected to the first wing plate via a pin shaft.
[0011] Preferably, a connecting block is fixedly installed between the inner walls of the bracket, an insertion port is opened through the top of the connecting block, rectangular slots are symmetrically opened on the inner walls on both sides of the insertion port, a clamping block is movably arranged inside the rectangular slot, a guide rod is symmetrically fixedly connected to the outer surface of one side of the clamping block, a spring is provided on the outside of the guide rod, and the end of the guide rod is fixedly connected to a limiting block.
[0012] Preferably, cover plates are symmetrically fixedly mounted on the outer surfaces of both sides of the pressing steel assembly, and the outer surface of the guide rod slides through the outer surface of the cover plate and extends to the other side.
[0013] Preferably, the number of the supporting steel piles is set to be multiple, the bottom of the supporting steel pile is fixedly connected with a socket block, the bottom of the foundation steel pile is fixedly connected with a cone head, the outer surfaces of the supporting steel pile and the foundation steel pile are both provided with card grooves, the card grooves cooperate with the card blocks, the tops of the supporting steel pile and the foundation steel pile are both provided with socket holes, the socket blocks cooperate with the socket holes.
[0014] Preferably, a plurality of pin holes are formed through the outer surface of the pressure rod, wherein a steel latch is movably provided inside one of the pin holes, and the pressure rod cooperates with the insertion port.
[0015] Preferably, the insides of the two threaded holes are threaded with supporting threaded rods, and a supporting plate is movably sleeved between the outer surfaces of the two supporting threaded rods, the top of the supporting plate corresponds to the top of the pressure rod, and the bottom of the supporting plate corresponds to the top of the supporting steel pile.
[0016] Compared with the prior art, the present invention has the following beneficial effects:
[0017] 1. By installing the connecting assembly at a position between adjacent steel upsetting assemblies, the bottom of the wall can be supported by the second support plate, and the bottom of the second support plate is supported by the top plate at the corresponding position in the supporting assembly, and the outer wall of the wall can be supported by the second wall-adhering plate, so that the connecting assembly as a whole can be fitted with the wall, and then the adjusting nut corresponding to the bottom of the connecting assembly is screwed to move the threaded sleeve upward until the top of the top plate is tightly fitted with the bottom of the second support plate, so that the bottom of the second support plate can be supported. This position makes up for the problem that the spacing between adjacent steel upsetting assemblies is not supported, thereby improving the supporting effect.
[0018] 2. By inserting a double-headed threaded rod between the second straight slot in the connecting component and the first straight slot in the adjacent steel upsetting component and locking it with a nut, the position of the adjacent steel upsetting components can be constrained by the connecting component to prevent the geological changes from happening again, which would cause the steel upsetting components to separate, thereby further improving the stability of the foundation structure.
[0019] 3. After lifting the sunken part of the wall, screw the nut into the top of the supporting threaded rod and lock it with the supporting plate. Through the cooperation of the supporting plate and the supporting threaded rod, fix the position of the steel upsetting assembly and the supporting steel pile to prevent it from sinking again. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 A three-dimensional diagram of a teaching building foundation seismic reinforcement structure according to the present invention;
[0021] Figure 2 This is a schematic diagram of a steel jacket structure of a teaching building foundation seismic reinforcement structure of the present invention;
[0022] Figure 3 This is a schematic diagram of the support component structure of a teaching building foundation seismic reinforcement structure of the present invention;
[0023] Figure 4 This is a schematic diagram of the steel upsetting assembly structure of a teaching building foundation seismic reinforcement structure of the present invention;
[0024] Figure 5 This is a schematic diagram of the structure of a pressed steel component of a teaching building foundation seismic reinforcement structure of the present invention;
[0025] Figure 6 It is a partial structural cross-sectional view of a pressed steel component of a teaching building foundation seismic reinforcement structure of the present invention;
[0026] Figure 7 This is a schematic diagram of the supporting steel pile structure of a teaching building foundation seismic reinforcement structure of the present invention;
[0027] Figure 8 This is a schematic diagram of a compression rod structure of a teaching building foundation seismic reinforcement structure of the present invention;
[0028] Fig. 9 This is a schematic diagram of a supporting threaded rod structure of a teaching building foundation seismic reinforcement structure of the present invention;
[0029] Fig.10 The present invention is a schematic diagram of the structure of the connecting components of the anti-seismic reinforcement structure of the foundation of a teaching building.
[0030] In the figure:
[0031] 1. Foundation; 11. Wall; 12. Foundation pit; 13. Precast concrete layer; 2. Steel sleeve; 3. Support assembly; 301. Bottom plate; 302. Threaded column; 303. Adjusting nut; 304. Threaded sleeve; 305. Top plate; 4. Steel upsetting assembly; 401. First wall plate; 402. First support plate; 403. Reinforcement rib; 404. First side plate; 405. First straight notch; 406. Support block; 407. Guide hole; 408. First wing plate; 409. Threaded hole; 5. Pressed steel assembly; 501. Bracket; 502. Connection block; 503. Insertion port; 504. Rectangular notch; 505 , block; 506, guide rod; 507, spring; 508, cover plate; 509, limit block; 510, second wing plate; 511, through hole; 512, first connecting seat; 513, hydraulic jack; 514, second connecting seat; 6, supporting steel pile; 61, foundation steel pile; 62, socket block; 63, cone head; 64, slot; 65, socket hole; 7, pressure rod; 71, pin hole; 72, steel latch; 8, supporting threaded rod; 81, supporting plate; 9, connecting assembly; 901, second wall panel; 902, second support plate; 903, second side panel; 904, second straight slot; 905, double-headed threaded rod. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the implementation regulations described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] See also Figure 1-10The present invention provides a technical solution: a teaching building foundation seismic reinforcement structure, including a foundation 1, supporting steel piles 6, foundation steel piles 61 and compression rods 7, a wall 11 is arranged on the top of the foundation 1, a plurality of steel upsetting components 4 are arranged on the outer surface of the wall 11, a connecting component 9 is arranged between two adjacent steel upsetting components 4, a compression steel component 5 is arranged on the top of the steel upsetting component 4, a foundation pit 12 is opened at the top of the foundation 1 near the bottom edge of the wall 11, a plurality of steel sleeves 2 are arranged on the inner bottom of the foundation pit 12, a precast concrete layer 13 is laid on the inner bottom of the foundation pit 12, a supporting component 3 is arranged on the top of the precast concrete layer 13, and the supporting component 3 includes a bottom plate 301, the bottom plate 301 is arranged on the top of the precast concrete layer 13, and a fixed connecting component 5 is arranged on the top of the bottom plate 301. A plurality of threaded columns 302 are connected, and an adjusting nut 303 is threadedly connected to the outer surface of the threaded column 302 near the middle position. A threaded sleeve 304 is movably sleeved on the outer surface of the threaded column 302 at the top of the adjusting nut 303, and a top plate 305 is rotatably set on the top of the threaded sleeve 304. The plurality of connecting components 9 all include a second wall plate 901, which is fixedly connected to the wall 11 by bolts, and a second support plate 902 is fixedly connected to the bottom of the second wall plate 901, and the bottom of the second support plate 902 fits with the top of the top plate 305. The second side plates 903 are symmetrically fixedly connected on both sides of the second wall plate 901, and a second straight slot 904 is opened through the outer surface of the second side plate 903, and a double-headed threaded rod 905 is set inside the second straight slot 904.
[0034] like Figure 1-10 As shown, multiple steel upsetting components 4 all include a first wall plate 401, which is fixedly connected to the wall 11 by bolts, and a first support plate 402 is fixedly connected to the rear surface of the first wall plate 401 near the middle, and the bottom of the first support plate 402 is in contact with the top of the top plate 305, and a reinforcing rib 403 is provided between the bottom of the first support plate 402 and the rear surface of the first wall plate 401, and the bottom of the wall 11 can be supported by the first support plate 402, and the bottom of the first support plate 402 is supported by the top plate 305 in the supporting component 3, and the outer wall of the wall 11 can be supported by the upper half of the first wall plate 401, so that the steel upsetting component 4 can be fitted with the wall 11 as a whole, and the firmness of the first support plate 402 can be improved by providing the reinforcing rib 403.
[0035] like Figure 1-10As shown, the outer surfaces of both sides of the first wall plate 401 are symmetrically fixedly connected with the first side plates 404, and the outer surface of the first side plate 404 is penetrated by a first straight slot 405, which cooperates with the double-headed threaded rod 905. The main function of the first side plate 404 and the first straight slot 405 is to cooperate with the double-headed threaded rod 905 to connect the steel upsetting assembly 4 with the connecting assembly 9, so that the connecting assembly 9 constrains the adjacent steel upsetting assemblies 4 to avoid the geological changes again, which will cause the steel upsetting assemblies 4 to separate, thereby further improving the stability of the foundation structure.
[0036] like Figure 1-10 As shown, a support block 406 is fixedly connected to the front surface of the first wall panel 401, a guide hole 407 is provided through the top of the support block 406 near the middle, threaded holes 409 are symmetrically provided at the top of the support block 406 near the edge, and first wing plates 408 are symmetrically fixedly connected to the outer surfaces of both sides of the support block 406. The guide holes 407 serve to guide the support steel piles 6 and the foundation steel piles 61 to avoid deviation, and the threaded holes 409 serve to install the support threaded rods 8.
[0037] like Figure 1-10 As shown, the pressed steel assembly 5 includes a bracket 501, the inner bottom of the bracket 501 is penetrated by a through hole 511, the outer surfaces of both sides of the bracket 501 are symmetrically fixedly connected with second wing plates 510, the surface of the second wing plate 510 is connected with a first connecting seat 512 through a pin shaft, the bottom of the first connecting seat 512 is fixedly connected with a hydraulic jack 513, the bottom of the hydraulic jack 513 is fixedly connected with a second connecting seat 514, the second connecting seat 514 is connected to the first wing plate 408 through a pin shaft, and the pressed steel assembly 5 can be installed on the steel upsetting assembly 4 by respectively installing the two second connecting seats 514 in the pressed steel assembly 5 on the corresponding first wing plates 408, and the connection method using the pin shaft is convenient for later disassembly, and the installation is convenient and the construction efficiency is high.
[0038] like Figure 1-10As shown, a connecting block 502 is fixedly installed between the inner walls of the bracket 501, an insertion port 503 is opened through the top of the connecting block 502, and rectangular notches 504 are symmetrically opened on the inner walls on both sides of the insertion port 503, and a clamping block 505 is movably arranged inside the rectangular notch 504, and a guide rod 506 is symmetrically fixedly connected to the outer surface of one side of the clamping block 505, and a spring 507 is sleeved on the outer side of the guide rod 506, and a limit block 509 is fixedly connected to the end of the guide rod 506. By inserting the foundation steel pile 61 from the insertion port 503 in the pressure steel component 5 to the bottom, the foundation steel pile 61 passes through the through hole 511, the guide hole 407 and the steel sleeve 2 in sequence until it reaches the foundation pit 12, and by controlling the extension or contraction of the hydraulic jack 513, pressure is applied to the foundation steel pile 61, so that the foundation steel pile 61 can be inserted into the foundation pit 12. When the hydraulic jack 513 is extended, as the clamping block 505 rises, it cooperates with the foundation When the block 505 contacts the slot 64 on the surface of the steel pile 61, it will squeeze the block 505 to shrink into the inside of the rectangular slot 504. Through the inclined surface setting of the block 505 and the slot 64, when the block 505 connects from the previous slot 64 to the next slot 64, the block 505 will extend again under the elastic force of the spring 507. At this time, the bottom of the block 505 will jam the small platform on the slot 64. When the hydraulic jack 513 shrinks, the block 505 jams the slot 64, so that the foundation steel pile 61 can be pushed to be inserted into the inside of the foundation 1. When the top of the foundation steel pile 61 is lower than the bottom of the bracket 501, the support steel pile 6 is inserted from the insertion port 503 in the pressing steel assembly 5 to the bottom, and the socket block 62 on the support steel pile 6 is socketed in the socket hole 65 on the foundation steel pile 61. In cooperation with the hydraulic jack 513, the support steel pile 6 and the foundation steel pile 61 can continue to be inserted deep into the foundation 1.
[0039] like Figure 1-10 As shown, cover plates 508 are symmetrically fixedly installed on the outer surfaces of both sides of the pressing steel assembly 5, and the outer surface of the guide rod 506 slides through the outer surface of the cover plate 508 and extends to the other side. By removing the connecting bolts on the cover plate 508, the cover plate 508 can be removed from the connecting block 502, which is convenient for the later maintenance or replacement of the block 505. The guide rod 506 plays the role of limiting and guiding the block 505, thereby improving the stability of the block 505.
[0040] like Figure 1-10As shown, the number of supporting steel piles 6 is set to be multiple, and the bottom of the supporting steel pile 6 is fixedly connected with a socket block 62, and the bottom of the foundation steel pile 61 is fixedly connected with a cone head 63. The outer surfaces of the supporting steel pile 6 and the foundation steel pile 61 are both provided with a card groove 64, and the card groove 64 cooperates with the card block 505. The tops of the supporting steel pile 6 and the foundation steel pile 61 are both provided with a socket hole 65, and the socket block 62 cooperates with the socket hole 65. By arranging the cone head 63 at the bottom of the foundation steel pile 61, the resistance of the foundation steel pile 61 to move downward can be reduced, and the insertion efficiency can be improved. By cooperating with the socket block 62 and the socket hole 65, the foundation steel pile 61 or the supporting steel pile 6 can be connected to each other.
[0041] like Figure 1-10 As shown, the outer surface of the compression rod 7 is penetrated by a plurality of pin holes 71, and a steel latch 72 is movably provided inside one of the pin holes 71. The compression rod 7 cooperates with the insertion port 503, and the compression rod 7 is passed through the compression steel assembly 5 from the insertion port 503 until it contacts the top of the support plate 81, and the compression rod 7 is fixed in the compression steel assembly 5 by the steel latch 72. At this time, the foundation steel pile 61 has reached the load-bearing stratum and cannot go deeper. In addition, the top of the supporting steel pile 6 serves as the supporting point of the compression rod 7, and its position is fixed. In conjunction with the contraction of the hydraulic jack 513, the steel upsetting assembly 4 is pulled upward under the reaction force, so that the sunken part of the wall 11 can be lifted, thereby restoring the horizontal state of the building and reducing the impact of uneven structural force.
[0042] like Figure 1-10 As shown, the interiors of the two threaded holes 409 are both threaded with supporting threaded rods 8, and a supporting plate 81 is movably sleeved between the outer surfaces of the two supporting threaded rods 8. The top of the supporting plate 81 corresponds to the top of the pressure rod 7, and the bottom of the supporting plate 81 corresponds to the top of the supporting steel pile 6. After the sunken part of the wall 11 is lifted, a nut is screwed into the top of the supporting threaded rod 8 and locked with the supporting plate 81. Through the cooperation of the supporting plate 81 and the supporting threaded rod 8, the position of the steel upsetting assembly 4 and the supporting steel pile 6 is fixed to prevent sinking again.
[0043] The use method and working principle of the device: When reinforcing the foundation of a building, first, dig a foundation pit 12 on the foundation 1, expose the bottom edge of the wall 11, and level the foundation pit 12, then arrange the steel sleeve 2 and insert it into the foundation pit 12, and then pour a layer of precast concrete layer 13, the pouring thickness does not exceed the height of the steel sleeve 2, wait for it to solidify, and then place the support component 3 on the surface of the precast concrete layer 13 at the spacing between adjacent steel sleeves 2, and make it located below the wall 11, and then arrange the steel upsetting component 4 to be installed on the wall 11, and its arrangement spacing is the same as the arrangement spacing of the steel sleeve 2, and the bottom of the wall 11 can be supported by the first support plate 402, and the bottom of the first support plate 402 is supported by the top plate 305 in the support component 3 The outer wall of the wall 11 can be supported by the upper part of the first wall plate 401, so that the steel upsetting component 4 can be fitted with the wall 11 as a whole. After that, the adjusting nut 303 corresponding to the bottom of the steel upsetting component 4 is screwed, so that the threaded sleeve 304 can be moved upward until the top of the top plate 305 fits with the bottom of the first support plate 402, which can provide preliminary support for the bottom of the first support plate 402 and improve the stability of the steel upsetting component 4. After that, the expansion screw is passed through the first wall plate 401 to fix the steel upsetting component 4 on the wall 11 as a whole, and then the pressing steel component 5 is installed on the steel upsetting component 4, and the two second connecting seats 514 in the pressing steel component 5 are respectively installed on the corresponding first wing plate 408 with the pin shaft to complete the work. After the installation of the pressing steel component 5, the pile pressing is carried out. First, the foundation steel pile 61 is inserted from the insertion port 503 in the pressing steel component 5 to the bottom. The foundation steel pile 61 passes through the through hole 511, the guide hole 407 and the steel sleeve 2 in sequence until it reaches the foundation pit 12. By controlling the extension or contraction of the hydraulic jack 513, pressure is applied to the foundation steel pile 61, so that the foundation steel pile 61 can be inserted into the foundation pit 12. When the hydraulic jack 513 is extended, as the block 505 rises, it contacts the groove 64 on the surface of the foundation steel pile 61, which squeezes the block 505 to shrink into the inside of the rectangular groove 504. Through the inclined surface setting of the block 505 and the groove 64, when the block 505 is connected from the previous groove 64 to the next groove 64, Under the action of the elastic force of the spring 507, the block 505 will extend again. At this time, the bottom of the block 505 will jam the small platform on the slot 64. When the hydraulic jack 513 contracts, the block 505 jams the slot 64, so that the foundation steel pile 61 can be pushed to be inserted into the inside of the foundation 1. When the top of the foundation steel pile 61 is lower than the bottom of the bracket 501, the support steel pile 6 is inserted from the insertion port 503 in the pressure steel assembly 5 to the bottom, and the socket block 62 on the support steel pile 6 is socketed in the socket hole 65 on the foundation steel pile 61. In conjunction with the hydraulic jack 513, the support steel pile 6 and the foundation steel pile 61 can be further inserted into the deep layer of the foundation 1. According to the depth of the load-bearing stratum, the support steel pile 6 is appropriately accumulated. When the foundation steel pile 61 reaches the load-bearing stratum,A support plate 81 is placed on the top of the support steel pile 6 of the top layer, and then the support threaded rod 8 is passed from the top of the support plate 81 to the bottom, and the support threaded rod 8 is installed through the threaded hole 409 on the steel upsetting assembly 4. After that, the compression rod 7 is passed through the compression steel assembly 5 from the insertion port 503 until it contacts the top of the support plate 81, and the compression rod 7 is fixed in the compression steel assembly 5 through the steel latch 72. At this time, the foundation steel pile 61 has reached the load-bearing stratum and cannot go deeper. In addition, the top of the support steel pile 6 serves as the support point of the compression rod 7, and its position is fixed, and cooperates with the hydraulic jack 51 3 is contracted, and under the reaction force, the steel upsetting assembly 4 is pulled upward, so that the sunken part of the wall 11 can be lifted, so as to restore the horizontal state of the building and reduce the influence of uneven force on the structure. After that, the nut is screwed into the top of the supporting threaded rod 8 and locked with the supporting plate 81. Through the cooperation of the supporting plate 81 and the supporting threaded rod 8, the position of the steel upsetting assembly 4 and the supporting steel pile 6 is fixed to prevent sinking again. After that, the pressure rod 7 and the pressure steel assembly 5 are removed in turn, and then the connection assembly 9 is installed at the position between the adjacent steel upsetting assemblies 4. The bottom of the wall 11 can be fixed by the second support plate 902. The bottom of the second support plate 902 is supported by the top plate 305 at the corresponding position in the support assembly 3, and the outer wall of the wall 11 can be supported by the second wall-adhering plate 901, so that the connection assembly 9 can be fitted with the wall 11 as a whole. After that, the adjusting nut 303 corresponding to the bottom of the connection assembly 9 is screwed, so that the threaded sleeve 304 can be moved upward until the top of the top plate 305 is tightly fitted with the bottom of the second support plate 902, so that the bottom of the second support plate 902 can be supported. This position makes up for the problem that the spacing between the adjacent steel upsetting assemblies 4 is not supported. The supporting effect is improved. After that, the corresponding adjustment nut 303 under the steel upsetting component 4 is tightened again, and the bottom of the steel upsetting component 4 is finally supported through the top plate 305, further improving the supporting effect of the steel upsetting component 4. After that, the double-headed threaded rod 905 is inserted between the second straight notch 904 in the connecting component 9 and the first straight notch 405 in the adjacent steel upsetting component 4, and the nut is used to lock it, so that the position of the adjacent steel upsetting components 4 can be constrained by the connecting component 9, avoiding the geological changes again, which will cause the separation between the steel upsetting components 4, and further improving the stability of the foundation structure.
[0044] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A teaching building foundation seismic reinforcement structure, comprising a foundation (1), supporting steel piles (6), foundation steel piles (61) and compression rods (7), characterized in that: A wall (11) is arranged on the top of the foundation (1), a plurality of steel upsetting assemblies (4) are arranged on the outer surface of the wall (11), a connecting assembly (9) is arranged between two adjacent steel upsetting assemblies (4), a pressing steel assembly (5) is arranged on the top of the steel upsetting assembly (4), a foundation pit (12) is opened at a position close to the bottom edge of the wall (11) on the top of the foundation (1), a plurality of steel sleeves (2) are arranged on the inner bottom of the foundation pit (12), a precast concrete layer (13) is laid on the inner bottom of the foundation pit (12), and a support assembly (3) is arranged on the top of the precast concrete layer (13); The support assembly (3) comprises a bottom plate (301), the bottom plate (301) is arranged on the top of the precast concrete layer (13), a plurality of threaded columns (302) are arranged and fixedly connected on the top of the bottom plate (301), an adjusting nut (303) is threadedly connected to the outer surface of the threaded column (302) near the middle, a threaded sleeve (304) is movably sleeved on the outer surface of the threaded column (302) at the top of the adjusting nut (303), and a top plate (305) is rotatably arranged on the top of the threaded sleeve (304); The plurality of connection components (9) all include a second wall plate (901), the second wall plate (901) being fixedly connected to the wall (11) by bolts, the bottom of the second wall plate (901) being fixedly connected to a second support plate (902), the bottom of the second support plate (902) being in contact with the top of the top plate (305), the second side plates (903) being symmetrically fixedly connected to both sides of the second wall plate (901), the outer surface of the second side plate (903) being provided with a second straight slot (904), the interior of the second straight slot (904) being provided with a double-headed threaded rod (905).
2. The seismic reinforcement structure for the foundation of a teaching building according to claim 1 is characterized by: The plurality of steel upsetting assemblies (4) all include a first wall plate (401), the first wall plate (401) being fixedly connected to the wall (11) by bolts, a first support plate (402) being fixedly connected to a position near the middle of the rear surface of the first wall plate (401), the bottom of the first support plate (402) being in contact with the top of the top plate (305), and a reinforcing rib (403) being arranged between the bottom of the first support plate (402) and the rear surface of the first wall plate (401).
3. The anti-seismic reinforcement structure for the foundation of a teaching building according to claim 2 is characterized by: The first side panels (404) are symmetrically fixedly connected to the outer surfaces of both sides of the first wall panel (401), and a first straight slot (405) is opened through the outer surface of the first side panel (404), and the first straight slot (405) cooperates with the double-headed threaded rod (905).
4. The anti-seismic reinforcement structure for the foundation of a teaching building according to claim 3 is characterized by: A support block (406) is fixedly connected to the front surface of the first wall panel (401), a guide hole (407) is provided through the top of the support block (406) near the middle, threaded holes (409) are symmetrically provided at the top of the support block (406) near the edge, and first wing panels (408) are symmetrically fixedly connected to the outer surfaces of both sides of the support block (406).
5. The anti-seismic reinforcement structure for the foundation of a teaching building according to claim 4 is characterized by: The pressed steel assembly (5) comprises a bracket (501), the inner bottom of the bracket (501) is penetrated by a through hole (511), the outer surfaces on both sides of the bracket (501) are symmetrically fixedly connected with second wing plates (510), the surface of the second wing plate (510) is connected with a first connecting seat (512) via a pin shaft, the bottom of the first connecting seat (512) is fixedly connected with a hydraulic jack (513), the bottom of the hydraulic jack (513) is fixedly connected with a second connecting seat (514), and the second connecting seat (514) is connected to the first wing plate (408) via a pin shaft.
6. The anti-seismic reinforcement structure for the foundation of a teaching building according to claim 5, characterized in that: A connecting block (502) is fixedly installed between the inner walls of the bracket (501); an insertion opening (503) is provided through the top of the connecting block (502); rectangular slots (504) are symmetrically provided on the inner walls on both sides of the insertion opening (503); a clamping block (505) is movably provided inside the rectangular slot (504); a guide rod (506) is symmetrically fixedly connected to the outer surface of one side of the clamping block (505); a spring (507) is sleeved on the outside of the guide rod (506); and a limiting block (509) is fixedly connected to the end of the guide rod (506).
7. The seismic reinforcement structure for the foundation of a teaching building according to claim 6, characterized in that: Cover plates (508) are symmetrically fixedly mounted on the outer surfaces of both sides of the pressing steel assembly (5), and the outer surface of the guide rod (506) slides through the outer surface of the cover plate (508) and extends to the other side.
8. The anti-seismic reinforcement structure for the foundation of a teaching building according to claim 1, characterized in that: The number of the supporting steel piles (6) is set to be multiple, the bottom of the supporting steel pile (6) is fixedly connected with a sleeve block (62), the bottom of the foundation steel pile (61) is fixedly connected with a cone head (63), the outer surfaces of the supporting steel pile (6) and the foundation steel pile (61) are both provided with a slot (64), the slot (64) cooperates with the block (505), the tops of the supporting steel pile (6) and the foundation steel pile (61) are both provided with a sleeve hole (65), the sleeve block (62) cooperates with the sleeve hole (65).
9. The anti-seismic reinforcement structure for the foundation of a teaching building according to claim 1, characterized in that: The outer surface of the pressure rod (7) is penetrated by a plurality of pin holes (71), wherein a steel latch (72) is movably arranged inside one of the pin holes (71), and the pressure rod (7) is matched with the insertion port (503).
10. The anti-seismic reinforcement structure for the foundation of a teaching building according to claim 4, characterized in that: The insides of the two threaded holes (409) are both threadedly provided with supporting threaded rods (8), and a supporting plate (81) is movably sleeved between the outer surfaces of the two supporting threaded rods (8), the top of the supporting plate (81) corresponds to the top of the pressure rod (7), and the bottom of the supporting plate (81) corresponds to the top of the supporting steel pile (6).