Arrangement method of energy storage workshop in iron-chromium flow battery energy storage power station

By adopting multi-module combination and high-precision data acquisition and analysis technology in the iron-chromium flow battery energy storage power station, combined with adaptive control and particle swarm optimization algorithm, the problem of insufficient rebalancing adjustment accuracy in the energy storage workshop is solved, and the battery is realized Performance consistency and stability improve system efficiency and reduce costs.

CN118889503AInactive Publication Date: 2024-11-01INNER MONGOLIA RUNMENG ENERGY CO LTD
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411354865.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-27
Publication Date
2024-11-01
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The traditional rebalancing method in the energy storage workshop in the iron-chromium flow battery energy storage power station is not very accurate, it is difficult to ensure the consistency and stability of battery performance, and cannot meet the strict requirements of practical applications.

Method used

Using 200 sets of 0.5MW/2MWh iron-chromium flow battery energy storage modules, each 4 sets are equipped with a set of 2MWPCS and box transformer integrated machines, through data acquisition and monitoring, data analysis and judgment, energy scheduling decision, rebalancing adjustment, and public Engineering assurance, real-time monitoring and feedback, maintenance and optimization modules combine adaptive control, PID control algorithm and particle swarm optimization algorithm to achieve consistency and stability of battery performance.

Benefits of technology

It improves the overall performance of the energy storage system, ensures the consistency and stability of battery performance, reduces energy consumption, and optimizes system efficiency and cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118889503A_ABST
    Figure CN118889503A_ABST
Patent Text Reader

Abstract

The invention discloses a method for arranging energy storage workshops in an iron-chromium flow battery energy storage power station, relates to the technical field of energy storage power stations, and aims to solve the problem that the arrangement of the energy storage workshops is crucial in the iron-chromium flow battery energy storage power station. The reasonable arrangement method can improve the efficiency, reliability and safety of the energy storage system and reduce the cost. At present, for a traditional rebalancing method for an energy storage workshop in an iron-chromium flow battery energy storage power station, the adjusting precision is not high, the high consistency and stability of battery performance are difficult to ensure, and the strict requirement for the battery performance in practical application cannot be met, a rebalancing system and the whole energy storage system are deeply integrated; cooperative work and information sharing among all the parts are achieved, optimization design and parameter adjustment are carried out on the battery performance, energy consumption and adjustment effect in the whole system, and the overall performance of the system is improved. Secondly, making a cooperative control strategy, and dynamically adjusting the charging power and current according to the state of the battery and the demand of a rebalance system;
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of energy storage power stations, and in particular to a method for arranging an energy storage workshop in an iron-chromium liquid flow battery energy storage power station. Background Art

[0002] With the continuous growth of energy demand and the widespread application of renewable energy, the importance of energy storage technology in power systems has become increasingly prominent. As a new large-scale energy storage technology, iron-chromium flow battery has the advantages of high safety, long life and low cost, and has received widespread attention.

[0003] In this regard, the patent document with publication number CN110797889B discloses a method for arranging energy storage power stations to solve the problem of power flow congestion, including the location arrangement of energy storage power stations and the capacity arrangement of energy storage power stations; selecting near-area nodes as the access points of energy storage power stations according to the location of the power flow congestion line, and selecting the access points with the highest sensitivity to the power flow of the congested line as the actual access points of the energy storage power station to form a location plan for the energy storage power station; constructing an objective function with the highest economic benefit after the power flow congestion line is connected to the energy storage power station, and using the particle swarm algorithm to solve the objective function to obtain the capacity arrangement plan of the smart power station. The energy storage power station arrangement obtained by the method is not only simpler and more convenient to calculate, but also can more reasonably select the capacity of the energy storage power station to obtain better economic benefits.

[0004] In an iron-chromium flow battery energy storage power station, the layout of the energy storage workshop is crucial. Reasonable layout methods can improve the efficiency, reliability and safety of the energy storage system and reduce costs. At present, the traditional rebalancing method for the energy storage workshop in the iron-chromium flow battery energy storage power station has low adjustment accuracy, making it difficult to ensure the high consistency and stability of battery performance, and unable to meet the strict requirements for battery performance in practical applications.

[0005] In view of the above problems, a method for arranging an energy storage workshop in an iron-chromium liquid flow battery energy storage power station is proposed. Summary of the invention

[0006] The purpose of the present invention is to provide a method for arranging an energy storage workshop in an iron-chromium liquid flow battery energy storage power station, which solves the problem that it is difficult to maintain consistency in rebalancing in the background technology.

[0007] To achieve the above purpose, the present invention provides the following technical solutions: a method for arranging an energy storage workshop in an iron-chromium liquid flow battery energy storage power station, which is composed of 200 groups of 0.5MW / 2MWh iron-chromium liquid flow battery energy storage modules, and each 4 groups of 0.5MW / 2MWh energy storage modules are equipped with 1 group of 2MWPCS and box-type transformer integrated machine. In the arrangement of the energy storage workshop in the iron-chromium liquid flow battery energy storage power station, the overall area of ​​the energy storage workshop is calculated and optimized, and the formula is as follows:

[0008] Calculate the voltage drop caused by the resistance of the current in the transmission line to evaluate and optimize the DC line layout from the energy storage module to the PCS and the box-type transformer to reduce the voltage drop loss. The calculation formula is as follows:

[0009] The battery energy storage module includes: data acquisition and monitoring module, which collects the operating data of the battery system, PCS and box-type transformer, rebalancing system, EMS system and utility system in real time through sensors and monitoring equipment. The transport data includes voltage, current, temperature and power parameters; The data analysis and judgment module transmits the collected data to the EMS system for analysis and processing to determine whether the system is in normal operation; Energy dispatch decision module: Based on data analysis results, grid demand, and renewable energy generation, the EMS system makes energy dispatch decisions and determines the charging and discharging mode and power of the energy storage system. Control command issuing module: The EMS system sends control commands to the PCS and box-type transformer to control the charging and discharging operations of the energy storage module; Rebalancing and adjustment module: The rebalancing system adjusts the distribution of chemical substances inside the battery according to the status of the battery module to maintain the consistency and stability of battery performance; Public engineering support module: The public engineering system operates continuously to provide cooling, ventilation, and fire protection for the entire energy storage system, ensuring that all equipment works in a suitable environment; Real-time monitoring and feedback module continuously monitors the operating status of the system. If there is any abnormality, it will be fed back to the EMS system in time for adjustment and processing; Maintenance and optimization module, data accumulation, replacement of aging components of the system and adjustment of control strategies.

[0010] Preferably, during data collection, sensors and monitoring technologies are optimized, and high-precision, high-sensitivity sensors are used to monitor the distribution and state changes of chemical substances inside the battery in real time. The sensors are calibrated and maintained regularly to ensure their accuracy and reliability.

[0011] Preferably, the data analysis algorithm analyzes and processes the data collected by the sensor quickly and accurately, and by building a battery model, predicts the changing trend of the distribution of chemical substances and makes adjustments in advance.

[0012] Preferably, adaptive control is used to improve the accuracy and timeliness of regulation, and the energy generated during the regulation process is recovered and reused. The recovered energy is used to power the system, thereby reducing energy consumption; Gradually adjust the frequency and amplitude of the adjustment dynamically according to the battery usage and status.

[0013] Preferably, the rebalancing system is deeply integrated with the entire energy storage system to achieve collaborative work and information sharing among various parts, and to optimize the design and parameter adjustment of battery performance, energy consumption and regulation effect in the entire system.

[0014] Preferably, a coordinated control strategy is formulated to dynamically adjust the charging power and current according to the battery status and the needs of the rebalancing system; during the discharge process, the discharge power is reasonably allocated according to the load demand and battery performance; Determine specific indicators to improve battery performance consistency and stability, analyze constraint rebalancing system adjustment speed, adjustment range, and energy consumption, build a mathematical model of the battery module, describe its charge and discharge characteristics, aging process, and chemical substance distribution changes, and establish a system-level model to simulate operation under different working conditions; Determine the combination of feedback control and feedforward control, select the appropriate time interval for adjustment according to the dynamic response characteristics of the system, and define the control cycle and frequency.

[0015] Preferably, a PID control algorithm is adopted, the control amount is calculated according to the deviation, and a particle swarm optimization algorithm is used to simultaneously optimize multiple objectives such as battery performance, system efficiency and cost while satisfying the constraints; Calculate the control amount based on the deviation, and the mathematical expression is:

[0016] in is the control quantity, is the difference between the actual and expected battery performance. is the proportionality coefficient, is the integration coefficient, is the differential coefficient, according to the deviation Calculate the control amount The control quantity is used to adjust the adjustment speed and adjustment range of the rebalancing system.

[0017] Preferably, under the premise of satisfying the constraints, multiple objectives such as battery performance, system efficiency and cost are optimized simultaneously. The particle optimization algorithm formula is as follows: Establish a population of n ions in a D-dimensional search space:

[0018] The position of the i-th particle is expressed as:

[0019] The speed is expressed as:

[0020] Particles update their positions and velocities by tracking two extreme values: one is the individual extreme value Indicates the optimal position found by the particle itself; The other is the global extreme value Indicates the optimal position currently found by the entire population; The particle speed and position update formula is as follows:

[0021]

[0022] Where K is the number of iterations, W is the inertia weight, and is the learning factor, and is a random number in the range [0,1].

[0023] Preferably, the developed collaborative control strategy is verified in a simulation environment, different working scenarios and input conditions are simulated, the effectiveness of the strategy is evaluated, experimental tests are conducted in actual rebalancing systems and energy storage systems, actual data are collected, and the collaborative control strategy is updated and improved in a timely manner.

[0024] Preferably, the principal component analysis (PCA) method is used to reduce the data dimension while retaining key information, and a long short-term memory network model is constructed to process time series data and capture the dynamic changes of battery status.

[0025] Compared with the prior art, the beneficial effects of the present invention are as follows: The present invention provides a method for arranging an energy storage workshop in an iron-chromium liquid flow battery energy storage power station, which deeply integrates the rebalancing system with the entire energy storage system, realizes collaborative work and information sharing between the various parts, optimizes the design and parameter adjustment of the battery performance, energy consumption and regulation effect in the entire system, and improves the overall performance of the system. Secondly, a collaborative control strategy is formulated to dynamically adjust the charging power and current according to the battery status and the needs of the rebalancing system; during the discharge process, the discharge power is reasonably allocated according to the load demand and battery performance, further improving the battery performance and system efficiency. The principal component analysis PCA method is used to reduce the data dimension while retaining key information, and a long short-term memory network model is constructed to process time series data and capture the dynamic changes in battery status, providing a more effective means for monitoring and controlling the system. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] Figure 1 It is the top floor layout diagram of the energy storage workshop of the present invention; Figure 2 This is a layout diagram of the first floor of the energy storage workshop of the present invention; Figure 3 is a flow chart of the present invention; Figure 4 Logic diagram of the rebalancing system of the present invention. DETAILED DESCRIPTION

[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0028] In order to further understand the content of the present invention, the present invention is described in detail in conjunction with the accompanying drawings.

[0029] Combination Figure 1-Figure 4 The present invention provides a method for arranging an energy storage workshop in an iron-chromium flow battery energy storage power station, including a 100MW / 400MWh iron-chromium flow battery energy storage system, wherein the iron-chromium flow battery energy storage system is composed of 200 groups of 0.5MW / 2MWh iron-chromium flow battery energy storage modules, and each 4 groups of 0.5MW / 2MWh energy storage modules are equipped with a group of 2MWPCS and a box-type transformer. In the arrangement of the energy storage workshop in the iron-chromium flow battery energy storage power station, the overall area of ​​the energy storage workshop is calculated and optimized, and the formula is as follows:

[0030] Calculate the voltage drop caused by the resistance of the current in the transmission line to evaluate and optimize the DC line layout from the energy storage module to the PCS and the box-type transformer to reduce the voltage drop loss. The calculation formula is as follows:

[0031] The battery energy storage module includes: data acquisition and monitoring module, which collects the operating data of the battery system, PCS and box-type transformer, rebalancing system, EMS system and utility system in real time through sensors and monitoring equipment. The transport data includes voltage, current, temperature and power parameters; During data collection, we optimize sensors and monitoring technologies, use high-precision and high-sensitivity sensors to monitor the distribution and state changes of chemical substances inside the battery in real time, and regularly calibrate and maintain sensors to ensure their accuracy and reliability. The data analysis algorithm quickly and accurately analyzes and processes the data collected by the sensors. By building a battery model, it predicts the changing trend of the distribution of chemical substances and makes adjustments in advance.

[0032] The data analysis and judgment module transmits the collected data to the EMS system for analysis and processing to determine whether the system is in normal operation; Energy dispatch decision module: Based on data analysis results, grid demand, and renewable energy generation, the EMS system makes energy dispatch decisions and determines the charging and discharging mode and power of the energy storage system. Adaptive control is used to improve the accuracy and timeliness of regulation, and the energy generated during the regulation process is recovered and reused. The recovered energy is used to power the system, reducing energy consumption; Gradually adjust the frequency and amplitude of the adjustment dynamically according to the battery usage and status.

[0033] Control command issuing module: The EMS system sends control commands to the PCS and box-type transformer to control the charging and discharging operations of the energy storage module; Rebalancing and adjustment module: The rebalancing system adjusts the distribution of chemical substances inside the battery according to the status of the battery module to maintain the consistency and stability of battery performance; Deeply integrate the rebalancing system with the entire energy storage system to achieve collaborative work and information sharing between the various parts, and optimize the design and parameter adjustment of battery performance, energy consumption and regulation effects in the entire system; Formulate a coordinated control strategy to dynamically adjust the charging power and current according to the battery status and the needs of the rebalancing system; during the discharge process, reasonably allocate the discharge power according to the load demand and battery performance; Determine specific indicators to improve battery performance consistency and stability, analyze constraint rebalancing system adjustment speed, adjustment range, and energy consumption, build a mathematical model of the battery module, describe its charge and discharge characteristics, aging process, and chemical substance distribution changes, and establish a system-level model to simulate operation under different working conditions; Determine the combination of feedback control and feedforward control, select the appropriate time interval for adjustment according to the dynamic response characteristics of the system, and define the cycle and frequency of control; Adopt PID control algorithm, calculate control quantity according to deviation, and use particle swarm optimization algorithm to optimize multiple objectives such as battery performance, system efficiency and cost at the same time while satisfying constraints; Calculate the control amount based on the deviation, and the mathematical expression is:

[0034] in is the control quantity, is the difference between the actual and expected battery performance. is the proportionality coefficient, is the integration coefficient, is the differential coefficient, according to the deviation Calculate the control amount , the control quantity is used to adjust the adjustment speed and adjustment range of the rebalancing system; Under the premise of satisfying the constraints, the battery performance, system efficiency and cost objectives are optimized simultaneously. The particle optimization algorithm formula is as follows: Establish a population of n ions in a D-dimensional search space:

[0035] The position of the i-th particle is expressed as:

[0036] The speed is expressed as:

[0037] Particles update their positions and velocities by tracking two extreme values: one is the individual extreme value Indicates the optimal position found by the particle itself; The other is the global extreme value Indicates the optimal position currently found by the entire population; The particle speed and position update formula is as follows:

[0038]

[0039] Where K is the number of iterations, W is the inertia weight, and is the learning factor, and is a random number in the range [0,1]; The operating data of the battery system, PCS and box-type transformer, rebalancing system, EMS system and utility system, including voltage, current, temperature and power, are collected in real time through sensors and monitoring equipment. The data analysis and judgment module transmits the collected data to the EMS system for analysis and processing to determine whether the system is in normal operation. When there is a deviation between the system state and the expected state, the PID control algorithm calculates the control amount according to the deviation; When the rebalancing system adjusts the distribution of chemical substances inside the battery, the control quantity is calculated based on the deviation e(t). The u(t) control quantity can be used to adjust the adjustment speed, adjustment range and other parameters of the rebalancing system to maintain the consistency and stability of battery performance.

[0040] Use particle swarm optimization algorithm to meet the constraints; When the rebalancing system adjusts speed, adjustment range, and energy consumption, and optimizes multiple objectives such as battery performance, system efficiency, and cost, the PID control algorithm is combined with the particle swarm optimization algorithm to more accurately adjust system parameters while meeting constraints, improve the consistency and stability of battery performance, reduce system costs, and improve system efficiency. In a multi-dimensional search space, there is a population of multiple particles. Each particle can represent a possible combination of system parameters, including the battery charging power, discharging power, and adjustment parameters of the rebalancing system.

[0041] Each particle has a fitness value, which is calculated by the objective function. The objective function is battery performance, system efficiency and cost. The fitness value can be a weighted combination of battery performance consistency index, system efficiency value and cost value; The particle updates its position and velocity by tracking the two extreme values. It can represent the optimal system parameter combination found by the particle itself, the global extreme value Indicates the optimal system parameter combination currently found by the entire population; The particle swarm optimization algorithm can be used to find the optimal charging power and current adjustment strategy, as well as the discharge power allocation strategy. According to the battery status and the needs of the rebalancing system, the particle swarm optimization algorithm is used to adjust the charging power and current. During the discharge process, the discharge power is reasonably allocated according to the load demand and battery performance. The inertia weight w controls the degree to which the particle retains its previous velocity, and the learning factor And random numbers It determines the degree to which particles learn from individual extreme values ​​and global extreme values. By continuously iteratively updating the position and velocity of particles, the optimal combination of system parameters is gradually found to achieve the goals of improving the consistency and stability of battery performance, optimizing system efficiency and reducing costs.

[0042] Verify the developed collaborative control strategy in the simulation environment, simulate different working scenarios and input conditions, evaluate the effectiveness of the strategy, conduct experimental tests in actual rebalancing systems and energy storage systems, collect actual data, update and improve the collaborative control strategy in a timely manner, and use the principal component analysis PCA method to reduce the data dimension while retaining key information. The principal component analysis method reduces the data dimension. First, the collected high-dimensional data matrix is ​​represented as X, where each row represents a data sample and each column represents a feature variable. Calculate the covariance matrix of the data

[0043] Perform eigenvalue decomposition on the covariance matrix C and obtain the eigenvalue and the eigenvector ; Select the first k eigenvectors with larger eigenvalues ​​to form the projection matrix p; Project the original data X into the low-dimensional space to obtain the reduced-dimensional data Y=XP.

[0044] When the collected high-dimensional data matrix is ​​represented as X, each row represents a data sample and each column represents a characteristic variable, such as the voltage, current, and temperature of the battery; Calculate the covariance matrix of the data according to the formula . Assume that the dimension of the data matrix X is (n samples, m features); First, calculate the mean vector of the data, Where x represents the i-th sample.

[0045] Then each sample is centered, that is,

[0046] Finally, the covariance matrix is ​​calculated as follows:

[0047] Eigenvalue Decomposition: Perform eigenvalue decomposition on the covariance matrix C and obtain the eigenvalue and the eigenvector , solve the characteristic equation |C |=0, where i is the unit matrix, and the eigenvalue is obtained ; For each eigenvalue , solve the equation , and obtain the corresponding feature vector ; The first k eigenvectors with larger eigenvalues ​​are selected to form the projection matrix P. The larger the eigenvalue, the larger the variance of the data in the direction represented by the corresponding eigenvector, and the more information it contains.

[0048] A long short-term memory network model is built to process time series data and capture the dynamic changes of battery status.

[0049] Public engineering support module: The public engineering system operates continuously to provide cooling, ventilation, and fire protection for the entire energy storage system, ensuring that all equipment works in a suitable environment; Real-time monitoring and feedback module continuously monitors the operating status of the system. If there is any abnormality, it will be fed back to the EMS system in time for adjustment and processing; Maintenance and optimization module, data accumulation, replacement of aging components of the system and adjustment of control strategies.

[0050] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0051] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A method for arranging an energy storage workshop in an iron-chromium liquid flow battery energy storage power station, characterized in that: It consists of 200 sets of 0.5MW / 2MWh iron-chromium flow battery energy storage modules. Every 4 sets of 0.5MW / 2MWh energy storage modules are equipped with 1 set of 2MWPCS and box-type transformer. In the layout of the energy storage workshop in the iron-chromium flow battery energy storage power station, the overall area of ​​the energy storage workshop is calculated and optimized. The formula is as follows: Calculate the voltage drop caused by the resistance of the current in the transmission line to evaluate and optimize the DC line layout from the energy storage module to the PCS and the box-type transformer to reduce the voltage drop loss. The calculation formula is as follows: The battery energy storage module includes: data acquisition and monitoring module, which collects the operating data of the battery system, PCS and box-type transformer, rebalancing system, EMS system and utility system in real time through sensors and monitoring equipment. The transport data includes voltage, current, temperature and power parameters; The data analysis and judgment module transmits the collected data to the EMS system for analysis and processing to determine whether the system is in normal operation; Energy dispatch decision module: Based on data analysis results, grid demand, and renewable energy generation, the EMS system makes energy dispatch decisions and determines the charging and discharging mode and power of the energy storage system. Control command issuing module: The EMS system sends control commands to the PCS and box-type transformer to control the charging and discharging operations of the energy storage module; Rebalancing and adjustment module: The rebalancing system adjusts the distribution of chemical substances inside the battery according to the status of the battery module to maintain the consistency and stability of battery performance; Public engineering support module: The public engineering system operates continuously to provide cooling, ventilation, and fire protection for the entire energy storage system, ensuring that all equipment works in a suitable environment; Real-time monitoring and feedback module continuously monitors the operating status of the system. If there is any abnormality, it will be fed back to the EMS system in time for adjustment and processing; Maintenance and optimization module, data accumulation, replacement of aging components of the system and adjustment of control strategies.

2. The method for arranging an energy storage workshop in an iron-chromium liquid flow battery energy storage power station according to claim 1, characterized in that: During data collection, we optimize sensors and monitoring technologies, use high-precision, high-sensitivity sensors to monitor the distribution and state changes of chemical substances inside the battery in real time, and regularly calibrate and maintain the sensors to ensure their accuracy and reliability.

3. The method for arranging an energy storage workshop in an iron-chromium liquid flow battery energy storage power station according to claim 2, characterized in that: The data analysis algorithm quickly and accurately analyzes and processes the data collected by the sensors. By building a battery model, it predicts the changing trend of the distribution of chemical substances and makes adjustments in advance.

4. The method for arranging an energy storage workshop in an iron-chromium liquid flow battery energy storage power station according to claim 3, characterized in that: Adaptive control is used to improve the accuracy and timeliness of regulation, and the energy generated during the regulation process is recovered and reused. The recovered energy is used to power the system, reducing energy consumption; Gradually adjust the frequency and amplitude of the adjustment dynamically according to the battery usage and status.

5. The method for arranging an energy storage workshop in an iron-chromium liquid flow battery energy storage power station according to claim 1, characterized in that: Deeply integrate the rebalancing system with the entire energy storage system to achieve collaborative work and information sharing among various parts, and optimize the design and parameter adjustment of battery performance, energy consumption and regulation effects in the entire system.

6. The method for arranging an energy storage workshop in an iron-chromium liquid flow battery energy storage power station according to claim 1, characterized in that: Formulate a coordinated control strategy to dynamically adjust the charging power and current according to the battery status and the needs of the rebalancing system; during the discharge process, reasonably allocate the discharge power according to the load demand and battery performance; Determine specific indicators to improve battery performance consistency and stability, analyze constraint rebalancing system adjustment speed, adjustment range, and energy consumption, build a mathematical model of the battery module, describe its charge and discharge characteristics, aging process, and chemical substance distribution changes, and establish a system-level model to simulate operation under different working conditions; Determine the combination of feedback control and feedforward control, select the appropriate time interval for adjustment according to the dynamic response characteristics of the system, and define the control cycle and frequency.

7. The method for arranging an energy storage workshop in an iron-chromium liquid flow battery energy storage power station according to claim 6, characterized in that: Adopt PID control algorithm, calculate control quantity according to deviation, and use particle swarm optimization algorithm to optimize multiple objectives such as battery performance, system efficiency and cost at the same time while satisfying constraints; Calculate the control amount based on the deviation, and the mathematical expression is: in is the control quantity, is the difference between the actual and expected battery performance. is the proportionality coefficient, is the integration coefficient, is the differential coefficient, according to the deviation Calculate the control amount The control quantity is used to adjust the adjustment speed and adjustment range of the rebalancing system.

8. The method for arranging an energy storage workshop in an iron-chromium liquid flow battery energy storage power station according to claim 7, characterized in that: Under the premise of satisfying the constraints, the battery performance, system efficiency and cost objectives are optimized simultaneously. The particle optimization algorithm formula is as follows: Establish a population of n ions in a D-dimensional search space: The position of the i-th particle is expressed as: The speed is expressed as: Particles update their positions and velocities by tracking two extreme values: one is the individual extreme value Indicates the optimal position found by the particle itself; The other is the global extreme value Indicates the optimal position currently found by the entire population; The particle speed and position update formula is as follows: Where K is the number of iterations, W is the inertia weight, and is the learning factor, and is a random number in the range [0,1].

9. The method for arranging an energy storage workshop in an iron-chromium liquid flow battery energy storage power station according to claim 1, characterized in that: The developed collaborative control strategy is verified in a simulation environment, different working scenarios and input conditions are simulated, the effectiveness of the strategy is evaluated, experimental tests are conducted in actual rebalancing systems and energy storage systems, actual data are collected, and the collaborative control strategy is updated and improved in a timely manner.

10. The method for arranging an energy storage workshop in an iron-chromium liquid flow battery energy storage power station according to claim 9, characterized in that: The principal component analysis (PCA) method is used to reduce the data dimension while retaining key information. A long short-term memory network model is constructed to process time series data and capture the dynamic changes of battery status.

Citation Information

Patent Citations

  • A method for deploying energy storage power stations to solve power flow congestion problems

    CN110797889B

  • Control system for a flow cell battery

    CN102460810A

  • Iron-chromium flow battery control system

    CN117423880A

  • Flow battery operation and maintenance system and method based on cloud digital twinning

    CN118101732A

  • Power supply system

    CN218449527U