Building engineering environment monitoring method and system
By acquiring and preprocessing a variety of environmental data in real time and calculating a comprehensive environmental assessment index, it solves the one-sided problem of traditional environmental monitoring methods, achieves comprehensive assessment of the construction area and early risk warning, and improves the accuracy of environmental monitoring and construction safety.
Patent Information
- Application Number
- CN202411324671.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-23
- Publication Date
- 2024-10-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional building construction environmental monitoring methods are usually limited to a single environmental indicator and lack multi-dimensional and comprehensive monitoring methods, resulting in one-sided monitoring data and difficulty in reflecting the comprehensive environmental conditions of the construction area, which may lead to environmental risks and affect project safety and progress.
Through real-time acquisition and pre-processing of various environmental data such as air quality, construction environment, surface settlement and soil infiltration in the building construction area, various evaluation indexes are calculated, and comprehensive analysis is performed to determine whether the preset threshold is exceeded and an environmental abnormality alarm is sent.
It achieves a comprehensive and accurate assessment of the environment in the construction area, improves the accuracy and effectiveness of environmental monitoring, detects environmental risks early, improves construction safety and management efficiency, reduces reliance on manual operations, and supports automated monitoring.
Smart Images

Figure CN118863545A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of construction engineering environment monitoring, and in particular to a construction engineering environment monitoring method and system. Background Art
[0002] Environmental monitoring technology plays a vital role in modern construction projects, which involves real-time monitoring and evaluation of multiple factors that affect the environment during construction. With the acceleration of urbanization and the improvement of public environmental awareness, it has become particularly important to ensure that the impact of construction activities on the environment is minimized. In addition, strict environmental protection regulations require construction projects to not only comply with safety and construction standards, but also ensure that environmental indicators meet statutory requirements to prevent negative impacts on surrounding ecosystems and residents' lives.
[0003] Based on the above solution, it is found that the limitations of the existing technology include at least the following problems: during the construction process, traditional environmental monitoring methods are often limited to monitoring of a single environmental indicator, such as only independent monitoring of air quality or noise levels, and lack of multi-dimensional and comprehensive monitoring methods, such as monitoring of surface subsidence, soil infiltration changes, light pollution, etc., which can easily lead to one-sidedness of monitoring data and make it difficult to fully reflect the comprehensive environmental conditions of the construction area. As a result, it is easy for some environmental parameters to meet the requirements under a single indicator, but other unmonitored factors may cause environmental risks, affecting the overall safety and progress of the project, while causing the construction site to have a negative impact on the surrounding environment, ecosystem and residential areas, exacerbating environmental damage during the construction process. Summary of the invention
[0004] In view of the deficiencies in the prior art, the present invention provides a construction project environmental monitoring method and system, which solves the problem that during the construction process, traditional environmental monitoring methods are often limited to monitoring of a single environmental indicator, such as only independent monitoring of air quality or noise levels, and lack of multi-dimensional and comprehensive monitoring means, such as monitoring of surface subsidence, soil infiltration changes, light pollution, etc., which easily leads to the one-sidedness of the monitoring data and makes it difficult to fully reflect the comprehensive environmental conditions of the construction area. As a result, it is easy for some environmental parameters to meet the requirements under a single indicator, but other unmonitored factors may cause environmental risks, affecting the overall safety and progress of the project, while causing the construction site to have a negative impact on the surrounding environment, ecosystem and residential areas, exacerbating the problem of environmental damage during the construction process.
[0005] To achieve the above objectives, the present invention is implemented through the following technical solutions: a method for monitoring the environment of a construction project, comprising the following steps: acquiring in real time air quality data, construction environment data, surface settlement data, and soil infiltration data of each construction area in the construction project, and performing preprocessing; analyzing the preprocessed air quality data, construction environment data, surface settlement data, and soil infiltration data of each construction area in the construction project, respectively, to obtain an air quality assessment index, a construction environment assessment index, a surface settlement assessment index, and a soil infiltration assessment index of each construction area in the construction project; performing comprehensive analysis on the air quality assessment index, construction environment assessment index, surface settlement assessment index, and soil infiltration assessment index of each construction area in the construction project, respectively, to obtain a comprehensive environmental assessment index of each construction area in the construction project; judging whether the comprehensive environmental assessment index of each construction area in the construction project is respectively within a preset environmental threshold range, and if there is a construction area whose comprehensive environmental assessment index is outside the preset environmental threshold range, marking the area and sending an environmental abnormality alarm.
[0006] Furthermore, the air quality data includes regional PM2.5 concentration values, regional PM10 concentration values, regional carbon dioxide concentration values, and regional emissions of each harmful gas; the construction environment data includes regional noise values, regional construction light intensity values, and regional environmental light intensity values; the surface settlement data includes the surface height value of each measuring location; and the soil infiltration data includes the soil moisture content value of each measuring location at several time points.
[0007] Furthermore, the specific steps for obtaining the comprehensive environmental assessment index of each construction area in the construction project are as follows: normalize the air quality assessment index, construction environment assessment index, surface settlement assessment index, and soil infiltration assessment index of each construction area in the construction project respectively; comprehensively analyze the normalized air quality assessment index, construction environment assessment index, surface settlement assessment index, and soil infiltration assessment index of each construction area in the construction project respectively to obtain the comprehensive environmental assessment index of each construction area in the construction project, and the calculation formula is as follows: ;in, For the Comprehensive environmental assessment index of the construction area, After normalization Air quality assessment index for construction areas, The first The air quality coefficient of the construction area, After normalization The construction environment assessment index of each construction area, The first The construction environment coefficient of each construction area, After normalization The surface settlement assessment index of the construction area is The first The surface settlement coefficient of the construction area is After normalization Soil permeability assessment index for each construction area, The first The soil permeability coefficient of the construction area is is a natural constant, , , is the number of construction areas.
[0008] Furthermore, the specific steps for obtaining the air quality assessment index of each construction area in the construction project are as follows: obtain the regional PM2.5 concentration standard value, regional PM10 concentration standard value, regional carbon dioxide concentration standard value, and regional standard emission of each harmful gas in each construction area in the construction project, and conduct a comprehensive analysis based on the regional PM2.5 concentration value, regional PM10 concentration value, regional carbon dioxide concentration value, and regional emission of each harmful gas to obtain the PM2.5 concentration assessment index, PM10 concentration assessment index, carbon dioxide concentration assessment index, and harmful gas emission assessment index for each construction area in the construction project; conduct a comprehensive analysis of the PM2.5 concentration assessment index, PM10 concentration assessment index, carbon dioxide concentration assessment index, and harmful gas emission assessment index for each construction area in the construction project to obtain the air quality assessment index for each construction area in the construction project.
[0009] Furthermore, the specific formulas for calculating the PM2.5 concentration assessment index, PM10 concentration assessment index, carbon dioxide concentration assessment index, harmful gas emission assessment index, and air quality assessment index for each construction area in the construction project are as follows: ;in, For the PM2.5 concentration assessment index for each construction area, For the The regional PM2.5 concentration value of the construction area, For the The regional PM2.5 concentration standard value of the construction area, For the PM10 concentration assessment index for each construction area, For the The regional PM10 concentration value of the construction area, For the The regional PM10 concentration standard value of the construction area, For the Carbon dioxide concentration assessment index for construction areas, For the The regional carbon dioxide concentration value of the construction area, For the The standard value of regional carbon dioxide concentration in the construction area, For the PM2.5 concentration assessment index for each construction area, For the The construction area Regional emissions of harmful gases, For the The construction area The regional standard emission of harmful gases, For the The construction area The weighting coefficient of harmful gases, , is the number of harmful gases, For the Air quality assessment index for construction areas, The first PM2.5 concentration coefficient of each construction area, The first PM10 concentration coefficient of each construction area, The first The carbon dioxide concentration coefficient of the construction area is The first The harmful gas coefficient of each construction area, is a natural constant, , , is the number of construction areas.
[0010] Furthermore, the specific steps for obtaining the construction environment assessment index of each construction area in the construction project are as follows: obtain the regional noise standard value of each construction area in the construction project, and conduct a comprehensive analysis in combination with the regional noise value to obtain the noise assessment index of each construction area in the construction project; conduct a comprehensive analysis of the regional construction light intensity value and the regional ambient light intensity value of each construction area in the construction project to obtain the light pollution assessment index of each construction area in the construction project; conduct a comprehensive analysis of the noise assessment index and the light pollution assessment index of each construction area in the construction project to obtain the construction environment assessment index of each construction area in the construction project.
[0011] Furthermore, the specific formulas for calculating the noise assessment index, light pollution assessment index, and construction environment assessment index of each construction area in the construction project are as follows: ;in, For the Noise assessment index for construction areas, For the The regional noise value of the construction area, For the The regional noise standard value of the construction area, For the Light pollution assessment index for construction areas, For the The regional construction light intensity value of each construction area, For the The regional ambient light intensity value of the construction area, For the The construction environment assessment index of each construction area, The first The noise coefficient of the construction area, The first The light pollution coefficient of the construction area is , , is the number of construction areas.
[0012] Furthermore, the specific steps for obtaining the surface settlement assessment index of each construction area in the construction project are as follows: perform mean analysis on the surface height values of each measurement position in each construction area in the construction project to obtain the mean surface height of each construction area in the construction project; obtain the initial value of the surface height and the maximum allowable settlement value of each construction area in the construction project, and perform a comprehensive analysis in combination with the mean surface height to obtain the surface settlement assessment index of each construction area in the construction project; wherein, the specific formula for calculating the mean surface height and the surface settlement assessment index of each construction area in the construction project is as follows: ;in, For the The average ground height of the construction area is For the The construction area The ground surface height value at each measurement location, , is the number of measurement positions, For the The surface settlement assessment index of the construction area is For the The initial value of the ground height of the construction area, For the The maximum allowable settlement value of the construction area is , is the number of construction areas.
[0013] Furthermore, the specific steps for obtaining the soil permeability assessment index of each construction area in the construction project are as follows: read the soil moisture value of each measurement position at several time points in each construction area in the construction project, and perform mean analysis to obtain the mean value of the soil moisture content at several time points in each construction area in the construction project; perform a comprehensive analysis on the mean value of the soil moisture content at several time points in each construction area in the construction project to obtain the soil permeability assessment index of each construction area in the construction project; wherein, the specific formula for calculating the mean value of the soil moisture content and the soil permeability assessment index at several time points in each construction area in the construction project is as follows: { TJ iv = ∑ b = 1 b 0 T ivb b 0 Trs i = ∑ v = 1 v 0 − 1 [ TJ i ( v + 1 ) − TJ iv ] v 0 ;in, For the The construction area The mean soil moisture content at each time point is For the The construction area The time point The soil moisture value at each measuring location, For the The construction area The mean soil moisture content at each time point is , is the number of measurement positions, , is the number of time points, , is the number of construction areas.
[0014] A construction project environment monitoring system comprises: a data acquisition module, an evaluation and analysis module, a comprehensive analysis module, and a judgment and analysis module; the data acquisition module is used to acquire air quality data, construction environment data, surface settlement data, and soil infiltration data of each construction area in the construction project in real time, and perform preprocessing; the evaluation and analysis module is used to analyze the preprocessed air quality data, construction environment data, surface settlement data, and soil infiltration data of each construction area in the construction project, respectively, to obtain the air quality evaluation index, construction environment evaluation index, surface settlement evaluation index, and soil infiltration evaluation index of each construction area in the construction project; the comprehensive analysis module is used to perform comprehensive analysis on the air quality evaluation index, construction environment evaluation index, surface settlement evaluation index, and soil infiltration evaluation index of each construction area in the construction project, respectively, to obtain the comprehensive environment evaluation index of each construction area in the construction project; the judgment and analysis module is used to judge whether the comprehensive environment evaluation index of each construction area in the construction project is respectively within a preset environmental threshold range, and if there is a construction area whose comprehensive environment evaluation index is outside the preset environmental threshold range, the area is marked and an environmental abnormality alarm is sent.
[0015] The present invention has the following beneficial effects:
[0016] (1) This construction project environmental monitoring method can comprehensively and accurately reflect the environmental conditions in the construction project by acquiring and preprocessing various environmental data such as air quality, construction environment, surface subsidence, soil infiltration, etc. in real time. Compared with the traditional single monitoring indicator, it covers more key environmental parameters and supports real-time updates, so that construction managers can timely grasp the environmental changes at the construction site. In addition, the data preprocessing step ensures data quality and avoids the interference of abnormal data on the analysis results, which greatly improves the accuracy and effectiveness of environmental monitoring.
[0017] (2) This construction project environmental monitoring method can conduct a comprehensive assessment of the overall environmental conditions of the construction area through a comprehensive analysis of various environmental assessment indexes, and determine in real time whether there are environmental risks. Once the environmental assessment index of a construction area exceeds the preset threshold, the system will immediately issue an alarm to prompt relevant personnel to take corresponding measures. Compared with the traditional post-feedback mechanism, this real-time early warning mechanism can help managers detect environmental problems early, such as excessive air pollution, excessive noise or surface subsidence risks, to avoid environmental deterioration or project delays caused by delayed treatment, thereby improving environmental safety during the construction process.
[0018] (3) This construction project environmental monitoring method systematizes and standardizes multi-dimensional environmental data through normalization and weighted coefficient analysis, and realizes unified evaluation of different environmental data by calculating the comprehensive environmental assessment index. It not only improves the management efficiency of environmental data, but also ensures that different types of environmental problems in the construction area can be fully considered and reasonably measured. Construction managers can quickly evaluate the overall environmental quality of each area based on the comprehensive assessment index, which greatly improves management efficiency. At the same time, it also provides a scientific quantitative basis for environmental monitoring of construction projects and reduces unnecessary time and manpower investment.
[0019] (4) The construction project environmental monitoring system realizes fully automated monitoring of the construction area environment through the integration of data acquisition module, evaluation and analysis module, comprehensive analysis module and judgment and analysis module, greatly reducing the reliance on manual operation. Traditional environmental monitoring usually requires manual data collection and manual analysis, while the system can automatically obtain multiple key data such as air quality, construction environment, surface subsidence, soil infiltration, etc. in real time, and perform efficient automated processing and analysis. Through systematic module collaboration, construction managers can rely on the real-time comprehensive evaluation results provided by the system to quickly respond to environmental anomalies and ensure the continuity and accuracy of environmental monitoring. At the same time, the automatic alarm function enables managers to obtain environmental risk warnings in the first place, thereby improving the initiative and efficiency of environmental risk management at the construction site.
[0020] Of course, any product implementing the present invention does not necessarily need to achieve all of the advantages described above at the same time. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 The present invention is a flow chart of a construction engineering environment monitoring method.
[0022] Figure 2 The present invention is a flowchart of the specific steps of obtaining a comprehensive environmental assessment index for each construction area in a construction project in a construction project environmental monitoring method.
[0023] Figure 3 The present invention is a flowchart of the specific steps of obtaining the air quality evaluation index of each construction area in a construction project in a construction project environment monitoring method.
[0024] Figure 4 The present invention is a block diagram of a construction engineering environment monitoring system. DETAILED DESCRIPTION
[0025] The embodiment of the present application solves the problem that traditional environmental monitoring methods during the construction process are often limited to monitoring of a single environmental indicator, such as only independent monitoring of air quality or noise levels, and lack of multi-dimensional and comprehensive monitoring means, such as monitoring of surface subsidence, soil infiltration changes, light pollution, etc., which easily leads to one-sidedness of monitoring data and makes it difficult to fully reflect the comprehensive environmental conditions of the construction area. As a result, it is easy for some environmental parameters to meet the requirements under a single indicator, but other unmonitored factors may cause environmental risks, affecting the overall safety and progress of the project, while causing the construction site to have a negative impact on the surrounding environment, ecosystem and residential areas, exacerbating the problem of environmental damage during the construction process.
[0026] The overall idea of the problem in the embodiment of this application is as follows:
[0027] Real-time monitoring and data collection of environmental data (air quality, construction environment, surface subsidence, soil infiltration) of each construction area are carried out to ensure the accuracy and continuity of the data. The preprocessing step cleans, screens and standardizes the collected raw data to remove noise and outliers, ensure that the data can be used for subsequent analysis, and classify and analyze the preprocessed data. By calculating various evaluation indexes (such as air quality evaluation index, construction environment evaluation index, surface subsidence evaluation index, soil infiltration evaluation index, etc.), a comprehensive evaluation of the specific environment of each construction area is carried out to obtain various environmental evaluation data, and all environmental evaluation indexes are comprehensively analyzed to calculate the comprehensive environmental evaluation index of each construction area, and compared with the preset environmental threshold. Once the environmental evaluation index of a certain area exceeds the threshold, the system automatically marks the area, sends an abnormal alarm, and notifies the relevant staff to ensure that necessary response measures are taken in a timely manner.
[0028] See also Figure 1The embodiment of the present invention provides a technical solution: a method for monitoring the environment of a construction project, comprising the following steps: acquiring air quality data, construction environment data, surface settlement data, and soil infiltration data of each construction area in the construction project in real time, and performing preprocessing; analyzing the preprocessed air quality data, construction environment data, surface settlement data, and soil infiltration data of each construction area in the construction project respectively, to obtain an air quality assessment index, a construction environment assessment index, a surface settlement assessment index, and a soil infiltration assessment index of each construction area in the construction project; performing comprehensive analysis on the air quality assessment index, construction environment assessment index, surface settlement assessment index, and soil infiltration assessment index of each construction area in the construction project respectively, to obtain a comprehensive environmental assessment index of each construction area in the construction project; judging whether the comprehensive environmental assessment index of each construction area in the construction project is respectively within a preset environmental threshold range, and if there is a construction area whose comprehensive environmental assessment index is outside the preset environmental threshold range, marking the area, sending an environmental abnormality alarm, and notifying relevant staff at the same time.
[0029] The air quality data include regional PM2.5 concentration values, regional PM10 concentration values, regional carbon dioxide concentration values, and regional emissions of each harmful gas; the construction environment data include regional noise values, regional construction light intensity values, and regional ambient light intensity values; the surface settlement data include the surface height values of each measuring location; and the soil infiltration data include the soil moisture content values of each measuring location at several time points.
[0030] Among them, the regional PM2.5 concentration value and the regional PM10 concentration value are obtained through a laser dust sensor (such as an optical particulate matter sensor).
[0031] The regional carbon dioxide concentration value is obtained through the infrared CO2 sensor.
[0032] The regional emission of each harmful gas is obtained by a multi-component gas analyzer.
[0033] The noise value is obtained by using a noise meter.
[0034] The light intensity value of the construction area and the light intensity value of the regional environment are obtained through the light intensity sensor (Lux sensor).
[0035] The ground height value at each measurement location is obtained using a total station or GPS / GNSS system.
[0036] The soil moisture sensor is used to obtain the soil moisture value at each measurement location at several time points.
[0037] Specifically, Figure 2As shown in the figure, the specific steps for obtaining the comprehensive environmental assessment index of each construction area in the construction project are as follows: normalize the air quality assessment index, construction environment assessment index, surface settlement assessment index, and soil infiltration assessment index of each construction area in the construction project respectively; comprehensively analyze the normalized air quality assessment index, construction environment assessment index, surface settlement assessment index, and soil infiltration assessment index of each construction area in the construction project respectively to obtain the comprehensive environmental assessment index of each construction area in the construction project, and the calculation formula is as follows: ;in, For the Comprehensive environmental assessment index of the construction area, After normalization Air quality assessment index for construction areas, The first The air quality coefficient of the construction area, After normalization The construction environment assessment index of each construction area, The first The construction environment coefficient of each construction area, After normalization The surface settlement assessment index of the construction area is The first The surface settlement coefficient of the construction area is After normalization Soil permeability assessment index for each construction area, The first The soil permeability coefficient of the construction area is is a natural constant, , , is the number of construction areas.
[0038] It needs to be explained that , , , The specific calculation process is: The air and value, construction and value, maximum allowable settlement value (obtained from the Code for Design of Building Foundations), and maximum allowable change rate of soil moisture content (the safe range of moisture content change is determined by engineering specifications or design standards) of each construction area are summed up to obtain the The environment and value of the construction area, and then The air and value, construction and value, maximum allowable settlement value, and maximum allowable change rate of soil moisture content in each construction area are ratio-analyzed with the environmental and value respectively. The ratio result is the corresponding coefficient, and these parameters are standardized before summing up, so they can be directly added for calculation.
[0039] In this implementation scheme, by introducing normalization processing and ratio analysis, the evaluation results of different environmental indicators (such as air quality, construction environment, surface settlement, and soil infiltration) are compared and weighted for comprehensive analysis at the same scale, thereby ensuring that the magnitude and unit of each evaluation index are consistent. Normalization processing standardizes the air quality, construction environment, settlement, and soil infiltration data of each construction area, so that different environmental factors can be fairly reflected in the comprehensive environmental evaluation index, avoiding excessive influence of a parameter on the overall evaluation result due to excessive or small magnitude. In addition, by comparing the actual evaluation data of each construction area with the reference coefficients stored in the database (such as air quality coefficient, construction environment coefficient, maximum allowable settlement value, and maximum allowable change rate of soil moisture content) for ratio analysis, it can accurately reflect whether the environmental performance of each area meets the standard or exceeds the standard. This method not only improves the accuracy of the calculation, but also enhances the flexibility and adaptability of the system, enabling it to be dynamically adjusted according to the specific environmental characteristics of different regions, thereby ensuring the overall environmental safety and scientificity of the construction project. At the same time, the standardized data is directly added, which simplifies the calculation process and improves the efficiency of data analysis.
[0040] Specifically, Figure 3 As shown, the specific steps for obtaining the air quality assessment index of each construction area in the construction project are as follows: obtain the regional PM2.5 concentration standard value, regional PM10 concentration standard value, regional carbon dioxide concentration standard value, and regional standard emission of each harmful gas in each construction area in the construction project, and conduct a comprehensive analysis based on the regional PM2.5 concentration value, regional PM10 concentration value, regional carbon dioxide concentration value, and regional emission of each harmful gas to obtain the PM2.5 concentration assessment index, PM10 concentration assessment index, carbon dioxide concentration assessment index, and harmful gas emission assessment index of each construction area in the construction project; conduct a comprehensive analysis of the PM2.5 concentration assessment index, PM10 concentration assessment index, carbon dioxide concentration assessment index, and harmful gas emission assessment index of each construction area in the construction project to obtain the air quality assessment index of each construction area in the construction project.
[0041] The specific formulas for calculating the PM2.5 concentration assessment index, PM10 concentration assessment index, carbon dioxide concentration assessment index, harmful gas emission assessment index, and air quality assessment index for each construction area in a construction project are as follows: ;in, For the PM2.5 concentration assessment index for each construction area, For the The regional PM2.5 concentration value of the construction area, For the The regional PM2.5 concentration standard value of the construction area, For the PM10 concentration assessment index for each construction area, For the The regional PM10 concentration value of the construction area, For the The regional PM10 concentration standard value of the construction area, For the Carbon dioxide concentration assessment index for construction areas, For the The regional carbon dioxide concentration value of the construction area, For the The standard value of regional carbon dioxide concentration in the construction area, For the PM2.5 concentration assessment index for each construction area, For the The construction area Regional emissions of harmful gases, For the The construction area The regional standard emission of harmful gases, For the The construction area The weighting coefficient of harmful gases, , is the number of harmful gases, For the Air quality assessment index for construction areas, The first PM2.5 concentration coefficient of each construction area, The first PM10 concentration coefficient of each construction area, The first The carbon dioxide concentration coefficient of the construction area is The first The harmful gas coefficient of each construction area, is a natural constant, , , is the number of construction areas.
[0042] It needs to be explained that The specific calculation process is: The regional standard emission of each harmful gas in each construction area is summed up to obtain the The harmful gas emissions and values of the construction area, and then The construction area A ratio analysis is performed on the regional standard emission of the harmful gas and the sum of the harmful gas emissions, and the result of the ratio analysis is the corresponding coefficient.
[0043] , , , The specific calculation process is: The regional PM2.5 concentration standard value, regional PM10 concentration standard value, regional carbon dioxide concentration standard value, and harmful gas emission value of each construction area are standardized, and then summed and analyzed after standardization to obtain the The air and value of the construction area are then standardized. The regional PM2.5 concentration standard value, regional PM10 concentration standard value, regional carbon dioxide concentration standard value, and harmful gas emission values of each construction area are respectively compared with the air and values, and the ratio result is the corresponding coefficient.
[0044] The regional PM2.5 concentration standard value and regional PM10 concentration standard value are obtained from the "Ambient Air Quality Standards".
[0045] During the construction process, mechanical equipment (such as diesel engines, generators, etc.) will emit CO2. Therefore, a reasonable standard value should be set in combination with the equipment emissions and the ventilation conditions of the construction site. If the construction site is closed or semi-closed (such as underground projects and tunnel construction), the CO2 concentration standard value should be more stringent, usually set at 600-1000ppm to ensure the safety of construction workers.
[0046] Harmful gases include nitrogen oxides (NOx), sulfur oxides (SOx) and volatile organic compounds (VOCs), which usually come from emissions from construction equipment or the use of materials (such as paints and solvents). Their specific standard values are obtained from the "Comprehensive Emission Standards for Air Pollutants".
[0047] In this implementation plan, the air quality assessment of each construction area is scientific, reasonable and accurate through standard value comparison and ratio analysis. First, the PM2.5, PM10, CO2 concentrations and harmful gas emission values are compared with their respective standard values, so that the air quality of each construction area can be quantitatively evaluated according to the specific environment and construction conditions. This standard-based analysis method can ensure that the evaluation results are consistent with the actual environmental quality requirements and avoid errors or misjudgments caused by relying solely on absolute values. Secondly, for each harmful gas, the system weights it by comparing the ratio of the gas emission to the overall harmful gas emission to ensure that the contribution ratio of each harmful gas to the air quality assessment is reasonable. This ratio analysis can comprehensively consider the impact of different types of harmful gases on air quality and reflect a more realistic air pollution situation. In addition, this part uses standardized processing and ratio analysis to unify different indicators on the same scale, which not only improves the accuracy of the calculation, but also ensures that each parameter is fairly weighted in the final air quality assessment, avoiding excessive influence of a single pollutant on the overall assessment result. This processing method effectively improves the accuracy and applicability of air quality assessment, especially in complex construction environments.
[0048] Specifically, the specific steps for obtaining the construction environment assessment index of each construction area in the construction project are as follows: obtain the regional noise standard value of each construction area in the construction project (obtained from the "Environmental Noise Emission Standards for Construction Sites"), and conduct a comprehensive analysis in combination with the regional noise value to obtain the noise assessment index of each construction area in the construction project; conduct a comprehensive analysis of the regional construction light intensity value and the regional ambient light intensity value of each construction area in the construction project to obtain the light pollution assessment index of each construction area in the construction project; conduct a comprehensive analysis of the noise assessment index and light pollution assessment index of each construction area in the construction project to obtain the construction environment assessment index of each construction area in the construction project.
[0049] The specific formulas for calculating the noise assessment index, light pollution assessment index, and construction environment assessment index for each construction area in a construction project are as follows: ;in, For the Noise assessment index for construction areas, For the The regional noise value of the construction area, For the The regional noise standard value of the construction area, For the Light pollution assessment index for construction areas, For the The regional construction light intensity value of each construction area, For the The regional ambient light intensity value of the construction area, For the The construction environment assessment index of each construction area, The first The noise coefficient of the construction area, The first The light pollution coefficient of the construction area is , , is the number of construction areas.
[0050] It needs to be explained that , The specific calculation process is: The regional noise standard value and regional ambient light intensity value of the construction area are standardized, and then summed and analyzed after the standardization to obtain the The construction and value of the construction area, and then the standardized The regional noise standard value and regional ambient light intensity value of each construction area are ratio analyzed with the construction and values respectively, and the ratio result is the corresponding coefficient.
[0051] In this implementation scheme, the actual measured values of noise and light intensity are standardized with the corresponding standard values to ensure that the evaluation results of different construction areas can be compared on the same scale. This method eliminates the evaluation errors that may be caused by the magnitude differences of the original measured values, making the evaluation results more fair and consistent. By summing and ratioing the standardized values of noise and light intensity, it not only simplifies the calculation process, but also provides a clear quantitative basis for judging the environmental quality of the construction area. This quantitative method makes the evaluation of the construction environment more specific and clear, and is convenient for construction managers to formulate corresponding environmental improvement measures based on specific values. By accurately calculating the noise level of each construction area, the environmental quality of the construction area can be improved. The sound assessment index and light pollution assessment index, and the ratio analysis of these indices with the total construction value, can accurately locate the severity and specific type of environmental problems. This analysis method can help construction managers adjust construction plans and take measures in a targeted manner, such as adding sound insulation measures or adjusting working hours in areas with high noise or light pollution, thereby effectively controlling the impact of construction on the surrounding environment. Automated data processing and analysis reduce the need for manual intervention and improve the efficiency and reliability of construction environment monitoring. The automated system can continuously monitor the construction environment, update the assessment index in real time, and promptly remind managers to take action when problems are found, which greatly enhances the timeliness and effectiveness of construction environment management.
[0052] Specifically, the specific steps for obtaining the surface settlement assessment index of each construction area in the construction project are as follows: perform mean analysis on the surface height values of each measurement position in each construction area in the construction project to obtain the mean surface height of each construction area in the construction project; obtain the initial value of the surface height of each construction area in the construction project (obtained by a total station or GPS / GNSS positioning system) and the maximum allowable settlement value, and perform a comprehensive analysis in combination with the mean surface height to obtain the surface settlement assessment index of each construction area in the construction project; wherein, the specific formula for calculating the mean surface height and the surface settlement assessment index of each construction area in the construction project is as follows: ;in, For the The average ground height of the construction area is For the The construction area The ground surface height value at each measurement location, , is the number of measurement positions, For the The surface settlement assessment index of the construction area is For the The initial value of the ground height of the construction area, For the The maximum allowable settlement value of the construction area is , is the number of construction areas.
[0053] In this implementation scheme, by performing mean analysis on the surface height value at each measurement location and comparing it with the initial value of the surface height, this method can accurately monitor the surface changes during the construction process. This precise data capture capability enables the construction team to promptly identify and respond to surface settlement problems and prevent possible structural safety problems. By setting the maximum allowable settlement value, this method provides a preventive safety threshold to help the construction team assess the severity of the settlement and take corresponding measures, which not only helps to maintain the structural integrity and safety of the building, but also prevents a wider range of geological or architectural problems caused by settlement. Combined with mean analysis and preset settlement limits, this method provides data-based decision support for the construction team. Construction managers can make more scientific and reasonable management decisions based on real-time updated settlement data, such as adjusting construction plans, enhancing infrastructure support, or implementing emergency safety measures. The initial value of the surface height is obtained through high-precision tools such as total stations or GPS / GNSS systems, ensuring the accuracy and reliability of the data. The systematic monitoring process not only improves the efficiency of data collection, but also ensures the standardization and repeatability of monitoring results, providing a stable environmental monitoring basis for large-scale or long-term construction projects.
[0054] Specifically, the specific steps for obtaining the soil permeability assessment index of each construction area in the construction project are as follows: read the soil moisture value of each measurement position at several time points in each construction area in the construction project, and perform mean analysis to obtain the mean soil moisture content at several time points in each construction area in the construction project; perform a comprehensive analysis on the mean soil moisture content at several time points in each construction area in the construction project to obtain the soil permeability assessment index of each construction area in the construction project; wherein, the specific formula for calculating the mean soil moisture content and the soil permeability assessment index at several time points in each construction area in the construction project is as follows: { TJ iv = ∑ b = 1 b 0 T ivb b 0 Trs i = ∑ v = 1 v 0 − 1 [ TJ i ( v + 1 ) − TJ iv ] v 0 ;in, For the The construction area The mean soil moisture content at each time point is For the The construction area The time point The soil moisture value at each measuring location, For the The construction area The mean soil moisture content at each time point is , is the number of measurement positions, , is the number of time points, , is the number of construction areas.
[0055] In this embodiment, by regularly monitoring the soil moisture content at each measuring location and calculating the average, the method is able to provide more accurate and continuous soil moisture change data. This continuous monitoring helps identify changing trends in soil conditions over time, especially when construction activities may affect groundwater flow and soil structure. Real-time updated soil moisture data and data-based soil permeability assessment index provide timely decision support for construction management, which helps the construction team adjust construction methods and plans based on current soil conditions to avoid structural problems or construction delays that may be caused by inappropriate soil treatment. By systematically analyzing the average and changes in soil moisture content, the construction team is able to better understand the permeability and bearing capacity of the soil. This understanding allows construction strategies to be more accurately optimized for specific geological conditions, thereby reducing risks and costs caused by soil problems. Regular and systematic soil moisture monitoring is not only suitable for individual construction projects, but can also be used as part of long-term soil health and sustainability management. These data can help assess the impact of construction activities on the environment and guide environmental protection measures for future projects.
[0056] See also Figure 4The embodiment of the present invention provides a technical solution: a construction project environment monitoring system, comprising: a data acquisition module, an evaluation and analysis module, a comprehensive analysis module, and a judgment and analysis module; the data acquisition module is used to acquire air quality data, construction environment data, surface settlement data, and soil infiltration data of each construction area in the construction project in real time, and perform preprocessing; the evaluation and analysis module is used to analyze the air quality data, construction environment data, surface settlement data, and soil infiltration data of each construction area in the construction project after preprocessing, and obtain the air quality evaluation index, construction environment evaluation index, surface settlement evaluation index, and soil infiltration evaluation index of each construction area in the construction project; the comprehensive analysis module is used to perform comprehensive analysis on the air quality evaluation index, construction environment evaluation index, surface settlement evaluation index, and soil infiltration evaluation index of each construction area in the construction project, and obtain the comprehensive environment evaluation index of each construction area in the construction project; the judgment and analysis module is used to judge whether the comprehensive environment evaluation index of each construction area in the construction project is respectively within the preset environment threshold range, and if there is a construction area whose comprehensive environment evaluation index is outside the preset environment threshold range, the area is marked, an environmental abnormality alarm is sent, and relevant staff are notified at the same time.
[0057] In summary, this application has at least the following effects:
[0058] By acquiring and preprocessing various environmental data such as air quality, construction environment, surface subsidence, soil infiltration, etc. in the construction area in real time, it can comprehensively and accurately reflect the environmental conditions in the construction project. Compared with the traditional single monitoring indicators, it covers more key environmental parameters and supports real-time updates, so that construction managers can keep abreast of environmental changes at the construction site. In addition, the data preprocessing step ensures data quality, avoids interference of abnormal data on the analysis results, and greatly improves the accuracy and effectiveness of environmental monitoring.
[0059] Through comprehensive analysis of various environmental assessment indexes, a comprehensive assessment of the overall environmental conditions of the construction area can be conducted, and whether there are environmental risks can be determined in real time. Once the environmental assessment index of a construction area exceeds the preset threshold, the system will immediately issue an alarm to prompt relevant personnel to take corresponding measures. Compared with the traditional post-feedback mechanism, this real-time early warning mechanism can help managers detect environmental problems early, such as excessive air pollution, excessive noise or surface subsidence risks, to avoid environmental deterioration or project delays due to delayed treatment, thereby improving environmental safety during the construction process.
[0060] Through normalization and weighted coefficient analysis, multi-dimensional environmental data are systematized and standardized, and unified evaluation of different environmental data is achieved by calculating the comprehensive environmental assessment index. This not only improves the management efficiency of environmental data, but also ensures that different types of environmental problems in the construction area can be fully considered and reasonably measured. Construction managers can quickly evaluate the overall environmental quality of each area based on the comprehensive assessment index, which greatly improves management efficiency. At the same time, it also provides a scientific quantitative basis for environmental monitoring of construction projects and reduces unnecessary time and manpower investment.
[0061] Through the integration of data acquisition module, evaluation and analysis module, comprehensive analysis module and judgment and analysis module, fully automated monitoring of the construction area environment is achieved, greatly reducing the reliance on manual operations. Traditional environmental monitoring usually requires manual data collection and manual analysis, while the system can automatically acquire multiple key data such as air quality, construction environment, surface subsidence, soil infiltration, etc. in real time, and perform efficient automated processing and analysis. Through systematic module collaboration, construction managers can rely on the real-time comprehensive evaluation results provided by the system, quickly respond to environmental anomalies, and ensure the continuity and accuracy of environmental monitoring. At the same time, the automatic alarm function enables managers to obtain environmental risk warnings in the first place, thereby improving the initiative and efficiency of environmental risk management at the construction site.
[0062] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0063] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A construction engineering environment monitoring method, It is characterized in that The following steps are involved: Acquire air quality data, construction environment data, surface settlement data, and soil infiltration data of each construction area in the construction project in real time and perform pre-processing; The air quality data, construction environment data, surface settlement data, and soil infiltration data of each construction area in the pre-processed construction project are analyzed respectively to obtain the air quality assessment index, construction environment assessment index, surface settlement assessment index, and soil infiltration assessment index of each construction area in the construction project; Comprehensively analyze the air quality assessment index, construction environment assessment index, surface settlement assessment index, and soil permeability assessment index of each construction area in the construction project to obtain the comprehensive environmental assessment index of each construction area in the construction project; Determine whether the comprehensive environmental assessment index of each construction area in the construction project is within the preset environmental threshold range. If there is a construction area whose comprehensive environmental assessment index is outside the preset environmental threshold range, the area will be marked and an environmental abnormality alarm will be sent.
2. The construction engineering environment monitoring method according to claim 1, It is characterized in that The air quality data includes regional PM2.5 concentration values, regional PM10 concentration values, regional carbon dioxide concentration values, and regional emissions of each harmful gas; the construction environment data includes regional noise values, regional construction light intensity values, and regional environmental light intensity values; the surface settlement data includes the surface height value of each measuring location; and the soil permeability data includes the soil moisture content value of each measuring location at several time points.
3. The construction engineering environment monitoring method according to claim 1, It is characterized in that The specific steps to obtain the comprehensive environmental assessment index for each construction area in a construction project are as follows: Normalize the air quality assessment index, construction environment assessment index, surface settlement assessment index, and soil permeability assessment index of each construction area in the construction project; The air quality assessment index, construction environment assessment index, surface settlement assessment index, and soil permeability assessment index of each construction area in the normalized construction project are comprehensively analyzed to obtain the comprehensive environmental assessment index of each construction area in the construction project. The calculation formula is as follows: ; in, For the Comprehensive environmental assessment index of the construction area, After normalization Air quality assessment index for construction areas, The first The air quality coefficient of the construction area, After normalization The construction environment assessment index of each construction area, The first The construction environment coefficient of each construction area, After normalization The surface settlement assessment index of the construction area is The first The surface settlement coefficient of the construction area is After normalization Soil permeability assessment index for each construction area, The first The soil permeability coefficient of the construction area is is a natural constant, , , is the number of construction areas.
4. The construction engineering environment monitoring method according to claim 2, It is characterized in that The specific steps to obtain the air quality assessment index for each construction area in a construction project are as follows: Obtain the regional PM2.5 concentration standard value, regional PM10 concentration standard value, regional carbon dioxide concentration standard value, and regional standard emission of each harmful gas in each construction area of the construction project, and conduct a comprehensive analysis based on the regional PM2.5 concentration value, regional PM10 concentration value, regional carbon dioxide concentration value, and regional emission of each harmful gas to obtain the PM2.5 concentration assessment index, PM10 concentration assessment index, carbon dioxide concentration assessment index, and harmful gas emission assessment index for each construction area in the construction project; A comprehensive analysis is conducted on the PM2.5 concentration assessment index, PM10 concentration assessment index, carbon dioxide concentration assessment index, and harmful gas emission assessment index of each construction area in the construction project to obtain the air quality assessment index of each construction area in the construction project.
5. The construction engineering environment monitoring method according to claim 4, It is characterized in that The specific formulas for calculating the PM2.5 concentration assessment index, PM10 concentration assessment index, carbon dioxide concentration assessment index, harmful gas emission assessment index, and air quality assessment index for each construction area in a construction project are as follows: ; in, For the PM2.5 concentration assessment index for construction areas, For the The regional PM2.5 concentration value of the construction area, For the The regional PM2.5 concentration standard value of the construction area, For the PM10 concentration assessment index for each construction area, For the The regional PM10 concentration value of the construction area, For the The regional PM10 concentration standard value of the construction area, For the Carbon dioxide concentration assessment index for construction areas, For the The regional carbon dioxide concentration value of the construction area, For the The standard value of regional carbon dioxide concentration in the construction area, For the PM2.5 concentration assessment index for construction areas, For the The construction area Regional emissions of harmful gases, For the The construction area The regional standard emission of harmful gases, For the The construction area The weighting coefficient of harmful gases, , is the number of harmful gases, For the Air quality assessment index for construction areas, The first PM2.5 concentration coefficient of each construction area, The first PM10 concentration coefficient of each construction area, The first The carbon dioxide concentration coefficient of the construction area is The first The harmful gas coefficient of each construction area, is a natural constant, , , is the number of construction areas.
6. The construction engineering environment monitoring method according to claim 2, It is characterized in that The specific steps to obtain the construction environment assessment index for each construction area in a construction project are as follows: Obtain the regional noise standard value of each construction area in the construction project, and conduct a comprehensive analysis based on the regional noise value to obtain the noise assessment index of each construction area in the construction project; Comprehensively analyze the regional construction light intensity value and regional ambient light intensity value of each construction area in the construction project to obtain the light pollution assessment index of each construction area in the construction project; A comprehensive analysis is conducted on the noise assessment index and light pollution assessment index of each construction area in the construction project to obtain the construction environment assessment index of each construction area in the construction project.
7. The construction engineering environment monitoring method according to claim 6, It is characterized in that The specific formulas for calculating the noise assessment index, light pollution assessment index, and construction environment assessment index for each construction area in a construction project are as follows: ; in, For the Noise assessment index for each construction area, For the The regional noise value of the construction area, For the The regional noise standard value of the construction area, For the Light pollution assessment index for construction areas, For the The regional construction light intensity value of each construction area, For the The regional ambient light intensity value of the construction area, For the The construction environment assessment index of each construction area, The first The noise coefficient of the construction area, The first The light pollution coefficient of the construction area is , , is the number of construction areas.
8. The construction engineering environment monitoring method according to claim 2, It is characterized in that The specific steps to obtain the surface settlement assessment index for each construction area in a construction project are as follows: Performing mean analysis on the ground surface height values of each measuring position in each construction area of the construction project, respectively, to obtain the mean ground surface height value of each construction area in the construction project; Obtain the initial value of the ground height and the maximum allowable settlement value of each construction area in the construction project, and conduct a comprehensive analysis based on the average ground height to obtain the ground settlement assessment index of each construction area in the construction project; Among them, the specific formula for calculating the mean ground height and ground settlement assessment index of each construction area in the construction project is as follows: ; in, For the The average ground height of the construction area is For the The construction area The ground surface height value at each measurement location, , is the number of measurement positions, For the The surface settlement assessment index of the construction area is For the The initial value of the ground height of the construction area, For the The maximum allowable settlement value of the construction area is , is the number of construction areas.
9. The construction engineering environment monitoring method according to claim 2, It is characterized in that The specific steps to obtain the soil permeability assessment index for each construction area in a construction project are as follows: Read the soil moisture value of each measuring position at several time points in each construction area of the construction project, and perform mean analysis to obtain the mean value of the soil moisture content at several time points in each construction area of the construction project; Comprehensively analyze the mean soil moisture content at several time points in each construction area of the construction project to obtain the soil permeability assessment index of each construction area in the construction project; Among them, the specific formula for calculating the mean soil moisture content and soil permeability assessment index at several time points in each construction area of the construction project is as follows: ; in, For the The construction area The mean soil moisture content at each time point is For the The construction area The time point The soil moisture value at each measuring location, For the The construction area The mean soil moisture content at each time point is , is the number of measurement positions, , is the number of time points, , is the number of construction areas.
10. A construction engineering environment monitoring system, using the construction engineering environment monitoring method according to any one of claims 1 to 9, It is characterized in that include: Data acquisition module, evaluation and analysis module, comprehensive analysis module, judgment and analysis module; The data acquisition module is used to acquire air quality data, construction environment data, surface settlement data, and soil infiltration data of each construction area in the construction project in real time and perform preprocessing; The evaluation and analysis module is used to analyze the air quality data, construction environment data, surface settlement data, and soil permeability data of each construction area in the pre-processed construction project, respectively, to obtain the air quality evaluation index, construction environment evaluation index, surface settlement evaluation index, and soil permeability evaluation index of each construction area in the construction project; The comprehensive analysis module is used to comprehensively analyze the air quality assessment index, construction environment assessment index, surface settlement assessment index, and soil permeability assessment index of each construction area in the construction project, and obtain the comprehensive environmental assessment index of each construction area in the construction project; The judgment and analysis module is used to judge whether the comprehensive environmental assessment index of each construction area in the construction project is within the preset environmental threshold range. If there is a construction area whose comprehensive environmental assessment index is outside the preset environmental threshold range, the area is marked and an environmental abnormality alarm is sent.
Citation Information
Patent Citations
Big data dust evaluation method for construction site based on big data
CN109358163A
Constructional engineering construction operation environment intelligent monitoring system based on big data
CN111539630A
Building engineering quality monitoring system based on BIM technology
CN116823064A
Multi-dimensional environmental data supervision method and supervision system
CN117078072A
Intelligent monitoring system for petrochemical engineering construction site
CN117670120A
Cited By
Verification system for environmental measurement
CN120801632A