Construction method suitable for unequal-depth adjacent foundation pits in soft soil area
By adopting the same-term construction method of inverted ox leg connecting structure in soft soil areas, the problems of construction troubles and high engineering cost of adjacent foundation pits from different depths are solved, and efficient and safe foundation pit construction is achieved, reducing project costs and increasing project costs The stability of the foundation pit.
Patent Information
- Application Number
- CN202411121411.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-15
- Publication Date
- 2024-11-01
AI Technical Summary
In soft soil areas, the existing technology of construction of adjacent foundation pits with different depths has problems of construction troubles and high engineering cost, especially due to the low soil bearing capacity and large deformation, which will cause excavation and enclosure of foundation pits. The requirements are high, and the existing methods require separate application of deep foundation pits and shallow foundation pits, and require a large amount of formation reinforcement.
A construction method is adopted, including the non-common enclosure structure of deep foundation pits and shallow foundation pits, and a common foundation pit enclosure structure is constructed between the two, and the shallow foundation pit bottom plate and the common foundation pit are connected by inverted ox leg connection structure. The enclosure structure is connected, and the stratigraphic reinforcement measures are abolished on the soil-facing side of the common foundation pit enclosure structure. The same-term construction method is adopted to excavate layer by layer and support layer by layer to reduce the stiffness of the common foundation pit enclosure structure.
This method can greatly improve construction efficiency, reduce project costs, reduce construction risks, and ensure construction safety. It provides lateral support and horizontal support stiffness through the inverted cow leg connection structure, avoid unnecessary formation reinforcement and improve the stability of the foundation pit and overall structural strength.
Smart Images

Figure CN118880896A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of foundation pits, and in particular to a construction method for adjacent foundation pits of unequal depths in soft soil areas. Background Art
[0002] With the continuous development of urban construction, it is common to build deep and large foundation pits in soft soil areas. Sometimes, due to engineering needs, it is necessary to build foundation pits of unequal depths at adjacent locations, or there are two parts of different depths in the same foundation pit. There are two main methods for the construction of adjacent foundation pits of unequal depths. One is to separate the two foundation pits, design independent retaining structures for each and stagger the construction. After the main structures in the two foundation pits are completed, the two main structures will be connected. On the one hand, this method increases the construction period. On the other hand, when the two main structures are connected after the construction is completed, the retaining structure at the connection part needs to be chiseled out. The construction is more troublesome and there are certain risks. The other is to adopt the simultaneous construction method, but in this case, the stiffness of the half-retaining structure is often designed to be very large, and at the same time, a large amount of stratum reinforcement treatment is required on the soil side of the half-retaining structure to ensure the safety of the foundation pit.
[0003] In view of this, it is necessary to propose a construction method suitable for adjacent foundation pits of unequal depths in soft soil areas to solve or at least alleviate the above defects. Summary of the invention
[0004] The main purpose of the present application is to provide a construction method for adjacent foundation pits of unequal depths in soft soil areas, so as to solve the technical problems of adjacent foundation pits of unequal depths in the prior art, such as construction difficulties and high engineering costs.
[0005] To achieve the above purpose, the present application provides a construction method for adjacent foundation pits of unequal depths in soft soil areas, comprising the following steps:
[0006] S1, construct a first non-shared enclosure structure for a deep foundation pit and a second non-shared enclosure structure for a shallow foundation pit, and construct a shared foundation pit enclosure structure between the first non-shared enclosure structure and the second non-shared enclosure structure; wherein the shared foundation pit enclosure structure and the first non-shared enclosure structure together enclose a deep foundation pit enclosure structure, and the shared foundation pit enclosure structure and the second non-shared enclosure structure together enclose a shallow foundation pit enclosure structure;
[0007] S2, excavating downward to a first depth in the deep foundation pit retaining structure and the shallow foundation pit retaining structure at the same time and dismantling the common foundation pit retaining structure corresponding to the first depth;
[0008] S3, constructing a shallow foundation pit floor and an inverted corbel connection structure at the same time at a position corresponding to the first depth; wherein the shallow foundation pit floor and the inverted corbel connection structure are cast together to form an integral structure;
[0009] S4, continue to excavate downward to a second depth in the deep foundation pit retaining structure, and construct a cap beam on the top of the remaining shared foundation pit retaining structure; wherein one end of the inverted corbel connection structure is connected to the bottom plate of the shallow foundation pit, and the other end is connected to the cap beam;
[0010] S5, continue to excavate downward to a third depth within the deep foundation pit retaining structure, and construct the deep foundation pit bottom plate and the remaining main structure.
[0011] Preferably, the step S2 specifically comprises the steps of:
[0012] S21, constructing a drainage well in the deep foundation pit retaining structure and the shallow foundation pit retaining structure at the same time;
[0013] S22, excavate downward from the ground to the i-th elevation, and construct the i-th deep foundation pit brace in the deep foundation pit retaining structure, and construct the i-th shallow foundation pit brace in the shallow foundation pit retaining structure, remove the shared foundation pit retaining structure corresponding to the i-th elevation, and then use the dewatering well to dewater the foundation pit; wherein i is a positive integer, the initial value of i is 1, both ends of the i-th deep foundation pit brace are connected to the first non-shared retaining structure, and both ends of the i-th shallow foundation pit brace are connected to the second non-shared retaining structure;
[0014] S23, continue to excavate downward from the i-th elevation to the i+1-th elevation, and construct the i+1-th deep foundation pit brace in the deep foundation pit retaining structure, and construct the i+1-th shallow foundation pit brace in the shallow foundation pit retaining structure, chisel out the shared foundation pit retaining structure corresponding to the i+1-th elevation, and then use the dewatering well to dewater the foundation pit; wherein both ends of the i+1-th deep foundation pit brace are connected to the first non-shared retaining structure, and both ends of the i+1-th shallow foundation pit brace are connected to the second non-shared retaining structure;
[0015] S24, determine whether the i+1th elevation is the elevation corresponding to the first depth; if so, go to step S3, if not, assign i+1 to i and return to step S23.
[0016] Preferably, the step S5 specifically comprises the steps of:
[0017] S51, excavating the jth depth footage downward from the second depth in the deep foundation pit retaining structure, constructing the jth deep foundation pit diagonal brace in the deep foundation pit retaining structure, and then using the dewatering well to dewater the foundation pit; wherein j is a positive integer, the initial value of j is 1, one end of the jth deep foundation pit diagonal brace is connected to the shared foundation pit retaining structure, and the other end is connected to the first non-shared retaining structure;
[0018] S52, continue to excavate the j+1th depth footage downward in the deep foundation pit retaining structure, and construct the j+1th deep foundation pit diagonal brace in the deep foundation pit retaining structure, and then use the dewatering well to dewater the foundation pit; wherein one end of the j+1th deep foundation pit diagonal brace is connected to the shared foundation pit retaining structure, and the other end is connected to the first non-shared retaining structure;
[0019] S53, determine whether the sum of the depth footage from the 1st to the j+1th depth footage is the third depth; if so, construct the deep foundation pit bottom plate and the remaining main structure; if not, assign j+1 to j and return to step S52.
[0020] Preferably, the step S2 and the step S3 further include the following steps:
[0021] Constructing a plurality of anti-pulling piles downward in the shallow foundation pit retaining structure;
[0022] A shallow foundation pit cushion layer is applied on the top of the pull-out piles and a plurality of shear keys are protruding from the side walls of the shallow foundation pit floor; wherein the reserved steel bars of the shallow foundation pit floor are connected to the reserved steel bars of the pull-out piles, and each of the shear keys is connected to the corresponding second non-shared retaining structure.
[0023] Preferably, the shallow foundation pit bottom plate and the shallow foundation pit cushion layer meet the following stress conditions:
[0024]
[0025] Where n is the number of shear keys, [τ 1i ] is the shear strength of the ith shear bond, S 1i is the cross-sectional area of the ith shear key, m is the number of pull-out piles, [τ 2j ] is the transverse shear strength of the jth pull-out pile, S 2j is the cross-sectional area of the jth anti-pullout pile, μ is the friction coefficient between the shallow foundation pit cushion and the underlying soil, G is the gravity of the shallow foundation pit bottom plate and the shallow foundation pit cushion, is the resultant force of the support reaction acting on the remaining common foundation pit retaining structure, l is the number of supports acting on the remaining common foundation pit retaining structure, and F k is the support reaction of the kth support, γ0 is the structural importance coefficient, γ F It is the sub-item coefficient of the basic combination.
[0026] Preferably, the difference between the second depth and the first depth is equal to the thickness of the bottom plate of the shallow foundation pit.
[0027] Preferably, the deep foundation pit braces, the shallow foundation pit braces and the deep foundation pit diagonal braces are all reinforced concrete structures.
[0028] Preferably, the common retaining structure includes a first section and a second section from top to bottom, the first section matches the depth of the shallow foundation pit, the first section is configured with a first skeleton steel bar and a first stirrup, the second section is configured with a second skeleton steel bar, a second stirrup and a longitudinal main reinforcement, wherein the first skeleton steel bar and the longitudinal main reinforcement are welded and connected, and the top of the longitudinal main reinforcement extends out of the crown beam and is anchored in the remaining main structure.
[0029] Preferably, a steel bar connector is reserved at one end of the shallow foundation pit floor close to the crown beam, one end of the steel bar connector is embedded in the interior of the shallow foundation pit floor, and the other end is anchored in the remaining main structure.
[0030] Compared with the prior art, this application has the following beneficial effects:
[0031] This application is particularly suitable for soft soil areas. Due to the low soil bearing capacity and large deformation in such areas, the requirements for foundation pit excavation and retaining structures are high. This application does not need to construct deep foundation pits and shallow foundation pits separately, and can be constructed in a simultaneous construction method, which can greatly improve construction efficiency and reduce project costs. The shallow foundation pit floor and the shared foundation pit retaining structure are connected by an inverted corbel connection structure. The shallow foundation pit floor provides lateral support reaction force for the shared foundation pit retaining structure. The shallow foundation pit floor and the inverted corbel connection structure provide horizontal support stiffness at the shared foundation pit retaining structure, thereby effectively reducing the stiffness of the shared foundation pit retaining structure itself, canceling the stratum reinforcement measures on the soil side of the shared foundation pit retaining structure, saving construction costs, and ensuring construction safety. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the structures shown in these drawings without paying any creative work.
[0033] Figure 1 It is a schematic diagram of a construction method in one embodiment of the present application;
[0034] Figure 2 This is a flowchart of the specific steps of step S2 in one embodiment of the present application;
[0035] Figure 3 This is a flowchart of the specific steps of step S5 in one embodiment of the present application;
[0036] Figure 4It is a schematic diagram of the structure after the first non-shared enclosure structure, the second non-shared enclosure structure and the shared foundation pit enclosure structure are constructed in one embodiment of the present application;
[0037] Figure 5 This is a schematic diagram of the structure when the construction reaches the bottom plate of the foundation pit in one embodiment of the present application;
[0038] Figure 6 This is a schematic diagram of the structure when the construction reaches the bottom plate of a deep foundation pit in another embodiment of the present application;
[0039] Figure 7 This is a structural schematic diagram of the remaining main structure after construction in one embodiment of the present application;
[0040] Figure 8 A schematic diagram of the force of a foundation pit retaining structure in one embodiment of the present application;
[0041] Fig. 9 It is a schematic top view of a shallow foundation pit in one embodiment of the present application;
[0042] Fig.10 It is a schematic diagram of the connection between the inverted corbel connection structure and the common foundation pit retaining structure and the shallow foundation pit bottom plate in one embodiment of the present application;
[0043] Fig.11 It is a schematic structural diagram of a common foundation pit retaining structure in one embodiment of the present application.
[0044] The purpose, features and advantages of this application will be further described in conjunction with the embodiments and with reference to the accompanying drawings.
[0045] Description of Figure Numbers:
[0046] 10. Deep foundation pit; 110. First non-shared retaining structure; 120. Deep foundation pit bottom plate; 130. Deep foundation pit bracing; 140. Deep foundation pit diagonal bracing; 20. Shallow foundation pit; 210. Shallow foundation pit bottom plate; 220. Shallow foundation pit bracing; 230. Shallow foundation pit cushion; 240. Shear key; 30. Shared foundation pit retaining structure; 310. Shared foundation pit retaining structure removed; 320. Remaining shared foundation pit retaining structure; 330. Crown beam; 340. First section; 341. First skeleton reinforcement; 350. Second section; 351. Longitudinal main reinforcement; 40. Inverted corbel connection structure; 410. Rebar connector; 50. Remaining main structure; 50. Pull-out piles. DETAILED DESCRIPTION
[0047] It should be understood that the specific embodiments described herein are only used to explain the present application and are not used to limit the present application.
[0048] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0049] It should be noted that all directional indications in the embodiments of the present application (such as up, down, left, right, front, back, etc.) are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.
[0050] In addition, the descriptions of "right part", "middle part" and the like in this application are only for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "right part" and "middle part" may explicitly or implicitly include at least one such feature. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in this field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by this application.
[0051] Please refer to the attached Figures 1 to 10 In one embodiment provided in the present application, a construction method for adjacent foundation pits of unequal depths in soft soil areas comprises the following steps:
[0052] S1, construct a first non-shared retaining structure 110 for the deep foundation pit 10 and a second non-shared retaining structure for the shallow foundation pit 20 (not shown in the figure), and construct a shared foundation pit retaining structure 30 between the first non-shared retaining structure 110 and the second non-shared retaining structure; wherein the shared foundation pit retaining structure 30 and the first non-shared retaining structure 110 together form a deep foundation pit retaining structure (not shown in the figure), and the shared foundation pit retaining structure 30 and the second non-shared retaining structure together form a shallow foundation pit retaining structure (not shown in the figure).
[0053] For example, the deep foundation pit 10 and the shallow foundation pit 20 are both rectangular foundation pits, then the first non-shared retaining structure 110 may be a three-sided retaining structure with an opening on one side close to the shallow foundation pit 20, the second non-shared retaining structure may be a three-sided retaining structure with an opening on one side close to the deep foundation pit 10, the shared foundation pit retaining structure 30 is located between the first non-shared retaining structure 110 and the second non-shared retaining structure, the shared foundation pit retaining structure 30 and the first non-shared retaining structure 110 together form a rectangular deep foundation pit retaining structure, and the shared foundation pit retaining structure 30 and the second non-shared retaining structure together form a rectangular shallow foundation pit retaining structure.
[0054] As a preferred example, the first non-shared enclosure structure 110, the second non-shared enclosure structure and the shared foundation pit enclosure structure 30 are all underground continuous walls, which have greater rigidity, can effectively resist the lateral earth pressure and groundwater pressure generated during the foundation pit excavation process, reduce the deformation and displacement of the foundation pit, ensure the overall stability and safety of the foundation pit project, and have good anti-seepage performance. Preferably, the thickness of the underground continuous wall is set between 0.8m and 1.2m. It can be understood that in other embodiments, the thickness of the underground continuous wall can also be set according to actual needs.
[0055] S2, excavating downward to a first depth in the deep foundation pit retaining structure and the shallow foundation pit retaining structure at the same time and demolishing the common foundation pit retaining structure 30 corresponding to the first depth; the present application does not need to construct the deep foundation pit 10 and the shallow foundation pit 20 separately, and can be constructed in a simultaneous construction manner, which can greatly improve construction efficiency and reduce engineering costs.
[0056] As a preferred implementation, step S2 specifically includes the following steps:
[0057] S21, dewatering wells are constructed in the deep foundation pit retaining structure and the shallow foundation pit retaining structure at the same time; for example, dewatering wells are constructed outside the foundation pit for dewatering the foundation pit. This part is a well-known technical means and will not be elaborated here.
[0058] S22, excavate from the ground downward to the i-th elevation, and construct the i-th deep foundation pit brace 130 in the deep foundation pit retaining structure, and construct the i-th shallow foundation pit 20 brace in the shallow foundation pit retaining structure, remove the shared foundation pit retaining structure 30 corresponding to the i-th elevation, and then use the dewatering well to dewater the foundation pit; wherein i is a positive integer, the initial value of i is 1, both ends of the i-th deep foundation pit brace 130 are connected to the first non-shared retaining structure 110, and both ends of the i-th shallow foundation pit 20 brace are connected to the second non-shared retaining structure;
[0059] S23, continue to excavate downward from the i-th elevation to the i+1-th elevation, and construct the i+1-th deep foundation pit brace 130 in the deep foundation pit retaining structure, and construct the i+1-th shallow foundation pit 20 brace in the shallow foundation pit retaining structure, chisel out the shared foundation pit retaining structure 30 corresponding to the i+1-th elevation, and then use the dewatering well to dewater the foundation pit; wherein both ends of the i+1-th deep foundation pit brace 130 are connected to the first non-shared retaining structure 110, and both ends of the i+1-th shallow foundation pit 20 brace are connected to the second non-shared retaining structure;
[0060] S24, determine whether the i+1th elevation is the elevation corresponding to the first depth; if so, proceed to step S3, if not, assign i+1 to i and return to step S23.
[0061] Specifically, this embodiment provides a preferred implementation method, in which dewatering wells are constructed in the deep foundation pit 10 and the shallow foundation pit retaining structure at the same time, and the foundation pit dewatering is carried out, which can effectively lower the groundwater level and reduce the buoyancy and seepage pressure of groundwater on the side walls of the foundation pit, thereby enhancing the stability of the foundation pit; during the excavation process, as the elevation decreases, the supporting structures of the deep foundation pit 10 and the shallow foundation pit 20 are gradually constructed, and these supporting structures provide stable and reliable support for the side walls of the foundation pit, effectively avoiding deformation and displacement of the side walls, and ensuring the stability of the foundation pit during the excavation process; through layer-by-layer excavation and support, the excavation depth is controlled within a safe range, avoiding safety accidents such as instability or collapse of the foundation pit due to excessive excavation.
[0062] This embodiment uses a cyclic operation method to determine whether to continue excavation and support, or to enter the next stage of construction by judging whether the current excavation elevation reaches the elevation corresponding to the first depth. This cyclic operation method improves the accuracy of foundation pit excavation and provides reliable guidance for foundation pit excavation. In addition, this embodiment can realize the simultaneous construction of the deep foundation pit 10 and the shallow foundation pit 20, thereby improving construction efficiency.
[0063] S3, constructing a shallow foundation pit bottom plate 210 and an inverted corbel connection structure 40 at the same time at the position corresponding to the first depth; wherein the shallow foundation pit bottom plate 210 and the inverted corbel connection structure 40 are cast together as an integral structure, see Fig. 9 ; Casting together as one increases the overall strength of the structure and improves its ability to resist deformation and damage.
[0064] S4, continue to excavate downward to a second depth in the deep foundation pit retaining structure, and construct a crown beam 330 on the top of the remaining common foundation pit retaining structure 320; wherein, one end of the inverted corbel connection structure 40 is connected to the shallow foundation pit bottom plate 210, and the other end is connected to the crown beam 330; as a preferred example, the difference between the second depth and the first depth is equal to the thickness of the shallow foundation pit bottom plate 210.
[0065] Specifically, the inverted corbel connection structure 40 increases the contact area between the shallow foundation pit bottom plate 210 and the crown beam 330, thereby improving the strength and stability of the connection. This structure can more effectively transmit and disperse the lateral earth pressure from the side wall of the foundation pit to prevent damage to the connection. The inverted corbel connection structure 40 can form a reasonable stress distribution at the connection and reduce stress concentration. The force analysis diagram can be referred to Figure 8 shown.
[0066] S5, continue to excavate downward to a third depth in the deep foundation pit retaining structure, and construct the deep foundation pit bottom plate 120 and the remaining main structure 50.
[0067] As a preferred implementation, the step S5 specifically includes the following steps:
[0068] S51, excavating the jth depth footage downward from the second depth in the deep foundation pit retaining structure, constructing the jth deep foundation pit diagonal brace 140 in the deep foundation pit retaining structure, and then using the dewatering well to dewater the foundation pit; wherein j is a positive integer, the initial value of j is 1, one end of the jth deep foundation pit diagonal brace 140 is connected to the shared foundation pit retaining structure 30, and the other end is connected to the first non-shared retaining structure 110;
[0069] S52, continue to excavate the j+1th depth footage downward in the deep foundation pit retaining structure, and construct the j+1th deep foundation pit diagonal brace 140 in the deep foundation pit retaining structure, and then use the dewatering well to dewater the foundation pit; wherein one end of the j+1th deep foundation pit diagonal brace 140 is connected to the shared foundation pit retaining structure 30, and the other end is connected to the first non-shared retaining structure 110;
[0070] S53, determine whether the sum of the depth footage from the 1st to the j+1th depth footage is the third depth; if so, construct the deep foundation pit bottom plate 120 and the remaining main structure 50; if not, assign j+1 to j and return to step S52.
[0071] Specifically, starting from the second depth, excavating each depth step downward step by step, and immediately constructing the corresponding deep foundation pit diagonal brace 140 after excavation, can effectively control the deformation and displacement of the side wall during the foundation pit excavation process, and ensure the stability of the foundation pit; after excavating each depth step, using the dewatering well to dewater the foundation pit can lower the groundwater level in the foundation pit, reduce the buoyancy and seepage pressure of groundwater on the side wall of the foundation pit, and further enhance the stability of the foundation pit; the construction method of gradual excavation and timely support can effectively reduce the risk of safety accidents such as collapse caused by too fast foundation pit excavation and untimely support; this embodiment adopts a cyclic operation method, by judging whether the current excavation depth reaches the third depth (corresponding to the design elevation of the deep foundation pit bottom plate 120), it is decided whether to continue excavation and support, or to start constructing the deep foundation pit bottom plate 120 and the remaining main structure 50. This cyclic operation method improves the accuracy of foundation pit excavation and provides reliable guidance for foundation pit excavation.
[0072] This application is particularly suitable for soft soil areas. Due to the low soil bearing capacity and large deformation in such areas, the requirements for foundation pit excavation and retaining structures are high. This application does not need to construct deep foundation pit 10 and shallow foundation pit 20 separately, and can be constructed in a simultaneous construction method, which can greatly improve construction efficiency and reduce project costs. The shallow foundation pit bottom plate 210 and the shared foundation pit retaining structure 30 are connected by an inverted corbel connection structure 40. The shallow foundation pit bottom plate 210 provides lateral support reaction force for the shared foundation pit retaining structure 30. The shallow foundation pit bottom plate 210 and the inverted corbel connection structure 40 provide horizontal support stiffness at the shared foundation pit retaining structure 30, thereby effectively reducing the stiffness of the shared foundation pit retaining structure 30 itself, canceling the stratum reinforcement measures on the soil side of the shared foundation pit retaining structure 30, saving construction costs, and ensuring construction safety.
[0073] As a preferred embodiment, the steps between step S2 and step S3 further include:
[0074] A plurality of anti-pulling piles 50 are installed downwardly in the shallow foundation pit retaining structure;
[0075] A shallow foundation pit cushion layer 230 is applied on the top of the pull-out pile 50 and a plurality of shear keys 240 are protruded from the side wall of the shallow foundation pit bottom plate 210; wherein the reserved steel bars of the shallow foundation pit bottom plate 210 are connected to the reserved steel bars of the pull-out pile 50, and each of the shear keys 240 is connected to the corresponding second non-shared retaining structure.
[0076] Furthermore, the shallow foundation pit bottom plate 210 and the shallow foundation pit cushion layer 230 meet the following stress conditions:
[0077]
[0078] Where n is the number of shear keys 240, [τ 1i] is the shear strength of the i-th shear key 240, S 1i is the cross-sectional area of the i-th shear key 240, m is the number of pull-out piles 50, [τ 2j ] is the transverse shear strength of the jth pull-out pile 50, S 2j is the cross-sectional area of the jth anti-pullout pile 50, μ is the friction coefficient between the shallow foundation pit cushion layer 230 and the lower soil, G is the gravity of the shallow foundation pit bottom plate 210 and the shallow foundation pit cushion layer 230, is the resultant force of the support reaction acting on the remaining common foundation pit retaining structure, l is the number of supports acting on the remaining common foundation pit retaining structure, and F k is the support reaction of the kth support, γ0 is the structural importance coefficient, and the structural importance coefficients of the supporting structures with safety levels of level 1, level 2, and level 3 are not less than 1.1, 1.0, and 0.9, respectively. F It is the partial coefficient of the basic combination, not less than 1.25.
[0079] Specifically, the stability of the foundation pit is directly related to the safety of the entire construction process, especially in soft soil areas. However, when the shallow foundation pit 20 is large, the base plate may not be completely constructed. By force analysis, that is, satisfying the above-mentioned formula conditions, the gravity of the shallow foundation pit cushion layer 230 and the shallow foundation pit base plate 210 is determined, and then the appropriate size of the shallow foundation pit cushion layer 230 and the shallow foundation pit base plate 210 is determined. This can reduce engineering costs while ensuring the safety and stability of the foundation pit and avoid unnecessary waste of materials.
[0080] The pull-out piles 50 and shear keys 240 are installed at the corresponding positions of the shallow foundation pit bottom plate 210. On the one hand, the pull-out piles 50 and shear keys 240 can provide a larger lateral stiffness for the bottom plate, and on the other hand, the pull-out piles 50 and shear keys 240 are more beneficial for resisting the floating uplift on the bottom plate. In soft soil areas, when the retaining structure is subjected to lateral force, the soil behind it is compressed and has a tendency to arch upward. By installing the pull-out piles 50 or shear keys 240, this arching tendency can be effectively resisted, which is beneficial to the safety of the structure.
[0081] In addition, this embodiment can also adaptively design the shallow foundation pit bottom plate 210 and the shallow foundation pit cushion layer 230 according to changes in geological conditions. For example, by adjusting the value of the friction coefficient μ (this value is affected by geological conditions and can be provided by a geological survey unit), the shallow foundation pit bottom plate 210 and the shallow foundation pit cushion layer 230 required under different geological conditions can be calculated, thereby ensuring that the stability of the foundation pit is not affected by changes in geological conditions.
[0082] In other embodiments, among the pull-out piles 50 and the shear keys 240, those skilled in the art may also choose to make only the pull-out piles 50 or the shear keys 240 as needed. For example, when only the shear keys 240 are made, the pull-out pile 50 part in the above formula is 0, and the corresponding shallow foundation pit cushion layer 230 and the gravity of the shallow foundation pit bottom plate 210 can be obtained by substituting them into the formula, thereby determining the appropriate size of the shallow foundation pit cushion layer 230 and the shallow foundation pit bottom plate 210.
[0083] Furthermore, the deep foundation pit brace 130, the shallow foundation pit brace 20, and the deep foundation pit diagonal brace 140 are all reinforced concrete structures. The reinforced concrete structure has a high bearing capacity and can effectively resist the huge lateral soil pressure and groundwater pressure generated during the foundation pit excavation process to ensure the stability and safety of the foundation pit. At the same time, the reinforced concrete structure has good durability.
[0084] As a preferred embodiment, the shared enclosure structure includes a first section 340 and a second section 350 from top to bottom, the first section 340 matches the depth of the shallow foundation pit 20, the first section 340 is configured with a first skeleton steel bar 341 and a first stirrup (not shown), the second section 350 is configured with a second skeleton steel bar (not shown), a second stirrup and a longitudinal main bar 351, wherein the first skeleton steel bar 341 and the longitudinal main bar 351 are welded and connected, and the top of the longitudinal main bar 351 extends out of the crown beam 330 and is anchored in the remaining main structure 50. The remaining main structure 50 is a conventional structure and is not described in detail here.
[0085] Specifically, for the convenience of chiseling, the chiseled portion of the first section 340 of the enclosure structure is only equipped with skeleton reinforcement and part of the stirrups, and the first skeleton reinforcement 341 is welded to the lower longitudinal main reinforcement 351. The lower longitudinal main reinforcement 351 needs to extend out of the crown beam 330 and be anchored into the remaining main structure 50 later.
[0086] Furthermore, a steel bar connector 410 is reserved at one end of the shallow foundation pit bottom plate 210 close to the crown beam 330 , one end of the steel bar connector 410 is embedded in the shallow foundation pit bottom plate 210 , and the other end is anchored in the remaining main structure 50 .
[0087] Specifically, a steel bar connector 410 is reserved at one end of the shallow foundation pit bottom plate 210 near the crown beam 330, so that the connection between the inverted corbel connection structure 40 and the crown beam 330 is more convenient. During the construction process, the reserved steel bar connector 410 can be used for connection, thereby improving the construction efficiency. The steel bar connector 410 and the remaining main structure 50 constructed later are connected into a whole, which can improve the overall structural strength of the foundation pit structure.
[0088] The above are only preferred embodiments of the present application, and are not intended to limit the patent scope of the present application. Any equivalent structure or equivalent process transformation made using the contents of the present application specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present application.
Claims
1. A construction method suitable for adjacent foundation pits of unequal depths in soft soil areas, characterized in that: Includes steps: S1, construct a first non-shared enclosure structure for a deep foundation pit and a second non-shared enclosure structure for a shallow foundation pit, and construct a shared foundation pit enclosure structure between the first non-shared enclosure structure and the second non-shared enclosure structure; wherein the shared foundation pit enclosure structure and the first non-shared enclosure structure together enclose a deep foundation pit enclosure structure, and the shared foundation pit enclosure structure and the second non-shared enclosure structure together enclose a shallow foundation pit enclosure structure; S2, excavating downward to a first depth in the deep foundation pit retaining structure and the shallow foundation pit retaining structure at the same time and dismantling the common foundation pit retaining structure corresponding to the first depth; S3, constructing a shallow foundation pit floor and an inverted corbel connection structure at the same time at a position corresponding to the first depth; wherein the shallow foundation pit floor and the inverted corbel connection structure are cast together to form an integral structure; S4, continue to excavate downward to a second depth in the deep foundation pit retaining structure, and construct a cap beam on the top of the remaining shared foundation pit retaining structure; wherein one end of the inverted corbel connection structure is connected to the bottom plate of the shallow foundation pit, and the other end is connected to the cap beam; S5, continue to excavate downward to a third depth within the deep foundation pit retaining structure, and construct the deep foundation pit bottom plate and the remaining main structure.
2. The construction method for adjacent foundation pits of unequal depths in soft soil areas according to claim 1 is characterized in that: The step S2 specifically includes the following steps: S21, constructing a drainage well in the deep foundation pit retaining structure and the shallow foundation pit retaining structure at the same time; S22, excavate downward from the ground to the i-th elevation, and construct the i-th deep foundation pit brace in the deep foundation pit retaining structure, and construct the i-th shallow foundation pit brace in the shallow foundation pit retaining structure, remove the shared foundation pit retaining structure corresponding to the i-th elevation, and then use the dewatering well to dewater the foundation pit; wherein i is a positive integer, the initial value of i is 1, both ends of the i-th deep foundation pit brace are connected to the first non-shared retaining structure, and both ends of the i-th shallow foundation pit brace are connected to the second non-shared retaining structure; S23, continue to excavate downward from the i-th elevation to the i+1-th elevation, and construct the i+1-th deep foundation pit brace in the deep foundation pit retaining structure, and construct the i+1-th shallow foundation pit brace in the shallow foundation pit retaining structure, chisel out the shared foundation pit retaining structure corresponding to the i+1-th elevation, and then use the dewatering well to dewater the foundation pit; wherein both ends of the i+1-th deep foundation pit brace are connected to the first non-shared retaining structure, and both ends of the i+1-th shallow foundation pit brace are connected to the second non-shared retaining structure; S24, determine whether the i+1th elevation is the elevation corresponding to the first depth; if so, go to step S3, if not, assign i+1 to i and return to step S23.
3. The construction method for adjacent foundation pits of unequal depths in soft soil areas according to claim 2 is characterized in that: The step S5 specifically comprises the following steps: S51, excavating the jth depth footage downward from the second depth in the deep foundation pit retaining structure, constructing the jth deep foundation pit diagonal brace in the deep foundation pit retaining structure, and then using the dewatering well to dewater the foundation pit; wherein j is a positive integer, the initial value of j is 1, one end of the jth deep foundation pit diagonal brace is connected to the shared foundation pit retaining structure, and the other end is connected to the first non-shared retaining structure; S52, continue to excavate the j+1th depth footage downward in the deep foundation pit retaining structure, and construct the j+1th deep foundation pit diagonal brace in the deep foundation pit retaining structure, and then use the dewatering well to dewater the foundation pit; wherein one end of the j+1th deep foundation pit diagonal brace is connected to the shared foundation pit retaining structure, and the other end is connected to the first non-shared retaining structure; S53, determine whether the sum of the depth footage from the 1st to the j+1th depth footage is the third depth; if so, construct the deep foundation pit bottom plate and the remaining main structure; if not, assign j+1 to j and return to step S52.
4. The construction method for adjacent foundation pits of unequal depths in soft soil areas according to claim 1 is characterized in that: The steps between step S2 and step S3 also include: Constructing a plurality of anti-pulling piles downward in the shallow foundation pit retaining structure; A shallow foundation pit cushion layer is applied on the top of the pull-out piles and a plurality of shear keys are protruding from the side walls of the shallow foundation pit floor; wherein the reserved steel bars of the shallow foundation pit floor are connected to the reserved steel bars of the pull-out piles, and each of the shear keys is connected to the corresponding second non-shared retaining structure.
5. The construction method for adjacent foundation pits of unequal depths in soft soil areas according to claim 4 is characterized in that: The shallow foundation pit bottom plate and the shallow foundation pit cushion layer meet the following stress conditions: Where n is the number of shear keys, [τ 1i ] is the shear strength of the ith shear bond, S 1i is the cross-sectional area of the ith shear key, m is the number of pull-out piles, [τ 2j ] is the transverse shear strength of the jth pull-out pile, S 2j is the cross-sectional area of the jth anti-pullout pile, μ is the friction coefficient between the shallow foundation pit cushion and the underlying soil, G is the gravity of the shallow foundation pit bottom plate and the shallow foundation pit cushion, is the resultant force of the support reaction acting on the remaining common foundation pit retaining structure, l is the number of supports acting on the remaining common foundation pit retaining structure, and F k is the support reaction of the kth support, γ0 is the structural importance coefficient, γ F It is the partial coefficient of the basic combination.
6. The construction method for adjacent foundation pits of unequal depths in soft soil areas according to claim 1, characterized in that: The difference between the second depth and the first depth is equal to the thickness of the bottom plate of the shallow foundation pit.
7. The construction method for adjacent foundation pits of unequal depths in soft soil areas according to claim 3 is characterized in that: The deep foundation pit bracing, the shallow foundation pit bracing and the deep foundation pit diagonal bracing are all reinforced concrete structures.
8. The construction method for adjacent foundation pits of unequal depths in soft soil areas according to claim 3 is characterized in that: The common enclosure structure includes a first section and a second section from top to bottom, wherein the first section matches the depth of the shallow foundation pit, the first section is provided with a first skeleton steel bar and a first stirrup, and the second section is provided with a second skeleton steel bar, a second stirrup and a longitudinal main reinforcement, wherein the first skeleton steel bar and the longitudinal main reinforcement are welded and connected, and the top of the longitudinal main reinforcement extends out of the crown beam and is anchored into the remaining main structure.
9. The construction method for adjacent foundation pits of unequal depths in soft soil areas according to claim 1, characterized in that: A steel bar connector is reserved at one end of the shallow foundation pit bottom plate close to the crown beam, one end of the steel bar connector is embedded in the interior of the shallow foundation pit bottom plate, and the other end is anchored in the remaining main structure.