Frame and pull rod integrated converter valve auxiliary maintenance device and maintenance method

By designing the lifting components of reactor and silicon stack on the frame pull rod integrated converter valve tower, combining the installation platform and support mechanism, maintenance without the need for external lifting equipment is achieved, the problem of space limitations of the valve layer is solved, and high efficiency is achieved Reactor and silicon stack components are repaired and reduce costs.

CN118894448APending Publication Date: 2024-11-05CHANGZHOU BORI ELECTRIC POWER AUTOMATION EQUIP +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410925926.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-11
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

The existing maintenance methods cannot be applied to valve towers of frame tie rod integrated converter valves. Especially when the valve layer space is compact and high pressure and high height, there is a lack of effective maintenance solutions, making it difficult to realize maintenance of reactors and silicon stack components. .

Method used

An auxiliary maintenance device and method is designed, using the valve tower as the lifting member support for the reactor and silicon stack, combined with the reactor placement platform and the silicon stack support mechanism to realize maintenance without the need for external lifting equipment, including the reactor lifting member and silicon. Stack the hoisting components, lift and push and pull through components such as hand-pull hoists and ring screws.

Benefits of technology

The maintenance of reactors and silicon stack components of any valve layer of the frame pull rod integrated converter valve valve tower is realized, and the installation is convenient and efficient, reducing production costs and avoiding the limitation of valve layer space.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118894448A_ABST
    Figure CN118894448A_ABST
Patent Text Reader

Abstract

The invention relates to a frame and pull rod integrated converter valve auxiliary maintenance device and method, and the device is characterized in that the device comprises an electric reactor maintenance auxiliary unit and a silicon stack maintenance auxiliary unit which are connected with a valve tower assembly of a converter valve, and the electric reactor maintenance auxiliary unit comprises an electric reactor hoisting member and an electric reactor placement platform; the frame and pull rod integrated converter valve tower is used as a support of an electric reactor hoisting component, and the electric reactor can be hoisted, pushed and pulled in place in cooperation with the electric reactor placement platform; the silicon stack maintenance auxiliary unit comprises a silicon stack hoisting component and a silicon stack supporting mechanism, a valve tower of the frame and pull rod integrated converter valve is used as a support of the silicon stack hoisting component, and the silicon stack can be hoisted and pushed and pulled in place in cooperation with the silicon stack supporting mechanism. According to the method, external hoisting equipment is not needed, installation is convenient, efficiency is high, meanwhile, limitation and constraint of the space of the valve layer are avoided, and maintenance of the electric reactor and the silicon stack assembly of any valve layer of the frame and pull rod integrated converter valve tower can be achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention specifically relates to an auxiliary maintenance device and a maintenance method for a frame-tie rod integrated converter valve, and belongs to the technical field of high-voltage direct current transmission. Background Art

[0002] The HVDC converter valve is the core equipment of the HVDC transmission system, and its key components need to be regularly inspected to ensure the normal operation of the equipment. The existing inspection and maintenance methods at home and abroad mainly use metal beams as supports or use external lifting equipment to remove the components from the valve tower for inspection and maintenance, which is suitable for suspended valve tower structures or pillar valve tower structures.

[0003] The structure of the frame tie rod integrated converter valve has changed greatly, and it is impossible to use metal beams as support. In addition, the valve layer space is compact, and it is difficult for external lifting equipment to move the components out of the valve tower, making the existing maintenance methods inapplicable. At present, there is a lack of mature solutions for the maintenance of reactors and silicon stack components of ultra-high voltage, high-height support, frame tie rod integrated valve towers in China. Therefore, it is necessary to provide an auxiliary maintenance device and maintenance method suitable for frame tie rod integrated converter valves, which can realize the maintenance of reactors and silicon stack components of any valve layer of the frame tie rod integrated converter valve valve tower. Summary of the invention

[0004] The purpose of the present invention is to provide an auxiliary maintenance device and maintenance method for a frame-tie-rod integrated converter valve, which can realize the maintenance of the reactor and silicon stack components of any valve layer on the valve tower of the frame-tie-rod integrated converter valve without the need for external lifting equipment and without being restricted or constrained by the valve layer space.

[0005] In order to achieve the above-mentioned purpose, the first technical solution of the present invention is: a frame-tie rod integrated converter valve auxiliary maintenance device, the innovation of which is: comprising a reactor maintenance auxiliary unit and a silicon stack maintenance auxiliary unit assembled and connected to the valve tower of the converter valve,

[0006] The reactor maintenance auxiliary unit includes a reactor hoisting component and a reactor placement platform, with the valve tower of the converter valve serving as a connecting support for the reactor hoisting component.

[0007] The reactor hoisting component comprises a first rail, a first supporting and connecting unit and a first hand chain hoist. Two groups of first supporting and connecting units arranged in parallel along the radial direction of the first rail are provided on the end surface of the first rail, and the first supporting and connecting unit is assembled and connected with the valve tower of the converter valve. A first hand chain hoist slidably matched with the first rail is provided at the bottom of the first rail.

[0008] The reactor placement platform includes a hanging block, a hanging plate and a first hanging eye screw. A plurality of separately arranged hanging block seats are arranged on the hanging plate and along its circumferential direction. A corresponding hanging block is inserted into each hanging block seat, and the hanging block is detachably connected to the hanging plate. A first hanging eye screw is arranged on the hanging plate and between adjacent hanging block seats. The hanging eye screw is connected to the hook of the first hand chain hoist through a shackle and a sling passing through the reactor.

[0009] The silicon stack maintenance auxiliary unit includes a silicon stack hoisting component and a silicon stack supporting mechanism, with the valve tower of the converter valve serving as a connecting support for the silicon stack hoisting component.

[0010] The silicon stack hoisting component includes a second track, a second supporting connection unit and a second hand chain hoist. The two second tracks arranged in parallel are connected as a whole through a supporting rod. The two second tracks are provided with two groups of second supporting connection units arranged in parallel along the radial direction thereof, and the second supporting connection units are assembled and connected with the valve tower of the converter valve. The bottom of each second track is slidably matched with a second hand chain hoist.

[0011] The silicon stack support mechanism includes a support channel steel and a second lifting eye screw. The support channel steel is provided with four second lifting eye screws. The upper two second lifting eye screws of the support channel steel are used to connect the second hand chain hoist, and the lower two second lifting eye screws are used to lift the silicon stack.

[0012] In the above-mentioned first technical solution, each group of first supporting connection units includes a first short supporting clamp block, a first clamp block and a first supporting screw sleeve used to connect with the valve tower pull rod. The two first short supporting clamp blocks of each group of first supporting connection units are arranged in a mirror image on the first track. The free end of each first short supporting clamp block is detachably connected to the corresponding first clamp block, and the first supporting screw sleeve is clamped between the first short supporting clamp block and the first clamp block.

[0013] In the above-mentioned first technical solution, each group of first supporting connection units includes a first short supporting clamp and a first clamp. The two first short supporting clamps of each group of first supporting connection units are arranged in a mirror image on the first track. The free end of each first short supporting clamp is detachably connected to the corresponding first clamp. A first supporting screw sleeve for connecting to the valve tower pull rod is provided between one group of first short supporting clamps and the corresponding first clamp, and a first screw sleeve for connecting to the valve tower maintenance platform clamp is provided between the other group of first short supporting clamps and the corresponding first clamp.

[0014] In the above-mentioned first technical solution, each group of second supporting connection units includes a second short supporting clamp, a second clamp, a long supporting block and a second supporting screw sleeve for connecting to the valve tower pull rod. The two second short supporting clamps of each group of second supporting connection units are connected by the long supporting block and are fixed on a second track at the same time. The free end of the second short supporting clamp is detachably connected to the second clamp, and the second supporting screw sleeve is arranged between the second short supporting clamp and the second clamp.

[0015] In the above-mentioned first technical solution, each group of second supporting connection units includes a second short supporting clamp, a second clamp and a long supporting block. The two second short supporting clamps of each group of second supporting connection units are connected by a long supporting block and are fixed on a second track at the same time. The free end of the second short supporting clamp is detachably connected to the second clamp. A second supporting screw sleeve for connecting to the valve tower pull rod is provided between one group of second short supporting clamps and the second clamp, and a second screw sleeve for connecting to the valve tower maintenance platform clamp is provided between another group of second short supporting clamps and the second clamp.

[0016] In the above-mentioned first technical solution, both ends of the first rail and the second rail and along their length directions are provided with limiting parts for limiting the hand chain hoists.

[0017] In the above-mentioned first technical solution, both the first track and the second track are H-type tracks.

[0018] In order to achieve the above object, the second technical solution of the present invention is: an auxiliary maintenance method according to the above frame tie rod integrated converter valve, the innovation of which is: including reactor maintenance and silicon stack maintenance, the specific steps of the reactor maintenance are as follows:

[0019] Step 1: Disassembly of valve tower parts,

[0020] Specifically, remove the components near the reactor on the valve tower in turn, including the shielding cover assembly, the interlayer water pipe assembly, and the copper busbar assembly.

[0021] Step 2: Installation of the reactor hoisting components,

[0022] Specifically, install the first rail and the first supporting connection unit in sequence according to the requirements of the drawing, and install the first hand chain hoist on the first rail.

[0023] Step 3: Installation of the reactor placement platform,

[0024] Specifically, insert the lifting block into the hole of the lifting block seat as required by the installation drawing and fix it on the lifting plate, then install the first lifting eye screw on the lifting plate, place the assembled reactor placement platform at the bottom of the reactor, use the lifting belt to pass through the inside of the reactor, and then connect the lifting eye screw to the hook of the first hand chain hoist through the lifting belt and the shackle.

[0025] Step 4: Repair the reactor.

[0026] Specifically, first remove the screws connecting the reactor and the valve tower frame, then control the first hand chain hoist to lift and remove the reactor, and then place the reactor on the aerial platform for maintenance. After the maintenance is completed, install the repaired reactor on the reactor placement platform, control the first hand chain hoist to lift and move the reactor in again, and finally place the repaired reactor in its original position and fix it to the valve tower frame.

[0027] Step 5: Restoration of valve tower parts.

[0028] Specifically, the reactor installation platform is dismantled in the reverse order of step three, the reactor hoisting components are dismantled in the reverse order of step two, and finally the valve tower parts are restored and installed in the reverse order of step one;

[0029] The specific steps of the silicon stack overhaul are as follows:

[0030] Step 1: Disassembly of valve tower parts,

[0031] Specifically, the components near the valve tower silicon stack were dismantled in sequence, including the shielding cover assembly, the interlayer water pipe assembly, and the copper busbar assembly.

[0032] Step 2: Installation of silicon stack hoisting components,

[0033] Specifically, install the second rail and the second connecting support unit in sequence according to the requirements of the drawing, and install the two second hand chain hoists on the corresponding second rails respectively.

[0034] Step 3: Installation of silicon stack support mechanism,

[0035] Specifically, install the second eyebolt on the supporting channel steel, use a set of annular slings and shackles to connect the eyebolts on the upper part of the supporting channel steel and the hook of the second hand chain hoist, and then use another set of annular slings and shackles to connect the eyebolts on the lower part of the supporting channel steel and the two side beams of the silicon pile.

[0036] Step 4: Silicon stack replacement,

[0037] Specifically, first remove the screws connecting the silicon stack and the valve tower frame, then synchronously control the two second hand chain hoists to lift and move out the silicon stack, and then place the silicon stack on the aerial platform for inspection. After the inspection is completed, hoist the inspected silicon stack onto the silicon stack support mechanism, and synchronously control the two second hand chain hoists to lift and move into the silicon stack again, and finally place the inspected silicon stack in its original position and fix it to the valve tower frame.

[0038] Step 5: Restoration of valve tower parts.

[0039] Specifically, the silicon stack support mechanism is removed in the reverse order of step three, the silicon stack hoisting components are removed in the reverse order of step two, and finally the valve tower parts are restored and installed in the reverse order of step one.

[0040] The positive effects of the present invention are:

[0041] (1) The present invention is applied to an auxiliary maintenance technology of a frame-tie rod integrated converter valve, which uses the frame-tie rod integrated converter valve tower as a support for the reactor hoisting component, and cooperates with the reactor placement platform to hoist the reactor and push and pull it into place;

[0042] By utilizing the valve tower of the frame-tie-rod integrated converter valve as a support for the silicon stack hoisting component, the silicon stack can be hoisted and pushed and pulled into place in cooperation with the silicon stack supporting mechanism. The present invention does not require external hoisting equipment, is easy to install and has high efficiency. At the same time, it is not limited or restricted by the valve layer space, and can realize the maintenance of the reactor and silicon stack components at any valve layer of the frame-tie-rod integrated converter valve valve tower.

[0043] (2) The parts of the reactor hoisting component of the present invention and the silicon stack hoisting component are highly common, and the same parts can be used interchangeably, which effectively reduces the production cost. BRIEF DESCRIPTION OF THE DRAWINGS

[0044] Figure 1 It is a three-dimensional structural schematic diagram of a specific embodiment of the present invention;

[0045] Figure 2 It is a three-dimensional structural schematic diagram of the reactor maintenance auxiliary unit of the present invention;

[0046] Figure 3 It is a schematic diagram of the three-dimensional structure of the silicon stack maintenance auxiliary unit of the present invention;

[0047] Figure 4 It is a half-section three-dimensional structural schematic diagram of the support screw sleeve of the present invention;

[0048] Figure 5 It is a half-section three-dimensional structural schematic diagram of the screw sleeve of the present invention. DETAILED DESCRIPTION

[0049] The present invention is further described below with reference to the accompanying drawings and given embodiments, but is not limited thereto.

[0050] Example 1

[0051] like Figure 1 , 2 As shown in , 3, 4, and 5, a frame-tie rod integrated converter valve auxiliary maintenance device includes a reactor maintenance auxiliary unit 1 and a silicon stack maintenance auxiliary unit 2 which are assembled and connected to the valve tower of the converter valve.

[0052] The reactor maintenance auxiliary unit 1 comprises a reactor hoisting component 11 and a reactor placement platform 12, with the valve tower of the converter valve serving as a connection support for the reactor hoisting component 11.

[0053] The reactor hoisting component 11 comprises a first rail 111, a first supporting and connecting unit 112 and a first hand chain hoist 113. Two groups of first supporting and connecting units 112 arranged in parallel along the radial direction are provided on the end surface of the first rail 111, and the first supporting and connecting units 112 are assembled and connected with the valve tower of the converter valve. The bottom of the first rail 111 is provided with a first hand chain hoist 113 which is slidably matched with the first rail.

[0054] The reactor placement platform 12 includes a hanging block 121, a hanging plate 122 and a first hanging eye screw 123. A plurality of separately arranged hanging block seats 124 are arranged on the hanging plate 122 and along its circumferential direction. A corresponding hanging block 121 is inserted into each hanging block seat 124, and the hanging block 121 is detachably connected to the hanging plate 122. A first hanging eye screw 123 is provided on the hanging plate 122 and between adjacent hanging block seats 124. The hanging eye screw 123 is connected to the hook of the first hand chain hoist 113 through a shackle and a sling passing through the reactor.

[0055] The silicon stack maintenance auxiliary unit 2 includes a silicon stack hoisting component 21 and a silicon stack supporting mechanism 22, with the valve tower of the converter valve serving as a connecting support for the silicon stack hoisting component 21.

[0056] The silicon stack hoisting component 21 includes a second rail 211, a second supporting connection unit 212 and a second hand chain hoist 213. The two second rails 211 arranged in parallel are connected as a whole through a supporting rod 214. The two second rails 211 are provided with two groups of second supporting connection units 212 arranged in parallel along the radial direction thereof, and the second supporting connection units 212 are assembled and connected with the valve tower of the converter valve. The bottom of each second rail 211 is slidably matched with a second hand chain hoist 213.

[0057] The silicon stack support mechanism 22 includes a support channel steel 221 and a second lifting eye screw 222. The support channel steel 221 is provided with four second lifting eye screws 222. The upper two second lifting eye screws of the support channel steel 221 are used to connect the second hand chain hoist 213, and the lower two second lifting eye screws are used to lift the silicon stack.

[0058] The frame-tie rod integrated converter valve of the present invention comprises a valve tower, and multiple valve layers arranged in layers on the valve tower, and some valve layers are provided with maintenance platforms. If the valve layer to be repaired does not have a maintenance platform, a first supporting connection unit 112 of the following structure is selected, specifically,

[0059] like Figure 2 , 4As shown, each group of first supporting connection units 112 includes a first short supporting clamp block 1121, a first clamp block 1122 and a first supporting screw sleeve 1123 for connecting to the valve tower tie rod. The two first short supporting clamp blocks 1121 of each group of first supporting connection units 112 are arranged in a mirror image on the first track 111. The free end of each first short supporting clamp block 1121 is detachably connected to the corresponding first clamp block 1122, and the first supporting screw sleeve 1123 is clamped between the first short supporting clamp block 1121 and the first clamp block 1122.

[0060] If the valve layer to be repaired has a repair platform, the first supporting connection unit 112 with the following structure is selected, specifically,

[0061] like Figure 2 , 5 As shown, each group of first supporting connection units 112 includes a first short supporting clamp block 1121 and a first clamp block 1122. The two first short supporting clamp blocks 1121 of each group of first supporting connection units 112 are arranged in a mirror image on the first track 111. The free end of each first short supporting clamp block 1121 is detachably connected to the corresponding first clamp block 1122. A first supporting screw sleeve 1123 for connecting to the valve tower pull rod is provided between one group of first short supporting clamp blocks 1121 and the corresponding first clamp blocks 1122, and a first screw sleeve 1124 for connecting to the valve tower maintenance platform clamp block is provided between another group of first short supporting clamp blocks 1121 and the corresponding first clamp blocks 1122.

[0062] If the valve layer to be repaired does not have a repair platform, the second support connection unit 212 with the following structure is selected, specifically,

[0063] like Figure 3 , 4 As shown, each group of second supporting connection units 212 includes a second short supporting clamp block 2121, a second clamp block 2122, a long supporting block 2123 and a second supporting screw sleeve 2124 for connecting to the valve tower pull rod. The two second short supporting clamp blocks 2121 of each group of second supporting connection units 212 are connected by the long supporting block 2123 and are fixed on a second rail 211 at the same time. The free end of the second short supporting clamp block 2121 is detachably connected to the second clamp block 2122, and the second supporting screw sleeve 2124 is arranged between the second short supporting clamp block 2121 and the second clamp block 2122.

[0064] If the valve layer to be repaired does not have a repair platform, the second support connection unit 212 with the following structure is selected, specifically,

[0065] like Figure 3 , 5As shown, each group of second supporting connection units 212 includes a second short supporting clamp 2121, a second clamp 2122 and a long supporting block 2123. The two second short supporting clamps 2121 of each group of second supporting connection units 212 are connected by the long supporting block 2123 and are fixed on a second rail 211 at the same time. The free ends of the second short supporting clamps 2121 are detachably connected to the second clamps 2122. A second supporting screw sleeve 2124 for connecting to the valve tower pull rod is provided between one group of second short supporting clamps 2121 and the second clamps 2122, and a second screw sleeve 2125 for connecting to the valve tower maintenance platform clamp is provided between another group of second short supporting clamps 2121 and the second clamps 2122.

[0066] In order to limit the moving stroke of the hand chain hoist, the first rail 111 and the second rail 211 of the present invention are provided with limiting parts for limiting the moving stroke of the hand chain hoist at both ends and along the length direction thereof. The present invention preferably provides screw holes at both ends of the rails, and forms limiting parts for limiting the moving stroke of the hand chain hoist by screwing screws into the screw holes, but it is of course not limited to this, and other forms of limiting structures can also be used.

[0067] like Figure 2 , 3 As shown, in order to make the structure more reasonable, the first track 111 and the second track 211 of the present invention are both H-shaped tracks.

[0068] Example 2

[0069] like Figure 1 As shown, a frame tie rod integrated converter valve auxiliary maintenance method according to embodiment 1 includes reactor maintenance and silicon stack maintenance, and the specific steps of the reactor maintenance are as follows:

[0070] Step 1: Disassembly of valve tower parts,

[0071] Specifically, remove the components near the reactor on the valve tower in turn, including the shielding cover assembly, the interlayer water pipe assembly, and the copper busbar assembly.

[0072] Step 2: Installation of the reactor hoisting component 11,

[0073] Specifically, the first rail 111 and the first supporting connection unit 112 are installed in sequence according to the drawing requirements, and the first hand chain hoist 113 is installed on the first rail 111.

[0074] Step 3: Installation of the reactor placement platform 12,

[0075] Specifically, the lifting block 121 is inserted into the hole of the lifting block seat 124 as required by the installation drawing, and fixed on the lifting plate 122, and then the first lifting eye screw 123 is installed on the lifting plate 122, and the assembled reactor placement platform 12 is placed at the bottom of the reactor, and the lifting belt is passed through the inside of the reactor, and then the lifting eye screw 123 is connected to the hook of the first hand chain hoist 113 through the lifting belt and the shackle.

[0076] Step 4: Repair the reactor.

[0077] Specifically, first remove the screws connecting the reactor and the valve tower frame, then control the first hand chain hoist 113 to lift and remove the reactor, and then place the reactor on the aerial platform for maintenance. After the maintenance is completed, install the repaired reactor on the reactor placement platform 12, control the first hand chain hoist 113 to lift and move the reactor in again, and finally place the repaired reactor in its original position and fix it to the valve tower frame.

[0078] Step 5: Restoration of valve tower parts.

[0079] Specifically, the reactor installation platform 12 is removed in the reverse order of step 3, and then the reactor hoisting component 11 is removed in the reverse order of step 2, and finally the valve tower parts are restored and installed in the reverse order of step 1;

[0080] The specific steps of the silicon stack overhaul are as follows:

[0081] Step 1: Disassembly of valve tower parts,

[0082] Specifically, the components near the valve tower silicon stack were dismantled in sequence, including the shielding cover assembly, the interlayer water pipe assembly, and the copper busbar assembly.

[0083] Step 2: Installation of silicon stack hoisting component 21,

[0084] Specifically, the second rail 211 and the second connecting support unit 212 are installed in sequence according to the requirements of the drawing, and the two second hand chain hoists 213 are respectively installed on the corresponding second rail 211.

[0085] Step 3: Installation of silicon stack support mechanism 22,

[0086] Specifically, the second eyebolt 222 is installed on the supporting channel steel 221, a set of annular slings and shackles are used to connect the eyebolts on the upper part of the supporting channel steel 221 and the hook of the second hand chain hoist 213, and another set of annular slings and shackles are used to connect the eyebolts on the lower part of the supporting channel steel 221 and the two side beams of the silicon stack.

[0087] Step 4: Silicon stack replacement,

[0088] Specifically, first remove the screws connecting the silicon stack and the valve tower frame, then synchronously control the two second hand chain hoists 213 to lift and move out the silicon stack, and then place the silicon stack on the aerial platform for inspection. After the inspection is completed, hoist the inspected silicon stack onto the silicon stack support mechanism 22, and synchronously control the two second hand chain hoists 213 to lift and move into the silicon stack again, and finally place the inspected silicon stack in its original position and fix it to the valve tower frame.

[0089] Step 5: Restoration of valve tower parts.

[0090] Specifically, the silicon stack support mechanism 22 is removed in the reverse order of step three, and then the silicon stack hoisting component 21 is removed in the reverse order of step two, and finally the valve tower parts are restored and installed in the reverse order of step one.

[0091] The positive effects of the present invention are:

[0092] (1) The present invention is applied to an auxiliary maintenance technology of a frame-tie rod integrated converter valve, which uses the frame-tie rod integrated converter valve tower as a support for the reactor hoisting component, and cooperates with the reactor placement platform to hoist the reactor and push and pull it into place;

[0093] By utilizing the valve tower of the frame-tie-rod integrated converter valve as a support for the silicon stack hoisting component, the silicon stack can be hoisted and pushed and pulled into place in cooperation with the silicon stack supporting mechanism. The present invention does not require external hoisting equipment, is easy to install and has high efficiency. At the same time, it is not limited or restricted by the valve layer space, and can realize the maintenance of the reactor and silicon stack components at any valve layer of the frame-tie-rod integrated converter valve valve tower.

[0094] (2) The parts of the reactor hoisting component of the present invention and the silicon stack hoisting component are highly common, and the same parts can be used interchangeably, which effectively reduces the production cost.

[0095] Based on the above ideal embodiments of the present invention, the relevant staff can make various changes and modifications without departing from the technical concept of the present invention through the above description. The technical scope of the present invention is not limited to the contents of the specification, and its technical scope must be determined according to the scope of the claims.

Claims

1. A frame-tie rod integrated converter valve auxiliary maintenance device, characterized in that: It comprises a reactor maintenance auxiliary unit (1) and a silicon stack maintenance auxiliary unit (2) which are assembled and connected to a valve tower of a converter valve. The reactor maintenance auxiliary unit (1) comprises a reactor hoisting component (11) and a reactor placement platform (12), with the valve tower of the converter valve serving as a connection support for the reactor hoisting component (11). The reactor hoisting component (11) comprises a first rail (111), a first supporting connection unit (112) and a first hand chain hoist (113); two groups of first supporting connection units (112) arranged in parallel along the radial direction of the first rail (111) are provided on the end surface of the first rail (111); the first supporting connection units (112) are assembled and connected with the valve tower of the converter valve; the bottom of the first rail (111) is provided with a first hand chain hoist (113) slidably matched with the first rail; The reactor placement platform (12) comprises a suspension block (121), a suspension plate (122) and a first suspension eye screw (123); a plurality of suspension block seats (124) are arranged separately on the suspension plate (122) and along its circumferential direction; a corresponding suspension block (121) is inserted into each suspension block seat (124); and the suspension block (121) and the suspension plate (122) are detachably connected; a first suspension eye screw (123) is arranged on the suspension plate (122) and between adjacent suspension block seats (124); the suspension eye screw (123) is connected to a suspension hook of a first hand chain hoist (113) through a shackle and a suspension belt passing through the reactor; The silicon stack maintenance auxiliary unit (2) comprises a silicon stack hoisting component (21) and a silicon stack supporting mechanism (22), with the valve tower of the converter valve serving as a connecting support for the silicon stack hoisting component (21). The silicon stack hoisting component (21) comprises a second rail (211), a second supporting connection unit (212) and a second hand chain hoist (213); the two second rails (211) arranged in parallel are connected as a whole through a supporting rod (214); the two second rails (211) are provided with two groups of second supporting connection units (212) arranged in parallel along their radial direction, and the second supporting connection units (212) are assembled and connected with the valve tower of the converter valve; the bottom of each second rail (211) is slidably matched with a second hand chain hoist (213); the silicon stack supporting mechanism (22) comprises a supporting channel steel (221) and a second lifting eye screw (222); the supporting channel steel (221) is provided with four second lifting eye screws (222); the upper two second lifting eye screws of the supporting channel steel (221) are used to connect the second hand chain hoist (213), and the lower two second lifting eye screws are used to hoist the silicon stack.

2. The frame-tie rod integrated converter valve auxiliary maintenance device according to claim 1, characterized in that: Each group of first supporting connection units (112) comprises a first short supporting clamp block (1121), a first clamp block (1122) and a first supporting screw sleeve (1123) used for connecting to a valve tower tie rod; the two first short supporting clamp blocks (1121) of each group of first supporting connection units (112) are arranged in a mirror image on the first track (111); the free end of each first short supporting clamp block (1121) is detachably connected to the corresponding first clamp block (1122); and the first supporting screw sleeve (1123) is clamped between the first short supporting clamp block (1121) and the first clamp block (1122).

3. The frame-tie rod integrated converter valve auxiliary maintenance device according to claim 1, characterized in that: Each group of first supporting connection units (112) comprises a first short supporting clamp block (1121) and a first clamp block (1122); the two first short supporting clamp blocks (1121) of each group of first supporting connection units (112) are arranged in a mirror image on the first track (111); the free end of each first short supporting clamp block (1121) is detachably connected to the corresponding first clamp block (1122); a first supporting screw sleeve (1123) for connecting to a valve tower tie rod is provided between one group of first short supporting clamp blocks (1121) and the corresponding first clamp block (1122); and a first screw sleeve (1124) for connecting to a valve tower maintenance platform clamp block is provided between another group of first short supporting clamp blocks (1121) and the corresponding first clamp block (1122).

4. The frame-tie rod integrated converter valve auxiliary maintenance device according to claim 1, characterized in that: Each group of second supporting connection units (212) comprises a second short supporting clamp block (2121), a second clamp block (2122), a long supporting block (2123) and a second supporting screw sleeve (2124) used for connecting to a valve tower tie rod; the two second short supporting clamp blocks (2121) of each group of second supporting connection units (212) are connected via the long supporting block (2123) and are simultaneously fixed on a second track (211); the free end of the second short supporting clamp block (2121) is detachably connected to the second clamp block (2122), and the second supporting screw sleeve (2124) is arranged between the second short supporting clamp block (2121) and the second clamp block (2122).

5. The frame-tie rod integrated converter valve auxiliary maintenance device according to claim 1, characterized in that: Each group of second supporting connection units (212) comprises a second short supporting clamp block (2121), a second clamp block (2122) and a long supporting block (2123); the two second short supporting clamp blocks (2121) of each group of second supporting connection units (212) are connected via the long supporting block (2123) and are simultaneously fixed on a second track (211); the free ends of the second short supporting clamp blocks (2121) are detachably connected to the second clamp blocks (2122); a second supporting screw sleeve (2124) for connecting to a valve tower tie rod is provided between one group of second short supporting clamp blocks (2121) and the second clamp blocks (2122); and a second screw sleeve (2125) for connecting to a valve tower maintenance platform clamp block is provided between another group of second short supporting clamp blocks (2121) and the second clamp blocks (2122).

6. The frame-tie rod integrated converter valve auxiliary maintenance device according to claim 1, characterized in that: Limiting parts for limiting the hand chain hoist are provided at both ends of the first track (111) and the second track (211) and along their length directions.

7. The frame-tie rod integrated converter valve auxiliary maintenance device according to claim 1, characterized in that: The first track (111) and the second track (211) are both H-shaped tracks.

8. An auxiliary maintenance method for a frame-tie rod integrated converter valve according to claim 1, characterized in that: Including reactor maintenance and silicon stack maintenance, the specific steps of reactor maintenance are as follows: Step 1: Disassembly of valve tower parts, Specifically, remove the components near the reactor on the valve tower in turn, including the shielding cover assembly, the interlayer water pipe assembly, and the copper busbar assembly. Step 2: Installation of the reactor hoisting component (11). Specifically, the first rail (111) and the first supporting connection unit (112) are installed in sequence according to the requirements of the drawings, and the first hand chain hoist (113) is installed on the first rail (111). Step 3: Installation of the reactor placement platform (12). Specifically, the lifting block (121) is inserted into the hole of the lifting block seat (124) as required by the installation drawing and fixed on the lifting plate (122), and then the first lifting eye screw (123) is installed on the lifting plate (122), and the assembled reactor placement platform (12) is placed at the bottom of the reactor, and a lifting belt is passed through the inside of the reactor, and then the lifting eye screw (123) is connected to the hook of the first hand chain hoist (113) through the lifting belt and the shackle. Step 4: Repair the reactor. Specifically, the screws connecting the reactor and the valve tower frame are first removed, and then the first hand chain hoist (113) is controlled to lift and remove the reactor, and then the reactor is placed on a climbing vehicle for maintenance. After the maintenance is completed, the repaired reactor is installed on the reactor placement platform (12), and the first hand chain hoist (113) is controlled again to lift and move the reactor in, and finally the repaired reactor is placed in the original position and fixedly connected to the valve tower frame. Step 5: Restoration of valve tower parts. Specifically, the reactor installation platform (12) is removed in the reverse order of step 3, and then the reactor hoisting component (11) is removed in the reverse order of step 2, and finally the valve tower parts are restored and installed in the reverse order of step 1; The specific steps of the silicon stack overhaul are as follows: Step 1: Disassembly of valve tower parts, Specifically, the components near the valve tower silicon stack were dismantled in sequence, including the shielding cover assembly, the interlayer water pipe assembly, and the copper busbar assembly. Step 2: Installation of silicon stack hoisting components (21), Specifically, the second rail (211) and the second connecting support unit (212) are installed in sequence according to the requirements of the drawings, and the two second hand chain hoists (213) are respectively installed on the corresponding second rails (211). Step 3: Installation of silicon stack support mechanism (22), Specifically, the second eyebolt (222) is installed on the supporting channel steel (221), a set of annular slings and shackles are used to connect the eyebolts on the upper part of the supporting channel steel (221) and the hook of the second hand chain hoist (213), and another set of annular slings and shackles are used to connect the eyebolts on the lower part of the supporting channel steel (221) and the two side beams of the silicon stack. Step 4: Silicon stack replacement, Specifically, firstly, the screws connecting the silicon stack and the valve tower frame are removed, and then the two second hand chain hoists (213) are synchronously controlled to lift and move out the silicon stack, and then the silicon stack is placed on a climbing vehicle for inspection. After the inspection is completed, the inspected silicon stack is hoisted on the silicon stack support mechanism (22), and the two second hand chain hoists (213) are synchronously controlled again to lift and move into the silicon stack, and finally the inspected silicon stack is placed in the original position and fixedly connected to the valve tower frame. Step 5: Restoration of valve tower parts. Specifically, the silicon stack support mechanism (22) is removed in the reverse order of step three, and then the silicon stack hoisting component (21) is removed in the reverse order of step two, and finally the valve tower parts are restored and installed in the reverse order of step one.