Utility tunnel pipeline buttress assembly type installation method
Through precast concrete pipeline piers and grouting technology, the problems of low construction efficiency and high safety risks in the existing technology are solved, efficient and safe installation of pipeline piers is achieved, cost and labor investment is reduced, and construction accuracy and appearance are improved. quality.
Patent Information
- Application Number
- CN202411087970.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-08
- Publication Date
- 2024-11-01
AI Technical Summary
The existing municipal comprehensive pipeline piers adopt the cast-in-place reinforced concrete construction method, resulting in low construction efficiency, high cost, high safety risks, and involve special operations, serious air pollution, and inconvenient materials and equipment entry and exit.
Precast concrete pipeline piers are used, reserved holes, embedded anchor ribs and sleeves are set up inside, and they are hoisted into the pipe corridor. Fixed connections are used using grouting templates and gravity grouting methods to reduce the use of on-site materials and equipment, improve positioning accuracy and Construction efficiency.
It reduces construction costs and safety risks, improves construction efficiency and concrete appearance quality, reduces concrete transportation frequency and labor investment, and improves the positioning accuracy of embedded parts.
Smart Images

Figure CN118880932A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of municipal integrated pipe gallery construction, and more specifically relates to an assembled installation method for pipe piers of an integrated pipe gallery. Background Art
[0002] The existing municipal integrated pipe corridor pipeline piers adopt the in-situ cast-in-place construction method of reinforced concrete. The anchor steel bars are embedded before the concrete pouring of the pier steel corridor, and the secondary construction is carried out after the main structure of the corridor is completed. The secondary construction is all limited space operations. The pier steel bars need to be welded, which seriously pollutes the air in the corridor and is a special operation; the template edge line needs to be measured and positioned again, and the arc pad and other embedded parts need to be firmly fixed to the template; the pier concrete needs to be transported vertically from the lifting port to the corridor, and then transported horizontally to the pouring point by a trolley. All the above processes are completed by manual labor with small machines. At the same time, there are many construction materials and machines in the corridor, which makes it inconvenient for materials and machines to enter and exit the corridor, with many processes, low construction efficiency and high construction cost. After the concrete is poured, the precision is low, the appearance quality is poor, and it involves special operations, which has high safety risks.
[0003] Therefore, how to provide a new method for prefabricated installation of pipeline piers in an integrated pipeline corridor with high construction efficiency is an urgent problem to be solved by those skilled in the art. Summary of the invention
[0004] In view of this, the present invention provides a method for assembling and installing pipeline piers of a comprehensive pipe gallery, which adopts the following technical solutions:
[0005] A method for assembling a pipeline support pier of a comprehensive pipe gallery, comprising the following steps:
[0006] S1: Prefabricated concrete pipe pier with reserved channels inside;
[0007] S2: During the construction of the tunnel floor, embedded anchor bars and embedded sleeves are arranged inside; the lower end of the embedded anchor bar is fixedly connected to the main reinforcement of the floor, and the upper end is fixedly connected to the embedded sleeve;
[0008] S3: hoisting the pipeline buttress into the pipeline gallery;
[0009] S4: Install the pipeline support pier; install fixed anchor bars above the embedded sleeve, align the reserved channel with the fixed anchor bars, and install the pipeline support pier below; after the position is fixed, set a grouting template between the bottom plate of the pipeline support pier and the pipeline gallery;
[0010] S5: Grouting is performed from the reserved channel to the bottom of the pipeline pier to fix the pipeline gallery bottom plate.
[0011] Furthermore, the shaping template of the concrete pipe pier adopted in S1 has an arc-shaped steel plate connected to its upper end; a lifting ring is embedded in the arc center of the arc-shaped steel plate at the upper end of the shaping template for lifting the pipe pier; 6 reserved channels are evenly arranged inside the pipe pier and 6 pull-out galvanized steel pipes are used to penetrate the reserved channels.
[0012] Furthermore, the embedded sleeve and the embedded anchor bar are circumferentially welded; the embedded sleeve is opened upward, the lower end is fixed in the tunnel floor, and a protective cover is provided at the upper opening to prevent concrete from entering during pouring.
[0013] Furthermore, the embedded sleeve adopts a straight threaded sleeve; a protective cover is provided at the opening of the upper end of the embedded sleeve to prevent concrete from entering during pouring.
[0014] Furthermore, the embedded anchor bars and the embedded sleeves are precisely positioned using positioning fixtures; the positioning fixtures are fixedly connected to the structural steel bars of the tunnel floor.
[0015] Furthermore, the contact surface between the bottom of the pipeline pier and the top of the pipeline gallery floor is fully roughened.
[0016] Furthermore, when the pipeline pier is hoisted by hoisting equipment, a certain gap is left between the pipeline pier and the bottom plate of the pipeline gallery, and shims are used around the bottom of the pipeline pier to support the pipeline pier to adjust the elevation and slope.
[0017] Furthermore, the grouting template is surrounded by two long and two short angle steel models, and the angle steel models are fixedly connected by bolts; rubber strips for sealing are arranged between the bottom side wall of the pipeline pier and the angle steel model, and between the pipe gallery floor and the angle steel model; inspection holes are reserved at the four corners and the middle position of the grouting template to ensure that the slurry is filled and dense after grouting.
[0018] Furthermore, the grouting adopts a gravity grouting method to grout the reserved channel on the pipeline pier until a slurry with a certain consistency flows out of the inspection hole; the inspection hole is sealed with a rubber plug; the top of the reserved channel is supplemented with grout for the second time before the grouting material initially sets, and the hole is sealed and finished.
[0019] The beneficial effects of the present invention are:
[0020] The present invention provides an assembled installation method for pipeline piers of an integrated pipe gallery. Compared with the traditional cast-in-place pipeline pier technology, the method reduces the use of on-site turnover materials and small machines, reduces the frequency of concrete transportation, reduces safety risks, improves construction efficiency, reduces labor input, and improves the positioning accuracy of embedded parts. Through the batch prefabrication of pipeline piers, the appearance quality of the pier concrete can be improved, errors can be reduced, and costs can be greatly saved. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.
[0022] Figure 1 It is a schematic diagram of the structure inside the pipe gallery bottom plate of the present invention.
[0023] Figure 2 It is a plan view of the grouting template at the bottom of the pier of the present invention.
[0024] Figure 3 It is a front view of the prefabricated pipeline buttress of the present invention.
[0025] Figure 4 It is a top view of the prefabricated pipeline buttress of the present invention.
[0026] Among them, in the figure:
[0027] 1- Pipeline corridor bottom plate; 2- Embedded anchor bar; 3- Bottom plate main reinforcement; 4- Embedded sleeve; 5- Fixed anchor bar; 6- Reserved channel; 7- Lifting ring; 8- Arc steel pad; 9- Inspection hole; 10- Rubber strip; 11- Angle steel model; 12- Pipeline pier. DETAILED DESCRIPTION
[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] Please see attached Figure 1-4 The present invention provides a method for assembling a pipeline support pier of a comprehensive pipe gallery, comprising the following steps:
[0030] S1: prefabricated concrete pipe support pier 12; the pipe support pier 12 is prefabricated off-site and poured with concrete;
[0031] A standard template for the pipeline pier 12 is selected and installed on the prefabricated platform. The steel bars are tied inside and the position of the reserved channel 6 is determined to penetrate the standard template. The upper end of the standard template is connected to an arc-shaped steel pad 8 to form an arc at the upper end of the pipeline pier 12. The arc-shaped steel pad 8 is made of finished steel components, and its diameter is adapted to the diameters of various pipelines that need to be laid in the pipeline gallery. The upper end of the standard template is also preset with pre-embedded bolt positioning holes for pipeline clamps, which are used for the finished pipeline pier 12 to fix the pipeline in the pipeline gallery through the pipeline clamps. A lifting ring 7 is also pre-embedded at the arc center position of the arc-shaped steel pad 8 on the upper end of the standard template for lifting the pipeline pier 12. After the installation of the standard template is accepted, concrete is poured into the standard template, and it is maintained and stored.
[0032] In one embodiment of the present invention, six reserved channels 6 are evenly arranged inside the pipeline pier 12; and the reserved channels 6 are arranged by six pull-out galvanized steel pipes.
[0033] S2: An embedded sleeve 4 is arranged in the tunnel floor 1; when the main structure of the tunnel is constructed, embedded anchor bars 2 and embedded sleeves 4 are arranged inside the tunnel floor 1; the lower end of the embedded anchor bar 2 is bent and fixed to the lower end of the main bar 3 of the bottom plate, and the upper end is fixedly connected to the embedded sleeve 4; the embedded sleeve 4 and the embedded anchor bar 2 are welded; the embedded sleeve 4 is opened upward, and the lower end is fixed in the tunnel floor 1, and a protective cover is arranged at the upper opening to prevent concrete from entering during pouring.
[0034] In one embodiment of the present invention, the embedded sleeve 4 is a straight threaded sleeve; the embedded anchor bar 2 and the embedded sleeve 4 are precisely positioned using a positioning fixture; the positioning fixture is fixedly connected to the structural steel bars of the tunnel floor 1; after the concrete pouring is completed, the positioning fixture is taken out and the lower section can be recycled.
[0035] S3: hoist the pipe pier 12 into the pipe gallery; hoist the pipe pier 12 into the pipe gallery using off-site hoisting equipment; transport it to the installation point using a small flatbed truck in the pipe gallery, hook the lifting ring 7 with a hand winch and then hoist the pipe pier 12, then fully roughen the contact surface between the bottom of the pipe pier 12 and the top of the pipe gallery floor 1, clean and moisten it, apply interface agent, and prepare for installation.
[0036] S4: Install the pipeline support 12; open the protective cover on the embedded sleeve 4; fix the fixed anchor bar 5 on the embedded sleeve 4; use a torque wrench to detect the torque, and install the support after the torque is qualified; use a hand chain hoist to move the pipeline support 12 to the top of the installation point, align the reserved channel 6 with the fixed anchor bar 5, and slowly lower the pipeline support 12;
[0037] A 2 cm gap is left between the pipeline pier 12 and the pipe gallery floor 1, and the pipeline pier 12 is supported by shims. The center line, elevation and slope of the pipeline pier 12 are located by using a laser collimator, a level and a handheld slope ruler. Shims are set around the bottom of the pipeline pier 12 to adjust the elevation and slope; the shims are thin steel sheets;
[0038] After the position of the pipeline pier 12 is fixed, a grouting template is installed around the bottom of the pipeline pier 12, and the lower end is connected to the pipeline gallery floor 1; the grouting template is surrounded by two long and two short angle steel models 11, and the angle steel models 11 are fixedly connected by bolts; rubber strips 10 for sealing are arranged between the bottom side wall of the pipeline pier 12 and the angle steel model 11, and between the pipeline gallery floor 1 and the angle steel model 11; inspection holes 9 with a diameter of 1 cm are reserved at the four corners and the middle position of the grouting template as overflow holes, which are used to ensure that the slurry is filled and dense after grouting.
[0039] S5: The bottom of the pipeline support 12 is grouted and fixedly connected to the pipeline gallery bottom plate 1; the grouting material adopts the compensating shrinkage grouting material, and the performance of the grouting material meets the grouting requirements; the grouting adopts the gravity grouting method, and grouting is poured into the reserved channel 6 on the pipeline support 12 until a certain consistency of grout flows out of the inspection hole 9, and then the grouting is stopped; the inspection hole 9 is sealed with a rubber plug; before the grouting material is initially set, the top of the reserved channel 6 is grouted for the second time, and the hole is sealed and the surface is finished; and then a plastic film is used to cover and maintain moisture. Thus, the installation of the pipeline support pier is completed.
[0040] In this specification, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.
[0041] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
Claims
1. A method for assembling and installing a pipeline support pier of a comprehensive pipe gallery, characterized in that: The steps include: S1: a prefabricated concrete pipe support pier (12) with a reserved channel (6) arranged inside; S2: When the pipe gallery floor plate (1) is constructed, embedded anchor bars (2) and embedded sleeves (4) are arranged inside; the lower end of the embedded anchor bars (2) is fixedly connected to the main reinforcement (3) of the floor plate, and the upper end is fixedly connected to the embedded sleeve (4); S3: hoisting the pipeline support pier (12) into the pipeline gallery; S4: installing the pipeline support pier (12); installing a fixed anchor bar (5) above the embedded sleeve (4), and aligning the reserved hole (6) with the fixed anchor bar (5); after the position of the pipeline support pier (12) below is fixed, setting a grouting template between the bottom of the pipeline support pier (12) and the pipeline gallery bottom plate (1); S5: Grouting is performed from the reserved hole (6) to the bottom of the pipeline support pier (12) to fix the pipeline gallery bottom plate (1).
2. The method for assembling and installing the pipeline support pier of the integrated pipe gallery according to claim 1 is characterized in that: The upper end of the shaping template of the concrete pipe pier (12) used in S1 is connected to an arc-shaped steel pad (8); a lifting ring (7) is embedded in the arc center position of the arc-shaped steel pad (8) at the upper end of the shaping template for lifting the pipe pier (12); six reserved channels (6) are evenly arranged inside the pipe pier (12) and six pull-out galvanized steel pipes are used to penetrate the reserved channels (6).
3. The method for assembling and installing the pipeline support piers of a comprehensive pipe gallery according to claim 1 is characterized in that: The embedded sleeve (4) and the embedded anchor bar (2) are welded together; the embedded sleeve (4) is opened upward, the lower end is fixed in the pipe gallery floor (1), and a protective cover is provided at the upper opening to prevent concrete from entering during pouring.
4. The method for assembling and installing the pipeline support piers of a comprehensive pipe gallery according to claim 1 is characterized in that: The embedded sleeve (4) is a straight threaded sleeve; a protective cover is provided at the upper opening of the embedded sleeve (4) to prevent concrete from entering during pouring.
5. The method for assembling and installing the pipeline support piers of the integrated pipe gallery according to claim 1 is characterized in that: The embedded anchor bar (2) and the embedded sleeve (4) are precisely positioned using a positioning fixture; the positioning fixture is fixedly connected to the structural steel bars of the tunnel floor (1).
6. The method for assembling and installing the pipeline support piers of a comprehensive pipe gallery according to claim 1 is characterized in that: The contact surface between the bottom of the pipeline buttress (12) and the top of the pipeline gallery floor plate (1) is fully roughened.
7. The method for assembling and installing the pipeline support piers of the integrated pipe gallery according to claim 1 is characterized in that: When the pipeline support pier (12) is hoisted by hoisting equipment, a certain gap is left between the pipeline support pier (1) and the pipeline gallery bottom plate (1). Washers are used around the bottom of the pipeline support pier (12) to support the pipeline support pier (12) so as to adjust the elevation and slope.
8. The method for assembling and installing the pipeline support piers of a comprehensive pipe gallery according to claim 1 is characterized in that: The grouting template is surrounded by two long and two short angle steel models (11), and the angle steel models (11) are fixedly connected by bolts; rubber strips (10) for sealing are arranged between the bottom side wall of the pipeline pier (12) and the angle steel model (11), and between the pipe gallery bottom plate (1) and the angle steel model (11); inspection holes (9) are reserved at the four corners and the middle of the grouting template to ensure that the grout is filled and dense after grouting.
9. The method for assembling and installing the pipeline support piers of the integrated pipe gallery according to claim 8 is characterized in that: The grouting adopts a gravity grouting method to grout the reserved channel (6) on the pipeline pier (12) until a slurry with a certain consistency flows out of the inspection hole (9); the inspection hole (9) is sealed with a rubber plug; and before the grouting material initially sets, the top of the reserved channel (6) is supplemented with grout for the second time, and the hole is sealed and finished.
10. The method for assembling and installing the pipeline support piers of the integrated pipe gallery according to claim 9, characterized in that: The grouting material used is shrinkage compensating grouting material.