House building foundation structure on heterogeneous stratum and construction method of house building foundation structure

By adopting a combined structure of raft slabs and pile foundation section bearings on the heterogeneous formation, combining waterproof coil layer and anchored steel bars, the damage and waterproofing problems caused by uneven settlement of loading and unloading platforms are solved, and the stability of the building is achieved. Improved waterproof performance.

CN118880924APending Publication Date: 2024-11-01CHINA RAILWAY FIRST GRP SECOND ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411264886.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

On the heterogeneous formation, uneven settlement of loading and unloading platforms leads to damage to the inclined surface of the bearing, damage to the waterproof structure, causing moisture reflux or leakage at the bottom of the building, affecting the normal use of factory equipment.

Method used

A building foundation structure on a heterogeneous strata is adopted, including the raft foundation section support and the pile foundation section support. Through the combined layout of shallow piles and deep piles, combined with the waterproof coil layer and anchored steel bar structure, the foundation weight distribution is adjusted. Enhance overall stability and prevent moisture penetration through grooves and multi-layer waterproof structures.

Benefits of technology

Effectively reduce the imbalance effect of the cover under lateral force, enhance overall stability, prevent moisture penetration, and ensure the stability and waterproof performance of the building.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118880924A_ABST
    Figure CN118880924A_ABST
Patent Text Reader

Abstract

The house building foundation structure comprises a bearing platform, a pile foundation, a plurality of bearing columns and a pile head waterproof structure, and the bearing platform comprises a raft foundation section bearing platform and a pile foundation section bearing platform; the raft foundation section bearing platform comprises a main body section and an extension section; the pile foundation section bearing platform comprises an upper bearing platform and a lower bearing platform which are positioned on the upper side and the lower side of the extension section; the plurality of bearing columns are arranged on the upper surface of the upper bearing platform; the pile foundation comprises a shallow pile and a deep pile, and the shallow pile is located between the deep pile and the main body section. The pile head waterproof structure comprises a cushion layer, a waterproof roll layer, a first waterproof layer and anchoring steel bars, and the cushion layer is provided with a groove; a second waterproof layer is further arranged above the head of the pile foundation, extends out of the edge of the head of the pile foundation and is connected with the first waterproof layer. The weight distribution of the foundation is adjusted, the unbalance effect of the bearing platform when the bearing platform is subjected to lateral force is relieved, and the overall stability of the bearing platform is enhanced by adjusting the layout of the pile foundation. The grooves are formed in the cushion layer, so that the waterproof roll layer is not prone to being separated from the side wall of the pile head, sealing is further enhanced through the first waterproof layer and the second waterproof layer, and water permeation is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building foundations, and in particular to a building foundation structure on a heterogeneous stratum and a construction method thereof. Background Art

[0002] The factory foundation cap often uses an inclined surface to increase the area of ​​the pressure surface and the bearing capacity to make the building more stable and safer. Since factories need to load and unload goods frequently, loading and unloading platforms are generally built when new factories are built to facilitate the loading and unloading operations of large loading and unloading trucks and freight trucks. However, due to the height difference of the loading and unloading platforms and the characteristics of the heterogeneous soil layer, the part of the loading and unloading platform located in the unloading area and the part of the factory building have uneven settlement. Affected by the settlement, the inclined surface of the cap is easy to damage the waterproof structure between the pile foundation head and the cap, causing moisture penetration and moisture return or even leakage at the bottom of the building, which in turn affects the normal use of the factory equipment installed below the ground. Summary of the invention

[0003] The present invention provides a building foundation structure on a heterogeneous stratum to solve the above technical problems.

[0004] In order to achieve the above object, the technical solution of the present invention is:

[0005] A foundation structure for building on a heterogeneous stratum comprises a cap, a pile foundation, a plurality of load-bearing columns and a pile head waterproof structure, wherein the cap comprises a raft foundation section cap and a pile foundation section cap; the raft foundation section cap comprises a main section and an extension section extending from the side wall of the main section, and the pile foundation section cap comprises an upper cap and a lower cap located at the upper and lower sides of the extension section; the side wall of the main section abuts against the side wall of the lower cap, the upper surface of the main section is higher than the upper surface of the lower cap, and the extension section covers the upper surface of the lower cap; the upper surface of the upper cap is flush with the upper surface of the main section, the upper cap abuts against the side wall of the main section, and the distance between the end of the upper cap away from the main section and the main section is smaller than the distance between the end of the lower cap away from the main section and the main section.

[0006] A number of load-bearing columns are arranged on the upper surface of the upper pedestal to support the building.

[0007] The pile foundation includes shallow piles and deep piles. The shallow piles and deep piles support the lower pedestal. The shallow piles are located between the deep piles and the main section.

[0008] The pile head waterproof structure includes: a cushion layer, a waterproof membrane layer, a first waterproof layer, and anchoring steel bars. The cushion layer is provided with a groove, which is arranged around the head of the pile foundation. Both side walls of the groove are inclined surfaces, and the side walls of the groove close to the pile foundation are connected to the outer peripheral surface of the pile foundation head; a second waterproof layer is also applied above the pile foundation head, and the second waterproof layer extends out of the edge of the pile foundation head and connects the end of the first waterproof layer toward the pile foundation.

[0009] Preferably, the raft foundation section cap adopts the raft foundation reinforcement binding process, and the pile foundation section cap adopts the pile foundation cap reinforcement binding process.

[0010] Preferably, the deep pile includes a first pile foundation and a second pile foundation, the first pile foundation is located between the shallow pile and the second pile foundation; the first pile foundation and the second pile foundation are connected by a plurality of additional reinforcements, and the additional reinforcements are respectively connected to the stirrups of the first pile foundation and the stirrups of the second pile foundation through a connecting assembly.

[0011] Preferably, the shallow piles are connected to the base cap connection structure through heterogeneous stratum reinforcement pipe piles; the heterogeneous stratum reinforcement pipe piles and base cap connection structure include: pipe piles, a well cage and a support plate, a number of connecting hooks are fixed to the inner wall of the pipe piles, and the several connecting hooks are arranged at the designed installation position at the bottom end of the well cage, and the connecting hooks can support the bottom end of the well cage.

[0012] Preferably, at least three limit blocks are fixed to the inner wall of the pipe pile, the limit blocks are located below the connecting hook, and the three limit blocks form a positioning surface; the support plate is located between the connecting hook and the positioning surface, and an elastic member is arranged between the support plate and the positioning surface, the lower end of the elastic member is fixedly connected to the limit block, and the elastic member is used to support the support plate.

[0013] Preferably, the groove includes: a first side wall, a second side wall and a groove bottom plane, the first side wall is inclined downward and connected to an end of the groove bottom plane away from the pile foundation, the end of the groove bottom plane facing the pile foundation is inclined upward and connected to the second side wall, and the end of the second side wall away from the groove bottom plane is connected to the outer peripheral surface of the pile foundation head.

[0014] Preferably, the waterproof roll material layer includes a waterproof roll material and an additional waterproof roll material, the waterproof roll material is applied on the entire cushion layer, and the additional waterproof roll material is applied on the waterproof roll material and is located above the groove.

[0015] Preferably, a first sealant is applied between the waterproof coiled material layer and the outer peripheral surface of the pile foundation head.

[0016] Preferably, a water stop ring is provided on the anchor steel bar, and the water stop ring is made of a rubber material that expands when in contact with water; a steel casing is arranged outside the water stop ring, and a clamp is installed on the outer periphery of the steel casing.

[0017] A construction method for a building foundation structure on a heterogeneous stratum comprises the following steps:

[0018] S1. Construction of shallow piles and deep piles;

[0019] S2, apply cushion layer;

[0020] S3. Lay a waterproof membrane layer on the cushion layer;

[0021] S4, apply the second waterproof layer after applying the first waterproof layer;

[0022] S5. Tie the steel frame of the lower cap of the pile foundation section above the shallow piles and deep piles;

[0023] S6. Tie the steel frame of the main section of the raft foundation section cap on the side of the steel frame of the lower cap, and tie the steel frame of the extension section of the raft foundation section cap on the upper side of the steel frame of the lower cap;

[0024] S7. Tie the steel frame of the upper cap of the pile foundation section onto the steel frame of the extension section;

[0025] S8. Pour concrete in one piece and construct the cap;

[0026] S9. Tie the steel frame of the load-bearing column on the upper pedestal and install the forming formwork of the load-bearing column, and pour concrete to construct the load-bearing column;

[0027] S10. Remove the forming formwork of the load-bearing column.

[0028] Beneficial effects:

[0029] The present application discloses a building foundation structure on a non-homogeneous stratum, which reduces the unbalanced effect of the pedestal when subjected to lateral force by reasonably selecting the foundation type and adjusting the foundation weight distribution, thereby enhancing the overall stability; and by adjusting the specific layout of the pile foundation, the overall stability of the pedestal is enhanced, effectively resisting the possible overturning moment. For the slight inclination of the pedestal, a groove is set on the cushion layer so that the waterproof roll material layer is not easy to separate from the side wall of the pile head, and the first waterproof layer and the second waterproof layer cooperate to further strengthen the seal and avoid moisture penetration. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0031] Figure 1 It is a structural schematic diagram of a foundation structure for building on a heterogeneous stratum disclosed in Example 1 of the present invention;

[0032] Figure 2 This is a schematic structural diagram of a deep pile of a building foundation structure on a heterogeneous stratum disclosed in Example 1 of the present invention;

[0033] Figure 3 It is a schematic diagram of additional reinforcement and stirrups of a building foundation structure on a heterogeneous stratum disclosed in Example 1 of the present invention being connected by cross fasteners;

[0034] Figure 4 The structural diagram of the connection structure between the heterogeneous stratum reinforcement pipe pile and the cap disclosed in Example 2 of the present invention Figure 1 ;

[0035] Figure 5 The structural diagram of the connection structure between the heterogeneous stratum reinforcement pipe pile and the cap disclosed in Example 2 of the present invention Figure 2 ;

[0036] Figure 6 The structural diagram of the connection structure between the heterogeneous stratum reinforcement pipe pile and the cap disclosed in Example 2 of the present invention Figure 3 ;

[0037] Figure 7 It is a schematic structural diagram of a basement pile head waterproof structure in a heterogeneous stratum disclosed in Example 3 of the present invention;

[0038] Figure 8 for Figure 7 A partial enlarged view of middle A;

[0039] Fig. 9 A top view of a basement pile head waterproof structure in a heterogeneous stratum disclosed in Example 3 of the present invention;

[0040] Fig.10 It is a schematic diagram of the waterproofing coiled material layer of the basement pile head waterproofing structure in the heterogeneous stratum disclosed in Example 3 of the present invention;

[0041] Fig.11 This is a schematic diagram of the assembly of a water stop ring, anchor steel bars, steel casing and clamps of a basement pile head waterproof structure in a heterogeneous stratum disclosed in Example 3 of the present invention.

[0042] 1. Cap; 11. Cap of raft foundation section; 111. Main section; 112. Extension section; 12. Cap of pile foundation section; 121. Upper cap; 122. Lower cap;

[0043] 21. Shallow pile; 22. Deep pile; 221. First pile foundation; 222. Second pile foundation; 223. Additional reinforcement; 224. Stirrups; 225. Cross fastener; 226. Anchor reinforcement; 23. Pipe pile; 24. Well cage; 25. Support plate; 26. Connecting hook; 27. Limit block; 28. Elastic member;

[0044] 31. Soft soil layer; 32. Hard rock layer; 33. Plain fill layer; 4. Cushion layer;

[0045] 51, first waterproof layer; 52, second waterproof layer; 531, first side wall; 532, second side wall; 533, groove bottom plane;

[0046] 61. Waterproofing membrane; 62. Additional waterproofing membrane; 63. First sealant; 64. Water stop ring; 65. Second sealant; 66. Steel casing; 67. Clamp;

[0047] 7. Load-bearing columns. DETAILED DESCRIPTION

[0048] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0049] Example 1

[0050] A building foundation structure on a heterogeneous stratum, combined with Figure 1 , Figure 7 and Figure 8 As shown, it includes a cap 1, a pile foundation, a plurality of load-bearing columns 7 and a basement pile head waterproof structure in a heterogeneous stratum, the cap 1 includes a raft foundation section cap 11 and a pile foundation section cap 12; the raft foundation section cap 11 includes a main section 111 and an extension section 112 extending from the side wall of the main section 111, the pile foundation section cap 12 includes an upper cap 121 and a lower cap 122 located at the upper and lower sides of the extension section 112; the side wall of the main section 111 abuts against the side wall of the lower cap 122, the upper surface of the main section 111 is higher than the upper surface of the lower cap 122, and the extension section 112 covers the lower cap 1 22; the upper surface of the upper pedestal 121 is flush with the upper surface of the main section 111, the upper pedestal 121 abuts against the side wall of the main section 111, the distance between the end of the upper pedestal 121 away from the main section 111 and the main section 111 is smaller than the distance between the end of the lower pedestal 122 away from the main section 111 and the main section 111; a plurality of load-bearing columns 7 are arranged on the upper surface of the upper pedestal 121 for supporting the building construction; the pile foundation includes shallow piles 21 and deep piles 22, the shallow piles 21 and the deep piles 22 support the lower pedestal 122, and the shallow piles 21 are located between the deep piles 22 and the main section 111. The basement pile head waterproofing structure in the heterogeneous stratum includes: a cushion layer 4, a waterproof membrane layer, a first waterproof layer 51, and anchoring steel bars 226. The cushion layer 4 is provided with a groove, which is arranged around the head of the pile foundation. Both side walls of the groove are inclined surfaces, and the side walls of the groove close to the pile foundation are connected to the outer peripheral surface of the pile foundation head; a second waterproof layer 52 is also applied above the pile foundation head, and the second waterproof layer 52 extends out of the edge of the pile foundation head and connects the end of the first waterproof layer 51 toward the pile foundation.

[0051] First, by reasonably selecting the foundation type, the raft foundation section cap 11 and the pile foundation section cap 12 are used in different regions to adjust the weight distribution of the building foundation, reduce the unbalanced effect of the cap 1 when subjected to lateral force, and thus enhance the overall stability. Secondly, by adjusting the specific layout of the pile foundation, shallow piles 21 are used on the side that is prone to settlement, and deep piles 22 are used on the side that is prone to uplift. They not only bear vertical loads, but also resist horizontal forces through their deep anchoring effect, effectively resisting possible overturning moments, thereby ensuring the stability of the cap 1 and several load-bearing columns 7. These comprehensive measures work together to ensure the stability and reliability of the cap 1 and the load-bearing columns 7 in various complex environments, making the entire building foundation stable, firm and safe; at the same time, they also provide solid guarantees for the safe loading and unloading of goods, which is conducive to improving the efficiency of loading and unloading operations and making the logistics and transportation of the project smoother. The pile head waterproof structure is achieved by setting a groove on the cushion layer 4, and then laying a waterproof roll material layer, a first waterproof layer 51 and a second waterproof layer 52 on the cushion layer 4, and the second waterproof layer 52 is connected and sealed with the first waterproof layer 51. For the slight inclination of the cap 1, the cap slope will act on the waterproof roll material layer located on the inclined surface of the groove away from the pile foundation and the waterproof roll material layer located at the bottom of the groove. The expansion and contraction characteristics of the waterproof roll material layer itself can compensate for the influence of the cap slope, and avoid the waterproof roll material layer located on the inclined surface of the groove close to the pile foundation from separating from the side wall of the pile foundation to form a seepage gap. For the waterproof roll material layer where the cap slope acts on the inclined surface of the groove close to the pile foundation, the force of the cap slope makes this part of the waterproof roll material layer approach the side wall of the pile foundation. In summary, the combined effect of the above-mentioned structure can prevent moisture from penetrating from the side wall of the pile head and ensure the waterproofing of the factory.

[0052] Preferably, the raft foundation section cap 11 adopts the raft foundation steel bar binding process, and a lightweight raft foundation steel bar binding process is adopted on the higher side, and it covers the entire foundation, which not only reduces the weight of the area, but also helps to disperse the load, and can also achieve close integration with the pile foundation section cap 12. The pile foundation section cap 12 adopts the pile foundation cap steel bar binding process. This foundation can go deep into the ground, provide stronger support, and have good economic benefits. The raft foundation section cap 11 and the pile foundation section cap 12 are cast and formed in one piece. The raft foundation section cap 11 and the pile foundation section cap 12 are combined through different steel bar binding techniques to ensure the overall strength and stability after the integrated casting.

[0053] Preferably, combined Figure 1 , Figure 2 and Figure 3As shown, the deep pile 22 includes a first pile foundation 221 and a second pile foundation 222. The first pile foundation 221 is located between the shallow pile 21 and the second pile foundation 222. The first pile foundation 221 and the second pile foundation 222 are connected by a plurality of additional ribs 223. The additional ribs 223 are connected to the stirrups 224 of the first pile foundation 221 and the stirrups 224 of the second pile foundation 222 through a connecting assembly. By adding the additional ribs 223 to connect the first pile foundation 221 and the second pile foundation 222, the pull-out resistance of the deep pile 22 is fully utilized to resist the tilting tendency.

[0054] Preferably, the connection assembly uses a cross fastener 225 to ensure that the additional reinforcement 223 and the stirrup 224 are tightly combined.

[0055] Preferably, the shallow piles 21 , the first pile foundation 221 and the second pile foundation 222 are all end-bearing piles, so that they can well bear the vertical load transmitted by the cap 1 .

[0056] Preferably, the cap 1 is arranged on the soft soil layer 31, and the shallow piles 21, the first pile foundation 221 and the second pile foundation 222 extend to the hard rock layer 32, so that the pile foundation can be more firmly embedded in the stratum, thereby greatly improving its anti-pullout performance, ensuring that even under extreme conditions, the cap 1 can remain stable and will not tilt unfavorably.

[0057] Example 2

[0058] The difference between this embodiment and embodiment 1 is that the shallow pile 21 is connected to the cap connection structure through a heterogeneous stratum reinforcement pipe pile.

[0059] Combination Figure 4 , Figure 5 and Figure 6 As shown, the connection structure between the pipe pile and the cap for reinforcing the heterogeneous stratum includes: a pipe pile 23, a cage 24 and a support plate 25. A plurality of connecting hooks 26 are fixed to the inner wall of the pipe pile 23. The plurality of connecting hooks 26 are arranged at the designed installation position at the bottom of the cage 24. The connecting hooks 26 can support the bottom of the cage 24. By arranging a plurality of connecting hooks 26 on the inner wall of the pipe pile 23 to support the bottom of the cage 24, the position of the bottom of the cage 24 is limited, and the cage 24 is ensured to be lowered to the designed installation position. It avoids the need to erect steel bars above the end of the pipe pile 23, which is convenient for workers to construct, and improves the construction efficiency and ensures the construction safety.

[0060] Preferably, a plurality of connecting hooks 26 are evenly distributed on the inner wall of the pipe pile 23 circumferentially, so that the connecting hooks 26 evenly and reliably support the bottom end of the well cage 24 .

[0061] Preferably, the connecting hook 26 is "L"-shaped, with the short side of the connecting hook 26 fixed to the inner wall of the pipe pile 23 and the long side arranged vertically upward. When the well cage 24 is lowered, it can be sleeved on the long sides of several connecting hooks 26, playing a certain positioning role and preventing the well cage 24 from shaking.

[0062] Specifically, the pipe pile 23 is a steel pipe pile, and the end of the short side of the connecting hook 26 is welded and fixed to the inner wall of the pipe pile 23 .

[0063] Preferably, the well cage 24 is also provided with anchoring steel bars 226 , which are buried in the cap 1 to strengthen the connection between the pile foundation and the cap 1 .

[0064] Preferably, at least three limit blocks 27 are fixed to the inner wall of the pipe pile 23. The limit blocks 27 are located below the connecting hook 26. The three limit blocks 27 form a positioning surface. The support plate 25 is located between the connecting hook 26 and the positioning surface. An elastic member 28 is provided between the support plate 25 and the positioning surface. The lower end of the elastic member 28 is fixedly connected to the limit blocks 27. The elastic member 28 is used to support the support plate 25. Under the action of the poured concrete, the support plate 25 continuously compresses the elastic member 28 and continuously sinks until the support plate 25 abuts against the limit blocks 27, and then the support plate 25 stops descending. Compared with the previous manual throwing, this structure can more accurately place the support plate 25 at the specified position, so that the connection structure is more stable after the concrete is poured.

[0065] Specifically, the limit block 27 is welded and fixed to the inner wall of the pipe pile 23 , and the elastic member 28 is a single-layer wave spring, and the lower end of the spring is welded and fixed to the upper surface of the limit block 27 .

[0066] Preferably, a cushion layer 4 is further included, and the top end of the pipe pile 23 passes through the cushion layer 4 .

[0067] Example 3

[0068] The difference between this embodiment and embodiment 1 lies in the basement pile head waterproof structure in the heterogeneous stratum.

[0069] Preferably, combined Figure 7 , Figure 8 , Fig. 9 , Fig.10 and Fig.11 As shown, the groove includes: a first side wall 531, a second side wall 532 and a groove bottom plane 533. The first side wall 531 is tilted downward and connected to the end of the groove bottom plane 533 away from the pile foundation. The end of the groove bottom plane 533 facing the pile foundation is tilted upward and connected to the second side wall 532. The end of the second side wall 532 away from the groove bottom plane 533 is connected to the outer peripheral surface of the pile foundation head. The setting of the groove prevents moisture from flowing obliquely downward along the waterproof membrane layer to the connection gap between the waterproof membrane layer and the side wall of the pile head, thereby preventing leakage caused by gaps around the pile head due to the shrinkage of the concrete itself.

[0070] Preferably, the first waterproof layer 51 is a 50mm thick 1:2 polymer cement waterproof mortar waterproof layer, and the second waterproof layer 52 is a 50mm thick 1:2.5 polymer cement waterproof mortar waterproof layer.

[0071] Specifically, the second waterproof layer 52 overlaps the first waterproof layer 51 and covers the connection position between the first waterproof layer 51 and the side wall of the pile foundation. After application, the first waterproof layer 51 and the second waterproof layer 52 solidify together to form a good connection and seal.

[0072] Preferably, the waterproof roll material layer includes a waterproof roll material 61 and an additional waterproof roll material 62. The waterproof roll material 61 is applied on the entire cushion layer 4, and the additional waterproof roll material 62 is applied on the waterproof roll material 61 and located above the groove to enhance the waterproof ability of the groove portion.

[0073] Preferably, a first sealant 63 is applied between the waterproof membrane layer and the outer peripheral surface of the pile foundation head to prevent the shrinkage of the concrete itself from causing a gap to appear at the connection between the waterproof membrane layer and the side wall of the pile head.

[0074] Specifically, the first sealant 63 is a single-component polyurethane sealant, which has excellent bonding properties and weather resistance and can effectively prevent water penetration.

[0075] Preferably, a plain filling layer 33 is applied under the cushion layer 4 to form an initial groove shape, which is convenient for applying the cushion layer 4 .

[0076] Preferably, a water stop ring 64 is provided on the anchoring steel bar 226, and the water stop ring 64 is made of a water-swelling rubber material. When the water stop ring 64 encounters water, it will expand rapidly and fit tightly on the surface of the anchoring steel bar 226, thereby forming an effective waterproof barrier to prevent water penetration.

[0077] Preferably, the bottom of the water stop ring 64 is bonded to the second waterproof layer 52 by the second sealant 65 to fix the water stop ring 64. In this embodiment, the second sealant 65 is also a single-component polyurethane sealant.

[0078] Preferably, a steel sleeve 66 is disposed outside the water stop ring 64, and a clamp 67 is installed on the outer periphery of the steel sleeve 66 to prevent the water stop ring 64 from absorbing water excessively, causing changes in shape and size, or even displacement, thereby affecting its normal waterproof effect.

[0079] Example 4

[0080] This embodiment provides a construction method for a building foundation structure on a heterogeneous stratum, comprising the following steps:

[0081] S1. Construction of shallow piles and deep piles:

[0082] S11. Construction of shallow piles:

[0083] A connecting hook is welded on the inner wall of the pipe pile, and the support plate is placed in the pipe pile; a spring is welded on the limit block, and then the spring and the limit block are installed in the pipe pile, and the limit block is fixed on the inner wall of the pipe pile by welding.

[0084] Clean the construction area, use a drilling rig to drill holes, and drill the pipe piles into the ground according to the design requirements until they reach the hard rock layer. The depth of the shallow piles and deep piles reaches the designed depth and maintains verticality.

[0085] The cage is lifted by a crane and lowered into the pipe pile until the hook is connected to support the cage.

[0086] Pour C35 concrete into the pile, the support plate sinks continuously under the gravity of the C35 concrete, and the spring is continuously compressed until the spring is flattened and the support plate stops sinking after it hits the limit block. Stop pouring when the C35 concrete reaches the bottom of the cage.

[0087] After the cage inspection is completed, concrete pouring shall be carried out immediately. During the pouring of concrete, vibration, flushing, compaction and other process operations need to be carried out simultaneously.

[0088] After the pouring is completed, maintenance and strength testing are required to ensure the quality and stability of the shallow piles.

[0089] S12. Construction of deep piles:

[0090] Positioning and laying out, excavating the soil to obtain pile holes for installing the first pile foundation and the second pile foundation.

[0091] The steel cages of the first pile foundation and the second pile foundation are hoisted by a crane, and the additional reinforcement is fixed on the steel cages of the first pile foundation and the second pile foundation by cross fasteners.

[0092] Backfill the soil between the steel cages, then pour concrete and cure to obtain deep piles.

[0093] S2. The plain fill layer is compacted around the shallow piles and deep piles to obtain the plain fill layer, which is used as the initial outline of the groove to provide a basis for subsequent work. Then, C15 concrete is poured on the plain fill layer to obtain the cushion layer.

[0094] S3. Lay the waterproofing membrane on the cushion layer, and lay the additional waterproofing membrane at the position corresponding to the groove on the waterproofing membrane; during the laying process, it is necessary to ensure that the membrane is flat and wrinkle-free to maximize its waterproof performance. Apply a single-component polyurethane sealant to the connection between the waterproofing membrane, the additional waterproofing membrane and the outer periphery of the pile for bonding and sealing.

[0095] S4. Use 50mm thick 1:2 polymer cement waterproof mortar to smoothen and form the first waterproof layer. Manually clean the pile head, wash away the debris, and use 50mm thick 1:2.5 polymer cement waterproof mortar to smoothen and form the second waterproof layer at the pile head. The second waterproof layer extends outward beyond the edge of the pile head and is smoothed onto the first waterproof layer.

[0096] A water stop ring is sleeved on the anchoring steel bar, and the water stop ring is bonded to the second waterproof layer by means of a single-component polyurethane sealant; a steel casing is sleeved outside the water stop ring and is clamped with a clamp.

[0097] S5. Tie the steel frame of the lower pedestal of the pile foundation section above the shallow piles and deep piles.

[0098] S6. Tie the steel frame of the main section of the raft foundation section cap on the side of the steel frame of the lower cap, and tie the steel frame of the extension section of the raft foundation section cap on the top of the steel frame of the lower cap.

[0099] S7. Tie the steel frame of the upper pedestal of the pile foundation section onto the steel frame of the extension section.

[0100] S8. Pour concrete in one piece and construct the foundation.

[0101] S9. Tie the steel frame of the load-bearing column on the upper pedestal and install the forming formwork of the load-bearing column, and pour concrete to construct the load-bearing column;

[0102] S10. Remove the forming formwork of the load-bearing column.

[0103] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A building foundation structure on a heterogeneous stratum, comprising a cap (1), a pile foundation, a plurality of load-bearing columns (7) and a pile head waterproof structure, characterized in that: The cap (1) comprises a raft foundation section cap (11) and a pile foundation section cap (12); the raft foundation section cap (11) comprises a main section (111) and an extension section (112) extending from the side wall of the main section (111); the pile foundation section cap (12) comprises an upper cap (121) and a lower cap (122) located at the upper and lower sides of the extension section (112); the side wall of the main section (111) abuts against the side wall of the lower cap (122); the upper surface of the main section (111) is higher than the lower surface of the lower cap (122); The upper surface of the lower support platform (122) is covered by the extension section (112); the upper surface of the upper support platform (121) is flush with the upper surface of the main section (111); the upper support platform (121) abuts against the side wall of the main section (111); the distance between one end of the upper support platform (121) away from the main section (111) and the main section (111) is smaller than the distance between one end of the lower support platform (122) away from the main section (111) and the main section (111); A plurality of load-bearing columns (7) are arranged on the upper surface of the upper support platform (121) for supporting the building; The pile foundation comprises shallow piles (21) and deep piles (22), wherein the shallow piles (21) and the deep piles (22) support the lower cap (122), and the shallow piles (21) are located between the deep piles (22) and the main body section (111); The pile head waterproof structure comprises: a cushion layer (4), a waterproof coiled material layer, a first waterproof layer (51), and anchoring steel bars (226); the cushion layer (4) is provided with a groove, the groove is arranged around the head of the pile foundation, both side walls of the groove are inclined surfaces, the side wall of the groove close to the pile foundation is connected to the outer peripheral surface of the pile foundation head; a second waterproof layer (52) is also applied above the pile foundation head, the second waterproof layer (52) extends out of the edge of the pile foundation head and connects the end of the first waterproof layer (51) toward the pile foundation.

2. A building foundation structure on a heterogeneous stratum according to claim 1, characterized in that: The raft foundation section cap (11) adopts a raft foundation reinforcement binding process, and the pile foundation section cap (12) adopts a pile foundation cap reinforcement binding process.

3. The building foundation structure on a heterogeneous stratum according to claim 1, characterized in that: The deep pile (22) comprises a first pile foundation (221) and a second pile foundation (222), wherein the first pile foundation (221) is located between the shallow pile (21) and the second pile foundation (222); the first pile foundation (221) and the second pile foundation (222) are connected via a plurality of additional reinforcements (223), wherein the additional reinforcements (223) are respectively connected to the stirrups (224) of the first pile foundation (221) and the stirrups (224) of the second pile foundation (222) via a connecting assembly.

4. The building foundation structure on a heterogeneous stratum according to claim 1, characterized in that: The shallow pile (21) is connected to the capping platform connection structure through a heterogeneous stratum reinforcement pipe pile; the heterogeneous stratum reinforcement pipe pile and the capping platform connection structure comprises: a pipe pile (23), a well cage (24) and a support plate (25); a plurality of connection hooks (26) are fixed to the inner wall of the pipe pile (23); the plurality of connection hooks (26) are arranged at the designed installation position at the bottom end of the well cage (24); and the connection hooks (26) can support the bottom end of the well cage (24).

5. A building foundation structure on a heterogeneous stratum according to claim 4, characterized in that: At least three limit blocks (27) are fixed to the inner wall of the pipe pile (23), and the limit blocks (27) are located below the connecting hook (26). The three limit blocks (27) form a positioning surface; the support plate (25) is located between the connecting hook (26) and the positioning surface, and an elastic member (28) is provided between the support plate (25) and the positioning surface. The lower end of the elastic member (28) is fixedly connected to the limit block (27), and the elastic member (28) is used to support the support plate (25).

6. The building foundation structure on a heterogeneous stratum according to claim 1, characterized in that: The groove comprises: a first side wall (531), a second side wall (532) and a groove bottom plane (533); the first side wall (531) is inclined downward and connected to an end of the groove bottom plane (533) away from the pile foundation; an end of the groove bottom plane (533) facing the pile foundation is inclined upward and connected to the second side wall (532); an end of the second side wall (532) away from the groove bottom plane (533) is connected to the outer peripheral surface of the pile foundation head.

7. A building foundation structure on a heterogeneous stratum according to claim 6, characterized in that: The waterproof roll material layer comprises a waterproof roll material (61) and an additional waterproof roll material (62), wherein the waterproof roll material (61) is applied on the entire cushion layer (4), and the additional waterproof roll material (62) is applied on the waterproof roll material (61) and is located above the groove.

8. The building foundation structure on a heterogeneous stratum according to claim 7, characterized in that: A first sealant (63) is coated between the waterproof coiled material layer and the outer peripheral surface of the pile foundation head.

9. The building foundation structure on a heterogeneous stratum according to claim 6, characterized in that: The anchoring steel bar (226) is provided with a water stop ring (64), and the water stop ring (64) is made of a rubber material that expands when in contact with water; a steel sleeve (66) is arranged outside the water stop ring (64), and a clamp (67) is installed on the outer periphery of the steel sleeve (66).

10. A construction method for a building foundation structure on a heterogeneous stratum according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1. Construction of shallow piles and deep piles; S2, apply cushion layer; S3. Lay a waterproof membrane layer on the cushion layer; S4, apply the second waterproof layer after applying the first waterproof layer; S5. Tie the steel frame of the lower cap of the pile foundation section above the shallow piles and deep piles; S6. Tie the steel frame of the main section of the raft foundation section cap on the side of the steel frame of the lower cap, and tie the steel frame of the extension section of the raft foundation section cap on the upper side of the steel frame of the lower cap; S7. Tie the steel frame of the upper cap of the pile foundation section onto the steel frame of the extension section; S8. Cast concrete in one piece and construct the cap; S9. Tie the steel frame of the load-bearing column on the upper pedestal and install the forming formwork of the load-bearing column, and pour concrete to construct the load-bearing column; S10. Remove the forming formwork of the load-bearing column.