Sheet pile wharf separation type seismic mitigation and isolation structure and construction method thereof
By adopting a separate seismic reduction and isolation structure and oil pressure damping support in the sheet pile wharf, the deformation and maintenance problems of the sheet pile wharf in the strong earthquake zone are solved, and the seismic performance improvement of the structure is achieved and the simplicity of maintenance is reduced, and the cost is reduced.
Patent Information
- Application Number
- CN202411088257.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-11-01
AI Technical Summary
In large deep-water sheet pile docks in strong earthquake zones, traditional anchor sheet pile structures are prone to deformation of the front wall and track deviation, which makes it difficult to maintain and costly. The seismic design requires increased construction costs and is difficult to ensure repair efficiency.
Adopt a separate earthquake-reducing and isolation structure, including chest wall, front track beam, rear track beam, earthquake isolation support, hydraulic damping support and other components. The pile foundation and rail beam are physically separated, flexible constraints are set, and the hydraulic damping support is used for Deformation buffering and structural resetting, simplifying maintenance and maintenance.
It effectively reduces the impact of pile foundation deformation on the superstructure under earthquake action, reduces the deformation deviation of the track after earthquake, improves seismic performance, facilitates rapid maintenance and resume operations, and reduces maintenance costs.
Smart Images

Figure CN118880797A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of sheet pile type wharf construction, and in particular relates to a sheet pile wharf separated type seismic isolation structure and a construction method thereof. Background Art
[0002] The sheet pile wharf structure has a short construction period and low cost, and has been widely used in wharf projects at home and abroad. The basic structure of the sheet pile wharf consists of a front wall, tie rods, and an anchor wall. The structure is designed to limit the deformation of the wharf front wall through the anchor system. In recent years, there have been some engineering cases that use the sheet pile front wall as both a retaining structure and the foundation of the wharf front track beam. For sheet pile wharves, controlling the deformation of the front wall is an issue that needs to be focused on in its design, construction, and operation, especially for large deep-water wharves located in strong earthquake zones, where the free length of the wharf front wall is long and is greatly affected by potential earthquake horizontal forces.
[0003] Chinese patent CN208455567U (publication date February 1, 2019) discloses a seismic connection structure for the front and rear track beams of a sheet pile wharf, including front and rear track beam structures, both of which have a clamping portion on their facing sides, and a vertical concave clamping groove in the clamping portion; the front and rear track beam structures are connected to each other through a cross bracing structure, and the front and rear ends of the cross bracing structure are respectively provided with a convex tenon matching the vertical concave clamping groove, and the convex tenon is embedded in the vertical concave clamping groove of the clamping portion to form a clamping structure with the front and rear track beam structures.
[0004] The conventional sheet pile structure adopts the traditional anchored sheet pile structure, and the front wall is at risk of large residual deformation after the earthquake, which will cause the upper track beam to deviate, affecting the operation of the lifting machinery, and the corresponding maintenance is difficult and costly. The conventional sheet pile wharf seismic design adopts the concept of "using rigidity to overcome rigidity", and improves the overall rigidity of the wharf structure through measures such as foundation reinforcement, setting anchor fork piles, increasing the bending rigidity of the front wall or strengthening the connection of components, but these measures require a significant increase in construction costs, and it is difficult to ensure the efficiency of wharf repair after a large earthquake. Summary of the invention
[0005] In order to solve the above problems, the present application proposes a sheet pile wharf separated seismic isolation structure and its construction method. The purpose of the present invention is to provide a sheet pile wharf separated seismic isolation structure with reliable structure, convenient maintenance and controllable cost, in view of the sheet pile deformation, track displacement and maintenance difficulties that are prone to occur in sheet pile wharfs in strong earthquake areas under the influence of earthquakes.
[0006] To achieve the above object, the technical solution adopted by the present invention is as follows: a sheet pile dock separated seismic isolation structure: the structure includes a breast wall, a front rail track beam, a rear rail track beam, a transition plate, a seismic isolation support, a top steel tie rod, a bottom steel tie rod, a front wall, an anchor wall, a front rail support pile, a rear rail support pile, a rear rail pile cap beam, and a hydraulic damping support;
[0007] The breast wall is divided into two parts, one part is a full-length section parallel to the front line of the wharf, and the other part is an outward cantilever section;
[0008] There is a seismic isolation groove between the breast wall and the front track beam;
[0009] The front rail track beam rests on the outwardly extending cantilever section of the breast wall;
[0010] The breast wall and the front rail track beam are connected via a hydraulic damping support;
[0011] The rear rail track beam and the rear rail pile cap beam are connected via a seismic isolation support;
[0012] The two ends of the transition plate are placed on the breast wall and the front rail beam respectively;
[0013] The seismic isolation groove is covered with a transition plate;
[0014] The top steel tie rod connects the front rail track beam and the rear rail track beam together;
[0015] The bottom steel tie rods connect the front wall and the anchor wall together;
[0016] The front wall and front rail support piles are located below the breast wall;
[0017] The rear rail supporting pile is located below the rear rail pile cap beam.
[0018] The front rail support piles are located below the cantilevered section of the breast wall, with a spacing of 5 to 10 m, and the pile foundation is a driven pile;
[0019] The arrangement spacing of the outwardly extending cantilever sections of the breast wall is consistent with the spacing of the front rail support piles.
[0020] The front wall is built parallel to the front line of the wharf and is constructed along its entire length. The front wall adopts a steel sheet pile structure or a combined sheet pile structure.
[0021] The front track beam is arranged parallel to the front line of the wharf, each section of the track beam is 15 to 30 meters long, and a 10 to 30 mm wide structural joint is reserved between the track beam structural sections.
[0022] The beam body axis direction of the rear rail pile cap beam is perpendicular to the longitudinal direction of the wharf, and the arrangement spacing is the same as the arrangement spacing of the outward cantilever section of the breast wall; two rear rail supporting piles are arranged under the rear rail pile cap beam.
[0023] The anchor wall is located behind the wharf, with a distance of more than 30m from the front wall of the wharf, and is built along the longitudinal length of the wharf. The anchor wall adopts a steel sheet pile structure;
[0024] The oil pressure damping support comprises a piston rod, a cylinder body, a piston, an oil pipeline, a one-way ball valve, a grid, an oil inlet, an oil outlet, a buffer pad, an anchor plate, and embedded bolts;
[0025] The top surface of the cylinder body is provided with an oil inlet and an oil outlet;
[0026] The cylinder body is provided with a buffer pad at one end close to the sea, and is fixed to the front rail beam at one end close to the land by embedded bolts;
[0027] The side wall of the cylinder body is provided with an oil delivery pipe;
[0028] The oil delivery pipe bends downward from one end on the land side of the cylinder body and extends to the bottom of the cylinder body on the sea side;
[0029] The end of the oil pipeline close to the sea is provided with a one-way ball valve and a grid net;
[0030] The cylinder body is filled with hydraulic oil and is provided with a piston rod and a piston;
[0031] The piston fits tightly with the inner wall of the cylinder, and an anchor plate is installed at the end of the piston rod to fix it to the breast wall;
[0032] The oil inlet and the oil outlet are opened and closed by screwing out and screwing in the bolts through threaded holes on the top of the cylinder body;
[0033] The one-way ball valve is located at the junction of the oil delivery pipe and the inner wall of the bottom of the cylinder body;
[0034] The grid net is located at the top of the one-way ball valve and can receive hydraulic oil flowing from the oil pipeline from bottom to top.
[0035] The arrangement spacing of the oil pressure damping supports on the horizontal plane is the same as the spacing of the front rail support piles.
[0036] The construction method of the separate seismic isolation structure of a sheet pile wharf comprises:
[0037] Step S1: piling the front wall of the wharf, the front rail supporting piles, the rear rail supporting piles and the anchor wall by means of a piling ship or an onshore piling frame; and reinforcing the original soft soil foundation within the width of the wharf to achieve the required foundation soil strength;
[0038] Step S2: constructing the bottom steel tie rod between the front wall and the anchor wall and applying pre-tightening force;
[0039] Step S3: Casting the breast wall and the rear rail pile cap beam; embedding the piston rod of the oil pressure damping support in the breast wall; installing a seismic isolation bearing on the top of each rear rail pile cap beam;
[0040] Step S4: Casting the rear rail track beam; embedding the land side end of the top steel tie rod in the rear rail track beam through an anchor, and temporarily fixing the sea side end of the top steel tie rod through a bracket;
[0041] Step S5: backfilling medium-coarse sand between the wharf front wall and the anchor wall to the position of the bottom steel tie rod, applying tension to the bottom steel tie rod, and then continuing to backfill to 0.5 to 1 m below the position of the top steel tie rod;
[0042] Step S6: Dredging is performed at the front of the wharf. After the deformation of the front wall of the wharf is stabilized, the front rail beam is cast, and the top steel tie rod and the cylinder body of the hydraulic damping support are cast together with the front rail beam through anchors; a seismic isolation groove is reserved between the front rail beam and the breast wall;
[0043] Step S7: Apply tension to the top steel tie rods and continue backfilling in the wharf area to the designed top elevation;
[0044] Step S8: opening the oil inlet and the oil outlet of the oil pressure damping support, and after the cylinder cavity is filled with damping oil, closing the oil inlet and the oil outlet;
[0045] Step S9: construct the dock surface layer and install a prefabricated reinforced concrete transition plate between the dock breast wall and the front track beam.
[0046] Compared with the prior art, the advantages and effects of this application are as follows:
[0047] 1. This application physically separates the pile foundation and track beam of the sheet pile wharf, and the front and rear track beams are connected by tie rods to form a whole, wherein the front track beam is connected to the wharf breast wall by a damping support, and the rear track beam is connected to the rear track pile cap beam by a seismic isolation support. The structure sets flexible constraints on the front and rear track beams to avoid or reduce the impact of pile foundation deformation on the upper structure under earthquake action, effectively reduce the post-earthquake deformation and displacement of the track, and improve seismic performance.
[0048] 2. For the front track of the wharf, the present application optimizes the traditional "pile foundation + front track beam" structure to a "front wall / front track supporting pile + breast wall + seismic isolation ditch + front track beam" structure. By setting a seismic isolation ditch between the breast wall and the front track beam and covering it with a transition plate, the transition plate covering the seismic isolation ditch can be lifted after a strong earthquake, and personnel can be arranged to enter the seismic isolation ditch to inspect the displaced section of the track beam, and the structure and the track can be reset with the help of the jack, so as to facilitate the rapid resumption of operation of the wharf.
[0049] 3. The hydraulic damping support installed in the seismic isolation groove of the present application has the functions of deformation buffer and hydraulic jack at the same time. When the breast wall is close to the front rail track beam, the relative displacement of the breast wall and the front rail track beam can be limited by the viscous resistance of the internal fluid and the buffer pad. When the breast wall is far away from the front rail track beam, on the one hand, the deformation of the breast wall can be limited by the viscous resistance of the internal fluid of the damping support. On the other hand, after the structural deformation is stable, the oil pump can be used to pump oil into the cylinder to push the piston to pull and reset the breast wall.
[0050] 4. The series of construction methods provided in this application realize a separate seismic isolation structure for large sheet pile docks in strong earthquake zones through the assembly of various components. It has the characteristics of simplicity, clarity and simple maintenance, which facilitates rapid maintenance and resumption of operation of the dock after an earthquake.
[0051] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application so that it can be implemented in accordance with the contents of the specification, and to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the following is a detailed description of the preferred embodiments of the present application in conjunction with the accompanying drawings as follows.
[0052] Based on the detailed description of the specific embodiments of the present application in combination with the accompanying drawings below, those skilled in the art will become more aware of the above and other objects, advantages and features of the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] In order to more clearly illustrate the technical solutions in the embodiments of the present application or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can also be obtained based on these drawings without creative work. In all drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, each element or part is not necessarily drawn according to the actual scale.
[0054] in:
[0055] Figure 1 It is a cross-sectional schematic diagram of the separate seismic isolation structure of the sheet pile wharf of the present invention;
[0056] Figure 2 It is a schematic plan view of the separate seismic isolation structure of the sheet pile wharf of the present invention;
[0057] Figure 3 It is a structural schematic diagram of the oil pressure damping support of the present invention;
[0058] Explanation of the reference numerals in the accompanying drawings: 1. breast wall; 2. front rail track beam; 3. rear rail track beam; 4. transition plate; 5. seismic isolation groove; 6. seismic isolation bearing; 7. top steel tie rod; 8. bottom steel tie rod; 9. front wall; 10. anchor wall; 11. front rail supporting pile; 12. rear rail supporting pile; 13. rear rail pile cap beam; 14. hydraulic damping support; 15. wharf surface layer; 16. piston rod; 17. cylinder body; 18. piston; 19. oil pipeline; 20. one-way ball valve; 21. grille; 22. oil inlet; 23. oil outlet; 24. buffer pad; 25. anchor plate; 26. embedded bolts. Specific embodiments
[0059] To make the purpose, technical scheme and advantages of the embodiment of the present application clearer, the technical scheme in the embodiment of the present application will be clearly and completely described below in conjunction with the accompanying drawings in the embodiment of the present application. Obviously, the described embodiment is a part of the embodiment of the present application, rather than all of the embodiments. In the following description, specific details such as specific configuration and components are provided only to help fully understand the embodiments of the present application. Therefore, it should be clear to those skilled in the art that various changes and modifications can be made to the embodiments described herein without departing from the scope and spirit of the present application. In addition, for clarity and brevity, the description of known functions and structures is omitted in the embodiment.
[0060] It should be understood that the references to "one embodiment" or "this embodiment" throughout the specification mean that the specific features, structures, or characteristics associated with the embodiment are included in at least one embodiment of the present application. Therefore, the references to "one embodiment" or "this embodiment" appearing throughout the specification do not necessarily refer to the same embodiment. In addition, these specific features, structures, or characteristics may be combined in any suitable manner in one or more embodiments.
[0061] In addition, the present application may repeat reference numerals and / or letters in different examples. This repetition is for the purpose of simplicity and clarity, and does not in itself indicate the relationship between the various embodiments and / or settings discussed.
[0062] The term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can mean: A exists alone, B exists alone, and A and B exist at the same time. The term " / and" in this article describes another type of association object relationship, indicating that there can be two relationships. For example, A / and B can mean: A exists alone, and A and B exist alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0063] The term "at least one" in this article is merely a description of the association relationship of associated objects, indicating that there may be three relationships. For example, at least one of A and B can mean: A exists alone, A and B exist at the same time, and B exists alone.
[0064] It should also be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusions.
[0065] Example 1
[0066] This embodiment relates to a sheet pile dock separated type seismic isolation structure, please refer to Figure 1-2 As shown, the structure includes a breast wall 1, a front rail track beam 2, a rear rail track beam 3, a transition plate 4, a seismic isolation support 6, a top steel tie rod 7, a bottom steel tie rod 8, a front wall 9, an anchor wall 10, a front rail support pile 11, a rear rail support pile 12, a rear rail pile cap beam 13, and a hydraulic damping support 14;
[0067] The breast wall 1 is a structure with an outward cantilever, which consists of two parts. One part is a full-length section parallel to the front line of the wharf, and the other part is an outward cantilever section arranged at a certain interval. The arrangement interval of the outward cantilever section is consistent with the interval of the front rail support piles 11.
[0068] There is a seismic isolation groove 5 between the breast wall 1 and the front track beam 2;
[0069] The front rail supporting piles 11 are located below the cantilevered section of the breast wall 1, with a spacing of 5 to 10 m. The pile foundations are driven piles, and steel pipe piles, PHC piles, etc. may be used according to geological conditions and bearing capacity requirements.
[0070] The breast wall 1 and the front rail track beam 2 are connected via a hydraulic damping support 14;
[0071] The rear rail track beam 3 and the rear rail pile cap beam 13 are connected via a seismic isolation support 6;
[0072] The two ends of the transition plate 4 are respectively placed on the breast wall 1 and the front rail track beam 2;
[0073] The seismic isolation trench 5 is covered with a transition plate 4, and the seismic isolation trench 5 has a width of about 1.5 m;
[0074] The top steel tie rod 7 connects the front rail track beam 2 and the rear rail track beam 3 together;
[0075] The bottom steel tie rod 8 is located between the front wall 9 and the anchor wall 10;
[0076] The front wall 9 and the front rail support piles 11 are located below the breast wall 1;
[0077] The front wall 9 is built parallel to the front line of the wharf and can be constructed in a steel sheet pile structure or a combined sheet pile (steel pipe piles and steel sheet piles are arranged alternately) structure.
[0078] The rear rail supporting pile 12 is located below the rear rail pile cap beam 13 .
[0079] The front rail support piles 11 are located below the cantilevered section of the breast wall 1, with a spacing of 5 to 10 m, and the pile foundation is a driven pile;
[0080] The arrangement spacing of the outwardly extending cantilever sections is consistent with the spacing of the front rail support piles 11 .
[0081] The front wall 9 is built parallel to the front line of the wharf and can be constructed in a steel sheet pile structure or a combined sheet pile structure.
[0082] The front rail track beam 2 is arranged parallel to the front line direction of the wharf, each track beam section is 15 to 30 meters long, and a 10 to 30 mm wide structural seam is reserved between the track beam structural sections.
[0083] The transition plate 4 is a prefabricated reinforced concrete plate. The length of each transition plate 4 is about 3-6m and the thickness is about 0.25-0.35m. The top surface of the transition plate 4 is installed with an embedded lifting ring.
[0084] The center elevation of the bottom steel tie rod 8 is located between the bottom of the breast wall 1 and the construction water level.
[0085] The center elevation of the top steel tie rod 7 is located between the bottom of the track beam and the bottom of the wharf surface layer 15 .
[0086] The technical effect of this embodiment is that the pile foundation and the track beam of the sheet pile wharf are physically separated, and the front and rear track beams are connected by a tie rod to form a whole, wherein the front track beam is connected to the wharf breast wall by a damping support, and the rear track beam is connected to the rear track pile cap beam by a seismic isolation support. The structure sets flexible constraints on the front and rear track beams, thereby avoiding or reducing the influence of pile foundation deformation under earthquake action on the upper structure, and effectively reducing the post-earthquake deformation and displacement of the track.
[0087] Example 2
[0088] This embodiment relates to a sheet pile dock separated type seismic isolation structure, please refer to Figure 3 As shown, based on the further introduction of Example 1, the oil pressure damping support 14 includes a piston rod 16, a cylinder body 17, a piston 18, an oil delivery pipe 19, a one-way ball valve 20, a grid mesh 21, an oil inlet 22, an oil outlet 23, a buffer pad 24, an anchor plate 25, and embedded bolts 26;
[0089] The top surface of the cylinder body 17 is provided with an oil inlet 22 and an oil outlet 23;
[0090] The cylinder body 17 is provided with a buffer pad 24 at one end close to the sea, and is fixed to the front rail track beam (2) at one end close to the land by embedded bolts 26;
[0091] The side wall of the cylinder body 17 is provided with an oil delivery pipe 19;
[0092] The oil delivery pipe 19 bends downward from one end of the cylinder body 17 on the land side and extends to the bottom of the cylinder body 17 on the sea side;
[0093] The end of the oil pipeline 19 close to the sea is provided with a one-way ball valve 20 and a grid net 21;
[0094] The cylinder 17 is filled with hydraulic oil and is provided with a piston rod 16 and a piston 18;
[0095] The piston 18 and the inner wall of the cylinder 17 fit tightly together, and the end of the piston rod 16 is provided with an anchor plate 25 to be fixed to the breast wall (1);
[0096] The oil inlet 22 and the oil outlet 23 are formed by threaded holes on the top of the cylinder body 17, and the oil inlet and outlet are opened and closed by screwing out and screwing in the bolts;
[0097] The one-way ball valve 20 is located at the junction of the sea side end of the oil delivery pipe 19 and the inner wall of the cylinder body 17;
[0098] The grid net 21 is located at the top of the one-way ball valve 20 and can receive the hydraulic oil flowing from the oil pipeline from bottom to top, while preventing the ball of the one-way ball valve 20 from sliding into the cylinder body 17 .
[0099] The oil pressure damping support 14 has a jack function. By opening the oil inlet 22 and the oil outlet 23, the oil delivery pipe and the oil return pipe of the oil pump are connected to the oil inlet 22 and the oil outlet 23 respectively, and the breast wall 1 can be pulled from the sea side to the land side by the oil pressure pushing piston 18.
[0100] The arrangement spacing of the oil pressure damping struts 14 on the horizontal plane is the same as the spacing of the front rail support piles 11 .
[0101] In case that the breast wall 1 of the sheet pile wharf deviates toward the sea side under the action of a strong earthquake, the breast wall 1 can be pulled and reset by using an oil pressure damping support 14. The specific implementation method is as follows:
[0102] Step 1: Through on-site survey, locate the deformed section of breast wall 1, measure the horizontal displacement value of breast wall 1, and calibrate the position where breast wall 1 needs to be reset.
[0103] Step 2: After lifting and removing the transition plate 4 on the seismic isolation trench 5 corresponding to the breast wall 1 of the deformed section by means of lifting equipment such as a crawler crane, a professional person enters the seismic isolation trench 5 for inspection and maintenance.
[0104] Step 3: Open the oil inlet 22 and the oil outlet 23 on the cylinder 17 on the hydraulic damping support 14, connect the oil inlet pipe and the oil return pipe of the hydraulic oil pump to the oil inlet 22 and the oil outlet 23 respectively, deliver oil to the corresponding cylinder 17 through the oil inlet 22, and draw out the hydraulic oil in the corresponding cylinder 17 through the oil outlet 23, so that the oil pressure of the cylinder 17 drives the piston rod 16 to pull the breast wall 1 back to the designed original position to the land side.
[0105] The technical effect of this embodiment: the oil pressure damping support installed in the seismic isolation groove has the functions of deformation buffer and oil pressure jack at the same time. When the breast wall is close to the front rail track beam, the relative displacement of the breast wall and the front rail track beam can be limited by the viscous resistance of the internal fluid and the buffer pad. When the breast wall is far away from the front rail track beam, on the one hand, the deformation of the breast wall can be limited by the viscous resistance of the internal fluid of the damping support, and on the other hand, after the structural deformation is stable, the oil pump can be used to pump oil into the cylinder to push the piston to pull and reset the breast wall.
[0106] Example 3
[0107] This embodiment relates to a construction method of a separate seismic isolation structure of a sheet pile wharf, which is further introduced based on Example 1 or 2. The implementation wharf is a deep-water wharf project in a strong earthquake zone abroad. The plane size of the wharf is about 1 km long and 40 m wide. The design high water level of the project is 2.4 m and the design low water level is 0.3 m.
[0108] The structural design and construction method includes the following steps:
[0109] Step 1: Determine the structural dimensions of the wharf through stability analysis and structural bearing capacity calculation. The wharf width, i.e., the distance between the front wall 9 and the anchor wall 10, is 42m. The front wall 9 adopts a composite sheet pile structure. The main piles of the composite sheet piles are steel pipe piles with a pile diameter of 2000mm, and the secondary piles of the composite sheet piles are AZ26 steel sheet piles. The main and secondary piles are arranged alternately along the front edge of the wharf. The wharf anchor wall 10 adopts AZ26 steel sheet piles. The tie rods are steel tie rods with a diameter of 130mm. The bottom steel tie rods 8 are 1.0m high and arranged at a spacing of 3.5m. The top steel tie rods 7 are 3.0m high and arranged at a spacing of 7m. The supporting piles under the front track beam 2 and the rear track beam 3 are steel pipe piles with a pile diameter of 900mm and arranged at a spacing of 7m.
[0110] Step 2: Use a pile-driving ship (coordinated with the advance dredging of the navigation area) or an onshore pile-driving frame to drive the combined sheet piles of the front wall of the dock 9, the supporting piles and the steel sheet piles of the anchor wall 10.
[0111] Step 3: Strengthen the original soft soil foundation within the width of the wharf. The reinforcement method can be cement mixing piles, sand pile replacement, gravel pile replacement, etc. according to the soil conditions of the foundation soil to achieve the required foundation soil strength.
[0112] Step 4: Construct the bottom steel tie rod 8 between the front wall 9 and the anchor wall 10. For the end of the tie rod connected to the front wall 9, a hole should be opened in advance on the steel pipe pile with a main pile diameter of 2000mm. After the tie rod is inserted, the anchor is installed at the end of the tie rod. After positioning, concrete is poured at the head of the steel pipe pile to fix the tie rod anchor section and the steel pipe pile together. For the end of the tie rod connected to the anchor wall 10, a hole is opened in advance on the steel sheet pile of the anchor wall 10 and a double-track perimeter purlin is welded. After the tie rod is inserted into the hole of the sheet pile, a nut is installed at the end of the tie rod to fix the tie rod and the perimeter purlin together. After the tie rod is installed, a pre-tightening force is applied to the tie rod.
[0113] Step 5: Based on the completed front wall 9 and front rail support piles 11, set up the template for casting the breast wall 1, embed the piston rod 16 and anchor plate 25 of the hydraulic damping support 14 in the breast wall 1, and the piston rod 16 needs to control the installation elevation and horizontality. Based on the completed rear rail support piles 12, set up the template for casting the rear rail pile cap beam 13, and embed the bolts of the seismic isolation bearing 6 on the top of the rear rail pile cap beam 13. Cast the breast wall 1 and the rear rail pile cap beam 13, and set a structural joint every 20m in the cast-in-place breast wall 1.
[0114] Step 6: After the curing age and strength of the rear rail pile cap beam 13 meet the requirements, cast the rear rail track beam 3, and place the rear rail track beam 3 on the seismic isolation support 6 at the top of the rear rail pile cap beam 13. Pre-embed the land side end of the top steel tie rod 7 in the rear rail track beam 3 through anchors, and temporarily fix the sea side end of the top steel tie rod 7 through a bracket. When installing the steel tie rod, the installation elevation and horizontality must be controlled.
[0115] Step 7: Backfill medium-coarse sand between the wharf front wall 9 and the anchor wall 10 to the bottom steel tie rod 8, and apply tension to the bottom steel tie rod 8. Then continue to backfill medium-coarse sand to 0.5 to 1 m below the top steel tie rod.
[0116] Step 8: Dredging the front of the wharf, after the deformation of the wharf front wall 9 is stable, cast the front track beam 2, the front track beam 2 is cast in sections, and the section length is 20m. A 1.5m wide seismic isolation trench 5 is reserved between the front track beam 2 and the breast wall 1, and the top steel tie rod 7 and the cylinder 17 of the hydraulic damping support 14 are cast together with the front track beam 2 through anchors.
[0117] Step 9: After the curing age and strength of the front rail track beam 2 and the rear rail track beam 3 meet the requirements, apply tension to the top steel tie rod 7, and continue to backfill in the dock area to the designed top elevation.
[0118] Step 10: Open the oil inlet 22 and the oil outlet 23 of the oil pressure damping support 14, and after the cavity of the cylinder body 17 is filled with damping oil, close the oil inlet 22 and the oil outlet 23.
[0119] Step 11: Construct the dock surface layer 15. The dock surface layer 15 consists of 100mm prefabricated high-strength interlocking blocks, 30mm thick medium-coarse sand cushion, 420mm thick cement-stabilized crushed stone, and 150mm thick graded crushed stone cushion from top to bottom. Install the reinforced concrete transition plate 4 between the dock breast wall 1 and the front track beam 2. The transition plate 4 is placed on the sills reserved on the breast wall 1 and the front track beam 2.
[0120] The above description is only the preferred embodiment of the present invention, which does not limit the protection scope of the present invention. For those skilled in the art, the present invention can be modified and varied in various ways. Within the spirit and principle of the present invention, any change, modification, replacement, integration and parameter change of these embodiments by conventional substitution or capable of achieving the same function without departing from the principle and spirit of the present invention shall fall within the protection scope of the present invention.
Claims
1. A separate seismic isolation structure for a sheet pile dock, characterized in that: The structure comprises a breast wall (1), a front rail track beam (2), a rear rail track beam (3), a transition plate (4), a seismic isolation support (6), a top steel tie rod (7), a bottom steel tie rod (8), a front wall (9), an anchor wall (10), a front rail support pile (11), a rear rail support pile (12), a rear rail pile cap beam (13), and a hydraulic damping support (14); The breast wall (1) is divided into two parts, one part is a full-length section parallel to the front line of the wharf, and the other part is an outward cantilever section; An isolation groove (5) is provided between the breast wall (1) and the front rail track beam (2); The front rail track beam (2) is placed on the outwardly extending cantilever section of the breast wall (1); The breast wall (1) and the front rail track beam (2) are connected via a hydraulic damping support (14); The rear rail track beam (3) and the rear rail pile cap beam (13) are connected via a seismic isolation support (6); The two ends of the transition plate (4) are respectively placed on the breast wall (1) and the front rail track beam (2); The seismic isolation groove (5) is covered with a transition plate (4); The top steel tie rod (7) connects the front rail track beam (2) and the rear rail track beam (3) together; The bottom steel tie rod (8) connects the front wall (9) and the anchor wall (10) together; The front wall (9) and the front rail support piles (11) are located below the breast wall (1); The rear rail support pile (12) is located below the rear rail pile cap beam (13).
2. The separate seismic isolation structure of a sheet pile dock according to claim 1 is characterized in that: The front rail support piles (11) are located below the cantilevered section of the breast wall (1), are arranged at a spacing of 5 to 10 m, and the pile foundations are driven piles; The arrangement spacing of the outwardly extending cantilever sections of the breast wall (1) is consistent with the spacing of the front rail support piles (11).
3. The separate seismic isolation structure of a sheet pile dock according to claim 1 is characterized in that: The front wall (9) is built parallel to the front line of the wharf and is constructed along its entire length. The front wall (9) adopts a steel sheet pile structure or a combined sheet pile structure.
4. The separate seismic isolation structure of a sheet pile dock according to claim 1 is characterized in that: The front rail track beam (2) is arranged parallel to the front line direction of the wharf, each track beam section is 15 to 30 meters long, and a 10 to 30 mm wide structural seam is reserved between the track beam structural sections.
5. The separate seismic isolation structure of a sheet pile dock according to claim 1 is characterized in that: The beam body axis direction of the rear rail pile cap beam (13) is perpendicular to the longitudinal direction of the wharf, and the arrangement spacing is the same as the arrangement spacing of the outwardly extending cantilever section of the breast wall (1); two rear rail supporting piles (12) are arranged under the rear rail pile cap beam (13).
6. The sheet pile dock separated seismic isolation structure according to claim 1, characterized in that: The anchor wall (10) is located behind the wharf, with a distance from the wharf front wall (9) greater than 30m, and is built along the longitudinal length of the wharf. The anchor wall (10) adopts a steel sheet pile structure.
7. The sheet pile dock separated seismic isolation structure according to claim 1, characterized in that: The oil pressure damping support (14) comprises a piston rod (16), a cylinder body (17), a piston (18), an oil delivery pipe (19), a one-way ball valve (20), a grid mesh (21), an oil inlet (22), an oil outlet (23), a buffer pad (24), an anchor plate (25), and embedded bolts (26); The top surface of the cylinder body (17) is provided with an oil inlet (22) and an oil outlet (23); The cylinder body (17) is provided with a buffer pad (24) at one end close to the sea, and is fixed to the front rail track beam (2) at one end close to the land by embedded bolts (26); The side wall of the cylinder body (17) is provided with an oil delivery pipe (19); The oil delivery pipe (19) bends downward from one end of the land side of the cylinder body (17) and extends to the bottom of the cylinder body (17) toward the sea side; The end of the oil delivery pipe (19) close to the sea is provided with a one-way ball valve (20) and a grid net (21); The cylinder (17) is filled with hydraulic oil and is provided with a piston rod (16) and a piston (18); The piston (18) and the inner wall of the cylinder (17) are tightly fitted, and the end of the piston rod (16) is provided with an anchor plate (25) to be fixed to the breast wall (1); The oil inlet (22) and the oil outlet (23) are formed by threaded holes on the top of the cylinder body (17), and the oil inlet and outlet are opened and closed by screwing out and screwing in bolts; The one-way ball valve (20) is located at the junction of the oil delivery pipe (19) and the inner wall of the bottom of the cylinder body (17); The grid net (21) is located at the top of the one-way ball valve (20) and can receive hydraulic oil flowing from the oil pipeline from bottom to top.
8. The separate seismic isolation structure of a sheet pile dock according to claim 7, characterized in that: The arrangement spacing of the oil pressure damping supports (14) on the horizontal plane is the same as the spacing of the front rail support piles (11).
9. The construction method of a sheet pile dock separated seismic isolation structure according to any one of claims 1 to 8, characterized in that: The method comprises: Step S1: using a pile-driving ship or an onshore pile-driving frame to drive the front wall (9), front rail support piles (11), rear rail support piles (12) and anchor wall (10) of the wharf; taking measures to reinforce the original soft soil foundation within the width of the wharf to achieve the required foundation soil strength; Step S2: constructing the bottom steel tie rod (8) between the front wall (9) and the anchor wall (10) and applying a pre-tightening force; Step S3: Casting the breast wall (1) and the rear rail pile cap beam (13); pre-embedding the piston rod (16) of the oil pressure damping support (14) in the breast wall (1); installing a seismic isolation support (6) on the top of each rear rail pile cap beam (13); Step S4: Casting the rear rail track beam (3); pre-embedding the land side end of the top steel tie rod (7) in the rear rail track beam (3) through an anchor, and temporarily fixing the sea side end of the top steel tie rod (7) through a bracket; Step S5: backfilling medium-coarse sand between the wharf front wall (9) and the anchor wall (10) to the position of the bottom steel tie rod (8), applying tension to the bottom steel tie rod (8), and then continuing to backfill to 0.5 to 1 m below the position of the top steel tie rod (7); Step S6: Dredging is performed at the front of the wharf. After the deformation of the wharf front wall (9) is stabilized, the front rail track beam (2) is cast, and the top steel tie rod (7) and the cylinder body (17) of the hydraulic damping support (14) are cast together with the front rail track beam (2) through anchors; a seismic isolation groove (5) is reserved between the front rail track beam (2) and the breast wall (1); Step S7: applying tension to the top steel tie rod (7), and continuing to backfill in the wharf area to the designed top elevation; Step S8: opening the oil inlet (22) and the oil outlet (23) of the oil pressure damping support (14), and after the cavity of the cylinder body (17) is filled with damping oil, closing the oil inlet (22) and the oil outlet (23); Step S9: construct the wharf surface layer (15), and install a prefabricated reinforced concrete transition plate (4) between the wharf breast wall (1) and the front track beam (2).