Quickly-installed charging pile
Through the snap structure, abutment structure and limit guide structure of the fast-install charging pile, the cumbersome installation of existing charging piles is solved, and the rapid installation and disassembly is achieved, which meets sudden demands and reduces time and costs. Suitable for large-scale events and pilot projects.
Patent Information
- Application Number
- CN202411257463.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-11-01
- Estimated Expiration
- 2044-09-09
AI Technical Summary
The installation process of existing charging piles is too cumbersome to be deployed quickly, unable to meet the sudden large-scale activities or temporary increased charging needs, and cannot help quickly build a pilot-type charging station testing environment, wasting time and cost.
A fast-install charging pile is designed, adopting a snap structure, abutment structure and limit guide structure. The charging pile is quickly installed and disassembled through the snap structure, and the components such as hooks, limit shells, mobile rods and screws are used to achieve rapid Fixed and disassembled, combined with controller and power module for charging monitoring and management.
The rapid installation and disassembly of charging piles has been achieved, which meets the sudden large-scale activities or temporary increased charging needs, reduces installation time and cost, and is suitable for pilot charging station projects.
Smart Images

Figure CN118876776A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of charging piles, and in particular to a quick-installation charging pile. Background Art
[0002] Charging piles, as a facility that provides power support for electric vehicles, play an increasingly important role in today's society. They convert the electrical energy in the power grid into electrical energy that can be stored and used by electric vehicles, thereby achieving the endurance and energy supply of electric vehicles.
[0003] There are many types of charging piles, which can be divided into public charging piles and private charging piles according to the installation location. Public charging piles are usually installed in public places, such as parking lots, gas stations, shopping malls, etc., for the shared use of electric vehicle users. Private charging piles are more often installed in personal residences or corporate parks to provide charging services for specific users or vehicles.
[0004] Charging piles are needed to replenish the power of new energy vehicles, but the installation process of charging piles is too cumbersome. In some cases, such as sudden large-scale events or temporary increased charging needs, ordinary charging piles cannot be deployed quickly and cannot meet immediate charging needs. At the same time, for some pilot charging station projects, ordinary charging piles cannot help quickly build a test environment, wasting time and cost. Summary of the invention
[0005] The purpose of the present invention is to provide a quick-installation charging pile, which has the advantage of quick installation of charging piles and solves the problem that the installation process of existing charging piles is too cumbersome. In some cases, such as sudden large-scale activities or temporarily increased charging needs, ordinary charging piles cannot be deployed quickly and cannot meet immediate charging needs. At the same time, for some pilot charging station projects, ordinary charging piles cannot help to quickly build a test environment, wasting time and cost.
[0006] To achieve the above object, the present invention provides the following technical solution: a quick-installation charging pile, comprising a charging pile for charging, one side of the charging pile is fixedly connected with a buckle structure for clamping and fixing the charging pile;
[0007] The buckle structure is provided with a supporting structure for opening the structure;
[0008] A limiting guide structure for structural limiting guidance is provided inside the abutting structure, and one side of the limiting guide structure is fixedly connected to the inside of the buckle structure;
[0009] The charging pile includes a shell body for structural protection, a controller for monitoring the charging process is arranged inside the shell body, a data processing control module is arranged inside the shell body, one end of the controller is connected to a power module, and one end of the power module is connected to a connector for transmitting power.
[0010] As a preferred quick-installation charging pile of the present invention, the snap-in structure includes a hook fixed to the wall, and a limiting shell for snapping is provided on the surface of the hook, one side of the limiting shell is fixedly connected to the surface of the shell body, and the front and rear sides of the hook are provided with snap-in grooves, and the front and rear sides of the limiting shell are provided with moving rods, and a snap-in block is fixedly connected to the side of the moving rod close to the hook, and the snap-in block penetrates the limiting shell and extends to the inside of the snap-in groove, the top of the moving rod is movably connected to the abutting structure, one side of the abutting structure penetrates the limiting shell and extends to the surface of the limiting shell, and the limiting guide structure is located inside the moving rod, and one side is fixedly connected to the inner wall of the limiting shell.
[0011] As a preferred quick-installation charging pile of the present invention, the resisting structure includes a resisting rod for resisting transmission, one side of the resisting rod penetrates into the interior of the limiting shell and is fixedly connected with a movable column, the surface of the movable column is movably connected with a special-shaped transmission rod, the interior of the special-shaped transmission rod is movably connected with the limiting column, one side of the limiting column is fixedly connected to the inner wall of the limiting shell, both sides inside the special-shaped transmission rod are movably connected with a linkage rod through a first rotating shaft, and the side of the linkage rod away from the special-shaped transmission rod is movably connected to the top of the moving rod through a second rotating shaft.
[0012] As a preferred quick-installation charging pile of the present invention, the limiting guide structure includes a guide column for guiding the moving rod, the guide column is located at the top and bottom inside the moving rod, one side of the guide column is fixedly connected to the inner wall of the limiting shell, the surface of the guide column is sleeved with a reinforcement sleeve, the surface of the reinforcement sleeve is fixedly connected to the inside of the moving rod, one side of the surface of the guide column is provided with a thread, the surface of the guide column is movably connected to a movable sleeve through the thread, and one side of the movable sleeve is in contact and cooperate with one side of the reinforcement sleeve.
[0013] As a preferred quick-installation charging pile of the present invention, one end of the hook that cooperates with the limiting shell is at an oblique angle, one side of the bottom of the buckle block is inclined and used in conjunction with the hook, a screw is provided on the surface of the hook, the threaded end of the screw passes through the hook and extends to one side of the hook, and the number of the screws is several and evenly distributed.
[0014] As a preferred quick-installation charging pile of the present invention, a handle for moving the movable rod is fixedly connected to one side of the movable rod, a movable groove for moving the movable column is opened inside the special-shaped transmission rod, and the surface of the movable column is in contact with the inner wall of the movable groove.
[0015] As a preferred quick-installation charging pile of the present invention, a stabilizing rod is sleeved on the surface of the abutting rod, the top of the stabilizing rod is fixedly connected to the inner wall of the limiting shell, and a ring is sleeved on the surface of the abutting rod, and the surface of the ring is fixedly connected to the inside of the limiting shell.
[0016] As a preferred quick-installation charging pile of the present invention, a return spring is sleeved on the surface of the guide column, one side of the return spring is fixedly connected to the surface of the moving rod, and the other side of the return spring is fixedly connected to the inner wall of the limit shell.
[0017] Compared with the prior art, the present invention has the following beneficial effects:
[0018] 1. The present invention provides a charging pile, a buckle structure, a moving structure, a limiting guide structure, a shell body, a controller, a control module, a power module and a connector. When there is a large-scale event or a temporary increase in charging demand, and the charging pile needs to be quickly installed, the charging pile can be quickly installed through the buckle structure, and the new energy vehicle can be charged through the charging pile. When disassembly is required, the moving structure can be quickly disassembled, and the limiting guide structure can quickly guide the structure, which solves the problem that the installation process of the existing charging pile is too cumbersome. In some cases, such as sudden large-scale events or temporary increase in charging demand, ordinary charging piles cannot be quickly deployed in place and cannot meet immediate charging needs. At the same time, for some pilot charging station projects, ordinary charging piles cannot help to quickly build a test environment, wasting time and cost.
[0019] 2. The present invention provides a buckle structure, so that the hook can be fixed on a wall or a stable structure such as a temporarily built steel structure. Since the limiting shell is fixedly connected to the shell body, the limiting shell can be directly hung on the surface of the hook, and the hook pushes the buckle block, and the buckle block drives the moving rod to move. When the buckle block moves to be flush with the buckle groove, the buckle block can be snapped into the buckle groove to limit the hook, thereby achieving the purpose of quickly installing the charging pile.
[0020] 3. The present invention sets a resisting structure. When the charging pile needs to be disassembled, the resisting rod is moved, and the resisting rod drives the movable column to move. The movable column moves inside the special-shaped transmission rod, and the special-shaped transmission rod rotates around the limiting column. While the special-shaped transmission rod rotates, it drives the linkage rod to move through the first rotating shaft. The linkage rod drives the moving rod to move through the second rotating shaft, so that the moving rod drives the buckle block to disengage from the buckle groove, thereby achieving the purpose of removing the charging pile.
[0021] 4. The present invention sets a limiting guide structure. When the moving rod moves, the moving rod drives the reinforcement sleeve to move, so that the reinforcement sleeve moves on the surface of the guide column, thereby achieving the purpose of limiting and guiding the moving rod. By twisting the movable sleeve, the movable sleeve is adjusted on the surface of the guide column, and the moving position of the moving rod can be limited, thereby achieving the purpose of adjusting the moving range of the moving rod.
[0022] 5. The present invention provides hooks, buckle blocks and screws, and can use the hook to push the buckle block, so that the buckle block can drive the moving rod to move, thereby achieving the purpose of quickly installing the charging pile. The screws can conveniently fix the hook on a stable structure such as a wall or a temporarily built steel structure, thereby achieving the purpose of stable fixation.
[0023] 6. The present invention can increase the contact area of the movable rod by providing a handle and a movable groove, making it convenient for the user to pull and push the movable rod to achieve structural transmission. The movable groove can facilitate the movement of the movable column inside the special-shaped transmission rod.
[0024] 7. The present invention can increase the stability of the movable rod and reduce the shaking of the movable rod by providing a stabilizing rod and a collar. The collar can reduce the friction between the movable rod and the limiting shell and increase the stability of the movement of the movable rod.
[0025] 8. The present invention can facilitate the resetting of the moving rod by providing a reset spring, thereby facilitating the moving rod to drive the buckle block to snap into the inside of the buckle groove, thereby achieving stable fixation of the charging pile. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 It is a main perspective view of the structure of the present invention;
[0027] Figure 2 It is a three-dimensional diagram of the structure of the present invention from another perspective;
[0028] Figure 3 It is a cutaway stereoscopic view of the limiting shell of the present invention;
[0029] Figure 4 A three-dimensional diagram of the hook of the present invention;
[0030] Figure 5 It is a three-dimensional diagram of the movable structure of the present invention;
[0031] Figure 6 A three-dimensional diagram of the abutment rod of the present invention;
[0032] Figure 7 This is a three-dimensional diagram of the connection of the special-shaped transmission rod of the present invention;
[0033] Figure 8 It is a three-dimensional diagram of the limiting guide structure of the present invention.
[0034] In the figure: 1. Charging pile; 101. Shell body; 102. Controller; 103. Control module; 104. Power module; 105. Connector; 2. Buckle structure; 201. Hook; 202. Limit shell; 203. Buckle groove; 204. Moving rod; 205. Buckle block; 3. Moving structure; 301. Moving rod; 302. Movable column; 303. Special-shaped transmission rod; 304. Limit column; 305. Linkage rod; 4. Limit guide structure; 401. Guide column; 402. Reinforcement sleeve; 403. Moving sleeve; 5. Screw; 6. Handle; 7. Moving groove; 8. Stabilizing rod; 9. Ring; 10. Reset spring. DETAILED DESCRIPTION
[0035] Example 1
[0036] See also Figure 1-Figure 8 A quick-installation charging pile comprises a charging pile 1 for charging, and a buckle structure 2 for clamping and fixing the charging pile 1 is fixedly connected to one side of the charging pile 1;
[0037] The buckle structure 2 is provided with a push structure 3 for opening the structure;
[0038] A limiting guide structure 4 for structural limiting guidance is arranged inside the abutting structure 3, and one side of the limiting guide structure 4 is fixedly connected to the inside of the buckle structure 2;
[0039] The charging pile 1 includes a shell body 101 for structural protection, a controller 102 for monitoring the charging process is arranged inside the shell body 101, a control module 103 for data processing is arranged inside the shell body 101, one end of the controller 102 is connected to a power module 104, and one end of the power module 104 is connected to a connector 105 for transmitting power;
[0040] When there is a large-scale event or a temporary increase in charging demand, the charging pile 1 needs to be installed quickly, the charging pile 1 is quickly installed through the snap-on structure 2, and the new energy vehicle is charged through the charging pile 1. When disassembly is required, the abutment structure 3 can quickly disassemble it, and the limiting guide structure 4 can quickly guide the structure, which solves the problem that the installation process of the existing charging pile 1 is too cumbersome. In some cases, such as sudden large-scale events or temporary increase in charging demand, the ordinary charging pile 1 cannot be deployed quickly and cannot meet the immediate charging demand. At the same time, for some pilot charging station projects, the ordinary charging pile 1 cannot help to quickly build a test environment, wasting time and cost.
[0041] Furthermore, the snap-on structure 2 includes a hook 201 fixed to the wall, and a limiting shell 202 for snapping is provided on the surface of the hook 201, and one side of the limiting shell 202 is fixedly connected to the surface of the shell body 101, and a snap-on groove 203 is provided on the front and rear sides of the hook 201, and a moving rod 204 is provided on the front and rear sides of the limiting shell 202. A snap-on block 205 is fixedly connected to the side of the moving rod 204 close to the hook 201, and the snap-on block 205 penetrates the limiting shell 202 and extends to the inside of the snap-on groove 203. The top of the moving rod 204 is movably connected to the abutting structure 3, and one side of the abutting structure 3 penetrates the limiting shell 202 and extends to the surface of the limiting shell 202. The limiting guide structure 4 is located inside the moving rod 204, and one side is fixedly connected to the inner wall of the limiting shell 202.
[0042] The hook 201 can be fixed on a stable structure such as a wall or a temporary steel structure. Since the limiting shell 202 is fixedly connected to the shell body 101, the limiting shell 202 can be directly hung on the surface of the hook 201. The hook 201 pushes the buckle block 205, and the buckle block 205 drives the moving rod 204 to move. When the buckle block 205 moves to be flush with the buckle groove 203, the buckle block 205 can be snapped into the buckle groove 203 to limit the hook 201, thereby achieving the purpose of quickly installing the charging pile 1.
[0043] Furthermore, the moving structure 3 includes a moving rod 301 for moving transmission, one side of the moving rod 301 penetrates into the interior of the limiting shell 202 and is fixedly connected to a movable column 302, the surface of the movable column 302 is movably connected to a special-shaped transmission rod 303, the interior of the special-shaped transmission rod 303 is movably connected to a limiting column 304, one side of the limiting column 304 is fixedly connected to the inner wall of the limiting shell 202, both sides of the interior of the special-shaped transmission rod 303 are movably connected to a linkage rod 305 through a first rotating shaft, and the side of the linkage rod 305 away from the special-shaped transmission rod 303 is movably connected to the top of the moving rod 204 through a second rotating shaft, when the charging pile 1 needs to be disassembled.
[0044] By moving the abutting rod 301, the abutting rod 301 drives the movable column 302 to move, and the movable column 302 moves inside the special-shaped transmission rod 303, and the special-shaped transmission rod 303 rotates around the limiting column 304. While the special-shaped transmission rod 303 rotates, it drives the linkage rod 305 to move through the first rotating shaft, and the linkage rod 305 drives the moving rod 204 to move through the second rotating shaft, so that the moving rod 204 drives the buckle block 205 to disengage from the buckle groove 203, thereby achieving the purpose of removing the charging pile 1.
[0045] Furthermore, the limiting guide structure 4 includes a guide column 401 for guiding the moving rod 204, the guide column 401 is located at the top and bottom of the moving rod 204, one side of the guide column 401 is fixedly connected to the inner wall of the limiting shell 202, the surface of the guide column 401 is provided with a reinforcement sleeve 402, the surface of the reinforcement sleeve 402 is fixedly connected to the inside of the moving rod 204, one side of the surface of the guide column 401 is provided with a thread, and the surface of the guide column 401 is movably connected to a movable sleeve 403 through a thread, and one side of the movable sleeve 403 is in contact and cooperate with one side of the reinforcement sleeve 402.
[0046] When the moving rod 204 moves, the moving rod 204 drives the reinforcement sleeve 402 to move, so that the reinforcement sleeve 402 moves on the surface of the guide column 401, thereby achieving the purpose of limiting and guiding the moving rod 204. By twisting the movable sleeve 403, the movable sleeve 403 is adjusted on the surface of the guide column 401, and the moving position of the moving rod 204 can be limited, thereby achieving the purpose of adjusting the moving range of the moving rod 204.
[0047] Furthermore, one end of the hook 201 that cooperates with the limiting shell 202 is at an oblique angle, and one side of the bottom of the snap block 205 is inclined and used in conjunction with the hook 201. A screw 5 is provided on the surface of the hook 201, and the threaded end of the screw 5 passes through the hook 201 and extends to one side of the hook 201. The number of screws 5 is several and is evenly distributed.
[0048] The hook 201 can be used to push the buckle block 205, so that the buckle block 205 can drive the moving rod 204 to move, thereby achieving the purpose of quickly installing the charging pile 1. The screw 5 can conveniently fix the hook 201 on a stable structure such as a wall or a temporarily built steel structure to achieve the purpose of stable fixation.
[0049] Furthermore, a handle 6 for moving the movable rod 301 is fixedly connected to one side of the movable rod 301 , and a moving groove 7 for moving the movable column 302 is provided inside the special-shaped transmission rod 303 , and the surface of the movable column 302 contacts and cooperates with the inner wall of the moving groove 7 .
[0050] The contact area of the movable rod 301 can be increased, making it convenient for the user to pull and push the movable rod 301 to achieve structural transmission. The movable groove 7 can facilitate the movement of the movable column 302 inside the special-shaped transmission rod 303.
[0051] Furthermore, a stabilizing rod 8 is sleeved on the surface of the abutting rod 301 , and the top of the stabilizing rod 8 is fixedly connected to the inner wall of the limiting shell 202 . A ring 9 is sleeved on the surface of the abutting rod 301 , and the surface of the ring 9 is fixedly connected to the inside of the limiting shell 202 .
[0052] The stability of the abutting rod 301 can be increased and the shaking of the abutting rod 301 can be reduced. The collar 9 can reduce the friction between the abutting rod 301 and the limiting shell 202 and increase the stability of the movement of the abutting rod 301.
[0053] Furthermore, a return spring 10 is sleeved on the surface of the guide column 401 , one side of the return spring 10 is fixedly connected to the surface of the moving rod 204 , and the other side of the return spring 10 is fixedly connected to the inner wall of the limiting shell 202 .
[0054] The movable rod 204 can be easily reset, so that the movable rod 204 can drive the buckle block 205 to snap into the inside of the buckle groove 203, thereby realizing stable fixation of the charging pile 1.
[0055] Working principle of the present invention:
[0056] When there is a large-scale event or a temporary increase in charging demand, and the charging pile 1 needs to be installed quickly, the hook 201 is fixed to a stable structure such as a wall or a temporarily built steel structure. Since the limiting shell 202 is fixedly connected to the shell body 101, the limiting shell 202 is directly hung on the surface of the hook 201, and the hook 201 pushes the buckle block 205, and the buckle block 205 drives the moving rod 204 to move, and the moving rod 204 pushes the reset spring 10 to shrink the reset spring 10. When the buckle block 205 moves to be flush with the buckle groove 203, the reset spring 10 rebounds the moving rod 204, and the moving rod 204 drives the buckle block 205 to move, and the buckle block 205 is snapped into the buckle groove 203 to limit the hook 201, so as to achieve the purpose of quickly installing the charging pile 1. When the charging pile 1 needs to be disassembled, the handle 6 is pushed, and the handle 6 drives the abutting rod 301 to move, and the abutting rod 301 brings The movable column 302 is moved, and the movable column 302 moves inside the special-shaped transmission rod 303, and the special-shaped transmission rod 303 rotates around the limiting column 304. While the special-shaped transmission rod 303 rotates, the linkage rod 305 is driven to move through the first rotating shaft, and the linkage rod 305 drives the movable rod 204 to move through the second rotating shaft, so that the movable rod 204 drives the buckle block 205 to disengage from the buckle groove 203, so as to achieve the purpose of removing the charging pile 1. When the movable rod 204 moves, the movable rod 204 drives the reinforcement sleeve 402 to move, so that the reinforcement sleeve 402 moves on the surface of the guide column 401, so as to achieve the purpose of limiting and guiding the movable rod 204. By twisting the movable sleeve 403, the movable sleeve 403 is adjusted on the surface of the guide column 401, so as to limit the moving position of the movable rod 204. In the above manner, the purpose of quickly installing the charging pile 1 is achieved.
[0057] Since the connection method, installation method and use method of electrical components such as the controller 102, control module 103, power module 104 and connector 105 in the shell body 101 are common knowledge in the field of charging piles, not much technical description is given in this application document.
[0058] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A quick-installation charging pile, comprising a charging pile (1) for charging, characterized in that: A buckle structure (2) for clamping and fixing the charging pile (1) is fixedly connected to one side of the charging pile (1); The buckle structure (2) is provided with an abutment structure (3) for opening the structure. A limiting guide structure (4) for structural limiting guidance is arranged inside the abutting structure (3), and one side of the limiting guide structure (4) is fixedly connected to the inside of the buckle structure (2); The charging pile (1) comprises a shell body (101) for structural protection, a controller (102) for monitoring the charging process is arranged inside the shell body (101), a data processing control module (103) is arranged inside the shell body (101), one end of the controller (102) is connected to a power module (104), and one end of the power module (104) is connected to a connector (105) for transmitting power.
2. A quick-installation charging pile according to claim 1, characterized in that: The buckle structure (2) comprises a hook (201) fixed to a wall, a limit shell (202) for buckling is arranged on the surface of the hook (201), one side of the limit shell (202) is fixedly connected to the surface of the housing body (101), a buckle groove (203) is provided on the front and rear sides of the hook (201), and a moving rod (204) is arranged on the front and rear sides of the inside of the limit shell (202), and the moving rod (204) is close to the hook (201). ) is fixedly connected to one side of the movable rod (204), the movable rod (204) having a snap block (205) penetrating the limiting shell (202) and extending to the inside of the snap groove (203), the top of the movable rod (204) is movably connected to the abutment structure (3), one side of the abutment structure (3) penetrating the limiting shell (202) and extending to the surface of the limiting shell (202), the limiting guide structure (4) is located inside the movable rod (204), and one side is fixedly connected to the inner wall of the limiting shell (202).
3. A quick-installation charging pile according to claim 2, characterized in that: The abutting structure (3) comprises an abutting rod (301) for abutting transmission, one side of the abutting rod (301) penetrates into the interior of the limiting shell (202) and is fixedly connected to a movable column (302), the surface of the movable column (302) is movably connected to a special-shaped transmission rod (303), the interior of the special-shaped transmission rod (303) is movably connected to a limiting column (304), one side of the limiting column (304) is fixedly connected to the inner wall of the limiting shell (202), both sides of the interior of the special-shaped transmission rod (303) are movably connected to a linkage rod (305) via a first rotating shaft, and the side of the linkage rod (305) away from the special-shaped transmission rod (303) is movably connected to the top of the moving rod (204) via a second rotating shaft.
4. A quick-installation charging pile according to claim 2, characterized in that: The limiting guide structure (4) comprises a guide column (401) for guiding the moving rod (204), the guide column (401) being located at the top and bottom of the moving rod (204), one side of the guide column (401) being fixedly connected to the inner wall of the limiting shell (202), the surface of the guide column (401) being sleeved with a reinforcing sleeve (402), the surface of the reinforcing sleeve (402) being fixedly connected to the inside of the moving rod (204), one side of the surface of the guide column (401) being provided with a thread, the surface of the guide column (401) being movably connected to a movable sleeve (403) through a thread, and one side of the movable sleeve (403) being in contact and cooperation with one side of the reinforcing sleeve (402).
5. A quick-installation charging pile according to claim 2, characterized in that: One end of the hook (201) that cooperates with the limiting shell (202) is at an oblique angle, one side of the bottom of the buckle block (205) is inclined and used in conjunction with the hook (201), a screw (5) is provided on the surface of the hook (201), the threaded end of the screw (5) passes through the hook (201) and extends to one side of the hook (201), and the number of the screws (5) is several and evenly distributed.
6. A quick-installation charging pile according to claim 3, characterized in that: A handle (6) for moving the movable rod (301) is fixedly connected to one side of the movable rod (301), and a movable groove (7) for moving the movable column (302) is provided inside the special-shaped transmission rod (303), and the surface of the movable column (302) is in contact with the inner wall of the movable groove (7).
7. A quick-installation charging pile according to claim 3, characterized in that: The surface of the abutting rod (301) is sleeved with a stabilizing rod (8), the top of which is fixedly connected to the inner wall of the limiting shell (202), and the surface of the abutting rod (301) is sleeved with a collar (9), the surface of which is fixedly connected to the inside of the limiting shell (202).
8. A quick-installation charging pile according to claim 4, characterized in that: A return spring (10) is sleeved on the surface of the guide column (401), one side of the return spring (10) is fixedly connected to the surface of the moving rod (204), and the other side of the return spring (10) is fixedly connected to the inner wall of the limiting shell (202).
Citation Information
Patent Citations
Vehicle charging pile with easy movement and stable placement
CN108621855A
Automobile charging pile convenient to use
CN108944513A
Automatic winding reel of charging pile
CN113321080A