Capacity planning method for configuring electrochemical energy storage for mechanical energy storage power station
By determining the gravity energy storage power regulation response function and optimizing the electrochemical energy storage configuration, the problem of insufficient regulation performance of gravity energy storage is solved, and the power grid operation assessment requirements and comprehensive frequency regulation performance are improved.
Patent Information
- Application Number
- CN202410884058.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-02
- Publication Date
- 2024-10-29
AI Technical Summary
The existing technology fails to effectively solve the capacity planning and performance improvement methods of gravity energy storage and electrochemical hybrid energy storage, resulting in the uncertainty of the response time of gravity energy storage power adjustment and the poor adjustment rate of high-power load increase and low-power load reduction, which cannot meet the requirements of Grid operation assessment requirements.
By determining the gravity energy storage power regulation response function, the electrochemical energy storage capacity measurement and configuration that meets the grid assessment requirements is optimized, and the hybrid energy storage power and capacity of gravity energy storage and electrochemical energy storage are combined to improve Comprehensive adjustment performance.
It improves the regulation performance of gravity energy storage, meets the assessment requirements of primary frequency regulation and automatic generation control (AGC) of the power grid, and improves the comprehensive frequency regulation performance index.
Smart Images

Figure CN118868166A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a capacity planning method for an energy storage power station, in particular to a capacity planning method for a mechanical energy storage power station configured with electrochemical energy storage, and belongs to the technical field of energy storage. Background Art
[0002] Gravity energy storage is a long-term energy storage technology route among new energy storage technologies. Taking self-built high-speed gravity energy storage as an example, affected by the combination timing of gravity blocks and the load characteristics of mechanical loading, its power curve has the characteristics of step linearization and uncertain response time, but it can achieve full capacity tracking within 1 minute. The dynamic adjustment process of gravity energy storage output is greatly affected by the starting load. The response time of large-power load increase and small-power load reduction is long and uncertain, and the adjustment rate is greatly affected. The configuration of electrochemical energy storage is of great significance to improving the response time and regulation performance of gravity energy storage power stations under the two operating modes. It is necessary to integrate with electrochemical energy storage to achieve power and energy complementarity, improve the comprehensive regulation performance of power stations, and meet the requirements of power grid operation assessment.
[0003] At present, the research on the integration of various energy storage forms mainly focuses on hybrid energy storage power stations in various forms such as flywheel and electrochemistry, supercapacitor and electrochemistry, lithium battery and liquid sulfur, etc., to achieve the complementarity of power-type and energy-type energy storage so that it has the characteristics of high power and high energy efficiency, and meets the peak load and frequency regulation requirements under complex working conditions of the power grid. At the same time, electrochemical energy storage has also been promoted and applied in many provinces and cities in China in conjunction with coal-fired thermal power transformation, and the frequency regulation auxiliary service income of power plants has been increased by improving the comprehensive frequency regulation performance indicators of thermal power plants.
[0004] Since the grid-related standards and performance indicators of gravity energy storage have not yet been made public, the published research has not yet involved optimization methods for capacity planning and performance improvement of gravity energy storage and electrochemical hybrid energy storage. Summary of the invention
[0005] The technical problem to be solved by the present invention is to provide a capacity planning method for configuring electrochemical energy storage in a mechanical energy storage power station, and to calculate the configured power and capacity of the electrochemical energy storage.
[0006] In order to solve the above technical problems, the technical solution adopted by the present invention is:
[0007] A capacity planning method for configuring electrochemical energy storage in a mechanical energy storage power station, characterized by comprising the following steps:
[0008] S1. Determine the power regulation response function of the gravity energy storage;
[0009] S2. Calculation of electrochemical energy storage capacity that meets grid assessment requirements;
[0010] S3. Optimization of electrochemical energy storage configuration capacity.
[0011] Furthermore, the step S1 specifically comprises:
[0012] The output active power of gravity energy storage is the sum of the output active power of the units. The power response function of a single unit is:
[0013]
[0014] Among them, P g (i,t) is the active power of unit i at time t; P g (i,t 0 ) is the time t at which the command is issued 0 Active power of the unit; t delay,i Adjust the delay time for the gravity block of unit i; T interval is the fixed interval time between gravity blocks; int() is the rounding down function; λ is the instruction adjustment direction; P u is the unit work power of the gravity block;
[0015] Gravity block adjustment delay time t of unit i delay,i is an interval variable with the following range:
[0016] (1) When increasing the charge / discharge power,
[0017]
[0018] Where, T st is the start delay time; max() is the maximum value function;
[0019] (2) When the charging / discharging power is reduced,
[0020]
[0021] Where, T cycle is the operating cycle of the gravity block;
[0022] The unit tracks the unit AGC command with the minimum deviation, and the adjustment process ends.
[0023] |P g (i,t)-P des (i,t 0 )|≤P u (4)
[0024] Where P des (i,t 0 ) is t 0 The active power control target allocated to unit i at the moment;
[0025] The power response function of the gravity energy storage unit is:
[0026]
[0027] In the formula, n is the number of energy storage units. Considering that the output power of the two units is similar, formula (5) is simplified by combining formula (1);
[0028]
[0029] Where P s (t) is the active power of the energy storage unit at time t; P s (t 0 ) is the time t at which the command is issued 0 Active power of energy storage unit; t delay Adjust the delay time for the gravity block of the energy storage unit; ΔP ε It is the correction component of the active power of the energy storage unit and the AGC instruction, and its value is 0, P u , ..., (n-1)P u ;
[0030] The gravity block of the energy storage unit adjusts the delay time t delay,i is an interval variable with the following range:
[0031] (1) When increasing the charge / discharge power,
[0032] (7)
[0034] In the formula, ceil() is the upward rounding function;
[0035] (2) When the charging / discharging power is reduced,
[0036]
[0037] The gravity energy storage unit meets the active power regulation range constraints and the state of charge (SOC) constraints.
[0038] Furthermore, the step S2 is specifically as follows:
[0039] 2.1. According to the technical requirements and assessment requirements of primary frequency regulation, frequency control dead zone, adjustment coefficient, and amplitude limit, by simulating system frequency disturbance and primary frequency regulation load instructions, using gravity energy storage to adjust the response function, analyze the primary frequency regulation response time and actual integrated power of gravity energy storage under different load levels;
[0040] 2.2. According to the adjustment rate and adjustment accuracy indicators of AGC assessment;
[0041] Furthermore, the step 2.1 is specifically as follows:
[0042] Referring to the primary frequency regulation assessment requirements, gravity energy storage and electrochemical hybrid energy storage meet the primary frequency regulation response time and actual integrated power index requirements, and calculate the minimum power and capacity required to configure electrochemical energy storage;
[0043] The hybrid energy storage power of gravity energy storage and electrochemical energy storage is,
[0044] P h (t) = P s (t)+P e (t) (9)
[0045] P des,e (t) = P des (t)-P s (t) (10)
[0046]
[0047] Where P h (t) is the active power of the hybrid energy storage at time t; P e (t) is the electrochemical active power at time t; P des,e (t) is the target electrochemical power at time t; p cmax,e is the maximum electrochemical charging power; p dmax,e is the maximum electrochemical discharge power; considering that electrochemical energy storage can achieve millisecond-level rapid response, the electrochemical active power is limited by the maximum charge and discharge power constraint;
[0048] Response time requirements The maximum discharge power of the energy storage is obtained,
[0049] P e (t resp )=p dmax,e ≥p pf,reg -P s (t resp ) (12)
[0050] Where, t resp is the frequency modulation response time, which is a fixed value; p pf,reg The primary frequency modulation response power is the theoretical action power;
[0051] Similarly, the maximum charging power of electrochemical energy storage, p cmax,e ≤p pf,reg -P s (t resp );
[0052] The response index meets the standard, that is, the ratio of actual integrated power to theoretical integrated power meets the assessment requirements.
[0053]
[0054] Where, R(t) is the primary frequency modulation response index at time t; r(t) is the response index assessment value at time t;
[0055] Take the above adjustment as an example,
[0056]
[0057] Among them, P e (t)≤p dmax,s -P s (t);
[0058] The fixed-step linear iteration method is used to solve formula (14). The maximum charging and discharging power of the energy storage is derived from formula (12), and the energy storage power to be configured is derived from (14). The larger value of the power and duration is taken as the configuration capacity that meets the requirements of the primary frequency regulation assessment.
[0059] Furthermore, the step 2.2 is specifically as follows:
[0060] 2.2.1. The regulation rate meets the standard. The regulation rate of the hybrid energy storage of gravity energy storage and electrochemical energy storage consists of two parts, one of which is the millisecond-level full-power charge and discharge response of the electrochemical energy storage, and the other is the tracking and regulation of the gravity energy storage. After the active power of the hybrid energy storage tracks the AGC target, the gravity energy storage continues to track the AGC target, and the electrochemical energy storage reduces the charge and discharge power to track the control deviation.
[0061] t 0 The AGC instruction received at the moment is P des (t 0 ), the active power of the energy storage station is P h (t 0 ), the adjustment step is P des (t 0 )-P h (t 0 ), where the active power of gravity energy storage is P s (t 0 ), the active power of electrochemical energy storage is P e (t 0 ), assuming P e (t 0 )=0、P des (t 0 )>P h (t 0 ), if P des (t 0 )-P h (t 0 )>P dmax,e The electrochemical energy storage is discharged at the maximum discharge power, and the deviation part Pdes (t 0 )-P h (t 0 ) is adjusted by gravity energy storage, and the adjustment time depends on the gravity energy storage P des (t 0 )-P h (t 0 ) adjustment time; if P des (t 0 )-P h (t 0 )≤P dmax,e , then electrochemistry takes on all the power regulation, and the regulation time depends on the electrochemical energy storage;
[0062] If the adjustment step length P step >P dmax,e ,
[0063]
[0064] Where P step is the AGC command step length issued by the superior dispatcher to the gravity energy storage power station, which is the command step length P in the historical operation data of the power station. des (t 0 )-P h (t 0 )’s statistical value or the value set by the superior dispatcher; reg,s P is the gravity energy storage step -P dmax,e Partial power adjustment time; P n is the rated capacity of the energy storage power station;
[0065] Take discharge as an example, where t reg,s According to formula (7), the delay time and P step -P dmax,e The adjustment time consists of two parts:
[0066]
[0067] Instruction issuance time P e (t 0 )=0, then P s (t 0 )+P step =P des (t 0 ).
[0068]
[0069] Substituting formula (17) into formula (15), we get:
[0070]
[0071] Among them, P s (t 0 )+P step <p dmax,s The formula is simplified to,
[0072]
[0073] 2.2.2. The regulation accuracy meets the standard; the tracking deviation of the AGC target of the hybrid energy storage consists of two parts: the tracking deviation of the gravity energy storage and the electrochemical energy storage deviation correction power;
[0074]
[0075] The electrochemical energy storage configuration power is obtained,
[0076] P dmax,e ≥2aP n -P u (twenty one)
[0077] The optimization requirements of the comprehensive regulation rate and regulation accuracy are given by equations (19) and (21), and the rated power of the electrochemical energy storage configuration is obtained as follows:
[0078]
[0079] Where P n,e Rated power configured for electrochemical energy storage.
[0080] Furthermore, the step S3 is specifically:
[0081] maxF=k pfr,cp (Q pfr,rl -Q pfr,th )+V sfr,cp +k sfr,cp D sfr -(λ 0 C pfr,ua +λ 1 C pfr,uc )Q disc
[0082] -(λ 2 C sfr,rt Q rt +λ 3 C sfr,ac Q ac )-λ 4 C es Q es (twenty three)
[0084] In the formula, k pfr,cp Q is the compensation coefficient for the frequency modulation exceeding the theoretical integral power;pfr,rl is the actual integrated power; Q pfr,th is the theoretical integrated charge; V sfr,cp Capacity compensation for AGC performance reaching the standard; k sfr,cp It is the comprehensive frequency modulation performance index of AGC; D sfr is the frequency modulation mileage; 0 , 1 , 2 , 3 They are respectively the coefficients of primary frequency modulation not being available, not meeting the standard, AGC rate and accuracy not meeting the standard, and the values are 0 or 1; C pfr,ua The primary frequency modulation does not have the assessment coefficient; C pfr,uc Q is the assessment coefficient for the failure of primary frequency regulation index to meet the standard; disc The power consumption for a frequency regulation test; C sfr,rt Q is the AGC rate non-compliance assessment coefficient; rt The power consumption for rate failure assessment; C sfr,ac Q is the accuracy non-compliance assessment coefficient; ac The power consumption for accuracy not meeting the standard; 4 is the electrochemical energy storage configuration coefficient, which takes a value of 0 or 1; C es Q is the average annual construction and operation cost of electrochemical energy storage units; es is the capacity of the electrochemical energy storage power station;
[0085] The calculation formula (23) shows the effect of different electrochemical energy storage configuration scales on λ 0 , 1 , 2 , 3 The impact of the assessment coefficient; the electrochemical energy storage configuration capacity is calculated for the electrochemical energy storage without configuration, meeting the primary frequency regulation assessment requirements, and meeting the AGC assessment requirements, and the λ 0 , 1 , 2 , 3 Assessment coefficient adjustment; the compensation costs of primary frequency modulation and AGC are estimated based on the historical number of primary frequency modulation actions and AGC instruction times of the system;
[0086] Calculate primary frequency regulation compensation, capacity compensation, AGC compensation, primary frequency regulation assessment, AGC assessment, annual average cost of energy storage and annual surplus for each scale in turn;
[0087] On the basis of the electrochemical energy storage configuration capacity that meets the AGC assessment requirements, the impact of further increasing the energy storage scale analysis on the annual surplus is analyzed.
[0088] Compared with the prior art, the present invention has the following advantages and effects: in view of the characteristics of uncertain response time of gravity energy storage power regulation, difference in regulation rate between large power load increase and small power load reduction, and fixed step non-continuous regulation, the present invention summarizes the response function of gravity energy storage power regulation, analyzes the response performance of single instructions and multiple instructions under different load levels, and calculates the configuration power and capacity of electrochemical energy storage to improve the regulation performance of gravity energy storage, meet the assessment requirements of primary frequency regulation and automatic generation control (AGC) of the power grid, and improve the comprehensive frequency regulation performance indicators. BRIEF DESCRIPTION OF THE DRAWINGS
[0089] Figure 1 It is a flow chart of a capacity planning method for configuring electrochemical energy storage in a mechanical energy storage power station of the present invention.
[0090] Figure 2 It is the power regulation response curve of the gravity energy storage unit of the present invention from zero power to full power discharge.
[0091] Figure 3 It is the power regulation response curve of the gravity energy storage unit of the present invention when discharging from full power to zero power.
[0092] Figure 4 It is the power regulation response curve of the gravity energy storage unit of the present invention when discharging from half power to full power.
[0093] Figure 5 It is the power regulation response curve of the gravity energy storage unit of the present invention for half-power to zero-power discharge.
[0094] Figure 6 This is the primary frequency modulation response curve of the gravity energy storage with zero power increasing output and full power decreasing output of the present invention.
[0095] Figure 7 These are the fastest and slowest response gravity energy storage high load increase and low load decrease primary frequency modulation response curves of the present invention.
[0096] Figure 8 This is a table of calculation results of the primary frequency modulation response of the gravity energy storage of the present invention.
[0097] Fig. 9 This is a table of AGC regulation rates under different load rates of gravity energy storage when the regulation step is 6MW according to the present invention.
[0098] Fig.10 This is a table of AGC regulation rates under different load rates of gravity energy storage when the regulation step is 12MW according to the present invention.
[0099] Fig.11 This is the gravity energy storage + electrochemical combined primary frequency modulation response curve of the present invention.
[0100] Fig.12It is the combined energy storage AGC regulation rate curve of electrochemical energy storage with different capacities of the present invention. DETAILED DESCRIPTION
[0101] In order to elaborate on the technical scheme adopted by the present invention to achieve the predetermined technical purpose, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only partial embodiments of the present invention, rather than all embodiments, and the technical means or technical features in the embodiments of the present invention can be replaced without paying creative work. The present invention will be described in detail below with reference to the drawings and in conjunction with the embodiments.
[0102] The capacity planning method of a mechanical energy storage power station configured with electrochemical energy storage of the present invention summarizes the response function of gravity energy storage power regulation according to the power regulation characteristics of gravity energy storage; calculates the power and capacity of gravity energy storage configured with electrochemical energy storage according to the primary frequency regulation and AGC assessment requirements of the power grid for new energy storage; considers the configuration cost of electrochemical energy storage, call compensation and ancillary service income, and performs optimization calculation of power and capacity configuration. Specifically, it includes the following steps:
[0103] S1. Determine the power regulation response function of the gravity energy storage.
[0104] The power regulation of gravity energy storage is to adjust the number of gravity blocks running with load. Taking a single generator motor as an example, the current power is P(t 0 ), the target power is P des (t), the unit work power of the gravity block is P u , then P(t 0 ) Adjust to P des (t), the corresponding number of gravity blocks running with load is P(t 0 ) / P u Adjust to P des (t) / P u The corresponding power regulation process is in P(t 0 ) Stable output, fixed time interval gravity block combination, insert or reduce (P des (t)-P(t 0 )) / P u The resulting problem is that after receiving the instruction, under the fixed timing combination of the current gravity block, the position where the gravity block can be inserted or reduced is uncertain, which leads to uncertainty in the response time.
[0105] The energy storage unit of gravity energy storage adopts the mode of group operation of two generator motors (referred to as units). To ensure the load balance of the energy storage tower, the output power of the two units is similar. Taking the energy storage unit rated power of 12MW (two single 6MW units) as an example, the power regulation response curve of the gravity energy storage unit under different load rates is as follows: Figure 2 , Figure 3 , Figure 4 and Figure 5 As shown. In the discharge state, zero power to full power (12MW) and full power (12MW) to zero power can respond instantly. The energy storage unit adjusts the step size of 1MW to the target power, and the minimum trackable deviation is the work power of a single gravity block of 0.5MW; half power (6MW) to full power (12MW), full power (12MW) to half power (6MW) The fastest response curve is active power 1, and the slowest response curve is active power 2. There is a large uncertainty in the response curve.
[0106] The output active power of gravity energy storage is the sum of the output active power of the units. The power response function of a single unit is:
[0107]
[0108] Among them, P g (i,t) is the active power of unit i at time t (MW); P g (i,t 0 ) is the time t at which the command is issued 0 Active power of the unit (MW); t delay,i is the delay time (seconds) for adjusting the gravity block of unit i, see formula (2); T interval is the fixed interval time (seconds) between gravity blocks; int() is the rounding down function; λ is the instruction adjustment direction, which is 1 for upward adjustment and -1 for downward adjustment; P u is the unit work power of the gravity block (MW).
[0109] Gravity block adjustment delay time t of unit i delay,i is an interval variable with the following range:
[0110] (1) When increasing the charge / discharge power,
[0111]
[0112] Where, T st is the startup delay time (seconds); max() is the maximum value function.
[0113] (2) When the charging / discharging power is reduced,
[0114]
[0115] Where, Tcycle is the operating period of the gravity block (in seconds).
[0116] The unit tracks the unit AGC command with the minimum deviation, and the adjustment process ends.
[0117] |P g (i,t)-P des (i,t 0 )|≤P u (4)
[0118] Where P des (i,t 0 ) is t 0 Active power control target allocated to unit i at time (MW).
[0119] The power response function of the gravity energy storage unit is:
[0120]
[0121] Where n is the number of energy storage units. Considering that the output power of the two units is similar, formula (5) is simplified by combining formula (1).
[0122]
[0123] Where P s (t) is the active power of the energy storage unit at time t (MW); P s (t 0 ) is the time t at which the command is issued 0 Active power of energy storage unit (MW); t delay Adjust the delay time (in seconds) for the gravity block of the energy storage unit; ΔP ε It is the correction component of the active power of the energy storage unit and the AGC instruction, and its value is 0, P u , ..., (n-1)P u .
[0124] The gravity block of the energy storage unit adjusts the delay time t delay,i is an interval variable with the following range:
[0125] (1) When increasing the charge / discharge power,
[0126]
[0127] Where ceil() is the rounding up function.
[0128] (2) When the charging / discharging power is reduced,
[0129]
[0130] The gravity energy storage unit meets the active power regulation range constraints and the state of charge (SOC) constraints.
[0131] S2. Calculation of electrochemical energy storage capacity that meets grid assessment requirements.
[0132] According to the assessment and compensation provisions in the "two rules" ("grid-connected operation management implementation rules" and "electricity auxiliary service management implementation rules") of the provincial or regional power grid where the gravity energy storage power station is located, the regulation performance indicators of the primary frequency regulation and automatic generation control (AGC) of the gravity energy storage at different load levels are calculated, and the overall performance indicators are optimized using electrochemical energy storage.
[0133] 2.1. According to the technical requirements and assessment requirements of primary frequency regulation, frequency control dead zone, adjustment coefficient, and amplitude limit, by simulating system frequency disturbance and primary frequency regulation load instructions, using gravity energy storage adjustment response function, analyze the primary frequency regulation response time and actual integrated power of gravity energy storage under different load levels. The primary frequency regulation action curves of the four working conditions of 0 to full power, full power to 0, high load rate increase load, and low load rate reduction load are as follows: Figure 6 and Figure 7 shown. Figure 7 The mid-power response curve is indeterminate in the shaded range.
[0134] The response results of frequency modulation under four working conditions are calculated as follows: Figure 8 As shown in the table.
[0135] Referring to the primary frequency regulation assessment requirements, gravity energy storage and electrochemical hybrid energy storage meet the primary frequency regulation response time and actual integrated power index requirements, and calculate the minimum power and capacity required to configure electrochemical energy storage.
[0136] The hybrid energy storage power of gravity energy storage and electrochemical energy storage is,
[0137] P h (t) = P s (t)+P e (t) (9)
[0138] P des,e (t) = P des (t)-P s (t) (10)
[0139]
[0140] Where P h (t) is the active power of the hybrid energy storage at time t; P e (t) is the electrochemical active power at time t; P des,e (t) is the target electrochemical power at time t; p cmax,eis the maximum electrochemical charging power; p dmax,e is the maximum electrochemical discharge power; considering that electrochemical energy storage can achieve millisecond-level rapid response, the electrochemical active power is limited by the maximum charge and discharge power constraints.
[0141] Response time requirements The maximum discharge power of the energy storage is obtained,
[0142] P e (t resp )=p dmax,e ≥p pf,reg -P s (t resp ) (12)
[0143] Where, t resp is the frequency modulation response time (seconds), which is a fixed value; p pf,reg The primary frequency modulation response power is 90% of the theoretical action power.
[0144] Similarly, the maximum charging power of electrochemical energy storage, p cmax,e ≤p pf,reg -P s (t resp );
[0145] The response index meets the standard, that is, the ratio of actual integrated power to theoretical integrated power meets the assessment requirements.
[0146]
[0147] Where R(t) is the primary frequency modulation response index at time t; r(t) is the response index assessment value at time t, and t is 15, 30 and 45 seconds respectively.
[0148] Take the above adjustment as an example,
[0149]
[0150] Among them, P e (t)≤p dmax,s -P s (t);
[0151] The fixed-step linear iteration method is used to solve formula (14). The maximum charging and discharging power of the energy storage is derived from formula (12), and the energy storage power to be configured is derived from (14). The larger value of the power and duration is taken as the configuration capacity that meets the requirements of the primary frequency regulation assessment.
[0152] The duration of a frequency modulation action is 50 seconds to 1 minute, and the configuration duration of electrochemical energy storage is at least greater than 1 minute. According to the average number of frequency modulation actions in the system in one day, n pfr,dayAccording to the electrochemical energy storage 6000 cycles and 10-year calendar life, the configuration capacity is
[0153] 2.2, according to the regulation rate and regulation accuracy indicators of AGC assessment. The regulation rate is the percentage of the actual regulation amount of the unit in the unit time to the rated capacity when the actual output reaches the target power tracking dead zone after receiving the command. The regulation rate depends on the regulation step and regulation time. The uncertainty of the gravity energy storage regulation response time is large, so there is uncertainty in the regulation rate. Therefore, the distribution range of the regulation rate under different load rates and regulation steps of gravity energy storage is calculated, such as Fig. 9 and Fig.10 As shown in the table.
[0154] The regulation rate of the gravity energy storage power station at different load rates is as follows, and the regulation step is 6MW. Fig. 9 The results in the table show that excluding the ones with adjustment steps less than 6MW, the adjustment rate of gravity energy storage AGC is 30% and above.
[0155] Fig.10 Tabular results and Fig. 9 Similarly, the overall regulation rate of the 2MW regulation step is better than that of the 6MW regulation step.
[0156] The regulation accuracy is the tracking deviation divided by the percentage of rated capacity. The tracking deviation of the gravity energy storage power station is half a mass block, and the tracking deviation is <0.25MW, that is, <1.04% of the installed capacity.
[0157] 2.2.1. The regulation rate meets the standard. The regulation rate of the hybrid energy storage of gravity energy storage and electrochemical energy storage consists of two parts, one of which is the millisecond-level full-power charge and discharge response of the electrochemical energy storage, and the other is the tracking and regulation of the gravity energy storage. After the active power of the hybrid energy storage tracks the AGC target, the gravity energy storage continues to track the AGC target, and the electrochemical energy storage reduces the charge and discharge power to track the control deviation.
[0158] As t 0 The AGC instruction received at the moment is P des (t 0 ), the active power of the energy storage station is P h (t 0 ), the adjustment step is P des (t 0 )-P h (t 0 ), where the active power of gravity energy storage is P s (t 0 ), the active power of electrochemical energy storage is P e (t 0 ), assuming P e (t 0 )=0、Pdes (t 0 )>P h (t 0 ), if P des (t 0 )-P h (t 0 )>P dmax,e The electrochemical energy storage is discharged at the maximum discharge power, and the deviation part P des (t 0 )-P h (t 0 ) is adjusted by gravity energy storage, and the adjustment time depends on the gravity energy storage P des (t 0 )-P h (t 0 ) adjustment time; if P des (t 0 )-P h (t 0 )≤P dmax,e , then electrochemistry takes on all power regulation, and the regulation time depends on the electrochemical energy storage.
[0159] If the adjustment step length P step >P dmax,e ,
[0160]
[0161] Where P step is the AGC command step size (MW) issued to the gravity energy storage power station by the superior dispatcher, which is the command step size P in the historical operation data of the power station. des (t 0 )-P h (t 0 )’s statistical value or the value set by the superior dispatcher; reg,s P is the gravity energy storage step -P dmax,e Partial power adjustment time (minutes); P n is the rated capacity of the energy storage power station (MW).
[0162] Take discharge as an example, where t reg,s According to formula (7), the delay time and P step -P dmax,e The adjustment time consists of two parts:
[0163]
[0164] Instruction issuance time P e (t 0 )=0, then P s (t 0 )+P step=P des (t 0 ).
[0165]
[0166] Substituting formula (17) into formula (15), we get:
[0167]
[0168] Among them, P s (t 0 )+P step <p dmax,s The formula is simplified to,
[0169]
[0170] 2.2.2. The regulation accuracy meets the standard. The tracking deviation of the AGC target of the hybrid energy storage consists of two parts: the tracking deviation of the gravity energy storage and the electrochemical energy storage deviation correction power. The tracking deviation of the gravity energy storage is 0.5P u , electrochemical energy storage configuration power greater than 0.5P u No-bias adjustment can be achieved.
[0171]
[0172] The electrochemical energy storage configuration power is obtained,
[0173] P dmax,e ≥2aP n -P u (twenty one)
[0174] The optimization requirements of the comprehensive regulation rate and regulation accuracy are given by equations (19) and (21), and the rated power of the electrochemical energy storage configuration is obtained as follows:
[0175]
[0176] Where P n,e Rated power (MW) configured for electrochemical energy storage.
[0177] According to the number of AGC instructions n in the system in one day sfr,day According to the electrochemical energy storage 6000 cycles and 10-year calendar life, the configuration capacity is
[0178] The actual configuration time of electrochemical energy storage needs to take into account various constraints such as the integration capabilities and costs of current electrochemical energy storage manufacturers.
[0179] Calculate the power and capacity of the electrochemical energy storage configuration that meets both primary frequency regulation and AGC assessments.
[0180] S3. Optimization of electrochemical energy storage configuration capacity.
[0181] The input-output ratio is analyzed by considering factors such as the assessment costs for failing to meet performance indicators, the compensation costs for meeting performance indicators, and the investment costs of electrochemical energy storage.
[0182] The assessment costs mainly consider the lack of primary frequency regulation, failure to meet primary frequency regulation standards, and failure to meet AGC performance standards. The compensation costs mainly consider primary frequency regulation excess response, AGC frequency regulation call compensation or mileage benefits. The investment cost of electrochemical energy storage is calculated based on a 10-year calendar life and 6,000 cycles. The calculation cycle is one year.
[0183] maxF=k pfr,cp (Q pfr,rl -Q pfr,th )+V sfr,cp +k sfr,cp D sfr -(λ 0 C pfr,ua +λ 1 C pfr,uc )Q disc
[0184] -(λ 2 C sfr,rt Q rt +λ 3 C sfr,ac Q ac )-λ 4 C es Q es (twenty three)
[0186] In the formula, k pfr,cp Q is the compensation coefficient for the frequency modulation exceeding the theoretical integral power; pfr,rl is the actual integrated power; Q pfr,th is the theoretical integrated charge; V sfr,cp Capacity compensation for AGC performance reaching the standard; k sfr,cp It is the comprehensive frequency modulation performance index of AGC; D sfr is the frequency modulation mileage; 0 , 1 , 2 , 3 They are respectively the coefficients of primary frequency modulation not being available, not meeting the standard, AGC rate and accuracy not meeting the standard, and the values are 0 or 1; C pfr,ua The primary frequency modulation does not have the assessment coefficient; C pfr,uc Q is the assessment coefficient for the failure of primary frequency regulation index to meet the standard; disc The power consumption for a frequency regulation test; C sfr,rt Q is the AGC rate non-compliance assessment coefficient;rt The power consumption for rate failure assessment; C sfr,ac Q is the accuracy non-compliance assessment coefficient; ac The power consumption for accuracy not meeting the standard; 4 is the electrochemical energy storage configuration coefficient, which takes a value of 0 or 1; C es Q is the average annual construction and operation cost of electrochemical energy storage units; es is the capacity of the electrochemical energy storage power station.
[0187] The calculation formula (23) shows the effect of different electrochemical energy storage configuration scales on λ 0 , 1 , 2 , 3 The impact of the assessment coefficient; the electrochemical energy storage configuration capacity is calculated for the electrochemical energy storage without configuration, meeting the primary frequency regulation assessment requirements, and meeting the AGC assessment requirements, and the λ 0 , 1 , 2 , 3 The assessment coefficient is adjusted; the compensation costs for primary frequency modulation and AGC are estimated based on the number of historical primary frequency modulation actions and the number of AGC instructions of the system.
[0188] For each scale, primary frequency regulation compensation, capacity compensation, AGC compensation, primary frequency regulation assessment, AGC assessment, annual average cost of energy storage and annual surplus are calculated in turn.
[0189] On the basis of the electrochemical energy storage configuration capacity that meets the AGC assessment requirements, the impact of further increasing the energy storage scale analysis on the annual surplus is analyzed.
[0190] Aiming at the characteristics of uncertain response time of gravity energy storage power regulation, difference in regulation rate between large-power load increase and small-power load reduction, and fixed-step discontinuous regulation, the present invention summarizes the response function of gravity energy storage power regulation, analyzes the response performance of single instructions and multiple instructions under different load levels, and calculates the configured power and capacity of electrochemical energy storage to improve the regulation performance of gravity energy storage, meet the assessment requirements of primary frequency regulation and automatic generation control (AGC) of the power grid, and improve the comprehensive frequency regulation performance indicators.
[0191] Taking a 24MW / 100MWh gravity energy storage power station as an example, according to the assessment requirements of new energy storage, the combined power response curve of gravity storage and electrochemical is: Fig.11 For the green curve, the frequency regulation response time is 11 seconds, and the integrated power in multiple time periods such as 15 seconds, 30 seconds, and 45 seconds is 84%, 92%, and 94%, all exceeding 70%, which meets the assessment requirements, and the configured capacity is 16.8MW / 16.8MWh.
[0192] Gravity energy storage reduces the charge and discharge power in the low load section and increases the charge and discharge power in the high load section. The response time and regulation performance are weak. Therefore, only a small capacity of energy storage is needed to achieve a significant improvement in the AGC regulation performance and reduce the impact of response time uncertainty. The electrochemical energy storage capacity only needs to cover the interval with the minimum AGC regulation rate. The AGC performance effect after configuring 1MW to 6MW electrochemical energy storage is analyzed. Fig.12 As shown in the figure, when 4MW electrochemical energy storage is configured, the average AGC regulation rate reaches 129%. For AGC instructions of 6MW and above, gravity energy storage and electrochemistry are required to participate in the entire active regulation process.
[0193] The above is only a preferred embodiment of the present invention and does not limit the present invention in any form. Although the present invention has been disclosed as a preferred embodiment as above, it is not used to limit the present invention. Any technician familiar with this profession can make some changes or modify the technical contents disclosed above into equivalent embodiments without departing from the scope of the technical solution of the present invention. However, any simple modification, equivalent replacement and improvement made to the above embodiments without departing from the content of the technical solution of the present invention, based on the technical essence of the present invention, within the spirit and principles of the present invention, still fall within the protection scope of the technical solution of the present invention.
Claims
1. A capacity planning method for configuring electrochemical energy storage in a mechanical energy storage power station. Features The following steps are involved: S1. Determine the power regulation response function of the gravity energy storage; S2. Calculation of electrochemical energy storage capacity that meets grid assessment requirements; S3. Optimization of electrochemical energy storage configuration capacity.
2. A capacity planning method for configuring electrochemical energy storage in a mechanical energy storage power station according to claim 1, Features: The step S1 specifically comprises: The output active power of gravity energy storage is the sum of the output active power of the units. The power response function of a single unit is: Among them, P g (i,t) is the active power of unit i at time t; P g (i,t 0 ) is the time t at which the command is issued 0 Active power of the unit; t delay,i Adjust the delay time for the gravity block of unit i; T interval is the fixed interval time between gravity blocks; int() is the rounding down function; λ is the instruction adjustment direction; P u is the unit work power of the gravity block; Gravity block adjustment delay time t of unit i delay,i is an interval variable with the following range: (1) When increasing the charge / discharge power, Where, T st is the start delay time; max() is the maximum value function; (2) When the charging / discharging power is reduced, Where, T cycle is the operating cycle of the gravity block; The unit tracks the unit AGC command with the minimum deviation, and the adjustment process ends. |P g (i,t)-P des (i,t 0 )|≤P u (4) Where P des (i,t 0 ) is t 0 The active power control target allocated to unit i at the moment; The power response function of the gravity energy storage unit is: In the formula, n is the number of energy storage units. Considering that the output power of the two units is similar, formula (5) is simplified by combining formula (1); Where P s (t) is the active power of the energy storage unit at time t; P s (t 0 ) is the time t at which the command is issued 0 Active power of energy storage unit; t delay Adjust the delay time for the gravity block of the energy storage unit; ΔP ε It is the correction component of the active power of the energy storage unit and the AGC instruction, and its value is 0, P u , ..., (n-1)P u ; The gravity block of the energy storage unit adjusts the delay time t delay,i is an interval variable with the following range: (1) When increasing the charge / discharge power, In the formula, ceil() is the upward rounding function; (2) When the charging / discharging power is reduced, The gravity energy storage unit meets the active power regulation range constraints and the state of charge (SOC) constraints.
3. A capacity planning method for configuring electrochemical energy storage in a mechanical energy storage power station according to claim 1, Features: The step S2 specifically comprises: 2.
1. According to the technical requirements and assessment requirements of primary frequency regulation, frequency control dead zone, adjustment coefficient, and amplitude limit, by simulating system frequency disturbance and primary frequency regulation load instructions, using gravity energy storage to adjust the response function, analyze the primary frequency regulation response time and actual integrated power of gravity energy storage under different load levels; 2.
2. According to the adjustment rate and adjustment accuracy indicators of AGC assessment.
4. A capacity planning method for configuring electrochemical energy storage in a mechanical energy storage power station according to claim 1, Features: The step 2.1 is specifically as follows: Referring to the primary frequency regulation assessment requirements, gravity energy storage and electrochemical hybrid energy storage meet the primary frequency regulation response time and actual integrated power index requirements, and calculate the minimum power and capacity required to configure electrochemical energy storage; The hybrid energy storage power of gravity energy storage and electrochemical energy storage is, P h (t)=P s (t)+P e (t) (9) P des,e (t)=P des (t)-P s (t) (10) Where P h (t) is the active power of the hybrid energy storage at time t; P e (t) is the electrochemical active power at time t; P des,e (t) is the target electrochemical power at time t; p cmax,e is the maximum electrochemical charging power; p dmax,e is the maximum electrochemical discharge power; considering that electrochemical energy storage can achieve millisecond-level rapid response, the electrochemical active power is limited by the maximum charge and discharge power constraint; Response time requirements The maximum discharge power of the energy storage is obtained, P e (t resp )=p dmax,e ≥p pf,reg -P s (t resp ) (12) Where, t resp is the frequency modulation response time, which is a fixed value; p pf,reg The primary frequency modulation response power is the theoretical action power; Similarly, the maximum charging power of electrochemical energy storage, p cmax,e ≤p pf,reg -P s (t resp ); The response index meets the standard, that is, the ratio of actual integrated power to theoretical integrated power meets the assessment requirements. Where, R(t) is the primary frequency modulation response index at time t; r(t) is the response index assessment value at time t; Take the above adjustment as an example, Among them, P e (t)≤p dmax,s -P s (t); The fixed-step linear iteration method is used to solve formula (14). The maximum charging and discharging power of the energy storage is derived from formula (12), and the energy storage power to be configured is derived from (14). The larger value of the power and duration is taken as the configuration capacity that meets the requirements of the primary frequency regulation assessment.
5. A capacity planning method for configuring electrochemical energy storage in a mechanical energy storage power station according to claim 3, Features: The step 2.2 is specifically as follows: 2.2.
1. The regulation rate meets the standard; the regulation rate of the hybrid energy storage of gravity energy storage and electrochemical energy storage consists of two parts, one of which is the millisecond-level full-power charge and discharge response of electrochemical energy storage, and the other is the tracking regulation of gravity energy storage. ; After the active power of the hybrid energy storage tracks the AGC target, the gravity energy storage continues to track the AGC target, and the electrochemical energy storage reduces the charge and discharge power to track the control deviation; t 0 The AGC instruction received at the moment is P des (t 0 ), the active power of the energy storage station is P h (t 0 ), the adjustment step is P des (t 0 )-P h (t 0 ), where the active power of gravity energy storage is P s (t 0 ), the active power of electrochemical energy storage is P e (t 0 ), assuming P e (t 0 )=0、P des (t 0 )>P h (t 0 ), if P des (t 0 )-P h (t 0 )>P dmax,e The electrochemical energy storage is discharged at the maximum discharge power, and the deviation part P des (t 0 )-P h (t 0 ) is adjusted by gravity energy storage, and the adjustment time depends on the gravity energy storage P des (t 0 )-P h (t 0 ) adjustment time; If P des (t 0 )-P h (t 0 )≤P dmax,e , then electrochemistry takes on all the power regulation, and the regulation time depends on the electrochemical energy storage; If the adjustment step length P step >P dmax,e , Where P step is the AGC command step length issued by the superior dispatcher to the gravity energy storage power station, which is the command step length P in the historical operation data of the power station. des (t 0 )-P h (t 0 ) or the value set by the superior dispatcher; t reg,s P is the gravity energy storage step -P dmax,e Partial power adjustment time; P n is the rated capacity of the energy storage power station; Take discharge as an example, where t reg,s According to formula (7), the delay time and P step -P dmax,e The adjustment time consists of two parts: Instruction issuance time P e (t 0 )=0, then P s (t 0 )+P step =P des (t 0 ). Substituting formula (17) into formula (15), we get: Among them, P s (t 0 )+P step <p dmax,s The formula is simplified to, 2.2.
2. The regulation accuracy meets the standard; the tracking deviation of the AGC target of the hybrid energy storage consists of two parts: the tracking deviation of the gravity energy storage and the electrochemical energy storage deviation correction power; The electrochemical energy storage configuration power is obtained, P dmax,e ≥2aP n -P u (21) The optimization requirements of the comprehensive regulation rate and regulation accuracy are given by equations (19) and (21), and the rated power of the electrochemical energy storage configuration is obtained as follows: Where P n,e Rated power configured for electrochemical energy storage.
6. A capacity planning method for configuring electrochemical energy storage in a mechanical energy storage power station according to claim 1, Features: The step S3 is specifically as follows: maxF=k pfr,cp (Q pfr,rl -Q pfr,th )+V sfr,cp +k sfr,cp D sfr -(λ 0 C pfr,ua +λ 1 C pfr,uc )Q disc -(l 2 C sfr,rt Q rt +λ 3 C sfr,ac Q ac )-l 4 C es Q es (23) In the formula, k pfr,cp Q is the compensation coefficient for the frequency modulation exceeding the theoretical integral power; pfr,rl is the actual integrated power; Q pfr,th is the theoretical integrated charge; V sfr,cp Capacity compensation for AGC performance reaching the standard; k sfr,cp It is the comprehensive frequency modulation performance index of AGC; D sfr is the frequency modulation mileage; 0 , 1 , 2 , 3 They are respectively the coefficients of primary frequency modulation not being available, not meeting the standard, AGC rate and accuracy not meeting the standard, and the values are 0 or 1; C pfr,ua The primary frequency modulation does not have the assessment coefficient; C pfr,uc Q is the assessment coefficient for the failure of primary frequency regulation index to meet the standard; disc The power consumption for a frequency regulation test; C sfr,rt Q is the AGC rate non-compliance assessment coefficient; rt The power consumption for rate failure assessment; C sfr,ac Q is the accuracy non-compliance assessment coefficient; ac The power consumption for accuracy not meeting the standard; 4 is the electrochemical energy storage configuration coefficient, which takes a value of 0 or 1; C es Q is the average annual construction and operation cost of electrochemical energy storage units; es is the capacity of the electrochemical energy storage power station; The calculation formula (23) shows the effect of different electrochemical energy storage configuration scales on λ 0 , 1 , 2 , 3 The impact of the assessment coefficient; the electrochemical energy storage configuration capacity is calculated for the electrochemical energy storage without configuration, meeting the primary frequency regulation assessment requirements, and meeting the AGC assessment requirements, and the λ 0 , 1 , 2 , 3 Assessment coefficient adjustment; the compensation costs of primary frequency modulation and AGC are estimated based on the historical number of primary frequency modulation actions and AGC instruction times of the system; Calculate primary frequency regulation compensation, capacity compensation, AGC compensation, primary frequency regulation assessment, AGC assessment, annual average cost of energy storage and annual surplus for each scale in turn; On the basis of the electrochemical energy storage configuration capacity that meets the AGC assessment requirements, the impact of further increasing the energy storage scale analysis on the annual surplus is analyzed.
Citation Information
Cited By
Power grid control method, device and equipment of hybrid energy storage system and readable medium
CN120978820A
