Coal pillar retaining form and anchor cable reinforcement scheme collaborative optimization method
By establishing a numerical simulation model and optimizing the anchor cable reinforcement solution, the problem of coordinated control of coal column support morphology and anchor cable reinforcement in open-pit coal mines is solved, and the stability and efficient mining of the open-pit coal mine slope are achieved.
Patent Information
- Application Number
- CN202410909988.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-09
- Publication Date
- 2024-11-01
AI Technical Summary
The existing anchor cable reinforcement method fails to effectively coordinate the control of the coal column support pattern in open-pit coal mines, resulting in challenges in slope engineering in terms of safe production and efficient mining.
By obtaining the slope morphology and lithologic parameters under the action of coal column support, a numerical simulation model was established, and numerical simulation calculation was performed using Flac3D software, different anchor cable reinforcement schemes were designed, and the model was adjusted to determine the optimal anchor cable reinforcement scheme, combining economics Benefits, optimize slope anchor cable reinforcement.
Under the conditions of maximizing coal mining resources, technical support is provided for open-pit coal mines, improving the stability and reinforcement effect of the slope, and ensuring safe production and efficient mining.
Smart Images

Figure CN118886175A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of open-pit coal mining, and in particular to a method for collaboratively optimizing a coal pillar support form and an anchor cable reinforcement scheme. Background Art
[0002] Cable anchor support is a method of changing the mechanical state inside the rock mass to form an integral and stable rock belt inside the rock mass, and using the joint action of anchor rods and rock mass to achieve the purpose of maintaining the stability of the slope. Cable anchors not only have good support effects, but also save materials, are simple to construct, are conducive to mechanized operation, and have a fast construction speed. Domestic and foreign patent scholars have achieved fruitful results in the research of slope anchor reinforcement. Invention patent CN117449890A provides a double-lane shared connection type through-anchor cable and a two-way reinforcement method for coal pillars along the goaf. The two-way reinforcement method for goaf-side lanes solves the problem of closed goafs during two-way reinforcement of coal pillars. Invention patent CN114753864A discloses a combined reinforcement method of long and short anchor cables and composite grouting for controlling the sidewalls and locking the bottom of coal mine floor drum tunnels, which can be applied to coal mine tunnels to fill the cracks of coal pillars on both sides and improve the rock properties of the bottom plate. The combined reinforcement of long and short prestressed anchor cables and composite grouting for controlling the sidewalls and locking the bottom can effectively prevent the deformation of the bottom drum and both sides caused by crack development and stress. Invention patent CN112412506A discloses an anti-impact method for anchor cable support at the head of coal tunnel excavation. By using the anchor cable support technology in the surrounding rock control of coal mine tunnels, only anchor cable support is needed to ensure the anti-impact ability of the head of the tunnel excavation. In addition, the disturbance to the head coal wall is small during the construction process, which can ensure the safety of construction. However, the methods disclosed in patents CN114526102A and CN112832858A are all single grouting to reinforce the anchor cable. This method is simple to operate, thereby increasing the stability of rock and soil. These patents study the support structure and reinforcement method applied to underground mines, but do not consider the reinforcement design under the coordinated control of the coal pillar support effect, especially without linking it with the efficiency improvement of open-pit coal mining. Therefore, there is an urgent need for a method for coordinated optimization of the coal pillar support form and the anchor cable reinforcement scheme to provide technical support for the safe production and efficient mining of open-pit coal mine slope engineering. Summary of the invention
[0003] The purpose of the present invention is to provide a method for collaborative optimization of coal pillar support morphology and anchor reinforcement scheme, taking into account the synergistic effect of anchor reinforcement and coal pillar support effect, and guiding the design of a slope anchor reinforcement scheme that meets the conditions under the condition of maximizing the recovery of coal resources, which can provide technical support for maximizing the quality and production increase of open-pit coal mines.
[0004] To achieve the above object, the present invention provides the following solutions:
[0005] A method for collaboratively optimizing a coal pillar support form and an anchor cable reinforcement scheme, the method comprising the following steps:
[0006] S1, obtain the morphological parameters and lithological parameters of the slope under the support of coal pillars in a stable state in the study area, and establish a numerical simulation model of the slope;
[0007] S2, import the established slope numerical simulation model into Flac 3D In the software, numerical simulation is performed to obtain the stability coefficient Fs1, and Fs1 is regarded as the safety reserve coefficient;
[0008] S3, based on the original coal pillar top flat plate length L1, design n length schemes that are smaller than the original coal pillar top flat plate length L1, select the simulation parameters and reinforcement parameters of anchor cable reinforcement for different coal pillar top flat plate lengths, and design different anchor cable reinforcement schemes;
[0009] S4, adjusting the slope numerical simulation model established in S1 based on different anchor cable reinforcement schemes, and performing numerical simulation calculations on the adjusted slope numerical simulation model under different anchor cable reinforcement schemes, to obtain multiple stability calculation results Fs2;
[0010] S5, judging the effective anchoring range and the invalid anchoring range according to the circumferential stress result obtained in the numerical simulation calculation process of the slope numerical simulation model adjusted in S4;
[0011] S6, within the effective anchoring range, compare the stability calculation result Fs2 with the safety reserve factor Fs1, determine the adjustment scheme of different anchor reinforcement schemes, and obtain the optimal anchor reinforcement scheme.
[0012] Furthermore, the step S1, obtaining the morphological parameters and lithological parameters of the slope under the support of the coal pillar in a stable state in the study area, and establishing a slope numerical simulation model, specifically includes:
[0013] S1.1, obtain the morphological parameters of the slope under the support of coal pillars, including: the flat plate length L1 of the original coal pillar top, the flat plate length L2 of other steps, the step angle α1, the flat plate length L3 of the slope supported by coal pillars, the step angle α2, and the lithology parameters including the cohesion, internal friction angle and bulk density of different rock layers;
[0014] S1.2, a numerical simulation model of the slope in the study area was established with the help of Rhino software.
[0015] Furthermore, in step S3, the stability coefficient obtained by numerical simulation calculation of the slope numerical simulation model corresponding to the n length schemes less than the length L1 of the flat plate at the top of the original coal pillar is less than the safety reserve coefficient Fs1.
[0016] Further, in step S5, during the numerical simulation calculation based on the slope numerical simulation model adjusted in S4, the circumferential stress results obtained are used to determine the effective anchorage range and the ineffective anchorage range, which specifically includes:
[0017] From the Flac 3D In the numerical simulation calculation, for the result of "Cable" - "Axial Stress", find the range of the cable with the value of "Axial Stress" being 0, which is the ineffective anchorage area, and the range of the cable with the value of "Axial Stress" not being 0 is the effective anchorage area.
[0018] Further, in step S6, within the ineffective anchorage range, compare the stability calculation result Fs2 with the safety reserve coefficient Fs1 to determine the adjustment plan for different cable reinforcement plans and obtain the optimal cable reinforcement plan, which specifically includes:
[0019] S6.1, if Fs2 - Fs1 ∈ (+0.005, -0.005), then the corresponding cable reinforcement plan is the optimal cable reinforcement plan;
[0020] S6.2, if Fs2 > Fs1 and Fs2 - Fs1 > 0.005, then increase the spacing q of the cables within the effective anchorage area to reduce the number of cables n, and conduct numerical simulation calculations on it to make the stability coefficient result satisfy Fs2 - Fs1 ∈ (+0.005, -0.005);
[0021] S6.3, if Fs2 < Fs1, then cables need to be arranged at the next lower bench of the coal pillar roof flat plate. At this time, the maximum displacement value is bi, and the displacement range of bi / 2 to bi is determined as the range that needs to be reinforced with cables, and numerical simulation calculations are carried out.
[0022] Further, step S6 also includes:
[0023] Compare the economic benefits of different cable reinforcement plans, and determine the optimal cable reinforcement plan in combination with the economic benefits.
[0024] According to the specific embodiments provided by the present invention, the present invention discloses the following technical effects: the method for collaborative optimization of the coal pillar support form and the anchor reinforcement scheme provided by the present invention first determines the safety reserve coefficient of the slope under the support of the coal pillar in a stable state, then designs different coal pillar top flat plate lengths, selects the simulation parameters and reinforcement parameters of the anchor reinforcement, and performs numerical simulation calculations to obtain the stability calculation results Fs2 of different anchor reinforcement schemes; finally, within the effective anchoring range, the stability calculation result Fs2 is compared with the safety reserve coefficient Fs1 to determine the adjustment schemes of different anchor reinforcement schemes, and at the same time, the optimal anchor reinforcement scheme is determined in combination with the economic benefits; based on the synergistic effect of the anchor reinforcement effect and the three-dimensional support effect of the slope, the present invention guides the design of a slope anchor reinforcement scheme that meets the conditions under the condition of maximizing the recovery of coal resources, and can provide reliable technical support for maximizing the quality and production increase of open-pit coal mines and the implementation of stability reinforcement projects for open-pit coal mine slopes. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0026] Figure 1 It is a flow chart of the method for collaboratively optimizing the coal pillar support form and the anchor cable reinforcement scheme of the present invention;
[0027] Figure 2 A three-dimensional model of the slope of the inner dump under the support of the coal pillar established in the embodiment of the present invention;
[0028] Figure 3 In the embodiment of the present invention Figure 2 The numerical simulation results of the three-dimensional model with a flat plate width of 38m at the top of the middle coal pillar;
[0029] Figure 4 In the embodiment of the present invention Figure 2 The numerical simulation results of the three-dimensional model with a flat plate width of 20m at the top of the middle coal pillar;
[0030] Figure 5 In the embodiment of the present invention Figure 2 The numerical simulation results of the three-dimensional model with a flat plate width of 30m at the top of the middle coal pillar;
[0031] Figure 6 The numerical simulation calculation results of the first deployment of anchor cables on a flat plate at the top of a 30m wide coal pillar in an embodiment of the present invention are shown in FIG. 1 , where (a) is the slope stability calculation result and (b) is the circumferential stress result;
[0032] Figure 7 The numerical simulation calculation results of the embodiment of the present invention are as follows: after increasing the spacing of anchor cables in the effective anchoring area on the flat plate at the top of the coal pillar with a width of 30m, the number of anchor cables is 2, where (a) is the slope stability calculation result, and (b) is the circumferential stress result;
[0033] Figure 8 The numerical simulation calculation results of the first deployment of anchor cables on a flat plate at the top of a 20m wide coal pillar in an embodiment of the present invention are shown in FIG. 1 , where (a) is the slope stability calculation result and (b) is the circumferential stress result;
[0034] Fig. 9 The numerical simulation calculation results of the embodiment of the present invention when the spacing of anchor cables in the effective anchoring area is increased to 20m on the top plate of the coal pillar with a width of 20m and the number of anchor cables is 18, wherein (a) is the slope stability calculation result, and (b) is the circumferential stress result;
[0035] Fig.10 The numerical simulation calculation results of the embodiment of the present invention are as follows: the spacing of anchor cables in the effective anchoring area is increased to 30m on the top flat plate of the coal pillar with a width of 20m, and the number of anchor cables is 12, wherein (a) is the slope stability calculation result, and (b) is the circumferential stress result. DETAILED DESCRIPTION
[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0037] The purpose of the present invention is to provide a method for coordinating the optimization of coal pillar support form and anchor cable reinforcement scheme, making full use of Flac 3D The software uses its built-in explicit Lagrangian algorithm model to perform numerical simulation calculations. Based on the synergistic effect of anchor reinforcement and the three-dimensional retaining effect of the slope, it guides the design of a slope anchor reinforcement scheme that meets the conditions under the condition of maximizing the recovery of coal resources. It can provide technical support for maximizing the quality and production of open-pit coal mines and the implementation of stability reinforcement projects for open-pit coal mine slopes.
[0038] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0039] like Figure 1 As shown, the method for collaboratively optimizing the coal pillar support form and the anchor cable reinforcement scheme provided by the present invention comprises the following steps:
[0040] S1, obtain the morphological parameters and lithological parameters of the slope under the support of coal pillars in a stable state in the study area, and establish a numerical simulation model of the slope, including:
[0041] S1.1, obtain the morphological parameters of the slope under the support of coal pillars, including: the flat plate length of the top of the original coal pillar is L1, the flat plate length of other steps is L2, and the step angle is α1. The flat plate length of the coal pillar support slope is L3, and the step angle is α2. The lithology parameters include the cohesion, internal friction angle, and bulk density of different rock layers. For example, the cohesion of rock layer 1 is c1, the internal friction angle is φ1, and the bulk density is γ1. The cohesion of rock layer 2 is c2, the internal friction angle is φ2, and the bulk density is γ2... The cohesion of rock layer i is c1, the internal friction angle is φ1, and the bulk density is γ1. i , the internal friction angle is φ i , bulk density is γ i ;
[0042] In this embodiment, the morphological parameters of the slope under the support of a coal pillar in an open-pit coal mine are: a flat plate of 38m at the top of the coal pillar, a flat plate of 20m at other steps, a step angle of 60°, a flat plate of 60m and a step angle of 33° for the slope of the inner spoil dump supported by the coal pillar, and the rock lithology parameters included are shown in Table 1.
[0043] Table 1 Physical and mechanical parameters of rock mass
[0044]
[0045]
[0046] S1.2, using Rhino software, a three-dimensional model of the slope in the study area is established, that is, a slope numerical simulation model, such as Figure 2 As shown;
[0047] S2, import the slope numerical simulation model established from Rhino software into Flac 3D In the software, numerical simulation is performed to obtain the stability coefficient Fs1, and Fs1 is regarded as the safety reserve coefficient;
[0048] In this embodiment, the model file is exported from Rhino and imported into Flac 3D The stability coefficient is 1.203 (as shown in Figure 3 ), at this time 1.203 is considered to be the safety reserve factor.
[0049] S3, based on the original coal pillar top flat plate length L1, design n length schemes that are smaller than the original coal pillar top flat plate length L1, select the simulation parameters and reinforcement parameters of anchor cable reinforcement for different coal pillar top flat plate lengths, and design different anchor cable reinforcement schemes;
[0050] Specifically, the purpose of recovering more coal resources is achieved by reducing the flat plate L1 at the top of the coal pillar, and at the same time, the slope stability is improved by laying anchor cables;
[0051] The stability coefficient obtained by numerical simulation calculation of the slope numerical simulation model corresponding to n length schemes less than the original coal pillar top flat plate length L1 is less than the safety reserve coefficient Fs1.
[0052] In this embodiment, the purpose of recovering more coal resources is achieved by reducing the top plate of the coal pillar L1 to 38m, and at the same time, the slope stability is improved by laying anchor cables. Based on the length of 38m, two coal pillar top width length schemes are designed (coal pillar top width 20m, 30m), and numerical simulation calculations are performed on the slope models with different coal pillar top widths. The stability coefficient of the slope model after reducing the plate is less than 1.203 (coal pillar top width 20m, for example). Figure 4 、The width of the top of the coal pillar is 30m. Figure 5 ), the anchor cable reinforcement schemes for slope models with different coal pillar top widths are designed one by one, as shown in Table 2.
[0053] Table 2 Summary of simulation parameters and reinforcement parameters of anchor reinforcement measures
[0054]
[0055]
[0056] S4, adjusting the slope numerical simulation model established in S1 based on different anchor cable reinforcement schemes, and performing numerical simulation calculations on the adjusted slope numerical simulation model under different anchor cable reinforcement schemes, to obtain multiple stability calculation results Fs2;
[0057] According to the simulation parameters of the anchor reinforcement in step S3 and the parameters related to the reinforcement parameters, the first step is to lay anchor cables on the flat plate of the coal pillar roof. Flac 3D Carry out numerical simulation calculations.
[0058] S5, judging the effective anchorage range and the invalid anchorage range according to the circumferential stress results obtained in the numerical simulation calculation process of the slope numerical simulation model adjusted in S4; specifically including:
[0059] By Flac 3D In the numerical simulation calculation, the results of "Cable" - "Axial Stress" are used to find the range of anchor cables with an "AxialStress" value of 0, which is the invalid anchorage area, and the range of anchor cables with a value other than 0 is the valid anchorage area.
[0060] In this embodiment, taking the scheme of reducing the width of the flat plate to 30 m as an example, the maximum value of the "Axial Stress" of the anchor cable is 1.7399×10 10 Pa, as Figure 6 shown in (b) of [reference], the value of the anchor cable framed is negative, which is an ineffective anchorage area.
[0061] S6. Compare the stability calculation result Fs2 with the safety reserve coefficient Fs1 within the effective anchorage range to determine the adjustment scheme for different anchor cable reinforcement schemes and obtain the optimal anchor cable reinforcement scheme, specifically including:
[0062] S6.1. If Fs2–Fs1 ∈ (+0.005, -0.005), the corresponding anchor cable reinforcement scheme is the optimal anchor cable reinforcement scheme;
[0063] S6.2. If Fs2 > Fs1 and Fs2–Fs1 > 0.005, reduce the number of anchor cables n by increasing the spacing q of the anchor cables within the effective anchorage area, and perform numerical simulation calculations to make the stability coefficient result satisfy Fs2–Fs1 ∈ (+0.005, -0.005);
[0064] S6.3. If Fs2 < Fs1, it is necessary to arrange anchor cables on the next step of the flat plate of the coal pillar roof. At this time, the maximum displacement value is bi, and the displacement range of bi / 2 to bi is determined as the range that needs to be reinforced with anchor cables, and numerical simulation calculations are performed.
[0065] In this embodiment, as Figure 6 shown in (a) of [reference], the stability coefficient Fs2 after the anchor cable reinforcement of the coal pillar with a top width of 30 m is 1.316, Fs2 > 1.203. It is necessary to increase the spacing of the anchor cables within the effective anchorage area. After changing the original spacing of 6 m to 20 m, the number of anchor cables becomes 2, and then perform numerical simulation calculations. The results are as Figure 7 shown. The stability calculation result Fs3 = 1.230, Fs3 > 1.203, and Fs3–1.203 > 0.005. However, if 2 anchor cables are still subtracted, Fs4 = 1.176 < 1.203, as Figure 5 . Then Figure 7 this scheme is relatively determined as the anchor cable reinforcement scheme that meets the conditions.
[0066] Furthermore, the step S6 further includes:
[0067] Repeat steps S4 and S5 for the slope models with different coal pillar top widths to design the corresponding anchor cable reinforcement schemes, compare the economic benefits of different anchor cable reinforcement schemes, and determine the optimal anchor cable reinforcement scheme in combination with the economic benefits.
[0068] In this embodiment, the simulation calculation results of the slope with a coal pillar top width of 20 m are carried out according to the simulation parameters and reinforcement parameters in Table 2 as Figure 8 As shown in the figure, the maximum value of the anchor cable "Axial Stress" is 1.8878×10 10 Pa, such as Figure 8 In (b), the anchor cable value is negative, indicating an invalid anchoring area. The stability coefficient after anchor cable reinforcement is Fs5 = 1.270, Fs5>1.203. It is necessary to increase the spacing of anchor cables in the effective anchoring area, and change the original spacing from 6m to 20m, so the number of anchor cables becomes 18. Then perform numerical simulation calculations, and the results are as follows: Fig. 9 , the stability calculation results are Fs6 = 1.211, Fs6>1.203, and Fs6-1.203>0.005. Then the effective anchoring area spacing is increased from 20m to 30m, the number of anchor cables is changed to 12, and numerical simulation is performed. The results are as follows Fig.10 , the stability calculation result is Fs7=1.190, Fs7<1.203, therefore, Fig. 9 The scheme is relatively determined to be an anchor reinforcement scheme that meets the requirements.
[0069] Based on the actual project calculation, the two schemes have increased coal mining volume, anchor cable costs and final benefits compared to the original coal top width of 38m, as shown in Table 3.
[0070] Table 3 Economic benefit calculation under anchor cable reinforcement scheme
[0071]
[0072] According to the comparative analysis of the economic benefits of the two plans, the optimal plan is when the top width is 20m and the number of anchor cables is 18.
[0073] The present invention also provides a system for collaboratively optimizing the coal pillar support form and the anchor cable reinforcement scheme, which is applied to the above-mentioned method for collaboratively optimizing the coal pillar support form and the anchor cable reinforcement scheme, and comprises:
[0074] The model building module is used to obtain the morphological parameters and lithological parameters of the slope under the support of coal pillars in a stable state in the study area, and to establish a numerical simulation model of the slope;
[0075] Numerical simulation calculation module, used to import the established slope numerical simulation model into Flac 3D In the software, numerical simulation is performed to obtain the stability coefficient Fs1, and Fs1 is regarded as the safety reserve coefficient;
[0076] The anchor cable reinforcement scheme design module is used to design n length schemes that are smaller than the original coal pillar top flat plate length L1 based on the original coal pillar top flat plate length L1. According to different coal pillar top flat plate lengths, the simulation parameters and reinforcement parameters of anchor cable reinforcement are selected to design different anchor cable reinforcement schemes.
[0077] The numerical simulation calculation module is also used to adjust the slope numerical simulation model based on different anchor reinforcement schemes, and perform numerical simulation calculations on the adjusted slope numerical simulation model under different anchor reinforcement schemes to obtain multiple stability calculation results Fs2;
[0078] An anchoring range determination module, used to determine the effective anchoring range and the invalid anchoring range according to the circumferential stress results obtained in the numerical simulation calculation process of the adjusted slope numerical simulation model;
[0079] The optimal solution determination module is used to compare the stability calculation result Fs2 with the safety reserve factor Fs1 within the effective anchoring range, determine the adjustment plan of different anchor reinforcement plans, and combine the economic benefits to obtain the optimal anchor reinforcement plan.
[0080] The present invention also provides an electronic device, comprising one or more processors; a memory; and one or more applications, wherein the one or more applications are stored in the memory and configured to be executed by the one or more processors, and the one or more programs are configured to execute the method for collaborative optimization of coal pillar support morphology and anchor reinforcement scheme as described above.
[0081] The present invention also provides a non-transitory computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the method for collaboratively optimizing the coal pillar support form and the anchor cable reinforcement scheme as described above is implemented.
[0082] Of course, those skilled in the art can understand that all or part of the processes in the above-mentioned embodiments can be implemented by instructing related hardware (such as a processor, a controller, etc.) through a computer program, and the program can be stored in a computer-readable storage medium, and the program can include the processes of the above-mentioned method embodiments when executed. The storage medium can be a memory, a disk, an optical disk, etc.
[0083] The principles and implementation methods of the present invention are described in this article using specific examples. The description of the above embodiments is only used to help understand the method and core idea of the present invention. At the same time, for those skilled in the art, according to the idea of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.
Claims
1. A method for collaborative optimization of coal pillar support form and anchor cable reinforcement scheme, characterized in that: It includes the following steps: S1. Obtain the morphological parameters and lithological parameters of the slope under the support of the coal pillar in a stable state within the research area, and establish a numerical simulation model of the slope; S2, import the established slope numerical simulation model into Flac 3D In the software, numerical simulation is performed to obtain the stability coefficient Fs1, and Fs1 is regarded as the safety reserve coefficient; S3. Based on the top bench length L1 of the original coal pillar, design n length schemes smaller than the top bench length L1 of the original coal pillar. For different top bench lengths of the coal pillar, select the simulation parameters and reinforcement parameters of the cable bolt reinforcement, and design different cable bolt reinforcement schemes; S4. Adjust the numerical simulation model of the slope established in S1 based on different cable bolt reinforcement schemes, and perform numerical simulation calculations on the adjusted numerical simulation models of the slope under different cable bolt reinforcement schemes respectively to obtain multiple stability calculation results Fs2; S5. Judge the effective anchorage range and ineffective anchorage range according to the circumferential stress results obtained during the numerical simulation calculation of the adjusted numerical simulation model of the slope in S4; S6. Within the effective anchorage range, compare the stability calculation result Fs2 with the safety reserve coefficient Fs1 to determine the adjustment schemes of different cable bolt reinforcement schemes and obtain the optimal cable bolt reinforcement scheme.
2. The method for collaborative optimization of coal pillar support form and anchor cable reinforcement scheme according to claim 1 is characterized in that: In the step S1, obtaining the morphological parameters and lithological parameters of the slope under the support of the coal pillar in a stable state within the research area and establishing a numerical simulation model of the slope specifically includes: S1.
1. Obtain the morphological parameters of the slope under the support of the coal pillar, including: the top bench length L1 of the original coal pillar, the other bench lengths are L2, the bench angle is α1, the bench length of the coal pillar supporting the slope is L3, the bench angle is α2, and the lithological parameters include the cohesion, internal friction angle, and unit weight of different rock layers; S1.
2. Establish a numerical simulation model of the slope within the research area with the aid of Rhino software.
3. The method for collaborative optimization of coal pillar support form and anchor cable reinforcement scheme according to claim 1 is characterized in that: In the step S3, the stability coefficients obtained by performing numerical simulation calculations on the numerical simulation models of the slope corresponding to n length schemes smaller than the top bench length L1 of the original coal pillar are less than the safety reserve coefficient Fs1.
4. The method for collaborative optimization of coal pillar support form and anchor cable reinforcement scheme according to claim 1 is characterized in that: In the step S5, judging the effective anchorage range and ineffective anchorage range according to the circumferential stress results obtained during the numerical simulation calculation of the adjusted numerical simulation model of the slope in S4 specifically includes: By Flac 3D In the numerical simulation calculation, in the "Cable" - "Axial Stress" result, find the range of anchor cables where the value of "Axial Stress" is 0, which is the invalid anchorage area, and the range of anchor cables where the value is not 0 is the valid anchorage area.
5. The method for collaborative optimization of coal pillar support form and anchor cable reinforcement scheme according to claim 1 is characterized in that: In the step S6, within the ineffective anchorage range, compare the stability calculation result Fs2 with the safety reserve coefficient Fs1 to determine the adjustment schemes of different cable bolt reinforcement schemes and obtain the optimal cable bolt reinforcement scheme, specifically including: S6.
1. If Fs2 - Fs1 ∈ (+0.005, -0.005), the corresponding cable bolt reinforcement scheme is the optimal cable bolt reinforcement scheme; S6.
2. If Fs2 > Fs1 and Fs2 - Fs1 > 0.005, reduce the number of cable bolts n by increasing the spacing q of the cable bolts within the effective anchorage area, and perform numerical simulation calculations on it to make the stability coefficient result satisfy Fs2 - Fs1 ∈ (+0.005, -0.005); S6.
3. If Fs2 < Fs1, it is necessary to arrange cable bolts on the next bench of the coal pillar roof bench. At this time, the maximum displacement value is bi, and the displacement range of bi / 2 to bi is determined as the range that needs to be reinforced with cable bolts, and numerical simulation calculations are performed.
6. The method for collaborative optimization of coal pillar support form and anchor cable reinforcement scheme according to claim 1, characterized in that: The step S6 also includes: Compare the economic benefits of different anchor reinforcement schemes and determine the optimal anchor reinforcement scheme based on the economic benefits.
Citation Information
Patent Citations
Anti-scour method for coal roadway tunneling head-on anchor cable support
CN112412506A
Gangue filling-grouting reinforcement deep well coal-pillar-free gob-side entry retaining construction process
CN112832858A
Bidirectional grouting opposite-penetrating anchor cable for coal pillar reinforcement and coal pillar grouting method
CN114526102A
Side-controlling and bottom-locking long and short anchor cable and composite grouting combined reinforcing method for coal mine floor heave roadway
CN114753864A
Connecting type opposite-penetrating anchor cable shared by two roadways and gob-side entry driving coal pillar two-way reinforcing method
CN117449890A