By obtaining machining process information, calling the physical model in the model library, matching the relationship between material removal characteristics and specific cutting volume, and comparing the characteristics of different machining processes, the problem of the narrow application range of traditional methods in single-piece machining scenarios is solved, and the Wider processing monitoring adaptability and accuracy.

CN118859802APending Publication Date: 2024-10-29INTELLIGENT GRINDOCTOR TECH SHENZHEN CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411055929.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

Traditional processing monitoring methods have a narrow application range in single-piece processing scenarios and cannot adapt to changes in process conditions, requiring re-learning of feature data.

Method used

By obtaining the information of the current machining process, including tool type and workpiece material, calling the physical model in the model library, matching the relationship between the corresponding material removal characteristics and the specific cutting amount, comparing the relationship between different machining processes, outputting monitoring suggestions, and excluding tool types and workpiece material.

Benefits of technology

It achieves monitoring adaptability in different processing scenarios, provides more accurate monitoring suggestions, is suitable for various processing scenarios, and avoids the learning of signals related to process conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118859802A_ABST
    Figure CN118859802A_ABST
Patent Text Reader

Abstract

According to the processing monitoring method, the processing monitoring device, the computer equipment and the computer readable storage medium provided by the embodiment of the invention, the first information in the first processing process is acquired in real time, the models in the model library are retrieved based on the first information, and the physical model with the second information identical to the first information is matched; the matched physical model represents a second relation between the material removal feature and the specific cutting amount, the influence of the tool type and the workpiece material is eliminated, the machining characteristics in the second machining process are reflected, and the difference between the first machining process and the second machining process is obtained by comparing the first relation with the second relation so as to provide monitoring suggestions. As the first relation and the second relation are obtained based on the material removal features and the specific cutting amount, signals strongly related to the process conditions are not adopted for learning to generate the monitoring threshold value, and the method is well suitable for various machining scenes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of intelligent manufacturing technology, and in particular relates to a processing monitoring method, a processing monitoring device, a computer device and a computer-readable storage medium. Background Art

[0002] During the machining process, sensors and other detection elements are usually installed on different parts of the machine tool to obtain various parameters of the machine tool during the machining process in real time, promptly discover and solve problems that arise during the machining process, and ensure the stability and accuracy of the machine tool machining.

[0003] The current processing monitoring methods are generally stably applied to large-scale processing scenarios. Since large-scale processing scenarios generally use specific processing technologies, the normal process data such as current, power, force, etc. of the tool are learned under the specific processing technology, the corresponding features are extracted, and then the monitoring threshold is generated for monitoring.

[0004] In the process of studying the prior art, the applicant found that for a single-piece processing scenario, when processing different workpieces, due to changes in process conditions, the corresponding feature data does not match the changed process conditions and needs to be re-learned, so the application scope of the traditional method is relatively narrow. Summary of the invention

[0005] The purpose of the embodiments of the present application is to provide a processing monitoring method, a processing monitoring device, a computer device and a computer-readable storage medium, aiming to solve the problems of the above-mentioned background technology.

[0006] To achieve the above purpose, the technical solution adopted in this application is: In a first aspect, the present application provides a processing monitoring method, comprising: obtaining first information of a first processing process, the first information including a first tool type and a first workpiece material in a current stage; calling a corresponding physical model from a model library according to the first information, wherein the model library includes a plurality of the physical models, each of the physical models including a second relationship between a material removal feature and a specific cutting amount obtained in a second processing process, the second processing process being obtained before the first processing process; determining a first relationship between a material removal feature and a specific cutting amount in the first processing process; comparing the first relationship with the second relationship; and outputting monitoring suggestions based on the comparison result.

[0007] In the second aspect, the present application provides a processing monitoring device, including: an information acquisition module, used to acquire first information of a first processing process, the first information including a first tool type and a first workpiece material in the current stage; a calling module, used to call a corresponding physical model from a model library according to the first information, wherein the model library includes a plurality of the physical models, each of the physical models includes a second relationship between a material removal feature and a specific cutting amount obtained in a second processing process, the second processing process being a processing process before the first processing process; a calculation module, used to determine a first relationship between a material removal feature and a specific cutting amount in the first processing process; a comparison module, used to compare the first relationship with the second relationship; and an output module, used to output monitoring suggestions based on the comparison result.

[0008] In a third aspect, the present application provides a computer device comprising a memory and a processor, wherein the memory is connected to the processor, and the processor is used to execute one or more computer programs stored in the memory. When the processor executes the one or more computer programs, the computer device implements the method of the first aspect.

[0009] In a fourth aspect, the present application provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, wherein the computer program includes program instructions, and when the program instructions are executed by a processor, the processor executes the method of the first aspect.

[0010] The beneficial effects of the present application are as follows: a processing monitoring method provided by the present embodiment obtains first information in a first processing process in real time, retrieves a model in a model library based on the first information, matches the second information with a physical model that is the same as the first information, and the matched physical model characterizes the second relationship between material removal characteristics and specific cutting amount, eliminates the influence of tool type and workpiece material, and reflects the processing characteristics in the second processing process. By comparing the first relationship with the second relationship, the difference between the first processing process and the second processing process is obtained to provide monitoring suggestions. Since the first relationship and the second relationship are obtained based on material removal characteristics and specific cutting amount, the monitoring threshold is not generated by learning using signals that are strongly correlated with process conditions, and the method is well suitable for various processing scenarios. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the embodiments or exemplary technical descriptions will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0012] Figure 1A schematic diagram of the structure of a workpiece processing system provided in an embodiment of the present application; Figure 2 A schematic diagram of a process flow of a processing monitoring method according to an embodiment of the present invention; Figure 3 is a comparison diagram of the first relationship and the second relationship of an embodiment of the present invention; Figure 4 A schematic diagram of a first boundary and a second boundary of an embodiment of the present invention; Figure 5 A schematic diagram of a method for calculating a material removal rate according to an embodiment of the present invention; Figure 6 A schematic diagram of the structure of a processing monitoring device according to an embodiment of the present invention; Figure 7 A schematic diagram of the structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0013] In order to make the purpose, technical solution and advantages of the present application more clearly understood, the present application is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present application.

[0014] The terms "first" and "second" are only used for descriptive purposes and should not be understood as indicating or implying relative importance or implicitly indicating the number of technical features. "Multiple" means two or more, unless otherwise clearly and specifically defined.

[0015] For ease of understanding, the workpiece processing system of the present application is first introduced. Figure 1 , Figure 1 A schematic diagram of the composition structure of a workpiece processing system provided in an embodiment of the present application is shown in FIG. Figure 1 As shown, the workpiece processing system 10 includes a CNC machine tool 101 , a monitoring device 102 , a cloud device 103 and an application terminal 104 .

[0016] The CNC machine tool 101 is used to process a workpiece, and can perform milling, drilling, reaming, boring, tapping or turning on the workpiece. The CNC machine tool 101 can be any suitable type of machine tool, such as a vertical CNC machine tool or a horizontal CNC machine tool.

[0017] The monitoring device 102 is used to monitor the processing signals when the CNC machine tool 101 processes the workpiece. For example, the monitoring device 102 can collect the related signals of the spindle of the CNC machine tool 101 as the processing signals, wherein the spindle is used to drive the tool to perform the processing operation. The related signals include the current signal, voltage signal, torque, motor slip rate or power signal, etc. used to drive the spindle to work. Alternatively, the monitoring device 102 can also collect the related signals generated when the CNC machine tool 101 processes the workpiece as the processing signals, and the related signals include the vibration signal or sound signal, etc. generated in the processing area.

[0018] It is understandable that those skilled in the art can configure the hardware architecture and software design of the monitoring device 102 according to the processing signal required by specific business needs. For example, if the processing signal is a power signal, the monitoring device 102 may include a current sensor and a voltage sensor disposed on the CNC machine tool. If the processing signal is a vibration signal, the monitoring device 102 may include a vibration sensor disposed on the CNC machine tool 102, and the vibration sensor may be installed in the processing area.

[0019] The cloud device 103 is used to communicate with the monitoring device 102. The monitoring device 102 can send the local data of the CNC machine tool 101 to the cloud device 103. The cloud device 103 stores the local data and uses the local data to complete big data analysis and processing, thereby laying a good foundation for some application development. The cloud device 103 can also control the monitoring device 102 to complete the corresponding business operations. In some embodiments, the cloud device 103 is composed of one or more servers, each of which can be a physical server or a logical server virtualized from multiple physical servers. The server can also be a server group composed of multiple servers that can communicate with each other, and each functional module can be distributed on each server in the server group.

[0020] The application terminal 104 can communicate with the cloud device 103 to realize the corresponding application functions. For example, the application terminal 104 can remotely control the monitoring device 102 through the cloud device 103 to further control the CNC machine tool 11. The application terminal 104 can directly receive information from the monitoring device 102 and realize real-time monitoring of the CNC machine tool 11 through offline learning and other methods. The application terminal 104 can be any form of electronic device, including but not limited to a mobile phone, a computer or a mobile device, etc. The application terminal can be directly deployed on the CNC machine tool 11.

[0021] based on Figure 1 The workpiece processing system shown can implement the technical solution of the present application. The technical solution of the present application can be applied to the numerical control system of the numerical control machine tool 101 or the monitoring device 102, and the present application does not impose any limitation thereto.

[0022] Before describing the specific embodiments of the present application, the technical terms in the present application are defined.

[0023] The first processing process refers to the time period during which the workpiece to be processed is processed according to a predetermined process. For the present application, when a processing process needs to be monitored, the start time of this processing process can be regarded as the start time of the first processing process. For example, when the processing process of a workpiece needs to be monitored, the time period from the start of processing the workpiece to the end of processing the workpiece can be defined as the first processing process.

[0024] The second processing process refers to the processing process before the start time of the first processing process. It can be understood that the second processing process is relative to the first processing process, and the second processing process can be any one of the first N processing processes of the first processing process. In some examples, the second processing process can also be obtained based on digital twin model testing and simulation.

[0025] The first information refers to information such as the tool type and workpiece material in the first processing process.

[0026] Tool types may include tool types and tool models. Tool types may include: surface processing tools such as turning tools, planers, milling cutters, grinding wheels and abrasive belts; hole processing tools such as drills, reamer drills, boring cutters, reamers and internal surface broaches; thread processing tools such as taps, dies, automatic thread cutting heads, thread turning tools and thread milling cutters; gear processing tools such as hobs, gear shaping cutters, gear shaving cutters, bevel gears and broaches; cutting tools such as toothed circular saw blades, band saws, bow saws, cut-off turning tools and saw blade milling cutters. Tool models may be specific parameters of the tool, including tool angles, tool materials and coatings, and tool blade shapes, which may be selected based on specific processes.

[0027] The workpiece material is an inherent property of the workpiece to be machined.

[0028] The second information refers to information such as the tool type and workpiece material in a second processing process.

[0029] The first relationship refers to the relationship between the material removal feature and the specific cutting amount in the first processing process. It can be understood that each processing position can obtain a material removal feature and a specific cutting amount, and a first curve representing the above first relationship can be fitted through multiple sets of material removal features and specific cutting amounts. The first curve can have multiple expressions, such as exponential decay, logarithmic decay, polynomial, etc. The fitting method can be selected from the least squares method and other fitting methods.

[0030] The second relationship refers to the relationship between the material removal characteristics and the specific cutting amount of a second machining process. The method for obtaining the second curve is similar to that of the first relationship and will not be repeated here. It should be noted that the second relationship in this embodiment can be roughly understood as the monitoring threshold in the traditional signal processing monitoring method, but the second relationship in this embodiment adopts a monitoring threshold based on a physical model, and is not obtained through data strongly related to the process.

[0031] The first boundary and the second boundary refer to obtaining one or more sets of second processing processes with the same second information, and determining the first boundary and the second boundary based on the material removal characteristics and specific cutting amount in the second processing process.

[0032] Material removal characteristics refer to the material removal characteristics generated under a certain contact state between the tool and the workpiece, including but not limited to the volume of material removed per unit time, the volume of material removed per unit time and unit width, the cross-sectional area of ​​the material removed, the undeformed cutting thickness, the contact arc length between the tool and the workpiece, etc.

[0033] Optionally, in the end milling process, the material removal characteristics can be characterized by material removal rate, material removal rate = cutting depth * cutting width * feed speed, or the material removal characteristics can be characterized by the undeformed cutting thickness. Optionally, the method for obtaining the material removal rate includes: under the premise of knowing the workpiece model (initial size and / or final size) and the CAM trajectory, the material removal rate of each position on the processing trajectory can be calculated. In another embodiment, please refer to Figure 5 Points A, C, and E determine a plane, and points B, D, and F determine a plane. The radius of the milling cutter is R. Assuming that the contour of the workpiece to be processed is known, the tool center starts to move from point A, cuts to point E, and cuts along the Y axis to point C for the first cut. After that, the tool runs dry to point B, cuts from point B to point F, and processes from F to point D for the second cut. During the entire cutting process of the first cut, the material removal rate = (milling cutter radius + AP) * AE * feed speed. During the entire cutting process of the second cut, the material removal rate = AB * AE * feed speed. Where AP is the length from point A to point P, AE is the length from point A to point E, and AB is the length from point A to point B.

[0034] The specific cutting amount refers to the energy consumed to remove a unit volume of material. In one embodiment, the spindle power of the machining process is collected in real time, and the power and time are integrated to obtain energy, i.e., the specific cutting energy. It is understood that other energy-related machining process characteristics such as current, power, force, vibration, and acoustic emission can also be used to obtain the corresponding energy, which can be obtained according to specific needs, and this embodiment does not impose any restrictions.

[0035] The model library refers to a record of multiple second relationships (physical models) labeled with second information based on multiple second processing processes, and the above-mentioned multiple second relationships are stored in an industrial computer or uploaded to the cloud to form a model library.

[0036] See also Figure 2 , the embodiment of the present application provides a processing monitoring method, comprising: S100: Acquire first information of a first machining process, where the first information includes a first tool type and a first workpiece material in a current stage.

[0037] In this embodiment, the first information is determined before the start time of the first processing process.

[0038] In one example, the first information is obtained by manual input, that is, displaying an input box on the display of the industrial computer. There may be two input boxes, which are respectively used for corresponding input operations to obtain the first tool type and the first workpiece material.

[0039] In another example, the first information is obtained by scanning the process sheet using a third-party device to obtain the first information, and transmitting the first information to an industrial computer.

[0040] S200: calling a corresponding physical model from a model library according to the first information, wherein the model library includes a plurality of the physical models, and each of the physical models includes a second relationship between a material removal feature and a specific cutting amount obtained in a second machining process.

[0041] In this embodiment, after receiving the first information, a search is performed in the model library based on the first information. Specifically, the physical model uses the second information as a label, so that the first information can be used as a search term to retrieve the second information that is the same as the first information, and then the physical model corresponding to the second information is determined and called.

[0042] It can be understood that the matched physical model reflects the machining characteristics under the conditions of tool type and workpiece material of the second machining process, and eliminates the influence of tool type change and material change on the machining characteristics.

[0043] S300: Determine a first relationship between a material removal feature and a specific cutting amount in a first machining process.

[0044] In this step, since the first relationship is generated between the material removal characteristics and the specific cutting amount in the first machining process, the status in the first machining process can be reflected in real time.

[0045] S400: Compare the first relationship with the second relationship.

[0046] In this step, by comparing the first relationship in the first machining process with the second relationship in the second machining process under the same tool type and workpiece material conditions, the difference between the first relationship and the second relationship is obtained, and the problem in the machining process is determined based on the above difference.

[0047] S500: Output monitoring suggestions based on the comparison result.

[0048] To summarize, the present embodiment provides a processing monitoring method, which obtains the first information in the first processing process in real time, retrieves the model in the model library based on the first information, matches the second information with the same physical model as the first information, and the matched physical model characterizes the second relationship between the material removal characteristics and the specific cutting amount, eliminates the influence of the tool type and the workpiece material, and reflects the processing characteristics in the second processing process. By comparing the first relationship with the second relationship, the difference between the first processing process and the second processing process is obtained to provide monitoring suggestions. Since the first relationship and the second relationship are obtained based on the material removal characteristics and the specific cutting amount, the monitoring threshold is not generated by learning using signals that are strongly correlated with the process conditions, and the method is well suitable for various processing scenarios.

[0049] In one embodiment, step S200 includes: The target physical model is called from the model library according to the first information, the second information of the target physical model is the same as the first information, and the second information includes a second tool type and a second workpiece material.

[0050] In this embodiment, when the tool type is changed, the tool type in the first information no longer matches the current tool type, and the tool type in the first information needs to be updated to the changed tool type, and the target physical model is retrieved from the model library with the updated first information.

[0051] It should be noted that the physical model can be called from the model library of the monitoring device 102 or from the cloud device 103. When the model library is called from the cloud device 103, the cloud device 103 receives the first information uploaded by the edge side. The physical model is retrieved from the model library based on the first information. After the second information of the physical model is retrieved and is the same as the first information, the cloud device 103 sends the physical model to the monitoring device 102.

[0052] It should be noted that, since there may be multiple second information that are the same as the first information, when multiple available physical models are screened out from the model library, since the machine tool accuracy will not change significantly between two similar processing processes, the physical model of the second processing process that is closest to the first processing process can be selected as the target physical model, which can increase the accuracy of monitoring.

[0053] In particular, before step S200, the following steps are also included: It is determined whether the tool type is changed at the start time of the first machining process.

[0054] If so, the tool type in the first information is updated with the replaced tool type, and the target physical model is called from the model library with the updated first information. The second information of the target physical model is the same as the first information, and the second information includes a second tool type and a second workpiece material.

[0055] If not, call the previous physical model of the first processing process.

[0056] In this embodiment, it is possible to communicate with the numerical control system and receive information from the numerical control system, thereby determining whether a tool change occurs at the start of the first machining process.

[0057] In this embodiment, when in a single-piece processing scenario, rough processing and fine processing can be performed continuously. During the processing, the workpiece material generally remains unchanged. If the tool type has not changed, the previous processing process of the first processing process can be used as the second processing process, so that the second relationship obtained is more real-time and the monitoring is more accurate.

[0058] In this embodiment, an auxiliary step may be added to confirm whether a material change occurs during the continuous processing. For example, when it is determined that "the tool type has not changed", a pop-up window such as "whether to change the workpiece", "yes", or "no" may be displayed on the computer monitor, and the workpiece change situation may be determined in response to the operator's selection instruction, thereby more reasonably determining whether to update the first information.

[0059] In one embodiment, step S400 includes: obtaining a first curve representing a first relationship and a second curve representing a second relationship, The first curve and the second curve are compared in the same coordinate system.

[0060] Please refer to Figure 3 In this embodiment, in order to compare the processing characteristics of the first processing process with the processing characteristics of the second processing process, the first relationship can be quantified into a first function by selecting one of the above-mentioned fitting methods, and the first function is named as a first curve (a line segment passing through R1 and S1) in the coordinate system; the second relationship can be quantified into a second function by selecting one of the above-mentioned fitting methods, and the second function is named as a second curve (a line segment passing through R2 and S2) in the coordinate system.

[0061] Optionally, the ordinate axis of the above coordinate system is the specific cutting amount, and the abscissa axis of the coordinate system is the material removal feature. It should be noted that the ordinate axis can also be the material removal feature, and the abscissa can also be the specific cutting amount, and this application does not impose any restrictions.

[0062] In this embodiment, the first curve has a first evaluation point R1 relative to the ordinate axis. In a possible example, there are multiple possibilities for the first evaluation point according to different fitting methods of the first curve. For example, the first evaluation point R1 may be the intersection of the first curve and the ordinate axis, or may be a point on the first curve that is at a certain distance (determined according to the fitted curve) from the ordinate axis. The first curve includes a first stable point S1, and the first stable point S1 may have a preset relationship with the first evaluation point R1. For example, when the ordinate of the first evaluation point R1 decays to N% (N is less than or equal to 100) and / or the decay speed is less than a predetermined value, it is the ordinate of the first stable point S1. Since there may be multiple points with the same ordinate, a point closest to the first evaluation point R1 may be selected as the first stable point S1.

[0063] In this embodiment, since the first curve represents the processing characteristics of the first processing process corresponding to the first relationship, and the second curve represents the processing characteristics of the second processing process corresponding to the second relationship, the change of the processing characteristics can be intuitively reflected by comparing the first curve and the second curve in the same coordinate system.

[0064] Please refer to Figure 3 In one embodiment, step S400 further includes: Selecting a curve segment within a preset range of the first evaluation point R1 in the first curve as a first evaluation interval; Selecting a curve segment within a preset range of the second evaluation point R2 in the second curve as a second evaluation interval; Determine a first evaluation value for the first evaluation interval and a second evaluation value for the second evaluation interval based on a predetermined indicator; Based on the degree of deviation between the first evaluation value and the second evaluation value, a tool state in the first machining process is determined.

[0065] In this embodiment, the circular area around R1 and R2 is the predetermined range. By selecting an evaluation interval for evaluation, the accuracy of the evaluation can be enhanced, and the evaluation value is selected by predetermined indicators, which can be applicable to a variety of different scenarios. The predetermined indicators include average value, maximum value, slope change and other indicators.

[0066] In this embodiment, tool wear is divided into initial wear, normal wear and acute wear. When this method is used to evaluate tool wear, in the initial wear and normal wear stages of the tool, the first relationship characterizing the first machining process will not deviate significantly from the second relationship characterizing the second machining process, that is, the degree of deviation between the first relationship and the second relationship will not be too large.

[0067] When the maximum value evaluation index is adopted (assuming that the first evaluation point R1 has the largest ordinate in the first evaluation interval, and assuming that the second evaluation point R2 has the largest ordinate in the second evaluation interval), the ordinate of the first evaluation point R1 is 100, the ordinate of the second evaluation point R2 is 130, and the degree of deviation is 30% (hereinafter referred to as evaluation point comparison). A predetermined threshold can be set according to the change value caused by the gradual wear of the normal tool. When the degree of deviation exceeds the predetermined threshold, it is determined to be a tool abnormality (sharp wear, chipping or breakage), and the output monitoring suggestion can be a tool abnormality, and it is recommended to check the tool status or stop the machine to replace the tool.

[0068] In this embodiment, the comparison method of other evaluation indicators (hereinafter referred to as other comparison) is similar to the comparison method between the first evaluation point R1 and the second evaluation point R2, and will not be described in detail here.

[0069] It should be noted that two or more evaluation indicators can be used for comprehensive evaluation. When evaluation point comparison and other comparisons are used at the same time, it is necessary to measure the first deviation degree of the evaluation point comparison and the second deviation degree of the other comparisons at the same time. The first coefficient and the second coefficient can be preset. The first coefficient is used to characterize the proportion of the first deviation degree, and the second coefficient is used to characterize the proportion of the second deviation degree. The final deviation degree = first coefficient * first deviation degree + second coefficient * second deviation degree.

[0070] In one embodiment, step S400 further includes: Selecting a curve segment within a preset range of the first stable point S1 on the first curve as a third evaluation interval; Selecting a curve segment within a preset range of the second stable point S2 on the second curve as a fourth evaluation interval; Determine a third evaluation value of the third evaluation interval and a fourth evaluation value of the fourth evaluation interval based on a predetermined indicator; Based on the degree of deviation between the third evaluation value and the fourth evaluation value, the state of incoming material and the state of the tool in the first machining process are judged.

[0071] In this embodiment, the second curve has a second evaluation point R2 relative to the ordinate axis, and the second curve includes a second stable point S2. The second stable point S2 and the second evaluation point may have a preset relationship. The method for determining the second evaluation point R2 and the second stable point S2 can refer to the method for obtaining the first evaluation point R1 and the first stable point S1, and will not be repeated here.

[0072] In this embodiment, for the same kind of workpiece, since it may be provided by different suppliers, the formula and process of production may be different, so the workpiece material is slightly different. By comparing the deviation between the third evaluation value and the fourth evaluation value, the change of the incoming material can be judged. For example, when the degree of deviation exceeds the predetermined threshold, the output monitoring suggestion may be that the incoming material changes greatly or the tool state changes, and it is recommended to check or replace the incoming material or tool. It can be understood that the comparison method between the third evaluation value and the fourth evaluation value is similar to the comparison method between the first evaluation value and the second evaluation value, and will not be repeated here.

[0073] In one embodiment, step S400 further includes: comparing a first change trend of the first curve and a second change trend of the second curve; Based on the difference between the first change trend and the second change trend, a change in processing conditions of the first processing process compared to the second processing process is determined.

[0074] In this embodiment, since the first curve represents the first relationship and the second curve represents the second relationship, and both the first relationship and the second relationship are obtained based on the same tool type and workpiece material, the first change trend and the second change trend can both represent changes in the processing environment other than the tool type and workpiece material. For example, the processing environment includes changes in machine tool performance (such as cold machine state, hot machine state, machine tool accuracy, fixture accuracy, etc.) and changes in cutting fluid.

[0075] In one possible example, the first slope is taken when the ordinate of the first evaluation point on the first curve decays to 70%; the second slope is taken when the ordinate of the second evaluation point on the second curve decays to 70%, and the deviation between the first slope and the second slope is compared. In this example, the first change trend and the second change trend can describe the decline speed of the corresponding curve.

[0076] In a possible example, two curves spaced apart and parallel to the Y axis can be used to simultaneously intercept the first curve and the second curve to obtain two curves at the same position. By comparing the similarity of the two curves, it is determined whether the processing environment has changed. For example, if the similarity of the two curves is greater than 90%, it is considered that the processing environment has not changed much and processing can continue.

[0077] In a possible example, two curves spaced apart and parallel to the Y axis can be used to simultaneously intercept the first curve and the second curve to obtain two curves at the same position, and the stability of the processing environment can be judged by comparing the fluctuation degree of the two curves. For example, if the number of fluctuations of the line segment intercepted from the first curve is greater than the number of fluctuations of the line segment intercepted from the second curve, and the fluctuation amplitude of the line segment intercepted from the first curve is greater than the fluctuation amplitude of the line segment intercepted from the second curve, it can be judged that the processing environment has changed.

[0078] In this embodiment, when the difference between the first change trend and the second change trend exceeds a predetermined threshold, the output monitoring suggestion may be that the processing environment is abnormal or unstable, and it is recommended to perform equipment maintenance before reprocessing.

[0079] Different from the above embodiment, another embodiment of the present application further includes: S100: Acquire first information of a first machining process, where the first information includes a first tool type and a first workpiece material in a current stage.

[0080] S200: calling a corresponding physical model from a model library according to the first information, wherein the model library includes a plurality of the physical models, and each of the physical models includes a second relationship between a material removal feature and a specific cutting amount obtained in a second machining process.

[0081] S210: Based on the corresponding multiple groups of material removal features and specific cutting amounts obtained from the physical model, a first boundary and a second boundary representing the second relationship are fitted in the coordinate system.

[0082] Step S310: determining a first coordinate representing the first relationship based on the real-time material removal feature and the real-time specific cutting amount; Step S400: comparing the positional relationship between the first coordinate and the first boundary and the second boundary.

[0083] Please refer to Figure 4 For each horizontal axis, the upper boundary point and the lower boundary point are generated respectively. The generation methods include normal distribution estimation (such as the three sigma principle), box plots, and maximum and minimum statistical methods. Then, a continuous first boundary is generated by fitting or enveloping multiple upper boundary points, or a continuous second boundary is generated by fitting or enveloping multiple lower boundary points. It should be noted that, in this embodiment, it is assumed that the first evaluation point R1 and the first stable point S1 are both at the first boundary, and it is assumed that the second evaluation point R2 and the second stable point S2 are both at the second boundary. This is only for illustrating a special case of the monitoring method and does not represent a limitation on the present application. In a possible example, the first evaluation point R1 and the first stable point S1 are both below the first boundary, and the second evaluation point R2 and the second stable point S2 are both above the second boundary.

[0084] In this embodiment, the first curve and the second curve are no longer used for comparison. Instead, the physical model identical to the first information is called to generate the first boundary and the second boundary in the coordinate system based on multiple sets of material removal features and specific cutting amounts in the physical model. Then, the first coordinate is obtained during the processing (the vertical coordinate is the real-time specific cutting amount, and the horizontal coordinate is the real-time material removal feature), and the positional relationship between the first coordinate and the first boundary and the second boundary is compared.

[0085] When the first coordinate is between the first boundary and the second boundary, the tool is judged to be in a normal processing state, and when the first coordinate is outside the first boundary and the second boundary, the tool is judged to be in an abnormal processing state. The output monitoring suggestion can be that the tool is abnormal or the processing environment is abnormal, and it is recommended to check before processing.

[0086] Please refer to Figure 6 The present application also provides a processing monitoring device, including: An information acquisition module 1 is used to acquire first information of a first machining process, wherein the first information includes a first tool type and a first workpiece material at a current stage; A calling module 2 is used to call a corresponding physical model from a model library according to the first information, wherein the model library includes a plurality of the physical models, each of the physical models includes a second relationship between a material removal feature and a specific cutting amount obtained in a second machining process, and the second machining process is a machining process before the first machining process; A calculation module 3, used to determine a first relationship between a material removal characteristic and a specific cutting amount in a first machining process; A comparison module 4, configured to compare the first relationship with the second relationship; The output module 5 is used to output monitoring suggestions based on the comparison results.

[0087] Since all the technical solutions of all the above method embodiments are adopted, all the beneficial effects brought by the technical solutions of the above embodiments are also obtained, which will not be described one by one here.

[0088] See also Figure 7 , which is a structural diagram of a computer device provided in an embodiment of the present application, the computer device 40 includes a processor 401 and a memory 402. The memory 402 is connected to the processor 401, for example, connected to the processor 401 through a bus.

[0089] The processor 401 is configured to support the computer device 40 to perform the corresponding functions in the method in the above method embodiment. The processor 401 can be a central processing unit (CPU), a network processor (NP), a hardware chip or any combination thereof. The above hardware chip can be an application specific integrated circuit (ASIC), a programmable logic device (PLD) or a combination thereof. The above PLD can be a complex programmable logic device (CPLD), a field-programmable gate array (FPGA), a generic array logic (GAL) or any combination thereof.

[0090] The memory 402 is used to store program codes, etc. The memory 402 may include a volatile memory (VM), such as a random access memory (RAM); the memory 402 may also include a non-volatile memory (NVM), such as a read-only memory (ROM), a flash memory, a hard disk drive (HDD), or a solid-state drive (SSD); the memory 402 may also include a combination of the above-mentioned types of memories.

[0091] An embodiment of the present application further provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, wherein the computer program includes program instructions, and when the program instructions are executed by a processor, the processor executes any one of the methods described above.

[0092] A person skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing the relevant hardware through a computer program, and the program can be stored in a computer-readable storage medium, and when the program is executed, it can include the processes of the embodiments of the above-mentioned methods. The storage medium can be a disk, an optical disk, a read-only memory (ROM) or a random access memory (RAM), etc.

[0093] The above are only optional embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.

Claims

1. A processing monitoring method, characterized in that: include: Acquire first information of a first machining process, wherein the first information includes a first tool type and a first workpiece material at a current stage; Calling a corresponding physical model from a model library according to the first information, wherein the model library includes a plurality of the physical models, each of the physical models includes a second relationship between a material removal feature and a specific cutting amount obtained in a second machining process, and the second machining process is obtained before the first machining process; determining a first relationship between a material removal characteristic and a specific cutting amount during a first machining process; comparing the first relationship with the second relationship; Output monitoring recommendations based on the comparison results.

2. The method according to claim 1, characterized in that: The calling the corresponding physical model from the model library according to the first information includes: The target physical model is called from the model library according to the first information, the second information of the target physical model is the same as the first information, and the second information includes a second tool type and a second workpiece material.

3. The method according to any one of claims 1 to 2, characterized in that: The comparing the first relationship with the second relationship comprises: acquiring a first curve representing the first relationship and a second curve representing the second relationship, Comparing the first curve and the second curve in the same coordinate system; The ordinate axis of the coordinate system is the specific cutting amount, and the abscissa axis of the coordinate system is the material removal feature.

4. The method according to claim 3, characterized in that: The first curve has a first evaluation point relative to the ordinate axis, and the second curve has a second evaluation point relative to the ordinate axis; The comparing the first curve and the second curve comprises: Selecting a curve segment within a preset range of a first evaluation point on the first curve as a first evaluation interval; Selecting a curve segment within a preset range of the second evaluation point on the second curve as a second evaluation interval; Determine a first evaluation value for the first evaluation interval and a second evaluation value for the second evaluation interval based on a predetermined indicator; Based on the degree of deviation between the first evaluation value and the second evaluation value, a tool state in the first machining process is determined.

5. The method according to claim 3, characterized in that: The first curve has a first stable point relative to the horizontal axis, and the second curve has a second stable point relative to the horizontal axis; The comparing the first curve and the second curve comprises: Selecting a curve segment within a preset range of the first stable point on the first curve as a third evaluation interval; Selecting a curve segment within a preset range of the second stable point on the second curve as a fourth evaluation interval; Determine a third evaluation value of the third evaluation interval and a fourth evaluation value of the fourth evaluation interval based on a predetermined indicator; Based on the degree of deviation between the third evaluation value and the fourth evaluation value, the state of incoming material and the state of the tool in the first machining process are judged.

6. The method according to claim 3, characterized in that: The comparing the first curve and the second curve comprises: comparing a first change trend of the first curve and a second change trend of the second curve; Based on the difference between the first change trend and the second change trend, a change in processing conditions of the first processing process compared to the second processing process is determined.

7. The method according to any one of claims 1 to 2, characterized in that: The calling the corresponding physical model from the model library according to the first information includes: Based on the corresponding multiple groups of material removal features and specific cutting amounts obtained from the physical model, a first boundary and a second boundary representing the second relationship are formed in the coordinate system; Determining a first relationship between a material removal feature and a specific cutting amount in a first machining process includes: Determine a first coordinate representing the first relationship based on the real-time material removal feature and the real-time specific cutting amount; The comparing the first relationship with the second relationship includes: Based on the relationship between the first coordinate and the first boundary and the second boundary, a machining condition state and a tool state in the first machining process are determined.

8. A processing monitoring device, characterized in that: include: An information acquisition module, used for acquiring first information of a first machining process, wherein the first information includes a first tool type and a first workpiece material at a current stage; A calling module, configured to call a corresponding physical model from a model library according to the first information, wherein the model library includes a plurality of the physical models, each of the physical models includes a second relationship between a material removal feature and a specific cutting amount obtained in a second machining process, and the second machining process is a machining process before the first machining process; A calculation module, used for determining a first relationship between a material removal characteristic and a specific cutting amount in a first machining process; A comparison module, configured to compare the first relationship with the second relationship; The output module is used to output monitoring suggestions based on the comparison results.

9. A computer device, characterized in that: The method comprises a memory and a processor, wherein the memory is connected to the processor, and the processor is used to execute one or more computer programs stored in the memory. When the processor executes the one or more computer programs, the computer device implements the method according to any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, wherein the computer program includes program instructions, and when the program instructions are executed by a processor, the processor is caused to perform the method according to any one of claims 1 to 7.

Citation Information

Cited By

  • Machining monitoring method, machining monitoring apparatus, computing device and computer-readable storage medium

    WO2026026430A1