Ring main unit load intelligent scheduling method and device and storage medium
By analyzing user power consumption data and historical behavior characteristics, the priority of grid fault recovery is determined, which solves the problem of low reliability of grid fault recovery in the existing technology and achieves more efficient power resource dispatching and grid stability.
Patent Information
- Application Number
- CN202410971979.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-19
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2044-07-19
AI Technical Summary
Existing technologies fail to fully consider the complexity and diversity of users' power consumption behaviors when responding to sudden power grid failures, resulting in low reliability of fault recovery.
By obtaining fault location information and historical power consumption data of surrounding users, the pre-configured power consumption data analysis model is used to analyze the user's power consumption behavior characteristics, and the user's scheduling priority is determined based on the weight allocation model, and the fault is restored from low to high. .
It improves the reliability of power grid fault recovery and the stability of power supply, ensures intelligent dispatching of power resources, and adapts to the complex and changeable power grid operating environment.
Smart Images

Figure CN118868069A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of load scheduling, and in particular to a method, device and storage medium for intelligent scheduling of load management of a ring main unit. Background Art
[0002] At present, against the background of growing global energy consumption, the ring main unit, as the core hub of power distribution, has made load intelligence the key to improving energy efficiency and ensuring power supply stability.
[0003] In the prior art, power load management lacks intelligent dispatching means when handling load faults. When handling faults, facing the complex and changeable power grid operating environment, the existing dispatching methods mainly dispatch based on the load power consumption, which is prone to inaccurate dispatching problems, and fail to fully consider the complexity and diversity of user power consumption behaviors. It lacks data-driven optimization algorithm support, and cannot handle according to the current scenario conditions when dispatching power resources to achieve fault recovery.
[0004] The above-mentioned technologies fail to fully consider the complexity and diversity of users' electricity consumption behaviors when recovering from sudden power grid faults, resulting in low reliability of fault recovery. Summary of the invention
[0005] The present invention provides a ring main unit load management intelligent scheduling method device and a storage medium to achieve the goal of solving the problem that the above-mentioned technology fails to fully consider the complexity and diversity of user power consumption behavior when recovering from sudden power grid failures, resulting in low reliability of fault recovery.
[0006] In a first aspect, in order to solve the above technical problems, the present invention provides a method for intelligent scheduling of load management of a ring main unit, comprising: Obtain fault location information and historical electricity consumption data of surrounding users; Based on the historical electricity consumption data, a pre-configured electricity consumption data analysis model is used to process and analyze the data to obtain the user's electricity consumption behavior characteristics; The user's electricity consumption behavior characteristics are weighted and matched based on a preset weight allocation model to obtain the user's scheduling priority, and the fault is restored from low to high according to the scheduling priority.
[0007] Optionally, the historical power consumption data is power consumption data of surrounding users within a preset time period before the fault occurs; Optionally, the processing and analyzing the historical electricity consumption data using a pre-configured electricity consumption data analysis model to obtain the user's electricity consumption behavior characteristics includes: The historical electricity usage data is analyzed using an electricity usage habit analysis model to obtain the user's electricity usage habit characteristics; wherein the user's electricity usage habit characteristics include the user's electricity usage frequency, the user's electricity usage, and the user's electricity usage peak and valley time periods within the time period; Inputting the electricity usage habit characteristics into the electricity usage behavior analysis model for analysis to obtain the user's electricity usage behavior characteristics; wherein the user's electricity usage behavior characteristics include user failure rate, user importance value, and user electricity usage probability prediction value; Among them, the electricity consumption data analysis model includes the electricity consumption habit analysis model and the electricity consumption behavior analysis model.
[0008] Optionally, after obtaining the user's electricity usage behavior characteristics, the method further includes: The original user power usage behavior characteristics stored in the memory are updated to obtain the updated user power usage behavior characteristics.
[0009] Optionally, the method further includes: When it is detected that the user failure rate of a certain user is higher than a preset failure rate threshold, a warning message is generated and sent to the user.
[0010] Optionally, the method further includes: The real-time power consumption of all surrounding users is obtained. When the real-time power consumption of any user is less than a preset user power consumption threshold, the power reserve of the user is called to perform fault recovery.
[0011] Optionally, the weight distribution model includes:
[0012] Wherein, N is the priority value of the user in the power resource scheduling, N1 is the importance value of the user, N2 is the failure rate of the user, N3 is the power consumption frequency of the user, and N4 is the power consumption probability prediction value of the user; in and It is a preset coefficient, and its value range is 0 to 1.
[0013] Optionally, the method further includes: When at least two fault areas exist, historical power consumption data of users in each fault area are analyzed respectively to obtain the fault recovery priority corresponding to each fault area, and fault recovery is performed in descending order according to the fault recovery priority; The historical electricity consumption data is the electricity consumption data of the faulty user within a preset time period before the fault occurs.
[0014] In a second aspect, the present invention provides a ring main unit load intelligent dispatching device, comprising: The power consumption monitoring unit is used to obtain the fault location information and the historical power consumption data of surrounding users; A weight determination unit, configured to perform processing and analysis using a pre-configured power consumption data analysis model to obtain a user's power consumption behavior characteristics; and to perform weight matching on the user's power consumption behavior characteristics based on a preset weight allocation model to obtain the user's scheduling priority; and to process the historical power consumption data to obtain the scheduling priority; The resource scheduling unit is used to schedule the power resources at the fault location for recovery according to the scheduling priority from low to high.
[0015] In a third aspect, the present invention further provides a computer-readable storage medium, which includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute any one of the above-mentioned methods for intelligent scheduling of ring network cabinet loads.
[0016] Compared with the prior art, the present invention has the following beneficial effects: The present invention provides a method for intelligent scheduling of ring network cabinet loads, including: obtaining fault location information and historical power consumption data of surrounding users; processing and analyzing the historical power consumption data using a pre-configured power consumption data analysis model to obtain user power consumption behavior characteristics; weight matching the user power consumption behavior characteristics based on a preset weight allocation model to obtain the user's scheduling priority, and recovering the fault from low to high according to the scheduling priority. When dealing with sudden power grid failures, the user's power consumption data is analyzed and analyzed using the power consumption data analysis model to obtain the user's power consumption behavior characteristics, and the user's power consumption behavior characteristics are processed using a weight allocation algorithm to obtain the user's scheduling priority, so that the system schedules power resources according to the user's scheduling priority for fault recovery, thereby improving the reliability of power supply. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a flow chart of a method for intelligently dispatching a ring main unit load provided by an embodiment of the present invention; Figure 2 It is a structural schematic diagram of a ring main unit load intelligent dispatching device provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0019] Reference Figure 1 The first embodiment of the present invention provides a method for intelligently dispatching a ring main unit load, comprising the following steps: S1, obtain the fault location information and historical electricity consumption data of surrounding users.
[0020] S2, processing and analyzing the historical electricity consumption data using a pre-configured electricity consumption data analysis model to obtain the user's electricity consumption behavior characteristics.
[0021] S3, weight matching is performed on the user's electricity consumption behavior characteristics based on a preset weight allocation model to obtain the user's scheduling priority, and the fault is restored from low to high according to the scheduling priority.
[0022] It should be noted that, in the context of the current global energy consumption continuing to grow, the role of the ring main unit, the core hub of power distribution, has become particularly important. The intelligence of the ring main unit is not only related to the improvement of energy efficiency, but also directly affects the stability and reliability of power supply. However, the existing power load management has obvious deficiencies in intelligence, especially in the emergency response capabilities when facing power grid failures.
[0023] Traditional methods often rely on simple power consumption data to make scheduling decisions when dealing with power grid failures. This single consideration standard cannot fully reflect the complexity of user power consumption behavior. For example, different users may have very different power consumption patterns in different time periods. Industrial users may have production peaks at night, while residential users may have power consumption peaks in the evening. In addition, factors such as the type of user's power equipment, power stability requirements, and sensitivity to power quality are all important dimensions that affect power grid scheduling decisions. However, existing technologies fail to take these factors into account and lack a data-driven optimization algorithm to support more accurate and reliable scheduling. When a sudden failure occurs in the power grid, if it is not possible to respond and adjust quickly based on real-time data and the user's power consumption characteristics, it will be difficult to achieve effective resource allocation and fault recovery, which directly affects the reliability of the power grid and the user's power experience.
[0024] The present invention provides a method for intelligent scheduling of ring main unit loads. When dealing with sudden power grid failures, the method analyzes user power consumption data and uses a power consumption data analysis model to obtain user power consumption behavior characteristics, which are processed using a weight allocation algorithm to obtain the user's scheduling priority. The system then schedules power resources for fault recovery according to the user's scheduling priority, thereby improving the reliability of power supply.
[0025] In order to facilitate the understanding of the present invention, some preferred embodiments of the present invention are further described below.
[0026] In step S1, the fault location information and the historical power consumption data of surrounding users are obtained.
[0027] It should be noted that fault location information refers to the detailed information of the specific location of the fault that the system can determine when a fault occurs in the power grid. In order to determine the specific location of the fault in the power system, this information is usually monitored and identified in real time through the monitoring equipment of the power grid, such as sensor networks, smart meters or anomaly detection algorithms in the power grid management system, so as to obtain fault signals. Once a power grid anomaly is detected, the system can accurately locate the location of the fault through GPS and other means. After determining the fault location, the system needs to collect historical electricity consumption data of surrounding users.
[0028] Specifically, the historical power consumption data in step S1 is the power consumption data of surrounding users within a preset time period before the fault occurs.
[0029] Among them, the preset time period is a specific time range set in the power grid management system for analyzing and predicting power consumption behavior. This time period is usually selected before the power grid failure occurs, which can be a time range of one month or half a year. The preset time period is set by the power grid staff based on the understanding of the power grid operation mode, the statistical analysis of historical fault data, or the characteristics of the user's power consumption pattern. Power consumption data refers to the user's power consumption information collected by the power monitoring equipment within the preset time period. This information includes but is not limited to electrical parameters such as voltage, current, power factor, and frequency; the collection of power consumption data is usually achieved through smart meters, sensors, data acquisition systems and other equipment, which can monitor and record the user's power consumption in real time.
[0030] In step S2, the historical electricity consumption data is processed and analyzed using a pre-configured electricity consumption data analysis model to obtain the user's electricity consumption behavior characteristics.
[0031] It should be noted that the electricity consumption data analysis model includes an electricity consumption habit analysis model and an electricity consumption behavior analysis model; The electricity usage habit analysis model is a pre-configured data analysis model that uses statistical analysis methods to identify electricity usage patterns and machine learning algorithms to improve the accuracy and efficiency of identification. It analyzes the input user electricity usage data to derive the user's daily electricity usage curve, seasonal electricity usage changes, electricity usage behavior under special events, etc.; by identifying these characteristics, the model can classify and label the user's electricity usage behavior, providing basic data for further analysis of electricity usage behavior characteristics.
[0032] The user's electricity usage habit characteristics include the user's electricity usage frequency, the user's electricity usage, the user's electricity usage peak and valley time periods, and other characteristics within the time period.
[0033] The electricity consumption behavior analysis model is a data analysis tool that is pre-trained using big data algorithms. It first preprocesses and analyzes the data based on the k-means clustering algorithm to obtain the target user's electricity consumption behavior characteristic parameter set, and then further applies the neural network algorithm to the characteristic parameter set, draws dynamic curves, predicts user behavior, and evaluates the potential risks of the user's electricity consumption behavior pattern, and finally outputs the user's electricity consumption behavior characteristics.
[0034] Exemplary, applied neural network algorithms include: Multilayer Perceptron (MLP) is a feedforward neural network composed of multiple neuron layers. It receives data through the input layer, performs weighted and nonlinear transformation through one or more hidden layers, and finally generates prediction results in the output layer. It uses the back propagation algorithm and gradient descent method to train the network weights so that it can learn complex function mapping. In the analysis of power consumption behavior, MLP can be used to identify and predict the user's power consumption pattern. The input layer receives the user's power consumption data, the hidden layer processes and extracts features, and the output layer generates prediction results.
[0035] Recurrent Neural Network (RNN) is a neural network that processes sequence data and can capture the temporal dependencies in time series data. Its internal loop mechanism enables the network to pass the information of the previous time step (i.e. historical data) to the current time step through the state of the hidden layer, thereby realizing dynamic processing of sequence data. Specifically, RNN receives an input vector at each time step, combines it with the hidden state of the previous time step, performs a linear transformation through the weight matrix, and then performs a nonlinear transformation through an activation function (such as Sigmoid or Tanh) to generate the output of the current time step and a new hidden state. This process is repeated until the entire sequence is processed. In the analysis of electricity consumption behavior, RNN can be used to predict the user's electricity consumption behavior in different time periods, especially when time dependency needs to be considered.
[0036] The user electricity consumption behavior characteristics include user failure rate, user importance value, and user electricity consumption probability prediction value.
[0037] In one embodiment, the specific modules of the electricity consumption behavior analysis model include: Habit acquisition unit: used to identify and acquire user's electricity usage frequency, user's electricity usage, user's electricity usage peak and valley time periods and other electricity usage habit data.
[0038] Data preprocessing unit: cleans, formats and converts the collected electricity usage habit data to meet the input requirements of the analysis model.
[0039] Behavior recognition unit: By statistically analyzing the characteristics of users' electricity usage habits and applying advanced algorithms such as machine learning and data mining technology, it can identify the significant characteristics and potential patterns of users' electricity usage behaviors.
[0040] Predictive analysis unit: Using technologies such as fuzzy neural network algorithms, this unit predicts users' future electricity consumption behavior and provides forward-looking guidance for the allocation of power resources and grid planning.
[0041] Feature output unit: outputs the user's electricity consumption behavior characteristics obtained from the processed historical electricity consumption data in a structured form.
[0042] In an optional implementation, the process described in step S2 is to process and analyze the historical power consumption data using a pre-configured power consumption data analysis model to obtain the power consumption behavior characteristics of the user, including: The historical electricity usage data is analyzed using an electricity usage habit analysis model to obtain user electricity usage habit characteristics; the electricity usage habit characteristics are input into an electricity usage behavior analysis model for analysis to obtain user electricity usage behavior characteristics.
[0043] It is worth noting that after obtaining the user's electricity consumption behavior characteristics, the method further includes: The original user power consumption behavior characteristics stored in the memory are updated to obtain the updated user power consumption behavior characteristics. Exemplarily, the updated user power consumption behavior characteristics can be stored as an external file and output. This output can be in a standardized data format, such as CSV, JSON or XML, so that different systems and applications can read and process it. In this way, the updated user power consumption behavior characteristics can be applied within the power system and provide data support for external researchers and developers.
[0044] Among them, the user failure rate is a parameter used to assess the potential risk of power supply interruption or failure encountered by users during the process of calling power resources. This parameter is expressed in a numerical range of 0 to 1, where the high and low values directly correspond to the probability of users facing power supply interruption. A higher value means that users are more likely to encounter failures during the power call process.
[0045] The user importance value is a parameter used in the power system to measure the user's demand for power supply stability and the priority of grid resource allocation. It comprehensively considers the user's socio-economic value, dependence on continuous power supply, and role in grid operation to ensure that key infrastructure and services are given priority when power is tight. This parameter is represented by a numerical range of 0 to 1, and a higher value means that the user has a higher demand for power supply stability and a higher priority for grid resource allocation.
[0046] The predicted value of the user's electricity consumption probability is a quantitative indicator used to predict the probability of a user using electricity in a specific time period of a day. This indicator is expressed in a numerical range of 0 to 1, where the smaller the value, the lower the probability of the user using electricity in the specific time period; the larger the value, the greater the probability of the user using electricity in the specific time period. The specific time period is the entire time period from the time when the power grid fails to the time when the failure is fully recovered.
[0047] It should also be noted that when it is detected that the user failure rate of a certain user is higher than a preset failure rate threshold, a warning message is generated and sent to the user.
[0048] The failure rate threshold is a key parameter used to evaluate and define the critical level of the risk of power supply interruption for users. This threshold is set based on the analysis of historical failure data and statistical methods. When the failure rate of a user exceeds this preset threshold, the early warning notification mechanism for the user is triggered and an early warning message is generated and sent to the user.
[0049] In addition, the generated warning information will be sent to the user through an appropriate communication channel to ensure that the user can receive this important information in a timely manner. This can be achieved through SMS, email, mobile application push or any other communication method agreed upon between the user and the grid operator.
[0050] In another optional embodiment, the method further includes: The real-time power consumption of all surrounding users is obtained. When the real-time power consumption of any user is less than a preset user power consumption threshold, the power reserve of the user is called to perform fault recovery.
[0051] The user power consumption threshold is set by the power system staff based on historical experience and grid load conditions. When the real-time power consumption of any user is monitored to be lower than the preset threshold, the system will identify that the user has unused power surplus. The system will automatically give priority to calling the power surplus of these users below the threshold to support the power demand for fault recovery.
[0052] In step S3, the user's electricity consumption behavior characteristics are weighted and matched based on a preset weight allocation model to obtain the user's scheduling priority, and the fault is restored from low to high according to the scheduling priority.
[0053] The weight distribution model includes:
[0054] in, is the priority value of the user in power resource scheduling, is the user importance value, N2 is the user failure rate, N3 is the user power consumption frequency, and N4 is the user power consumption probability prediction value.
[0055] Among them, the priority value of users in power resource scheduling It is a decisive parameter, which is obtained through comprehensive calculation and reflects the priority of users in obtaining electricity resources. The larger the value, the more important the user is in the allocation of power resources. Therefore, when power resources are tight or fault recovery occurs, the system will give priority to meeting the needs of these high-priority users. At the same time, this also means that in the event of a power grid failure, the system will tend to first call on the power resources of users with lower priority values to achieve rapid recovery of the power grid and optimal allocation of resources. This scheduling mechanism ensures that key users can obtain stable and reliable power supply, while also improving the overall operating efficiency and reliability of the power grid.
[0056] is the user importance value, which is in the range of 0 to 1. Within this range, the higher the value, the more urgent the user's demand for power supply stability is, and the higher the priority of the user in power grid resource allocation is.
[0057] The user failure rate is represented by a numerical range of 0 to 1. When the value of the user failure rate is low, it indicates that the user faces a smaller risk of power supply interruption during the use of power resources; conversely, when this value is high, it indicates that the probability of the user encountering a failure during the power call process increases.
[0058] The frequency of electricity consumption of the user measures the frequency of the user's access to the grid and consumption of electricity within a certain period of time. The value range of this indicator is from 0 to 1, where 0 means that the user has no electricity consumption during the period of observation, and 1 means that the user uses electricity continuously, which is close to or equal to the full-time usage.
[0059] is the predicted value of the user's electricity usage probability, which is measured in a numerical range of 0 to 1. The value is directly related to the size of the electricity usage probability: when the value is low, it means that the user is less likely to use electricity in this specific time period; on the contrary, a higher value indicates that the user is more likely to use electricity in this specific time period.
[0060] and are two core preset coefficients, which represent the weight adjustment factors of different parameters in the model. Their values are between 0 and 1. The power system staff sets their specific values according to the actual operation strategy and goals. It is mainly used to weigh the user's power consumption frequency. This affects the proportion of user failure rate in the weight calculation.
[0061] In implementation, the user weight value can be calculated based on the user importance value, user failure rate, and user power usage probability prediction value of the user power usage frequency and user power usage behavior characteristics in the above-mentioned user power usage habit characteristics, and corresponding coefficients are set for the user power usage frequency and the user power usage probability prediction value. At the same time, it is also necessary to ensure that under certain circumstances, the primary and secondary relationships among the four weights of user importance value, user failure rate, user power usage frequency, and user power usage probability prediction value, so that the user's scheduling priority is a function of the variables of user importance value, user failure rate, user power usage frequency, and user power usage probability prediction value. It is worth explaining that, first of all, the importance value of the user is the priority principle, that is, for two users with different importance values, if the importance value of the first user is higher than that of the second user, the scheduling priority of the first user should be higher than that of the second user, and the power resources of the second user should be used to restore the fault first. Secondly, the influence of the weight of the user's failure rate should be second only to the weight of the user's importance value. The higher the user's failure rate, the greater the possibility of failure in the process of calling power resources for recovery. Then, the weights of the user's failure rate and the predicted value of the user's power consumption probability should be considered comprehensively, which can be specifically calculated through the coefficient and Finally, the user's power consumption frequency is an auxiliary factor, which has the least impact on the user's scheduling priority.
[0062] At the same time, the real-time power consumption of all surrounding users is monitored and obtained. When the real-time power consumption of any user is less than the preset user power consumption threshold, the scheduling priority of the user will be automatically reduced to the lowest, and the power resources of the user will be called for fault recovery. If the real-time power consumption of at least two users is less than the preset user power consumption threshold, the scheduling priority of all users is calculated according to the formula, and the power resources of users with lower priorities are called in turn according to the scheduling priority for fault recovery.
[0063] In an optional implementation, when there are at least two faulty users, the historical electricity usage data of each faulty user is analyzed respectively to obtain the fault recovery priority corresponding to each faulty user, and fault recovery is performed in descending order according to the fault recovery priority.
[0064] The historical electricity consumption data is the electricity consumption data of the faulty user within a preset time period before the fault occurs.
[0065] Specifically, the system will analyze the historical electricity consumption data of each faulty user. The historical electricity consumption data will be processed and analyzed using a pre-configured electricity consumption data analysis model to obtain the user's electricity consumption behavior characteristics; further combined with the weight allocation algorithm, these characteristics are converted into the dispatch priority of each faulty user. Through the analysis of these data, the system can calculate the fault recovery priority corresponding to each faulty user to ensure that key areas and users can get priority in the restoration of power resources. Then, the system will perform fault recovery operations in order from high to low according to these priorities, optimize the allocation of power resources, and improve the efficiency and effectiveness of power grid fault recovery.
[0066] In summary, the present invention relates to a method for intelligent scheduling of ring network cabinet loads when a power grid fails. The method obtains fault location information and historical power consumption data of surrounding users. And based on the historical power consumption data, a pre-configured power consumption data analysis model is used for processing and analysis to obtain user power consumption behavior characteristics; further combined with a weight distribution algorithm, these characteristics are converted into scheduling priorities for each user. Finally, the system dynamically adjusts and optimizes the allocation of power resources based on these priorities to ensure that power can be restored quickly and effectively when a fault occurs. This method not only improves the response speed and recovery capability of the power grid, but also enhances the reliability and intelligence level of power resource management, providing a solid guarantee for the stable operation of the power grid and the power safety of users.
[0067] Reference Figure 2 The second embodiment of the present invention provides a ring main unit load intelligent dispatching device, comprising: The power consumption monitoring unit is used to obtain the fault location information and the historical power consumption data of surrounding users; A weight determination unit, configured to perform processing and analysis using a pre-configured power consumption data analysis model to obtain a user's power consumption behavior characteristics; and to perform weight matching on the user's power consumption behavior characteristics based on a preset weight allocation model to obtain the user's scheduling priority; and to process the historical power consumption data to obtain the scheduling priority; The resource scheduling unit is used to schedule the power resources at the fault location for recovery according to the scheduling priority from low to high.
[0068] Specifically, the power consumption monitoring unit is responsible for real-time monitoring and recording of the user's power consumption. By connecting to data collection devices such as smart meters and sensors, the power consumption monitoring unit can obtain the user's historical power consumption data within a specific time period. This data not only includes the amount of power consumption, but also covers detailed information such as the frequency of power consumption, peak and valley time periods, etc. Through this data, the system can fully understand the user's power consumption habits and power consumption behavior characteristics.
[0069] Weight determination unit: Receives historical power consumption data provided by the power consumption monitoring unit and uses the preset weight allocation model for in-depth analysis. The weight allocation model comprehensively considers multiple factors such as the user's power consumption frequency, power consumption, peak and valley periods, failure rate, importance value, and power consumption probability prediction value, and calculates the scheduling priority of each user through a scientific algorithm. This priority reflects the relative importance of the user in the power resource scheduling and provides a decision-making basis for subsequent resource scheduling.
[0070] Resource scheduling unit: This unit is a key part of the system's execution operation. It intelligently schedules the power resources at the fault location based on the scheduling priority calculated by the weight determination unit. The resource scheduling unit dynamically adjusts the allocation of power resources through optimization algorithms to prioritize the power supply of high-priority users. When a power grid fails, the unit can respond quickly and reasonably allocate power resources based on the user's power consumption behavior characteristics and priorities to achieve rapid recovery from the fault. At the same time, the resource scheduling unit can also dynamically adjust the scheduling strategy based on the real-time operation status of the power grid and changes in user power demand to ensure the stable operation of the power grid and the quality of power consumption of users.
[0071] The local electricity consumption behavior characteristic analysis module includes: A habit feature analysis unit, configured to analyze the historical power consumption data using a power consumption habit analysis model to obtain the user's power consumption habit features; wherein the user's power consumption habit features include the user's power consumption frequency, the user's power consumption, and the user's power consumption peak and valley time periods within the preset time period; The behavior characteristic analysis unit is used to input the power usage habit characteristics into the power usage behavior analysis model for analysis to obtain the user's power usage behavior characteristics; wherein the user's power usage behavior characteristics include user failure rate, user importance value, and user power usage probability prediction value.
[0072] It should be noted that the intelligent load scheduling device for a ring main unit provided in an embodiment of the present invention is used to execute all the process steps of the intelligent load scheduling method for a ring main unit in the above embodiment. The working principles and beneficial effects of the two correspond one to one, and thus will not be described in detail.
[0073] The embodiment of the present invention further provides an electronic device. The electronic device includes: a processor, a memory, and a computer program stored in the memory and executable on the processor, such as a ring main unit load intelligent scheduling program. When the processor executes the computer program, the steps in the above-mentioned embodiments of the ring main unit load intelligent scheduling method are implemented, such as Figure 1 Alternatively, when the processor executes the computer program, the functions of the modules / units in the above-mentioned device embodiments are implemented, such as the weight determination module.
[0074] Exemplarily, the computer program may be divided into one or more modules / units, which are stored in the memory and executed by the processor to implement the present invention. The one or more modules / units may be a series of computer program instruction segments capable of implementing specific functions, which are used to describe the execution process of the computer program in the electronic device.
[0075] The electronic device may be a computing device such as a desktop computer, a notebook, a PDA, and a smart tablet. The electronic device may include, but is not limited to, a processor and a memory. Those skilled in the art will appreciate that the above components are merely examples of electronic devices and do not constitute a limitation on the electronic device. The electronic device may include more or fewer components than the above components, or may combine certain components, or different components. For example, the electronic device may also include input and output devices, network access devices, buses, etc.
[0076] The processor may be a central processing unit (CPU), other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc. The processor is the control center of the electronic device, and uses various interfaces and lines to connect various parts of the entire electronic device.
[0077] The memory can be used to store the computer program and / or module, and the processor realizes various functions of the electronic device by running or executing the computer program and / or module stored in the memory, and calling the data stored in the memory. The memory can mainly include a program storage area and a data storage area, wherein the program storage area can store an operating system, an application required for at least one function (such as a sound playback function, an image playback function, etc.), etc.; the data storage area can store data created according to the use of the mobile phone (such as audio data, a phone book, etc.), etc. In addition, the memory can include a high-speed random access memory, and can also include a non-volatile memory, such as a hard disk, a memory, a plug-in hard disk, a smart memory card (Smart Media Card, SMC), a secure digital (Secure Digital, SD) card, a flash card (Flash Card), at least one disk storage device, a flash memory device, or other volatile solid-state storage devices.
[0078] Wherein, if the module / unit integrated in the electronic device is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on such an understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Wherein, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable media do not include electric carrier signals and telecommunication signals.
[0079] It should be noted that the device embodiments described above are merely schematic, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. In addition, in the accompanying drawings of the device embodiments provided by the present invention, the connection relationship between the modules indicates that there is a communication connection between them, which may be specifically implemented as one or more communication buses or signal lines. A person of ordinary skill in the art may understand and implement it without paying any creative effort.
[0080] The specific embodiments described above further illustrate the purpose, technical solutions and beneficial effects of the present invention. It should be understood that the above description is only a specific embodiment of the present invention and is not intended to limit the scope of protection of the present invention. It is particularly pointed out that for those skilled in the art, any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the scope of protection of the present invention.
Claims
1. A method for intelligent scheduling of ring main unit loads. It is characterized in that include: Obtain fault location information and historical electricity consumption data of surrounding users; Based on the historical electricity consumption data, a pre-configured electricity consumption data analysis model is used to process and analyze the data to obtain the user's electricity consumption behavior characteristics; The user's electricity consumption behavior characteristics are weighted and matched based on a preset weight allocation model to obtain the user's scheduling priority, and the fault is restored from low to high according to the scheduling priority.
2. According to the method for intelligent scheduling of ring main unit loads according to claim 1, It is characterized in that The historical power consumption data is the power consumption data of surrounding users within a preset time period before the fault occurs.
3. According to claim 2, the intelligent scheduling method for ring main unit load, It is characterized in that The method of processing and analyzing the historical electricity consumption data using a pre-configured electricity consumption data analysis model to obtain the user's electricity consumption behavior characteristics includes: The historical electricity usage data is analyzed using an electricity usage habit analysis model to obtain the user's electricity usage habit characteristics; wherein the user's electricity usage habit characteristics include the user's electricity usage frequency, the user's electricity usage, and the user's electricity usage peak and valley time periods within the preset time period; Inputting the electricity usage habit characteristics into the electricity usage behavior analysis model for analysis to obtain the user's electricity usage behavior characteristics; wherein the user's electricity usage behavior characteristics include user failure rate, user importance value, and user electricity usage probability prediction value; Among them, the electricity consumption data analysis model includes the electricity consumption habit analysis model and the electricity consumption behavior analysis model.
4. According to claim 3, the ring main unit load intelligent dispatching method, It is characterized in that After obtaining the user's electricity usage behavior characteristics, the method further includes: The original user power usage behavior characteristics stored in the memory are updated to obtain the updated user power usage behavior characteristics.
5. According to claim 3, the intelligent scheduling method for ring main unit load, It is characterized in that include: When it is detected that the user failure rate of a certain user is higher than a preset failure rate threshold, a warning message is generated and sent to the user.
6. According to claim 3, the intelligent scheduling method for ring main unit load, It is characterized in that The method further comprises: The real-time power consumption of all surrounding users is obtained. When the real-time power consumption of any user is less than a preset user power consumption threshold, the power reserve of the user is called to perform fault recovery.
7. The method for intelligently dispatching the load of a ring main unit according to claim 3, It is characterized in that The weight distribution model includes: Among them, N is the priority value of the user in power resource scheduling, N 1 is the user importance value, N 2 is the user failure rate, N 3 is the user's power frequency, N 4 The predicted value of the user's electricity consumption probability; in and It is a preset coefficient, and its value range is 0 to 1.
8. The method for intelligently dispatching the load of a ring main unit according to any one of claims 1 to 7, It is characterized in that Also includes: When at least two fault areas exist, historical power consumption data of users in each fault area are analyzed respectively to obtain the fault recovery priority corresponding to each fault area, and fault recovery is performed in order from high to low according to the fault recovery priority; The historical electricity consumption data is the electricity consumption data of the faulty user within a preset time period before the fault occurs.
9. An intelligent load dispatching device for ring main unit, It is characterized in that include: The power consumption monitoring unit is used to obtain the fault location information and the historical power consumption data of surrounding users; A weight determination unit, used to process and analyze the power consumption data using a pre-configured power consumption data analysis model to obtain the user's power consumption behavior characteristics; And based on a preset weight allocation model, weight matching is performed on the user's electricity consumption behavior characteristics to obtain the user's scheduling priority. The historical electricity consumption data is processed to obtain the scheduling priority; The resource scheduling unit is used to schedule the power resources at the fault location for recovery according to the scheduling priority from low to high.
10. A computer-readable storage medium, It is characterized in that The computer-readable storage medium includes a stored computer program, wherein when the computer program is running, the device where the computer-readable storage medium is located is controlled to execute the intelligent scheduling method for ring main unit load according to any one of claims 1 to 8.
Citation Information
Patent Citations
Active service auxiliary judgment method based on power failure reporting
CN111080142A
Method for rapidly recovering load and reducing loss during power failure of multi-circuit line
CN112564097A
Power system scheduling method based on cloud edge cooperative computing
CN117134365A
Energy storage power supply control method, household energy storage equipment and storage medium
CN117613976A
Cited By
Ring main unit dynamic segmentation load reconstruction method based on edge calculation
CN121710248A
