District service processing method and device, computer storage medium and electronic equipment
By verifying the historical line loss report and electricity meter list, and combining the business work order and construction group information, the target construction group was determined, the problems of low verification accuracy and low construction coordination efficiency of the historical load cutting problem in the area were solved, and the problem of low verification accuracy and low construction coordination efficiency was achieved. More accurate line loss management and construction coordination.
Patent Information
- Application Number
- CN202411052169.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-01
AI Technical Summary
In the prior art, the accuracy of the verification of whether there is a historical load cutting problem in the area is low, resulting in low construction coordination efficiency of the construction group and difficult to accurately identify and deal with management line loss problems.
By obtaining the historical line loss report and historical meter list of the target area, conducting historical load cutting verification, combining the business work order information and the historical construction information of the construction group, determining the construction constraints to determine the target construction group and improving the verification accuracy and coordinate construction efficiency.
The accuracy of verification of historical load cutting problems in the area has been improved, the construction coordination capabilities of the construction team have been enhanced, and the accuracy of line loss calculation and effective handling of line loss problems have been ensured.
Smart Images

Figure CN118886885A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of electric power technology or other related fields, and more specifically, to a method, device, computer storage medium and electronic equipment for processing area services. Background Art
[0002] When power supply enterprises manage data, the management of line loss in the substation is a key link. It is not only related to the efficiency of power grid operation, but also involves the accuracy of measurement and the economic benefits of the enterprise. It is also an important parameter reflecting the rationality of the grid structure, the accuracy of the metering equipment, metering failures, and whether there is power loss behavior. However, the existing line loss analysis methods have many shortcomings, especially in the identification and treatment of management line loss problems.
[0003] The existing line loss analysis of grassroots power supply enterprises mainly relies on the developed metering automation system, but the system often only supports line loss modeling and calculation with time dimensions of month and day, and the calculation cycle is one calculation per day. In addition, the accuracy of line loss calculation in this method is limited by the accuracy of power supply relationship and metering power accuracy, and due to problems such as untimely archiving of business work orders, meters not being online, and changes in load cutover power supply relationships, the line loss calculation is often inaccurate, resulting in the misjudgment of abnormal line loss in the substation area. This phenomenon can be collectively referred to as management line loss problems.
[0004] Although the use of broadband carriers for meter collection has greatly increased the online rate of meters, the untimely filing of business work orders and the change of load cutover power supply relations are still management problems. On the one hand, the age structure of employees in grassroots power supply stations is relatively old, and business acceptors may not be professional back-end operators, resulting in defects in the business dispatching process, which easily causes back-end operators to miss the system order, and user files are not changed in time, resulting in line loss calculation errors; on the other hand, abnormal areas with management line loss increase the useless analysis time of line loss managers, because these areas often have self-healing properties, that is, they can be automatically restored after the system files or power supply relations are rectified, so there is an urgent need for a management line loss analysis tool to assist in analysis and reduce the burden. In addition, current line loss analysis tools mostly use big data, mathematical statistics methods and intelligent algorithms, but these methods usually require the system to export a large amount of data, and the results cannot be quantitatively analyzed. The number is huge, and the reasons still need to be carefully checked later, which is not practical. In addition, existing analysis tools tend to analyze technical line loss problems, ignoring the management line loss problems caused by daily business, resulting in insufficient reference for line loss calculation results.
[0005] Regarding the problem that the verification accuracy of whether there is a historical load cutover problem in the relevant technology is low, resulting in the lack of construction coordination of the construction team, and no effective solution has been proposed yet. Summary of the invention
[0006] The main purpose of this application is to provide a method, device, computer storage medium and electronic device for processing area business, so as to solve the problem of low verification accuracy when verifying whether there is a historical load cutover problem in the area in the related technology, resulting in lack of construction coordination of the construction team.
[0007] In order to achieve the above-mentioned purpose, according to one aspect of the present application, a method for processing area business is provided. The method includes: obtaining a historical line loss report and a historical meter list associated with the target area, performing a historical load cutover check on the historical line loss report to obtain a first check result, performing a historical load cutover check on the historical meter list to obtain a second check result, wherein the target area includes N substations, the historical line loss report includes N line loss associations, each line loss association represents an association between each substation and the line loss rate of each substation in a historical time period, and the historical meter list stores meter counts of abnormal meters contained in N substations in a historical time period, where N is a positive integer; when the first check result and / or the second check result represents that there is a historical load cutover in the target area, obtain Y business workers. The business work order information is obtained, and the historical construction information of X construction groups associated with each business work order information is obtained to obtain X groups of historical construction information, wherein Y business work order information refers to the work order information associated with Y business work orders in the work order information list, and the Y business work order information is collected through preset equipment, and X and Y are positive integers; for a business work order, the construction constraint conditions are determined according to the X groups of historical construction information, and the target construction group is determined from the X construction groups according to the construction constraint conditions, and the business execution information is sent to the target construction group, wherein the target construction group refers to the construction group that processes the business work order in the historical time period and meets the construction constraint conditions, and the business execution information is used to prompt the target construction group to process the business work order.
[0008] Furthermore, a historical load cutover verification is performed on the historical line loss report to obtain a first verification result, including: obtaining a first line loss rate threshold, screening out substations having line loss rates greater than the first line loss rate threshold from the historical line loss report, and obtaining M abnormal substations, wherein the M abnormal substations refer to substations having line loss rates greater than the first line loss rate threshold, M is less than N, and M is a positive integer; obtaining substation information of the M abnormal substations, and using the M abnormal substation information to determine whether there is a line loss substation combination in the target area; when there is a line loss substation combination in the target area, determining the first verification result as the existence of historical load cutover in all substations in the line loss substation combination.
[0009] Furthermore, the line loss substation combination is determined in the following manner: for an abnormal substation, a substation longitude and latitude list is obtained, and the distance between the abnormal substation and N-1 substations in the target area is calculated using the substation longitude and latitude list to obtain N-1 substation distances; a distance threshold is obtained, and the target substation distance less than the distance threshold is obtained from the N-1 substation distances, and the substations associated with the abnormal substation and the target substation distance are combined to obtain K candidate line loss substation area combinations, where K is a positive integer; a second line loss rate threshold is obtained, and the line loss rate of each candidate line loss substation area combination is calculated to obtain K candidate combination line loss rates; if there are H candidate combination line loss rates whose line loss rates are less than the second line loss rate threshold, a candidate line loss substation area combination associated with the line loss rates of the H candidate combinations is obtained, and the H candidate line loss substation area combinations are determined as the line loss substation area combination, where H is less than or equal to K and H is a positive integer.
[0010] Furthermore, after using the information of M abnormal substations to determine whether there is a line loss substation combination in the target area, the method also includes: when there is no line loss substation combination in the target area, obtaining the meter counts of non-abnormal substations in each candidate line loss substation combination according to the historical meter list, and obtaining K meter counts, wherein the non-abnormal substations in each candidate line loss substation combination refer to the substations other than the abnormal substations in each candidate line loss substation combination; obtaining the minimum cutover threshold, and determining whether the K meter counts are greater than the minimum cutover threshold; if there is a target meter count greater than the minimum cutover threshold, determining the first verification result as the existence of historical load cutover for the candidate line loss substation combination associated with the target meter count; if the K meter counts are all less than or equal to the minimum cutover threshold, determining the first verification result as the existence of historical load cutover for the K abnormal substations in the candidate line loss substation combination.
[0011] Furthermore, a historical load cutover verification is performed on the historical meter list to obtain a second verification result, including: obtaining a work order information list, matching the work order information list with the historical meter list, obtaining Z meter replacement areas, and calculating the line loss rates of the Z meter replacement areas, wherein the Z meter replacement areas refer to areas for which there are meter replacement work orders in Y business work orders within a historical time period, and Z is a positive integer; obtaining a third line loss rate threshold, and when there is a target meter replacement area with a line loss rate greater than the third line loss rate threshold among the Z meter replacement areas, determining the second verification result as the existence of historical load cutover for the target meter replacement area; and when the line loss rates of the Z meter replacement areas are all less than or equal to the third line loss rate threshold, determining the second verification result as the absence of historical load cutover for the Z meter replacement areas.
[0012] Furthermore, determining the construction constraint conditions according to X groups of historical construction information includes: obtaining the construction time of X construction groups from the X groups of historical construction information to obtain X construction time consumptions, and obtaining the traffic time of the X construction groups to obtain X traffic time consumptions; calculating the sum of each construction time consumption and each traffic time consumption to obtain X total working times of the X construction groups; calculating the actual working time of each construction group according to each group of historical construction information to obtain X actual working times, and determining the construction constraint conditions according to the X total working times and the X actual working times.
[0013] Further, determining a target construction group from X construction groups according to the construction constraint conditions includes: for one construction group, obtaining the total working time and actual working time associated with the construction group, and obtaining the maximum working time of the construction group; obtaining the traffic time associated with the construction group, calculating the grid data according to the traffic time, and obtaining the traffic grid data; when the traffic grid data is less than the traffic grid threshold and the actual working time is less than the maximum working time, determining the construction group as a candidate construction group; when the total working time is the minimum value of the X total working times, determining the candidate construction group as the target construction group.
[0014] In order to achieve the above-mentioned purpose, according to another aspect of the present application, a device for processing area services is provided. The device includes: a first acquisition unit, which is used to obtain the historical line loss report and the historical meter list associated with the target area, perform a historical load cutover check on the historical line loss report to obtain a first verification result, and perform a historical load cutover check on the historical meter list to obtain a second verification result, wherein the target area includes N substations, the historical line loss report includes N line loss association relationships, each line loss association relationship represents the association relationship between each substation and the line loss rate of each substation in a historical time period, and the historical meter list stores the meter counts of abnormal meters contained in the N substations in the historical time period, where N is a positive integer; a second acquisition unit, which is used to obtain Y when the first verification result and / or the second verification result represent that there is a historical load cutover in the target area. business work order information, and obtain historical construction information of X construction groups associated with each business work order information, to obtain X groups of historical construction information, wherein Y business work order information refers to work order information associated with Y business work orders in the work order information list, and the Y business work order information is collected through preset equipment, and X and Y are positive integers; a first determination unit is used to determine, for a business work order, a construction constraint condition according to the X groups of historical construction information, and determine a target construction group from the X construction groups according to the construction constraint condition, and send business execution information to the target construction group, wherein the target construction group refers to a construction group that processes the business work order in a historical time period and meets the construction constraint condition, and the business execution information is used to prompt the target construction group to process the business work order.
[0015] According to another aspect of an embodiment of the present invention, a computer storage medium is provided, which is used to store a program, wherein when the program is run, the device where the computer storage medium is located is controlled to execute a method for processing area services.
[0016] According to another aspect of an embodiment of the present invention, an electronic device is provided, comprising one or more processors and a memory; the memory stores computer-readable instructions, and the processor is used to run the computer-readable instructions, wherein the computer-readable instructions execute a method for processing area services when they are run.
[0017] According to another aspect of an embodiment of the present invention, a computer program product is provided, including a computer program, and when the computer program is executed by a processor, a method for processing a slice service is executed.
[0018] Through the present application, the following steps are adopted: obtaining a historical line loss report and a historical meter list associated with a target area, performing a historical load cutover check on the historical line loss report to obtain a first check result, and performing a historical load cutover check on the historical meter list to obtain a second check result, wherein the target area includes N substations, the historical line loss report includes N line loss association relationships, each line loss association relationship represents an association relationship between each substation and a line loss rate of each substation in a historical time period, and the historical meter list stores meter counts of abnormal meters included in the N substations in the historical time period, where N is a positive integer; when the first check result and / or the second check result represents that there is a historical load cutover in the target area, Y business work order information is obtained, and historical construction information of X construction groups associated with each business work order information is obtained to obtain X groups of historical construction information, wherein the Y business work order information refers to the work order information associated with the Y business work orders in the work order information list, and the Y business work order information is collected by a preset device, and the X , Y is a positive integer; for a business work order, the construction constraint conditions are determined according to X groups of historical construction information, and the target construction group is determined from the X construction groups according to the construction constraint conditions, and the business execution information is sent to the target construction group, wherein the target construction group refers to the construction group that processes the business work order in the historical time period and meets the construction constraint conditions, and the business execution information is used to prompt the target construction group to process the business work order, which solves the problem of low verification accuracy when verifying whether there is a historical load cutover problem in the area in the related technology, resulting in a lack of construction coordination for the construction group. By performing a historical load cutover verification on the historical line loss report and the historical meter list, a verification result is obtained. When the verification result indicates that there is a historical load cutover in the target area, the construction constraint conditions are determined according to the historical construction information associated with the business work order information, and then the target construction group is determined based on the construction constraint conditions, thereby achieving the effect of improving the verification accuracy of whether there is a historical load cutover problem in the area and improving the construction coordination efficiency of the construction group. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments and descriptions of the present application are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0020] Figure 1 is a flowchart of a method for processing a zone service according to an embodiment of the present application; and
[0021] Figure 2 is a schematic diagram of a method for determining a verification result provided in an embodiment of the present application;
[0022] Figure 3 It is a schematic diagram of a method for collecting business work order information provided in an embodiment of the present application;
[0023] Figure 4 is a schematic diagram of a processing device for a zone service provided according to an embodiment of the present application;
[0024] Figure 5 is a schematic diagram of an electronic device provided according to an embodiment of the present application. DETAILED DESCRIPTION
[0025] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.
[0026] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.
[0027] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0028] It should be noted that the relevant information (including but not limited to user device information, user personal information, etc.) and data (including but not limited to data for display, data for analysis, etc.) involved in this disclosure are all information and data authorized by the user or fully authorized by all parties. For example, an interface is set between this system and the relevant user or organization. Before obtaining relevant information, it is necessary to send an acquisition request to the aforementioned user or organization through the interface, and obtain relevant information after receiving the consent information fed back by the aforementioned user or organization.
[0029] It should be noted that the collected information used in this application is information and data authorized by the user or fully authorized by all parties, and the collection, storage, use, processing, transmission, provision, disclosure and application of the relevant data comply with the relevant laws, regulations and standards of the relevant regions, take necessary confidentiality measures, do not violate public order and good morals, and provide corresponding operation entrances for users to choose to authorize or refuse to use it.
[0030] The present invention is described below in conjunction with preferred implementation steps. Figure 1 is a flowchart of a method for processing a zone service according to an embodiment of the present application, such as Figure 1 As shown, the method comprises the following steps:
[0031] Step S101, obtain the historical line loss report and historical meter list associated with the target area, perform historical load cutover verification on the historical line loss report to obtain a first verification result, and perform historical load cutover verification on the historical meter list to obtain a second verification result, wherein the target area includes N substations, the historical line loss report includes N line loss associations, each line loss association represents the association between each substation and the line loss rate of each substation in a historical time period, and the historical meter list stores the meter counts of abnormal meters contained in the N substations in the historical time period, and N is a positive integer.
[0032] Specifically, the target area refers to an area managed by a power supply company, and the historical load cutover verification refers to verifying whether there is a management line loss problem in the area. The management line loss problem refers to the inaccuracy of line loss calculation caused by untimely filing of business work orders, meters not being online, and changes in load cutover power supply relationships, which leads to the phenomenon of misjudgment of abnormal line loss in the area. In order to determine whether there is a historical load cutover problem in the area, verification can be performed based on the historical line loss report containing daily and monthly line loss data and the historical meter list, thereby obtaining the first verification result and the second verification result.
[0033] It should be noted that Figure 2 is a schematic diagram of a method for determining a verification result according to an embodiment of the present application, such as Figure 2As shown, it is possible to determine whether there is an abnormal line loss caused by load cutover factors based on the monthly line loss list of the substation, and then determine whether there is a line loss problem caused by business factors based on the daily line loss in the last 10 days. First, the substations with a line loss rate greater than 10% can be screened out from the historical line loss report, and according to the longitude and latitude table of the substation, the distances between all abnormal substations and other substations in the target area are traversed and calculated respectively. After setting the distance threshold, all abnormal substations with a distance less than the distance threshold are combined to obtain a combination that satisfies the combined line loss rate of less than 6. If a matching combination is found, it is determined that there is a historical load cutover in the combination, and the first verification results of all substations in the combination are determined to be a management line loss problem caused by load cutover factors; if not, the meter counts of abnormal meters whose distance from the abnormal substation is less than the distance threshold can be screened out from the historical meter list, and finally, based on the meter counts, it is determined whether there is a historical cutover problem in the substation. For example, after setting the minimum cutover threshold, if the meter count is greater than the minimum cutover threshold, it indicates that there is a management line loss problem caused by load cutover between the original substation and the abnormal substation of these meters; if it is not met, the abnormal substation has a non-management line loss problem, and the first verification result determines that there is historical load cutover in the target area.
[0034] Optionally, the historical line loss report and the historical meter list are matched to realize daily line loss analysis: first, the substations with meter replacement work orders can be screened out. The line loss threshold of each substation is set. If the line loss rate of this part of the substation exceeds the line loss threshold, it is judged that the substation has a management line loss problem due to business factors, and the second verification result determines that the target area has a historical load cutover; if it does not meet the requirements, it indicates that the substation does not have a management line loss problem due to business factors, and the second verification result determines that the target area does not have a historical load cutover.
[0035] Step S102, when the first verification result and / or the second verification result indicates that there is historical load cutover in the target area, obtain Y business work order information, and obtain historical construction information of X construction groups associated with each business work order information, to obtain X groups of historical construction information, wherein the Y business work order information refers to the work order information associated with Y business work orders in the work order information list, and the Y business work order information is collected by preset equipment, and X and Y are positive integers.
[0036] Specifically, when the first verification result and / or the second verification result indicates that there is a historical load cutover problem in the target area, it means that the construction team handling the area may have construction abnormalities. At this time, the historical construction information of all construction teams for each business work order in the historical time period can be obtained, and then the best construction team to handle each business work order can be determined based on the historical construction information.
[0037] It should be noted that Figure 3is a schematic diagram of a method for collecting business work order information provided in an embodiment of the present application, such as Figure 3 As shown, business work order information can be collected based on a preset device, wherein the preset device can be a UIBOT RPA robot, which can be used to implement real-time detection of received chat information until the preset field is detected and then enter the information receiving state. Specifically, first, the business receptionist types a "business entry request" containing preset fields into the robot, wherein the preset fields can be "business" or "field".
[0038] Optionally, after receiving the request, the robot feeds back an input request to the business receptionist to prompt for input of business work order information; after receiving the input request, the business receptionist sends the initial information of the business work order to the robot, and the robot calls regular expressions to extract and convert the input initial information, and finally forms standard business work order information, which is stored on the server. The business work order information may include user name, user number (optional), user meter asset number (optional), address, business type and agreed time, thereby achieving closed-loop control of work orders.
[0039] The historical construction information of each construction group can be obtained from the business work order information in the server. The business work order information constitutes the business construction time consumption dashboard and the work order data dashboard. Table 1 is the construction group business construction time consumption dashboard, as shown in Table 1: xy represents the construction time of the x-th construction team for work order y, t avery Represents the average time taken for business work order y, which satisfies x and y represent the total number of construction teams and the total number of work orders respectively:
[0040] Table 1
[0041]
[0042]
[0043] Table 2 is a work order data dashboard. As shown in Table 2: n is the total number of work orders. Each sheet element contains style (business vector), addr (address vector), Tlimit (work order time limit vector), cteam (construction team number vector), and ctime (construction time vector):
[0044] Table 2
[0045]
[0046] It should be noted that the average construction time vector in Table 2 is obtained by matching the average time in Table 1 according to the work order number. Since power supply agencies usually use grid management to manage the jurisdiction involved, the grids are usually divided and named by communities, streets or villages. Therefore, the business work order address contains the corresponding keywords. After extracting the address information from the business work order information on the server, the address information is edited again to obtain the address vector.
[0047] Step S103, for a business work order, determine the construction constraints according to X groups of historical construction information, and determine the target construction group from the X construction groups according to the construction constraints, and send business execution information to the target construction group, where the target construction group refers to the construction group that processes the business work order in the historical time period and meets the construction constraints, and the business execution information is used to prompt the target construction group to process the business work order.
[0048] Specifically, after obtaining the historical construction information of all construction groups, work order data is constructed based on this historical construction information, and then the work order data can be processed to obtain the construction constraints corresponding to each business work order. Finally, the above-mentioned construction groups can be screened in turn based on the construction constraints, and the construction group that best meets the construction constraints can be selected. This construction group is then used as the target construction group, and when a certain business work order is involved, business execution information is sent to the target construction group to prompt the processing of the work order business.
[0049] The method for processing area services provided in the embodiment of the present application obtains a historical line loss report and a historical meter list associated with the target area, performs a historical load cutover check on the historical line loss report to obtain a first check result, and performs a historical load cutover check on the historical meter list to obtain a second check result, wherein the target area includes N substations, the historical line loss report includes N line loss association relationships, each line loss association relationship represents the association relationship between each substation and the line loss rate of each substation in a historical time period, and the historical meter list stores the meter counts of abnormal meters contained in the N substations in the historical time period, where N is a positive integer; when the first check result and / or the second check result represents that there is a historical load cutover in the target area, Y business work order information is obtained, and the historical construction information of X construction groups associated with each business work order information is obtained to obtain X groups of historical construction information, wherein the Y business work order information refers to the work order information associated with the Y business work orders in the work order information list, and the Y business work order information is collected by a preset device It is obtained that X and Y are positive integers; for a business work order, the construction constraint conditions are determined according to the X groups of historical construction information, and the target construction group is determined from the X construction groups according to the construction constraint conditions, and the business execution information is sent to the target construction group, wherein the target construction group refers to the construction group that processes the business work order in the historical time period and meets the construction constraint conditions, and the business execution information is used to prompt the target construction group to process the business work order, which solves the problem of low verification accuracy when verifying whether there is a historical load cutover problem in the area in the related technology, resulting in a lack of construction coordination for the construction group. By performing a historical load cutover verification on the historical line loss report and the historical meter list, a verification result is obtained. When the verification result indicates that there is a historical load cutover in the target area, the construction constraint conditions are determined according to the historical construction information associated with the business work order information, and then the target construction group is determined based on the construction constraint conditions, thereby achieving the effect of improving the verification accuracy of whether there is a historical load cutover problem in the area and improving the construction coordination efficiency of the construction group.
[0050] In order to determine whether there is a historical load cutover problem in the substation, a historical line loss report can be used for verification. Optionally, in the method for processing the area business provided in the embodiment of the present application, a historical load cutover verification is performed on the historical line loss report to obtain a first verification result, including: obtaining a first line loss rate threshold, screening substations with line loss rates greater than the first line loss rate threshold from the historical line loss report, and obtaining M abnormal substations, wherein the M abnormal substations refer to substations with line loss rates greater than the first line loss rate threshold, M is less than N, and M is a positive integer; obtaining substation information of the M abnormal substations, and using the M abnormal substation information to determine whether there is a line loss substation combination in the target area; when there is a line loss substation combination in the target area, determining the first verification result as the existence of historical load cutover in all substations in the line loss substation combination.
[0051] Specifically, when verifying the historical line loss report, the first line loss rate threshold can be set first, and the first line loss rate threshold can be 10%, wherein the line loss rate (also known as the line loss rate or the transmission loss rate) refers to the proportion of electric energy loss caused by various factors in the transmission line from the power plant to the user in the power system, expressed as a percentage. After determining the first line loss rate threshold, the historical line loss report is screened according to the threshold, that is, the substations with a line loss rate greater than 10% are screened out from the historical line loss report, and the screened out substations are used as abnormal substations.
[0052] Optionally, after obtaining the location and other substation information of these abnormal substations, it is determined whether there is a substation combination with a combined line loss rate of less than 6% in the area based on the substation information of each abnormal substation, that is, it is determined whether there is a line loss substation combination. If this combination exists in the area, it indicates that the substation in the combination has a historical load cutover problem. Optionally, the specific causes of the historical load cutover problem are further analyzed, and corresponding improvement measures are formulated to reduce the line loss rate and improve the efficiency of power grid operation. This embodiment uses historical line loss reports to perform substation analysis, and then realizes hierarchical judgment of the causes of substation abnormalities, thereby ensuring the stability of the power system.
[0053] Optionally, in the method for processing area services provided in the embodiment of the present application, the line loss area combination is determined in the following manner: for an abnormal area, a list of longitude and latitude of the area is obtained, and the distance between the abnormal area and N-1 areas in the target area is calculated using the list of longitude and latitude of the area to obtain N-1 area distances; a distance threshold is obtained, and the target area distance that is less than the distance threshold is obtained from the N-1 area distances, and the abnormal area and the area associated with the target area distance are combined to obtain K candidate line loss area combinations, where K is a positive integer; a second line loss rate threshold is obtained, and the line loss rate of each candidate line loss area combination is calculated to obtain K candidate combination line loss rates; if there are H candidate combination line loss rates whose line loss rates are less than the second line loss rate threshold, a candidate line loss area combination associated with the line loss rates of the H candidate combinations is obtained, and the H candidate line loss area combinations are determined as the line loss area combination, where H is less than or equal to K and H is a positive integer.
[0054] Specifically, when using the substation information to determine whether there is a line loss substation combination in the area, first obtain the substation longitude and latitude list containing the longitude and latitude information of all substations in the target area, and then calculate the distances between all abnormal substations and other substations in the target area according to the substation longitude and latitude table to obtain multiple substation distances. After obtaining the distance threshold dist, obtain the substation distance less than the distance threshold from the above multiple substation distances, that is, obtain multiple standard substation distances, and then combine the abnormal substations and other substations in each target substation distance to obtain multiple candidate line loss substation combinations.
[0055] Optionally, the line loss rate of each candidate line loss substation combination is calculated to obtain multiple candidate combination line loss rates, and then it is determined whether there is a candidate combination line loss rate less than a second line loss rate threshold. For example, the second line loss rate threshold may be 6%. If there is a candidate combination line loss rate less than the second line loss rate threshold, the candidate line loss substation combination corresponding to the line loss rate is determined as the line loss substation combination. This embodiment calculates the distance between substations and then determines the candidate line loss substation combination based on the substation distance, laying a foundation for the subsequent verification of whether there is a historical load cutover problem in the substation.
[0056] The first verification result includes multiple results. Optionally, in the method for processing area services provided in the embodiment of the present application, after using M abnormal area information to determine whether there is a line loss area combination in the target area, the method also includes: when there is no line loss area combination in the target area, obtaining the meter count of non-abnormal areas in each candidate line loss area combination according to the historical meter list to obtain K meter counts, wherein the non-abnormal areas in each candidate line loss area combination refer to the areas other than the abnormal areas in each candidate line loss area combination; obtaining the minimum cutover threshold, and determining whether the K meter counts are greater than the minimum cutover threshold; if there is a target meter count greater than the minimum cutover threshold, determining the first verification result as the candidate line loss area combination associated with the target meter count having a historical load cutover; if the K meter counts are all less than or equal to the minimum cutover threshold, determining the first verification result as the K abnormal areas in the candidate line loss area combination having no historical load cutover.
[0057] Specifically, if there is no line loss area combination in the target area, the meter counts of all non-abnormal areas in the candidate line loss area combination can be obtained from the historical meter list, and then the meter counts obtained according to the area records can be obtained. For example, n1, n2, ..., n v , where v can be the number of combinations of candidate line loss substations, or the number of substations whose distance from other substations to the abnormal substation is less than the distance threshold dist.
[0058] Optionally, after setting the minimum cutover threshold, it is determined whether the meter count is greater than the minimum cutover threshold, and the first verification result of the candidate line loss area combination that meets the above requirements is set to the existence of historical load cutover, and the first verification result of the candidate line loss area combination that does not meet the above requirements is set to the absence of historical load cutover problems. The first verification result of the candidate line loss area combination can also be set to the existence of non-management line loss problems. This embodiment can achieve hierarchical judgment by obtaining the meter count of the area and then verifying the area based on the meter count, thereby improving verification efficiency.
[0059] In order to determine whether there is a historical load cutover problem in the substation, a historical meter list can be used for verification. Optionally, in the method for processing area services provided in the embodiment of the present application, a historical load cutover verification is performed on the historical meter list to obtain a second verification result including: obtaining a work order information list, matching the work order information list with the historical meter list to obtain Z meter replacement substations, and calculating the line loss rates of the Z meter replacement substations, wherein the Z meter replacement substations refer to the substations for which there are meter replacement work orders in Y business work orders within the historical time period, and Z is a positive integer; obtaining a third line loss rate threshold, and when there is a target meter replacement substation with a line loss rate greater than the third line loss rate threshold among the Z meter replacement substations, the second verification result is determined as there is a historical load cutover in the target meter replacement substation; when the line loss rates of the Z meter replacement substations are all less than or equal to the third line loss rate threshold, the second verification result is determined as there is no historical load cutover in the Z meter replacement substations.
[0060] Specifically, when verifying based on the historical meter list, the obtained work order information list and the historical meter list can be matched first, and then the meter replacement area can be obtained. For example, the meters and corresponding areas that have meter replacement work orders in the past ten days can be screened out.
[0061] Optionally, a third line loss rate threshold can be set based on the average value of the line loss rates of the past 10 days, and it is determined whether the line loss rate of the meter replacement area is greater than the third line loss rate threshold. If the line loss rate of the meter replacement area is greater than the third line loss rate threshold, it indicates that the area has a management line loss problem due to business factors, and the second verification result of the area is set as a historical load cutover problem; if the line loss rate of the meter replacement area is less than or equal to the third line loss rate threshold, it indicates that the area does not have a management line loss problem due to business factors, and the second verification result of the area can be set as no historical load cutover. This embodiment improves the verification efficiency and accuracy by using historical meters to perform area verification, and can also reduce the analysis work of management personnel.
[0062] For each business work order, the construction constraints are determined by the construction information of the historical time period. Optionally, in the processing method of the area business provided in the embodiment of the present application, determining the construction constraints based on X groups of historical construction information includes: obtaining the construction time of X construction groups from the X groups of historical construction information to obtain X construction time consumptions, and obtaining the traffic time of X construction groups to obtain X traffic time consumptions; calculating the sum of each construction time consumption and each traffic time consumption to obtain X total working times of the X construction groups; calculating the actual working time of each construction group according to each group of historical construction information to obtain X actual working times, and determining the construction constraints based on the X total working times and the X actual working times.
[0063] Specifically, when determining the construction constraints of each business work order, the construction time and traffic time of the construction team can be obtained from the historical construction information, and then the total working time of each construction team can be calculated by the following formula:
[0064]
[0065] Among them, Ctimeaver i represents the construction time of each construction group, t trani (z i ) represents the traffic time of each construction team, and conut represents the number of work orders that each construction team can handle. For example, when the work orders processed by the same construction team have z grid keywords, and the cross-grid traffic time is 30 minutes each time, the traffic time can be: t trani (z i )=30*(z i -1).
[0066] Optionally, the actual working time of each construction group can be calculated based on historical construction information, which can be calculated by the following formula: i=1,2,...,x;where ctime i ' and cteam' refer to the vector elements obtained after sorting. Due to time constraints, each construction team will not process all business work orders. Therefore, the actual working time of each construction team is related to the business work orders actually completed. For example, the business work order includes three work orders, and construction team A only processes the first and third business work orders. When calculating the actual working time, ctime2'=0, that is, the actual working time includes the working time of the first business work order and the third business work order. Finally, the construction constraint condition can be constructed based on the total working time and the actual working time. This embodiment determines the construction constraint condition by using historical construction information, which can provide data support for determining the construction group that processes each business work order.
[0067] Optionally, in the method for processing area services provided in the embodiment of the present application, determining a target construction group from X construction groups according to construction constraints includes: for a construction group, obtaining the total working time and actual working time associated with the construction group, and obtaining the maximum working time of the construction group; obtaining the traffic time associated with the construction group, calculating the grid data according to the traffic time, and obtaining the traffic grid data; when the traffic grid data is less than the traffic grid threshold and the actual working time is less than the maximum working time, determining the construction group as a candidate construction group; when the total working time is the minimum of X total working times, determining the candidate construction group as the target construction group.
[0068] Specifically, when determining the target construction group for a certain business work order, it can be screened based on the construction constraints. First, the total working time and actual working time of all construction groups can be obtained, and then the maximum working time of each construction group can be obtained from the database. Then, the traffic time is extracted from the total working time, and the traffic grid data of the standard traffic transfer is calculated using the following formula: t trani (z i )=30*(z i -1), then determine whether the traffic grid data of each construction group is less than the traffic grid threshold, whether the actual working time is less than the maximum working time, if there are one or more construction groups that meet the above conditions, select the construction group with the smallest total working time from these construction groups and use it as the target construction group. This embodiment uses construction constraints to determine the construction group, so that construction personnel can complete the construction more efficiently and purposefully, which can effectively avoid the problems of work order timeout and delayed archiving of business work orders, and avoid line loss abnormalities caused by untimely file updates.
[0069] It should be noted that the steps shown in the flowcharts of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and that, although a logical order is shown in the flowcharts, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0070] The embodiment of the present application also provides a processing device for a zone service. It should be noted that the processing device for a zone service in the embodiment of the present application can be used to execute the processing method for a zone service provided in the embodiment of the present application. The following introduces the processing device for a zone service provided in the embodiment of the present application.
[0071] Figure 4 is a schematic diagram of a processing device for a zone service provided in an embodiment of the present application, such as Figure 4 As shown, the device includes: a first acquisition unit 40, a second acquisition unit 41, and a first determination unit 42.
[0072] The first acquisition unit 40 is used to obtain a historical line loss report and a historical meter list associated with the target area, perform a historical load cutover check on the historical line loss report to obtain a first check result, and perform a historical load cutover check on the historical meter list to obtain a second check result, wherein the target area includes N substations, the historical line loss report includes N line loss association relationships, each line loss association relationship represents an association relationship between each substation and a line loss rate of each substation in a historical time period, and the historical meter list stores meter counts of abnormal meters included in the N substations in the historical time period, and N is a positive integer;
[0073] The second acquisition unit 41 is used to acquire Y business work order information and acquire historical construction information of X construction groups associated with each business work order information when the first verification result and / or the second verification result indicates that there is a historical load cutover in the target area, so as to obtain X groups of historical construction information, wherein the Y business work order information refers to the work order information associated with Y business work orders in the work order information list, and the Y business work order information is collected by a preset device, and X and Y are positive integers;
[0074] The first determination unit 42 is used to determine the construction constraint conditions for a business work order according to X groups of historical construction information, and determine the target construction group from the X construction groups according to the construction constraint conditions, and send business execution information to the target construction group, wherein the target construction group refers to the construction group that processes the business work order in the historical time period and meets the construction constraint conditions, and the business execution information is used to prompt the target construction group to process the business work order.
[0075] The processing device for area business provided in the embodiment of the present application obtains the historical line loss report and the historical meter list associated with the target area through the first acquisition unit 40, performs a historical load cutover check on the historical line loss report to obtain a first check result, and performs a historical load cutover check on the historical meter list to obtain a second check result, wherein the target area includes N substations, the historical line loss report includes N line loss association relationships, each line loss association relationship represents the association relationship between each substation and the line loss rate of each substation in a historical time period, and the historical meter list stores the meter counts of abnormal meters contained in the N substations in the historical time period, where N is a positive integer; the second acquisition unit 41 obtains Y business work order information when the first check result and / or the second check result represents that there is a historical load cutover in the target area, and obtains the historical construction information of X construction groups associated with each business work order information to obtain X groups of historical construction information, wherein the Y business work order information refers to the work order information associated with the Y business work orders in the work order information list, and the Y business work order information is obtained through the preset device The data are collected and obtained, where X and Y are positive integers; the first determination unit 42 determines the construction constraints for a business work order according to X groups of historical construction information, and determines the target construction group from the X construction groups according to the construction constraints, and sends business execution information to the target construction group, wherein the target construction group refers to the construction group that processes the business work order in the historical time period and meets the construction constraints. The business execution information is used to prompt the target construction group to process the business work order, which solves the problem of low verification accuracy when verifying whether there is a historical load cutover problem in the area in the related technology, resulting in a lack of construction coordination for the construction group. The historical load cutover verification is performed on the historical line loss report and the historical meter list to obtain the verification result. When the verification result indicates that there is a historical load cutover in the target area, the construction constraints are determined according to the historical construction information associated with the business work order information, and then the target construction group is determined based on the construction constraints, thereby achieving the effect of improving the verification accuracy of whether there is a historical load cutover problem in the area and improving the construction coordination efficiency of the construction group.
[0076] Optionally, in the processing device for the area service provided in the embodiment of the present application, the first acquisition unit 40 includes: a first acquisition module, used to obtain a first line loss rate threshold, and screen out substations whose line loss rates are greater than the first line loss rate threshold from historical line loss reports to obtain M abnormal substations, wherein the M abnormal substations refer to substations whose line loss rates are greater than the first line loss rate threshold, M is less than N, and M is a positive integer; a second acquisition module, used to obtain substation information of the M abnormal substations, and use the M abnormal substation information to determine whether there is a line loss substation combination in the target area; a first determination module, used to determine the first verification result as that all substations in the line loss substation combination have historical load cutover when there is a line loss substation combination in the target area.
[0077] Optionally, in the processing device for the area service provided in the embodiment of the present application, the first acquisition unit 40 includes: the line loss area combination is determined by the following methods: a third acquisition module is used to obtain a list of longitude and latitude of the area for an abnormal area, and use the list of longitude and latitude of the area to calculate the distance between the abnormal area and N-1 areas in the target area to obtain the N-1 area distance; a fourth acquisition module is used to obtain a distance threshold, obtain the target area distance less than the distance threshold from the N-1 area distances, and separate the abnormal area and the target area distance. The connected substations are combined to obtain K candidate line loss substation area combinations, where K is a positive integer; a fifth acquisition module is used to obtain a second line loss rate threshold, calculate the line loss rate of each candidate line loss substation area combination, and obtain K candidate combination line loss rates; a sixth acquisition module is used to obtain the candidate line loss substation area combinations associated with the line loss rates of the H candidate combinations if there are H candidate combination line loss rates whose line loss rates are less than the second line loss rate threshold, and determine the H candidate line loss substation area combinations as the line loss substation area combination, where H is less than or equal to K and H is a positive integer.
[0078] Optionally, in the processing device for the area service provided in the embodiment of the present application, the device also includes: a third acquisition unit, which is used to determine whether there is a line loss area combination in the target area by using M abnormal area information. If there is no line loss area combination in the target area, obtain the meter count of the non-abnormal area in each candidate line loss area combination according to the historical meter list to obtain K meter counts, wherein the non-abnormal area in each candidate line loss area combination refers to the area other than the abnormal area in each candidate line loss area combination; a fourth acquisition unit, which is used to obtain the minimum cutover threshold and determine whether the K meter counts are greater than the minimum cutover threshold; a second determination unit, which is used to determine the first verification result as the existence of historical load cutover for the candidate line loss area combination associated with the target meter count if there is a target meter count greater than the minimum cutover threshold; and a fourth determination unit, which is used to determine the first verification result as the existence of historical load cutover for the K abnormal areas in the candidate line loss area combination if the K meter counts are all less than or equal to the minimum cutover threshold.
[0079] Optionally, in the processing device for the area business provided in the embodiment of the present application, the first acquisition unit 40 includes: a seventh acquisition module, used to obtain a work order information list, match the work order information list with the historical meter list, obtain Z meter replacement areas, and calculate the line loss rate of the Z meter replacement areas, wherein the Z meter replacement areas refer to the areas where there are meter replacement work orders in Y business work orders within the historical time period, and Z is a positive integer; an eighth acquisition module, used to obtain a third line loss rate threshold, and when there is a target meter replacement area with a line loss rate greater than the third line loss rate threshold among the Z meter replacement areas, the second verification result is determined as the existence of historical load cutover in the target meter replacement area; a second determination module, used to determine the second verification result as the absence of historical load cutover in the Z meter replacement areas when the line loss rates of the Z meter replacement areas are all less than or equal to the third line loss rate threshold.
[0080] Optionally, in the processing device for the area service provided in the embodiment of the present application, the first determination unit 42 includes: a ninth acquisition module, used to obtain the construction time of X construction groups from X groups of historical construction information, to obtain X construction time, and to obtain the traffic time of X construction groups, to obtain X traffic time; a first calculation module, used to calculate the sum of each construction time and each traffic time, to obtain X total working time of X construction groups; a second calculation module, used to calculate the actual working time of each construction group according to each group of historical construction information, to obtain X actual working time, and to determine the construction constraint conditions according to the X total working time and the X actual working time.
[0081] Optionally, in the processing device for the area service provided in the embodiment of the present application, the first determination unit 42 includes: a tenth acquisition module, which is used to obtain the total working time and actual working time associated with a construction group, and obtain the maximum working time of the construction group; an eleventh acquisition module, which is used to obtain the traffic time associated with the construction group, calculate the grid data according to the traffic time, and obtain the traffic grid data; a third determination module, which is used to determine the construction group as a candidate construction group when the traffic grid data is less than the traffic grid threshold and the actual working time is less than the maximum working time; and a fourth determination module, which is used to determine the candidate construction group as the target construction group when the total working time is the minimum value of X total working times.
[0082] The processing device for the above-mentioned area business includes a processor and a memory. The above-mentioned first acquisition unit 40, second acquisition unit 41, first determination unit 42, etc. are all stored in the memory as program units, and the processor executes the above-mentioned program units stored in the memory to realize corresponding functions.
[0083] The processor includes a kernel, which calls the corresponding program unit from the memory. One or more kernels can be set, and the kernel parameters can be adjusted to solve the problem of low verification accuracy when verifying whether there is a historical load cutover problem in the area in the related technology, resulting in a lack of construction coordination of the construction team.
[0084] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM, and the memory includes at least one memory chip.
[0085] An embodiment of the present invention provides a computer storage medium, which is used to store a program. When the program is running, the device where the computer storage medium is located is controlled to execute a method for processing a slice service.
[0086] Figure 5 is a schematic diagram of an electronic device provided according to an embodiment of the present application, such as Figure 5 As shown, an embodiment of the present invention provides an electronic device, the electronic device 50 includes a processor, a memory, and a program stored in the memory and executable on the processor, the processor is used to execute a computer-readable instruction, wherein the computer-readable instruction executes a method for processing a zone service when it is executed. The device in this article can be a server, a PC, a PAD, a mobile phone, etc.
[0087] The present application also provides a computer program product, including a computer program, which, when executed by a processor, implements the steps of a method for processing area services in each embodiment of the present application.
[0088] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.
[0089] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0090] These computer program instructions may also be stored in a computer readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer readable memory produce an article of manufacture including an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0091] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 A step that specifies a function in one or more boxes.
[0092] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.
[0093] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.
[0094] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.
[0095] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.
[0096] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.
Claims
1. A method for processing area services, characterized in that: include: Obtain a historical line loss report and a historical meter list associated with the target area, perform a historical load cutover check on the historical line loss report to obtain a first check result, and perform a historical load cutover check on the historical meter list to obtain a second check result, wherein the target area includes N substations, the historical line loss report includes N line loss association relationships, each line loss association relationship represents an association relationship between each substation and the line loss rate of each substation in a historical time period, and the historical meter list stores meter counts of abnormal meters contained in the N substations in the historical time period, and N is a positive integer; In the case where the first verification result and / or the second verification result indicates that there is a historical load cutover in the target area, Y business work order information is obtained, and historical construction information of X construction groups associated with each business work order information is obtained to obtain X groups of historical construction information, wherein the Y business work order information refers to work order information associated with Y business work orders in the work order information list, and the Y business work order information is collected by a preset device, and X and Y are positive integers; For a business work order, the construction constraint conditions are determined according to the X groups of historical construction information, and a target construction group is determined from the X construction groups according to the construction constraint conditions, and business execution information is sent to the target construction group, wherein the target construction group refers to a construction group that processes the business work order in a historical time period and meets the construction constraint conditions, and the business execution information is used to prompt the target construction group to process the business work order.
2. The method according to claim 1, characterized in that Performing a historical load cutover check on the historical line loss report to obtain a first check result includes: Obtain a first line loss rate threshold, and select substations whose line loss rates are greater than the first line loss rate threshold from the historical line loss report to obtain M abnormal substations, wherein the M abnormal substations refer to substations whose line loss rates are greater than the first line loss rate threshold, M is less than N, and M is a positive integer; Acquire the substation information of the M abnormal substations, and use the M abnormal substation information to determine whether there is a line loss substation combination in the target area; In the case where the line loss station area combination exists in the target area, the first verification result is determined as that all stations in the line loss station area combination have historical load cutover.
3. The method according to claim 2, characterized in that The line loss zone combination is determined by the following method: For an abnormal station area, obtain a list of longitude and latitude of the station area, and use the list of longitude and latitude of the station area to calculate the distance between the abnormal station area and N-1 stations in the target area to obtain the distance between the N-1 stations; Obtaining a distance threshold, obtaining a target area distance less than the distance threshold from the N-1 area distances, combining the abnormal area and the area associated with the target area distance to obtain K candidate line loss area combinations, where K is a positive integer; Obtain a second line loss rate threshold, calculate the line loss rate of each candidate line loss station area combination, and obtain K candidate combination line loss rates; If there are H candidate combinations whose line loss rates are less than the second line loss rate threshold, obtain the candidate line loss station area combinations associated with the H candidate combinations' line loss rates, and determine the H candidate line loss station area combinations as the line loss station area combinations, where H is less than or equal to K and H is a positive integer.
4. The method according to claim 3, characterized in that: After using the M abnormal area information to determine whether there is a line loss area combination in the target area, the method further includes: In the case where the line loss area combination does not exist in the target area, the meter counts of the non-abnormal areas in each candidate line loss area combination are obtained according to the historical meter list to obtain K meter counts, wherein the non-abnormal areas in each candidate line loss area combination refer to the areas other than the abnormal areas in each candidate line loss area combination; Obtaining a minimum cutover threshold, and determining whether the counts of the K electric meters are greater than the minimum cutover threshold; If there is a target meter count greater than the minimum cutover threshold, determining the first verification result as a candidate line loss station area combination associated with the target meter count having a historical load cutover; If the counts of the K electric meters are all less than or equal to the minimum cutover threshold, the first verification result is determined as there is no historical load cutover for the K abnormal substations in the candidate line loss substation combination.
5. The method according to claim 1, characterized in that Performing a historical load cutover verification on the historical electricity meter list to obtain a second verification result includes: Obtain the work order information list, match the work order information list with the historical meter list, obtain Z meter replacement areas, and calculate the line loss rate of the Z meter replacement areas, wherein the Z meter replacement areas refer to the areas with meter replacement work orders in the Y business work orders within the historical time period, and Z is a positive integer; Obtaining a third line loss rate threshold, and if there is a target meter replacement area with a line loss rate greater than the third line loss rate threshold among the Z meter replacement areas, determining the second verification result as a historical load cutover in the target meter replacement area; When the line loss rates of the Z meter replacement areas are all less than or equal to the third line loss rate threshold, the second verification result is determined as no historical load cutover exists in the Z meter replacement areas.
6. The method according to claim 1, characterized in that Determining the construction constraint conditions according to the X groups of historical construction information includes: Acquire the construction time of the X construction groups from the X groups of historical construction information to obtain X construction time, and acquire the traffic time of the X construction groups to obtain X traffic time; Calculate the sum of each construction time and each traffic time to obtain X total working times of the X construction teams; The actual working time of each construction group is calculated according to each group of historical construction information to obtain X actual working times, and the construction constraint condition is determined according to the X total working times and the X actual working times.
7. The method according to claim 6, characterized in that Determining a target construction group from the X construction groups according to the construction constraint condition includes: For a construction group, obtain the total working time and actual working time associated with the construction group, and obtain the maximum working time of the construction group; Obtaining the traffic time associated with the construction group, calculating grid data according to the traffic time, and obtaining traffic grid data; When the traffic grid data is less than the traffic grid threshold and the actual working time is less than the maximum working time, determining the construction group as a candidate construction group; When the total working time is the minimum value of the X total working times, the candidate construction group is determined as the target construction group.
8. A processing device for area services, characterized in that: include: A first acquisition unit is used to acquire a historical line loss report and a historical meter list associated with a target area, perform a historical load cutover check on the historical line loss report to obtain a first check result, and perform a historical load cutover check on the historical meter list to obtain a second check result, wherein the target area includes N substations, the historical line loss report includes N line loss association relationships, each line loss association relationship represents an association relationship between each substation and a line loss rate of each substation in a historical time period, and the historical meter list stores meter counts of abnormal meters contained in the N substations in the historical time period, and N is a positive integer; A second acquisition unit is used to acquire Y business work order information and acquire historical construction information of X construction groups associated with each business work order information when the first verification result and / or the second verification result indicates that there is a historical load cutover in the target area, so as to obtain X groups of historical construction information, wherein the Y business work order information refers to the work order information associated with Y business work orders in the work order information list, and the Y business work order information is collected by a preset device, and X and Y are positive integers; The first determination unit is used to determine, for a business work order, a construction constraint condition according to the X groups of historical construction information, determine a target construction group from the X construction groups according to the construction constraint condition, and send business execution information to the target construction group, wherein the target construction group refers to a construction group that processes the business work order in a historical time period and meets the construction constraint condition, and the business execution information is used to prompt the target construction group to process the business work order.
9. A computer storage medium, characterized in that: The computer storage medium is used to store a program, wherein when the program is run, the device where the computer storage medium is located is controlled to execute the area service processing method described in any one of claims 1 to 7.
10. An electronic device, characterized in that: It includes one or more processors and a memory, wherein the memory is used to store one or more programs, wherein when the one or more programs are executed by the one or more processors, the one or more processors implement the method for processing area services as described in any one of claims 1 to 7.