A drainage pipe blockage self-alarm system for BIM construction sites

By setting up a system of sand accumulation troughs and fixed-point warning columns at the BIM construction site, early warning and timely cleaning of drainage pipe blockage is achieved, problems that blockage affect construction efficiency in the existing technology are solved, and construction efficiency and cost-effectiveness are improved.

CN118840853BActive Publication Date: 2024-11-29NANTONG SHOUGE INFORMATION TECH CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411324613.0
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-11-29
Estimated Expiration
2044-09-23

AI Technical Summary

Technical Problem

At the BIM construction site, drainage pipes are prone to blockage due to dust and gravel deposition. The existing technology can only be discovered and maintained after sewage overflows, which affects construction efficiency and cannot achieve early warning and timely cleaning.

Method used

A system including sand accumulation trough and fixed-point warning column was designed to deposit gravel dust in sewage through sand accumulation trough, trigger the bottom ball detection alarm, and remind staff through early warning channels and scattered warning strips to realize drainage pipes Warn of blockage and timely cleaning.

Benefits of technology

It effectively reduces the probability of drainage pipe blockage and its impact on the construction period of BIM, ensuring improvement in construction efficiency and cost savings.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118840853B_ABST
    Figure CN118840853B_ABST
Patent Text Reader

Abstract

The present application discloses a drainage pipe blockage self-alarm system for BIM construction sites, which is applied to the field of pipeline blockage alarm. By setting a sand accumulation trough and a fixed-point early warning column, the gravel carried in the sewage can be concentratedly deposited, thereby effectively reducing the probability of the drainage pipe being blocked. At the same time, as the amount of impurities such as gravel and dust deposited in the sand accumulation trough increases, the bottom measuring ball gradually touches the bottom, triggering the sound and light alarm to sound an alarm. Compared with the existing technology, an early warning can be given before the drainage pipe is blocked, which is convenient for the staff to clean up the gravel in time, thereby greatly reducing the impact on the BIM construction period. At the same time, in the process of the bottom measuring ball gradually moving downward, part of the water flow gradually enters the external early warning strip along the early warning channel due to the water pressure, causing the external early warning strip to undergo obvious morphological changes, which can serve as a reminder and early warning to the surrounding staff nearby, further reducing the impact on the BIM construction period.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field related to pipeline blockage alarm, and in particular to a drainage pipe blockage self-alarm system at a BIM building construction site. Background Art

[0002] BIM (Building Information Modeling) technology is a digital tool used in engineering design, construction, and management. By integrating digital and information models of buildings, it is shared and transmitted throughout the entire life cycle of project planning, operation, and maintenance. It enables engineering and technical personnel to correctly understand and efficiently respond to various building information, provides a basis for collaborative work for design teams and all construction entities including construction and operation units, and plays an important role in improving production efficiency, saving costs, and shortening construction periods.

[0003] The water consumption at the BIM construction site is relatively large, and due to the special environment of dust and gravel at the construction site, the sewage generated at the construction site carries dust at any time. After being discharged into the sewer, the drainage pipe is prone to blockage due to the deposition of gravel and dust. In the existing technology, the drainage pipe is often found to be blocked only after obvious sewage overflow occurs. Maintenance at this time is likely to affect the efficiency of BIM construction, which does not meet the requirements of shortening construction period and saving costs advocated by BIM construction. Summary of the invention

[0004] The purpose of the present application is to give an early warning before the drainage pipe at the construction site is blocked, thereby reducing the impact on the construction efficiency. Compared with the prior art, the present application provides a sand accumulation trough arranged between two adjacent drainage pipe connection nodes and a fixed-point early warning column corresponding to the sand accumulation trough, a concrete slab is cast on the top of the sand accumulation trough, the fixed-point early warning column is fixedly cast in the middle of the concrete slab, a bottom measuring ball is fixedly connected to the bottom of the fixed-point early warning column, a bottom supporting ring is fixedly connected to the outer end of the bottom measuring ball, the bottom supporting ring and the bottom end of the sand accumulation trough are in conflict with each other, a hollow top block is fixedly connected to the top of the fixed-point early warning column, an audible and visual alarm and a control panel connected to the BIM information model signal are installed on the hollow top block, a plurality of outwardly scattered early warning strips distributed in an array are fixedly connected to the lower end of the hollow top block, and the fixed-point early warning column is located on the inner side of a ring surrounded by the plurality of outwardly scattered early warning strips;

[0005] The fixed-point warning column includes an outer sleeve fixedly embedded in a concrete slab, a pre-dropping tube movably mounted in the outer sleeve, a connecting rod fixedly connected to the middle part of the outer sleeve and a sealing pipe block fixedly connected to the lower end of the connecting rod, the lower end of the connecting rod movably passes through the middle part of the upper end of the pre-dropping tube and extends into the pre-dropping tube, and the sealing pipe block has an interference fit with the pre-dropping tube. An early warning channel is provided in the fixed-point warning column, and the early warning channel is connected with the hollow top block and the external early warning strip in turn. The early warning channel includes an upper sealing hole excavated on the pre-dropping tube and a plurality of water inlet holes, the upper sealing hole is located above the sealing pipe block, and the plurality of water inlet holes are all located in the outer sleeve, the early warning channel also includes an early warning cavity excavated inside the outer sleeve and a water through hole excavated at the outer end of the outer sleeve, the water through hole is located between the upper sealing hole and the water inlet hole, and the water through hole is communicated with the early warning cavity; through the provision of a plurality of sand accumulation troughs and fixed-point early warning columns, sewage can be The gravel, dust and other impurities carried in the sand trough are concentratedly deposited, effectively reducing the path of their movement with the sewage, thereby effectively reducing the probability of the drain pipe being blocked. At the same time, as the amount of gravel, dust and other impurities deposited in the sand accumulation trough increases, the bottom support ring is pressed down and deformed, causing the bottom measuring ball to gradually touch the bottom, thereby causing the sound and light alarm to sound an alarm. Compared with the existing technology, an early warning can be given before the drain pipe is blocked, making it convenient for the staff to clean up the gravel in time, thereby greatly reducing the impact of the blockage on the construction period of the BIM building. At the same time, in the process of the bottom measuring ball gradually moving downward, under the action of water pressure, part of the sewage gradually enters the external warning strip along the early warning channel, causing the external warning strip to undergo obvious morphological changes, which can serve as a reminder and early warning to the surrounding staff nearby, further reducing the impact on the construction period of the BIM building.

[0006] As a further improvement of the present application, the bottom support ring is an elastic umbrella-shaped structure, and the bottom support ring is a multi-permeable hole structure.

[0007] As a further improvement of the present application, the lower end of the outer sleeve contacts the lower end of the concrete slab, and a reinforcing block is fixedly connected to the outer end of the outer sleeve, and the reinforcing block contacts the upper surface of the concrete slab.

[0008] As a further improvement of the present application, the distance between the upper sealing hole and the bottom of the sealing pipe block and the distance between the uppermost water inlet hole and the bottom of the outer sleeve are no greater than the distance between the bottom of the bottom measuring ball and the bottom end of the sand accumulation groove; the longitudinal span of the water hole is 2-3 times the longitudinal span of the upper sealing hole, and when the bottom measuring ball contacts the bottom of the sand accumulation groove, the upper sealing hole coincides with the water hole.

[0009] As a further improvement of the present application, the bottom measuring ball includes a bottom plate fixedly connected to the lower end of the pre-drop tube, an internal pressure sensor installed at the lower end of the bottom plate, and an outer protective layer and an inner variable layer covering the internal pressure sensor. The outer protective layer is located outside the inner variable layer, the internal pressure sensor is connected to the main control board signal, the outer protective layer is a flexible structure made of special fiber material, and the inner variable layer is made of high resilience material.

[0010] As a further improvement of the present application, the outward-scattering warning strip is a flexible sealing structure whose bottom is sealed by binding with straps, and the length of the outward-scattering warning strip is not less than 1 / 3 of the height of the fixed-point warning column above the ground.

[0011] As a further improvement of the present application, a pressure measuring plate is provided at the outer end of the outer sleeve, and a plurality of elastic ropes corresponding to a plurality of external dispersion warning strips are fixedly connected between the upper end of the pressure measuring plate and the lower end of the hollow top block, and a ferromagnetic block is fixedly connected to the elastic rope, and the end of the external dispersion warning strip away from the hollow top block is connected to the ferromagnetic block.

[0012] As a further improvement of the present application, the external dispersion warning strip includes a folding strip fixedly connected to the hollow top block and a fixed strip magnetic ball fixedly connected to the end of the folding strip. The fixed strip magnetic ball is sleeved on the ferromagnetic block, and the fixed strip magnetic ball and the ferromagnetic block are mutually adsorbed.

[0013] As a further improvement of the present application, the pressure measuring plate includes a bearing base plate fixedly connected to the outer end of the outer sleeve, an external pressure sensor evenly installed on the upper end of the bearing base plate, and an upper movable plate movably mounted outside the outer sleeve, and the upper movable plate is in contact with the upper end of the external pressure sensor.

[0014] As a further improvement of the present application, the longitudinal height of the fixed magnetic ball when located at the bottom of the elastic rope is not less than 1 / 2 of the straightened length of the folded strip.

[0015] Compared with the prior art, the advantages of this application are:

[0016] (1) This scheme can concentrate the gravel carried in the sewage by setting up sand accumulation troughs and fixed-point warning columns, thereby effectively reducing the probability of the drainage pipe being blocked. At the same time, as the amount of impurities such as gravel and dust deposited in the sand accumulation trough increases, the bottom measuring ball gradually touches the bottom, triggering the sound and light alarm to sound an alarm. Compared with the existing technology, this scheme can issue an early warning before the drainage pipe is blocked, making it easier for staff to clean up the gravel in time, thereby greatly reducing the impact on the construction period of the BIM building. At the same time, as the bottom measuring ball gradually moves downward, part of the water flow gradually enters the external warning strip along the warning channel due to water pressure, causing the external warning strip to undergo obvious morphological changes, which can serve as a reminder and warning to nearby staff, further reducing the impact on the construction period of the BIM building. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 This is the main system block diagram of Example 1 of the present application;

[0018] Figure 2 This is a structural schematic diagram of the front side of the fixed-point warning column in Example 1 of the present application;

[0019] Figure 3 This is a structural schematic diagram of the front side of the fixed-point warning column in Example 1 of the present application;

[0020] Figure 4 This is a structural schematic diagram of a fixed-point warning column portion when there is a lot of gravel deposition in Example 1 of the present application;

[0021] Figure 5 This is a structural schematic diagram of the bottom portion of the fixed-point warning column in Example 1 of the present application;

[0022] Figure 6 This is a schematic diagram of the structure of the fixed-point warning column after the bottom of the bottom touches the bottom in Example 1 of the present application;

[0023] Figure 7 This is a schematic diagram of the three-dimensional structural change of the fixed-point warning column after a lot of gravel is deposited in Example 1 of the present application;

[0024] Figure 8 This is a schematic diagram of the structure of the upper end portion of the fixed-point warning column in Example 2 of the present application;

[0025] Fig. 9 This is a schematic structural diagram of the upper end portion of the fixed-point warning column when there is a lot of gravel deposition in Example 2 of the present application.

[0026] Description of the numbers in the figure:

[0027] 1 drainage pipe, 2 sand accumulation trough, 3 fixed-point warning column, 31 outer sleeve, 32 pre-dropping tube, 33 connecting rod, 34 sealing pipe block, 4 bottom measuring ball, 41 outer protective layer, 42 inner variable layer, 43 internal pressure sensor, 5 external dispersion warning strip, 51 folding strip, 52 fixed strip magnetic ball, 6 reinforcement block, 7 bottom support ring, 81 water inlet hole, 82 upper sealing hole, 83 water hole, 84 warning cavity, 91 elastic rope, 92 ferromagnetic block, 10 hollow top block, 121 bearing bottom plate, 122 upper moving plate, 123 external pressure sensor, 14 sound and light alarm. DETAILED DESCRIPTION

[0028] The technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present application.

[0029] Embodiment 1:

[0030] This application discloses a drainage pipe blockage self-alarm system at a BIM construction site. Figure 1, including a sand accumulation trough 2 arranged between the connection nodes of two adjacent drainage pipes 1 and a fixed-point warning column corresponding to the sand accumulation trough 2. A concrete slab is cast on the top of the sand accumulation trough 2, and the fixed-point warning column 3 is fixedly cast in the middle of the concrete slab. As the water flows, when the water carrying gravel passes through the sand accumulation trough 2, under the action of gravity, part of the gravel falls into the sand accumulation trough 2 and generates an extrusion pressure on the bottom support ring 7 at the bottom of the fixed-point warning column 3. As the amount of gravel increases, the extrusion pressure on the bottom support ring 7 becomes greater and greater until the bottom measuring ball 4 touches the bottom. At this time, the pressure sensor in the bottom measuring ball 4 can be triggered to be stressed, thereby causing the sound and light alarm 14 to sound an alarm. Compared with the prior art, the gravel gathers at the sand accumulation trough 2, which is convenient for cleaning.

[0031] It is also worth noting that the connection between the sand trough 2 and the drainage pipe 1 is located above the first three-point point from top to bottom of the sand trough 2, so that there is a large space below the sand trough 2 below the connection between the two, which is convenient for the gravel carried by water to be deposited in the sand trough 2 when water flows through the sand trough 2.

[0032] See also Figure 2 The bottom of the fixed-point warning column 3 is fixedly connected to a bottom measuring ball 4, and the outer end of the bottom measuring ball 4 is fixedly connected to a bottom support ring 7. The bottom support ring 7 is an elastic umbrella-shaped structure, and the bottom support ring 7 is a multi-permeable hole structure. When there is no gravity extrusion of gravel, it supports the pre-falling tube 32. When it is squeezed by gravel, the bottom support ring 7 is deformed downward under the action of gravity, and drives the pre-falling tube 32 to gradually move downward, so that the warning channel is gradually opened, and then the water flow can enter the external dispersion warning strip 5, so that the external dispersion warning strip 5 undergoes obvious morphological changes, which can serve as a warning for nearby staff; the bottom support ring 7 and the bottom end of the sand accumulation trough 2 conflict with each other, and the top of the fixed-point warning column 3 is fixedly connected to a hollow top block 10, and the hollow top block 10 is equipped with an audible and visual alarm 14 and a control panel connected to the BIM information model signal. A plurality of outward-scattered warning strips 5 distributed in an array are fixedly connected to the lower end of the hollow top block 10. The fixed-point warning column 3 is located on the inner side of the ring formed by the plurality of outward-scattered warning strips 5. As the pre-drop tube 32 continues to move downward, after it touches the bottom, the bottom measuring ball 4 gradually deforms, causing the internal pressure sensor 43 inside it to generate force data, which can trigger the audible and visual alarm 14 to perform a fixed-point audible and visual warning, thereby reminding the staff to clean the gravel in the sand accumulation trough 2 before the drainage pipe 1 is blocked. Compared with the existing technology, the incidence of blockage is greatly reduced, thereby reducing the impact on the construction period of the BIM building.

[0033] The lower end of the outer sleeve 31 contacts the lower end of the concrete slab, and a reinforcing block 6 is fixedly connected to the outer end of the outer sleeve 31. The reinforcing block 6 contacts the upper surface of the concrete slab. The reinforcing block 6 and the bottom of the outer sleeve 31 can effectively increase the casting strength between the fixed-point warning column 3 and the concrete slab.

[0034] See also Figure 3The fixed-point warning column 3 includes an outer sleeve 31 fixedly embedded in the concrete slab, a pre-dropping tube 32 movably sleeved in the outer sleeve 31, a connecting rod 33 fixedly connected to the middle of the outer sleeve 31, and a sealing tube block 34 fixedly connected to the lower end of the connecting rod 33. The lower end of the connecting rod 33 movably passes through the middle of the upper end of the pre-dropping tube 32 and extends into the pre-dropping tube 32, and the sealing tube block 34 has an interference fit with the pre-dropping tube 32. An early warning channel is provided in the fixed-point early warning column 3, and the early warning channel is connected with the hollow top block 10 and the external early warning strip 5 in sequence. The early warning channel includes an upper sealing hole 82 drilled on the pre-dropping tube 32 and a plurality of The upper sealing hole 82 is located above the sealing pipe block 34, and the multiple water inlet holes 81 are all located in the outer sleeve 31. The early warning channel also includes an early warning cavity 84 excavated inside the outer sleeve 31 and a water through hole 83 excavated at the outer end of the outer sleeve 31. The water through hole 83 is located between the upper sealing hole 82 and the water inlet hole 81, and the water through hole 83 is communicated with the early warning cavity 84. In the initial state, due to the absence of crushed stone squeezing, the upper sealing hole 82 and the water through hole 83 are misaligned. At this time, it is difficult for water to enter the outer scattered early warning strip 5 along the early warning channel. The outer scattered early warning strip 5 is in a loose state and can float with the wind; Figure 4 and Figure 6 When squeezed by gravel, the bottom support ring 7 deforms downward, driving the pre-drop tube 32 to move downward, causing the upper sealing hole 82 to move downward accordingly, and gradually turn over the sealing pipe block 34 and gradually overlap with the water hole 83. When part of the overlap occurs, the warning channel begins to be conducted, and the water flow can enter the external dispersion warning strip 5. When the bottom measuring ball 4 touches the bottom, the upper sealing hole 82 is completely conducted with the water hole 83. Under the action of water pressure, the external dispersion warning strip 5 can be quickly filled with water, thereby expanding and becoming vertical under the action of gravity, which is significantly different from the initial state.

[0035] The distance between the upper sealing hole 82 and the bottom of the sealing pipe block 34 and the distance between the uppermost water inlet hole 81 and the bottom of the outer sleeve 31 are no greater than the distance between the bottom of the bottom measuring ball 4 and the bottom end of the sand accumulation groove 2, which effectively ensures that the upper sealing hole 82 and the water hole 83 can overlap with each other after the bottom measuring ball 4 touches the bottom; the longitudinal span of the water hole 83 is 2-3 times the longitudinal span of the upper sealing hole 82, so that the upper sealing hole 82 and the water hole 83 are completely overlapped, making the early warning more timely, and when the bottom measuring ball 4 contacts the bottom of the sand accumulation groove 2, the upper sealing hole 82 and the water hole 83 overlap.

[0036] See also Figure 5The bottom measuring ball 4 includes a bottom plate fixedly connected to the lower end of the pre-dropping tube 32, an internal pressure sensor 43 installed at the lower end of the bottom plate, and an outer protective layer 41 and an inner variable layer 42 covered outside the internal pressure sensor 43. The outer protective layer 41 is located outside the inner variable layer 42. The internal pressure sensor 43 is connected to the main control board signal. The outer protective layer 41 is a flexible structure made of special fiber material. The outer protective layer 41 protects the internal variable layer 42 so that the internal variable layer 42 is not easily worn by gravel and water is not easily infiltrated. The inner variable layer 42 is made of high resilience material. After the bottom measuring ball 4 touches the bottom, as the gravel continues to increase, it deforms, causing the internal pressure sensor 43 to gradually be subjected to force.

[0037] The outward dispersion warning strip 5 is a flexible sealing structure whose bottom is sealed by binding tape, and the length of the outward dispersion warning strip 5 is not less than 1 / 3 of the height of the fixed warning column 3 above the ground, so that the overall length of the outward dispersion warning strip 5 is larger, and when its shape changes, the difference between the front and the back is obvious, thereby providing a better initial warning effect for the staff.

[0038] In addition, it is worth noting that, in the specific implementation, the elastic force of the bottom support ring 7 is set through multiple experimental verifications, so that when the gravel deposits in the sand accumulation trough 2 are about to reach the connection between the drain pipe 1 and the sand accumulation trough 2, the fixed-point warning column 3 can touch the bottom, so that the internal pressure sensor 43 generates data, triggering the sound and light alarm 14 to alarm.

[0039] By setting a plurality of sand accumulation tanks 2 and fixed-point warning columns 3, as Figure 6 , the gravel and dust carried in the sewage can be concentratedly deposited, effectively reducing the path of its movement with the sewage, thereby effectively reducing the probability of the drainage pipe 1 being blocked. At the same time, as the amount of impurities such as gravel and dust deposited in the sand accumulation tank 2 increases, the bottom support ring 7 is pressed down and deformed, causing the bottom measuring ball 4 to gradually touch the bottom, thereby causing the sound and light alarm 14 to sound an alarm. Compared with the prior art, an early warning can be given before the drainage pipe 1 is blocked, which is convenient for the staff to clean up the gravel in time, thereby greatly reducing the impact of blockage on the construction period of the BIM building. At the same time, Figure 6 As the bottom measuring ball 4 gradually moves downward, under the action of water pressure, part of the sewage gradually enters the external warning strip 5 along the warning channel. Figure 7 , so that the external warning strip 5 undergoes obvious shape changes, which can serve as a reminder and warning to the surrounding staff nearby, further reducing the impact on the BIM building construction period.

[0040] Embodiment 2:

[0041] Compared with Embodiment 1, this embodiment is different in that the outward dispersion warning strip 5 is different, and the following technical features are newly added.

[0042] See also Figure 8A pressure measuring plate is provided at the outer end of the outer sleeve 31, and a plurality of elastic ropes 91 corresponding to the plurality of external dispersion warning strips 5 are fixedly connected between the upper end of the pressure measuring plate and the lower end of the hollow top block 10, and a ferromagnetic block 92 is fixedly connected to the elastic rope 91, and the end of the external dispersion warning strip 5 away from the hollow top block 10 is connected to the ferromagnetic block 92; the external dispersion warning strip 5 includes a folding strip 51 fixedly connected to the hollow top block 10 and a fixed strip magnetic ball 52 fixedly connected to the end of the folding strip 51, the fixed strip magnetic ball 52 is sleeved on the ferromagnetic block 92, and the fixed strip magnetic ball 52 and the ferromagnetic block 92 are mutually adsorbed, so that it can temporarily adsorb the fixed strip magnetic ball 52, thereby making the external dispersion warning strip 5 in this embodiment in a rotating state, when a blockage warning occurs, it stretches downward, effectively ensuring that the difference between the front and rear states is greater, which can visually prompt the staff and make the effect of fixed-point warning better.

[0043] The pressure measuring plate includes a bearing base plate 121 fixedly connected to the outer end of the outer sleeve 31, an external pressure sensor 123 evenly installed on the upper end of the bearing base plate 121, and an upper movable plate 122 movably sleeved outside the outer sleeve 31, and the upper movable plate 122 and the upper end of the external pressure sensor 123 are in contact with each other, effectively ensuring that when there is a large amount of gravel deposition and there is a risk of blockage, such as Fig. 9 Under the action of water pressure, part of the water enters the external dispersion warning strip 5 along the warning channel, so that the gravity of the external dispersion warning strip 5 gradually increases. At this time, its end gradually separates from the ferromagnetic block 92 and moves to the bottom of the elastic rope 91. At this time, the folding strip 51 is not bent, and its lower end part is accumulated on the upper moving plate 122, so that the upper moving plate 122 moves downward under the action of gravity, and then the external pressure sensor 123 gradually generates force data, and the data is fed back to the main control board. The main control board controls the sound and light alarm 14 to alarm, thereby timely providing an early warning to the staff, and the early warning of the sound and light alarm 14 can realize a fixed-point early warning.

[0044] The longitudinal height of the fixed magnetic ball 52 when it is located at the bottom of the elastic rope 91 is not less than 1 / 2 of the straight length of the folding strip 51, which effectively ensures that when there is a risk of blockage, after the folding strip 51 is filled with water and the end moves downward, its bottom can accumulate on the upper moving plate 122, thereby making the change of data on the external pressure sensor 123 more obvious and making the warning more timely.

[0045] It is also worth noting that, through programming, the sound or light color of the alarm triggered by the external pressure sensor 123 and the internal pressure sensor 43 of the sound and light alarm 14 can be set to be different, thereby distinguishing the two warning situations, which helps the staff to judge the deposition of gravel and dust in the sand accumulation tank 2.

[0046] The above is only a preferred specific implementation manner of the present application, but the protection scope of the present application is not limited thereto. Any technician familiar with the technical field can make equivalent substitutions or changes within the technical scope disclosed in the present application according to the technical solution and its improved conception, which should be covered by the protection scope of the present application.

Claims

1. A drainage pipe blockage self-alarm system at a BIM construction site, comprising a sand accumulation trough (2) arranged between connection nodes of two adjacent drainage pipes (1) and a fixed-point warning column corresponding to the sand accumulation trough (2), the top of the sand accumulation trough (2) being cast with a concrete slab, the fixed-point warning column (3) being fixedly cast in the middle of the concrete slab, the bottom of the fixed-point warning column (3) being fixedly connected with a bottom measuring ball (4), the outer end of the bottom measuring ball (4) being fixedly connected with a bottom support ring (7), the bottom support ring (7) and the inner bottom end of the sand accumulation trough (2) being mutually abutted, the top of the fixed-point warning column (3) being fixedly connected with a hollow top block (10), the hollow top block (10) being mounted with an audible and visual alarm (14) and a control panel connected to a BIM information model signal, the lower end of the hollow top block (10) being fixedly connected with a plurality of outwardly scattered warning strips (5) distributed in an array, the fixed-point warning column (3) being located on the inner side of a ring formed by the plurality of outwardly scattered warning strips (5); The fixed-point warning column (3) comprises an outer sleeve (31) fixedly embedded in a concrete slab, a pre-dropping tube (32) movably sleeved in the outer sleeve (31), a connecting rod (33) fixedly connected to the middle of the outer sleeve (31), and a pipe sealing block (34) fixedly connected to the lower end of the connecting rod (33), wherein the lower end of the connecting rod (33) movably passes through the middle of the upper end of the pre-dropping tube (32) and extends into the pre-dropping tube (32), and the pipe sealing block (34) is interference-fitted with the pre-dropping tube (32). A warning channel is provided in the fixed-point warning column (3), and the warning channel is connected in sequence to the hollow top block (10) and The warning channel comprises an upper sealing hole (82) and a plurality of water inlet holes (81) bored on the pre-drop tube (32), the upper sealing hole (82) being located above the sealing tube block (34), the plurality of water inlet holes (81) being located inside the outer sleeve (31), the warning channel further comprising a warning cavity (84) bored inside the outer sleeve (31) and a water through hole (83) bored at the outer end of the outer sleeve (31), the water through hole (83) being located between the upper sealing hole (82) and the water inlet hole (81), and the water through hole (83) being in communication with the warning cavity (84); The bottom measuring ball (4) comprises a bottom plate fixedly connected to the lower end of the pre-dropping tube (32), an internal pressure sensor (43) installed at the lower end of the bottom plate, and an outer protective layer (41) and an inner variable layer (42) arranged outside the internal pressure sensor (43), wherein the outer protective layer (41) is located outside the inner variable layer (42), the internal pressure sensor (43) is connected to the main control board signal, the outer protective layer (41) is a flexible structure made of special fiber material, the inner variable layer (42) is made of high resilience material, the bottom support ring (7) is an elastic umbrella-shaped structure, and the bottom support ring (7) is a multi-through hole structure.

2. The drainage pipe blockage self-alarm system at the BIM construction site according to claim 1 is characterized in that: The lower end of the outer sleeve (31) is in contact with the lower end of the concrete slab, and a reinforcing block (6) is fixedly connected to the outer end of the outer sleeve (31), and the reinforcing block (6) is in contact with the upper surface of the concrete slab.

3. The drainage pipe blockage self-alarm system at the BIM construction site according to claim 1 is characterized in that: The distance between the upper sealing hole (82) and the bottom of the sealing pipe block (34) and the distance between the uppermost water inlet hole (81) and the bottom of the outer sleeve (31) are not greater than the distance between the bottom of the bottom measuring ball (4) and the inner bottom end of the sand accumulation groove (2); the longitudinal span of the water passage hole (83) is 2-3 times the longitudinal span of the upper sealing hole (82), and when the bottom measuring ball (4) contacts the bottom of the sand accumulation groove (2), the upper sealing hole (82) and the water passage hole (83) overlap.

4. The drainage pipe blockage self-alarm system at a BIM construction site according to claim 1 is characterized in that: The outward scattering warning strip (5) is a flexible sealing structure whose bottom is sealed by binding with a strap, and the length of the outward scattering warning strip (5) is not less than 1 / 3 of the height of the fixed-point warning column (3) above the ground.

5. The drainage pipe blockage self-alarm system at a BIM construction site according to claim 1 is characterized in that: A pressure measuring plate is provided at the outer end of the outer sleeve (31); a plurality of elastic ropes (91) respectively corresponding to a plurality of external dispersion warning strips (5) are fixedly connected between the upper end of the pressure measuring plate and the lower end of the hollow top block (10); a ferromagnetic block (92) is fixedly connected to the elastic rope (91); and the end of the external dispersion warning strip (5) away from the hollow top block (10) is connected to the ferromagnetic block (92).

6. The drainage pipe blockage self-alarm system at the BIM construction site according to claim 5 is characterized in that: The outward dispersion warning strip (5) comprises a folded strip (51) fixedly connected to the hollow top block (10) and a fixed strip magnetic ball (52) fixedly connected to the end of the folded strip (51); the fixed strip magnetic ball (52) is sleeved on the ferromagnetic block (92), and the fixed strip magnetic ball (52) and the ferromagnetic block (92) are mutually attracted.

7. The drainage pipe blockage self-alarm system at the BIM construction site according to claim 6 is characterized in that: The pressure measuring plate comprises a bearing base plate (121) fixedly connected to the outer end of the outer sleeve (31), an external pressure sensor (123) evenly mounted on the upper end of the bearing base plate (121), and an upper movable plate (122) movably sleeved outside the outer sleeve (31), wherein the upper movable plate (122) and the upper end of the external pressure sensor (123) are in contact with each other.

8. The drainage pipe blockage self-alarm system at the BIM construction site according to claim 7 is characterized in that: The longitudinal height of the fixed strip magnetic ball (52) when located at the bottom of the elastic rope (91) is not less than 1 / 2 of the straightened length of the folded strip (51).

Citation Information

Patent Citations

  • Prefabricated concrete pipeline capable of achieving online monitoring and early warning

    CN115654226A

  • Blockage multi-stage early warning device for concrete guniting pipeline

    CN116336395A