Air conditioning system and air conditioning operation method

By detecting the power consumption value of the target air conditioning equipment in the air conditioning system and marking high-energy-consuming equipment, the problem of unreasonable energy consumption management in the air conditioning system is solved, and the high-efficiency energy consumption management and operation efficiency improvement of the air conditioning system is achieved.

CN118856529BActive Publication Date: 2025-02-07JIANGSU CARBON CONTROL TECH CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411039707.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2025-02-07
Estimated Expiration
2044-07-31

AI Technical Summary

Technical Problem

The energy consumption management mode of each air conditioner equipment in the air conditioner system is not reasonable enough, resulting in the inability to accurately find the target air conditioner equipment that needs to be repaired and cleaned, which in turn affects the overall energy consumption management and air conditioner operation efficiency.

Method used

By detecting that the target air conditioning equipment in the air conditioning system is about to start the operation process, the operation process of other air conditioning equipment will be stopped, and the first batch of operation process of the target air conditioning equipment will be started after the target is left to stand for a long time. Then, the power consumption value of the target air conditioning equipment during the first batch operation process is obtained, and the reasonable power consumption value is determined based on the preset equipment load relationship. If the consumption value exceeds the standard, it is marked as a heavy energy-consuming equipment; if it does not exceed the standard, start the second batch of operation of other air-conditioning equipment.

Benefits of technology

The reasonable management of power consumption in the air-conditioning system is achieved, which avoids the problem that operators cannot accurately find high-energy-consuming equipment, reduces the risk of power system collapse, and improves the overall energy consumption management and operation efficiency of the air-conditioning system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118856529B_ABST
    Figure CN118856529B_ABST
Patent Text Reader

Abstract

The present application discloses an air conditioning system and an air conditioning operation method. By applying the technical solution of the present application, it is possible to realize a method in which, when it is detected that a certain air conditioning device in the air conditioning system is about to start an operation process, the operation process of other air conditioning devices sharing the same circuit system with the air conditioning device is stopped first, and after determining that the target air conditioning device has completed an operation process for a certain period of time, the power energy consumption consumed by the target air conditioning device to complete this operation process is obtained, so as to indirectly determine whether the current power energy consumption of the air conditioning device exceeds the standard based on the power energy consumption value, and if it exceeds the standard, it is marked. If it does not exceed the standard, the power energy consumption detection process of other air conditioning devices is continued to be started.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of energy-saving technology, and in particular to an air-conditioning system and an air-conditioning operation method. Background Art

[0002] Due to the growing demand for office and home use, air-conditioning systems deployed in multiple indoor rooms in buildings are also growing at a high frequency.

[0003] Among them, for the use of electricity resources in buildings, the electricity resource energy consumption occupied by the air-conditioning system deployed indoors can account for the vast majority of the overall energy consumption of the building. Therefore, the optimized energy-saving control of the air-conditioning system plays a very important role in the field of energy-saving technology of buildings.

[0004] However, since the air-conditioning system is usually associated with a large number of individual air-conditioning devices, even if some of the air-conditioning devices consume a lot of extra electricity due to failure, obsolescence or long-term uncleaning, the management personnel cannot accurately find the target air-conditioning devices that need to be repaired and cleaned. This also leads to unreasonable overall energy consumption management of the air-conditioning system, and thus the problem of inability to operate the air-conditioning. Summary of the invention

[0005] The embodiment of the present application provides an air conditioning system and an air conditioning operation method, so as to solve the problem in the related art that the energy consumption management mode of each air conditioning device in the air conditioning system is not reasonable.

[0006] According to one aspect of an embodiment of the present application, a method for operating an air conditioner is provided, comprising:

[0007] When it is detected that a target air-conditioning device in the air-conditioning system is about to start an operation process, other air-conditioning devices belonging to the same power supply system as the target air-conditioning device are obtained;

[0008] Stop the current operation process of the other air-conditioning equipment, and start the first batch of operation processes of the target air-conditioning equipment after the target static time;

[0009] After determining that the first batch of operation processes have ended, obtaining a first power consumption value consumed by the target air-conditioning equipment during the first batch of operation processes, and determining a first reasonable power consumption value matching the first batch of operation processes based on a preset equipment load relationship, wherein the equipment load relationship records the power value required for the target air-conditioning equipment to complete the first batch of operation processes under normal operating load;

[0010] If it is determined that the first power consumption value is less than or equal to the first reasonable power consumption value, starting a second batch operation process of at least one of the other air-conditioning equipment;

[0011] If it is determined that the first power consumption value is greater than the first reasonable power consumption value, the target air-conditioning equipment is marked as a heavy energy-consuming equipment.

[0012] Optionally, in another embodiment of the method of the present application, the determining, based on a preset equipment load relationship, a first reasonable power consumption value matching the first batch operation process further includes:

[0013] Obtaining the equipment model of the target air-conditioning equipment and the first temperature reaching point corresponding to the first batch operation process;

[0014] Based on the equipment model and the first temperature reaching point, the first reasonable power consumption value required for the target air-conditioning equipment to reach the first temperature reaching point is determined from the equipment load relationship.

[0015] Optionally, in another embodiment of the method of the present application, after determining that the first batch of operation processes are finished, obtaining a first power consumption value consumed by the target air-conditioning equipment during the first batch of operation processes further includes:

[0016] When starting a first batch operation process of the target air-conditioning equipment, recording a first current remaining power value; and when determining that the first batch operation process ends, recording a second current remaining power value;

[0017] The first power consumption value is determined based on a difference between the first current remaining power value and the second current remaining power value.

[0018] Optionally, in another embodiment of the method of the present application, after determining that the first power consumption value is less than or equal to the first reasonable power consumption value, starting a second batch operation process of at least one of the other air-conditioning equipment includes:

[0019] After determining that the first power consumption value is less than or equal to the first reasonable power consumption value, detecting a first difference between the first power consumption value and the first reasonable power consumption value;

[0020] Based on the first difference, it is determined to start a second batch operation process of at least one of the other air-conditioning devices.

[0021] Optionally, in another embodiment of the method of the present application, determining to start a second batch operation process of at least one of the other air-conditioning equipment based on the first difference includes:

[0022] If it is detected that the first difference is greater than a preset difference, the target air-conditioning device is determined to be an energy-saving device, and a second batch operation process of at least one of the other air-conditioning devices is directly started;

[0023] or,

[0024] If it is detected that the first difference is less than or equal to the preset difference, the target air-conditioning equipment is determined to be a light energy-consuming equipment, and after a second static period, a second batch operation process of at least one of the other air-conditioning equipment is started.

[0025] Optionally, in another embodiment of the method of the present application, after marking the target air-conditioning equipment as a heavy energy-consuming equipment, the method further includes:

[0026] A maintenance instruction for instructing to perform energy consumption management on the target air-conditioning equipment is sent to a maintenance center.

[0027] Optionally, in another embodiment of the method of the present application, before starting the first batch operation process of the target air-conditioning equipment after the target static time, the method further includes:

[0028] Determining the total number of the other air conditioning equipment;

[0029] Based on the total number, the target static time is determined.

[0030] Optionally, in another embodiment of the method of the present application, determining the target static duration based on the total number includes:

[0031] When it is detected that the total number of other air-conditioning devices is greater than a preset value, it is determined that the target static time exceeds the target time;

[0032] or,

[0033] When it is detected that the number of other air-conditioning devices is less than or equal to a preset value, it is determined that the target static time does not exceed the target time.

[0034] Optionally, in another embodiment of the method of the present application, the target static time is determined based on the following formula:

[0035] T = a*(S1-S2) / Sn;

[0036] Among them, T represents the target static time, a is the pre-set time adjustment gradient, Sn is the total number of air-conditioning equipment in the air-conditioning system, and (S1-S2) is the difference between the number of other air-conditioning equipment and the number of target air-conditioning equipment.

[0037] According to another aspect of the embodiment of the present application, a system for operating an air conditioner is provided, comprising:

[0038] The detection module is configured to obtain other air-conditioning devices belonging to the same power supply system as the target air-conditioning device when detecting that the target air-conditioning device in the air-conditioning system is about to start the operation process;

[0039] A first starting module is configured to stop the current operation process of the other air-conditioning equipment and start the first batch of operation processes of the target air-conditioning equipment after the target static time;

[0040] a determination module configured to, after determining that the first batch of operation processes are finished, obtain a first power consumption value consumed by the target air-conditioning device during the first batch of operation processes, and determine a first reasonable power consumption value matching the first batch of operation processes based on a preset device load relationship, wherein the device load relationship records the power value required for the target air-conditioning device to complete the first batch of operation processes under normal operating load;

[0041] A second starting module is configured to start a second batch operation process of at least one of the other air-conditioning devices if it is determined that the first power consumption value is less than or equal to the first reasonable power consumption value;

[0042] The second startup module is configured to mark the target air-conditioning device as a heavy energy-consuming device if it is determined that the first power consumption value is greater than the first reasonable power consumption value.

[0043] According to another aspect of the embodiments of the present application, an electronic device is provided, including:

[0044] A memory for storing executable instructions; and

[0045] The display is used to execute the executable instructions with the memory to complete the operation of any of the above-mentioned air conditioning operation methods.

[0046] According to another aspect of an embodiment of the present application, a computer-readable storage medium is provided for storing computer-readable instructions, and when the instructions are executed, the operations of any of the above-mentioned air conditioning operation methods are performed.

[0047] In the present application, when it is detected that a target air-conditioning device in an air-conditioning system is about to start an operation process, other air-conditioning devices belonging to the same power supply system as the target air-conditioning device are obtained; the current operation processes of other air-conditioning devices are stopped, and the first batch of operation processes of the target air-conditioning device are started after the target static time; after determining that the first batch of operation processes have ended, the first power consumption value consumed by the target air-conditioning device during the first batch of operation processes is obtained, and based on a preset equipment load relationship, a first reasonable power consumption value matching the first batch of operation processes is determined, wherein the equipment load relationship records the power value that the target air-conditioning device needs to consume to complete the first batch of operation processes under normal operating load; after determining that the first power consumption value is less than the first reasonable power consumption value, the second batch of operation processes of at least one other air-conditioning device is started.

[0048] By applying the technical solution of the present application, it is possible to realize a method in which, when it is detected that a certain air-conditioning device in the air-conditioning system is about to start an operation process, the operation process of other air-conditioning devices sharing the same circuit system with the air-conditioning device is stopped first, and after determining that the target air-conditioning device has completed an operation process for a certain period of time, the power energy consumption consumed by the target air-conditioning device to complete this operation process is obtained, so as to indirectly determine whether the current power energy consumption of the air-conditioning device exceeds the standard based on the power energy consumption value, and if it exceeds the standard, it is marked. If it does not exceed the standard, the power energy consumption detection process of other air-conditioning devices is continued to be started.

[0049] On the one hand, the technical solution of the present application avoids the problem in the related art that the operator cannot timely and accurately find the target air-conditioning equipment in the air-conditioning system that consumes too much power due to failure or long-term operation. On the other hand, by starting each air-conditioning equipment in the air-conditioning system in sequence, it can also avoid the disadvantage of the power system crashing due to the instantaneous overload of the operation.

[0050] The technical solution of the present application is further described in detail below through the accompanying drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0051] The accompanying drawings, which constitute a part of the specification, illustrate embodiments of the present application and, together with the description, serve to explain the principles of the present application.

[0052] The present application can be more clearly understood from the following detailed description with reference to the accompanying drawings, in which:

[0053] Figure 1 A schematic diagram of an air conditioning operation method proposed in this application;

[0054] Figure 2 This is an overall flow chart of an air conditioning operation method proposed in this application;

[0055] Figure 3 A schematic diagram of the structure of the air conditioning operation system proposed in this application;

[0056] Figure 4 This is a schematic diagram of the structure of the electronic device proposed in this application. DETAILED DESCRIPTION

[0057] Various exemplary embodiments of the present application will now be described in detail with reference to the accompanying drawings. It should be noted that unless otherwise specifically stated, the relative arrangement of components and steps, numerical expressions and numerical values ​​set forth in these embodiments do not limit the scope of the present application.

[0058] At the same time, it should be understood that for the convenience of description, the sizes of the various parts shown in the drawings are not drawn according to the actual proportional relationship.

[0059] The following description of at least one exemplary embodiment is merely illustrative in nature and is not intended to limit the present application, its application, or uses.

[0060] Technologies, systems, and devices known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, systems, and devices should be considered part of the specification.

[0061] It should be noted that like reference numerals and letters refer to similar items in the following figures, and therefore, once an item is defined in one figure, it is not necessary to initiate further discussion of it in subsequent figures.

[0062] In addition, the technical solutions between the various embodiments of the present application can be combined with each other, but it must be based on the fact that ordinary technicians in the field can implement it. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by this application.

[0063] It should be noted that all directional indications in the embodiments of the present application (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0064] Combine the following Figure 1-Figure 2 To describe a method for starting an air conditioner operation according to an exemplary embodiment of the present application. It should be noted that the following application scenarios are only shown to facilitate understanding of the spirit and principles of the present application, and the embodiments of the present application are not limited in this regard. On the contrary, the embodiments of the present application can be applied to any applicable scenario.

[0065] The present application also provides an air conditioning system and an air conditioning operation method.

[0066] Figure 1 The flowchart of a method for operating an air conditioner according to an embodiment of the present application is schematically shown. Figure 1 As shown, including:

[0067] S101, when it is detected that a target air-conditioning device in an air-conditioning system is about to start an operation process, other air-conditioning devices belonging to the same power supply system as the target air-conditioning device are obtained.

[0068] S102, stopping the current operation processes of other air-conditioning equipment, and starting the first batch of operation processes of the target air-conditioning equipment after the target static time.

[0069] S103, after determining that the first batch of operating processes are completed, obtain the first power consumption value consumed by the target air-conditioning equipment during the first batch of operating processes, and determine the first reasonable power consumption value matching the first batch of operating processes based on a preset equipment load relationship, wherein the equipment load relationship records the power value required for the target air-conditioning equipment to complete the first batch of operating processes under normal operating load.

[0070] S104: If it is determined that the first power consumption value is less than or equal to the first reasonable power consumption value, start a second batch operation process of at least one other air-conditioning device.

[0071] S105: If it is determined that the first power consumption value is greater than the first reasonable power consumption value, the target air-conditioning device is marked as a heavy energy-consuming device.

[0072] As for the use of electricity resources in buildings, the electricity energy consumption of the air-conditioning system deployed indoors can account for the vast majority of the overall energy consumption of the building. Therefore, the optimized energy-saving control of the air-conditioning system plays a very important role in the field of energy-saving technology in buildings.

[0073] Furthermore, when the air-conditioning equipment is old, has malfunctions, or has poor operating load indicators, continuing to operate it at a heavy load will increase the power consumption of the air-conditioning equipment.

[0074] For example, if the air-conditioning equipment is old or malfunctioning, after running for a period of time, the performance of the mechanical and electronic components will decline due to friction, wear and other reasons, thereby reducing the production energy efficiency of the equipment. The reduction in production energy efficiency will cause more electrical energy to be converted into heat energy or invalid energy, which means that it cannot be used by the air-conditioning equipment for useful power output, which will lead to unnecessary waste of electrical energy.

[0075] For another example, if the air-conditioning equipment has a poor operating load index due to not being cleaned for a long time, the air-conditioning equipment will require more electricity to operate under the same operating load, which will result in unnecessary waste of electricity of the air-conditioning equipment.

[0076] Therefore, the present application proposes a method to indirectly determine whether the target air-conditioning equipment is currently old, faulty, or has poor operating load indicators based on the power consumption value of the target air-conditioning equipment during a batch of operation processes. Then, based on the subsequent judgment of the state of the target air-conditioning equipment, it is selected whether to continue to start it or mark it as a heavy energy-consuming equipment that needs maintenance and cleaning.

[0077] However, since the air-conditioning system is usually associated with a large number of individual air-conditioning devices, even if some of the air-conditioning devices consume a lot of extra electricity due to failure, obsolescence or long-term uncleaning, the management personnel cannot accurately find the target air-conditioning devices that need to be repaired and cleaned. This also leads to unreasonable overall energy consumption management of the air-conditioning system, and thus the problem of inability to operate the air-conditioning.

[0078] For example, a building has an air conditioning system with 20 individual air conditioning units, and the building's operation and management personnel recently discovered that the power consumption is significantly higher than before. In this case, although the operation personnel know that some of the air conditioning units have increased power consumption due to old age, they can only find the target air conditioning units with problems by checking them one by one. Understandably, this method requires a lot of effort.

[0079] Based on this, the present application proposes a method for operating an air conditioner, which can realize a method of stopping the operation process of other air conditioners that share the same circuit system with the target air conditioner when it is detected that a certain air conditioner in the air conditioner system is about to start the operation process, and after determining that the target air conditioner has completed the operation process for a certain period of time, obtaining the power consumption consumed by the target air conditioner to complete this operation process, thereby indirectly determining whether the current power consumption of the air conditioner exceeds the standard based on the power consumption value, and marking it if it exceeds the standard. If it does not exceed the standard, continue to start the power consumption detection process of other air conditioners.

[0080] It can be understood that the technical solution of the present application avoids the problem in the related art that the operator cannot timely and accurately find the target air-conditioning equipment in the air-conditioning system that consumes too much power due to failure or long-term operation. On the other hand, by starting each air-conditioning equipment in the air-conditioning system in sequence, it can also avoid the disadvantage of the power system crashing due to the instantaneous overload of the operation.

[0081] Further, this application is hereby incorporated by reference Figure 2 Specific instructions for program launch:

[0082] Step 1: when it is detected that a target air-conditioning device in the air-conditioning system is about to start an operation process, other air-conditioning devices belonging to the same power supply system as the target air-conditioning device are obtained.

[0083] In one embodiment, the target air-conditioning device is not specifically limited. For example, the target air-conditioning device can be any air-conditioning device in the air-conditioning system, or can be an air-conditioning device in the air-conditioning system that may consume higher power resources (such as a high-power air-conditioning device or an air-conditioning device that takes a long time to install).

[0084] In one embodiment, the number of target air-conditioning devices may be one or more.

[0085] In one embodiment, the other air-conditioning devices share the same power supply system as the target air-conditioning device and may be air-conditioning devices of the same power or matching power.

[0086] It is understandable that if the operation process of other air-conditioning equipment is started at the same time as the operation process of the target air-conditioning equipment, the power consumption value of the target air-conditioning equipment during operation cannot be accurately calculated. It may also cause the overall energy consumption resource load of the air-conditioning system to be heavy, and then the power supply system may collapse, thereby affecting the risk of affecting the operation process of the target air-conditioning equipment, and thus affecting the manufacturing progress of the business.

[0087] Step 2: Stop the current operation process of other air-conditioning equipment, and start the first batch of operation processes of the target air-conditioning equipment after the target static time.

[0088] When it is detected that the number of other air-conditioning devices is greater than a preset value, it is determined that the target static time exceeds the target time;

[0089] or,

[0090] When it is detected that the number of other air-conditioning devices is less than or equal to a preset value, it is determined that the target static time does not exceed the target time.

[0091] In one way, the embodiment of the present application can select a longer idle time (e.g., 10 minutes) when the number of other air-conditioning devices is detected to be large (i.e., greater than a preset value, such as 50). This can reduce the high operating load of each power supply device in the power supply system in the previous time period as much as possible, and then provide reliable power supply for the first batch of target air-conditioning devices in the subsequent operation process.

[0092] Optionally, in another embodiment of the method of the present application, the target static time is determined based on the following formula:

[0093] T = a*(S1-S2) / Sn;

[0094] Among them, T represents the target static time, a is the pre-set time adjustment gradient, Sn is the total number of air-conditioning equipment in the air-conditioning system, and (S1-S2) is the difference between the number of other air-conditioning equipment and the number of target air-conditioning equipment.

[0095] Step 3: when starting the first batch operation process of the target air-conditioning equipment, recording the first current remaining power value; and when determining that the first batch operation process is finished, recording the second current remaining power value.

[0096] In one embodiment, since the operation process of other air-conditioning devices in the power supply system has been stopped, the first current remaining power value and the second current remaining power value counted at this time can best reflect the power consumption value of the target air-conditioning device. This avoids the disadvantages of detecting the power consumption value of a certain air-conditioning device alone when multiple air-conditioning devices are running, such as the detection result is easily affected by other devices, or the need to set up a separate power detection device, which increases the detection cost.

[0097] Step 4: Determine a first power consumption value based on a difference between the first current remaining power value and the second current remaining power value.

[0098] For example, if the first current remaining power value is 1000W degrees and the second current remaining power value is 500W degrees, then the first power consumption value is 500W degrees.

[0099] Step 5: Obtain the equipment model of the target air-conditioning equipment and the first temperature arrival point corresponding to the first batch of operation processes.

[0100] Step 6: Based on the equipment model and the first temperature reaching point, determine the first reasonable power consumption value required for the target air conditioning equipment to reach the first temperature reaching point from the equipment load relationship. Then proceed to step 7a or step 7b.

[0101] In one method, the present application can pre-establish a device load relationship table, wherein the device load relationship table records the power values ​​required to complete the first batch of operation processes (i.e., the first reasonable power consumption value required by the air conditioner to reach the first temperature arrival point) of each air conditioner, including the target air conditioner, under normal operating load (i.e., not old, faulty, or in a state of poor operating load indicators).

[0102] For example, taking the first temperature reaching point of 18 degrees as an example, the equipment load relationship table records: the reasonable power consumption value of 3kw required for the target air-conditioning equipment to reach 18 degrees in the room.

[0103] Step 7a: After determining that the first power consumption value is less than or equal to the first reasonable power consumption value, detect a first difference between the first power consumption value and the first reasonable power consumption value, and then proceed to step 8a1 or step 8a2.

[0104] Step 8a1: if it is detected that the first difference is greater than the preset difference, the target air-conditioning device is marked as an energy-saving device, and the second batch operation process of at least one other air-conditioning device is directly started.

[0105] For example, the first power consumption value is 1kw, the first reasonable power consumption value is 3kw, and the preset difference is 1kw:

[0106] When it is detected that the first power consumption value is less than the first reasonable power consumption value, it means that the target air conditioning device is currently under normal operating load (i.e., it is not old, has a malfunction, or is not in a state of poor operating load index). At this time, the magnitude relationship between the first difference and the preset difference is further determined.

[0107] It is understandable that the first difference between the first power consumption value and the first reasonable power consumption value is 2kw, which is greater than the preset difference of 1kw, which means that the target air-conditioning device is very energy-saving. Therefore, it can be marked as an energy-saving device, and the air-conditioning system can be directly instructed to start the operation process of other air-conditioning devices.

[0108] Step 8a2: if it is detected that the first difference is less than or equal to the preset difference, the target air-conditioning device is determined to be an energy-consuming device, and after a second static time, the second batch operation process of the target air-conditioning device to the target air-conditioning device is started.

[0109] Taking the preset difference of 3kw as an example, it can be understood that the first difference between the first power consumption value and the first reasonable power consumption value is 2kw, which is less than the preset difference of 3kw. At this time, it means that although the target air-conditioning equipment is not old, faulty or has poor operating load indicators, the first difference is small, which means that the energy consumed by the target air-conditioning equipment to complete the first batch of operating processes is relatively large, that is, it is a light energy-consuming equipment.

[0110] Step 7b: If it is determined that the first power consumption value is greater than the first reasonable power consumption value, the target air-conditioning device is marked as a heavy energy-consuming device.

[0111] Here, take the first power consumption value as 5kw and the first reasonable power consumption value as 4kw as an example:

[0112] In one method, when it is detected that the first power consumption value is greater than the first reasonable power consumption value, it means that the target air-conditioning equipment is currently in a heavy energy consumption state (that is, the air-conditioning equipment may be old, malfunctioning, or in a poor operating load indicator, etc.), which will cause the first power consumption value consumed during the first batch of operating processes to be too large (that is, exceeding the reasonable power consumption value).

[0113] Therefore, in order to ensure that the target air-conditioning equipment is quickly screened by the operating personnel, the present application can mark it as a heavy energy-consuming equipment so that subsequent operating personnel can handle it accordingly.

[0114] Step 8b: Send a maintenance instruction for instructing the maintenance center to perform energy consumption management on the target air-conditioning equipment.

[0115] In one way, the present application determines whether the power consumption value of each air-conditioning device in the air-conditioning system exceeds the standard one by one, on the one hand, for the accuracy of the detection result. On the other hand, it can also avoid the problem of easy failure caused by excessive instantaneous power supply pressure when the power system itself is already overloaded.

[0116] By applying the technical solution of the present application, it is possible to realize a method in which, when it is detected that a certain air-conditioning device in the air-conditioning system is about to start an operation process, the operation process of other air-conditioning devices sharing the same circuit system with the air-conditioning device is stopped first, and after determining that the target air-conditioning device has completed an operation process for a certain period of time, the power energy consumption consumed by the target air-conditioning device to complete this operation process is obtained, so as to indirectly determine whether the current power energy consumption of the air-conditioning device exceeds the standard based on the power energy consumption value, and if it exceeds the standard, it is marked. If it does not exceed the standard, the power energy consumption detection process of other air-conditioning devices is continued to be started.

[0117] On the one hand, this avoids the problem in related technologies that operators cannot find certain target air-conditioning equipment in the air-conditioning system that consumes too much power due to failure or long-term operation in a timely and accurate manner. On the other hand, by starting each air-conditioning equipment in the air-conditioning system in sequence, it can also avoid the disadvantage of power system collapse due to instantaneous excessive load.

[0118] Optionally, in another embodiment of the method of the present application, after determining that the first batch of operation processes are finished, obtaining a first power consumption value consumed by the target air-conditioning equipment during the first batch of operation processes further includes:

[0119] When starting a first batch operation process of the target air-conditioning equipment, recording a first current remaining power value; and when determining that the first batch operation process ends, recording a second current remaining power value;

[0120] The first power consumption value is determined based on a difference between the first current remaining power value and the second current remaining power value.

[0121] Optionally, in another embodiment of the method of the present application, after determining that the first power consumption value is less than or equal to the first reasonable power consumption value, starting a second batch operation process of at least one of the other air-conditioning equipment includes:

[0122] After determining that the first power consumption value is less than or equal to the first reasonable power consumption value, detecting a first difference between the first power consumption value and the first reasonable power consumption value;

[0123] Based on the first difference, it is determined to start a second batch operation process of at least one of the other air-conditioning devices.

[0124] Optionally, in another embodiment of the method of the present application, determining to start a second batch operation process of at least one of the other air-conditioning equipment based on the first difference includes:

[0125] If it is detected that the first difference is greater than a preset difference, the target air-conditioning device is determined to be an energy-saving device, and a second batch operation process of at least one of the other air-conditioning devices is directly started;

[0126] or,

[0127] If it is detected that the first difference is less than or equal to the preset difference, the target air-conditioning equipment is determined to be a light energy-consuming equipment, and after a second static period, a second batch operation process of at least one of the other air-conditioning equipment is started.

[0128] Optionally, in another embodiment of the method of the present application, after marking the target air-conditioning equipment as a heavy energy-consuming equipment, the method further includes:

[0129] A maintenance instruction for instructing to perform energy consumption management on the target air-conditioning equipment is sent to a maintenance center.

[0130] Optionally, in another embodiment of the method of the present application, before starting the first batch operation process of the target air-conditioning equipment after the target static time, the method further includes:

[0131] Determining the total number of the other air conditioning equipment;

[0132] Based on the total number, the target static time is determined.

[0133] Optionally, in another embodiment of the method of the present application, determining the target static duration based on the total number includes:

[0134] When it is detected that the total number of other air-conditioning devices is greater than a preset value, it is determined that the target static time exceeds the target time;

[0135] or,

[0136] When it is detected that the number of other air-conditioning devices is less than or equal to a preset value, it is determined that the target static time does not exceed the target time.

[0137] Optionally, in another embodiment of the method of the present application, the target static time is determined based on the following formula:

[0138] T = a*(S1-S2) / Sn;

[0139] Among them, T represents the target static time, a is the pre-set time adjustment gradient, Sn is the total number of air-conditioning equipment in the air-conditioning system, and (S1-S2) is the difference between the number of other air-conditioning equipment and the number of target air-conditioning equipment.

[0140] Optionally, in another embodiment of the present application, Figure 3 As shown, the present application also provides a system for operating an air conditioner. It includes:

[0141] The detection module is configured to obtain other air-conditioning devices belonging to the same power supply system as the target air-conditioning device when detecting that the target air-conditioning device in the air-conditioning system is about to start the operation process;

[0142] A first starting module is configured to stop the current operation process of the other air-conditioning equipment and start the first batch of operation processes of the target air-conditioning equipment after the target static time;

[0143] a determination module configured to, after determining that the first batch of operation processes are finished, obtain a first power consumption value consumed by the target air-conditioning device during the first batch of operation processes, and determine a first reasonable power consumption value matching the first batch of operation processes based on a preset device load relationship, wherein the device load relationship records the power value required for the target air-conditioning device to complete the first batch of operation processes under normal operating load;

[0144] A second starting module is configured to start a second batch operation process of at least one of the other air-conditioning devices if it is determined that the first power consumption value is less than or equal to the first reasonable power consumption value;

[0145] The second startup module is configured to mark the target air-conditioning device as a heavy energy-consuming device if it is determined that the first power consumption value is greater than the first reasonable power consumption value.

[0146] By applying the technical solution of the present application, it is possible to realize a method in which, when it is detected that a certain air-conditioning device in the air-conditioning system is about to start an operation process, the operation process of other air-conditioning devices sharing the same circuit system with the air-conditioning device is stopped first, and after determining that the target air-conditioning device has completed an operation process for a certain period of time, the power energy consumption consumed by the target air-conditioning device to complete this operation process is obtained, so as to indirectly determine whether the current power energy consumption of the air-conditioning device exceeds the standard based on the power energy consumption value, and if it exceeds the standard, it is marked. If it does not exceed the standard, the power energy consumption detection process of other air-conditioning devices is continued to be started.

[0147] The present application also provides an electronic device to perform the above-mentioned air conditioner operation method. Figure 4 , which shows a schematic diagram of an electronic device provided by some embodiments of the present application. Figure 4 As shown, the electronic device 3 includes: a processor 300, a memory 301, a bus 302 and a communication interface 303, wherein the processor 300, the communication interface 303 and the memory 301 are connected via the bus 302; the memory 301 stores a computer program that can be run on the processor 300, and when the processor 300 runs the computer program, the method for operating the air conditioner provided in any of the aforementioned embodiments of the present application is executed.

[0148] The memory 301 may include a high-speed random access memory (RAM), and may also include a non-volatile memory, such as at least one disk storage. The communication connection between the device network element and at least one other network element is realized through at least one communication interface 303 (which may be wired or wireless), and the Internet, wide area network, local area network, metropolitan area network, etc. may be used.

[0149] The bus 302 may be an ISA bus, a PCI bus, or an EISA bus, etc. The bus may be divided into an address bus, a data bus, a control bus, etc. The memory 301 is used to store programs, and the processor 300 executes the programs after receiving the execution instruction. The video transmission method disclosed in any implementation of the embodiment of the present application may be applied to the processor 300, or implemented by the processor 300.

[0150] The processor 300 may be an integrated circuit chip with signal processing capabilities. In the implementation process, each step of the above method can be completed by the hardware integrated logic circuit or software instructions in the processor 300. The above processor 300 can be a general-purpose processor, including a processor (Centra lProcessing Unit, referred to as CPU), a network processor (Network Processor, referred to as NP), etc.; it can also be a digital signal processor (DSP), an application-specific integrated circuit (ASIC), a readily available programmable gate array (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components. The methods, steps and logic block diagrams disclosed in the embodiments of the present application can be implemented or executed. The general-purpose processor can be a microprocessor or the processor can also be any conventional processor, etc. The steps of the method disclosed in the embodiments of the present application can be directly embodied as a hardware decoding processor to execute, or the hardware and software modules in the decoding processor can be executed. The software module can be located in a mature storage medium in the field such as a random access memory, a flash memory, a read-only memory, a programmable read-only memory or an electrically erasable programmable memory, a register, etc. The storage medium is located in the memory 301, and the processor 300 reads the information in the memory 301 and completes the steps of the above method in combination with its hardware.

[0151] The electronic device provided in the embodiment of the present application and the method for operating the air conditioner provided in the embodiment of the present application are based on the same inventive concept and have the same beneficial effects as the methods adopted, operated or implemented therein.

[0152] It should be understood that the present application is not limited to the precise structures that have been described above and shown in the drawings, and that various modifications and changes may be initiated without departing from its scope. The scope of the present application is limited only by the appended claims.

Claims

1. A method for operating an air conditioner, characterized in that: include: When it is detected that a target air-conditioning device in the air-conditioning system is about to start an operation process, other air-conditioning devices belonging to the same power supply system as the target air-conditioning device are obtained, wherein the number of the target air-conditioning device is one, and the number of the other air-conditioning devices is one; Stop the current operation process of the other air-conditioning equipment, and start the first batch of operation processes of the target air-conditioning equipment after the target static time; After determining that the first batch of operation processes have ended, obtaining a first power consumption value consumed by the target air-conditioning equipment during the first batch of operation processes, and determining a first reasonable power consumption value matching the first batch of operation processes based on a preset equipment load relationship, wherein the equipment load relationship records the power value required for the target air-conditioning equipment to complete the first batch of operation processes under normal operating load; If it is determined that the first power consumption value is less than or equal to the first reasonable power consumption value, starting the second batch operation process of the other air-conditioning equipment; If it is determined that the first power consumption value is greater than the first reasonable power consumption value, marking the target air-conditioning device as a heavy energy-consuming device; Wherein, before starting the first batch operation process of the target air-conditioning equipment after the target static time, the method further includes: Determining the total number of said other air conditioning equipment; Based on the total number, the target static time is determined.

2. The method according to claim 1, characterized in that The determining, based on the preset equipment load relationship, a first reasonable power consumption value matching the first batch of operation processes further includes: Obtaining the equipment model of the target air-conditioning equipment and the first temperature reaching point corresponding to the first batch operation process; Based on the equipment model and the first temperature reaching point, the first reasonable power consumption value required for the target air-conditioning equipment to reach the first temperature reaching point is determined from the equipment load relationship.

3. The method according to claim 1, characterized in that The step of obtaining, after determining that the first batch of operation processes are finished, a first power consumption value consumed by the target air-conditioning equipment during the first batch of operation processes further includes: When starting a first batch operation process of the target air-conditioning equipment, recording a first current remaining power value; and when determining that the first batch operation process ends, recording a second current remaining power value; The first power consumption value is determined based on a difference between the first current remaining power value and the second current remaining power value.

4. The method according to claim 1, characterized in that After determining that the first power consumption value is less than or equal to the first reasonable power consumption value, starting the second batch operation process of the other air-conditioning equipment includes: After determining that the first power consumption value is less than or equal to the first reasonable power consumption value, detecting a first difference between the first power consumption value and the first reasonable power consumption value; Based on the first difference, it is determined to start a second batch operation process of the other air-conditioning equipment.

5. The method according to claim 4, characterized in that The step of determining to start a second batch operation process of the other air-conditioning equipment based on the first difference includes: If it is detected that the first difference is greater than a preset difference, the target air-conditioning equipment is marked as an energy-saving equipment, and the second batch operation process of the other air-conditioning equipment is directly started; or, If it is detected that the first difference is less than or equal to the preset difference, the target air-conditioning equipment is marked as light energy-consuming equipment, and the second batch operation process of the other air-conditioning equipment is started.

6. The method according to claim 1, characterized in that After marking the target air conditioning equipment as heavy energy consuming equipment, the method further includes: A maintenance instruction for instructing to perform energy consumption management on the target air-conditioning equipment is sent to a maintenance center.

7. The method according to claim 1, characterized in that The step of determining the target static duration based on the total number includes: When it is detected that the total number of other air-conditioning devices is greater than a preset value, determining that the target static time exceeds the target time; or, When it is detected that the number of other air-conditioning devices is less than or equal to a preset value, it is determined that the target static time does not exceed the target time.

8. The method according to claim 1, characterized in that The target static time is determined based on the following formula: T = a*(S1-S2) / Sn; Among them, T represents the target static time, a is the pre-set time adjustment gradient, Sn is the total number of air-conditioning equipment in the air-conditioning system, and (S1-S2) is the difference between the number of other air-conditioning equipment and the number of target air-conditioning equipment.

9. An air conditioning system, characterized in that: include: A detection module is configured to, when detecting that a target air-conditioning device in the air-conditioning system is about to start an operation process, obtain other air-conditioning devices belonging to the same power supply system as the target air-conditioning device, wherein the number of the target air-conditioning device is one, and the number of the other air-conditioning devices is one; A first starting module is configured to stop the current operation process of the other air-conditioning equipment and start the first batch of operation processes of the target air-conditioning equipment after the target static time; a determination module configured to, after determining that the first batch of operation processes are finished, obtain a first power consumption value consumed by the target air-conditioning device during the first batch of operation processes, and determine a first reasonable power consumption value matching the first batch of operation processes based on a preset device load relationship, wherein the device load relationship records the power value required for the target air-conditioning device to complete the first batch of operation processes under normal operating load; A second starting module is configured to start a second batch operation process of the other air-conditioning equipment if it is determined that the first power consumption value is less than or equal to the first reasonable power consumption value; The second starting module is configured to mark the target air conditioning device as a heavy energy consuming device if it is determined that the first power consumption value is greater than the first reasonable power consumption value; Wherein, before starting the first batch operation process of the target air-conditioning equipment after the target static time, the method further includes: Determining the total number of said other air conditioning equipment; Based on the total number, the target static time is determined.