Silo top steel rib beam mounting method

Through the technology of assembling steel beams and fixing floor decking, it is directly hoisted to the silo position, which solves the problem of complex installation of steel beams and formwork in the existing technology, simplifies the construction process, reduces construction risks and time, and improves efficiency. .

CN118835804APending Publication Date: 2024-10-25SHANGHAI BAOYE CONSTR INDAL FURNACE ENG TECH +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411050272.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-01
Publication Date
2024-10-25

AI Technical Summary

Technical Problem

The installation process of the steel beams and formwork on the roof of the existing silo is complicated, which results in cumbersome erection of the bailey and complicated formwork removal operations, which prolongs the construction period and increases the risk of high-altitude operations.

Method used

A step-by-step installation method of steel beam assembly, bottom, side and warehouse roof decking is adopted. The steel beam is fixed by threading screws and supports, and is directly hoisted to the silo location, reducing high-altitude operations and avoiding later formwork removal.

Benefits of technology

It simplifies the steel beam installation process, reduces the danger of high-altitude operations, shortens construction time, reduces the utilization of machinery and materials, improves construction efficiency, and eliminates formwork removal and maintenance work.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118835804A_ABST
    Figure CN118835804A_ABST
Patent Text Reader

Abstract

The invention provides a silo top steel rib beam mounting method which comprises the following steps: a steel rib beam mounting step: assembling steel rib beams; a bottom floor support plate mounting step: mounting a bottom floor support plate at the bottom of the steel rib beam; side floor support plates are installed, specifically, the side floor support plates are installed on the left side and the right side of the steel rib beam correspondingly; a silo top floor support plate mounting step: mounting a silo top floor support plate on the top of the steel rib beam; and a hoisting step: repeating the steel rib beam mounting step, the bottom floor support plate mounting step, the side floor support plate mounting step and the silo top floor support plate mounting step to mount the plurality of steel rib beams, hoisting the plurality of mounted steel rib beams to the silo mounting position, and connecting each steel rib beam with the silo. The construction method is easy to operate and convenient to install, a bailey truss does not need to be erected, the danger of high-altitude operation is reduced, the floor support plate does not need to be dismantled, the working procedures of formwork dismantling and component cleaning are reduced, the construction time is shortened, the floor support plate is free of dismantling and maintenance, follow-up construction can be directly conducted, and the construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of silo construction, and in particular to a method for installing a steel beam on a silo roof. Background Art

[0002] Silos are warehouses for storing bulk materials. The roof structure of silos is steel beam + concrete floor structure. For steel beams, they are usually installed in bulk or in sections. For the roof formwork, Bailey frames are set up in the silo, and the formwork is installed after the steel beams are hoisted. In this way, the Bailey frame erection leads to a cumbersome process, and after the formwork is installed, the Bailey frame and formwork need to be removed, which is complicated and prolongs the construction period. Summary of the invention

[0003] In view of this, the present invention proposes a method for installing a steel frame beam on a silo roof, aiming to solve the problem of complex installation process of the steel frame beam and the template in the prior art.

[0004] The present invention proposes a method for installing steel beams on a silo roof, which comprises the following steps: a steel beam installation step, assembling the steel beams; a bottom floor deck installation step, installing the bottom floor deck at the bottom of the steel beams; a side floor deck installation step, installing the side floor decks on the left and right sides of the steel beams respectively; a silo roof floor deck installation step, installing the silo roof floor deck on the top of the steel beams; a hoisting step, repeating the steel beam installation step, the bottom floor deck installation step, the side floor deck installation step and the silo roof floor deck installation step to sequentially install a plurality of steel beams, hoisting the installed plurality of steel beams to the installation position of the silo, and then connecting each steel beam to the silo.

[0005] Furthermore, in the above-mentioned method for installing the steel frame beam of the silo roof, in the steel frame beam installation step, the various parts of the steel frame beam are assembled and connected together, and then, the steel bars are installed on the assembled steel frame beam.

[0006] Furthermore, in the above-mentioned method for installing the steel frame beam for the silo roof, in the step of installing the bottom floor decking, two groups of first pairs of through screws are arranged at intervals at preset positions at the bottom of the steel frame beam, and each group includes: a plurality of first pairs of through screws arranged at intervals along the length direction of the steel frame beam; the bottom floor decking is in contact with the bottom of the steel frame beam, and each first pair of through screws is penetrated through the bottom floor decking and screwed with a nut.

[0007] Furthermore, in the above-mentioned silo roof steel frame beam installation method, a U-shaped wrapping plate is arranged at the bottom of the steel frame beam, the wrapping plate wraps part of the side wall of the steel frame beam from the bottom of the steel frame beam, and the bottom floor decking plate is placed inside the wrapping plate; each first pair of through screws are sequentially penetrated through the closed ends of the bottom floor decking plate and the wrapping plate and are screwed with nuts.

[0008] Furthermore, in the above-mentioned method for installing the steel frame beam of the silo roof, a plurality of support members are arranged at intervals along the length direction of the steel frame beam outside the closed end of the wrapping plate, and each support member is perpendicular to the length direction of the steel frame beam; each first pair of through screws is sequentially penetrated through the bottom floor decking plate, the closed end of the wrapping plate and the support member and is screwed with the nut.

[0009] Furthermore, in the above-mentioned method for installing the steel frame beams for the silo roof, in the step of installing the side floor decking, there are two side floor deckings, and the two side floor deckings are arranged in a one-to-one correspondence with the two sides of the steel frame beam; a plurality of second pairs of through-screws are arranged at intervals along the height direction of the steel frame beam, each second pair of through-screws penetrates the steel frame beam and the two side floor deckings, and each end of each second pair of through-screws is placed on the outside of the side floor decking on the corresponding side and is screwed with a nut; a connecting piece is arranged at each end of each second pair of through-screws, and each connecting piece is clamped between the side floor decking on the corresponding side and the nut.

[0010] Furthermore, in the above-mentioned method for installing the steel frame beam of the silo roof, the two side floor decking plates are inserted into the wrapping plates, and each side floor decking plate is connected to the side wall corresponding to the wrapping plate; a third pair of through screws are arranged corresponding to the wrapping plates, and the third pair of through screws are passed through the steel frame beam, the two side floor decking plates and the two side walls of the wrapping plates and are screwed with nuts; a gasket is arranged at each side wall of the wrapping plate, and each gasket is clamped between the side wall corresponding to the wrapping plate and the nut.

[0011] Furthermore, in the above-mentioned silo roof steel frame beam installation method, in the silo roof floor decking installation step, the silo roof floor decking is divided into two groups, and the two groups of silo roof floor decking are arranged on the top of the two side floor deckings in a one-to-one correspondence, and each group includes: a plurality of silo roof floor deckings arranged at intervals along the length direction of the steel frame beam, and each silo roof floor decking is vertically connected to the top of the corresponding side floor decking.

[0012] Furthermore, in the above-mentioned silo roof steel beam installation method, when the span of the silo roof deck exceeds a preset value, a reinforcement member is provided in the middle portion of the silo roof deck.

[0013] Furthermore, in the above-mentioned method for installing the steel frame beams on the silo roof, in the hoisting step, a plurality of notches are reserved in the ring beam of the silo, each steel frame beam is hoisted to the corresponding notch, and each steel frame beam is connected to the ring beam of the silo, each steel frame beam partially extends to the outside of the silo ring beam and is closed by a template; a plurality of fan-shaped areas are formed between each steel frame beam and the ring beam of the silo, a support body is arranged at each fan-shaped area, one side of each support body is connected to the corresponding steel frame beam, and the other side of each support body is connected to the ring beam of the silo.

[0014] In the present invention, steel beams are assembled on the construction site, and then the bottom floor deck is installed at the bottom of the steel beams, the side floor decks are installed on the left and right sides of the steel beams respectively, and the silo roof floor deck is installed on the top of the steel beams, and then the steel beams and the floor decks are hoisted together to the installation position of the silo, and then the steel beams are connected to the silo. The operation is simple and easy to install. There is no need to set up Bailey frames in the silo, which reduces high-altitude operations and thus reduces the danger of high-altitude operations. There is no need to remove the floor deck in the later stage, which reduces the process of template removal and component cleaning, shortens the construction time, and solves the problem of complicated installation process of steel beams and templates in the prior art. In addition, the floor deck does not need to be removed or maintained, and subsequent construction can be carried out directly, which reduces the use of machinery and materials and improves construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Various other advantages and benefits will become apparent to those of ordinary skill in the art by reading the detailed description of the preferred embodiments below. The accompanying drawings are only for the purpose of illustrating the preferred embodiments and are not to be considered as limiting the present invention. Moreover, the same reference symbols are used throughout the accompanying drawings to represent the same components. In the accompanying drawings:

[0016] Figure 1 A flow chart of a method for installing a silo roof steel beam provided by an embodiment of the present invention;

[0017] Figure 2 A schematic structural diagram of a steel frame beam in a method for installing a steel frame beam for a silo roof provided in an embodiment of the present invention. DETAILED DESCRIPTION

[0018] Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although exemplary embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be limited by the embodiments set forth herein. On the contrary, these embodiments are provided in order to enable a more thorough understanding of the present disclosure and to be able to fully convey the scope of the present disclosure to those skilled in the art. It should be noted that, in the absence of conflict, the embodiments of the present invention and the features described in the embodiments can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0019] See also Figure 1 , Figure 1 A flow chart of a method for installing a silo roof steel beam provided by an embodiment of the present invention. As shown in the figure, the method for installing a silo roof steel beam includes the following steps:

[0020] The steel beam installation step S1 is to assemble the steel beam.

[0021] Specifically, the parts of the steel beam are assembled and connected together, and then the steel bars are installed on the assembled steel beam.

[0022] More specifically, the time for the steel beams to arrive at the site is arranged according to the construction site conditions and the construction and maintenance characteristics of the ring beam concrete on the top of the silo, and the site is leveled and compacted at the pre-set steel beam assembly position.

[0023] The production height of the saddle is set according to the overall assembly height and weight of the steel beam, the installation height of the steel bars and the installation height of the floor decking, and the saddle is installed to ensure the subsequent installation of the steel bars and floor decking as well as the operating space requirements of personnel.

[0024] The parts of the steel beam are assembled and connected together to form a steel beam. During the assembly process, the position of the bolts of the steel beam, the tightness of the high-strength bolts at the connection position of the steel beam and the welding quality must be determined, and the installation of the steel beam must be monitored. Then, the steel bar hooks are welded on the steel beam according to the design requirements. During welding, the height, position, and spacing of the steel bar hooks must meet the requirements of the subsequent steel bar arrangement of the primary and secondary beams to ensure accuracy and firmness. Then, after the welding of the steel bar hooks is completed, the steel bar installation and binding operations of the primary and secondary beams of the steel beam are carried out.

[0025] The bottom floor decking installation step S2 is to install the bottom floor decking at the bottom of the steel beam.

[0026] Specifically, see Figure 2 The bottom floor decking plate 2 is placed at the bottom of the steel frame beam 1, and the bottom floor decking plate 2 is in contact with the bottom of the steel frame beam 1. The bottom floor decking plate 2 extends along the length direction of the steel frame beam 1.

[0027] Two groups of first pairs of through screws are arranged at preset positions at the bottom of the steel beam 1. The two groups are arranged at intervals at the bottom of the steel beam 1. The position of each group has a preset distance from the edge of the steel beam 1. The preset distance can be determined according to actual conditions, and this embodiment does not impose any restrictions on this. Preferably, the distance between the position of each group and the edge of the steel beam 1 is 100 mm. Specifically, the positions of the two groups are 100 mm inward with the inner spacing of the side floor decking of the steel beam as the edge line.

[0028] Each group includes: a plurality of first pairs of through screws 5. Among them, each first pair of through screws 5 is arranged at intervals along the length direction of the steel frame beam 1, and there is a preset spacing between two adjacent first pairs of through screws 5. The preset spacing can be determined according to actual conditions, and this embodiment does not impose any restrictions on this. In this embodiment, the spacing between two adjacent first pairs of through screws 5 is 1000mm, that is, each first pair of through screws 5 is evenly arranged every 1000mm according to the length of the steel frame beam 1. Each first pair of through screws 5 is welded to the bottom of the steel frame beam 1.

[0029] Each first pair of through screws 5 is penetrated through the bottom floor decking plate 2 , and each first pair of through screws 5 is screwed with a corresponding nut, so that the bottom floor decking plate 2 is fixed to the bottom of the steel beam 1 .

[0030] In specific implementation, the bottom floor decking plate can be made of YX75-200-600 (1.0) s350 grade. Each first pair of through screws can be a galvanized Φ14 through screw.

[0031] See also Figure 2 Preferably, a U-shaped wrapping plate 6 is provided at the bottom of the steel beam 1. The wrapping plate 6 extends along the length direction of the steel beam 1. The open end of the wrapping plate 6 faces the bottom of the steel beam 1. The wrapping plate 6 wraps part of the side wall of the steel beam 1 from the bottom of the steel beam 1. The closed end of the wrapping plate 6 is parallel to the bottom of the steel beam 1. The wrapping plate 6 wraps the side wall of the steel beam 1 near the bottom. The two opposite side walls of the wrapping plate 6 correspond to the left and right sides of the steel beam 1. The bottom floor deck 2 is placed inside the wrapping plate 6, that is, the bottom floor deck 2 is sandwiched between the inside of the closed end of the wrapping plate 6 and the bottom of the steel beam 1. Each first pair of through screws 5 is sequentially penetrated through the closed ends of the bottom floor deck 2 and the wrapping plate 6 and is screwed with the corresponding nut.

[0032] During specific implementation, the covering plate 6 is made of 6mm galvanized plate with U-shaped corners.

[0033] See also Figure 2 Preferably, a plurality of support members 7 are arranged outside the closed end of the wrapping plate 6, and each support member 7 is arranged at intervals along the length direction of the steel frame beam 1, and each support member 7 is perpendicular to the length direction of the steel frame beam 1. Specifically, each support member 7 is placed outside the wrapping plate 6 and located at the bottom of the wrapping plate 6. Each first pair of through screws 5 penetrates the bottom floor deck 2, the closed end of the wrapping plate 6 and the support member 7 in sequence, and each first pair of through screws 5 is screwed with a corresponding nut. In this way, after the concrete pouring is completed in the later stage, each support member 7 supports the bottom floor deck 2, so that the bottom floor deck 2 is not easily deformed or bent.

[0034] There is a preset distance between two adjacent support members 7, which can be determined according to actual conditions, and this embodiment does not impose any restrictions on this. In this embodiment, the preset distance is 1000mm, that is, each support member 7 is arranged at an interval of 1000mm outside the closed end of the package plate 6.

[0035] In specific implementation, each support member 7 can be a galvanized channel steel / I-beam.

[0036] The side floor decking installation step S3 is to install the side floor decking on the left and right sides of the steel beam respectively.

[0037] Specifically, see Figure 2There are two side floor decking plates 3, and the two side floor decking plates 3 correspond to the two sides of the steel frame beam 1 one by one, and each side floor decking plate 3 is attached to the corresponding side of the steel frame beam 1. In other words, one side floor decking plate 3 is arranged on the left side of the steel frame beam 1, and one side floor decking plate 3 is arranged on the right side of the steel frame beam 1.

[0038] Along the height direction of the steel beam 1 ( Figure 2 In the direction from top to bottom as shown in the figure, a plurality of second pairs of through-screws 8 are arranged at intervals, each second pair of through-screws 8 penetrates the steel frame beam 1 and the two side floor decking plates 3, each end of each second pair of through-screws 8 is placed outside the side floor decking plates 3 on the corresponding side, and each end of each second pair of through-screws 8 is screwed with a corresponding nut. Specifically, each second pair of through-screws 8 is arranged in a plurality of groups, each second pair of through-screws 8 in each group is arranged at intervals along the height direction of the steel frame beam 1, and each group is arranged at intervals along the length direction of the steel frame beam 1. Each second pair of through-screws 8 in each group penetrates the steel frame beam 1 and the two side floor decking plates 3, and the two ends of each second pair of through-screws 8 are placed outside the two side floor decking plates 3 after respectively penetrating the two side floor decking plates 3 and then screwed with a corresponding nut. Each second pair of through-screws 8 is welded to the steel frame beam 1.

[0039] Each end of each second pair of through screws 8 is provided with a connecting piece 9, and two connecting pieces 9 are provided on one second pair of through screws 8, and each connecting piece 9 is sandwiched between the side floor decking plate 3 and the nut on the corresponding side. Each connecting piece 9 is consistent with the length direction of the steel frame beam 1, that is, each connecting piece 9 extends along the length direction of the steel frame beam 1.

[0040] When the height of the steel beam 1 is less than or equal to 1500mm, each connector 9 is an angle steel. One of the right-angled sides of the angle steel fits with the side floor decking plate 3 on the corresponding side, and the right-angled side is sandwiched between the side floor decking plate 3 on the corresponding side and the nut, and the other right-angled side of the angle steel is perpendicular to the side floor decking plate 3 on the corresponding side. In the height direction of the steel beam 1, the spacing between two adjacent second pairs of through screws 8 is 300mm. In this embodiment, each angle steel can be a galvanized L50*50*5 angle steel.

[0041] When the height of the steel beam 1 is greater than 1500 mm, each connector 9 is a channel steel. In the height direction of the steel beam 1, the spacing between two adjacent second pairs of through screws 8 is 500 mm. In this embodiment, each connector 9 can be a No. 10 channel steel.

[0042] See also Figure 2, the two side floor decking plates 3 are inserted into the wrapping plate 6, and each side floor decking plate 3 is connected to the side wall corresponding to the wrapping plate 6. Specifically, the two side floor decking plates 3 are inserted into the inside of the wrapping plate 6 from the open end of the wrapping plate 6, and the wrapping plate 6 wraps the bottom of the two side floor decking plates 3. The two side floor decking plates 3 correspond to the two opposite side walls of the wrapping plate 6 one by one, and each side floor decking plate 3 is connected to the side wall corresponding to the wrapping plate 6 by rivets. In this way, since the bottom floor decking plate 2 is perpendicular to the two side floor decking plates 3, there will be a large gap when collage is performed, so the wrapping plate 6 wraps the bottom of the bottom floor decking plate 2 and the two side floor decking plates 3.

[0043] A third pair of through screws 10 is provided at a position corresponding to the wrapping plate 6. The third pair of through screws 10 penetrates the steel beam 1, the two side floor decking plates 3 and the two side walls of the wrapping plate 6, and the two ends of the third pair of through screws 10 are respectively screwed with corresponding nuts. Specifically, the third pair of through screws 10 corresponds to the side wall of the wrapping plate 6, and there is a preset distance between the third pair of through screws 10 and the bottom of the steel beam 1. The preset distance can be determined according to actual conditions, and this embodiment does not impose any restrictions on this. In this embodiment, the distance between the third pair of through screws 10 and the bottom of the steel beam 1 is 100 mm.

[0044] A gasket 11 is provided at each side wall of the enveloping plate 6, and each gasket 11 is sandwiched between the corresponding side wall and nut of the enveloping plate 6. Specifically, two gaskets 11 are provided at the third pair of through screws 10, and the two gaskets 11 correspond to the two ends of the third pair of through screws 10 one by one. Each end of the third pair of through screws 10 penetrates the corresponding side floor deck 3, the corresponding side wall of the enveloping plate 6 and the corresponding gasket 11, and then is screwed with the corresponding nut. Each gasket 11 can be an angle steel.

[0045] In specific implementation, a plurality of third pairs of through screws 10 are provided, and each third pair of through screws 10 is arranged at intervals along the length direction of the steel frame beam 1. Each third pair of through screws 10 is passed through the steel frame beam 1, two side floor decks 3, two side walls of the wrapping plate 6 and two gaskets 11 and is screwed with a corresponding nut.

[0046] See also Figure 2 A supporting member 12 is provided near the top of each side floor deck 3, and the supporting member 12 may be a galvanized channel steel / I-beam.

[0047] In specific implementation, each side floor decking plate can be made of YX75-200-600 (1.0) s350 grade, and each second pair of through screws and third pair of through screws can be galvanized Φ14 through screws.

[0048] The warehouse roof decking installation step S4 is to install the warehouse roof decking on the top of the steel beam.

[0049] Specifically, see Figure 2 There are two groups of warehouse roof decking plates 4, and the two groups of warehouse roof decking plates 4 correspond to the two side floor decking plates 3 one by one. Each group of warehouse roof decking plates 4 is arranged on the top of the corresponding side floor decking plates 3. Each group includes: a plurality of warehouse roof decking plates 4. Among them, each warehouse roof decking plate 4 is arranged at intervals along the length direction of the steel frame beam 1, and each warehouse roof decking plate 4 is vertically connected to the top of the corresponding side floor decking plate 3. Specifically, each warehouse roof decking plate 4 is vertically connected to the board surface of the side floor decking plate 3, and the warehouse roof decking plate 4 corresponds to the top of the side floor decking plate 3.

[0050] More specifically, each warehouse roof decking plate 4 is perpendicular to the length direction of the steel frame beam 1 , that is, each warehouse roof decking plate 4 is cross-staggered with the steel frame beam 1 .

[0051] In order to prevent the roof decking from bending due to a large span, the span of the roof decking 4 is preferably 2000mm. When the span of the roof decking exceeds the preset value, a reinforcement is set in the middle of the roof decking. Specifically, the preset value can be 2000mm, and the reinforcement is set in the middle of the roof decking 4. The reinforcement can be 10# galvanized channel steel / I-beam. The reinforcement is cross-staggered with the roof decking 4 to avoid bending and deformation of the roof decking 4 due to stress or large upper load.

[0052] After the warehouse roof decking plate 4 is installed, the warehouse roof decking plate 4 is connected to the side decking plate 3 on the corresponding side through the supporting member 12. Specifically, the warehouse roof decking plate 4 is fixedly connected to the supporting member 12 on the side decking plate 3 by self-tapping screws, and the supporting member 12 is used to support the warehouse roof decking plate 4. In specific implementation, the supporting member 12 can extend along the length direction of the steel frame beam, or multiple supporting members 12 can be arranged at intervals along the length direction of the steel frame beam, and this embodiment does not impose any limitation on this.

[0053] During specific implementation, each warehouse roof decking plate 4 can be made of YX75-200-600 (1.0) s350 grade.

[0054] In the hoisting step S5, the steel beam installation step S1, the bottom floor deck installation step S2, the side floor deck installation step S3 and the silo roof floor deck installation step S4 are repeated to install multiple steel beams in sequence, and the installed multiple steel beams are hoisted to the installation position of the silo, and then each steel beam is connected to the silo.

[0055] Specifically, after the first steel beam and the bottom floor deck, the side floor deck and the silo roof floor deck are installed, the steel beam installation step S1, the bottom floor deck installation step S2, the side floor deck installation step S3 and the silo roof floor deck installation step S4 are repeated to install multiple steel beams and their bottom floor decks, side floor decks and silo roof floor decks, and then the installed multiple steel beams are hoisted to the preset installation position of the silo.

[0056] During the hoisting process, the steel beams are hoisted in sections. After the hoisting is completed, each section of the steel beam is welded, and the disconnected parts of the steel bars and floor decking caused by the hoisting are repaired and reinforced.

[0057] Connect the hoisted steel beams to the ring beam at the top of the silo. Specifically, the ring beam of the silo is pre-set with multiple gaps, and each gap is set according to the design requirements. Hoist each steel beam to the corresponding gap and connect each steel beam to the ring beam of the silo. Each steel beam partially extends to the outside of the silo ring beam. After the steel beam is calibrated, it is closed by the template.

[0058] After each steel beam is installed in place, multiple fan-shaped areas are formed between each steel beam and the ring beam of the silo, and these fan-shaped areas are special-shaped areas. A support body is set at each fan-shaped area, one side of each support body is connected to the corresponding steel beam, and the other side of each support body is connected to the ring beam of the silo. Specifically, one side of each support body is welded to the corresponding steel beam, and the other side of each support body can be fixedly connected to the ring beam of the silo by expansion bolts, or embedded parts can be set when constructing the ring beam, and each support body is welded to the embedded parts.

[0059] In specific implementation, each support body can be 10# galvanized channel steel / I-beam.

[0060] In the specific implementation, the floor deck is laid on the top of each steel beam and the gap between two adjacent steel beams. After each steel beam is installed on the top of the silo, concrete is poured on each steel beam.

[0061] It can be seen that in this embodiment, the steel frame beams are assembled on the construction site, and then the bottom floor decking is installed at the bottom of the steel frame beams, the side floor decking is installed on the left and right sides of the steel frame beams respectively, and the silo roof floor decking is installed on the top of the steel frame beams, and then the steel frame beams and the floor decking are hoisted together to the installation position of the silo, and then the steel frame beams are connected to the silo. The operation is simple and easy to install. There is no need to set up Bailey frames in the silo, which reduces high-altitude operations and thus reduces the danger of high-altitude operations. There is no need to remove the floor decking in the later stage, which reduces the process of removing the formwork and cleaning the components, shortens the construction time, and solves the problem of complicated installation process of steel frame beams and formworks in the prior art. In addition, the floor decking does not need to be removed or maintained, and subsequent construction can be carried out directly, which reduces the use of machinery and materials and improves construction efficiency.

[0062] It should be noted that, in the description of the present invention, terms such as "up", "down", "left", "right", "inside" and "outside" indicating directions or positional relationships are based on the directions or positional relationships shown in the drawings. This is only for the convenience of description and does not indicate or imply that the device or element must have a specific orientation, be constructed and operated in a specific orientation. Therefore, it should not be understood as a limitation on the present invention.

[0063] In addition, it should be noted that in the description of the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0064] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.

Claims

1. A method for installing a steel beam on a silo roof, characterized in that: The steps include: Steel beam installation steps: assemble the steel beam; A bottom floor deck installation step, installing the bottom floor deck at the bottom of the steel beam; The side floor deck installation step comprises installing the side floor decks on the left and right sides of the steel beam respectively; A warehouse roof decking installation step, installing the warehouse roof decking on the top of the steel beam; The hoisting step comprises repeating the steel beam installation step, the bottom floor deck installation step, the side floor deck installation step and the silo roof floor deck installation step to sequentially install a plurality of steel beams, and hoisting the installed plurality of steel beams to the installation position of the silo, and then connecting each of the steel beams to the silo.

2. The method for installing the silo roof steel beam according to claim 1, characterized in that: In the steel beam installation step, The parts of the steel beam are assembled and connected together, and then the steel bars are installed on the assembled steel beam.

3. The method for installing the silo roof steel beam according to claim 1, characterized in that: In the bottom floor decking installation step, Two groups of first pairs of through screws are arranged at intervals at preset positions on the bottom of the steel beam, each group comprising: a plurality of first pairs of through screws arranged at intervals along the length direction of the steel beam; The bottom floor deck is in contact with the bottom of the steel beam, and each of the first pair of through screws is penetrated through the bottom floor deck and is screwed with a nut.

4. The method for installing the silo roof steel beam according to claim 3 is characterized in that: A U-shaped wrapping plate is arranged at the bottom of the steel beam, the wrapping plate wraps a part of the side wall of the steel beam from the bottom of the steel beam, and the bottom floor deck is placed inside the wrapping plate; Each of the first pair of through screws is sequentially penetrated through the closed ends of the bottom floor decking plate and the wrapping plate and is threadedly connected with a nut.

5. The method for installing the silo roof steel beam according to claim 4, characterized in that: A plurality of support members are arranged at intervals outside the closed end of the wrapping plate along the length direction of the steel beam, and each of the support members is perpendicular to the length direction of the steel beam; Each of the first pair of through screws sequentially penetrates the bottom floor decking plate, the closed end of the wrapping plate and the support member and is threadedly connected with the nut.

6. The method for installing the silo roof steel beam according to claim 4, characterized in that: In the side floor decking installation step, There are two side floor decks, and the two side floor decks are arranged one by one correspondingly on both sides of the steel beam; A plurality of second pairs of through-screws are arranged at intervals along the height direction of the steel beam, each of the second pairs of through-screws penetrates the steel beam and the two side floor decks, and each end of each second pair of through-screws is placed outside the side floor deck on the corresponding side and is screwed to a nut; Each end of each of the second through-screws is provided with a connecting piece, and each of the connecting pieces is clamped between the side floor decking plate and the nut on the corresponding side.

7. The method for installing the silo roof steel beam according to claim 6, characterized in that: The two side floor decking plates are inserted into the wrapping plate, and each side floor decking plate is connected to the corresponding side wall of the wrapping plate; A third pair of through screws is arranged at a position corresponding to the wrapping plate, wherein the third pair of through screws is passed through the steel beam, the two side floor decks and the two side walls of the wrapping plate and is screwed with nuts; A gasket is arranged at each side wall of the enclosing plate, and each of the gaskets is sandwiched between the corresponding side wall of the enclosing plate and the nut.

8. The method for installing the silo roof steel beam according to claim 1, characterized in that: In the warehouse roof decking installation step, There are two groups of warehouse roof decking plates, which are arranged on the top of the two side floor decking plates in a one-to-one correspondence. Each group includes: a plurality of warehouse roof decking plates arranged at intervals along the length direction of the steel frame beam, and each of the warehouse roof floor decking plates is vertically connected to the top of the corresponding side floor decking plate.

9. The method for installing the silo roof steel beam according to claim 8, characterized in that: When the span of the warehouse roof deck exceeds a preset value, a reinforcement member is provided at the middle portion of the warehouse roof deck.

10. The method for installing a silo roof steel beam according to claim 1, characterized in that: In the hoisting step, The ring beam of the silo is provided with a plurality of notches, each of the steel beams is hoisted to the corresponding notches, and each of the steel beams is connected to the ring beam of the silo, each of the steel beams partially extends to the outside of the ring beam of the silo and is closed by a template; A plurality of fan-shaped areas are formed between each of the steel beams and the ring beam of the silo, and a support body is arranged at each of the fan-shaped areas, one side of each of the support bodies is connected to the corresponding steel beam, and the other side of each of the support bodies is connected to the ring beam of the silo.

Citation Information

Patent Citations

  • Large-span stiff beam screw-free structure and construction method thereof

    CN107083821A

  • Construction process for self-supporting cast-in-place reinforced concrete frame of assembly rib mold

    CN116290767A

  • Connecting joint of concrete silo top ring beam and steel beam

    CN117386026A

  • Shaped steel concrete beam does not have scaffold frame formwork

    CN206903215U

  • Construction method of beam, beam formwork device, and cap for side plate

    JP1998325173A