By designing multi-point fixing components and pouring concrete in prefabricated building steel structure connecting members, the problem of low fixing stability in the prior art is solved, and higher structural stability and connection strength are achieved.
Patent Information
- Application Number
- CN202411241012.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-05
- Publication Date
- 2024-11-01
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing prefabricated building steel structure connecting components have low stability after fixing, and mainly rely on bolts to fix them, resulting in poor fixing effect.
A connecting member including building beams and columns and cross beams was designed. By setting multiple grooves and grooves on the beams and columns, and using components such as positioning rods, limiting plates, operating rods, sliding plates and inserting rods to realize the cross beams. Multi-point fixation and stable connections, and ultimately enhance structural stability by pouring concrete.
Through multi-point fixing and filling concrete, the stability of the connection is significantly improved, the problem of poor bolt fixing effect is avoided, and higher structural stability and connection strength are achieved.
Smart Images

Figure CN118881035A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of prefabricated buildings and relates to a prefabricated building steel structure connecting component and a construction method thereof. Background Art
[0002] During the construction of prefabricated buildings, a large amount of on-site work in traditional construction methods is transferred to factories, where building components and accessories are processed and manufactured and then transported to the site for installation, thereby saving a lot of time, increasing building strength and reducing construction costs.
[0003] After searching, the invention with the announcement number CN116657759B discloses a prefabricated building steel structure connection component and its use method, which relates to the field of prefabricated buildings. The prefabricated building steel structure connection component includes prefabricated building beams and steel structure beams, the prefabricated building beams and steel structure beams are fixed with bolts, and a reinforcing support mechanism is provided at the connection between the prefabricated building beams and steel structure beams. After the prefabricated building beams and steel structure beams are connected and fixed with bolts, the prefabricated building steel structure connection component adopts a reinforcing support mechanism to perform a reinforcement operation when reinforcing the prefabricated building beams and steel structure beams. This reinforcement method is easy to operate, which solves the problem of small operating space and time-consuming and labor-intensive traditional reinforcement methods. When the subsequent acceptance fails, the replacement process of the steel structure beam is time-saving and labor-saving, and rapid disassembly and installation reinforcement are achieved to meet the use requirements.
[0004] However, when this type of connecting member is connected, it is fixed by a fixing structure, but the fixed structure is still located below and on the side of the device, and the main fixing still relies on bolts, so the fixing effect is poor and the stability is low. Summary of the invention
[0005] In view of this, the present invention provides a prefabricated building steel structure connection component and a construction method thereof in order to solve the problem that when the connection component is connected, it is fixed by a fixing structure, but the fixed structure is still located below and on the side of the device, and the main fixation still relies on bolts, resulting in poor fixing effect and low stability.
[0006] To achieve the above object, the present invention provides the following technical solution: an assembled building steel structure connection component, comprising:
[0007] Building beams and four cross beams, the top four sides of the building beams are provided with placement grooves, the placement grooves are used in conjunction with the cross beams, the bottom inner wall of the placement grooves is fixedly connected with a plurality of positioning rods, a bottom side of the cross beam is provided with a plurality of positioning grooves, the positioning grooves and the positioning rods are used in conjunction with each other, a third rectangular groove is provided on both sides of the middle position of the building beams, the third rectangular groove is connected with the corresponding two placement grooves, the tops of the inner walls on both sides of the remaining two placement grooves are provided with second rectangular grooves, and a first fixing component for fixing the cross beam is provided inside the second rectangular groove;
[0008] A first elliptical groove is provided inside the building beam column, the first elliptical groove is located between the two third rectangular grooves and is connected to the third rectangular grooves, and a second fixing component for fixing the cross beam is provided inside the first elliptical groove;
[0009] A rectangular groove is provided inside the building beam column, and the rectangular groove is located directly below the first elliptical groove. A third fixing component for fixing the crossbeam is provided inside the rectangular groove.
[0010] Furthermore, the first fixing component includes a second limiting plate slidably connected to the inside of the second rectangular groove, a first operating rod is fixedly connected to one side of the second limiting plate, one end of the first operating rod extends to one side of the building beam column and is fixedly connected to the second operating block, and a plurality of second circular grooves for use with the second operating blocks are provided on one side of the building beam column. By setting a plurality of second limiting plates, the tops of two of the beams can be fixed to ensure the stability of the connection.
[0011] Furthermore, the second fixing component includes an elliptical block arranged inside the first elliptical groove, the top of the elliptical block is fixedly connected to the second operating rod, the top of the second operating rod extends to the top of the building beam and is fixedly connected to the first operating block, the top of the building beam is provided with a first circular groove used in conjunction with the first operating block, the inside of the third rectangular groove is slidably penetrated by a first limit plate, the elliptical block is located between the two first limit plates, the first limit plates are used in conjunction with two of the beams, and by setting two first limit plates, two of the beams can be braked.
[0012] Furthermore, the third fixing component includes four sliding plates slidably connected inside the rectangular groove. The four sliding plates are symmetrically arranged in pairs around the rectangular groove. One side of two of the sliding plates is fixedly connected with an extension rod. The sliding plates and the extension rod are used in conjunction with the elliptical block. The insertion rod can be pushed out through the sliding plates and the extension rod to facilitate subsequent fixation.
[0013] Furthermore, one side of the sliding plate is fixedly connected with a plurality of plug rods, one end of the crossbeam is provided with a plurality of plug holes, one side of the positioning rod is provided with a mounting hole, and both the plug holes and the mounting holes are used in conjunction with the plug rods, and the positioning rod can be fixed again by the plug rods to ensure the connection stability of the positioning rod and the crossbeam.
[0014] Furthermore, an inclined groove is provided on the top of the second limiting plate, and a plurality of first rectangular grooves are provided on one side of the building beam column. A clamping rod is slidably passed through the inside of the first rectangular groove, and one end of the clamping rod is in conflict with the inclined surface of the inclined groove. Clamping grooves are provided on both sides of the first limiting plate, and the clamping grooves are engaged with the clamping rod. The position of the first limiting plate can be limited by the clamping rod and the clamping groove to prevent the first limiting plate from loosening.
[0015] Furthermore, a second elliptical groove is opened inside the building beam column, which is located between the first elliptical groove and the rectangular groove and is used to connect the first elliptical groove and the rectangular groove. The second elliptical groove is perpendicular to the first elliptical groove. The second elliptical groove is used in conjunction with the elliptical block and can pass through the rectangular groove when the elliptical block moves downward.
[0016] Furthermore, a reinforcing rib is fixedly connected between one side of the building beam and the bottom of the crossbeam, which can improve the stability of the connection between the building beam and the crossbeam.
[0017] Furthermore, two symmetrically arranged first casting holes are provided on the top of the building beam column, and the first casting holes are connected to the first elliptical groove. Four symmetrically arranged second casting holes are provided on the top of the building beam column, and the four second casting holes are respectively connected to the four second rectangular grooves. Concrete can be poured into the interior of the first elliptical groove and the second elliptical groove, so that the device is finally integrated into one, thereby improving the stability of the connection.
[0018] An assembled building steel structure connection component and a construction method thereof, specifically comprising the following steps:
[0019] S1, sending a plurality of beams into the placement slot from above in sequence for engagement, and engaging the positioning rods with the positioning slots to achieve initial positioning of the beams;
[0020] S2, rotating the first operating block, and moving the two first limit plates to the top of two of the beams to fix the beams again;
[0021] S3, the sliding plate drives the insertion rod away, and the insertion rod passes through the insertion hole and enters the mounting hole on one side of the positioning rod, so that the connection between the positioning rod and the crossbeam can be fixed again to improve stability;
[0022] S4. Use multiple reinforcing ribs to finally connect the building beams and beams to improve stability. Concrete can be poured into the interior of the second circular groove through the second casting hole. Concrete can be poured into the interior of the first elliptical groove and the second elliptical groove through the two first casting holes and the second casting holes, so that the device is finally integrated into one, improving the stability of the connection.
[0023] The beneficial effects of the present invention are:
[0024] 1. The present invention discloses an assembled building steel structure connection member and a construction method thereof. By setting a positioning rod, the crossbeam can be initially fixed when the crossbeam is placed, and the connection between the crossbeam and the positioning rod can be fixed again by a plurality of insertion rods.
[0025] 2. The present invention discloses an assembled building steel structure connection component and a construction method thereof. By setting two first limit plates and four second limit plates, the tops of multiple beams can be blocked respectively, thereby fixing the multiple beams, and the position of the first limit plate can be fixed again by setting a slot and a clamping rod.
[0026] 3. The present invention discloses a prefabricated building steel structure connection component and a construction method thereof. By setting a first casting hole and a second casting hole, concrete can be injected into the component after the installation is completed, so that the device can be finally integrated into one, thereby improving the stability of the connection.
[0027] Other advantages, objectives and features of the present invention will be described in the following description to some extent, and to some extent, will be obvious to those skilled in the art based on the following examination and study, or can be taught from the practice of the present invention. The objectives and other advantages of the present invention can be realized and obtained through the following description. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be described in detail below in conjunction with the accompanying drawings, wherein:
[0029] Figure 1 A three-dimensional structural schematic diagram of an assembled building steel structure connection member and a construction method thereof according to the present invention;
[0030] Figure 2 A schematic diagram of the three-dimensional structure of a beam and a building beam column in an assembled building steel structure connection member and a construction method thereof according to the present invention;
[0031] Figure 3 A schematic diagram of the three-dimensional structure of a beam and a building beam column in a prefabricated building steel structure connection member and a construction method thereof from a second perspective of the present invention;
[0032] Figure 4 A schematic diagram of the three-dimensional structure of building beams and columns in an assembled building steel structure connection component and a construction method thereof according to the present invention;
[0033] Figure 5 It is a schematic diagram of a three-dimensional cross-sectional structure of a building beam in an assembled building steel structure connection member and a construction method thereof according to the present invention;
[0034] Figure 6It is a three-dimensional structural schematic diagram of a building crossbeam and a first limiting plate in an assembled building steel structure connection component and a construction method thereof of the present invention;
[0035] Figure 7 It is a schematic diagram of the three-dimensional structure of a rectangular groove and a second elliptical groove in an assembled building steel structure connection member and a construction method thereof of the present invention;
[0036] Figure 8 The present invention provides a schematic diagram of the three-dimensional structure of a sliding plate and an extension plate in a prefabricated building steel structure connection member and a construction method thereof.
[0037] Figure numerals: 1. building beam column; 2. cross beam; 3. first casting hole; 4. second casting hole; 5. first operating block; 6. second operating block; 7. positioning groove; 8. positioning rod; 9. reinforcing rib; 10. insertion hole; 11. placement groove; 12. insertion rod; 13. first rectangular groove; 14. first circular groove; 15. second rectangular groove; 16. third rectangular groove; 17. second circular groove; 18. elliptical block; 19. first elliptical groove; 20. first operating rod; 21. second operating rod; 22. second elliptical groove; 23. first limiting plate; 24. clamping rod; 25. inclined groove; 26. second limiting plate; 27. clamping groove; 28. rectangular groove; 29. sliding plate; 30. extension rod. DETAILED DESCRIPTION
[0038] The following describes the embodiments of the present invention by specific examples, and those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification. The present invention can also be implemented or applied through other different specific embodiments, and the details in this specification can also be modified or changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention. It should be noted that the illustrations provided in the following embodiments only illustrate the basic concept of the present invention in a schematic manner, and the following embodiments and features in the embodiments can be combined with each other without conflict.
[0039] Among them, the drawings are only used for illustrative explanations, and they only represent schematic diagrams rather than actual pictures, and should not be understood as limitations on the present invention. In order to better illustrate the embodiments of the present invention, some parts of the drawings may be omitted, enlarged or reduced, and do not represent the size of actual products. For those skilled in the art, it is understandable that some well-known structures and their descriptions in the drawings may be omitted.
[0040] The same or similar numbers in the drawings of the embodiments of the present invention correspond to the same or similar parts; in the description of the present invention, it should be understood that if the terms "upper", "lower", "left", "right", "front", "rear", etc. indicate the orientation or position relationship, they are based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operate in a specific orientation. Therefore, the terms describing the position relationship in the drawings are only used for illustrative purposes and cannot be understood as limiting the present invention. For ordinary technicians in this field, the specific meanings of the above terms can be understood according to specific circumstances.
[0041] like Figure 1-8 The illustrated prefabricated building steel structure connection component comprises:
[0042] A building beam column 1 and four cross beams 2, a placement groove 11 is provided on all four sides of the top of the building beam column 1, the placement groove 11 is used in conjunction with the cross beam 2, a same reinforcing rib 9 is fixedly connected between one side of the building beam column 1 and the bottom of the cross beam 2, a plurality of positioning rods 8 are fixedly connected to the bottom inner wall of the placement groove 11, a plurality of positioning grooves 7 are provided on one side of the bottom of the cross beam 2, the positioning grooves 7 and the positioning rods 8 are used in conjunction, a plurality of cross beams 2 are sequentially fed from above into the interior of the placement groove 11 for engagement, and the positioning rods 8 are engaged with the positioning grooves 7, to achieve the initial positioning of the cross beam 2, first rotate the first operating block 5, the first operating block 5 drives the second operating rod 21 to rotate, the second operating rod 21 drives the elliptical block 18 to rotate, the long side of the elliptical block 18 enters the interior of the third rectangular groove 16, and the two first limit plates 23 are pushed out, and the third rectangular grooves 16 are opened on both sides of the middle position of the building beam column 1, and the third rectangular groove 16 is connected with the corresponding two placement grooves 11, and the tops of the inner walls on both sides of the remaining two placement grooves 11 are opened with second rectangular grooves 15, and the interior of the second rectangular groove 15 is provided with a first fixing component for fixing the cross beam 2, and the first fixing component includes a sliding connection in the second rectangular groove. A second limiting plate 26 is provided inside the shaped groove 15, and a first operating rod 20 is fixedly connected to one side of the second limiting plate 26. One end of the first operating rod 20 extends to one side of the building beam column 1 and is fixedly connected to the second operating block 6. A plurality of second circular grooves 17 for use with the second operating block 6 are provided on one side of the building beam column 1. An oblique groove 25 is provided on the top of the second limiting plate 26. A plurality of first rectangular grooves 13 are provided on one side of the building beam column 1. A clamping rod 24 is slidably penetrated inside the first rectangular groove 13. One end of the clamping rod 24 conflicts with the inclined surface of the oblique groove 25. Both sides of the first limiting plate 23 A card slot 27 is provided, and the card slot 27 is engaged with the card rod 24. At this time, multiple second operating blocks 6 can be pushed, and the second operating block 6 drives the first operating rod 20 to move horizontally. The first operating rod 20 pushes the second limit plate 26 to move horizontally. The second limit plate 26 moves out to the outside of the second rectangular groove 15, and contacts and fixes the tops of the remaining two cross beams 2. At the same time, the inclined surface of the inclined groove 25 will push the card rod 24 to move horizontally, and the card rod 24 passes through the first rectangular groove 13 and enters the inside of the card slot 27. At this time, the extended first limit plate 23 can be fixed again by the card rod 24;
[0043] A first elliptical groove 19 is provided inside the building beam column 1, and the first elliptical groove 19 is located between the two third rectangular grooves 16 and is connected to the third rectangular groove 16. A second fixing component for fixing the crossbeam 2 is provided inside the first elliptical groove 19, and the second fixing component includes an elliptical block 18 provided inside the first elliptical groove 19, and a second operating rod 21 is fixedly connected to the top of the elliptical block 18, and the top of the second operating rod 21 extends to the top of the building beam column 1 and is fixedly connected to the first operating block 5. A first circular groove 14 for use with the first operating block 5 is provided on the top of the building beam column 1, and a first limiting plate 23 is slidably penetrated inside the third rectangular groove 16, and the elliptical block 18 is located between the two first limiting plates 23, and the first limiting plate 23 and its The two cross beams 2 are used in conjunction with each other, and a second elliptical groove 22 is opened inside the building beam column 1. The second elliptical groove 22 is located between the first elliptical groove 19 and the rectangular groove 28 and is used to connect the first elliptical groove 19 and the rectangular groove 28. The second elliptical groove 22 is vertical to the first elliptical groove 19. The second elliptical groove 22 is used in conjunction with the elliptical block 18. At this time, the two first limit plates 23 move to the top of two of the cross beams 2 to fix the cross beams 2 again, and the elliptical block 18 moves to the top of the second elliptical groove 22 at this time, and the first operating block 5 is moved vertically downward, so that the elliptical block 18 can be pushed into the second elliptical groove 22. At the same time, the first operating block 5 completely enters the first circular groove 14 to achieve closure;
[0044] A rectangular groove 28 is provided inside the building beam column 1, and the rectangular groove 28 is located directly below the first elliptical groove 19. A third fixing component for fixing the cross beam 2 is provided inside the rectangular groove 28, and the third fixing component includes four sliding plates 29 slidably connected to the inside of the rectangular groove 28, and the four sliding plates 29 are symmetrically arranged around the rectangular groove 28 in pairs, wherein one side of two sliding plates 29 is fixedly connected to an extension rod 30, and the sliding plates 29 and the extension rod 30 are used in conjunction with the elliptical block 18, and one side of the sliding plate 29 is fixedly connected to a plurality of plug rods 12, and one end of the cross beam 2 is provided with a plurality of plug holes 10, and one side of the positioning rod 8 is provided with a plurality of plug holes 10. A mounting hole is provided, and both the insertion hole 10 and the mounting hole are used in conjunction with the insertion rod 12. When the elliptical block 18 moves downward, it will pass through the rectangular groove 28. Since there are two extension rods 30 and two sliding plates 29 extending from the inside of the rectangular groove 28, the long side of the elliptical block 18 contacts the sliding plate 29, and the short side of the elliptical block 18 contacts the extension rod 30, so that the multiple sliding plates 29 can be pushed and the multiple sliding plates 29 are moved away from each other, and the sliding plate 29 drives the insertion rod 12 away. At this time, the insertion rod 12 passes through the insertion hole 10 and enters the mounting hole on one side of the positioning rod 8, and the connection between the positioning rod 8 and the beam 2 can be fixed again to improve stability;
[0045] Two symmetrically arranged first casting holes 3 are provided on the top of the building beam column 1, and the first casting holes 3 are connected to the first elliptical groove 19. Four symmetrically arranged second casting holes 4 are provided on the top of the building beam column 1, and the four second casting holes 4 are respectively connected to the four second rectangular grooves 15. After the installation is completed, the building beam column 1 and the cross beam 2 can be finally connected using multiple reinforcing ribs 9 to improve stability. Concrete can be poured into the second circular groove 17 through the second casting holes 4, and concrete can be poured into the first elliptical groove 19 and the second elliptical groove 22 through the two first casting holes 3, so that the device is finally integrated into one, thereby improving the stability of the connection.
[0046] An assembled building steel structure connection component and a construction method thereof, specifically comprising the following steps:
[0047] S1, a plurality of beams 2 are sequentially fed from above into the placement groove 11 for engagement, and the positioning rods 8 are engaged with the positioning grooves 7 to achieve initial positioning of the beams 2;
[0048] S2, rotating the first operating block 5, the two first limiting plates 23 move to the top of two of the beams 2, and fixing the beams 2 again;
[0049] S3, the sliding plate 29 drives the insertion rod 12 away, and the insertion rod 12 passes through the insertion hole 10 and enters the mounting hole on one side of the positioning rod 8, so that the connection between the positioning rod 8 and the crossbeam 2 can be fixed again to improve stability;
[0050] S4. Use multiple reinforcing ribs 9 to finally connect the building beam column 1 and the cross beam 2 to improve stability. Concrete can be poured into the interior of the second circular groove 17 through the second casting hole 4, and concrete can be poured into the interior of the first elliptical groove 19 and the second elliptical groove 22 through the two first casting holes 3 and the second casting holes 4, so that the device is finally integrated into one, improving the stability of the connection.
[0051] Working principle:
[0052] When in use, multiple beams 2 are sequentially fed from above into the placement groove 11 for engagement, and the positioning rod 8 is engaged with the positioning groove 7 to achieve the initial positioning of the beam 2. The first operating block 5 is rotated first, and the first operating block 5 drives the second operating rod 21 to rotate, and the second operating rod 21 drives the elliptical block 18 to rotate, and the long side of the elliptical block 18 enters the third rectangular groove 16, and the two first limit plates 23 are pushed out;
[0053] At this time, the two first limit plates 23 move to the top of two of the cross beams 2 to fix the cross beams 2 again, and the elliptical block 18 moves to the top of the second elliptical groove 22, and the first operating block 5 moves vertically downward, so that the elliptical block 18 can be pushed into the second elliptical groove 22, and the first operating block 5 completely enters the first circular groove 14 to achieve closure;
[0054] When the elliptical block 18 moves downward, it will pass through the rectangular groove 28. Since there are two extension rods 30 and two sliding plates 29 extending from the inside of the rectangular groove 28, the long side of the elliptical block 18 contacts the sliding plate 29, and the short side of the elliptical block 18 contacts the extension rod 30, so that the multiple sliding plates 29 can be pushed and moved away from each other, and the sliding plate 29 drives the insertion rod 12 away. At this time, the insertion rod 12 passes through the insertion hole 10 and enters the mounting hole on one side of the positioning rod 8, and the connection between the positioning rod 8 and the crossbeam 2 can be fixed again to improve stability;
[0055] At this time, multiple second operating blocks 6 can be pushed, and the second operating blocks 6 drive the first operating rod 20 to move horizontally. The first operating rod 20 pushes the second limit plate 26 to move horizontally. The second limit plate 26 moves out to the outside of the second rectangular groove 15, and contacts and fixes the tops of the remaining two beams 2. At the same time, the inclined surface of the inclined groove 25 pushes the clamping rod 24 to move horizontally, and the clamping rod 24 passes through the first rectangular groove 13 and enters the inside of the clamping groove 27. At this time, the extended first limit plate 23 can be fixed again by the clamping rod 24;
[0056] After the installation is fully completed, multiple reinforcing ribs 9 can be used to finally connect the building beams 1 and the crossbeams 2 to improve stability. Concrete can be poured into the second circular groove 17 through the second casting hole 4, and concrete can be poured into the first elliptical groove 19 and the second elliptical groove 22 through the two first casting holes 3, so that the device is finally integrated into one, improving the stability of the connection.
[0057] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, those skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the purpose and scope of the technical solution, which should be included in the scope of the claims of the present invention.
Claims
1. An assembled building steel structure connection member, characterized in that: include: A building beam column (1) and four cross beams (2), wherein four sides of the top of the building beam column (1) are provided with placement grooves (11), the placement grooves (11) are used in conjunction with the cross beams (2), a plurality of positioning rods (8) are fixedly connected to the bottom inner wall of the placement groove (11), a plurality of positioning grooves (7) are provided on one side of the bottom of the cross beam (2), the positioning grooves (7) and the positioning rods (8) are used in conjunction with each other, a third rectangular groove (16) is provided on both sides of the middle position of the building beam column (1), the third rectangular groove (16) is connected to the corresponding two placement grooves (11), and a second rectangular groove (15) is provided on the top of the inner walls of both sides of the remaining two placement grooves (11), and a first fixing component for fixing the cross beam (2) is arranged inside the second rectangular groove (15); A first elliptical groove (19) is provided inside the building beam column (1), the first elliptical groove (19) is located between the two third rectangular grooves (16) and is connected to the third rectangular groove (16), and a second fixing component for fixing the cross beam (2) is provided inside the first elliptical groove (19); A rectangular groove (28) is provided inside the building beam column (1), and the rectangular groove (28) is located directly below the first elliptical groove (19). A third fixing component for fixing the crossbeam (2) is provided inside the rectangular groove (28).
2. The prefabricated building steel structure connection member according to claim 1, characterized in that: The first fixing component comprises a second limiting plate (26) slidably connected to the inside of the second rectangular groove (15); a first operating rod (20) is fixedly connected to one side of the second limiting plate (26); one end of the first operating rod (20) extends to one side of the building beam column (1) and is fixedly connected to a second operating block (6); and a plurality of second circular grooves (17) for use with the second operating blocks (6) are provided on one side of the building beam column (1).
3. The prefabricated building steel structure connection member according to claim 2, characterized in that: The second fixing assembly comprises an elliptical block (18) arranged inside the first elliptical groove (19); the top of the elliptical block (18) is fixedly connected to a second operating rod (21); the top of the second operating rod (21) extends to the top of the building beam column (1) and is fixedly connected to the first operating block (5); the top of the building beam column (1) is provided with a first circular groove (14) for use with the first operating block (5); the inside of the third rectangular groove (16) is slidably penetrated by a first limiting plate (23); the elliptical block (18) is located between the two first limiting plates (23); and the first limiting plates (23) are used in conjunction with two of the cross beams (2).
4. The prefabricated building steel structure connection member according to claim 3, characterized in that: The third fixing assembly comprises four sliding plates (29) slidably connected inside the rectangular groove (28), the four sliding plates (29) are symmetrically arranged in pairs around the rectangular groove (28), one side of two of the sliding plates (29) is fixedly connected with an extension rod (30), and the sliding plates (29) and the extension rod (30) are used in conjunction with the elliptical block (18).
5. The prefabricated building steel structure connection member according to claim 4, characterized in that: A plurality of insertion rods (12) are fixedly connected to one side of the sliding plate (29), a plurality of insertion holes (10) are provided at one end of the crossbeam (2), and a mounting hole is provided at one side of the positioning rod (8), and both the insertion holes (10) and the mounting holes are used in conjunction with the insertion rods (12).
6. The prefabricated building steel structure connection member according to claim 3, characterized in that: The top of the second limiting plate (26) is provided with an inclined groove (25), one side of the building beam column (1) is provided with a plurality of first rectangular grooves (13), a clamping rod (24) is slidably passed through the interior of the first rectangular groove (13), one end of the clamping rod (24) is in contact with the inclined surface of the inclined groove (25), and both sides of the first limiting plate (23) are provided with clamping grooves (27), and the clamping grooves (27) are engaged with the clamping rod (24).
7. The prefabricated building steel structure connection member according to claim 6, characterized in that: A second elliptical groove (22) is provided inside the building beam column (1); the second elliptical groove (22) is located between the first elliptical groove (19) and the rectangular groove (28) and is used to connect the first elliptical groove (19) and the rectangular groove (28); the second elliptical groove (22) is perpendicular to the first elliptical groove (19); and the second elliptical groove (22) is used in conjunction with the elliptical block (18).
8. The prefabricated building steel structure connection member according to claim 7, characterized in that: A same reinforcing rib (9) is fixedly connected between one side of the building beam column (1) and the bottom of the cross beam (2).
9. The prefabricated building steel structure connection member according to claim 8, characterized in that: The top of the building beam column (1) is provided with two symmetrically arranged first casting holes (3), the first casting holes (3) being connected to the first elliptical groove (19), and the top of the building beam column (1) is provided with four symmetrically arranged second casting holes (4), the four second casting holes (4) being connected to the four second rectangular grooves (15) respectively.
10. An assembled building steel structure connection member and a construction method thereof according to any one of claims 1 to 8, characterized in that: The specific steps include: S1, sending a plurality of beams (2) into the interior of the placement groove (11) from above in sequence for engagement, and making the positioning rod (8) engage with the positioning groove (7), thereby achieving initial positioning of the beams (2); S2, rotating the first operating block (5), and moving the two first limiting plates (23) to the top of two of the cross beams (2), and fixing the cross beams (2) again; S3, the sliding plate (29) drives the insertion rod (12) away, and the insertion rod (12) passes through the insertion hole (10) and enters the mounting hole on one side of the positioning rod (8), so that the connection between the positioning rod (8) and the crossbeam (2) can be fixed again to improve stability; S4. The building beam column (1) and the cross beam (2) are finally connected by using a plurality of reinforcing ribs (9) to improve stability. Concrete can be poured into the interior of the second circular groove (17) through the second pouring hole (4). Concrete can be poured into the interior of the first elliptical groove (19) and the second elliptical groove (22) through the two first pouring holes (3) and the second pouring holes (4), so that the device is finally integrated into one, improving the stability of the connection.