Inland river immersed tube construction method based on multifunctional ship and its function conversion method

The function conversion method using spiral-distributed anchor cables and water flow assistance addresses the challenge of large-angle turning for inland river immersed tube construction, ensuring efficient and cost-effective operation of a multifunctional ship with integrated construction functions.

CN118894193BActive Publication Date: 2024-12-06CCCC FIRST HARBOR ENGINEERING CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411375274.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-09-30
Publication Date
2024-12-06
Estimated Expiration
2044-09-30

AI Technical Summary

Technical Problem

The challenge of achieving small-radius, large-angle turning of a multifunctional ship for inland river immersed tube construction within a restricted working surface, while minimizing energy consumption and ensuring safety, due to the large number of working units and complex power matching required for hull rotation.

Method used

A function conversion method utilizing four anchor cables distributed in a spiral shape relative to the hull center, with one active drive anchor cable selected against the water flow to facilitate turning, assisted by the water flow, and controlled displacement to achieve large-angle turning with minimal energy consumption and easy control.

Benefits of technology

Enables rapid, efficient, and safe function conversion of the multifunctional ship by reducing energy consumption and maintaining a small turning radius, allowing streamlined operations for block stone filling, tamping, leveling, and immersed tube installation, thereby enhancing construction efficiency and reducing costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118894193B_ABST
    Figure CN118894193B_ABST
Patent Text Reader

Abstract

The present invention relates to an inland river immersed tube construction method based on a multifunctional ship and a function conversion method thereof, and belongs to the technical field of inland river immersed tube tunnel construction. The function conversion method comprises the following steps: when the hull is in the initial orientation state, an anchor cable is thrown outward from the four corners of the hull by using an anchor winch device to fix the plane position of the hull by mooring; the anchor point position of each anchor cable is changed to the initial anchor point position close to the adjacent anchor cable, so that the four anchor cables are distributed in a spiral shape relative to the center of the hull; any one of the two anchor cables extending in the opposite direction of the water flow is selected as the active drive anchor cable, the active drive anchor cable is tightened, and the other anchor cables are loosened; the active drive anchor cable is reeled in, and the active drive anchor cable is matched with the force of the water flow to drive the hull to turn; as the hull turns, the other three anchor cables are reeled in to control the displacement of the hull center not to exceed the preset offset. The function conversion method can realize the small radius and large angle turning of the multifunctional ship to realize the function conversion.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of inland river immersed tube tunnel construction, and in particular relates to an inland river immersed tube construction method based on a multifunctional ship and a function conversion method thereof. Background Art

[0002] Compared with the construction conditions of offshore immersed tube tunnels, the construction of inland river immersed tube tunnels involves more social factors such as navigation planning, water resource protection, and traffic organization. Inland waterways are usually narrow and the working surface is limited. Therefore, in order to reduce social impact and avoid the impact of comprehensive navigation closures, the development of an inland river immersed tube construction multifunctional ship assembled from two working barges that integrates the functions of block stone filling, block stone tamping, gravel leveling, immersed tube floating and immersed tube installation is an optimal solution to minimize the configuration of construction ships in the construction of inland river immersed tube tunnels and realize streamlined operations of multiple processes on the water.

[0003] In the multifunctional ship for inland river immersed tube construction, two working barges are equipped with different working units, and the function conversion is realized by turning the hull. However, due to the large number of working units carried by the multifunctional ship, the driving force required for its turning is large. Moreover, when the function is converted, the multifunctional ship needs to rotate at an angle of 90° or even 180°. If the two working barges are used to turn the hull by their own power, it is impossible to complete such a large angle of turning within the limited working surface of the inland waterway. Moreover, the power matching control of the two working barges is a difficult point in the operation. Once the power of the two working barges is not matched, it may cause serious safety accidents.

[0004] Therefore, how to achieve small-radius, large-angle turning of the multifunctional vessel for inland immersed tube construction within the restricted working surface of the inland waterway to realize functional conversion is a technical problem that urgently needs to be solved. Summary of the invention

[0005] In response to the above technical problems, the present invention provides an inland river immersed tube construction method based on a multifunctional ship and a function conversion method thereof. The function conversion method can realize small radius and large angle turning of the multifunctional ship for inland river immersed tube construction, thereby realizing function conversion.

[0006] The invention provides a function conversion method of a multifunctional ship for inland river immersed tube construction, the multifunctional ship for inland river immersed tube construction comprising a hull, the hull comprising two working barges arranged in parallel with each other and a connecting crossbeam connected between the two working barges; the two working barges and the connecting crossbeam are respectively equipped with working units with different functions corresponding to different construction processes in inland river immersed tube tunnel construction; the bow end and the stern end of the two working barges are respectively provided with anchoring equipment for anchoring and retracting and releasing anchor cables; the extension direction of the inland river immersed tube tunnel to be constructed is perpendicular to the water flow direction of the inland river, the orientation of the working unit to be operated carried by the hull when it is in the correct operating orientation is used as the operating orientation of the working unit, and the function conversion method is used to turn the hull to make the orientation of the working unit the same as the corresponding operating orientation when the orientation of the working unit is 90 degrees with the corresponding operating orientation, so as to realize function conversion; the function conversion method comprises the following steps:

[0007] Hull anchoring and mooring: When the hull is in the initial position, use the anchor winch equipment at the bow and stern of the two working barges to throw out an anchor cable from the four corners of the hull respectively. The thrown four anchor cables are distributed in a divergent shape relative to the center of the hull to fix the plane position of the hull by mooring;

[0008] Cable shifting: Taking the anchor point position of the anchor cable when the ship is moored as the initial anchor point position, the anchor point position of each anchor cable is changed to a position close to the initial anchor point position of the adjacent anchor cable, so that the four anchor cables are distributed in a spiral shape relative to the center of the hull; when the hull rotates clockwise from the initial position to the operating position, the spiral is in the clockwise direction, and vice versa;

[0009] Cable-winding steering: select any one of the two anchor cables extending outward from the corner of the hull against the direction of the water flow as the active drive anchor cable, tighten the active drive anchor cable, and loosen the other three anchor cables; use the anchor winch equipment to reel in the active drive anchor cable, and cooperate with the force of the water flow impacting the hull to drive the hull to turn; as the hull turns, reel in the other three anchor cables to control the displacement of the hull center in the horizontal plane not to exceed the preset offset, until the operating unit to be operated carried by the hull turns to its corresponding operating position.

[0010] In some of the embodiments, in the cable moving step, the anchor positions of the two anchor cables that are moved perpendicular to the water flow direction are first changed, and then the anchor positions of the remaining two anchor cables are changed.

[0011] In some of the embodiments, two anchoring devices are arranged at each end of each working barge; in the hull anchoring and mooring step, one of the two anchoring devices located at the same end of the working barge is used to drop anchor; in the cable moving step, the other spare anchoring device is used to throw a new anchor cable in the direction of the new anchor point position, and then the initial working anchoring device is used to retrieve the original anchor cable to complete the replacement of the anchor point position.

[0012] In some of the embodiments, in the cable moving step, the angle between the anchor cable after the anchor point position is changed and the edge of the hull close to one side is 30°~60°.

[0013] In some of the embodiments, in the cable-winding steering step, the anchor cable located on the side of the hull facing the water flow among the two anchor cables is selected as the actively driven anchor cable.

[0014] In some of the embodiments, in the cable steering step, the preset offset is 10-15m.

[0015] In some of the embodiments, the cable steering step further includes: providing a tugboat and utilizing the tugboat to tow the hull to assist in steering the hull.

[0016] In addition, the present invention also provides an inland river immersed tube construction method based on a multifunctional ship, which includes a base bed construction step and an immersed tube transportation and installation construction step, and both the base bed construction step and the immersed tube transportation and installation construction step are constructed by using an inland river immersed tube construction multifunctional ship; the inland river immersed tube construction multifunctional ship includes a hull, and the hull includes two working barges arranged in parallel with each other and a connecting beam connected between the two working barges; the two working barges and the connecting beam are respectively equipped with working units with different functions corresponding to different construction processes in the inland river immersed tube tunnel construction; the bow and stern ends of the two working barges are respectively provided with anchor winch equipment for anchoring and retracting and releasing anchor cables; the two working barges are respectively a first working barge and a second working barge, and the working units include a block stone throwing and filling working unit, a block stone tamping working unit, a crushed stone leveling working unit and an immersed tube sinking and installation working unit, the block stone throwing and filling working unit and the block stone tamping working unit are carried on the first working barge, the crushed stone leveling working unit is carried on the second working barge, and the immersed tube sinking and installation working unit is carried on the connecting beam;

[0017] The base bed construction steps include the following specific steps:

[0018] The steps of rock dumping and filling operation are as follows: a rock dumping and filling operation unit is used as the operation unit to be operated, and the orientation of the ship body when the length direction of the first operation barge is perpendicular to the extension direction of the inland river immersed tube tunnel to be constructed and the first operation barge is closer to the initial operation end of the rock dumping and filling construction than the second operation barge is used as the operation orientation of the rock dumping and filling operation unit; initially, the ship body is located in the initial orientation state where the length direction of the first operation barge is parallel to the extension direction of the inland river immersed tube tunnel to be constructed, and the function conversion method of the multifunctional ship for inland river immersed tube construction described in any of the above technical solutions is used to drive the ship body to rotate 90°, so that the orientation of the rock dumping and filling operation unit faces its corresponding operation orientation, and the ship body is moved along the extension direction of the inland river immersed tube tunnel to be constructed, and the rock dumping and filling operation is performed by using the rock dumping and filling operation unit;

[0019] The stone tamping operation steps: the stone tamping operation unit is used as the operation unit to be operated. The operation direction of the stone tamping operation unit is the same as the operation direction of the stone dumping operation unit. The hull does not need to turn. The hull is returned to the initial position and moved along the extension direction of the inland river immersed tube tunnel to be constructed. The stone tamping operation unit is used to perform the stone tamping operation;

[0020] The stone crushing and leveling operation steps include: taking the stone crushing and leveling operation unit as the operation unit to be operated, taking the orientation of the ship body when the length direction of the second operation barge is perpendicular to the extension direction of the inland river immersed tube tunnel to be constructed and the second operation barge is closer to the initial operation end of the stone crushing and leveling construction than the first operation barge as the operation orientation of the stone crushing and leveling operation unit; using the function conversion method of the inland river immersed tube construction multifunctional ship described in any of the above technical solutions to drive the ship body to turn twice so that the ship body rotates 180 degrees, so that the orientation of the stone crushing and leveling operation unit faces its corresponding operation orientation, and moving the ship body along the extension direction of the inland river immersed tube tunnel to be constructed, and using the stone crushing and leveling operation unit to perform stone crushing and leveling operations;

[0021] The immersed tube transportation and installation construction steps include: taking the immersed tube laying and installation operation unit as the operation unit to be operated, and taking the orientation of the hull when the length direction of the first operation barge is parallel to the extension direction of the inland river immersed tube tunnel to be constructed as the operation orientation of the immersed tube laying and installation operation unit; using the function conversion method of the inland river immersed tube construction multifunctional ship described in any of the above technical solutions to drive the hull to rotate 90° so that the orientation of the immersed tube laying and installation operation unit is toward its corresponding operation orientation, moving the hull to the dock door of the dry dock to connect the immersed tube section moved out of the dry dock, moving the hull along the extension direction of the inland river immersed tube tunnel to be constructed, so as to transport the immersed tube section to the installation position, and sink the immersed tube section.

[0022] In some of the embodiments, before each immersed tube segment is transported and installed, a stone crushing and leveling operation is performed on the base bed corresponding to the immersed tube segment.

[0023] In some of the embodiments, when the gravel leveling operation is performed on the base bed of the immersed tube section closest to the other side of the dry dock, the position of the gravel leveling operation unit close to the other side of the dry dock is used as the operation position; when the gravel leveling operation is performed on the base bed of the immersed tube section closest to the dry dock, the position of the gravel leveling operation unit close to the dry dock is used as the operation position.

[0024] Compared with the prior art, the advantages and beneficial effects of the present invention are:

[0025] 1. The function conversion method of the multifunctional boat for inland river immersed pipe construction provided by the present invention utilizes four anchor cables thrown out from the four corners of the hull when the boat is moored, and moves the anchor point positions of the four anchor cables so that the four anchor cables are distributed in a spiral shape consistent with the turning direction of the hull relative to the center of the hull, and then selects any one of the two anchor cables extending outward from the hull corners in the opposite direction of the water flow as the active driving anchor cable, and realizes the rapid turning of the hull by winding up the active driving anchor cable with the help of the water flow, thereby realizing the function conversion quickly, without using the power of the working barge itself, with low energy consumption and easy control;

[0026] 2. In the function conversion method of the multifunctional ship for inland river immersed tube construction provided by the present invention, during the turning process of the hull, the displacement of the hull center in the horizontal plane is controlled not to exceed the preset offset by winding up the other three anchor cables, thereby realizing the hull turning at a large angle under the premise of a small turning radius, which can meet the construction requirements of the narrow working surface of the inland river;

[0027] 3. In the function conversion method of the multifunctional ship for inland river immersed tube construction provided by the present invention, the active driving anchor cable for driving the ship to turn is selected according to the direction of the water flow, so that the ship can always turn quickly by using the water flow in the inland river with changeable water flow direction, thereby minimizing energy consumption and having good economic benefits;

[0028] 4. The inland river immersed tube construction method based on a multifunctional ship provided by the present invention utilizes a multifunctional ship integrated with the functions of block stone filling, block stone tamping, crushed stone leveling, immersed tube floating and immersed tube installation for construction, and switches between various operating units are achieved by driving the hull steering through a cable, thereby completing the processes of block stone filling, block stone tamping, crushed stone leveling, immersed tube floating and immersed tube installation, forming a streamlined operation, significantly improving the efficiency of water construction and reducing construction costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:

[0030] Figure 1 A schematic diagram of the anchoring and mooring of a hull in a method for converting the functions of a multifunctional ship for inland river immersed tube construction provided by one embodiment of the present invention;

[0031] Figure 2 A schematic diagram of first replacing the anchor point positions of two anchor cables in the cable moving step of a function conversion method of a multifunctional ship for inland river immersed tube construction provided by one embodiment of the present invention;

[0032] Figure 3 A schematic diagram of replacing the anchor point positions of the remaining two anchor cables in the cable moving step of a function conversion method of a multifunctional ship for inland river immersed tube construction provided by one embodiment of the present invention;

[0033] Figure 4 A schematic diagram of a 45° turning of the hull in a cable turning step of a function conversion method of a multifunctional ship for inland river immersed tube construction provided by an embodiment of the present invention;

[0034] Figure 5 A schematic diagram of a 90° turning of the hull in a cable turning step of a method for converting the function of a multifunctional ship for inland river immersed tube construction provided by an embodiment of the present invention;

[0035] Figure 6 A schematic diagram of a tugboat assisting the ship's hull steering in a method for converting functions of a multifunctional ship for inland river immersed tube construction provided by another embodiment of the present invention;

[0036] Figure 7 A schematic flow chart of a block rock dumping operation step in a bed construction step of an inland river immersed tube construction method based on a multifunctional ship provided in one embodiment of the present invention;

[0037] Figure 8 A schematic flow chart of a block stone tamping operation step in a base bed construction step of an inland river immersed tube construction method based on a multifunctional ship provided in one embodiment of the present invention;

[0038] Fig. 9 A schematic flow chart of a step of gravel leveling of a bed corresponding to a first immersed tube section close to the opposite bank of a dry dock in a bed construction step of an inland river immersed tube construction method based on a multifunctional ship provided by an embodiment of the present invention;

[0039] Fig.10 A schematic flow chart of immersed tube transportation and installation construction steps in an inland river immersed tube construction method based on a multifunctional ship provided in one embodiment of the present invention;

[0040] Fig.11 A schematic flow chart of the stone leveling operation step for the base bed corresponding to the last immersed tube section close to the dry dock in the base bed construction step of the inland river immersed tube construction method based on a multifunctional ship provided in one embodiment of the present invention.

[0041] In the figure:

[0042] 1. Hull; 11. First working barge; 12. Second working barge; 13. Connecting beam; 14. Stone throwing and filling operation unit; 15. Stone tamping and leveling operation unit; 16. Stone crushing and leveling operation unit; 17. Immersed tube sinking and installation operation unit; 18. Anchor winch equipment; 2. Tugboat; 3. Immersed tube section;

[0043] L1, first anchor cable; L2, second anchor cable; L3, third anchor cable; L4, fourth anchor cable. DETAILED DESCRIPTION

[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.

[0045] In the description of the present invention, it should be understood that the terms "first", "second", "third", and "fourth" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first", "second", "third", and "fourth" may explicitly or implicitly include one or more of the features.

[0046] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0047] The multifunctional vessel for inland river immersed tube construction comprises a hull 1, which comprises two work barges (specifically comprising a first work barge 11 and a second work barge 12) arranged in parallel with each other and a connecting beam 13 connected between the two work barges; the two work barges and the connecting beam 13 are respectively equipped with work units with different functions corresponding to different construction processes in the inland river immersed tube tunnel construction (specifically comprising a block stone filling work unit 14, a block stone tamping work unit 15, a crushed stone leveling work unit 16 and an immersed tube sinking and installation work unit 17); the bow and stern ends of the two work barges are respectively provided with anchor-winding equipment 18 for anchoring and retracting and releasing anchor cables.

[0048] As attached Figure 1-Figure 5 As shown, an illustrative embodiment of the present invention provides a function conversion method for a multifunctional ship for inland river immersed tube construction, wherein the extension direction of the inland river immersed tube tunnel to be constructed is perpendicular to the water flow direction of the inland river, and the orientation of the working unit to be operated carried by the hull 1 of the multifunctional ship for inland river immersed tube construction when it is in the correct working orientation is used as the working orientation of the working unit. The function conversion method is used to turn the hull 1 to make the orientation of the working unit the same as its corresponding working orientation when the orientation of the working unit is 90° with its corresponding working orientation, so as to realize function conversion; the function conversion method for a multifunctional ship for inland river immersed tube construction includes the following steps:

[0049] S101 hull anchoring and mooring: when the hull 1 is in the initial orientation state, the anchor winch equipment 18 at the bow and stern of the two working barges is used to throw out an anchor cable from the four corners of the hull 1 respectively, and the thrown out four anchor cables (specifically including the first anchor cable L1, the second anchor cable L2, the third anchor cable L3 and the fourth anchor cable L4) are distributed in a divergent shape relative to the center of the hull 1 to fix the plane position of the hull 1 by mooring;

[0050] S102 cable shifting: taking the anchor point position of the anchor cable when the hull 1 is moored and fixed as the initial anchor point position, the anchor point position of each anchor cable is changed to a position close to the initial anchor point position of the adjacent anchor cable, so that the four anchor cables are distributed in a spiral shape relative to the center of the hull 1; wherein, when the hull 1 rotates clockwise from the initial orientation to the operating orientation, the spiral is in the clockwise direction, and vice versa; in this step, it should be noted that when determining the rotation direction of the hull 1, the premise is that the required rotation angle of the hull 1 is minimized, that is, an angle less than 180° is selected as the required rotation angle of the hull 1;

[0051] S103 Cable-winding steering: select any one of the two anchor cables extending outward from the corner of the hull 1 against the direction of the water flow as the active drive anchor cable, tighten the active drive anchor cable, and loosen the other three anchor cables; use the anchor-winding device 18 to reel in the active drive anchor cable, and cooperate with the force of the water flow impacting the hull 1 to drive the hull 1 to turn; as the hull 1 turns, reel in the other three anchor cables to control the displacement of the center of the hull 1 in the horizontal plane not to exceed the preset offset, until the working unit to be operated carried by the hull 1 turns to its corresponding working direction.

[0052] The function conversion method of the above-mentioned multifunctional ship for inland river submerged pipe construction utilizes four anchor cables thrown from the four corners of the hull 1 when the hull 1 is moored, and by moving the anchor point positions of the four anchor cables, the four anchor cables are distributed in a spiral shape relative to the center of the hull 1 in the same direction as the turning direction of the hull 1, and then any one of the two anchor cables extending outward from the corner of the hull 1 in the opposite direction of the water flow is selected as the active drive anchor cable, and by winding the active drive anchor cable, the hull 1 is quickly turned with the help of the water flow, thereby realizing the function conversion, without using the power of the working barge itself, with low energy consumption and easy to control. At the same time, in the function conversion method of the above-mentioned multifunctional ship for inland river submerged pipe construction, during the turning process of the hull 1, the displacement of the center of the hull 1 in the horizontal plane is controlled not to exceed the preset offset by winding the other three anchor cables, thereby realizing the large-angle turning of the hull 1 under the premise of a small turning radius, which can meet the construction requirements of the narrow working surface of the inland river. In addition, in the function conversion method of the above-mentioned multifunctional ship for inland river immersed tube construction, the active driving anchor cable that drives the hull 1 to turn is selected according to the direction of the water flow. In the inland river where the water flow direction is changeable, the water flow can always be used to realize the rapid turning of the hull 1, thereby minimizing energy consumption and having good economic benefits.

[0053] like Figure 2 and Figure 3 As shown, in the cable moving step, the anchor positions of the two anchor cables (specifically the second anchor cable L2 and the fourth anchor cable L4) whose anchor positions are moved perpendicular to the water flow direction are first changed, and then the anchor positions of the remaining two anchor cables (specifically the first anchor cable L1 and the third anchor cable L3) are changed. By moving the anchor cables in the above order, after first moving the two anchor cables, the four anchor cables can be extended along the water flow direction, so that the hull 1 is tightened in the water flow direction by the tensioning of the four anchor cables, and the hull 1 can be prevented from being deflected by the water flow before the four anchor cables are completely moved into place, thereby avoiding safety accidents.

[0054] like Figure 1-Figure 3 As shown, in this embodiment, two anchoring devices 18 are arranged at each end of each working barge; in the step of anchoring and mooring of the hull 1, one of the two anchoring devices 18 located at the same end of the working barge is used to anchor; in the step of moving the cable, the other free anchoring device 18 is used to throw a new anchor cable in the direction of the new anchor point position, and then the initial working anchoring device 18 is used to retract the original anchor cable to complete the replacement of the anchor point position. By arranging two anchoring devices 18 at each corner of the hull 1, the movement of the anchor point position of the anchor cable is achieved by alternating the two anchoring devices 18, which can effectively prevent the hull 1 from being offset during the cable moving process, and avoid safety accidents.

[0055] like Figure 3 As shown, in the cable shifting step, the angle between the anchor cable after the anchor point position is changed and the edge of the hull 1 on one side is preferably 30° to 60°. The anchor cable arranged in this preferred angle range can make the hull 1 turn 90° at one time without multiple cable shifting and multiple cable twisting and steering.

[0056] In the cable-winding steering step, preferably, the anchor cable located on the side of the hull 1 facing the water flow is selected as the active drive anchor cable, which can minimize the displacement of the center of the hull 1 in the water flow direction, thereby minimizing the offset of the center of the hull 1 in the horizontal plane, which is conducive to achieving in-situ steering of the hull 1. Specifically, in this embodiment, the fourth anchor cable L4 is used as the active drive anchor cable.

[0057] Furthermore, in the cable turning step, the preset offset is preferably controlled within the range of 10-15m. It should be noted that the winding speeds of the other three anchor cables except the active drive anchor cable need to be regulated according to the preset offset of the displacement of the center of the hull 1 in the horizontal plane. Controlling the preset offset within the above preferred range can effectively control the turning radius of the hull 1, which is conducive to realizing the in-situ turning of the hull 1 to adapt to the construction of the narrow working surface of the inland river.

[0058] like Figure 6As shown, in another embodiment of the present invention, in order to further improve the steering speed of the hull 1, the cable steering step further includes: providing a tugboat 2, and using the tugboat 2 to drag the hull 1 to assist the steering of the hull 1. It should be noted that the direction in which the tugboat 2 drags the hull 1 is consistent with the rotation direction of the hull 1 to assist the steering of the hull 1.

[0059] Based on the above-mentioned function conversion method of the multifunctional ship for inland river immersed tube construction, as shown in the attached Figure 7-Figure 10 As shown, another embodiment of the present invention further provides an inland river immersed tube construction method based on a multifunctional ship, which includes a base bed construction step and a immersed tube transportation and installation construction step, and both the base bed construction step and the immersed tube transportation and installation construction step are constructed using the above-mentioned inland river immersed tube construction multifunctional ship; wherein, the block stone filling operation unit 14 and the block stone tamping operation unit 15 are carried on the first operation barge 11, the crushed stone leveling operation unit 16 is carried on the second operation barge 12, and the immersed tube sinking and installation operation unit 17 is carried on the connecting beam 13.

[0060] Among them, the S1 base bed construction steps include the following specific steps:

[0061] S11 rock dumping operation step: take the rock dumping operation unit 14 as the operation unit to be operated, take the orientation of the hull 1 when the length direction of the first operation barge 11 is perpendicular to the extension direction of the inland river immersed tube tunnel to be constructed and the first operation barge 11 is closer to the initial operation end of the rock dumping construction than the second operation barge 12 as the operation orientation of the rock dumping operation unit 14; initially, the hull 1 is located in the initial orientation state where the length direction of the first operation barge 11 is parallel to the extension direction of the inland river immersed tube tunnel to be constructed, and the function conversion method of the multifunctional ship for inland river immersed tube construction is used to drive the hull 1 to rotate 90° so that the orientation of the rock dumping operation unit 14 faces its corresponding operation orientation, and the hull 1 is moved along the extension direction of the inland river immersed tube tunnel to be constructed, and the rock dumping operation unit 14 is used to perform rock dumping operation;

[0062] S12: stone tamping operation step: the stone tamping operation unit 15 is used as the operation unit to be operated, the operation position of the stone tamping operation unit 15 is the same as the operation position of the stone dumping operation unit 14, the hull 1 does not need to turn, the hull 1 is returned to the initial position, the hull 1 is moved along the extension direction of the inland river immersed tube tunnel to be constructed, and the stone tamping operation unit 15 is used to perform the stone tamping operation;

[0063] S13 gravel leveling operation steps: take the gravel leveling operation unit 16 as the operation unit to be operated, and take the orientation of the hull 1 when the length direction of the second operation barge 12 is perpendicular to the extension direction of the inland river immersed tube tunnel to be constructed and the second operation barge 12 is closer to the initial operation end of the gravel leveling construction than the first operation barge 11 as the operation orientation of the gravel leveling operation unit 16; use the function conversion method of the above-mentioned inland river immersed tube construction multifunctional ship to drive the hull 1 to turn twice to rotate the hull 1 180°, so that the orientation of the gravel leveling operation unit 16 is toward its corresponding operation orientation, and the hull 1 is moved along the extension direction of the inland river immersed tube tunnel to be constructed, and the gravel leveling operation unit 16 is used to perform gravel leveling operations.

[0064] Among them, the S2 immersed tube transportation and installation construction steps include: taking the immersed tube laying and installation operation unit 17 as the operation unit to be operated, and taking the orientation of the hull 1 when the length direction of the first operation barge 11 is parallel to the extension direction of the inland river immersed tube tunnel to be constructed as the operation orientation of the immersed tube laying and installation operation unit 17; using the function conversion method of the above-mentioned inland river immersed tube construction multifunctional ship to drive the hull 1 to rotate 90°, so that the orientation of the immersed tube laying and installation operation unit 17 is toward its corresponding operation orientation, moving the hull 1 to the dock door of the dry dock to connect the immersed tube segment 3 moved out of the dry dock, moving the hull 1 along the extension direction of the inland river immersed tube tunnel to be constructed, so as to transport the immersed tube segment 3 to the installation position, and sink the immersed tube segment 3.

[0065] In the above-mentioned inland river immersed tube construction method based on a multifunctional ship, it should be noted that the flow direction of the inland river changes with the rise and fall of the tide. When carrying out the above-mentioned construction steps, a suitable construction window period is selected for construction. When the hull 1 turns, based on the function conversion method of the above-mentioned inland river immersed tube construction multifunctional ship, the construction workers determine which of the four anchor cables to select as the active drive anchor cable, and cooperate with the water flow direction to realize the turning of the hull 1. Figure 7-Figure 10 Only the construction process under one water flow condition is shown.

[0066] The above-mentioned inland river immersed tube construction method based on a multifunctional ship utilizes a multifunctional ship integrated with the functions of block stone filling, block stone tamping, crushed stone leveling, immersed tube floating and immersed tube installation for construction, and switches between various operating units are achieved by driving the hull 1 to turn by a winch cable, thereby completing the processes of block stone filling, block stone tamping, crushed stone leveling, immersed tube floating and immersed tube installation, forming a streamlined operation, significantly improving the efficiency of water construction and reducing construction costs.

[0067] In some embodiments, before each immersed tube segment 3 is transported and installed, a gravel leveling operation is performed on the base bed corresponding to the immersed tube segment 3 to ensure that the elevation of the gravel base bed will not change significantly during the immersed tube transportation and installation, thereby ensuring the installation accuracy of the immersed tube segment 3.

[0068] In some embodiments, Fig. 9 As shown, in order to ensure that the gravel leveling operation of the bed at the edge of the dry dock can be carried out in place, when the gravel leveling operation of the bed is carried out for the immersed tube section 3 closest to the dry dock, the position of the gravel leveling operation unit 16 close to the dry dock is used as the operation position; Fig.10 As shown, in order to ensure that the gravel leveling operation of the base bed at the dry dock can be completed in place, when the gravel leveling operation of the base bed is performed on the immersed tube section 3 closest to the dry dock, the position of the gravel leveling operation unit 16 close to the dry dock is used as the operation position.

[0069] Finally, it should be noted that: the various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.

[0070] The above embodiments are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the preferred embodiments, ordinary technicians in the field should understand that the specific implementation methods of the present invention can still be modified or some technical features can be replaced by equivalents without departing from the spirit of the technical solution of the present invention, which should be included in the scope of the technical solution for protection of the present invention.

Claims

1. A method for converting the function of a multifunctional ship for inland river immersed tube construction, characterized in that: The multifunctional ship for inland river immersed tube construction comprises a hull, wherein the hull comprises two work barges arranged in parallel with each other and a connecting beam connected between the two work barges; the two work barges and the connecting beam are respectively equipped with work units with different functions corresponding to different construction processes in the inland river immersed tube tunnel construction; the bow and stern ends of the two work barges are respectively provided with anchor winch equipment for anchoring and retracting and releasing anchor cables; The extension direction of the inland river immersed tube tunnel to be constructed is perpendicular to the water flow direction of the inland river. The orientation of the working unit to be operated carried by the hull when it is in the correct working orientation is used as the working orientation of the working unit. The function conversion method is used to turn the hull to make the orientation of the working unit the same as the corresponding working orientation when the orientation of the working unit is 90 degrees with the corresponding working orientation, so as to realize function conversion; the function conversion method comprises the following steps: Hull anchoring and mooring: when the hull is in the initial orientation, the anchor winch equipment at the bow and stern of the two working barges is used to throw out an anchor cable from the four corners of the hull respectively, and the thrown four anchor cables are distributed in a divergent shape relative to the center of the hull to fix the plane position of the hull by mooring; Cable shifting: taking the anchor point position of the anchor cable when the ship is moored as the initial anchor point position, the anchor point position of each anchor cable is changed to a position close to the initial anchor point position of the adjacent anchor cable, so that the four anchor cables are distributed in a spiral shape relative to the center of the hull; wherein, when the hull rotates clockwise from the initial orientation to the operating orientation, the spiral is in the clockwise direction, and vice versa; when judging the rotation direction of the hull, the angle less than 180° is selected as the required rotation angle of the hull on the premise of minimizing the required rotation angle of the hull; Cable-winding steering: among the two anchor cables extending outward from the corners of the hull in the direction against the water flow, select the anchor cable fixed to the hull on the side facing the water flow as the actively driven anchor cable, tighten the actively driven anchor cable, and loosen the other three anchor cables; use the anchor-winding equipment to reel in the actively driven anchor cable, and cooperate with the force of the water flow impacting the hull to drive the hull to turn; as the hull turns, reel in the other three anchor cables to control the displacement of the center of the hull in the horizontal plane to not exceed a preset offset, until the working unit to be operated carried by the hull turns to its corresponding working position.

2. The function conversion method of the multifunctional ship for inland river immersed tube construction according to claim 1 is characterized in that: In the cable moving step, the anchor positions of the two anchor cables that are moved perpendicular to the water flow direction are first changed, and then the anchor positions of the remaining two anchor cables are changed.

3. The function conversion method of the multifunctional ship for inland river immersed tube construction according to claim 1 is characterized in that: There are two anchoring devices installed at each end of each working barge; in the hull anchoring and mooring step, one of the two anchoring devices located at the same end of the working barge is used to anchor; in the cable moving step, the other spare anchoring device is used to throw a new anchor cable in the direction of the new anchor point position, and then the initial working anchoring device is used to retract the original anchor cable to complete the replacement of the anchor point position.

4. The method for converting the function of a multifunctional ship for inland river immersed tube construction according to any one of claims 1 to 3, characterized in that: In the cable moving step, the angle between the anchor cable after the anchor point position is changed and the edge of the hull on one side thereof is 30° to 60°.

5. The function conversion method of the multifunctional ship for inland river immersed tube construction according to claim 1 is characterized in that: In the cable turning step, the preset offset is 10-15m.

6. The function conversion method of the multifunctional ship for inland river immersed tube construction according to claim 1 is characterized in that: The winching and steering step also includes: providing a tugboat and utilizing the tugboat to tow the hull to assist in steering the hull.

7. The inland river immersed tube construction method based on a multifunctional ship is characterized by: It includes a base bed construction step and a immersed tube transportation and installation construction step, both of which are constructed by using a multifunctional ship for inland river immersed tube construction; the multifunctional ship for inland river immersed tube construction includes a hull, the hull includes two work barges arranged in parallel with each other and a connecting beam connected between the two work barges; the two work barges and the connecting beam are respectively equipped with work units with different functions corresponding to different construction processes in the inland river immersed tube tunnel construction; the bow and stern ends of the two work barges are respectively provided with anchor winch equipment for anchoring and retracting and releasing anchor cables; the two work barges are respectively a first work barge and a second work barge, the work units include a block stone throwing and filling work unit, a block stone tamping work unit, a crushed stone leveling work unit and a immersed tube sinking and installation work unit, the block stone throwing and filling work unit and the block stone tamping work unit are carried on the first work barge, the crushed stone leveling work unit is carried on the second work barge, and the immersed tube sinking and installation work unit is carried on the connecting beam; The base bed construction steps include the following specific steps: The steps of rock dumping operation are as follows: taking the rock dumping operation unit as the operation unit to be operated, taking the orientation of the hull when the length direction of the first operation barge is perpendicular to the extension direction of the inland river immersed tube tunnel to be constructed and the first operation barge is closer to the initial operation end of the rock dumping construction than the second operation barge as the operation orientation of the rock dumping operation unit; initially, the hull is located in the initial orientation state where the length direction of the first operation barge is parallel to the extension direction of the inland river immersed tube tunnel to be constructed, using the function conversion method of the multifunctional ship for inland river immersed tube construction described in any one of claims 1 to 6 to drive the hull to rotate 90°, so that the orientation of the rock dumping operation unit faces the corresponding operation orientation, moving the hull along the extension direction of the inland river immersed tube tunnel to be constructed, and using the rock dumping operation unit to perform rock dumping operation; The stone tamping operation step: the stone tamping operation unit is used as the operation unit to be operated, the operation orientation of the stone tamping operation unit is the same as the operation orientation of the stone dumping operation unit, the hull does not need to turn, the hull is returned to the initial position, the hull is moved along the extension direction of the inland river immersed tube tunnel to be constructed, and the stone tamping operation unit is used to perform the stone tamping operation; Gravel leveling operation step: taking the gravel leveling operation unit as the operation unit to be operated, taking the orientation of the hull when the length direction of the second operation barge is perpendicular to the extension direction of the inland river immersed tube tunnel to be constructed and the second operation barge is closer to the initial operation end of the gravel leveling construction than the first operation barge as the operation orientation of the gravel leveling operation unit; The function conversion method of the multifunctional ship for inland river immersed tube construction according to any one of claims 1 to 6 is used to drive the hull to turn twice so that the hull rotates 180°, so that the orientation of the stone crushing and leveling operation unit faces the corresponding operation orientation, and the hull is moved along the extension direction of the inland river immersed tube tunnel to be constructed, and the stone crushing and leveling operation unit is used to perform stone crushing and leveling operations; The immersed tube transportation and installation construction step includes: taking the immersed tube laying and installation operation unit as the operation unit to be operated, and taking the orientation of the hull when the length direction of the first operation barge is parallel to the extension direction of the inland river immersed tube tunnel to be constructed as the operation orientation of the immersed tube laying and installation operation unit; The function conversion method of the multifunctional ship for inland river immersed tube construction described in any one of claims 1 to 6 is adopted to drive the hull to rotate 90° so that the orientation of the immersed tube sinking and installation operation unit is toward its corresponding operation orientation, the hull is moved to the dock door of the dry dock to connect the immersed tube section moved out of the dry dock, the hull is moved along the extension direction of the inland river immersed tube tunnel to be constructed, so as to transport the immersed tube section to the installation position and sink the immersed tube section.

8. The inland river immersed tube construction method based on a multifunctional ship according to claim 7 is characterized in that: Before each immersed tube section is transported and installed, gravel leveling operations are carried out on the base bed corresponding to the immersed tube section.

9. The inland river immersed tube construction method based on a multifunctional ship according to claim 8, characterized in that: When performing a stone crushing and leveling operation on the bed of an immersed tube section closest to the other side of the dry dock, the position of the stone crushing and leveling operation unit close to the other side of the dry dock is used as the operation position; When the stone crushing and leveling operation is performed on the base bed of the immersed tube section closest to the dry dock, the position of the stone crushing and leveling operation unit close to the dry dock is used as the operation position.