Urban rail transit risk chain group construction method based on multilayer network
By constructing an urban rail transit risk chain group based on a multi-layer network method, the problem of lack of integrity and systematicness of analysis methods in the existing technology is solved, and the overall control of risk accidents in the urban rail transit system and the occurrence process of risk accidents are realized. The determination reduces the occurrence of risk accidents.
Patent Information
- Application Number
- CN202310423720.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-04-19
- Publication Date
- 2024-10-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing urban rail transit risk accident analysis methods based on accident trees and fishbone diagrams lack integrity and systematicity and cannot effectively reflect the development process of risk accidents.
The risk chain group construction method based on multi-layer network is used to determine the risk points and risk accident types of urban rail transit, define the connection relationship and logical relationship between risk points, and construct the risk chain group to represent the process of risk accident occurrence.
It has achieved overall control of risk accidents in the urban rail transit system, and can determine the accident development process and take corresponding control measures to reduce the occurrence of risk accidents.
Smart Images

Figure CN118863504A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of rail transit safety assurance technology, and in particular to a method for constructing a risk chain group for urban rail transit based on a multi-layer network. Background Art
[0002] The occurrence of risk accidents in urban rail transit systems is often not caused by hidden dangers at a single risk point. The occurrence of a risk accident is often caused by the interaction of hidden dangers at multiple risk points. Therefore, it is particularly important to study the interaction between risk points, analyze the generation process of urban rail transit risk accidents, and fully grasp the causes and development process of risk accidents in order to have a comprehensive grasp of the safety of the rail transit system.
[0003] The accident tree is a common method for analyzing accidents. The analysis process starts from a single top event, and then analyzes the lower events that may lead to the upper event step by step until the bottom event is found. The accident tree is a method of applying deduction to analyze how the top event occurs. The fishbone diagram is a systematic diagram of the many causes of a certain result, that is, a diagram to express the relationship between the result (characteristic) and the cause (factor). It is a causal analysis method. The disadvantage of the fishbone diagram in the field of safety analysis is that it cannot reflect the development process of the event.
[0004] Therefore, the existing urban rail transit risk accident analysis methods based on accident trees and fishbone diagrams lack integrity and systematicity. Summary of the invention
[0005] An embodiment of the present invention provides a method for constructing a risk chain group of urban rail transit based on a multi-layer network to solve the shortcomings of the prior art.
[0006] In order to achieve the above object, the present invention adopts the following technical scheme.
[0007] A method for constructing a risk chain group of urban rail transit based on a multi-layer network, comprising:
[0008] Step 1: Determine the risk points and risk accident types of urban rail transit, form all risk points into a risk point set, and form all risk accident types into a risk accident set;
[0009] Step 2: Define the connection relationship between risk points based on multi-layer network theory. The relationship between risk points in each layer of the network is defined as an inner connection, and the connection relationship between risk points in different layers of the network is defined as an outer connection.
[0010] Step 3: Determine the logical relationship between risk points, which includes a propagation relationship and a correlation relationship, and connect each risk point with a propagation relationship;
[0011] Step 4: Match the last risk point in the connected propagation relationship with the risk accident type to form a risk chain group.
[0012] Furthermore, the step 1 is specifically as follows:
[0013] Analyze relevant urban rail transit operation data and combine it with empirical data, determine the standards according to a certain risk point granularity from the four aspects of "man-machine-environment-management", and obtain the risk points in the actual operation of rail transit and risk accident type i , the four risk point sets of "man-machine-environment-management" are obtained, including: Thus, the global safety risk point set of urban rail transit is constructed S = {S 1 ,S 2 ,S 3 ,S 4}, the risk accident set composed of risk accident types is E = {e i |i=1,2,...,n}, where n1 is the risk point set S 1 The number of risk points in, n2 is the risk point set S 2 The number of risk points in, n3 is the risk point set S 3 The number of risk points in, n4 is the risk point set S 4 The number of risk points in .
[0014] Furthermore, in the risk point set S 1 Among them, the risk points of “people” include: Indicates negligence of maintenance personnel. The driver lacks safety awareness. It means the driver is operating improperly.
[0015] The risk points of "machine" include: Indicates that the power supply of the transmission equipment is unstable. Indicates a fixing bolt failure. Indicates a gateway power failure. Indicates a bogie failure. Indicates that the regional controller is offline. Improper networking method. Indicates that the train automatically downgrades. Indicates a functional design defect. All trains on the line applied emergency brakes. Indicates that the line is on fire. Indicates that the signal light is faulty.
[0016] The risk points of the “ring” include: Indicates foreign body intrusion. Indicates that the limit signs around the operating route are missing. Indicates extremely cold weather.
[0017] The risk points of “management” include: Insufficient staff training. Indicates the lack of emergency plan, so
[0018] Furthermore, the risk accident types include: e1 represents a train derailment accident, e2 represents a train delay accident, and e3 represents a fire accident, so the risk accident set is E={e1, e2, e3}.
[0019] Furthermore, the step 2 specifically includes:
[0020] According to the multi-layer network theory, the connection relationship between risk points is defined, and the connection relationship between risk points is reflected in the network as a connection edge. According to the urban rail transit operation data and empirical data, it is determined whether there is a connection edge between risk points. The connection relationship between risk points in each layer of the network is defined as an inner connection. Then, the risk points in the k-layer and The inner connecting edges between The connected edge set within the layer is
[0021]
[0022] The connection relationship between risk points in different layers of the network is defined as an external connection, then the risk point p in the layer and q-layer risk points The external connection edge between The set of inter-layer connection edges is:
[0023]
[0024] Furthermore, the step 3 specifically includes:
[0025] Based on empirical data and analysis of historical accident / failure data, the logical relationship types between risk points are determined. There are two types of logical relationships: one is a directional propagation relationship, which reflects the relationship between two risk points that have a sequence in the propagation process, including: promotion relationship and inhibition relationship; the other is a correlation relationship, which reflects the relationship between points that propagate risks toward the same risk point, including: and relationship and or relationship;
[0026] After determining the logical relationship between risk points, the risk points with propagation relationships are connected according to the propagation type.
[0027] Furthermore, the logical relationship is specifically defined as follows:
[0028] 1) Promote relationships
[0029] The promotion relationship refers to the fact that when a risk point generates hidden dangers, it can promote the generation of hidden dangers in other risk points that are connected to it. and The promoting relationship between p-layer risk points and q-layer risk points The promotion relationship is defined as
[0030] 2) Inhibition relationship
[0031] If the state of a risk point changes and the state of another risk point connected to it is not easy to change, then the former risk point is said to have an inhibitory relationship with the latter risk point. and The inhibitory relationship between p-layer risk points and q-layer risk points The inhibitory relationship between them is defined as
[0032] 3) Relationship with
[0033] The states of multiple risk points change at the same time. Their combined effect causes the states of other risk points to change, and ultimately leads to risk accidents. and The relationship between and is p-layer risk points and q-layer risk points The relationship between and is defined as
[0034] 4) or the relationship
[0035] If one of the multiple risk points has a hidden danger, it may lead to an accident. We define the relationship between these risk points as an OR relationship, where the risk points within the layer and The relationship between p-layer risk points and q-layer risk points The relationship between or is defined as
[0036] It can be seen from the technical solutions provided by the above-mentioned embodiments of the present invention that the present invention locates all possible types of risk accidents based on the connection relationship and logical relationship between the risk points of the urban rail transit system, and constructs a risk chain group, thereby determining the development process of accidents in the urban rail transit system and globally controlling the occurrence process of risk accidents. On this basis, corresponding control measures can be taken to reduce the occurrence of risk accidents and other advantages. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.
[0038] Figure 1 A processing flow chart of a method for constructing a risk chain group of urban rail transit based on a multi-layer network provided by an embodiment of the present invention;
[0039] Figure 2 A schematic diagram of the connection relationship between urban rail transit risk points provided by an embodiment of the present invention;
[0040] Figure 3 A schematic diagram of the propagation relationship between risk points in urban rail transit provided by an embodiment of the present invention;
[0041] Figure 4 A schematic diagram of a risk chain group for urban rail transit provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0042] To facilitate understanding of the embodiments of the present invention, several specific embodiments will be further explained below with reference to the accompanying drawings, and each embodiment does not constitute a limitation on the embodiments of the present invention.
[0043] The method proposed in the embodiment of the present invention starts from the basic events (risk points), studies the relationship between risk points, and explores the process of risk generation. There is no obvious superior-subordinate relationship between risk points, and the same risk point may have multiple risk chains passing through it. There are also multiple possibilities for the final risk accidents that evolve from the transmission of risk chains. This method is more in line with the law of event development.
[0044] Based on determining the risk point set and risk accident set of urban rail transit, the present invention studies the connection relationship and logical relationship between risk points, locates the formed risk accidents, and finally forms a risk chain group representing the process of risk accident occurrence. The risk accident formation process is analyzed from a global perspective, which has certain practical significance for controlling risk evolution and reducing the occurrence of risk accidents.
[0045] In order to solve the problem that the existing risk accident analysis lacks integrity and systematization, the embodiment of the present invention provides a method for constructing a risk chain group of urban rail transit based on a multi-layer network. The processing flow of the method is as follows: Figure 1 As shown, the following steps are included:
[0046] Step 1: Determine the risk points and risk accident types of urban rail transit, form all risk points into a risk point set, and form all risk accident types into a risk accident set;
[0047] Step 2: Define the connection relationship between risk points based on multi-layer network theory. The relationship between risk points in each layer of the network is defined as an inner connection, and the connection relationship between risk points in different layers of the network is defined as an outer connection.
[0048] Step 3: Determine the logical relationship between risk points, which includes a propagation relationship and a correlation relationship, and connect each risk point with a propagation relationship;
[0049] Step 4: Match the last risk point in the connected propagation relationship with the risk accident type to form a risk chain group.
[0050] The step 1 is specifically as follows:
[0051] Analyze the operation data of relevant urban rail transit, and combine the previous experience data of urban rail transit on-site engineers and managers. At the same time, determine the standards according to a certain risk point granularity from the four aspects of "man-machine-environment-management" to obtain the risk points in the actual operation of rail transit. and risk accident type i , the four risk point sets of "man-machine-environment-management" are obtained as follows: in, Represents the risk point set S 1 The i-th risk point in Represents the risk point set S 2 The i-th risk point in Represents the risk point set S 3 The i-th risk point in Represents the risk point set S 4 The i-th risk point in, n1 is the risk point set S 1 The number of risk points in, n2 is the risk point set S 2 The number of risk points in, n3 is the risk point set S 3 The number of risk points in, n4 is the risk point set S 4 The number of risk points in .
[0052] At risk point set S 1Among them, the risk points of “people” include: Indicates negligence of maintenance personnel. The driver lacks safety awareness. It means the driver is operating improperly.
[0053] The risk points of "machine" include: Indicates that the power supply of the transmission equipment is unstable. Indicates a fixing bolt failure. Indicates a gateway power failure. Indicates a bogie failure. Indicates that the regional controller is offline. Improper networking method. Indicates that the train automatically downgrades. Indicates a functional design defect. All trains on the line applied emergency brakes. Indicates that the line is on fire. Indicates that the signal light is faulty.
[0054] The risk points of the “ring” include: Indicates foreign body intrusion. Indicates that the limit signs around the operating route are missing. Indicates extremely cold weather.
[0055] The risk points of “management” include: Insufficient staff training. Indicates the lack of emergency plan, so Constructing the global safety risk point set of urban rail transit S = {S 1 ,S 2 ,S 3 ,S 4}.
[0056] The risk accident types are determined as follows: e1 represents a train derailment accident, e2 represents a train delay accident, and e3 represents a fire accident. Therefore, the risk accident set is E = {e1, e2, e3}.
[0057] The step 2 is specifically as follows:
[0058] According to the multi-layer network theory, the connection relationship between risk points is defined, and this connection relationship is reflected in the network in the form of connecting edges.
[0059] The connection relationship between risk points in each layer of the network is defined as inner connection, so the k-layer risk points and The inner connecting edges between The connected edge set within the layer is
[0060] The connection relationship between risk points in different layers of the network is defined as an outer connection, then the risk point p in the layer and q-layer risk points The external connection edge between The set of inter-layer connection edges is
[0061]
[0062] Based on empirical data and urban rail transit operation data, determine whether there are connecting edges between risk points.
[0063] The step 3 determines the logical relationship between the risk points, and the risk points connected with the propagation relationship are specifically:
[0064] Based on empirical data and analysis of historical accident / failure data of urban rail transit operations, the logical relationship types between risk points are determined. The logical relationship types are divided into two types: one is a propagation relationship (directional), which reflects the relationship between two risk points that have a sequence in the propagation process, including: promotion relationship and inhibition relationship; the other is a correlation relationship, which reflects the relationship between points that propagate risks toward the same risk point, including: and relationship and or relationship. After determining the logical relationship between risk points, the risk points with propagation relationships are connected according to the propagation type.
[0065] The logical relationship is specifically defined as follows:
[0066] 1) Promote relationships
[0067] The promotion relationship means that if a risk point generates hidden dangers, it may promote hidden dangers in other risk points that are connected to it. and The promoting relationship between p-layer risk points and q-layer risk points The promotion relationship is defined as
[0068] 2) Inhibition relationship
[0069] If the state of a risk point changes and the state of another risk point connected to it is not easy to change, then the former risk point is said to have an inhibitory relationship with the latter risk point. and The inhibitory relationship between p-layer risk points and q-layer risk points The inhibitory relationship between them is defined as
[0070] 3) Relationship with
[0071] The states of multiple risk points change at the same time. Their combined effect causes the states of other risk points to change, and ultimately leads to risk accidents. and The relationship between and is p-layer risk points and q-layer risk points The relationship between and is defined as
[0072] 4) or the relationship
[0073] If one of the multiple risk points has a hidden danger, it may lead to an accident. The relationship between these risk points is defined as an OR relationship, where the risk points within the layer and The relationship between p-layer risk points and q-layer risk points The relationship between or is defined as
[0074] Figure 2 A schematic diagram of promotion or suppression between risk points in urban rail transit provided in an embodiment of the present invention. To make the schematic diagram clearer, the symbols of connecting edges between risk points are omitted. Figure 3 A schematic diagram of the relationship of and and or between urban rail transit risk points provided by an embodiment of the present invention.
[0075] Step 4: Match the last risk point in the connected propagation relationship with the risk accident type to form a risk chain group.
[0076] According to the connection relationship and logical relationship between all risk points in the above risk point set, the last risk point in the connected propagation relationship is matched with the risk accident type to form a risk chain group, which represents the process of risk accident occurrence. In order to make the propagation process diagram clearer, Figure 4 A schematic diagram of an urban rail transit risk chain group provided in an embodiment of the present invention.
[0077] To sum up, the present invention obtains all possible types of risk accidents and constructs risk chain groups based on the connection relationship and logical relationship between risk points in the urban rail transit system, so as to determine the development process of accidents in the urban rail transit system and globally control the process of risk accidents. On this basis, corresponding control measures can be taken to reduce the occurrence of risk accidents and other advantages.
[0078] Applying the method of the embodiment of the present invention has certain practical significance for controlling risk evolution and reducing the occurrence of risk accidents.
[0079] Those skilled in the art can understand that the accompanying drawings are only schematic diagrams of an embodiment, and the modules or processes in the accompanying drawings are not necessarily required to implement the present invention.
[0080] The above is only a preferred specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily thought of by a person skilled in the art within the technical scope disclosed by the present invention should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.
Claims
1. A method for constructing a risk chain group of urban rail transit based on a multi-layer network, characterized in that: include: Step 1: Determine the risk points and risk accident types of urban rail transit, form all risk points into a risk point set, and form all risk accident types into a risk accident set; Step 2: Define the connection relationship between risk points based on multi-layer network theory. The relationship between risk points in each layer of the network is defined as an inner connection, and the connection relationship between risk points in different layers of the network is defined as an outer connection. Step 3: Determine the logical relationship between risk points, which includes a propagation relationship and a correlation relationship, and connect each risk point with a propagation relationship; Step 4: Match the last risk point in the connected propagation relationship with the risk accident type to form the final risk chain group.
2. The method according to claim 1, characterized in that: The step 1 is specifically as follows: Analyze relevant urban rail transit operation data and combine it with empirical data, determine the standards according to a certain risk point granularity from the four aspects of "man-machine-environment-management", and obtain the risk points in the actual operation of rail transit and risk accident type i , the four risk point sets of "man-machine-environment-management" are obtained, including: Thus, the global safety risk point set of urban rail transit is constructed S = {S 1 ,S 2 ,S 3 ,S 4 }, the risk accident set composed of risk accident types is E = {e i |i=1,2,...,n}, where n1 is the risk point set S 1 The number of risk points in, n2 is the risk point set S 2 The number of risk points in, n3 is the risk point set S 3 The number of risk points in, n4 is the risk point set S 4 The number of risk points in .
3. The method according to claim 2, characterized in that: At risk point set S 1 The "human" risk points include: Indicates negligence of maintenance personnel. The driver lacks safety awareness. It means the driver is operating improperly. The risk points of "machine" include: Indicates that the power supply of the transmission equipment is unstable. Indicates a fixing bolt failure. Indicates a gateway power failure. Indicates a bogie failure. Indicates that the regional controller is offline. Improper networking method. Indicates that the train automatically downgrades. Indicates a functional design defect. All trains on the line applied emergency brakes. Indicates that the line is on fire. Indicates that the signal light is faulty. The risk points of the "ring" include: Indicates foreign body intrusion. Indicates that the limit signs around the operating route are missing. Indicates extremely cold weather. The risk points of "management" include: Insufficient staff training. Indicates the lack of emergency plan, so 4. The method according to claim 2, characterized in that: The risk accident types include: e1 represents a train derailment accident, e2 represents a train delay accident, and e3 represents a fire accident, so the risk accident set is E={e1, e2, e3}.
5. The method according to any one of claims 1 to 4, characterized in that: The step 2 specifically includes: According to the multi-layer network theory, the connection relationship between risk points is defined. The connection relationship between risk points is reflected in the network in the form of connecting edges. According to the urban rail transit operation data and empirical data, whether there are connecting edges between risk points is determined. The connection relationship between risk points in each layer of the network is defined as an inner connection. Then, the k-layer risk points and The inner connecting edges between The connected edge set within the layer is The connection relationship between risk points in different layers of the network is defined as an external connection, then the risk point p in the layer and q-layer risk points The external connection edge between The set of inter-layer connection edges is:
6. The method according to claim 5, characterized in that The step 3 specifically includes: Based on empirical data and analysis of historical accident / failure data, the logical relationship types between risk points are determined. There are two types of logical relationships: one is a directional propagation relationship, which reflects the relationship between two risk points that have a sequence in the propagation process, including: promotion relationship and inhibition relationship; the other is a correlation relationship, which reflects the relationship between points that propagate risks toward the same risk point, including: and relationship and or relationship; After determining the logical relationship between risk points, the risk points with propagation relationships are connected according to the propagation type.
7. The method according to claim 6, characterized in that The logical relationship is specifically defined as follows: 1) Promote relationships The promotion relationship refers to the fact that when a risk point generates hidden dangers, it can promote the generation of hidden dangers in other risk points that are connected to it. and The promoting relationship between p-layer risk points and q-layer risk points The promotion relationship is defined as 2) Inhibition relationship If the state of a risk point changes and the state of another risk point connected to it is not easy to change, then the former risk point is said to have an inhibitory relationship with the latter risk point. and The inhibitory relationship between p-layer risk points and q-layer risk points The inhibitory relationship between them is defined as 3) Relationship with The states of multiple risk points change at the same time. Their combined effect causes the states of other risk points to change, and ultimately leads to risk accidents. and The relationship between and is p-layer risk points and q-layer risk points The relationship between and is defined as 4) or the relationship If one of the multiple risk points has a hidden danger, it may lead to an accident. We define the relationship between these risk points as an OR relationship, where the risk points within the layer and The relationship between p-layer risk points and q-layer risk points The relationship between or is defined as