Power distribution network power supply capability optimization method considering multiple load transfer
Through depth-first traversal and particle swarm optimization algorithm, the distribution network power supply path set and improvement model are constructed, which solves the problem of failure to fully consider load transfer in the distribution network power supply capacity evaluation, and realizes multiple load transfers under extreme circumstances. The supply transfer strategy improves the power supply capacity and resource utilization of the distribution network.
Patent Information
- Application Number
- CN202410876373.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2024-10-29
AI Technical Summary
Existing distribution network power supply capacity assessment methods fail to fully consider the flexible transfer of network-side loads, resulting in the inability to effectively adjust load distribution under extreme circumstances, affecting system reliability and investment returns.
The path search algorithm and particle swarm optimization algorithm based on depth-first traversal logic are used to construct the distribution network power supply path set, and the power supply capacity improvement model under extreme conditions is established through N-1 verification, and a strategy for multiple load transfers is proposed to Improve power supply capacity.
On the premise of meeting N-1 verification, it can alleviate extreme situations such as line overload and main transformer overload, maximize power supply capacity, meet load demand, and improve resource utilization.
Smart Images

Figure CN118868031A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of distribution network control optimization, and in particular to a method for optimizing the power supply capacity of a distribution network taking into account multiple load transfers. Background Art
[0002] In order to adapt to the continuous growth of urban load, the expansion of distribution network will also be carried out simultaneously. However, the task of expanding distribution network capacity should not only consider the load demand, but also the actual investment return. If the expansion investment is too large, the utilization rate of distribution network system equipment will decrease and the investment return rate will decrease; on the contrary, if the expansion investment is too small, the future distribution network will not be able to meet the high reliability of power supply, which will seriously affect the stable development of social economy.
[0003] At present, urban land resources are tight, and the construction of substations and power corridors will cost a lot of money. Therefore, each expansion of the distribution network should be adapted to the load growth demand as much as possible under the premise of meeting the system reliability. In summary, in order to have an accurate estimate of the power supply capacity of the distribution network and obtain a suitable load distribution, corresponding theoretical methods are needed to support it, so as to provide guidance for the planning and construction of the distribution network. The current evaluation methods of the power supply capacity of the distribution network mainly have the following problems: the flexible transfer of network-side loads is not fully considered, a relatively conservative evaluation method is adopted to evaluate the power supply capacity, and adjustment measures for the operation plan are not formulated for extreme situations such as overload of substations. Summary of the invention
[0004] In view of the above problems, the present invention proposes a method for optimizing the power supply capacity of a distribution network taking into account multiple load transfers, aiming to make full use of existing power grid resources, maximize the power supply margin of the existing power grid through flexible network topology transformation, and provide the maximum allowable load configuration of each main transformer and line under extreme operating conditions. Through N-1 verification of each main transformer, the corresponding topological structure when each main transformer fails and the system completes the power failure load transfer is provided, thereby proposing a reliable power failure load transfer strategy for the operation of each main transformer under the premise of ensuring the safe operation of the power grid.
[0005] In order to solve the above technical problems, the technical solution of the present invention is as follows:
[0006] A method for optimizing the power supply capacity of a distribution network considering multiple load transfers comprises the following steps:
[0007] A path search algorithm based on depth-first traversal logic is used to describe the network topology of the target distribution network and to construct a set of power supply paths for the loads.
[0008] Taking the on / off state of any path in the power supply path set as a variable, taking the maximum sum of system loads as a goal, and taking N-1 verification as a constraint, a distribution network power supply capacity improvement model under extreme conditions is established;
[0009] A particle swarm optimization algorithm is used to solve the distribution network power supply capacity improvement model, a penalty function is set to characterize the fitness value of the particle, and an optimal solution is output when the maximum number of iterations is reached, wherein the optimal solution is the maximum load that the power grid can bear.
[0010] In some implementations, the process of constructing the power supply path set includes:
[0011] Obtain the network topology of the target distribution network;
[0012] Setting the starting power source point and the ending load point of the network topology, and constructing the path search algorithm in combination with the depth-first traversal logic;
[0013] The path search algorithm is used to start searching from the starting power source point to obtain all possible power supply paths from the starting power source point to the search end load point, which are defined as the power supply path set.
[0014] In some embodiments, the operation constraints include at least power grid radial constraints, power source capacity constraints, and branch capacity constraints.
[0015] In some implementations, the N-1 check includes:
[0016] A main transformer fault point is randomly set for the network topology, and when the network topology performs load transfer, the algorithm solves a transfer plan that meets the N-1 safety criteria of the distribution network;
[0017] In a fault transfer task, the optimal solution is selected from multiple transfer solutions with the optimization goal of minimizing the number of switch operations of the network topology.
[0018] In some implementations, the N-1 constraint conditions of the distribution network power supply capacity improvement model include:
[0019]
[0020] Where b m represents the branch of the target distribution network, Indicates a path The on / off state, Indicates the load node l i The kth path of power supply, i represents the load node l i , S j Indicates power point j capacity value, j represents the code of the power node, L i is the load point l i The load value, B m For branch b mThe capacity upper limit of the fault power supply node S t , set branch b m The two endpoints of are i and j, and the definition The load point l i is the end point and passes through branch b m The power supply path set is defined as Take the load point as l j End point and pass through branch b m The power supply path set, set D s is the branch set of the sectionalizer of the distribution system, set I s It is the collection of branches where the interconnecting switches of the distribution system are located.
[0021] The beneficial effects of the present invention are as follows: by combining operation constraints and N-1 transfer verification to optimize the distribution network power supply capacity improvement model, the maximum sum of the loads carried by the distribution network is taken as the optimization goal, and multiple transfers can alleviate extreme situations such as line overload and main transformer overload. On the premise of meeting the N-1 verification, the power supply capacity of the existing power grid is improved to meet the current load demand to the greatest extent. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 A schematic flow chart of a method for optimizing the power supply capacity of a distribution network considering multiple load transfers disclosed in an embodiment of the present invention;
[0023] Figure 2 A flowchart of a path search task disclosed in an embodiment of the present invention;
[0024] Figure 3 A flowchart of a particle swarm optimization task disclosed in an embodiment of the present invention;
[0025] Figure 4 This is a schematic diagram of the network topology used in the example verification;
[0026] Figure 5 This is a schematic diagram of the iterative convergence times of particle swarm optimization in the example verification;
[0027] Figure 6 It is a schematic diagram of the load transfer scheme for each main transformer failure in the example verification;
[0028] Figure 7 This is a schematic diagram of the load rate of each main transformer under different main transformer fault conditions in the example verification. DETAILED DESCRIPTION
[0029] In order to make the purpose, technical solution and advantages of the present invention clearer and more specific, the content of the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. It is understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for the convenience of description, only the parts related to the present invention are shown in the accompanying drawings, rather than all the contents.
[0030] This embodiment proposes a method for optimizing the power supply capacity of a distribution network that takes into account multiple load transfers. Considering that the current power grid may have extreme situations such as partial line overload and overload of the main transformer, the period required for the construction of a new substation or line is relatively long. In order to ensure the safety of the current power grid operation, it is necessary to make full use of the existing power grid resources and make corresponding adjustments to the power grid operation mode and load distribution in a timely manner, so as to improve the power supply capacity of the existing power grid and meet the current load demand to the greatest extent while satisfying the N-1 verification. The core invention of this scheme is to propose a method for adjusting the operation of the power grid under extreme conditions and to provide a load distribution strategy. The power supply capacity improvement model of the distribution network in this scheme can directly solve the maximum power supply capacity of the power grid under full consideration of resource utilization. Compared with the traditional load one-time and two-time transfer evaluation method, this scheme proposes an evaluation method that takes into account multiple load transfers, which fully considers the flexibility of load transfer and can solve the maximum load that the current power grid can bear. Compared with the traditional evaluation method, it can improve resource utilization.
[0031] The load transfer strategy of the present invention is obtained incidentally on the basis of solving the maximum power supply capacity. Therefore, the solution of the maximum power supply capacity of this scheme has solved the defects of the original evaluation method.
[0032] like Figure 1 As shown, the following steps are included:
[0033] S1, a path search algorithm based on depth-first traversal logic is used to describe the network topology of the target distribution network and construct a set of power supply paths for the loads.
[0034] The elements that constitute the network topology of the target distribution network include not only substations and feeders, but also the power loads connected to the feeders. Due to the large number of loads and different specifications, the scale of the distribution network is very large. Therefore, in order to analyze the distribution network, its structure must be simplified first. Usually, the partitioning method is adopted to divide the distribution system into various feeder partitions, and then reasonably merge the loads in the partitions to simplify the feeder partitions into load nodes.
[0035] After the above-mentioned partitioning and block operations, a point-line topology model of the distribution network can be established. In this point-line topology model, "points" include power points and load points, where power points refer to various substations, and "lines" refer to the power supply paths between power points and load points. Since the distribution network needs to follow the "closed-loop design" principle on the one hand, and the "open-loop operation" principle on the other hand, the distribution network will be subject to radial constraints during operation. In order to meet the radial constraints, any specified load is only allowed to have one corresponding power node, and the power supply path must be unique. According to the above analysis, it can be seen that the specific operating state of the distribution network and the specific path on-off status are one-to-one corresponding, so the network topology can be characterized by the power nodes, load nodes and all possible power supply path sets in the network.
[0036] To facilitate understanding, we first define the relevant concepts to facilitate the subsequent description of the network topology:
[0037] Definition 1: Define the power node set S of the distribution network set for:
[0038]
[0039] Among them, s j is the jth power node, with a total of N S Power supply node.
[0040] Definition 2: Load node set L of distribution network set for:
[0041]
[0042] In the load node set L set In, l j is the jth load node in the distribution network. There are N L load nodes.
[0043] Definition 3: The branch set B of the distribution network set for:
[0044]
[0045] In branch set B set Middle, b m is the mth branch, and there are N B Branch road.
[0046] Definition 4: Definition The load node l i The set of paths with the destination as:
[0047]
[0048] Assume theoretically that i The power supply lines have a total of P i strip, Indicates the load node l i The kth path powered.
[0049] Definition 5: Due to the radial operation of the power grid, the path set At most one power supply path is a pass, defining Indicates a path The on / off state, For binary variables:
[0050]
[0051] Definition 6: Definition For power supply j The set of paths starting from:
[0052]
[0053] gather All paths in the j The power supply path, Represented by the power node s j The kth path powered by power supply s j The total number of power supply paths is Q j .
[0054] Definition 7: Definition For branch b m The set of power supply paths.
[0055] Definition 8: Assume that branch b m The nodes at both ends are i and j respectively, and the definition is The load point l i is the end point and passes through branch b l The power supply path set is defined as The load point l j is the end point and passes through branch b l The set of power supply paths.
[0056] The process of building a power supply path set includes:
[0057] S101, obtaining the network topology of the target distribution network, taking the connection relationship between the nodes in the target distribution network as a known input quantity;
[0058] S102, setting the starting power source point and the ending load point of the network topology, and constructing a path search algorithm in combination with the depth-first traversal logic;
[0059] S103, using a path search algorithm to start searching from the starting power source point, obtain all possible power supply paths from the starting power source point to the search end load point, which are defined as a power supply path set. The path search logic is as follows: Figure 2 In S103, all power supply points and load points are combined one by one to perform path search, and finally all possible power supply paths of the entire distribution system can be obtained. These paths are then classified according to load nodes, power supply nodes, and branches, which lays the foundation for the subsequent maximum power supply capacity evaluation considering multiple transfers.
[0060] S2, taking the on-off state of any path in the power supply path set as a variable, the maximum sum of system loads as the goal, and N-1 verification as a constraint, a distribution network power supply capacity improvement model under extreme conditions is established.
[0061] The operation constraints include at least grid radial constraints, power supply capacity constraints and branch capacity constraints.
[0062] S201, where the radial constraints of the power grid are shown in equations (7) and (8)
[0063] Studies have shown that when the following constraints are met, the distribution network operates in a radial manner and is connected:
[0064] ① If the power supply path set of each load node There is only one path in the connected state, and the rest are in the disconnected state. At this time, the network is in a radial operation mode, that is,
[0065]
[0066] ②If the path is in the on state, and the path Included in path Then the path It is also in the on state, that is:
[0067]
[0068] S202, power capacity constraint is as shown in formula (9)
[0069] During the operation of the distribution network, the power supply S j The load supplied should be less than the capacity of the power source, i.e.
[0070]
[0071] Among them, L j is the load point l j Load value; S j For power points j The capacity value of .
[0072] S203, the branch capacity constraint is as shown in formula (10)
[0073] During the operation of the distribution network, branch b m The transmitted power value should be lower than the rated capacity upper limit of the branch, that is,
[0074]
[0075] Among them, B m For branch b m The upper capacity limit.
[0076] When transferring load after a fault occurs, there may be multiple transfer schemes that meet the N-1 safety criteria of the distribution network. However, considering the key role of switch operation in the load transfer process, and the fact that the switch operation completion time is closely related to the time to restore power supply, this scheme chooses to transfer load with the minimum number of switch operations as the optimization goal. Generally speaking, the fewer the number of switch operations, the faster the system can restore power supply, while also reducing the cost of switch operation and extending its service life.
[0077] Studies have shown that connecting load nodes l i and l j Branch b l The necessary and sufficient condition for a path is: passing through branch b l For load node l i and l j The sum of all power supply path states is 1, that is,
[0078]
[0079] Branch b l The two endpoints of are i and j, and the definition The load point l i is the end point and passes through branch b l The power supply path set is defined as The load point l j is the end point and passes through branch b l The set of power supply paths.
[0080] Let set D s is the branch set of the sectionalizer of the distribution system, set I s It is the collection of branches where the interconnecting switches of the distribution system are located.
[0081] N-1 verification includes:
[0082] S204, randomly setting a main transformer fault point for the network topology, when the network topology performs load transfer, the algorithm solves a transfer plan that meets the N-1 safety criteria of the distribution network;
[0083] S205, in a fault transfer task, the optimal solution is selected from multiple transfer solutions with the optimization goal of minimizing the number of switch operations of the network topology. Combined with formula (11), the following formula (12) can be used to express the number of switch operations of the system after the fault, that is,
[0084]
[0085] In the formula, the first summation term represents the number of operations of the system tie switch after the fault occurs, and the second summation term represents the number of operations of the section switch. The objective function of the distribution network N-1 safety verification model is the minimum value of formula (12).
[0086] Considering the actual operation situation, reducing the number of switch operations can reduce the impact on the grid structure and make it easier for the system to quickly restore power supply. In addition, reducing the number of switch operations can also reduce operating costs. Therefore, by using equations (7)-(10) as constraints and the minimum value of equation (12) as the objective function, the number of switch operations can be minimized during the load transfer process. The N-1 constraints of the distribution network power supply capacity improvement model shown in equation (13) include:
[0087]
[0088]
[0089] Where b m represents the branch of the target distribution network, Indicates a path The on / off state, Indicates the load node l i The kth path of power supply, i represents the load node l i , S j Indicates power point j capacity value, j represents the code of the power node, L i is the load point l i The load value, B m For branch b m The capacity upper limit of the fault power supply node S t , set branch b m The two endpoints of are i and j, and the definition The load point l i is the end point and passes through branch b m The power supply path set is defined as Take the load point as l j End point and pass through branch b m The set of power supply paths, set D sis the branch set of the sectionalizer of the distribution system, set I s It is the collection of branches where the interconnecting switches of the distribution system are located.
[0090] In the constraint equation group shown in formula (13), the first equation represents the capacity limit of other main transformers in the distribution network except the faulty main transformer; the second equation represents that the load carried by the faulty main transformer is zero; the third equation represents the branch capacity limit; the fourth and fifth equation groups represent the radial operation constraints of the distribution network.
[0091] L in the model i , L j , S j , B m is the input variable, path status is an unknown variable. Set each main transformer in the distribution network as a faulty main transformer in turn, and then solve the 0-1 integer linear programming problem. If the model has a solution when any main transformer fails, it means that the system will not lose load, that is, the system has passed the N-1 check. After that, the path status obtained by the solution can be To confirm the on-off status of each section switch and the connecting switch, so as to obtain the load transfer plan after the failure. If there is no solution when a main transformer fails in the above model, it means that the load configuration of the system does not meet the requirements of N-1 safety verification in this case.
[0092] The definition of multiple load transfer is as follows: Multiple load transfer means that when performing N-1 verification of a main transformer, the load of the faulty main transformer is transferred to other main transformers interconnected with it through multiple actions of the section switch and the tie switch. In the case of multiple load transfer, in order to reduce the operation time and increase the service life of the switch, the number of switch actions should be minimized as much as possible.
[0093] The objective function of the distribution network power supply capacity improvement model considering multiple power transfers is as follows:
[0094]
[0095] st style (13)
[0096] Since constraint (13) does not specify the load transfer method like the maximum power supply capacity model of the distribution network based on feeder interconnection, this model allows multiple load transfers, improves the limitations of the conventional power supply capacity model, and gives full play to the flexibility of load transfer in the power grid, enabling it to carry more loads.
[0097] S3, using the particle swarm optimization algorithm to solve the distribution network power supply capacity improvement model, set the penalty function to represent the fitness value of the particle, and output the optimal solution after reaching the maximum number of iterations. The optimal solution is the maximum load that the power grid can bear. Figure 3 shown.
[0098] The technical effects of this solution are as follows:
[0099] (1) Make full use of existing power grid resources, make timely adjustments to the power grid operation mode and load distribution, alleviate extreme situations such as line overload and main transformer overload, and improve the power supply capacity of the existing power grid to meet the current load demand to the greatest extent possible while meeting the N-1 verification. Compared with previous models, the power capacity improvement model provided does not specify the load transfer method under fault conditions. Through flexible multiple load transfers on the network side, it further taps the power supply potential of the distribution network.
[0100] (2) The PSO algorithm (Particle Swarm Optimization, PSO particle swarm algorithm) is used to solve the model, which has the advantages of good robustness, easy implementation, and high computational efficiency. In the solution process, in order to reduce the solution space, ensure the convergence of the algorithm, and avoid particles entering the infeasible region, a penalty function is set to characterize the fitness value of the particle after N-1 verification.
[0101] (3) While effectively and fully determining the load configuration, it can also propose a safe and reliable power-off load transfer strategy for each main transformer N-1 fault situation, thereby improving the fault emergency response capability of the distribution network.
[0102] Example verification:
[0103] To verify the effectiveness of the proposed method, Figure 4 The topology of the distribution network in a certain area of China is verified by example. The example network has 6 main transformers S1~S6, and the main transformer capacities are 40, 40, 40, 40, 63, and 63MVA respectively. There are 26 normally closed section switches located on the distribution lines and 9 normally open contact switches located on the tie lines. The capacity of the tie lines is 11.3MVA, and the capacity of the trunk lines is 18MVA.
[0104] The PSO algorithm is used to solve the model, the number of particles is set to 20, and the iteration is 65 times. The algorithm iteration convergence process is as follows: Figure 5 As shown, the final calculated maximum power supply capacity of the system that meets all N-1 fault conditions is 187.78MVA. Compared with the traditional evaluation method that only considers the one-time transfer of loads, the method proposed in the present invention taps out about 21.4% of the remaining power supply potential.
[0105] The maximum load values allowed for each load node under the proposed evaluation method are shown in Table 1.
[0106] Table 1 Calculated load values of each load node
[0107]
[0108] The distribution network under the above load distribution is subjected to N-1 safety verification. Considering the worst case, each main transformer is set to a fault state and N-1 verification is performed to obtain a transfer plan that meets the constraints of the safe operation of the distribution network. Figure 6 When each main transformer fails, the load rate of the main transformers S1-S6 is as follows: Figure 7 .
[0109] Taking the failure of main transformer S1 as an example, the proposed method is compared with the traditional planning method that only considers one-time transfer, and the sufficiency and superiority of the power capacity improvement method provided in this chapter are explained in extreme cases. The comparison of the load situation after the traditional planning method and the multiple transfers considered in this chapter is shown in Table 2.
[0110] Table 2 Load transfer mode of main transformer S1 fault under different methods
[0111]
[0112]
[0113] When the main transformer S1 fails and stops running, loads L1, L7, and L8 lose power and need to be transferred by other main transformers to avoid the system from losing power. The load transfer scheme obtained by the method in this chapter is that the loads L1, L2, L7, L8, and L7 of the main transformer S2 are 10 , L 22 , load L9, L 21 The load L originally carried by the main transformer S3 is transferred 24 , L 25 They are transferred by main transformer S6 and main transformer S5 respectively. It can be seen from Table 4-5 that under this load distribution, after multiple transfers, the main transformers are not overloaded, and the N-1 safety check can be passed when the main transformer S1 fails. Compared with the traditional maximum power supply capacity planning method that only considers one-time load transfer, since the main transformer S1 is only directly connected to the main transformer S2, the loads L1, L7, and L8 can only be transferred by the main transformer S2 after power failure, and the main transformer S2 also needs to maintain the original loads L2, L9, L 10 , L 21 , L 22 The sum of the load values of the above 8 load points is 50.83MVA, and the rated capacity of the main transformer S2 is only 40MVA. At this time, the system cannot bear the load of these 8 load points, cannot pass the system N-1 safety check, and cannot tap the maximum power supply capacity of 187.78MVA.
[0114] from Figure 7 It can also be seen that when each main transformer fails, the main transformer at the same station as the faulty main transformer is close to full load. It can be considered that the particle swarm algorithm used in the present invention has reached convergence, and the searched power supply capacity has reached the maximum value that the system can bear, which further illustrates the rationality and effectiveness of the method proposed in the present invention.
[0115] The above embodiments are only for illustrating the technical concept and features of the present invention, and their purpose is to enable ordinary technicians in the field to understand the content of the present invention and implement it accordingly, and they cannot be used to limit the protection scope of the present invention. Any equivalent changes or modifications made based on the essence of the content of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for optimizing the power supply capacity of a distribution network considering multiple load transfers, characterized in that: The following steps are involved: A path search algorithm based on depth-first traversal logic is used to describe the network topology of the target distribution network and to construct a set of power supply paths for the loads. Taking the on / off state of any path in the power supply path set as a variable, taking the maximum sum of system loads as a goal, and taking N-1 verification as a constraint, a distribution network power supply capacity improvement model under extreme conditions is established; A particle swarm optimization algorithm is used to solve the distribution network power supply capacity improvement model, a penalty function is set to characterize the fitness value of the particle, and an optimal solution is output when the maximum number of iterations is reached, wherein the optimal solution is the maximum load that the power grid can bear.
2. The method for optimizing the power supply capacity of a distribution network considering multiple load transfers according to claim 1, characterized in that: The process of constructing the power supply path set includes: Obtain the network topology of the target distribution network; Setting the starting power source point and the ending load point of the network topology, and constructing the path search algorithm in combination with the depth-first traversal logic; The path search algorithm is used to start searching from the starting power source point to obtain all possible power supply paths from the starting power source point to the search end load point, which are defined as the power supply path set.
3. The method for optimizing the power supply capacity of a distribution network considering multiple load transfers according to claim 1, characterized in that: The operation constraints include at least power grid radial constraints, power supply capacity constraints and branch capacity constraints.
4. The method for optimizing the power supply capacity of a distribution network considering multiple load transfers according to claim 1, characterized in that: The N-1 check includes: A main transformer fault point is randomly set for the network topology, and when the network topology performs load transfer, the algorithm solves a transfer plan that meets the N-1 safety criteria of the distribution network; In a fault transfer task, minimizing the number of switch operations of the network topology is taken as the optimization goal, and the optimal solution is determined with the operating conditions as constraints.
5. The method for optimizing the power supply capacity of a distribution network considering multiple load transfers according to claim 1, characterized in that: The N-1 constraints of the distribution network power supply capacity improvement model include: Where b m represents the branch of the target distribution network, Indicates a path The on / off state, Indicates the load node l i The kth path of power supply, i represents the load node l i , S j Indicates power point j capacity value, j represents the code of the power node, L i is the load point l i The load value, B m For branch b m The capacity upper limit of the fault power supply node S t , set branch b m The two endpoints of are i and j, and the definition The load point l i is the end point and passes through branch b m The power supply path set is defined as Take the load point as l j End point and pass through branch b m The power supply path set, set D s is the set of branches where the sectionalizers of the distribution system are located, and the set I s It is the collection of branches where the interconnecting switches of the distribution system are located.