Electrode slurry conveying system and electrode slurry temperature control method using same

By mixing high-temperature and low-temperature slurries in the electrode slurry delivery system, and using the flow rate adjustment section to adjust the slurry temperature in the coater supply tank, the problem of long slurry temperature control time and loss is solved, and production efficiency is improved.

CN118872085APending Publication Date: 2024-10-29LG ENERGY SOLUTION LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202380021016.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Priority Date
2022-10-26
Filing Date
2023-10-26
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

When controlling the slurry temperature, the existing electrode slurry delivery system requires a long waiting time and causes slurry loss, affecting coating quality and production efficiency.

Method used

The method of mixing high-temperature slurry and low-temperature slurry is adopted, and the mixture is mixed in the coater supply tank through parallel branch delivery pipes and flow rate adjustment parts, and the slurry temperature is adjusted to quickly reach the target temperature.

Benefits of technology

The time and losses required for slurry temperature adjustments are reduced, increasing productivity and reducing the need for design modifications to traditional systems.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118872085A_ABST
    Figure CN118872085A_ABST
Patent Text Reader

Abstract

An electrode slurry transfer system according to the present invention comprises: a mixer storage tank for storing an electrode slurry discharged from a mixer; a first transfer tank using a first transfer pipe branched in parallel so as to be connected to the mixer storage tank and to store the high-temperature slurry; a second transfer tank using a first transfer pipe branched in parallel so as to be connected to the mixer storage tank and to store the low-temperature slurry; a coater supply tank receiving the high-temperature slurry and the low-temperature slurry from the first transfer tank and the second transfer tank, respectively, so as to supply the electrode slurry containing the mixture thereof to the coater; a flow rate adjusting unit for adjusting a conveying flow rate of each of the high-temperature slurry flowing from the first conveying tank to the coater supply tank and the low-temperature slurry flowing from the second conveying tank to the coater supply tank; and a control unit for controlling the temperature of the electrode slurry.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application claims the benefit of priority of Korean Patent Application No. 10-2022-0139373, filed on October 26, 2022.

[0002] The present invention relates to an electrode slurry delivery system for delivering electrode slurry from a mixer to an applicator for applying the electrode slurry to an electrode current collector, and a method for controlling the temperature of the electrode slurry.

[0003] More specifically, the present invention relates to an electrode slurry delivery system and a method for controlling the temperature of electrode slurry, which controls the temperature of the slurry by mixing high-temperature slurry and low-temperature slurry in a power receiving method, reduces the waiting time consumed for controlling the slurry temperature, and reduces the loss of slurry used to control the temperature. Background Art

[0004] Secondary batteries that can be repeatedly charged and discharged are used in various electronic devices. In addition, as the types and shapes of electronic devices are diversified, the types of secondary batteries installed in electronic devices are also diversified. Recently, lithium-ion secondary batteries using lithium as secondary batteries have been widely used.

[0005] To manufacture these secondary batteries, a negative electrode coated with a negative electrode active material, a positive electrode coated with a positive electrode active material, and a separator placed between the negative electrode and the positive electrode are required. To manufacture these negative electrode active materials and positive electrode active materials, a mixture of electrode active materials, conductive materials, and binders, called slurry, is usually required.

[0006] Specifically, the manufacture of positive and negative electrodes includes a mixing process of mixing raw materials, and processes such as coating, drying, roll pressing, taping, and slitting. In the mixing process of mixing raw materials such as electrode active materials, conductive materials, and binders to form a uniform slurry, the temperature of the slurry gradually increases due to the heat of mixing, and then the slurry is transported through various storage tanks, and the temperature of the slurry is controlled to a desired temperature using a coolant.

[0007] Figure 1 A conventional electrode slurry delivery system is shown. Figure 1 In the prior art, the slurry formed in the mixer 10 is transported to the mixer storage tank 20, the transport tank 30, and finally to the coater supply tank 40 which supplies the slurry to the coating roller.

[0008] In the coating process, the temperature of the slurry will affect the coating quality, loading deviation, etc. Therefore, it is very important to control the slurry temperature at an appropriate level to ensure the consistency of electrode quality.

[0009] Since electrode coating is continuous, but slurry mixing is performed in batches, and the temperature of the delivered slurry has a curve with periodic highs and lows. Here, in the portion where the temperature changes rapidly, the time required to stabilize the slurry to the target temperature may be too long. In addition, if the coating process as a continuous process is temporarily stopped due to conversion, disconnection, etc., and the process is resumed after adjusting the process conditions, the temperature conditions of the slurry can also be adjusted according to the adjustment of the process conditions. And according to the adjustment of the temperature conditions of the slurry, a longer waiting time for the slurry to reach the target temperature will reduce the yield.

[0010] Therefore, it is necessary to develop a technology that reduces the amount of current collector and slurry lost in order to stabilize the temperature during coating and minimizes the waiting time required to adjust the slurry temperature to a target value. Summary of the invention

[0011] Technical issues

[0012] The present invention is directed to providing an electrode slurry delivery system and an electrode slurry temperature control method which minimize the time required to adjust the temperature of the electrode slurry to a target value, thereby minimizing the loss of the slurry and the current collector.

[0013] Technical Solution

[0014] An electrode slurry conveying system according to an exemplary embodiment of the present invention is an electrode slurry conveying system for conveying electrode slurry from a mixer where the electrode slurry is mixed to a coater for coating the electrode slurry, the electrode slurry conveying system comprising: a mixer storage tank, the mixer storage tank being used to store the electrode slurry discharged from the mixer; a first conveying tank, the first conveying tank being used to store high-temperature slurry and being connected to the mixer storage tank through a first conveying pipe branching in parallel; a second conveying tank, the second conveying tank being used to store low-temperature slurry and being connected to the mixer storage tank through a first conveying pipe branching in parallel; a coater supply tank, the coater supply tank being configured to receive high-temperature slurry and low-temperature slurry from the first conveying tank and the second conveying tank, respectively, and supply an electrode slurry mixture of the high-temperature slurry and the low-temperature slurry to the coater; a flow rate regulating section, the flow rate regulating section being configured to respectively regulate the conveying flow rate of the high-temperature slurry introduced from the first conveying tank to the coater supply tank and the conveying flow rate of the low-temperature slurry introduced from the second conveying tank to the coater supply tank; and a control section, the control section being used to control the temperature of the electrode slurry in the coater supply tank.

[0015] The electrode slurry delivery system according to an exemplary embodiment of the present invention may further include: a second delivery pipe, the second delivery pipe is connected between the first delivery tank and the flow rate regulating part to introduce the high-temperature slurry into the flow rate regulating part; a third delivery pipe, the third delivery pipe is connected between the second delivery tank and the flow rate regulating part to introduce the low-temperature slurry into the flow rate regulating part; a fourth delivery pipe, the fourth delivery pipe is connected between the flow rate regulating part and the coater supply tank to introduce the high-temperature slurry and the low-temperature slurry into the coater supply tank; and a fifth delivery pipe, the fifth delivery pipe is connected between the coater supply tank and the coater to introduce the electrode slurry into the coater.

[0016] In an electrode slurry delivery system according to an exemplary embodiment of the present invention, a flow rate regulating portion is provided with a first port connected to a second delivery pipe and a second port connected to a third delivery pipe, and the flow rate regulating portion can be configured to adjust the opening and closing rate of the first port and the opening and closing rate of the second port.

[0017] In the electrode slurry delivery system according to the exemplary embodiment of the present invention, the control portion may control the temperature of the electrode slurry in the coater supply tank by adjusting the opening and closing rates of the first port and the second port, respectively.

[0018] The electrode slurry delivery system according to an exemplary embodiment of the present invention may further include: a plurality of temperature sensors for measuring the temperature of the electrode slurry, wherein the temperature sensors may be respectively installed in the mixer storage tank, the first delivery tank, the second delivery tank, the coater supply tank and the fifth delivery pipe.

[0019] In an electrode slurry delivery system according to an exemplary embodiment of the present invention, a first return pipe that branches off from the second delivery pipe and returns to the first delivery tank, and a first valve may be installed at a branch portion of the second delivery pipe and the first return pipe, and a second return pipe that branches off from the third delivery pipe and returns to the second delivery tank, and a second valve may be installed at a branch portion of the third delivery pipe and the second return pipe.

[0020] The electrode slurry delivery system according to an exemplary embodiment of the present invention may further include: a first circulation pump, which is installed on the first return pipe to provide a driving force for circulating the high-temperature slurry to the first delivery tank; and a second circulation pump, which is installed on the second return pipe to provide a driving force for circulating the low-temperature slurry to the second delivery tank.

[0021] The electrode slurry delivery system according to an exemplary embodiment of the present invention may further include: a plurality of temperature sensors for measuring the temperature of the electrode slurry, wherein the temperature sensors may be respectively installed in the mixer storage tank, the first return pipe, the second return pipe, the coater supply tank and the fifth delivery pipe.

[0022] In an electrode slurry delivery system according to an exemplary embodiment of the present invention, any one or more of the mixer storage tank, the first delivery tank, and the second delivery tank may include: a chamber for receiving the slurry; and a jacket formed on a wall of the chamber and circulating a coolant to adjust the temperature of the slurry.

[0023] In the electrode slurry delivery system according to an exemplary embodiment of the present invention, the control portion may be configured to control the temperature of the electrode slurry in any one or more tanks among the mixer storage tank, the first delivery tank, and the second delivery tank by adjusting the temperature of the coolant in the jacket.

[0024] In the electrode slurry conveying system according to the exemplary embodiment of the present invention, the control part may be configured to control the temperature of the electrode slurry through PID control (Proportional Integral Derivative Control).

[0025] In the electrode slurry conveying system according to an exemplary embodiment of the present invention, the control unit can control so that the temperature (Th) of the high-temperature slurry in the first conveying tank satisfies the following condition 1, and the temperature (Tl) of the low-temperature slurry in the second conveying tank satisfies the following condition 2.

[0026]

Condition 1

[0027] Ts≤Th≤Ts+5℃

[0028]

Condition 2

[0029] Ts-5℃≤Tl≤Ts

[0030] (In the above conditions 1 and 2, Ts is the target temperature of the electrode slurry in the coater supply tank)

[0031] In the electrode slurry conveying system according to the exemplary embodiment of the present invention, the control unit can control so that the temperature (Th) of the high temperature slurry in the first conveying tank satisfies the following condition 3, and the temperature (Tl) of the low temperature slurry in the second conveying tank satisfies the following condition 4.

[0032]

Condition 3

[0033] Ts+1.5℃≤Th≤Ts+3.5℃

[0034]

Condition 4

[0035] Ts-3.5℃≤Tl≤Ts-1.5℃

[0036] (In the above conditions 3 and 4, Ts is the target temperature of the electrode slurry in the coater supply tank)

[0037] In the electrode slurry delivery system according to the exemplary embodiment of the present invention, the control part may control such that the temperature of the electrode slurry in the mixer storage tank is equal to the target temperature (Ts) of the electrode slurry in the coater supply tank.

[0038] In the electrode slurry delivery system according to the exemplary embodiment of the present invention, the control part may control the temperature of the electrode slurry so that a sensing value of a temperature sensor installed in the fifth delivery pipe is the same as a sensing value of a temperature sensor installed in a coater supply tank.

[0039] The method of controlling the temperature of the electrode slurry according to the exemplary embodiment of the present invention uses the above-mentioned electrode slurry delivery system.

[0040] Beneficial Effects

[0041] According to the electrode slurry delivery system and the temperature control method of the electrode slurry of the present invention, the first delivery tank and the second delivery tank store high-temperature slurry and low-temperature slurry separately, and the temperature of the electrode slurry in the coater supply tank is controlled by mixing the high-temperature slurry and the low-temperature slurry, but the flow rate regulating part regulates the flow rate of the high-temperature slurry and the flow rate of the low-temperature slurry introduced into the coater supply tank respectively, so that the slurry in the coater supply tank can quickly reach the target temperature.

[0042] According to the electrode slurry delivery system and the temperature control method of the electrode slurry of the present invention, when adjusting the temperature of the slurry, the temperature of the electrode slurry in the mixer storage tank is controlled to be the same as the target temperature of the electrode slurry in the coater supply tank, so that the time required to adjust the temperature of the electrode slurry in the first delivery tank and the second delivery tank can be reduced.

[0043] In addition, the electrode slurry delivery system and the temperature control method of the electrode slurry according to the present invention have the following effects: since only an additional delivery tank and a flow rate regulating part need to be installed in a conventional electrode slurry delivery system including a storage tank, a delivery tank and a coater supply tank, productivity is improved while reducing the loss of slurry and a current collector used to stabilize the temperature during coating without making major design changes to the electrode slurry delivery system. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 is a schematic diagram of a conventional electrode slurry delivery system.

[0045] Figure 2 is a schematic diagram of an electrode slurry delivery system according to an exemplary embodiment of the present invention.

[0046] Figure 3 is a schematic diagram of a flow rate regulating portion according to an exemplary embodiment of the present invention.

[0047] Figure 4 is a schematic diagram of a first delivery tank according to an exemplary embodiment of the present invention.

[0048] Figure 5 is a schematic diagram of an electrode slurry delivery system according to another exemplary embodiment of the present invention. DETAILED DESCRIPTION

[0049] Hereinafter, various embodiments of the present invention are described in detail with reference to the accompanying drawings to facilitate the practice of those skilled in the art to which the present invention belongs. The present invention can be implemented in many different forms and is not limited to the embodiments described herein.

[0050] In order to clearly illustrate the present invention, parts irrelevant to the description are omitted, and the same or similar components are denoted by the same reference numerals throughout the specification.

[0051] Furthermore, the dimensions of each configuration shown in the drawings are arbitrary for the purpose of explanation, and the present invention is not necessarily limited to those shown.

[0052] Furthermore, throughout the specification, when it is stated that a component “includes” a component, it means that the one component may further include other components, rather than excluding other components, unless explicitly stated otherwise.

[0053] Figure 2 Schematic diagram of an electrode slurry delivery system according to an exemplary embodiment of the present invention. Figure 2 In the figure, the solid arrows indicate the flow of the slurry.

[0054] The electrode slurry delivery system 100 according to the exemplary embodiment of the present invention includes a mixer storage tank 110 , a first delivery tank 120 , a second delivery tank 130 , a coater supply tank 140 , a flow rate regulating part 150 , and a control part (not shown).

[0055] In the mixer not shown, the electrode slurry may be prepared by mixing an electrode active material, a conductive material, a binder, etc., and the electrode slurry prepared in the mixer may be transported in the following order: a mixer storage tank 110, a first transport tank 120, a second transport tank 130, a flow rate regulating part 150, and a coater supply tank 140. The electrode slurry transported to the coater supply tank 140 may be supplied to the coater C, coated on a current collector, and then subjected to processes such as drying, rolling, etc.

[0056] The mixer storage tank 110 is a primary storage tank for the electrode slurry discharged from the mixer. The electrode slurry in the mixer storage tank 110 is transferred to the first transfer tank 120 and the second transfer tank 130 in parallel.

[0057] In order to transfer the electrode slurry discharged from the mixer storage tank 110 to the first delivery tank 120 and the second delivery tank 130 in parallel, the area between the mixer storage tank 110 and the first delivery tank 120 and the area between the mixer storage tank 110 and the second delivery tank 130 are respectively connected by the first delivery pipe 161 branched in parallel. That is, the first delivery pipe 161 has a Figure 2 The structure shown is branched into two pipes, wherein one end of the first delivery pipe 161 extends into the interior of the mixer storage tank 110, and the other ends of the branched delivery pipes extend into the interiors of the first delivery tank 120 and the second delivery tank 130, respectively.

[0058] In a specific example, a valve 193 may be installed at a branch point along the path of the first delivery pipe, wherein specifically, the valve 193 may be a three-way valve.

[0059] The first delivery tank 120 receives the electrode slurry from the mixer storage tank 110 through the first delivery pipe 161 and stores the high temperature slurry. In a specific example, the temperature of the high temperature slurry stored in the first delivery tank 120 can be set to be higher than or equal to the target temperature Ts of the electrode slurry in the coater supply tank 140.

[0060] The second delivery tank 130 receives the electrode slurry from the mixer storage tank 110 through the first delivery pipe 161 and stores the low temperature slurry. In a specific example, the temperature of the low temperature slurry stored in the second delivery tank 130 can be set to be lower than or equal to the target temperature Ts of the electrode slurry in the coater supply tank 140.

[0061] The coater supply tank 140 is a tank for storing the electrode slurry supplied to the coater C. The coater supply tank 140 may receive the high temperature slurry and the low temperature slurry from the first delivery tank 120 and the second delivery tank 130, respectively, and store a mixture thereof.

[0062] The flow rate regulating portion 150 may be configured to regulate the temperature of the electrode slurry introduced into the coater supply tank 140 by respectively regulating the flow rate of the high temperature slurry entering the coater supply tank 140 from the first delivery tank 120 and the flow rate of the low temperature slurry entering the coater supply tank 140 from the second delivery tank 130 .

[0063] The first conveying tank 120 is connected to the flow rate regulating portion 150 through the second conveying pipe 162 , and the high-temperature slurry in the first conveying tank 120 flows into the flow rate regulating portion 150 through the second conveying pipe 162 .

[0064] The second conveying tank 130 is connected to the flow rate regulating part 150 through the third conveying pipe 163 , and the low-temperature slurry in the second conveying tank 130 flows into the flow rate regulating part 150 through the third conveying pipe 163 .

[0065] The flow rate regulating part 150 is connected with the coater supply tank 140 through the fourth delivery pipe 164 , and the fourth delivery pipe 164 introduces the high temperature slurry and the low temperature slurry into the coater supply tank 140 .

[0066] The coater supply tank 140 is connected to the coater C through the fifth delivery pipe 165 , and the electrode slurry in the coater supply tank 140 flows into the coater C through the fifth delivery pipe 165 .

[0067] A control part (not shown) for controlling the temperature of the electrode slurry may be configured to control the temperature of the electrode slurry in the coater supply tank by controlling each of the mixer storage tank, the first delivery tank, the second delivery tank, and the flow rate adjustment part.

[0068] The electrode slurry delivery system 100 according to the present invention divides the delivery tank that supplies the electrode slurry to the coater supply tank 140 into two parts in order to minimize the time required for the temperature of the electrode slurry in the coater supply tank 140 to reach the target temperature Ts, wherein, respectively, the first delivery tank 120 is configured to supply high-temperature slurry, and the second delivery tank 130 is configured to supply low-temperature slurry, and the flow rate regulating part 150 regulates the flow rate of the high-temperature slurry and the flow rate of the low-temperature slurry, respectively, so that the temperature of the electrode slurry in the coater supply tank 140 can be quickly controlled to the target temperature Ts. Here, the target temperature is an arbitrarily specified temperature value for slurry temperature control.

[0069] Figure 3 Schematic diagram of a flow rate regulating unit according to an embodiment of the present invention. Figure 3 The flow rate regulating part 150 may have a first port 151, a second port 152 and a third port 153 respectively connected to the second delivery pipe 162, the third delivery pipe 163 and the fourth delivery pipe 164. And, these first port 151 to the third port 153 may constitute a flow rate regulating part housing 154 of the flow rate regulating part.

[0070] A flow rate control valve (not shown) configured to open and close each of the first port 151 and the second port 152 may be installed inside the flow rate regulating portion housing 154, wherein one flow rate control valve may adjust the opening and closing rates of each of the first port 151 and the second port 152, or a flow rate control valve may be installed at each of the first port 151 and the second port 152 so that each flow rate control valve adjusts the opening and closing rates of the first port 151 and the opening and closing rates of the second port 152.

[0071] In the flow rate regulating part 150, the opening and closing rates of each of the first port 151 and the second port 152 can be adjusted by the control part, so as to control the temperature of the electrode slurry in the coater supply tank 140. Specifically, if it is necessary to increase the temperature of the electrode slurry in the coater supply tank 140, the first port 151 can be opened by 100% to 75%, and the second port 152 can be opened by 0% to 25% to increase the flow rate of the high-temperature slurry introduced through the first port. Conversely, if it is necessary to reduce the temperature of the electrode slurry in the coater supply tank 140, the second port 152 can be opened by 0% to 25%, and the second port 152 can be opened by 100% to 75% to increase the flow rate of the low-temperature slurry introduced through the second port.

[0072] The flow rate regulating unit 150 may also include an actuator (not shown) that operates a flow rate control valve located on one side of the flow rate control valve (not shown), and a flow rate control valve controller (not shown) that controls the operation of the actuator by receiving inputs of respective opening and closing rates from a first port and a second port of a control unit (not shown).

[0073] The electrode slurry delivery system of the present invention also includes multiple temperature sensors for measuring the temperature of the electrode slurry so as to control the temperature of the electrode slurry, wherein the temperature sensors can be installed in the mixer storage tank 110, the first delivery tank 120, the second delivery tank 130, the coater supply tank 140 and the fifth delivery pipe 165 respectively.

[0074] The temperature sensor may be configured to measure the temperature of the electrode slurry in real time and transmit the measured temperature data to the control unit in real time. Therefore, the control unit may control the temperature of the electrode slurry supplied to the coater C to a target temperature in real time based on the received temperature data.

[0075] In a specific example, the control unit can control the temperature of the electrode slurry by PID control (proportional integral derivative control). PID control is a proportional control method that uses the difference between the target temperature and the current temperature so that the temperature of the electrode slurry supplied to the coater C can be controlled to the target temperature.

[0076] Figure 4 Schematic diagram of a first delivery tank according to an exemplary embodiment of the present invention. Figure 4 The first conveying tank may include a chamber 121 for receiving the slurry S, an impeller 122 disposed inside the chamber 121 for mixing the slurry S, a temperature sensor 170 for measuring the temperature of the slurry S, and a jacket 123 formed on the wall of the chamber 121 for adjusting the temperature of the slurry S.

[0077] In the chamber 121, a feed pipe 121a and a discharge pipe 121b are formed so that the slurry S can be introduced into and discharged from the chamber 121. The impeller 122 may be installed inside the chamber 121 and may be driven by an external driving force of the chamber 121 to mix the electrode slurry S inside the chamber. For example, the impeller 122 may be driven by a motor disposed in the central upper portion of the chamber 121.

[0078] The jacket 123 may be formed on the outer surface of the chamber 121 and configured to circulate a coolant to adjust the internal temperature of the chamber 121 and the temperature of the incoming slurry S. For example, the jacket 123 spirally connected along the outer surface of the chamber 121 may form a channel between the chamber 121 and the jacket 123, and the coolant may circulate along the channel. In addition, a coolant feed pipe 123a and a coolant discharge pipe 123b are connected to the jacket 123 so that the coolant can be continuously introduced and discharged. In addition, there is no particular limitation on the position of the jacket 123, so a configuration in which the jacket 123 is formed on the inner surface of the chamber 121 is also possible.

[0079] The temperature sensor 170 is installed inside the chamber 121, and can measure in real time the temperature inside the chamber 121 and the temperature of the incoming slurry S. The temperature data measured by the temperature sensor 170 is sent to the control part, and the control part can adjust the temperature of the coolant flowing inside the jacket based on the temperature data to control the temperature of the electrode slurry stored in the first delivery tank 120 to a high temperature.

[0080] The above configuration of the first delivery tank 120 may be used for the second delivery tank 130 and the mixer storage tank 110. That is, similar to the first delivery tank, the second delivery tank may include a configuration of a chamber, an impeller, a temperature sensor, and a jacket to control the temperature of the electrode slurry in the second delivery tank 130 to a low temperature, and the mixer storage tank 110 may include a configuration of a chamber, an impeller, a temperature sensor, and a jacket to control the temperature of the electrode slurry stored in the mixer storage tank 110.

[0081] In the electrode slurry delivery system of this structure, the control part can control the temperature of the electrode slurry inside the mixer storage tank 110, the first delivery tank 120 and the second delivery tank 130 within a suitable temperature range by adjusting the temperature of the coolant.

[0082] In the electrode slurry conveying system according to an exemplary embodiment of the present invention, the control unit can control so that the temperature (Th) of the high-temperature slurry in the first conveying tank 120 satisfies the following condition 1, and the temperature (Tl) of the low-temperature slurry in the second conveying tank 130 satisfies the following condition 2.

[0083]

Condition 1

[0084] Ts≤Th≤Ts+5℃

[0085]

Condition 2

[0086] Ts-5℃≤Tl≤Ts

[0087] (In the above conditions 1 and 2, Ts is the target temperature of the electrode slurry in the coater supply tank)

[0088] In the electrode slurry conveying system according to an exemplary embodiment of the present invention, the control unit can control so that the temperature (Th) of the high-temperature slurry in the first conveying tank satisfies the following condition 3, and the temperature (Tl) of the low-temperature slurry in the second conveying tank satisfies the following condition 4.

[0089]

Condition 3

[0090] Ts+1.5℃≤Th≤Ts+3.5℃

[0091]

Condition 4

[0092] Ts-3.5℃≤Tl≤Ts-1.5℃

[0093] (In the above conditions 3 and 4, Ts is the target temperature of the electrode slurry in the coater supply tank)

[0094] By controlling the temperature of the high-temperature slurry in the first delivery tank 120 and the temperature of the low-temperature slurry in the second delivery tank 130 to satisfy each of the above-mentioned conditions 1 and 2, and more specifically, satisfying conditions 3 and 4, the temperature change caused by the mixing of the high-temperature slurry and the low-temperature slurry introduced into the coater supply tank 140 can be achieved in a short time.

[0095] In the electrode slurry delivery system according to the exemplary embodiment of the present invention, the control part may control the temperature of the electrode slurry in the mixer storage tank 110 to be equal to the target temperature (Ts) of the electrode slurry in the coater supply tank 140 .

[0096] The greater the difference between the temperature of the electrode slurry in the mixer storage tank 110 and the temperature of the electrode slurry in the coater supply tank 140, the longer the time required to heat and cool the slurries in the first and second delivery tanks, respectively. Therefore, by controlling the temperature of the electrode slurry in the mixer storage tank 110 to be equal to the target temperature Ts of the electrode slurry in the coater supply tank 140, the temperature variation of the slurries respectively supplied in the first and second delivery tanks 120 and 130 can be minimized, thereby shortening the stabilization time of the slurry temperature.

[0097] In the electrode slurry delivery system according to the exemplary embodiment of the present invention, the control part can control the temperature of the electrode slurry so that the sensing value of the temperature sensor 170 installed in the fifth delivery pipe 165 is the same as the sensing value of the temperature sensor 170 installed in the coater supply tank 140. Therefore, the electrode slurry delivery system is controlled according to the flow rate of each of the high temperature slurry and the low temperature slurry entering the coater supply tank 140, so that the electrode slurry in the coater supply tank 140 with a changed temperature is supplied to the coater C.

[0098] Figure 5 Schematic diagram of an electrode slurry delivery system according to another exemplary embodiment of the present invention. Figure 5 In the electrode slurry delivery system 200, a first return pipe 266 is branched from the second delivery pipe 262 to return to the first delivery tank 220, wherein a first valve 291 is installed at the branch portion of the second delivery pipe 262 and the first return pipe 266, and a second return pipe 267 is branched from the third delivery pipe 263 to return to the second delivery tank 230, wherein a second valve 292 is installed at the branch portion of the third delivery pipe 263 and the second return pipe 267. Each of the first valve 291 and the second valve 292 may be a three-way valve.

[0099] The electrode slurry discharged from the first delivery tank 220 is pumped out by a pump (not shown) and delivered to the coater supply tank 240 via the second delivery pipe 262, but if more than a certain amount of slurry is supplied in the coater supply tank 240, the supply of slurry to the coater supply tank 240 can be blocked by the first valve 291, and the electrode slurry can be returned to the first delivery tank 220 via the first return pipe 266.

[0100] Similarly, the supply of slurry to the coater supply tank 240 may be blocked by the second valve 292 , so that the electrode slurry discharged from the second delivery tank 230 may be returned to the second delivery tank 230 via the second return pipe 267 .

[0101] In addition, the electrode slurry conveying system 200 may also include: a first circulation pump (not shown), which is installed on the first return pipe 266 to provide a driving force for circulating the high-temperature slurry to the first conveying tank 220; and a second circulation pump (not shown), which is installed on the second return pipe 267 to provide a driving force for circulating the low-temperature slurry to the second conveying tank 230.

[0102] In addition, the electrode slurry delivery system 200 may also include multiple temperature sensors 270 for measuring the temperature of the electrode slurry, wherein the temperature sensors 270 may be installed in the mixer storage tank 210, the first return pipe 266, the second return pipe 267, the coater supply tank 240 and the fifth delivery pipe 265, respectively.

[0103] The temperature sensor 270 can be configured to measure the temperature of the electrode slurry in real time and send the measurement data to the control unit, and the control unit can adjust the operation of various components including the electrode delivery system based on the measurement data received from the temperature sensor to control the temperature of the electrode slurry so that the temperature of the electrode slurry reaches the target temperature.

[0104] Hereinafter, a temperature control method of an electrode slurry according to an exemplary embodiment of the present invention will be described. The temperature control method of an electrode slurry according to the present invention controls the temperature of the electrode slurry by using the above-mentioned electrode slurry conveying system.

[0105] Reference Figures 1 to 4 , the temperature control method of the electrode slurry according to the exemplary embodiment of the present invention includes the following processes: a slurry supplying process S1, in which the electrode slurry prepared by a mixer not shown is supplied to the mixer storage tank 110, the first delivery tank 120, the second delivery tank 130 and the coater supply tank 140; an electrode slurry temperature measuring process S2, which measures the temperature of the electrode slurry via temperature sensors respectively installed in the mixer storage tank, the first delivery tank, the second delivery tank, the coater supply tank and the fifth delivery pipe; an electrode slurry temperature regulating process S3, which The temperature of the electrode slurry in each of the mixer storage tank 110, the first delivery tank 120 and the second delivery tank 130 is adjusted by an indirect method using a coolant; process S4, which adjusts the delivery flow rate of the high-temperature slurry from the first delivery tank 120 to the coater supply tank 140 and the delivery flow rate of the low-temperature slurry from the second delivery tank 130 to the coater supply tank 140 respectively through the flow rate regulating unit 150; and process S5, which controls the temperature of the coolant, the delivery flow rate of the high-temperature slurry and the delivery flow rate of the low-temperature slurry in real time through the flow rate regulating unit.

[0106] In the slurry supply process S1, the electrode slurry discharged from the mixer storage tank 110 may be introduced into the first delivery tank 120 and the second delivery tank 130 through the first delivery pipe 161 having a parallel branch structure. Therefore, the first delivery tank 120 supplies the high temperature slurry to the coater supply tank 140 via the second delivery pipe 162 and the flow rate regulating part 150, and the second delivery tank 130 supplies the low temperature slurry to the coater supply tank 140 via the third delivery pipe 163 and the flow rate regulating part 150.

[0107] The process S2 of measuring the electrode slurry temperature is a process of determining the current temperature of the electrode slurry, and the electrode slurry temperature control method according to the present invention measures the temperature of the electrode slurry in real time through a temperature sensor and transmits the temperature data to a control part.

[0108] In the process S3 of adjusting the temperature of the electrode slurry in each of the mixer storage tank 110, the first delivery tank 120 and the second delivery tank 130, the indirect method of the coolant may be a heat exchange method, as described above, by circulating the coolant in the jacket to achieve indirect heating or indirect cooling.

[0109] Process S4 of adjusting the delivery flow rate of the high-temperature slurry entering the coater supply tank 140 and the respective delivery flow rates of the low-temperature slurry entering the coater supply tank 140 from the second delivery tank 130 is the following process: adjusting the delivery flow rate of the high-temperature slurry entering the coater supply tank 140 and the delivery flow rate of the low-temperature slurry entering the coater supply tank 140 so that the temperature of the electrode slurry in the coater supply tank 140 quickly reaches the target temperature.

[0110] At this time, the flow rate regulating portion 150 can adjust the delivery flow rate of the high temperature slurry and the delivery flow rate of the low temperature slurry entering the coater supply tank 140 by adjusting the opening and closing rates of the first port 151 connected to the second delivery pipe 162 and the second port 152 connected to the third delivery pipe 163.

[0111] The process S5 of controlling the temperature of the coolant, the delivery flow rate of the high temperature slurry, and the delivery flow rate of the low temperature slurry in real time by the flow rate regulating portion based on the difference between the current temperature of the electrode slurry measured in real time by the temperature sensor 170 in the temperature measurement process S2 and the target temperature may include controlling the temperature of the respective electrode slurries in the mixer storage tank 110, the first delivery tank 120, and the second delivery tank 130 by regulating the temperature of the coolant circulating through the respective jackets installed in the mixer storage tank 110, the first delivery tank 120, and the second delivery tank 130. The process S5 may also include controlling the operation of the flow rate regulating portion to control the temperature of the electrode slurry in the coater supply tank 140 to meet the target temperature.

[0112] As described above, according to the electrode slurry delivery system and the electrode slurry temperature control method of the present invention, the first delivery tank and the second delivery tank store high-temperature slurry and low-temperature slurry separately, respectively, and the flow rate regulating unit regulates the flow rate of the high-temperature slurry and the flow rate of the low-temperature slurry entering the coater supply tank, so that the temperature of the slurry in the coater supply tank can be controlled to quickly reach the target temperature.

[0113] In addition, when the temperature of the slurry is adjusted, the time required to reach the target value can be shortened, thereby improving productivity and reducing the amount of loss of slurry and current collectors required to stabilize the temperature during coating.

[0114] The present invention has been described in more detail above with reference to the accompanying drawings and embodiments. However, it is to be understood that the configuration shown in the accompanying drawings or embodiments described herein is only one embodiment of the present invention and does not represent all technical concepts of the present invention, and various equivalents and modifications that can replace them may exist when submitting this disclosure.

[0115] [reference numerals]

[0116] 100, 200: Electrode slurry delivery system

[0117] 110, 210: Storage tank

[0118] 120, 220: First conveying tank

[0119] 130, 230: Second conveying tank

[0120] 140, 240: Coating supply tank

[0121] 150, 250: Flow rate adjustment unit

[0122] 151-153: First port to third port

[0123] 161-165, 261-265: First to fifth delivery pipes

[0124] 266-267: First return pipe to second return pipe

[0125] 170, 270: Temperature sensor

[0126] 291 to 293: First valve to third valve

[0127] C: Coating machine

Claims

1. An electrode slurry delivery system, the electrode slurry delivery system is used to deliver electrode slurry from a mixer where the electrode slurry is mixed to a coater for coating the electrode slurry, the electrode slurry delivery system comprising: a mixer storage tank, the mixer storage tank being used to store the electrode slurry discharged from the mixer; a first delivery tank, the first delivery tank being used to store high-temperature slurry and being connected to the mixer storage tank via a parallel branched first delivery pipe; a second delivery tank, the second delivery tank being used to store low-temperature slurry and being connected to the mixer storage tank through the first delivery pipe branched in parallel; a coater supply tank configured to receive the high temperature slurry and the low temperature slurry from the first delivery tank and the second delivery tank, respectively, and supply an electrode slurry mixture of the high temperature slurry and the low temperature slurry to the coater; a flow rate regulating portion configured to respectively regulate a conveying flow rate of the high temperature slurry introduced from the first conveying tank to the coater supply tank and a conveying flow rate of the low temperature slurry introduced from the second conveying tank to the coater supply tank; and A control section is provided for controlling the temperature of the electrode slurry in the coater supply tank.

2. The electrode slurry delivery system according to claim 1, further comprising: a second delivery pipe connected between the first delivery tank and the flow rate regulating part to introduce the high-temperature slurry into the flow rate regulating part; a third delivery pipe connected between the second delivery tank and the flow rate regulating part to introduce the low-temperature slurry into the flow rate regulating part; a fourth delivery pipe connected between the flow rate regulating portion and the coater supply tank to introduce the high temperature slurry and the low temperature slurry into the coater supply tank; as well as A fifth delivery pipe is connected between the coater supply tank and the coater to introduce the electrode slurry into the coater.

3. The electrode slurry delivery system according to claim 2, wherein: The flow rate regulating portion is provided with a first port connected to the second delivery pipe and a second port connected to the third delivery pipe, and The flow rate adjustment section is configured to adjust an opening and closing rate of the first port and an opening and closing rate of the second port.

4. The electrode slurry delivery system according to claim 3, wherein: The control portion controls the temperature of the electrode slurry in the coater supply tank by adjusting opening and closing rates of the first port and the second port, respectively.

5. The electrode slurry delivery system according to claim 2, further comprising: A plurality of temperature sensors, the plurality of temperature sensors are used to measure the temperature of the electrode slurry, wherein: The temperature sensors are respectively installed in the mixer storage tank, the first delivery tank, the second delivery tank, the coater supply tank, and the fifth delivery pipe.

6. The electrode slurry delivery system according to claim 2, wherein: A first return pipe is branched from the second delivery pipe and returns to the first delivery tank, and a first valve is installed at a branch portion of the second delivery pipe and the first return pipe, and A second return pipe that branches off from the third delivery pipe and returns to the second delivery tank is installed at a branch portion of the third delivery pipe and the second return pipe.

7. The electrode slurry delivery system according to claim 6, further comprising: a first circulation pump, the first circulation pump being installed on the first return pipe to provide a driving force for circulating the high-temperature slurry to the first transport tank; as well as A second circulation pump is installed on the second return pipe to provide a driving force for circulating the low-temperature slurry to the second transport tank.

8. The electrode slurry delivery system according to claim 6, further comprising: A plurality of temperature sensors, the plurality of temperature sensors are used to measure the temperature of the electrode slurry, wherein: The temperature sensors are respectively installed in the mixer storage tank, the first return pipe, the second return pipe, the coater supply tank, and the fifth delivery pipe.

9. The electrode slurry delivery system according to claim 1, wherein: Any one or more of the mixer storage tank, the first delivery tank and the second delivery tank comprises: a chamber for receiving the slurry; and A jacket is formed on a wall of the chamber and circulates a coolant to adjust a temperature of the slurry.

10. The electrode slurry delivery system according to claim 9, wherein: The control portion is configured to control a temperature of the electrode slurry in any one or more of the mixer storage tank, the first delivery tank, and the second delivery tank by adjusting a temperature of the coolant in the jacket.

11. The electrode slurry delivery system according to claim 1, wherein: The control section is configured to control the temperature of the electrode slurry through PID control (proportional integral control).

12. The electrode slurry delivery system according to claim 1, wherein: The control unit performs control so that The temperature (Th) of the high temperature slurry in the first transport tank satisfies the following condition 1, and The temperature (T1) of the low-temperature slurry in the second transport tank satisfies the following condition 2; 【Condition 1】 Ts≤Th≤Ts+5℃ 【Condition 2】 Ts-5℃≤Tl≤Ts (In the above conditions 1 and 2, Ts is the target temperature of the electrode slurry in the coater supply tank).

13. The electrode slurry delivery system according to claim 1, wherein: The control unit performs control so that The temperature (Th) of the high temperature slurry in the first transport tank satisfies the following condition 3, and The temperature (T1) of the low-temperature slurry in the second transport tank satisfies the following condition 4; 【Condition 3】 Ts+1.5℃≤Th≤Ts+3.5℃ 【Condition 4】 Ts-3.5℃≤Tl≤Ts-1.5℃ (In the above conditions 3 and 4, Ts is the target temperature of the electrode slurry in the coater supply tank).

14. The electrode slurry delivery system according to claim 1, wherein: The control portion controls so that the temperature of the electrode slurry in the mixer storage tank is equal to a target temperature (Ts) of the electrode slurry in the coater supply tank.

15. The electrode slurry delivery system according to claim 2, wherein: The control part controls the temperature of the electrode slurry so that a sensed value of a temperature sensor installed in the fifth delivery pipe is the same as a sensed value of a temperature sensor installed in the coater supply tank.

16. A method of controlling the temperature of an electrode slurry using the electrode slurry delivery system according to any one of claims 1 to 15.