Single-well reasonable production allocation method for tight sandstone gas reservoir

By selecting the historical production wells with the highest EUR as typical wells, and guiding the production allocation of newly put into production single wells according to the classification of reservoirs and well types, a gas production and pressure decline model was established to solve the problem of unreasonable production allocation of gas wells in tight sandstone gas reservoirs. , extending the stable production period of the gas well and improving the final gas production and utilization rate.

CN118855422APending Publication Date: 2024-10-29CHINA PETROLEUM & CHEMICAL CORP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310400791.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-04-14
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

Due to low reservoir porosity and permeability and strong reservoir heterogeneity in tight sandstone gas reservoirs, existing gas well production allocation methods lead to rapid decline in gas production and pressure, resulting in a short stable production period of gas wells, low cumulative gas production, and gas wells Unreasonable production allocation leads to low formation energy utilization and poor development benefits.

Method used

By obtaining the production characteristic data of historical production wells, the production well with the highest EUR is selected as a typical well, and the production of a newly put into production is allocated according to the production characteristics of the typical well, and classification guidance is provided according to the reservoir category and well type to establish production Gas volume and pressure decline model, adjust the production plan to improve accuracy and reliability.

Benefits of technology

Extend the stable production period of gas wells, increase the final gas production of single wells, improve gas well utilization and development efficiency, and ensure the scientificity and rationality of gas field productivity construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118855422A_ABST
    Figure CN118855422A_ABST
Patent Text Reader

Abstract

The invention discloses a tight sandstone gas reservoir single well reasonable production allocation method, and belongs to the technical field of gas field development and research, the method comprises the following steps: obtaining production characteristic data of historical production wells in a target gas reservoir area, and selecting the production well with the highest EUR as a typical well; and according to the production characteristics of the typical well, guiding the single well newly put into production in the target gas reservoir area to carry out production allocation. The reservoir stratums are classified, so that the accuracy and adaptability of the typical well for guiding the newly-put-into-production single well are improved. The production characteristic of the highest single well EUR in a certain reservoir category and a certain well type is selected, although the annual gas production rate of the highest EUR is low, the decreasing rate of the gas production rate is also low, and the utilization rate of the single well of the gas well and the final gas production rate are integrally improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of gas field development research, and in particular relates to a method for rationally allocating production of a single well in a tight sandstone gas reservoir. Background Art

[0002] Reasonable production allocation of gas wells in tight sandstone gas reservoirs is the basis for long-term stable production of gas fields and improving the EUR of single wells. Due to the low reservoir porosity and permeability and strong reservoir heterogeneity of tight sandstone gas reservoirs, unreasonable production allocation will lead to rapid gas production and pressure drop. At present, the empirical method of gas well production allocation is commonly used, in which vertical wells are allocated at 1 / 7 to 1 / 9 of the open flow rate, and horizontal wells are allocated at 1 / 3 to 1 / 5 of the open flow rate. Due to the poor reservoir physical properties of tight sandstone gas reservoirs, the formation pressure wave is difficult to reach the seepage boundary during the gas test, and the open flow test results of the gas well are inaccurate. Allocation according to the percentage of open flow rate will lead to too fast pressure drop rate of gas wells, rapid decline in gas production, short stable production period of gas wells, low cumulative gas production, unreasonable gas well production allocation, or too low gas well production allocation, low formation energy utilization, poor development efficiency, and difficulty in meeting production requirements. Therefore, reasonable gas well production allocation can extend the stable production period of gas wells and increase the EUR (ultimate gas production) of single wells, thereby guiding the construction of gas field production capacity and providing a scientific basis for the rational development of gas fields.

[0003] The existing gas well production allocation has the following technical problems: low reservoir utilization and low single-well EUR. Summary of the invention

[0004] The purpose of the present invention is to provide a method for reasonably allocating production of a single well in a tight sandstone gas reservoir, so as to solve the technical problems of low reservoir utilization and low single well EUR.

[0005] To achieve the above-mentioned purpose, the technical solution of the method for rationally allocating production of a single well in a tight sandstone gas reservoir provided by the present invention is:

[0006] A method for reasonably allocating production of a single well in a tight sandstone gas reservoir comprises the following steps: obtaining production characteristic data of historical production wells in a target gas reservoir area, selecting a production well with the highest EUR as a typical well; and allocating production of a newly-commissioned single well in the target gas reservoir area according to the production characteristics of the typical well.

[0007] The beneficial effect is: select the production characteristics of the historical single well with the highest EUR in the gas reservoir area. Generally speaking, the annual gas production of the single well with the highest EUR is low in the first few years, but the gas production decline rate is also low, that is to say, the annual gas production is relatively high for several years, and the final gas production is high overall. This production characteristic is used as the production characteristic of the typical well, and the typical well is used to guide the newly put into production single well, so that the newly put into production single well has a high overall utilization rate and a large final gas production under the guidance of the typical well.

[0008] As a further improvement, when selecting typical wells, historical production wells with the same reservoir category as the newly-commissioned single well are selected from the target gas reservoir area, and the production well with the highest EUR is selected as the typical well.

[0009] The beneficial effect is that the production allocation of single wells in the same reservoir is guided according to the classification of the reservoir, thereby improving the accuracy and adaptability of the guidance of typical wells to newly put into production single wells.

[0010] As a further improvement, the reservoir category is classified according to reservoir characteristics, which include: formation thickness, physical properties, and gas saturation.

[0011] The beneficial effect is that the characteristics of the reservoir reflect the amount of gas in the reservoir. The time and effort required to invest in reservoirs with different gas contents, as well as the expected final gas production, are also different. By classifying different reservoir types, targeted final gas production targets can be set to maximize the economic benefits of a single well in the reservoir.

[0012] As a further improvement, when selecting typical wells, historical production wells with the same well type as the newly-commissioned single well are selected from the target gas reservoir area, and the production well with the highest EUR is selected as the typical well.

[0013] The beneficial effect is that in the same gas reservoir area, corresponding typical wells are established for different well types, and single wells of the same well type are guided to allocate production according to the production characteristics of the typical wells, thereby improving the accuracy and reliability of typical wells in guiding single well production allocation.

[0014] As a further improvement, the production characteristics of typical wells include gas production and pressure. The gas production and pressure of typical wells are normalized, and a gas production decline model and a pressure decline model are established based on the normalized gas production and pressure of the typical wells. Production is allocated for newly commissioned single wells based on the gas production decline model and the pressure decline model.

[0015] The beneficial effects are: the optimal gas production of a newly-commissioned single well each year is estimated based on the typical well gas production decline model, and the production allocation of the newly-commissioned single well is guided according to the gas production corresponding to the typical well load decline law, thereby improving the consistency of the production characteristics of the newly-commissioned single well with those of the typical well, so that the EUR of the newly-commissioned well is higher under the guidance of the gas production decline trend of the typical well.

[0016] As a further improvement, the gas production decline model is an exponential decline model or a hyperbolic decline model; the exponential decline model formula is: q = q1*e -Dt ; The formula of the hyperbolic decreasing model is: Among them, q is the annual gas production, q1 is the initial production in the decline stage, t is the time, n is the decline index, and D is the decline rate.

[0017] The beneficial effect is: observing whether the changes in the gas production data of typical wells are more in line with the exponential or hyperbolic decreasing trend, and establishing different gas production decline models accordingly, thereby improving the accuracy of data processing on typical well production data and further improving the reliability of typical well guidance.

[0018] As a further improvement, the pressure reduction model formula is: p = p1*e -mt , where p is pressure, p1 is the initial pressure in the decreasing stage, m is the coefficient, and t is time.

[0019] The beneficial effect is that the pressure data corresponding to each year can be easily calculated according to the specific pressure reduction model.

[0020] As a further improvement, when a newly commissioned single well has started production, the production characteristics of the newly commissioned single well are first compared with the production characteristics of the corresponding typical well. If the production characteristics are consistent, production continues. If the production characteristics are inconsistent, the actual pressure of the newly commissioned well is substituted into the typical well pressure decline model to calculate the first-year allocation pressure of the newly commissioned well. The first-year allocation pressure is substituted into the proportional relationship between pressure and annual gas production to calculate the first-year allocation gas production. The first-year allocation gas production is substituted into the typical well gas production decline model to calculate each year's allocation gas production. The newly commissioned single well is allocated production according to each year's allocation gas production.

[0021] The beneficial effect is: for a single well that has been producing for a period of time, first compare the current production characteristics with the production characteristics of a typical well to see if they are consistent. If the production characteristics are consistent, continue production according to the current production allocation plan. If the production characteristics are inconsistent, specifically guide the production allocation according to the pressure decline model and gas production decline model of the typical well, so as to achieve the effect of improving the EUR of the single well. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 This is a flow chart of a method for reasonable production allocation of a single well in a tight sandstone gas reservoir according to the present invention;

[0023] Figure 2 It is a schematic diagram of the normalized annual gas production of a typical horizontal well of the present invention;

[0024] Figure 3 is a schematic diagram of the normalized pressure of a typical horizontal well of the present invention;

[0025] Figure 4 It is a comparison chart between the current production allocation of the present invention and the reasonable production allocation based on typical wells. DETAILED DESCRIPTION

[0026] In order to make the purpose, technical scheme and advantages of the present invention clearer, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention, that is, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments. The components of the embodiments of the present invention described and shown in the drawings herein can be arranged and designed in various different configurations.

[0027] Implementation example of a method for rationally allocating production of a single well in a tight sandstone gas reservoir:

[0028] like Figure 1 As shown in the figure, taking the newly put into production single well in the T2 gas reservoir area of ​​Class I reservoir and the well type is a horizontal well as an example, the production characteristic data of historical production wells of horizontal well type in this reservoir category are selected, and the production characteristics of the single well with the highest EUR are selected as the production characteristics of the typical well.

[0029] The reservoir category is classified according to the reservoir characteristics. In the target gas reservoir area T2, the reservoir is classified according to the reservoir characteristics; the reservoir is divided into Class I high-quality reservoir, Class II medium reservoir, and Class III general reservoir according to the reservoir thickness, physical properties, and gas saturation. The Class I reservoir has a sand body thickness of ≥15m, a porosity of ≥10%, a permeability of ≥0.8mD, and a gas saturation of ≥60%; the Class II reservoir has a sand body thickness of ≥10m, a porosity of 8-10%, a permeability of ≥0.4-0.8mD, and a gas saturation of 50-60%; the Class III reservoir has a sand body thickness of <15m, a porosity of <8%, a permeability of <0.4mD, and a gas saturation of <50%. According to specific needs, the result of the reservoir classification based on reservoir characteristics can be multiple categories, such as two categories, four categories, or five categories.

[0030] Single well types are divided into vertical wells and horizontal wells.

[0031] Among them, the production characteristics include the single well gas production change curve, production decline rate, pressure drop rate, etc. The production characteristics of typical wells are processed to obtain the gas production decline rate and pressure rate. The gas production decline rate and pressure rate of the typical well corresponding to the horizontal well of Class I reservoir in T2 gas reservoir are shown in Table 1 below:

[0032] Table 1

[0033] Time (year) Decline rate (%) Pressure drop rate (MPa / d) 1 0 0.0124 2 4.7 0.0074 3 28.6 0.0035 4 20.8 0.0035 5 17.7 0.0026 6 23.5 0.0010 7 17.5 0.0006 8 8.4 0.0015

[0034] The newly commissioned well DP-51 has been in production for two years. First, the actual production characteristics of the newly commissioned single well are compared with the typical well production characteristics of the corresponding Class I reservoir horizontal wells. By comparing the decline rate of gas production, the production allocation of the newly commissioned well DP-51 is observed to be reasonable. The pressure drop rate is used as a reference data to assist in observing whether the production allocation of the newly commissioned well DP-51 is reasonable, as shown in Table 2 below:

[0035] Table 2

[0036]

[0037] From Table 2 above, it is found that the gas production decline rate of DP-51 well is obviously inconsistent with that of the typical well, and the pressure drop rate is also inconsistent. This shows that the production allocation of this well is unreasonable, so it is necessary to reallocate the production of DP-51 well.

[0038] like Figure 3 As shown in Table 1, based on the pressure decline rate of typical horizontal wells and the actual pressure data of the corresponding newly commissioned wells, a corresponding pressure decline model is established. The corresponding formula (1) of the model is as follows:

[0039] p=13.581*e (-0.223* t ) (1)

[0040] The production pressure in the first year is calculated according to the pressure reduction model formula (1).

[0041] Substitute the first year's allocated production pressure into the relationship between pressure and annual gas production to calculate the first year's allocated production gas production; where pressure is proportional to annual gas production, expressed by formula (3):

[0042]

[0043] Among them, q t is the gas production of a typical well in a certain year, p t is the pressure of a typical well in a certain year, p0 is the allocated production pressure of a newly put into production well in the corresponding year, and q0 is the allocated gas production of a newly put into production well in the corresponding year.

[0044] like Figure 2 As shown in the figure, the production characteristics of the typical wells are normalized to obtain the normalized gas production curve of the typical wells of the horizontal wells of the type I reservoir in the T2 gas reservoir area. The fitting results of the gas production curve are observed. Compared with the hyperbolic decline model, the gas production is more consistent with the change trend of the exponential decline model. Therefore, the corresponding exponential gas production decline model is established. The first year's allocated gas production q0 is substituted into the gas production model to obtain the corresponding formula (3) as follows:

[0045] q=2846*e (-0.24* t ) (3)

[0046] The formula for the above hyperbolic declining model is: Among them, q is the annual gas production, q1 is the initial production in the decline stage, t is the time, n is the decline index, and D is the decline rate.

[0047] The corresponding annual gas production is calculated based on the production decline model of typical wells. Since there has been actual gas production in the first two years, the production allocation of DP-51 well will be based on the typical well data and well type from the third year onwards. The recommended production allocation data is shown in Table 3 below:

[0048] Table 3

[0049]

[0050]

[0051] like Figure 4 As shown in the figure, under the original production allocation, the final gas production of DP-51 well is expected to be 301.8 billion cubic meters. After reasonable production allocation through the decline model of typical wells, the final gas production of DP-51 well is expected to increase from 301.8 billion cubic meters to 423.4 billion cubic meters, and the EUR is increased by 40.2%, achieving the effect of improving the utilization rate and final gas production of single gas wells as a whole.

[0052] For newly commissioned single wells with a short production time, for example, a single well that has only been in production for one month, there is no need to compare the data with the typical wells, and production can be allocated directly according to the gas production decline model of the typical wells.

[0053] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention is described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions recorded in the aforementioned embodiments without creative work, or replace some of the technical features therein with equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for rational production allocation of a single well in a tight sandstone gas reservoir, characterized in that: The method comprises the following steps: obtaining production characteristic data of historical production wells in the target gas reservoir area, selecting the production well with the highest EUR as a typical well; and allocating production for newly put into production single wells in the target gas reservoir area according to the production characteristics of the typical well.

2. The method for rational production allocation of a single well in a tight sandstone gas reservoir according to claim 1, characterized in that: When selecting typical wells, historical production wells with the same reservoir category as the newly commissioned single well are selected from the target gas reservoir area, and the production well with the highest EUR is selected as the typical well.

3. The method for rational production allocation of a single well in a tight sandstone gas reservoir according to claim 2, characterized in that: The reservoir categories are classified according to reservoir characteristics, which include: formation thickness, physical properties, and gas saturation.

4. The method for rational production allocation of a single well in a tight sandstone gas reservoir according to claim 1 or 2, characterized in that: When selecting typical wells, historical production wells with the same well type as the newly commissioned single well are selected from the target gas reservoir area, and the production well with the highest EUR is selected as the typical well.

5. The method for rational production allocation of a single well in a tight sandstone gas reservoir according to claim 1, characterized in that: The production characteristics of the typical well include gas production and pressure. The gas production and pressure of the typical well are normalized, and a gas production decline model and a pressure decline model are established according to the normalized gas production and pressure of the typical well. Production allocation is performed for a newly commissioned single well according to the gas production decline model and the pressure decline model.

6. The method for rational production allocation of a single well in a tight sandstone gas reservoir according to claim 5, characterized in that: The gas production decline model is an exponential decline model or a hyperbolic decline model; the exponential decline model formula is: q = q1* -Dt ; The hyperbolic decline model formula is: Among them, q is the annual gas production, q1 is the initial production in the decline stage, t is the time, n is the decline index, and D is the decline rate.

7. The method for rational production allocation of a single well in a tight sandstone gas reservoir according to claim 5, characterized in that: The pressure reduction model formula is: p = p1* -mt , where p is the pressure, p1 is the initial pressure in the decreasing phase, m is the decreasing rate, and t is the time.

8. The method for rational production allocation of a single well in a tight sandstone gas reservoir according to any one of claims 5 to 7, characterized in that: When a newly commissioned single well has started production, the production characteristics of the newly commissioned single well are first compared with the production characteristics of the corresponding typical well. If the production characteristics are consistent, production will continue. If the production characteristics are inconsistent, the actual pressure of the newly commissioned well will be substituted into the typical well pressure decline model to calculate the first-year allocation pressure of the newly commissioned well. The first-year allocation pressure is substituted into the proportional relationship between pressure and annual gas production to calculate the first-year allocation gas production. The first-year allocation gas production is substituted into the typical well gas production decline model to calculate each year's allocation gas production. The newly commissioned single well is allocated production according to each year's allocation gas production.