Railway engineering unmanned aerial vehicle intelligent inspection system

Through the intelligent inspection system of railway engineering drone, the construction site is monitored in real time using drones and AI intelligent identification algorithms, which solves the problems of high cost and low efficiency of traditional manual inspections, and achieves more efficient construction management and safety monitoring .

CN118890438APending Publication Date: 2024-11-01CHINA RAILWAY BRIDGE RES TECH CO LTD +3
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410975112.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-19
Publication Date
2024-11-01

AI Technical Summary

Technical Problem

The construction environment in railway engineering projects is complex, the safety risks are high, the traditional manual inspection is costly and inefficient, making it difficult to monitor the construction progress and mechanical equipment situation in real time.

Method used

Design an intelligent inspection system for railway engineering drones, including perception layer, network layer, platform layer and management layer. Use drones to collect construction site images and combine machine deep learning AI intelligent identification algorithm to achieve construction personnel and safety Real-time monitoring and analysis of risks, the use of large-scale construction machinery and construction progress.

Benefits of technology

It has improved the safety management level of the construction site and the efficiency of construction machinery and equipment use, improved the level of construction progress management, reduced inspection costs, and achieved more efficient railway engineering construction inspection management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118890438A_ABST
    Figure CN118890438A_ABST
Patent Text Reader

Abstract

A sensing layer comprises an unmanned aerial vehicle and a flight control system, the flight control system is used for setting a railway line inspection route and making and issuing a flight plan, and the unmanned aerial vehicle is used for collecting an inspection image of a railway construction site; the network layer is used for realizing data transmission between each unmanned aerial vehicle and the platform layer; the platform layer comprises a management platform, and the management platform is used for carrying out data analysis and processing on the inspection images and sending inspection results to the inspection result visualization layer; the inspection result visualization layer is used for displaying constructors, safety risks, use conditions of large engineering machinery, engineering construction progress and data analysis and statistics results of tampering progress, and checking flight records, flight plan execution conditions, inspection process real-time live broadcast and inspection images; and the management layer is used for project management personnel to perform safety management, quality management and progress management in combination with the visual inspection result. According to the invention, more efficient railway engineering construction inspection management can be realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of railway engineering project construction management and inspection, and in particular to a railway engineering drone intelligent inspection system. Background Art

[0002] Railway construction lines are long, the terrain is complex, and temporary construction such as project departments, beam yards, main bridges, and mixing plants are scattered, which poses great safety risks. Traditional railway inspections mainly rely on manual work, which requires a lot of manpower and material resources, and the inspection costs are high. During manual inspections, the safety risks of staff are high, and the safety management efficiency of the project department is low. In recent years, the development and application prospects of drone technology are broad. Drones can fly quickly and conduct all-round observations of railway lines. Advanced sensor equipment is used to obtain accurate inspection data in real time, which greatly improves inspection efficiency, reduces inspection costs, and improves inspection safety.

[0003] Railway engineering projects currently have increasingly higher requirements for intelligent management. Railway engineering drone inspection technology can be combined with artificial intelligence algorithms, and big data analysis and other technical means can be used to monitor and manage the railway engineering construction process. At present, drones and drone airports are rarely used in railway projects. They are mainly used for aerial photography and recording. It still takes time for them to be used for on-site feature recognition and construction management. In the process of railway engineering project construction management, how to deal with harsh construction environments, improve the management efficiency of managers, reduce safety violations of on-site personnel, and grasp the construction progress of construction sites in real time, and the attendance of mechanical engineering machinery and equipment are the key and difficult points in on-site management. Summary of the invention

[0004] The embodiment of the present application provides a railway engineering UAV intelligent inspection system, which can achieve more efficient railway engineering construction inspection management.

[0005] The embodiment of the present application provides a railway engineering drone intelligent inspection system, which includes a perception layer, a network layer, a platform layer, an inspection result visualization layer and a management layer;

[0006] The perception layer includes a drone and a flight control system. The flight control system is used to set a railway line inspection route, formulate and issue a flight plan. The drone is used to fly according to the railway line inspection route and flight plan, and collect inspection images of the railway construction site.

[0007] The network layer is used to realize data transmission between each drone and the platform layer;

[0008] The platform layer includes a management platform, which is used to perform data analysis and processing on the received inspection images, and send the inspection results obtained by processing to the inspection result visualization layer;

[0009] The inspection results visualization layer is used to display the construction personnel, safety risks, use of large-scale construction machinery, construction progress, demolition progress data analysis and statistical results, view flight records, flight plan execution, real-time live broadcast of the inspection process, and inspection images;

[0010] The management layer is used by project managers to perform safety management, quality management and progress management in combination with visualized inspection results.

[0011] In some embodiments, the drone is equipped with a drone airport, which is used to charge the drone and provide the drone with fixed-point takeoff and landing. The drone airport is connected to an external AC power supply and is equipped with a rain gauge, a wind turbine and video surveillance.

[0012] In some embodiments, the network layer includes a wired communication network and a wireless communication network. The drone and the drone airport use the wireless communication network to complete data transmission, and the drone airport and the management platform complete data transmission through the wired communication network.

[0013] In some embodiments, the drone is equipped with a 4G module, and the 4G module is used to enhance long-distance inspection image transmission signals and send and receive flight instructions.

[0014] In some embodiments, the flight control system includes:

[0015] The equipment management module is used to uniformly manage the equipment of drone airports and drones, and display whether the drones and drone airports are online, the number of missions performed, and the flight duration information;

[0016] A route management module, which is used to support the management of the UAV to create new railway line inspection routes, and view, edit, and delete existing railway line inspection routes;

[0017] The flight plan module is used to manage and maintain flight plans, create new flight plans, view flight plans in lists, calendars, and monthly calendars, and formulate immediate inspection tasks, regular single inspection tasks, and regular cyclic inspection tasks;

[0018] The flight record module is used to view historical and future flight plans, and to view the corresponding flight status, flight start and end time, completion rate, plan type, plan name, route, and creator;

[0019] The command hall module is used to view the operation status of online drones and online drone airports, obtain real-time videos of online drones, understand the real-time status of online drones, link the control list of online drones, and realize remote control of online drones;

[0020] The flight control homepage contains statistical data, online data, and a map area to view the online status and distribution of personnel, airports, and drones, and is used for plotting, flight control, and flight guidance.

[0021] In some embodiments, the platform layer also includes a server, a machine deep learning AI intelligent recognition algorithm, and a drone inspection database;

[0022] The management platform is also used to establish a drone inspection database based on the server to store equipment management data, flight records, inspection images, and inspection results in real time;

[0023] The management platform is also used to use inspection images to intelligently identify and count construction personnel, safety risks, use of large-scale construction machinery, construction progress, and demolition progress based on machine deep learning AI intelligent recognition algorithms.

[0024] In some embodiments, the device management data includes the name of the drone, the name of the drone airport, and the drone's power, network, and temperature information.

[0025] In some embodiments, the inspection results visualization layer includes:

[0026] A visual homepage, which is used to display the number of construction workers at the railway construction site, the classification of safety risks and the statistics of various safety risks by year, month and day, the working conditions and number of large-scale construction machinery entering the site, the progress of construction at each work site of the railway line, the progress of the acquisition and demolition of houses and power equipment near the railway line, and the statistical results of the acquisition and demolition information data analysis;

[0027] The airport management module is used to monitor the real-time operation status of the drone and the drone airport and view flight records, flight plan execution status, and real-time live broadcast of the inspection process;

[0028] Resource file module, which is used to view inspection images.

[0029] In some embodiments, the safety risk includes construction workers not wearing safety helmets;

[0030] The large-scale construction machinery includes heavy trucks, crawler cranes, cement trucks, rotary drilling rigs and excavators;

[0031] The inspection images include video and picture image data during the inspection.

[0032] In some embodiments, the management layer is used for project department and project branch managers to compare the inspection images of drones with the construction progress plan, obtain progress deviations, and provide a basis for adjusting construction strategies;

[0033] The management layer is also used by project department and project branch managers to analyze drone inspection images, obtain safety hazards and construction quality at the construction site, and resolve them;

[0034] The management layer is also used to generate weekly, monthly and quarterly statistical data based on the inspection results, and the statistical data include project construction progress, construction quality and safety hazards.

[0035] The beneficial effects of the technical solution provided by this application include:

[0036] The embodiment of the present application provides a railway engineering drone intelligent inspection system, which can improve the safety management level of the construction site, improve the efficiency of the use of engineering machinery and equipment, improve the level of construction progress management, improve the inspection efficiency, reduce the inspection cost, and achieve more efficient railway engineering construction inspection management. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0038] Figure 1 Module diagram of the railway engineering UAV intelligent inspection system provided in the embodiment of the present application;

[0039] Figure 2 A module diagram of a flight control system provided in an embodiment of the present application;

[0040] Figure 3 This is a module diagram of the inspection results visualization layer provided in an embodiment of the present application. DETAILED DESCRIPTION

[0041] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0042] See also Figure 1 As shown, an embodiment of the present application provides a railway engineering UAV intelligent inspection system, which includes a perception layer, a network layer, a platform layer, an inspection results visualization layer and a management layer.

[0043] The perception layer includes a drone and a flight control system. The flight control system is used to set railway line inspection routes, formulate and issue flight plans, and the drone is used to fly according to the railway line inspection routes and flight plans, and collect inspection images of railway construction sites.

[0044] The network layer is used to realize data transmission between each UAV and the platform layer.

[0045] The platform layer includes a management platform, and the management platform is used to perform data analysis and processing on the received inspection images, and send the inspection results obtained by processing to the inspection result visualization layer.

[0046] The inspection results visualization layer is used to display the statistical results of data analysis on construction personnel, safety risks, use of large-scale construction machinery, construction progress, and demolition progress, and to view flight records, flight plan execution status, real-time broadcast of the inspection process, and inspection images.

[0047] The management layer is used by project managers to perform safety management, quality management and progress management in combination with visualized inspection results.

[0048] This application uses drones to replace manual inspections, which has strong operability. Drones can enter places that are difficult for humans to enter, avoiding safety risks for workers. Drones can take inspection images of factory construction sites, analyze and process the inspection images, and visualize them for relevant managers to conduct safety management, quality management, and progress management. It can be seen that compared with manual inspections, this application can improve the level of safety management at construction sites, improve the efficiency of the use of construction machinery and equipment, improve the level of construction progress management, improve inspection efficiency, reduce inspection costs, and achieve more efficient railway engineering construction inspection management.

[0049] See also Figure 1 As shown, in some preferred embodiments, the drone is equipped with a drone airport, which is used to charge the drone and provide the drone with fixed-point takeoff and landing to achieve unmanned operation. The drone airport is connected to an external AC power supply and is equipped with a rain gauge, a wind turbine and video surveillance.

[0050] The drone must be equipped with wide-angle, telephoto and infrared cameras, which can intuitively present visible light and thermal imaging images and is suitable for security, inspection and other operations; the operating radius of the drone must reach 10km.

[0051] Drones can also be equipped with RTK modules to achieve high-precision and accurate positioning to meet high-precision operation requirements and improve safety.

[0052] The drone is also equipped with a 4G module, which is used to enhance long-distance inspection image transmission signals and send and receive flight instructions.

[0053] See also Figure 1 As shown, in some preferred embodiments, the network layer includes a wired communication network and a wireless communication network. The UAV and the UAV airport use the wireless communication network to complete data transmission, and the UAV airport and the management platform complete data transmission through the wired communication network.

[0054] The wired communication network includes optical fiber or network cable, and the wireless communication network includes 2.4G radio communication and 4G radio communication.

[0055] See also Figure 2 As shown, in some preferred embodiments, the flight control system includes an equipment management module, a route management module, a flight plan module, a flight recording module, a command hall module and a flight homepage, wherein:

[0056] The equipment management module is used to perform unified equipment management on drone airports and drones, and to display whether the drones and drone airports are online, the number of missions performed, and flight duration information.

[0057] The route management module is used to support the management of the UAV to create new railway line inspection routes, and view, edit, and delete existing railway line inspection routes.

[0058] The flight plan module is used to manage and maintain flight plans, create new flight plans, support viewing flight plans in lists, calendars, and monthly calendars, and formulate immediate inspection tasks, regular single inspection tasks, and regular cyclic inspection tasks.

[0059] The flight record module is used to view historical and future flight plans, and to view the corresponding flight status (such as in flight or not in flight), flight start and end time, completion rate, plan type, plan name, route, and creator.

[0060] The command hall module is used to view the operation status of online drones and online drone airports, obtain real-time videos of online drones, understand the real-time status of online drones, link to the control list of online drones, and realize remote control of online drones.

[0061] The flight homepage contains statistics, online data, and a map area to view the online status and distribution of personnel, airports, and drones, and is used for plotting, flight control, and flight guidance.

[0062] See also Figure 1As shown, in some preferred embodiments, the platform layer also includes a server, a machine deep learning AI intelligent recognition algorithm and a drone inspection database.

[0063] The management platform is also used to establish a drone inspection database based on the server to store equipment management data, flight records, inspection images, and inspection results in real time.

[0064] The management platform is also used to use inspection images to intelligently identify and analyze statistics on construction personnel, safety risks, use of large-scale construction machinery, construction progress, and demolition progress based on machine deep learning AI intelligent recognition algorithms.

[0065] Among them, the device management data includes the name of the drone, the name of the drone airport, the power, network and temperature information of the drone.

[0066] See also Figure 3 As shown, in some preferred embodiments, the inspection results visualization layer includes a visualization homepage, an airport management module and a resource file module, wherein:

[0067] The visualization homepage is used to display the number of construction workers at the railway construction site, the classification of safety risks and statistics of various safety risks by year, month and day, the working conditions and quantity of large-scale construction machinery entering the site, the construction progress of various work points on the railway line, the progress of the acquisition and demolition of houses and power equipment near the railway line, and the statistical results of the acquisition and demolition information data analysis.

[0068] The airport management module is used to monitor the real-time operating status of the drone and the drone airport and to view flight records, flight plan execution status, and live broadcast of the inspection process.

[0069] The resource file module is used to view inspection images.

[0070] Among them, the safety risks include construction workers not wearing safety helmets, etc.

[0071] The large-scale construction machinery includes heavy trucks, crawler cranes, cement trucks, rotary drilling rigs and excavators, etc.

[0072] The inspection images include video, picture and image data during the inspection.

[0073] The inspection results visualization layer also includes an early warning shouting module, which is used for drone inspection and emergency response. Specifically, during the construction of the railway project, emergencies may occur, such as natural disasters, engineering machinery and equipment failures, etc. With the cooperation of the management, the drone can quickly fly to the site to obtain first-hand information, help the project department to respond to emergencies, adjust the construction schedule, and ensure the smooth progress of the construction. In addition, the 5G speaker on the drone can be used to remotely shout for sudden risk events, and the dangerous behavior of the on-site personnel can be corrected in time; and the drone inspection warning photos can be pushed to the project management personnel in real time through the WeChat public account, so that the project management personnel can grasp the on-site situation in time and take emergency measures to deal with safety risks in time; at the same time, it supports multi-level risk warning functions, and the warning push is pushed step by step according to the risk level.

[0074] In some preferred implementations, the management layer is used for project department and project branch managers to compare the inspection images of the drone with the construction progress plan, obtain progress deviations, and provide a basis for adjusting the construction strategy.

[0075] Specifically, the management layer is used to assist in monitoring the progress of the project construction visually based on the inspection results. Regular inspections of the railway construction site are carried out by drones to obtain inspection images of the railway construction site in real time, so as to accurately grasp the progress of the project construction. The project department and project branch managers compare the inspection images of the drone with the construction schedule, promptly discover progress deviations, and provide a basis for adjusting construction strategies.

[0076] The management layer is also used by project department and project branch managers to analyze drone inspection images, obtain safety hazards and construction quality at the construction site, and resolve them.

[0077] Specifically, the management layer is also used to visually assist in solving safety and quality problems based on the inspection results. The high-definition camera and infrared thermal imaging technology of the drone can identify safety hazards and construction quality problems at the construction site. Project department and project branch managers can analyze the inspection images of drones to promptly discover and solve safety and quality problems to prevent the problems from expanding and affecting the construction progress.

[0078] The management layer is also used to generate weekly, monthly and quarterly statistical data based on the inspection results, and the statistical data include project construction progress, construction quality and safety hazards.

[0079] Specifically, the management layer is also used to visualize inspection data statistics based on the inspection results, regularly use drones for inspections, and generate weekly, monthly, and quarterly statistical data. The statistical data include data on construction progress, construction quality, safety hazards, etc. These data can be used as a basis for construction progress adjustment, quality improvement, and safety management.

[0080] Furthermore, the management layer is also used by project managers to effectively respond to emergencies during the construction of railway projects, such as natural disasters, engineering machinery and equipment failures, etc. UAVs can quickly fly to the site to obtain first-hand information, help the project department respond to emergencies, adjust the construction schedule, and ensure smooth construction.

[0081] Furthermore, the management layer is also used by project managers to conduct image traceability of railway engineering projects. Through this process, the construction progress, quality, safety and other aspects of the engineering projects can be understood, and important basis can be provided for subsequent project management, quality assessment, accident investigation, etc.

[0082] Take the specific steps of intelligent inspection by drones of a high-speed railway project as an example. When deploying drones and drone airports near the inspection railway line, it is recommended to install them in places without obvious signal obstructions, such as open ground or rooftops; to ensure the signal quality of the airport's built-in RTK module and the operating stability of engineering machinery and equipment, it is necessary to ensure that there are no obvious signal obstructions within the 20° ground elevation angle; the drone airport needs to be connected to the wired network and 220V mains power and installed in a fixed position; because the inspection line is long, the drone needs to be installed with a 4G image transmission enhancement module and a high-traffic 4G traffic card; after the drone and drone airport are deployed, check whether the drone and drone airport are in good working condition, including whether the network signal, GPS signal, flight sensor and drone obstacle avoidance system are normal; connect the drone and drone airport to the flight control system and management platform; use the drone to automatically survey the terrain near the drone airport, the drone performs the inspection task, the management platform stores, analyzes and processes the inspection data, and visualizes the inspection results.

[0083] The flight control system is used to set up railway line inspection routes, formulate and issue inspection flight plans, and collect on-site image data. The flight control system must have the following functional modules:

[0084] The equipment management module can perform unified equipment management on drone airports and drone equipment, and can display whether the drones and drone airports are online, the number of missions performed, and the flight duration information;

[0085] The route management module supports the management of the UAV to create new routes, view, edit and delete existing routes;

[0086] The flight plan module manages and maintains flight plans. It can create new plans, view plans in lists, calendars, and monthly calendars, and execute them immediately. The flight plan module can formulate immediate inspection tasks, regular single inspection tasks, and regular cyclic inspection tasks.

[0087] The flight record module can view historical and future plans, and view the corresponding flight status, flight start and end time, completion rate, plan type, plan name, route, and creator.

[0088] The command hall module can view the operation status of online drones and online airports, obtain real-time videos of online drones, understand the real-time status of drones, and link to the control list of online drones to realize remote control of online drones;

[0089] The flight control homepage contains statistical data, online data, and a map area to view the online status and distribution of personnel, airports, and drones; it can directly perform plotting, flight control, and flight guidance;

[0090] The flight control system's online remote control function or use of a remote controller to survey the terrain near the railway line and plan a safe and reasonable inspection route; the inspection route needs to be as long as possible to meet the needs of railway engineering inspections, the inspection route needs to meet the recommended relative flight altitude of the drone between 100m-120m, the camera gimbal angle needs to be aimed at the center line of the line, and ensure that the route meets the needs of collecting construction conditions at the construction site and the surrounding demolition conditions.

[0091] A cyclical scheduled inspection plan is set based on the flight control system, and the inspection frequency can be set according to the inspection requirements. In the embodiment, the inspection frequency of the high-speed railway engineering drone is twice a day, at 10 am and 3 pm every day; based on the flight control system, an immediate inspection task and a single scheduled inspection task are also set;

[0092] Based on the flight control system and the drone, the drone autonomously flies according to the inspection route to inspect the inspection target; the drone uses the lens to capture video of the inspection object and pushes the video stream to the streaming media server; it can realize real-time collection of videos and photos of the railway construction site, and transmit the collected image data to the management platform in real time for real-time analysis and processing.

[0093] The platform layer software content includes database, management platform and machine deep learning AI intelligent recognition algorithm, and the hardware content includes server; the management platform deploys AI recognition algorithm for storing, analyzing and processing collected data;

[0094] The management platform can establish the management platform drone inspection database based on the server, and store equipment management data, flight record data, inspection image data, inspection results data and other data in real time; the equipment management data includes information such as the name of the drone, the name of the drone airport, the power, network and temperature of the drone, etc.

[0095] The management platform is based on machine deep learning AI intelligent recognition algorithm, and uses inspection images to intelligently identify and count construction personnel, safety risks, use of large-scale construction machinery, construction progress, and demolition progress; the AI ​​intelligent recognition algorithm can identify and warn of situations such as not wearing a safety helmet, not wearing a life jacket, and not wearing a safety belt during high-altitude operations in the construction area, effectively reducing unsafe human behavior; the AI ​​intelligent recognition algorithm counts the attendance of personnel and construction machinery and equipment on the entire line in real time, helping the project to grasp the attendance rate of personnel and machinery in real time, and providing valuable data support for the decision-making of project managers; the AI ​​intelligent recognition algorithm recognizes the height of each pier at the construction site to achieve real-time construction progress of the pier body; the AI ​​intelligent recognition algorithm identifies the progress of demolition of buildings and high-voltage lines at the construction site.

[0096] The AI ​​intelligent recognition algorithm model achieves the above functions through the following steps;

[0097] Step 1: Data collection and preparation, identify the target objects, scenes or features that need to be identified or classified; Data collection: Use appropriate methods and tools to collect sufficiently diverse and representative image data; Data annotation: Annotate the collected data to indicate the areas of interest in the image and their categories. This can be done manually or with the help of auxiliary tools; Data cleaning: Screen and clean the collected data to remove duplicate, blurred or non-standard images to ensure the cleanliness and effectiveness of the data set;

[0098] Step 2: Model selection and training. Model selection: select a suitable model architecture such as convolutional neural network (CNN) and its various variants such as VGGNet, ResNet, Inception, etc. according to task requirements and available resources; data preprocessing: in order to improve the model training effect, perform necessary preprocessing operations before inputting data, such as scaling images to the same size and normalizing them; model training: use the selected model architecture for training;

[0099] Step 3: Feature extraction: extract effective features from the preprocessed image for use by subsequent classifiers.

[0100] Step 4: Design a classifier to identify objects in the image based on the extracted features. Common classifiers include SVM, decision tree, neural network, etc. Convolutional neural network (CNN) in deep learning has shown remarkable performance in image classification tasks;

[0101] Step 5: Output and application of results: output the recognition results and apply them to actual scenarios, such as face recognition, object recognition and classification, medical image analysis, etc.

[0102] Through the above steps, AI intelligent recognition algorithm can realize intelligent analysis and recognition of image content, providing strong technical support for applications in various fields.

[0103] The inspection results visualization layer includes functional modules such as a visualization homepage, an airport management module, a resource file module, and a visualization management module.

[0104] The visual homepage can display the statistical results of personnel, safety risks, large-scale construction machinery, project progress, and demolition progress data analysis; the visual homepage can display the execution status of inspection tasks in the form of pie charts, such as successful execution, failed execution, and statistics in progress;

[0105] The visualization homepage can display the number of on-site personnel during the inspection process and scroll through the identification result images;

[0106] The visualization homepage can display the working conditions and quantity of large-scale construction machinery such as heavy trucks, crawler cranes, cement trucks, rotary drilling rigs, excavators, etc. during the inspection process and scroll through the identification result pictures;

[0107] The visualization homepage can display the construction progress of each work point of the line during the inspection process, such as the construction progress of bridge abutments, piers, and main beams, and scroll through the identification result pictures;

[0108] The visualization homepage can display the data analysis and statistical results of the demolition progress and demolition information of houses and power equipment near the line during the inspection process, and scroll the recognition result pictures;

[0109] The airport management module can monitor the drone airport operation time, network status, storage capacity, airport temperature, wind speed, rainfall and other parameters in real time; it can monitor the drone power, number of GPS satellites, wind speed, horizontal speed, vertical speed, relative altitude, longitude and latitude and other parameters in real time, and can also view the airport real-time monitoring; view the inspection flight records such as the project organization, plan name, route, planned flight time, execution completion time, and flight plan execution status;

[0110] The resource file module can select a time period to view historical inspection image data;

[0111] The visual management module can classify and manage inspection results, such as project video files, project image files, project orthophoto files, demolition and requisition images, and manually annotated files;

[0112] The visual management module can analyze and compile statistics on different inspection categories such as safety risks, personnel, machinery, and demolition and requisition identification categories, and view and manage them in the form of charts.

[0113] The management layer is for project managers to manage based on the visual inspection results. The management layer is used by project managers to improve the construction management level by combining the visual inspection results to carry out safety management, quality management and progress management.

[0114] The management can help solve safety and quality problems based on the visualization of the inspection results. The high-definition camera and infrared thermal imaging technology of the drone can identify safety hazards and construction quality problems at the construction site. Project department and project branch managers can analyze the inspection data of drones to timely discover and solve safety and quality problems to prevent the problems from expanding and affecting the construction progress.

[0115] The management level can visualize the inspection data statistics based on the inspection results, regularly use drones for inspections, and generate weekly / monthly / quarterly statistical data on the drone inspection platform. The statistical data include data on construction progress, construction quality, safety hazards, etc. These data can be used as a basis for construction progress adjustment, quality improvement, and safety management.

[0116] The management team can effectively respond to emergencies during the construction of railway projects, such as natural disasters, engineering machinery and equipment failures, etc. UAVs can quickly fly to the site to obtain first-hand information, help the project department respond to emergencies, adjust the construction schedule, and ensure smooth construction.

[0117] The management-level project managers can conduct image traceability of railway engineering projects. Through this process, they can understand the construction progress, quality, safety and other aspects of the engineering projects, and provide important basis for subsequent project management, quality assessment, accident investigation, etc.

[0118] In the description of the present application, it should be noted that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to the specific circumstances.

[0119] It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

[0120] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.

Claims

1. A railway engineering UAV intelligent inspection system, characterized in that: It includes the perception layer, network layer, platform layer, inspection results visualization layer and management layer; The perception layer includes a drone and a flight control system. The flight control system is used to set a railway line inspection route, formulate and issue a flight plan. The drone is used to fly according to the railway line inspection route and flight plan, and collect inspection images of the railway construction site. The network layer is used to realize data transmission between each drone and the platform layer; The platform layer includes a management platform, which is used to perform data analysis and processing on the received inspection images, and send the inspection results obtained by processing to the inspection result visualization layer; The inspection results visualization layer is used to display the construction personnel, safety risks, use of large-scale construction machinery, construction progress, demolition progress data analysis and statistical results, view flight records, flight plan execution, real-time live broadcast of the inspection process, and inspection images; The management layer is used by project managers to perform safety management, quality management and progress management in combination with visualized inspection results.

2. The railway engineering UAV intelligent inspection system according to claim 1, characterized in that: The drone is equipped with a drone airport, which is used to charge the drone and provide the drone with a fixed-point takeoff and landing. The drone airport is connected to an external AC power supply and is equipped with a rain gauge, a wind turbine and video surveillance.

3. The railway engineering UAV intelligent inspection system according to claim 2, characterized in that: The network layer includes a wired communication network and a wireless communication network. The UAV and the UAV airport use the wireless communication network to complete data transmission, and the UAV airport and the management platform complete data transmission through the wired communication network.

4. The railway engineering UAV intelligent inspection system according to claim 1, characterized in that: The drone is equipped with a 4G module, which is used to enhance long-distance inspection image transmission signals and send and receive flight instructions.

5. The railway engineering UAV intelligent inspection system according to claim 1, characterized in that: The flight control system comprises: The equipment management module is used to uniformly manage the equipment of drone airports and drones, and display whether the drones and drone airports are online, the number of missions performed, and the flight duration information; A route management module, which is used to support the management of the UAV to create new railway line inspection routes, and view, edit, and delete existing railway line inspection routes; The flight plan module is used to manage and maintain flight plans, create new flight plans, view flight plans in lists, calendars, and monthly calendars, and formulate immediate inspection tasks, regular single inspection tasks, and regular cyclic inspection tasks; The flight record module is used to view historical and future flight plans, and to view the corresponding flight status, flight start and end time, completion rate, plan type, plan name, route, and creator; The command hall module is used to view the operation status of online drones and online drone airports, obtain real-time videos of online drones, understand the real-time status of online drones, link the control list of online drones, and realize remote control of online drones; The flight control homepage contains statistical data, online data, and a map area to view the online status and distribution of personnel, airports, and drones, and is used for plotting, flight control, and flight guidance.

6. The railway engineering UAV intelligent inspection system according to claim 1, characterized in that: The platform layer also includes servers, machine deep learning AI intelligent recognition algorithms and drone inspection databases; The management platform is also used to establish a drone inspection database based on the server to store equipment management data, flight records, inspection images, and inspection results in real time; The management platform is also used to use inspection images to intelligently identify and count construction personnel, safety risks, use of large-scale construction machinery, construction progress, and demolition progress based on machine deep learning AI intelligent recognition algorithms.

7. The railway engineering UAV intelligent inspection system according to claim 6, characterized in that: The device management data includes the name of the drone, the name of the drone airport, the power, network, and temperature information of the drone.

8. The railway engineering UAV intelligent inspection system according to claim 1, characterized in that: The inspection results visualization layer includes: A visual homepage, which is used to display the number of construction workers at the railway construction site, the classification of safety risks and the statistics of various safety risks by year, month and day, the working conditions and number of large-scale construction machinery entering the site, the progress of construction at each work site of the railway line, the progress of the acquisition and demolition of houses and power equipment near the railway line, and the statistical results of the acquisition and demolition information data analysis; The airport management module is used to monitor the real-time operation status of the drone and the drone airport and view flight records, flight plan execution status, and real-time live broadcast of the inspection process; Resource file module, which is used to view inspection images.

9. The railway engineering UAV intelligent inspection system according to claim 8, characterized in that: The safety risks mentioned include construction workers not wearing hard hats; The large-scale construction machinery includes heavy trucks, crawler cranes, cement trucks, rotary drilling rigs and excavators; The inspection images include video and picture image data during the inspection.

10. The railway engineering UAV intelligent inspection system according to claim 1, characterized in that: The management layer is used by project department and project branch managers to compare the inspection images of drones with the construction progress plan, obtain progress deviations, and provide a basis for adjusting construction strategies; The management layer is also used by project department and project branch managers to analyze drone inspection images, obtain safety hazards and construction quality at the construction site, and resolve them; The management layer is also used to generate weekly, monthly and quarterly statistical data based on the inspection results, and the statistical data include project construction progress, construction quality and safety hazards.

Citation Information

Cited By

  • Engineering project remote command management and control method and system