Safety management system for operation of tower crane for intelligent construction site

Through the safe management system of tower crane operation on smart construction sites, the load, angle, wind speed and structural status of tower cranes are monitored in real time, the risk coefficient is calculated, and the alarm is automatically triggered, which solves the accident risk and maintenance problems in traditional tower crane management systems and improves safety management and work efficiency.

CN118894451AInactive Publication Date: 2024-11-05JIANGLIAN IND INTELLIGENT TECHNOLOGY CO LTD

Patent Information

Application Number
CN202411323414.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-11-05
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure CN118894451A_ABST
    Figure CN118894451A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of building construction safety, in particular to an intelligent construction site tower crane operation safety management system, which comprises a data acquisition module, the data acquisition system is in signal connection with an infrared camera, the data acquisition system is in signal connection with a communication technology module, and the communication technology module is in signal connection with a wireless communication module. The communication data module is in signal connection with an early warning technology module, the early warning technology module is in signal connection with a control technology module, and the control technology module is in signal connection with a tower crane safety monitoring system. Potential safety hazards are found in time, so that accidents are effectively prevented, the system can collect operation data of the tower crane in real time, analysis is conducted through data analysis and processing software, accurate operation state information is provided for managers, and the remote monitoring alarm system allows the managers to monitor the state of the tower crane in real time at a remote position.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of building construction safety, and in particular to a safety management system for tower crane operation at a smart construction site. Background Art

[0002] Smart construction site tower crane refers to equipment that integrates modern information technology, such as the Internet of Things, big data, and cloud computing, to manage tower cranes intelligently on construction sites.

[0003] Traditional methods rely on the driver's vision and experience, and cannot completely eliminate the risks brought by blind spots and long-distance blur. Traditional systems may lack the ability to monitor key parameters of tower cranes in real time, such as the tilt angle of the fuselage, foundation settlement, counterweight, etc., resulting in the inability to detect potential problems in time. Traditional tower crane systems may not have real-time fault diagnosis and early warning functions, and cannot take preventive measures before problems occur. For example, the monitoring of wind speed may not be timely or accurate enough to effectively prevent accidents caused by bad weather. Traditional technologies may not continuously monitor the structural integrity of tower cranes, including cracks and deformations, which may lead to structural problems being ignored. The lack of long-term recording and analysis of tower crane operation data makes it difficult to predict potential risks and plan maintenance. Traditional alarm systems may not be able to automatically trigger alarms based on real-time data, or the alarm thresholds and rules are not flexible enough, resulting in untimely responses. Traditional technologies may not be able to conduct in-depth analysis of the collected data, and thus cannot provide effective maintenance recommendations and predict potential risks. To this end, we have developed a safety management system for tower crane operations on smart construction sites to solve the above problems. Summary of the invention

[0004] The purpose of the present invention is to provide a safety management system for tower crane operation at smart construction sites to solve the problems raised in the above-mentioned background technology.

[0005] The technical solution of the present invention is: a safety management system for tower crane operation in a smart construction site, including a data acquisition module, the data acquisition system signal is connected to an infrared camera, the data acquisition system signal is connected to a communication technology module, the communication data module signal is connected to an early warning technology module, the early warning technology module signal is connected to a control technology module, and the control technology module signal is connected to a tower crane safety monitoring system.

[0006] Preferably, the tower crane safety monitoring system includes a tower crane load monitoring module, the tower crane load monitoring module is data-connected with an angle monitoring module, the angle monitoring module is signal-connected with a wind speed monitoring module, the wind speed monitoring module is data-connected with a position monitoring module, the position monitoring module is signal-connected with a structure monitoring module, the structure monitoring module is signal-connected with an operation status monitoring module, the operation status monitoring data is data-connected with a fault monitoring system, the fault diagnosis system is signal-connected with a data recording and analysis module, and the data recording and analysis module is signal-connected with the data recording monitoring module.

[0007] Preferably, the data recording and analysis module is data-connected to a remote monitoring and alarm system, the remote monitoring and alarm system is signal-connected to a sensor, the sensor is data-connected to a data acquisition unit, the data acquisition unit is signal-connected to a communication module, and the data recording and analysis module is data-connected to data analysis and processing software.

[0008] Preferably, the tower crane safety monitoring system is data-connected with a data storage module, and the data storage module is signal-connected with a GPRS module.

[0009] Preferably, the tower crane safety monitoring system is connected to the data acquisition module signal, and the tower crane safety monitoring system is connected to the sensor data.

[0010] Preferably, the communication module is data-connected to a display, and the tower crane monitoring system is signal-connected to the display.

[0011] Preferably, the method comprises the following steps:

[0012] Step S1: Use an infrared camera to automatically track the hook and automatically focus on the cargo to prevent blind spots in the crane driver's field of view during construction, blurred vision at a long distance, and errors in voice guidance;

[0013] Step S2: The tower crane safety monitoring system monitors the inclination angle of the tower crane, the foundation settlement of the tower crane and the counterweight of the tower crane, and calculates the risk factor of the tower crane safety. The calculation formula of the risk factor is: Among them, K risk represents the risk factor, P a represents the observed value of the fuselage tilt angle, P x Indicates the lower limit of the safety threshold of the fuselage tilt angle, P s Indicates the upper limit of the safety threshold of the fuselage tilt angle, C a represents the observed value of tower crane foundation settlement, C x represents the lower limit of the safety threshold of tower crane foundation settlement, C s represents the upper limit of the safety threshold of tower crane foundation settlement, Z a represents the observed value of the tower crane counterweight, Zx Represents the lower limit of the safety threshold of the tower crane counterweight, Z s Indicates the upper limit of the safety threshold of the tower crane counterweight;

[0014] Step S3: The data recording and analysis module and the data analysis and processing software generate visual real-time data for viewing, and calculate the risk factor based on the visual real-time data to prevent the tower crane from malfunctioning during operation and causing accidents;

[0015] Step S4: monitor the load status of the tower crane in real time through the tower crane load monitoring module to ensure that the rated load is not exceeded. The load status calculation formula is F = (M*g) / L, where: F = load, M = mass on the crane arm, g = gravity acceleration, and L = length of the crane arm;

[0016] Step S5: Monitor the boom angle of the tower crane through the angle monitoring module to prevent accidents caused by improper angles. The length L of the boom and the angle θ between the boom and the ground are obtained through the angle detection module. The horizontal X and vertical Y positions of the top of the boom can be calculated using the following formulas. The boom angle calculation formula is X=L*cos(θ), Y=L*sin(θ), where X is the horizontal distance of the top of the boom and Y is the vertical height of the top of the boom.

[0017] Step S6: Detect the ambient wind speed through the wind speed monitoring module, calculate the swing amplitude of the tower crane caused by the ambient wind speed, set a safety threshold according to the swing amplitude, and issue an alarm when the wind speed exceeds the safety threshold. Wind speed (m / s) = (number of pulses / time interval) * (sensor constant), and the swing amplitude calculation formula is:

[0018]

[0019] Among them, A represents the swing amplitude, δ T Represents the structural flexibility coefficient of the tower crane, V f represents the ambient wind speed, L represents the length of the crane arm, g represents the acceleration of gravity, H represents the height of the tower crane, k represents the natural frequency of the tower crane, γ represents the damping ratio (damping characteristics of the tower crane), and the safety threshold is set according to the swing amplitude;

[0020] Step S7: Ensure that the tower crane operates within the specified operating range through the position monitoring module and check the integrity of the tower crane structure, including cracks and deformation, through the structural health monitoring module;

[0021] Step S8: Monitor the operation status of the tower crane in real time through the operation status monitoring module, including lifting, rotation, and luffing. Lifting speed = lifting height / lifting time, rotation speed = rotation angle / rotation time, luffing speed = luffing distance / luffing time, and maximum operating load. The calculation formula of the maximum operating load is:

[0022]

[0023] Among them, F max Indicates the maximum operating load, F maxH Indicates the maximum load during lifting, F maxR Indicates the maximum load during the rotation process, F maxA Indicates the maximum load during the amplitude change process, M z represents the mass of the object to be lifted, g represents the acceleration due to gravity, a H is the lifting acceleration, ω H Indicates the lifting speed, r s represents the radius of the hoisting rope, μ represents the moment of inertia of the tower crane, a R represents the rotational acceleration, ω R represents the rotation speed, r T Indicates the rotation radius of the tower crane, a A represents the amplitude acceleration, ω H Indicates the amplitude change speed, L A Indicates the amplitude variation distance;

[0024] Step S9: diagnose and warn possible faults that may occur during the operation of the tower crane through the fault diagnosis system. Record the operation data of the tower crane through data recording and analysis, and conduct long-term analysis to predict potential risks;

[0025] Step S10: collecting data from the sensor through the data acquisition unit and performing preliminary processing;

[0026] Step S11: The alarm system automatically triggers an alarm and notifies relevant personnel when the tower crane operating parameters are abnormal based on the threshold and rules of exceeding 10% of the rated lifting capacity;

[0027] Step S12: Conduct in-depth analysis on the collected data, predict potential risks, and provide maintenance recommendations.

[0028] The present invention provides a grass-planting mosaic construction safety field through improvement, which has the following improvements and advantages compared with the prior art:

[0029] First, the present invention can monitor the operation status of the tower crane in real time through the infrared camera and the tower crane safety monitoring system, timely discover potential safety hazards, and effectively prevent accidents. The system can collect the tower crane operation data in real time, and analyze it through the data analysis and processing software to provide managers with accurate operation status information. The remote monitoring alarm system allows managers to monitor the tower crane status in real time at a remote location, and receive alarms in time under abnormal circumstances and take measures quickly. The system can perform fault diagnosis on the operation status of the tower crane, and send out early warning signals through the early warning technology module to reduce the possibility of faults. The data recording and analysis module and the data storage module can record the operation data and historical information of the tower crane, which is convenient for post-analysis and long-term monitoring. Through the connection of the display and the sensor, the manager can intuitively understand the operation status of the tower crane, which is convenient for daily maintenance and management decisions. Through automated and intelligent monitoring and management, the need for manual monitoring is reduced, and the overall work efficiency and management efficiency of the construction site are improved. The system can adapt to different construction site environments through the connection of the GPRS module and the data storage module, realize remote transmission and storage of data, and provide comprehensive guarantees for the safe operation of the tower crane by integrating advanced technical means, which helps to improve the overall safety management level and operation efficiency of the construction site.

[0030] Second, the present invention reduces the blind spots of the driver's vision and operational errors through automatic tracking and focusing technology, and reduces the risk of accidents caused by blurred vision. The monitoring system can track the tilt angle, foundation settlement, counterweight, load status, boom angle and wind speed of the tower crane in real time to ensure that the tower crane operates within safety parameters. Through data analysis and processing software, visual real-time data is generated to help managers understand the status of the tower crane in a timely manner, prevent failures and accidents, analyze the tower crane operation data for a long time, predict potential risks, perform maintenance in advance, and avoid sudden failures. When the tower crane operation parameters are abnormal, the alarm system can automatically trigger an alarm, notify relevant personnel in time, and respond to potential problems quickly. Through the structural health monitoring module, the integrity of the tower crane structure, including cracks and deformation, is checked to ensure structural safety. The tower crane's lifting, rotation, and amplitude change operating states are monitored in real time to ensure that the operation complies with regulations. Through the fault diagnosis system, possible faults are warned and diagnosed, downtime is reduced, and efficiency is improved. The sensor data is collected and preliminarily processed through the data acquisition unit to provide support for in-depth analysis and decision-making. The collected data is deeply analyzed, potential risks are predicted, and maintenance suggestions are provided to extend the service life of the tower crane and reduce maintenance costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The present invention will be further explained below in conjunction with the accompanying drawings and embodiments:

[0032] Figure 1 It is a flow chart of the data acquisition module of the present invention;

[0033] Figure 2 It is a flow chart of the tower crane safety monitoring system of the present invention;

[0034] Figure 3 It is a schematic diagram of the data recording and analysis module of the present invention. DETAILED DESCRIPTION

[0035] The present invention is described in detail below, and the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0036] The present invention provides a safety management system for tower crane operation in a smart construction site through improvement. The technical solution of the present invention is:

[0037] like Figure 1 - Figure 3 As shown, a safety management system for tower crane operation in a smart construction site includes a data acquisition module, the data acquisition system signal is connected to an infrared camera, the data acquisition system signal is connected to a communication technology module, the communication data module signal is connected to an early warning technology module, the early warning technology module signal is connected to a control technology module, and the control technology module signal is connected to a tower crane safety monitoring system.

[0038] Furthermore, the tower crane safety monitoring system includes a tower crane load monitoring module, the tower crane load monitoring module data is connected to the angle monitoring module, the angle monitoring module signal is connected to the wind speed monitoring module, the wind speed monitoring module data is connected to the position monitoring module, the position monitoring module signal is connected to the structure monitoring module, the structure monitoring module signal is connected to the operation status monitoring module, the operation status monitoring data is connected to the fault monitoring system, the fault diagnosis system signal is connected to the data recording and analysis module, the data recording and analysis module is connected to the data recording and monitoring module signal, the system can monitor the load, angle, wind speed, position, structural state and operation state of the tower crane in real time, and detect abnormal conditions in time. Through continuous monitoring and data analysis, the system can predict potential risks and faults. Faults can be detected and preventive measures can be taken to avoid accidents. The detailed data recorded by the system is helpful for accident analysis and responsibility tracking, and provides historical data support for maintenance and operation. The fault monitoring system can quickly diagnose the problem, reduce downtime, and improve the efficiency of tower crane use. The data recording and analysis module provides a scientific basis for safety management and helps to formulate more reasonable maintenance plans and work instructions. Through the monitoring system, the operating parameters of the tower crane can be optimized, the operating efficiency and equipment utilization rate can be improved, the requirements of relevant laws and regulations and standards for tower crane safety can be met, and the legal risks faced by enterprises due to illegal operations can be reduced. The tower crane safety monitoring system integrates multiple monitoring modules, which not only improves the safety of tower crane operations, but also improves management efficiency and equipment performance.

[0039] Furthermore, the data of the data recording and analysis module is connected to the remote monitoring and alarm system, the signal of the remote monitoring and alarm system is connected to the sensor, the sensor data is connected to the data acquisition unit, the signal of the data acquisition unit is connected to the communication module, and the data of the data recording and analysis module is connected to the data analysis and processing software. The system can obtain sensor data in real time and instantly understand the status of the monitored object. The remote monitoring and alarm system can issue an alarm in time for abnormal situations based on the data analysis results. The data analysis and processing software can conduct in-depth analysis of the collected data to help users make more informed decisions. Through long-term data recording and analysis, the system can identify potential problems and failure trends, and perform maintenance and repairs in advance. The analysis results can be used to optimize operating procedures and resource allocation, improve efficiency and reduce costs. Monitoring of key equipment and environment can effectively prevent the occurrence of safety accidents and ensure the safety of personnel and property.

[0040] Furthermore, the tower crane safety monitoring system data is connected to a data storage module, and the data storage module signal is connected to a GPRS module. Through the GPRS module, the monitoring center can receive the working status data of the tower crane in real time and discover abnormal situations in time. The data storage module can record the operating data of the tower crane, which is convenient for subsequent analysis and troubleshooting. Combined with remote communication capabilities, monitoring personnel can control and adjust the tower crane remotely to improve work efficiency. The system can analyze the collected data, issue early warnings for potential safety risks, and effectively prevent accidents. The data storage and remote transmission functions enable maintenance personnel to diagnose problems remotely, reducing the number and cost of on-site maintenance. Data can be shared with the project management team to help them better plan projects and allocate resources.

[0041] Furthermore, the tower crane safety monitoring system is connected to the data acquisition module signal, and the tower crane safety monitoring system is connected to the sensor data. The system can monitor the working status of the tower crane in real time, including key parameters such as load, angle, wind speed, etc., to ensure that the tower crane operates within a safe range. Through the collected data, in-depth analysis can be carried out to predict potential failures and risks, so as to take measures in advance to avoid accidents. The system can set thresholds. Once the monitored data exceeds the normal range, an early warning can be issued to remind the operator or maintenance personnel to check and process. Long-term data accumulation helps to analyze the use pattern and wear of the tower crane, provide a scientific basis for maintenance, and extend the service life of the equipment. Accurate data monitoring and analysis help optimize the operating efficiency of the tower crane, reduce unnecessary downtime, and improve construction efficiency. All monitoring data can be kept as safety records for accident investigation and responsibility tracing, enhancing the transparency and traceability of safety management.

[0042] Furthermore, the communication module data is connected to a display, and the tower crane monitoring system is connected to the display signal, which can display the working status and operating data of the tower crane in real time, making it convenient for operators to understand the equipment status in a timely manner. Abnormal signals can be quickly identified through the display, fault warnings can be realized, and the risks caused by equipment failures can be reduced. The data recorded by the monitoring system can be played back on the display, which is convenient for analyzing the working performance and historical status of the tower crane. The display can provide operating instructions and prompts to help operators use the tower crane correctly and improve work efficiency. The display can monitor key parameters such as the load and angle of the tower crane to ensure operation safety. In some systems, the display can cooperate with the communication module to realize remote control functions, which is convenient for managers to remotely monitor and operate the tower crane.

[0043] Further, the following steps are included:

[0044] Step S1: Use an infrared camera to automatically track the hook and automatically focus on the cargo to prevent blind spots in the crane driver's field of view during construction, blurred vision at a long distance, and errors in voice guidance;

[0045] Step S2: The tower crane safety monitoring system monitors the inclination angle of the tower crane, the foundation settlement of the tower crane and the counterweight of the tower crane, and calculates the risk factor of the tower crane safety. The calculation formula of the risk factor is: Among them, K risk represents the risk factor, P a represents the observed value of the fuselage tilt angle, P x Indicates the lower limit of the safety threshold of the fuselage tilt angle, P s Indicates the upper limit of the safety threshold of the fuselage tilt angle, C a represents the observed value of tower crane foundation settlement, C x represents the lower limit of the safety threshold of tower crane foundation settlement, C s represents the upper limit of the safety threshold of tower crane foundation settlement, Z a represents the observed value of the tower crane counterweight, Z x Represents the lower limit of the safety threshold of the tower crane counterweight, Z s Indicates the upper limit of the safety threshold of the tower crane counterweight;

[0046] Step S3: The data recording and analysis module and the data analysis and processing software generate visual real-time data for viewing, and calculate the risk factor based on the visual real-time data to prevent the tower crane from malfunctioning during operation and causing accidents;

[0047] Step S4: monitor the load status of the tower crane in real time through the tower crane load monitoring module to ensure that the rated load is not exceeded. The load status calculation formula is F = (M*g) / L, where: F = load, M = mass on the crane arm, g = gravity acceleration, and L = length of the crane arm;

[0048] Step S5: Monitor the boom angle of the tower crane through the angle monitoring module to prevent accidents caused by improper angles. The length L of the boom and the angle θ between the boom and the ground are obtained through the angle detection module. The horizontal X and vertical Y positions of the top of the boom can be calculated using the following formulas. The boom angle calculation formula is X=L*cos(θ), Y=L*sin(θ), where X is the horizontal distance of the top of the boom and Y is the vertical height of the top of the boom.

[0049] Step S6: Detect the ambient wind speed through the wind speed monitoring module, calculate the swing amplitude of the tower crane caused by the ambient wind speed, set a safety threshold according to the swing amplitude, and issue an alarm when the wind speed exceeds the safety threshold. Wind speed (m / s) = (number of pulses / time interval) * (sensor constant), and the swing amplitude calculation formula is:

[0050]

[0051] Among them, A represents the swing amplitude, δT Represents the structural flexibility coefficient of the tower crane, V f represents the ambient wind speed, L represents the length of the crane arm, g represents the acceleration of gravity, H represents the height of the tower crane, k represents the natural frequency of the tower crane, γ represents the damping ratio (damping characteristics of the tower crane), and the safety threshold is set according to the swing amplitude;

[0052] Step S7: Ensure that the tower crane operates within the specified operating range through the position monitoring module and check the integrity of the tower crane structure, including cracks and deformation, through the structural health monitoring module;

[0053] Step S8: Monitor the operation status of the tower crane in real time through the operation status monitoring module, including lifting, rotation, and luffing. Lifting speed = lifting height / lifting time, rotation speed = rotation angle / rotation time, luffing speed = luffing distance / luffing time, and maximum operating load. The calculation formula of the maximum operating load is:

[0054]

[0055] Among them, F max Indicates the maximum operating load, F maxH Indicates the maximum load during lifting, F maxR Indicates the maximum load during the rotation process, F maxA Indicates the maximum load during the amplitude change process, M z represents the mass of the object to be lifted, g represents the acceleration due to gravity, a H is the lifting acceleration, ω H Indicates the lifting speed, r s represents the radius of the hoisting rope, μ represents the moment of inertia of the tower crane, a R represents the rotational acceleration, ω R represents the rotation speed, r T Indicates the rotation radius of the tower crane, a A represents the amplitude acceleration, ω H Indicates the amplitude change speed, L A Indicates the amplitude variation distance;

[0056] Step S9: diagnose and warn possible faults that may occur during the operation of the tower crane through the fault diagnosis system. Record the operation data of the tower crane through data recording and analysis, and conduct long-term analysis to predict potential risks;

[0057] Step S10: collecting data from the sensor through the data acquisition unit and performing preliminary processing;

[0058] Step S11: The alarm system automatically triggers an alarm and notifies relevant personnel when the tower crane operating parameters are abnormal based on the threshold and rules of exceeding 10% of the rated lifting capacity;

[0059] Step S12: Conduct in-depth analysis on the collected data, predict potential risks, and provide maintenance recommendations.

[0060] The above description enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but will conform to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A safety management system for tower crane operation at a smart construction site, including a data acquisition module, characterized in that: The data acquisition system signal is connected to an infrared camera, the data acquisition system signal is connected to a communication technology module, the communication data module signal is connected to an early warning technology module, the early warning technology module signal is connected to a control technology module, and the control technology module signal is connected to a tower crane safety monitoring system.

2. According to claim 1, a safety management system for tower crane operation at a smart construction site is characterized by: The tower crane safety monitoring system includes a tower crane load monitoring module, the tower crane load monitoring module is data-connected with an angle monitoring module, the angle monitoring module is signal-connected with a wind speed monitoring module, the wind speed monitoring module is data-connected with a position monitoring module, the position monitoring module is signal-connected with a structure monitoring module, the structure monitoring module is signal-connected with an operation status monitoring module, the operation status monitoring data is data-connected with a fault monitoring system, the fault diagnosis system is signal-connected with a data recording and analysis module, and the data recording and analysis module is signal-connected with the data recording monitoring module.

3. According to claim 1, a safety management system for tower crane operation in a smart construction site is characterized by: The data recording and analysis module is data-connected to a remote monitoring and alarm system, the remote monitoring and alarm system is signal-connected to a sensor, the sensor is data-connected to a data acquisition unit, the data acquisition unit is signal-connected to a communication module, and the data recording and analysis module is data-connected to data analysis and processing software.

4. According to claim 1, a safety management system for tower crane operation in a smart construction site is characterized by: The tower crane safety monitoring system is data-connected with a data storage module, and the data storage module is signal-connected with a GPRS module.

5. According to claim 1, a safety management system for tower crane operation at a smart construction site is characterized by: The tower crane safety monitoring system is connected to the data acquisition module signal, and the tower crane safety monitoring system is connected to the sensor data.

6. According to claim 1, a safety management system for tower crane operation in a smart construction site is characterized by: The communication module is data-connected with a display, and the tower crane monitoring system is signal-connected with the display.

7. According to claim 1, a safety management system for tower crane operation in a smart construction site is characterized by: The following steps are involved: Step S1: Use an infrared camera to automatically track the hook and automatically focus on the cargo to prevent blind spots in the crane driver's field of view during construction, blurred vision at a long distance, and errors in voice guidance; Step S2: The tower crane safety monitoring system monitors the inclination angle of the tower crane, the foundation settlement of the tower crane and the counterweight of the tower crane, and calculates the risk factor of the tower crane safety. The calculation formula of the risk factor is: Among them, K risk represents the risk factor, P a represents the observed value of the fuselage tilt angle, P x Indicates the lower limit of the safety threshold of the fuselage tilt angle, P s Indicates the upper limit of the safety threshold of the fuselage tilt angle, C a represents the observed value of tower crane foundation settlement, C x represents the lower limit of the safety threshold of tower crane foundation settlement, C s represents the upper limit of the safety threshold of tower crane foundation settlement, Z a represents the observed value of the tower crane counterweight, Z x Represents the lower limit of the safety threshold of the tower crane counterweight, Z s Indicates the upper limit of the safety threshold of the tower crane counterweight; Step S3: The data recording and analysis module and the data analysis and processing software generate visual real-time data for viewing, and calculate the risk factor based on the visual real-time data to prevent the tower crane from malfunctioning during operation and causing accidents; Step S4: monitor the load status of the tower crane in real time through the tower crane load monitoring module to ensure that the rated load is not exceeded. The load status calculation formula is F = (M*g) / L, where: F = load, M = mass on the crane arm, g = gravity acceleration, and L = length of the crane arm; Step S5: Monitor the boom angle of the tower crane through the angle monitoring module to prevent accidents caused by improper angles. The length L of the boom and the angle θ between the boom and the ground are obtained through the angle detection module. The horizontal X and vertical Y positions of the top of the boom can be calculated using the following formulas. The boom angle calculation formula is X=L*cos(θ), Y=L*sin(θ), where X is the horizontal distance of the top of the boom and Y is the vertical height of the top of the boom. Step S6: Detect the ambient wind speed through the wind speed monitoring module, calculate the swing amplitude of the tower crane caused by the ambient wind speed, set a safety threshold according to the swing amplitude, and issue an alarm when the wind speed exceeds the safety threshold. Wind speed (m / s) = (number of pulses / time interval) * (sensor constant), the swing amplitude calculation formula is: Among them, A represents the swing amplitude, δ T Represents the structural flexibility coefficient of the tower crane, V f represents the ambient wind speed, L represents the length of the crane arm, g represents the acceleration of gravity, H represents the height of the tower crane, k represents the natural frequency of the tower crane, γ represents the damping ratio (damping characteristics of the tower crane), and the safety threshold is set according to the swing amplitude; Step S7: Ensure that the tower crane operates within the specified operating range through the position monitoring module and check the integrity of the tower crane structure, including cracks and deformation, through the structural health monitoring module; Step S8: Monitor the operation status of the tower crane in real time through the operation status monitoring module, including lifting, rotation, and luffing. Lifting speed = lifting height / lifting time, rotation speed = rotation angle / rotation time, luffing speed = luffing distance / luffing time, and maximum operating load. The calculation formula of the maximum operating load is: Among them, F max Indicates the maximum operating load, F maxH Indicates the maximum load during lifting, F maxR Indicates the maximum load during the rotation process, F maxA Indicates the maximum load during the amplitude change process, M z represents the mass of the object to be lifted, g represents the acceleration due to gravity, a H is the lifting acceleration, ω H Indicates the lifting speed, r s represents the radius of the hoisting rope, μ represents the moment of inertia of the tower crane, a R represents the rotational acceleration, ω R represents the rotation speed, r T Indicates the rotation radius of the tower crane, a A represents the amplitude acceleration, ω H Indicates the amplitude change speed, L A Indicates the amplitude variation distance; Step S9: diagnose and warn possible faults that may occur during the operation of the tower crane through the fault diagnosis system. Record the operation data of the tower crane through data recording and analysis, and conduct long-term analysis to predict potential risks; Step S10: collecting data from the sensor through the data acquisition unit and performing preliminary processing; Step S11: The alarm system automatically triggers an alarm and notifies relevant personnel when the tower crane operating parameters are abnormal based on the threshold and rules of exceeding 10% of the rated lifting capacity; Step S12: Conduct in-depth analysis on the collected data, predict potential risks, and provide maintenance recommendations.

Citation Information

Patent Citations

  • Safety monitoring and managing system for special equipment

    CN102034149A

  • Tower crane integrated control system and control method thereof

    CN111675104A

  • Intelligent construction site special equipment monitoring system

    CN116911756A

  • Accident prevention monitoring method and system for tower crane

    KR102623060B1

Cited By

  • Remote control system of frequency converter

    CN119637732A

  • A remote control system for frequency converter

    CN119637732B