Curve steel box girder incremental launching construction process control method

By employing multi-point synchronous jacking, full-process monitoring, and attitude correction methods in the construction of curved steel box girders, combined with three-way jacks, RTK and UAV surveying, and using a digital twin system for simulation, the problems of poor accuracy and cumbersome deviation calculation in the construction of curved bridges have been solved, achieving efficient and accurate alignment control.

CN118880760APending Publication Date: 2024-11-01THE FIRST CONSTRUCTION COMPANY OF CCCC SECOND HARBOR ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411160606.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

Traditional jacking technology has problems such as poor accuracy, complicated deviation calculation, and difficulty in real-time correction in the construction of curved bridges. Especially in the construction of curved steel box girders, existing technology cannot accurately control the alignment, which poses the risk of overturning and construction inconvenience.

Method used

A method for controlling the construction process of curved steel box girder jacking is adopted, including the erection of temporary piers, installation of guide beams and jacking equipment. Through multi-point synchronous jacking, full-process monitoring, attitude measurement, cyclic construction and attitude correction, precise control is achieved by using three-way jacks, RTK and UAVs, and combined with a digital twin system for simulation and correction, to ensure that the steel box girder is advanced along the axis.

Benefits of technology

It improves the accuracy of jacking control and construction safety, reduces error accumulation, improves construction efficiency and precision, and ensures that the posture of the steel box girder can be accurately corrected at every step to meet design requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118880760A_ABST
    Figure CN118880760A_ABST
Patent Text Reader

Abstract

The invention provides a control method for the incremental launching construction process of a curved steel box girder. The control method comprises the following steps that S1, temporary piers are erected; s2, a guide beam is installed, and pushing equipment is installed and debugged; s3, assembling the steel box girder; s4, multi-point synchronous pushing is carried out, and whole-process monitoring is carried out in the pushing process; s5, overall beam falling is conducted, and the posture of the steel box beam is measured; s6, cyclic construction and pushing are conducted to the tail of the segment, and the posture of the steel box girder is corrected in the pushing process; s7, the steel box girder is lengthened, and circulating construction is conducted till pushing is in place; and S8, the equipment and the temporary structure are dismantled. The method is convenient to operate, the construction process can be well guided, the posture of the steel box girder is rapidly corrected, and it is guaranteed that the pushing process is safe and efficient.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge construction, and in particular to a method for controlling the jacking construction process of a curved steel box girder. Background Art

[0002] With the progress of the times and the development of society, my country's infrastructure projects are becoming more and more perfect. At present, my country has built more than one million bridges. When constructing across existing uninterrupted roads, the jacking technology is widely used due to its advantages of short construction period and small impact on traffic. At present, jacking construction mostly uses one-way jacks with slides and guide devices for jacking. During the jacking process, the deviation between the box girder axis and the designed position is large, there is a risk of overturning, and the guide device will produce resistance to the jacked box girder, which makes construction inconvenient.

[0003] China's public invention application CN115679841A provides a walking multi-point continuous jacking linear control method, which is applied to large-span and large-slope bridges, but does not disclose how to control the linear shape of a curved bridge during jacking. China's public invention application CN117211194A provides a jacking linear control method for a curved steel bridge, but the control method provided is a coordinate method, which requires the box girder to be stationed and the measurement to be completed before linear measurement can be performed, and then linear correction can be performed. It is impossible to accurately determine the jacking stroke during the jacking process, and the construction guidance is poor. Summary of the invention

[0004] The invention provides a method for controlling the jacking construction process of a curved steel box girder, which solves the problems of poor precision, complicated deviation calculation and difficulty in real-time deviation correction in a traditional jacking process.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: a method for controlling the top-pushing construction process of a curved steel box girder, which is characterized by comprising the following steps:

[0006] S1. Set up temporary piers;

[0007] S2. Install the guide beam, install the jacking equipment and debug;

[0008] S3, steel box girder assembly;

[0009] S4, multi-point synchronous pushing, full monitoring during the pushing process;

[0010] S5. Drop the beam as a whole and measure the posture of the steel box beam;

[0011] S6, cyclic construction and pushing to the end of the segment, and correcting the posture of the steel box girder during the pushing process;

[0012] S7, extend the steel box girder and repeat the construction until it is pushed into place;

[0013] S8. Dismantle equipment and temporary structures.

[0014] In the preferred solution, in step S2, the jacking equipment is provided with three-way jacks, which are used for jacking along the tangential, vertical and vertical directions of the steel box girder respectively; multiple groups of jacking equipment are arranged at symmetrical positions on the axis of the box girder below the steel box girder, the working direction of the first jack of the jacking equipment is along the tangential direction of the steel box girder, the working direction of the second jack is along the vertical direction of the top surface of the steel box girder, and the working direction of the third jack is along the normal direction of the steel box girder;

[0015] In step S4, the top pushing of the steel box girder is controlled according to the following formula:

[0016]

[0017] L x1 =L1 cosβ

[0018] L y1 =L1 sinβ

[0019]

[0020] Where:

[0021] α——the angle of the steel box girder under one jacking working stroke;

[0022] β——the angle between the outer tangent of the steel box girder and the connecting line before and after jacking;

[0023] L1——Total stroke of single jacking on the outer side of the steel box girder;

[0024] R——radius of curvature of the steel box girder axis;

[0025] a——The distance between the pushing axis of the pushing equipment on the outer side of the steel box girder and the center axis of the steel box girder;

[0026] L x1 ——Jumping process in the tangential direction of the outer side of the steel box girder;

[0027] L y1 ——Jumping process in the normal direction of the outer side of the steel box girder;

[0028] L x2 ——Jumping process in the tangent direction of the inner side of the steel box girder;

[0029] L y2 ——The pushing process in the normal direction of the inner side of the steel box girder.

[0030] In the preferred solution, in step S2, the temporary pier erection process needs to make marking points, which coincide with the projection of the designed edge line of the steel box girder;

[0031] In step S5, after the beam is dropped, the coordinates of the box beam marking points are measured using a total station, and the positions of the steel box beam marking points and the marking lines on the temporary piers are compared to verify and determine the normal displacement that needs to be corrected for the next jacking.

[0032] In the preferred solution, in step S6, during the nth section pushing process, the error of the n-1th section is corrected, and the error calculation uses the polar coordinate system. The error determination method is as follows:

[0033] L x1n =L x1 +ΔL x1

[0034] L y1n =L y1 +ΔL y1

[0035] L x2n =L x2 +ΔL x2

[0036] L y2n =L y2 +ΔL y2

[0037]

[0038] ΔL y1 =Δρ1

[0039]

[0040] ΔL y1 =Δρ2

[0041] Where:

[0042] L x1n ——The pushing travel in the tangential direction of the outer side of the nth jacking steel box girder;

[0043] L y1n ——The pushing travel distance in the normal direction of the outer side of the n-th jacking steel box girder;

[0044] L x2n ——The pushing travel in the inner tangential direction of the nth jacking steel box girder;

[0045] L y2n ——The pushing travel in the normal direction of the inner side of the steel box girder for the nth time;

[0046] Δρ——the side normal direction deviation of the n-1th jacking steel box girder;

[0047] Δθ——angle deviation of the n-1th jacking steel box girder.

[0048] In the preferred embodiment, in step S2, when debugging the jacking device, the following steps are included:

[0049] S21. After the jacking equipment is installed, debug and inspect the equipment and run at least one working stroke in three directions to ensure that all functions of the jacking equipment are working properly;

[0050] S22. After the stand-alone debugging is completed, online debugging is carried out to ensure that the jacking equipment at different positions can move synchronously and coordinately;

[0051] S23. Control the automatic mode and manual mode of the operating system respectively to ensure normal response.

[0052] In the preferred embodiment, in S21, when the jacking device is installed, a hinged connection is adopted between the top of the jacking device and the steel box girder, and the steel box girder is rotated at the contact point with the jacking device as needed to correct the overall angle.

[0053] In the preferred solution, in S3, RTK is installed on the steel box girder being pushed, and RTK is installed on the adjacent non-pushed steel box girder at the same time. The debugging drone is flown to the central axis of the curvature of the steel box girder being pushed, and the drone and RTK are jointly debugged for GPS measurement point data.

[0054] In the preferred solution, the working height of the UAV is adjusted to be consistent with the working heights of the two RTKs. At this time, the UAV is coplanar with the two RTKs. Using the GPS point data between the UAV and the RTK, the angle between the UAV and the line connecting the two RTK center points is measured as the initial angle, which reflects the position of the initial state of the steel box girder before jacking.

[0055] In the preferred solution, after a jacking process, the angle between the connecting line between the drone and the two RTK center points is measured again as the jacking angle, and the jacking angle is subtracted from the initial angle to obtain the actual change angle α1 of the steel box girder after jacking. This data α1 is compared with the angle difference data α2 before and after jacking measured by the total station;

[0056] At least two measurements are made. When the difference between α1 and α2 is small, the mean method is used to obtain the actual change angle of this jacking. When the difference between α1 and α2 is large, the measurement is repeated to remove the large discrete values, and according to the previous change angle, α1 or α2 is used as the actual change angle of this jacking.

[0057] The actual measured change angle of jacking is used as a reference to correct the posture of the steel box girder to be jacked in the next step.

[0058] In the preferred scheme, before pushing, data modeling is first performed, and then the digital twin system is used to set the pushing parameters and simulate the pushing process. The simulated steel box girder pushing change angle is α3. After an actual pushing work stroke, α1 and α2 are used to compare the final pushing angle change with α3, and α3 is corrected at the same time. The corrected digital twin system simulation obtains the new next pushing change angle as α4. α4 is used as a theoretical value to guide the next pushing process and is compared with the measured data α1 and α2 to avoid inaccurate correction of the steel box girder posture during the pushing process when measurement errors occur in α1 and α2 at the same time, resulting in excessive error accumulation.

[0059] The beneficial effects of the present invention are as follows: the change of the angle of the actual jacking process is obtained by a calibration method, and then the displacement change of each direction of the steel box girder jacking process is calculated using the angle change, and the value of the jacking in the previous step is used as a correction value to guide the jacking process in the next step. The overall jacking control has high accuracy, and the jack stroke is calculated in advance through a linear control equation, which has strong guidance for the operation; the error repair time is fast, and the nth stroke repairs the error of the n-1th stroke; the polar coordinate system is used for jacking control, and the steel box girder can be pushed along the axis with higher accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0060] The present invention will be further described below in conjunction with the accompanying drawings and embodiments:

[0061] Figure 1 It is a schematic diagram of the construction process of the present invention;

[0062] Figure 2 This is a schematic diagram of the geometric relationship before pushing of the present invention. Figure 1 ;

[0063] Figure 3 This is a schematic diagram of the geometric relationship after the push of the present invention. Figure 2 ;

[0064] Figure 4 The geometric relationship diagram of the front and rear jacks of the present invention is shown in FIG. Figure 1 ;

[0065] Figure 5 The geometric relationship diagram of the front and rear jacks of the present invention is shown in FIG. Figure 2 . DETAILED DESCRIPTION

[0066] like Figure 1-5 A method for controlling the top-pushing construction process of a curved steel box girder is characterized by comprising the following steps:

[0067] S1. Set up temporary piers;

[0068] S2. Install the guide beam, install the jacking equipment and debug;

[0069] S3, steel box girder assembly;

[0070] S4, multi-point synchronous pushing, full monitoring during the pushing process;

[0071] S5. Drop the beam as a whole and measure the posture of the steel box beam;

[0072] S6, cyclic construction and pushing to the end of the segment, and correcting the posture of the steel box girder during the pushing process;

[0073] S7, extend the steel box girder and repeat the construction until it is pushed into place;

[0074] S8. Dismantle equipment and temporary structures.

[0075] In the process of bridge construction, it is necessary to construct straight sections and curved sections according to design requirements. When constructing curved sections, it is necessary to ensure the safety, stability and efficiency of the overall construction. The control of the curve line type is the most important indicator in the construction process. Only when the line type is close to the theoretical design drawing can the safety of steel box girder construction be guaranteed. At the same time, its ability to bear loads during use is guaranteed to reach the technical parameters of the design drawing. During construction, it is necessary to grasp the changes in the position and state of the steel box girder during each step of the jacking process. The present invention can calculate the jack stroke in advance through the line type control equation, which has strong guidance for the operation; the error repair time is fast, and the nth stroke repairs the error of the n-1th stroke; using the polar coordinate system for jacking control, the steel box girder can be pushed along the axis with higher accuracy, thereby avoiding the problem of difficulty in construction correction and long construction period caused by error accumulation.

[0076] In the preferred solution, in step S2, the jacking equipment is provided with three-way jacks, which are used for jacking along the tangential, vertical and vertical directions of the steel box girder respectively; multiple groups of jacking equipment are arranged at symmetrical positions on the axis of the box girder below the steel box girder, the working direction of the first jack of the jacking equipment is along the tangential direction of the steel box girder, the working direction of the second jack is along the vertical direction of the top surface of the steel box girder, and the working direction of the third jack is along the normal direction of the steel box girder;

[0077] In step S4, the top pushing of the steel box girder is controlled according to the following formula:

[0078]

[0079] L x1 =L1 cosβ

[0080] L y1 =L1 sinβ

[0081]

[0082] Where:

[0083] α——the angle of the steel box girder under one jacking working stroke;

[0084] β——the angle between the outer tangent of the steel box girder and the connecting line before and after jacking;

[0085] L1——Total stroke of single jacking on the outer side of the steel box girder;

[0086] R——radius of curvature of the steel box girder axis;

[0087] a——The distance between the pushing axis of the pushing equipment on the outer side of the steel box girder and the center axis of the steel box girder;

[0088] L x1 ——Jumping process in the tangential direction of the outer side of the steel box girder;

[0089] L y1 ——Jumping process in the normal direction of the outer side of the steel box girder;

[0090] L x2 ——Jumping process in the tangent direction of the inner side of the steel box girder;

[0091] L y2 ——The pushing process in the normal direction of the inner side of the steel box girder.

[0092] Through the linear control equation, we can better grasp the trend changes of the steel box girder during the jacking process in advance, prepare response plans in advance, and ensure smooth and stable construction.

[0093] In the preferred solution, in step S2, the temporary pier erection process needs to make marking points, which coincide with the projection of the designed edge line of the steel box girder;

[0094] In step S5, after the beam is dropped, the coordinates of the box beam marking points are measured using a total station, and the positions of the steel box beam marking points and the marking lines on the temporary piers are compared to verify and determine the normal displacement that needs to be corrected for the next jacking.

[0095] On the premise of ensuring construction safety and convenience, the position changes of the marking points and the steel box girder are used to better measure the state changes of the actual jacking process through the total station, so that the data measured by the total station can be used to guide the next step of the jacking process.

[0096] In the preferred solution, in step S6, during the nth section pushing process, the error of the n-1th section is corrected, and the error calculation uses the polar coordinate system. The error determination method is as follows:

[0097] L x1n =L x1 +ΔL x1

[0098] L y1n =L y1 +ΔL y1

[0099] L x2n =L x2 +ΔL x2

[0100] L y2n =L y2 +ΔL y2

[0101]

[0102] ΔL y1 =Δρ1

[0103]

[0104] ΔL y1 =Δρ2

[0105] Where:

[0106] L x1n ——The pushing travel in the tangential direction of the outer side of the nth jacking steel box girder;

[0107] L y1n ——The pushing travel distance in the normal direction of the outer side of the n-th jacking steel box girder;

[0108] L x2n ——The pushing travel in the inner tangential direction of the nth jacking steel box girder;

[0109] L y2n ——The pushing travel in the normal direction of the inner side of the steel box girder for the nth time;

[0110] Δρ——the side normal direction deviation of the n-1th jacking steel box girder;

[0111] Δθ——angle deviation of the n-1th jacking steel box girder.

[0112] By correcting the errors multiple times, it is possible to better adapt the actual state of the steel box girder during the jacking process, ensure the safety of the jacking process, reduce the accumulation of errors, and make the operation convenient and efficient.

[0113] In the preferred embodiment, in step S2, when debugging the jacking device, the following steps are included:

[0114] S21. After the jacking equipment is installed, debug and inspect the equipment and run at least one working stroke in three directions to ensure that all functions of the jacking equipment are working properly;

[0115] S22. After the stand-alone debugging is completed, online debugging is carried out to ensure that the jacking equipment at different positions can move synchronously and coordinately;

[0116] S23. Control the automatic mode and manual mode of the operating system respectively to ensure normal response.

[0117] The equipment is calibrated before operation. The pushing equipment in different positions has better consistency during the linkage process, avoiding jamming problems and the unsmooth pushing process. The response is timely. When fine-tuning is required, manual mode single-point control is adopted, and the overall operation is convenient.

[0118] In the preferred solution, in S21, when the jacking device is installed, a hinged connection is used between the top of the jacking device and the steel box girder, and the steel box girder is rotated at the contact point with the jacking device as needed to correct the overall angle. Since the construction process is curved jacking, and each step operation of the jacking is a straight line segment, the hinged connection method can be used to correct the rotation angle and replace the curve with a straight line to better ensure the accuracy of the construction.

[0119] In the preferred solution, in S3, RTK is installed on the steel box girder being pushed, and RTK is installed on the adjacent non-pushed steel box girder at the same time. The debugging drone is flown to the central axis of the curvature of the steel box girder being pushed, and the drone and RTK are jointly debugged for GPS measurement point data.

[0120] RTK is installed on the adjacent non-pushing steel box girders as a fixed point, so that it can stably cooperate with the drone to determine the initial position. Multiple RTKs can be installed on the pushed steel box girder according to the length and shape of the steel box girder, and multi-point data measurement can be performed on the welded steel box girder as a whole, so as to better grasp the changes in position and angle of the steel box girder during the pushing process. RTK measurement has high accuracy, and the drone is easy to operate and has strong adaptability to the environment. The cooperation between the two ensures accurate and efficient construction.

[0121] In the preferred solution, the working height of the UAV is adjusted to be consistent with the working heights of the two RTKs. At this time, the UAV is coplanar with the two RTKs. Using the GPS point data between the UAV and the RTK, the angle between the UAV and the line connecting the two RTK center points is measured as the initial angle, which reflects the position of the initial state of the steel box girder before jacking.

[0122] The UAV can change flexibly within a certain height range. At the same time, when the center of curvature is blocked by buildings or other objects, the GPS data includes X, Y, and Z data. The UAV is adjusted on the axis of the center of curvature. It is only necessary to ensure that the projection of the center point of the UAV and the center of curvature roughly coincide. At this time, the problem of non-coplanarity in the Z direction is solved. At this time, the X and Y data of the UAV and the RTK data are fitted and calculated. The overall operation is convenient, the calculation is accurate, and it can better reflect the changes in the jacking process.

[0123] In the preferred solution, after a jacking process, the angle between the connecting line between the drone and the two RTK center points is measured again as the jacking angle, and the jacking angle is subtracted from the initial angle to obtain the actual change angle α1 of the steel box girder after jacking. This data α1 is compared with the angle difference data α2 before and after jacking measured by the total station;

[0124] At least two measurements are made. When the difference between α1 and α2 is small, the mean method is used to obtain the actual change angle of this jacking. When the difference between α1 and α2 is large, the measurement is repeated to remove the large discrete values, and according to the previous change angle, α1 or α2 is used as the actual change angle of this jacking.

[0125] The actual measured change angle of jacking is used as a reference to correct the posture of the steel box girder to be jacked in the next step.

[0126] By using two methods to verify each other, the accuracy of the angle change of the jacking is further improved, and the posture changes of the jacking process are controlled from different directions. Since the total station needs to be set up and fixed when in use, when the construction environment is inconvenient, such as when the center of curvature is in a lake or is covered and blocked by buildings and other objects, there will be errors in the overall measurement. The two methods work together to ensure high measurement accuracy and more reliable overall measurement data.

[0127] In the preferred scheme, before pushing, data modeling is first performed, and then the digital twin system is used to set the pushing parameters and simulate the pushing process. The simulated steel box girder pushing change angle is α3. After an actual pushing work stroke, α1 and α2 are used to compare the final pushing angle change with α3, and α3 is corrected at the same time. The corrected digital twin system simulation obtains the new next pushing change angle as α4. α4 is used as a theoretical value to guide the next pushing process and is compared with the measured data α1 and α2 to avoid inaccurate correction of the steel box girder posture during the pushing process when measurement errors occur in α1 and α2 at the same time, resulting in excessive error accumulation.

[0128] When the external environment has a great impact on the measurement, such as strong winds affecting the attitude of the drone, and deviations in the measurement of the total station in dusty weather, the α1 and α2 obtained at this time may be wrong. On the contrary, after the numerical values ​​of the previous step are input into the digital twin system for deduction and simulation, the next step of the jacking change angle α4 can be calculated. Initially, the deviation trend and deviation value between the digital twin system and the actual jacking process can be obtained through the above process. Through the above operations, the jacking process can be better served to ensure the safety and efficiency of the jacking process.

[0129] The above embodiments are only preferred technical solutions of the present invention and should not be regarded as limiting the present invention. The protection scope of the present invention shall be the technical solutions recorded in the claims, including equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A method for controlling the construction process of a curved steel box girder, characterized in that: The following steps are involved: S1. Set up temporary piers; S2. Install the guide beam, install the jacking equipment and debug; S3, steel box girder assembly; S4, multi-point synchronous pushing, full monitoring during the pushing process; S5. Drop the beam as a whole and measure the posture of the steel box beam; S6, cyclic construction and pushing to the end of the segment, and correcting the posture of the steel box girder during the pushing process; S7, extend the steel box girder and repeat the construction until it is pushed into place; S8. Dismantle equipment and temporary structures.

2. The method for controlling the top-pushing construction process of a curved steel box girder according to claim 1 is characterized in that: In step S2, a three-way jack is provided on the jacking device, and jacking is performed along the tangential, vertical and vertical directions of the steel box girder respectively; multiple groups of jacking devices are arranged below the steel box girder at symmetrical positions along the axis of the box girder, and the working direction of the first jack of the jacking device is along the tangential direction of the steel box girder, the working direction of the second jack is along the vertical direction of the top surface of the steel box girder, and the working direction of the third jack is along the normal direction of the steel box girder; In step S4, the top pushing of the steel box girder is controlled according to the following formula: L x1 =L1 cosβ L y1 =L1 sinβ Where: α——the angle of the steel box girder under one jacking working stroke; β——the angle between the outer tangent of the steel box girder and the connecting line before and after jacking; L1——Total stroke of single jacking on the outer side of the steel box girder; R——radius of curvature of the steel box girder axis; a——The distance between the pushing axis of the pushing equipment on the outer side of the steel box girder and the center axis of the steel box girder; L x1 ——Jumping process in the tangential direction of the outer side of the steel box girder; L y1 ——Jumping distance in the normal direction of the outer side of the steel box girder; L x2 ——Jumping process in the tangent direction of the inner side of the steel box girder; L y2 ——The pushing process in the normal direction of the inner side of the steel box girder.

3. The method for controlling the top-pushing construction process of a curved steel box girder according to claim 1 is characterized by: In step S2, the temporary pier erection process requires marking points, which should coincide with the projection of the designed edge line of the steel box girder; In step S5, after the beam is dropped, the coordinates of the box beam marking points are measured using a total station, and the positions of the steel box beam marking points and the marking lines on the temporary piers are compared to verify and determine the normal displacement that needs to be corrected for the next jacking.

4. The method for controlling the top-pushing construction process of a curved steel box girder according to claim 1 is characterized by: exist In step S6, during the nth section pushing process, the error of the n-1th section is corrected. The error calculation uses the polar coordinate system. The error determination method is as follows: L x1n =L x1 +ΔL x1 L y1n =L y1 +ΔL y1 L x2n =L x2 +ΔL x2 L y2n =L y2 +ΔL y2 L y1 =Dr1 ΔL y1 =Δρ2 Where: L x1n ——The pushing travel in the tangential direction of the outer side of the nth jacking steel box girder; L y1n ——The pushing travel distance in the normal direction of the outer side of the n-th jacking steel box girder; L x2n ——The pushing travel in the inner tangential direction of the nth jacking steel box girder; L y2n ——The pushing travel in the normal direction of the inner side of the steel box girder for the nth time; Δρ——the side normal direction deviation of the n-1th jacking steel box girder; Δθ——angle deviation of the n-1th jacking steel box girder.

5. The method for controlling the top-pushing construction process of a curved steel box girder according to claim 1 is characterized by: In step S2, when debugging the jacking equipment, the following steps are included: S21. After the jacking equipment is installed, debug and inspect the equipment and run at least one working stroke in three directions to ensure that all functions of the jacking equipment are working properly; S22. After the stand-alone debugging is completed, online debugging is carried out to ensure that the jacking equipment at different positions can move synchronously and coordinately; S23. Control the automatic mode and manual mode of the operating system respectively to ensure normal response.

6. The method for controlling the top-pushing construction process of a curved steel box girder according to claim 5 is characterized by: In S21, when the jacking device is installed, a hinged connection is adopted between the top of the jacking device and the steel box girder, and the steel box girder is rotated at the contact point with the jacking device as needed to correct the overall angle.

7. The method for controlling the top-pushing construction process of a curved steel box girder according to claim 1 is characterized by: In S3, RTK is installed on the steel box girder being pushed, and RTK is installed on the adjacent non-pushing steel box girder at the same time. The debugging drone is flown to the central axis of the curvature of the steel box girder being pushed, and the GPS measurement point data of the drone and RTK are jointly debugged.

8. The method for controlling the top-pushing construction process of a curved steel box girder according to claim 7 is characterized by: Adjust the working height of the UAV to be consistent with the working height of the two RTKs. At this time, the UAV and the two RTKs are coplanar. Using the GPS point data between the UAV and the RTK, measure the angle between the UAV and the line connecting the two RTK center points as the initial angle, which reflects the initial position of the steel box girder before jacking.

9. A method for controlling the top-pushing construction process of a curved steel box girder according to claim 8, characterized in that: After a jacking process, the angle between the UAV and the two RTK center points is measured again as the jacking angle. The jacking angle is subtracted from the initial angle to get the actual change angle α1 of the steel box girder after jacking. This data α1 is compared with the angle difference data α2 before and after jacking measured by the total station. At least two measurements are made. When the difference between α1 and α2 is small, the mean method is used to obtain the actual change angle of this jacking. When the difference between α1 and α2 is large, the measurement is repeated to remove the large discrete values, and according to the previous change angle, α1 or α2 is used as the actual change angle of this jacking. The actual measured change angle of jacking is used as a reference to correct the posture of the steel box girder to be jacked in the next step.

10. The method for controlling the top-pushing construction process of a curved steel box girder according to claim 9 is characterized by: Before jacking, data modeling is first carried out, and then the digital twin system is used to set the jacking parameters and simulate the jacking process. The simulated steel box girder jacking change angle is α3. After an actual jacking work stroke, α1 and α2 are used to compare the final jacking angle change with α3, and α3 is corrected at the same time. The corrected digital twin system simulation obtains the new next jacking change angle as α4. α4 is used as the theoretical value to guide the next jacking process and compared with the measured data α1 and α2 to avoid inaccurate correction of the steel box girder posture during the jacking process when measurement errors occur in α1 and α2 at the same time, resulting in excessive error accumulation.