Method for preventing liquid pouring of desulfurization system during biogas treatment
By gradually adjusting the speed of the booster fan and desulfurization fan, we ensure that the liquid in the desulfurization tower does not flow backwards and discharges residual pressure when closing the system, the liquid pouring problem caused by pressure imbalance in the biogas desulfurization system is solved, and the equipment and system stability is protected sex.
Patent Information
- Application Number
- CN202411026924.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-11-05
AI Technical Summary
When the biogas desulfurization system is turned off, the pressure imbalance in the system causes the liquid to flow backward, causing liquid reflux, wasting desulfurizer and damaging the equipment.
By gradually reducing the speed of the booster fan and the desulfurization fan, the target pressure of the blower outlet of the booster fan is equal to the target pressure of the air outlet of the desulfurization tower, ensuring that the liquid in the desulfurization tower cannot flow backwards. Then close the fan and open the drain valve of the dehydration tower to discharge. Remaining pressure, ensure that there is no residual gas in the system and shut down all equipment after the system is closed.
It effectively avoids liquid pouring, protects the equipment, ensures the stability and safety of the system, and avoids unstable or damage caused by excessively low pressure.
Smart Images

Figure CN118895170A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of biogas treatment, in particular to a method for preventing liquid backflow in a desulfurization system during biogas treatment. Background Art
[0002] Biogas is a gas produced by microbial fermentation of organic matter under anaerobic conditions, and its main components include methane and carbon dioxide. However, biogas often contains some impurities, such as hydrogen sulfide. Sulfur is toxic and corrosive, and can cause air pollution and equipment damage, seriously affecting the environment and health, while reducing combustion efficiency and energy utilization. Therefore, desulfurization treatment is of great significance for the utilization of biogas. By removing hydrogen sulfide, it can not only improve energy utilization efficiency, but also protect equipment, reduce environmental pollution, and avoid affecting the environment.
[0003] In the biogas treatment system, the desulfurization tower is the key equipment for removing hydrogen sulfide from biogas. The desulfurization tower removes hydrogen sulfide by contacting biogas with a specific liquid or a combination of solid and liquid. In the desulfurization process, the biogas needs to be fully contacted with a specific liquid, which will increase the water content of the biogas. Therefore, a dehydration tower needs to be set up after the desulfurization tower, and a fan needs to provide the necessary airflow and pressure to ensure the effective transmission of biogas in different treatment stages.
[0004] Each component and pipeline in the biogas desulfurization system has a certain resistance. When the blower is running, these resistances are overcome and maintained in balance. Once the blower stops, the flow rate of the gas in the system decreases, the system resistance effect becomes apparent, and the pressure distribution is uneven, which causes the liquid to flow back to the upstream desulfurization tower, causing liquid backflow, which not only wastes the desulfurizer, but also damages the front-end equipment. If it lasts for a long time, it will also cause scaling and agglomeration problems. Summary of the invention
[0005] The purpose of the present invention is to provide a method for preventing liquid backflow in a desulfurization system during biogas treatment, so as to solve the problem in the prior art that when shutting down the desulfurization system, if the system is directly shut down, it will cause pressure imbalance in the system, and liquid will flow back to the upstream desulfurization tower, causing liquid backflow, which will not only waste desulfurizer, but also damage the front-end equipment. If the time is long, it will also cause scaling and agglomeration.
[0006] The technical solution adopted by the present invention is as follows: a method for preventing liquid backflow in a desulfurization system during biogas treatment, wherein the desulfurization system comprises a desulfurization induced draft fan, a desulfurization tower, a dehydration tower, and a booster fan which are sequentially connected through pipelines, and the biogas is pressurized by the desulfurization induced draft fan and then sent to the desulfurization tower through a pipeline between the desulfurization induced draft fan and the desulfurization tower, and the desulfurized biogas enters the dehydration tower through a pipeline to complete dehydration, and then is pressurized by the booster fan and sent to a subsequent treatment process;
[0007] When the desulfurization system is in operation, the output air pressure of the desulfurization induced draft fan pressurizes the biogas in the desulfurization induced draft fan, requiring the pressure at the outlet of the desulfurization tower to reach the target pressure required by the system. There is desulfurization liquid in the desulfurization tower, so the output air pressure of the desulfurization induced draft fan, after overcoming the resistance brought by the desulfurization liquid, reaches the pressure of the biogas at the outlet of the desulfurization tower, which is the target pressure; after the pressure of the biogas at the outlet of the desulfurization tower reaches the target pressure, it is dehydrated in the dehydration tower and then pressurized by the booster fan to enter the subsequent treatment process. When the system is shut down, the desulfurization induced draft fan and the booster fan stop at the moment, and all valves on the desulfurization system pipeline are in the open state. At this time, the target pressure at the outlet of the booster fan is greater than the static pressure difference of the corresponding liquid level of the desulfurization tower, so that the desulfurization liquid in the desulfurization tower flows to the front process of the desulfurization system under the action of the rear pressure, resulting in liquid backflow.
[0008] Therefore, the following steps are taken to prevent the occurrence of liquid pouring:
[0009] S1. gradually reduce the speed of the booster fan so that the target pressure at the outlet of the booster fan is lower than the target pressure at the outlet of the desulfurization tower;
[0010] S2. Adjust the speed of the desulfurization induced draft fan so that the target pressure at the outlet of the desulfurization tower is equal to the target pressure at the outlet of the booster fan;
[0011] S3, shutting down the desulfurization induced draft fan and the booster fan;
[0012] S4. Open the drain valve at the bottom of the dehydration tower to discharge the remaining pressure in the system;
[0013] S5. Shut down the system.
[0014] The desulfurization induced draft fan and booster fan are Roots blowers, and their output air pressure is 40kPa. The liquid level in the desulfurization tower is 2m high, and the pressure generated is 20kPa. After overcoming the resistance brought by the liquid in the desulfurization tower, the pressure at the outlet of the desulfurization tower is 20kPa. After the booster fan is pressurized, the pressure at the outlet of the booster fan is 60kPa. When the desulfurization induced draft fan and the booster fan are completely closed, the pressure at the outlet of the booster fan minus the pressure at the outlet of the desulfurization tower of 20kPa is greater than the resistance brought by the liquid in the desulfurization tower, so that it flows to the front process of the desulfurization system under the action of pressure, resulting in liquid backflow.
[0015] Therefore, when shutting down the system, in order to prevent the pressure in the system from being unbalanced, it is necessary to first reduce the speed of the booster fan to reduce the target pressure at the booster fan outlet. However, in order to ensure the stability of the system, the booster fan cannot be completely shut down directly. Therefore, the speed of the booster fan is reduced every 2 minutes, and the rated speed is reduced by 25% each time until the target pressure at the booster fan outlet drops to 15kPa. At the same time, the output wind pressure of the desulfurization induced draft fan is reduced to 35kPa, so that the target pressure at the outlet of the desulfurization tower is also 15kPa. 15kPa is 25% of the original target pressure of 60kPa at the outlet of the booster fan. 15kPa is within the minimum safe operating pressure range of the desulfurization system and boosting equipment, which can protect the equipment and avoid unstable operation or damage caused by too low pressure.
[0016] When the target pressures at the two locations are the same, the desulfurization liquid in the desulfurization tower cannot flow to the front process of the desulfurization system under the pressure at the rear, avoiding liquid backflow. At this time, the desulfurization induced draft fan and the booster fan are completely closed, and the drain valve at the bottom of the dehydration tower is opened. After waiting for 2-5 minutes, ensure that the remaining gas and pressure in the system are completely discharged through the drain valve. After confirming that there is no residual pressure in the system, close all equipment and valves to complete the system shutdown.
[0017] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0018] 1. When shutting down the desulfurization system, the present invention adjusts the rotation speeds of the booster fan and the desulfurization fan 1 in sequence, so that the target pressure at the outlet of the booster fan is equal to the target pressure at the outlet of the desulfurization tower. When the target pressures at the two locations are the same, the desulfurization liquid in the desulfurization tower cannot flow to the front process of the desulfurization system under the pressure at the rear, thereby avoiding liquid backflow. After that, the desulfurization induced draft fan and the booster fan are completely shut down, and the drain valve at the bottom of the dehydration tower is opened. After waiting for 2-5 minutes, ensure that the remaining gas and pressure in the system are completely discharged. After confirming that there is no residual pressure in the system, all equipment and valves are shut down to complete the shutdown of the system.
[0019] 2. The present invention adjusts the rotation speed of the booster fan and the desulfurization fan 1, and reduces the target pressure of the booster fan outlet to 25% of the original target pressure. 25% of the original target pressure is within the minimum safe operating pressure range of the desulfurization system and the booster equipment, which can protect the equipment and avoid unstable operation or damage of the equipment caused by too low pressure;
[0020] 3. When reducing the speed of the booster fan, in order to avoid completely shutting down the booster fan and causing system instability, the present invention reduces the speed of the booster fan every 2 minutes, reducing the rated speed by 25% each time until the target pressure at the outlet of the booster fan is reduced to the required pressure;
[0021] 4. In order to avoid liquid backflow, the drain valve of the dehydration tower is a solenoid valve. In an emergency, the solenoid valve is controlled to open through the emergency switch, so that the drain port of the dehydration tower is in an open state, and the gas and pressure in the system can be quickly discharged;
[0022] 5. The solenoid valve adopts a normally open solenoid valve. When the desulfurization induced draft fan and the booster fan lose power and are directly closed, it will also cause pressure imbalance in the system. Therefore, the solenoid valve installed at the sewage outlet of the dehydration tower is a normally open solenoid valve. The normally open solenoid valve is in the open state when it is not powered on, ensuring that when the desulfurization induced draft fan and the booster fan lose power and are directly closed, the sewage outlet of the dehydration tower is in the open state, and the gas and pressure in the system can be quickly discharged;
[0023] 6. The pipeline between the desulfurization induced draft fan and the desulfurization tower is an inverted U-shaped pipe, the top height of which is greater than the liquid level of the desulfurization liquid in the desulfurization tower. Even if pressure fluctuations occur in the system, causing part of the desulfurization liquid to attempt to flow back, the desulfurization liquid cannot cross the highest point of the inverted U-shaped pipe, and thus cannot flow to the forward process;
[0024] 7. Pressure sensors are installed at the air inlet of the desulfurization induced draft fan, the air outlet of the desulfurization tower, and the air outlet of the booster fan to detect the gas pressure at the above locations. The output air pressure of the desulfurization induced draft fan is 40kPa. The desulfurization induced draft fan boosts the biogas. The liquid level in the desulfurization tower is 2m high, and the pressure generated is 20kPa. Under the condition of ensuring that the pressure at the outlet of the desulfurization tower is 20kPa, it is necessary to ensure that the air intake pressure of the desulfurization induced draft fan is not less than -10kPa. If it is less than -10kPa, it may cause the desulfurization induced draft fan to shut down due to overload. Moreover, if the air intake pressure of the desulfurization induced draft fan is lower than -10kPa, it means that the pipeline in front of the system is blocked or liquid has entered, and maintenance is required. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a schematic diagram of the structure of the desulfurization system in the present invention.
[0026] Description of reference numerals:
[0027] 1. Desulfurization induced draft fan; 2. Desulfurization tower; 3. Dehydration tower; 4. Booster fan; 5. Reverse U-shaped pipe. DETAILED DESCRIPTION
[0028] The technical solution of the present invention will be described clearly and completely in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0029] In the description of the present invention, it should be noted that the orientations or positional relationships indicated by the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc. are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used for descriptive purposes and cannot be understood as indicating or implying relative importance. Among them, the terms "first position" and "second position" are two different positions, and the first feature "above", "above" and "above" the second feature include the first feature being directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. The first feature "below", "below" and "below" the second feature include the first feature being directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0030] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0031] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.
[0032] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] Example 1
[0034] Figure 1As shown: a method for preventing liquid backflow in a desulfurization system during biogas treatment, the desulfurization system comprises a desulfurization induced draft fan 1, a desulfurization tower 2, a dehydration tower 3, and a booster fan 4 which are sequentially connected through pipelines. After the biogas is pressurized by the desulfurization induced draft fan 1, it is sent to the desulfurization tower 2 through a pipeline between the desulfurization induced draft fan 1 and the desulfurization tower 2. After the desulfurized biogas enters the dehydration tower 3 through a pipeline to complete dehydration, it is pressurized by the booster fan 4 and sent to a subsequent treatment process.
[0035] When the desulfurization system is in operation, the output wind pressure of the desulfurization induced draft fan 1 pressurizes the biogas in the desulfurization induced draft fan 1, requiring the pressure at the outlet of the desulfurization tower 2 to reach the target pressure required by the system, wherein there is desulfurization liquid in the desulfurization tower 2, so the output wind pressure of the desulfurization induced draft fan 1, after overcoming the resistance caused by the desulfurization liquid, reaches the pressure of the biogas at the outlet of the desulfurization tower 2, which is the target pressure; after the pressure of the biogas at the outlet of the desulfurization tower 2 reaches the target pressure, it is dehydrated by the dehydration tower 3 and then pressurized by the booster fan 4 to enter the subsequent treatment process. When the system is shut down, the desulfurization induced draft fan 1 and the booster fan 4 stop at the moment, and all valves on the desulfurization system pipeline are in the open state. At this time, the target pressure at the outlet of the booster fan 4 is greater than the static pressure difference of the corresponding liquid level of the desulfurization tower 2, so that the desulfurization liquid in the desulfurization tower 2 flows to the front process of the desulfurization system under the action of the rear pressure, thereby causing liquid backflow.
[0036] Therefore, the following steps are taken to prevent the occurrence of liquid pouring:
[0037] S1. Gradually reduce the speed of the booster fan 4 so that the target pressure at the outlet of the booster fan 4 is lower than the target pressure at the outlet of the desulfurization tower 2;
[0038] S2. Adjust the speed of the desulfurization induced draft fan 1 so that the target pressure at the outlet of the desulfurization tower 2 is equal to the target pressure at the outlet of the booster fan 4;
[0039] S3, shut down the desulfurization induced draft fan 1 and the booster fan 4;
[0040] S4, open the drain valve at the bottom of the dehydration tower 3 to discharge the remaining pressure in the system;
[0041] S5. Shut down the system.
[0042] The desulfurization induced draft fan 1 and the booster fan 4 are Roots blowers, and their output air pressures are both 40kPa. The liquid level in the desulfurization tower 2 is 2m high, and the pressure generated is 20kPa. After overcoming the resistance brought by the liquid in the desulfurization tower 2, the pressure at the outlet of the desulfurization tower 2 is 20kPa. After being pressurized by the booster fan 4, the pressure at the outlet of the booster fan 4 is 60kPa. When the desulfurization induced draft fan 1 and the booster fan 4 are completely closed, the pressure at the outlet of the booster fan 4 minus the pressure at the outlet of the desulfurization tower 2 (20kPa) is greater than the resistance brought by the liquid in the desulfurization tower 2, so that it flows to the front process of the desulfurization system under the action of pressure, resulting in liquid backflow.
[0043] Therefore, when shutting down the system, the pressure in the system will not be unbalanced. First, the speed of the booster fan 4 needs to be reduced to reduce the target pressure at the outlet of the booster fan 4. However, in order to ensure the stability of the system, the booster fan 4 cannot be completely shut down directly. Therefore, the speed of the booster fan 4 is reduced every 2 minutes, and the rated speed is reduced by 25% each time until the target pressure at the outlet of the booster fan 4 drops to 15kPa. At the same time, the output wind pressure of the desulfurization induced draft fan 1 is reduced to 35kPa, so that the target pressure at the outlet of the desulfurization tower 2 is also 15kPa. 15kPa is 25% of the original target pressure of 60kPa at the outlet of the booster fan 4. 15kPa is within the minimum safe operating pressure range of the desulfurization system and the boosting equipment, which can protect the equipment and avoid unstable operation or damage of the equipment due to too low pressure.
[0044] When the target pressures at the two locations are the same, the desulfurized liquid in the desulfurization tower 2 cannot flow to the front process of the desulfurization system under the pressure at the rear, to avoid liquid backflow. At this time, the desulfurization induced draft fan 1 and the booster fan 4 are completely closed, and the drain valve at the bottom of the dehydration tower 3 is opened. After waiting for 2-5 minutes, ensure that the remaining gas and pressure in the system are completely discharged. After confirming that there is no residual pressure in the system, close all equipment and valves to complete the system shutdown.
[0045] Example 2
[0046] The difference between this embodiment and embodiment 1 is that when an emergency occurs and the desulfurization induced draft fan 1 and the booster fan 4 need to be forcibly shut down, the speed of the desulfurization induced draft fan 1 and the booster fan 4 cannot be gradually reduced to achieve the purpose of regulating the pressure in the system.
[0047] In this case, in order to avoid liquid backflow, the drain valve in the dehydration tower 3 is a solenoid valve. In an emergency, the solenoid valve is controlled to open by an emergency switch, so that the drain port of the dehydration tower 3 is in an open state, and the gas and pressure in the system can be quickly discharged.
[0048] Example 3
[0049] The difference between this embodiment and embodiment 2 is that the solenoid valve is a normally open solenoid valve. When the desulfurization induced draft fan 1 and the booster fan 4 lose power and are directly closed, it will also cause pressure imbalance in the system. Therefore, the solenoid valve installed at the sewage outlet of the dehydration tower 3 is a normally open solenoid valve. The normally open solenoid valve is in an open state when not powered, ensuring that when the desulfurization induced draft fan 1 and the booster fan 4 lose power and are directly closed, the sewage outlet of the dehydration tower 3 is in an open state, and the gas and pressure in the system can be quickly discharged.
[0050] Example 4
[0051] The difference between this embodiment and Embodiment 1 is that the pipeline between the desulfurization draft fan 1 and the desulfurization tower 2 is an inverted U-shaped pipe 5, and the top height of the inverted U-shaped pipe 5 is greater than the liquid level of the desulfurization liquid in the desulfurization tower 2. Even if pressure fluctuations occur in the system, causing part of the desulfurization liquid to attempt to flow back, the desulfurization liquid cannot cross the highest point of the inverted U-shaped pipe 5, and therefore cannot flow to the forward process.
[0052] Example 5
[0053] The difference between this embodiment and embodiment 1 is that pressure sensors are installed at the air inlet of the desulfurization induced draft fan 1, the air outlet of the desulfurization tower 2 and the air outlet of the booster fan 4 for detecting the gas pressure at the above-mentioned locations.
[0054] And the output wind pressure of the desulfurization induced draft fan 1 is 40kPa. The desulfurization induced draft fan 1 pressurizes the biogas. The liquid level in the desulfurization tower 2 is 2m high, and the pressure generated is 20kPa. While ensuring that the pressure at the outlet of the desulfurization tower 2 is 20kPa, it is necessary to ensure that the intake pressure of the desulfurization induced draft fan 1 is not less than -10kPa. If it is less than -10kPa, it may cause the desulfurization induced draft fan 1 to overload and shut down. Moreover, if the intake pressure of the desulfurization induced draft fan 1 is lower than -10kPa, it means that the pipeline in front of the system is blocked or liquid has entered, and maintenance is required.
[0055] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the protection scope of the present invention. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.
Claims
1. A method for preventing liquid backflow in a desulfurization system during biogas treatment, the desulfurization system comprising a desulfurization induced draft fan (1), a desulfurization tower (2), a dehydration tower (3), and a booster fan (4) connected in sequence through a pipeline; It is characterized in that The following steps are involved: S1. gradually reducing the rotation speed of the booster fan (4), reducing the target pressure at the air outlet of the booster fan (4), and making the target pressure at the air outlet of the booster fan (4) lower than the target pressure at the outlet of the desulfurization tower (2); S2, adjusting the rotation speed of the desulfurization induced draft fan (1) so that the target pressure at the outlet of the desulfurization tower (2) is equal to the target pressure at the air outlet of the booster fan (4); S3, shutting down the desulfurization induced draft fan (1) and the booster fan (4); S4, open the drain valve at the bottom of the dehydration tower (3) to discharge the remaining pressure in the system; S5. Shut down the system.
2. The method for preventing liquid backflow in a desulfurization system during biogas treatment according to claim 1, characterized in that: When the speed of the booster fan (4) is gradually reduced in step S1, the speed of the booster fan (4) is reduced once every 2 minutes, each time by 25% of the rated speed.
3. The method for preventing liquid backflow in a desulfurization system during biogas treatment according to claim 1, characterized in that: In step S1, the target pressure at the air outlet of the booster fan (4) is reduced to 25% of the original target pressure at the air outlet of the booster fan (4).
4. The method for preventing liquid backflow in a desulfurization system during biogas treatment according to claim 1, characterized in that: Between steps S4 and S5, wait for 2 to 5 minutes.
5. The method for preventing liquid backflow in a desulfurization system during biogas treatment according to claim 1, characterized in that: In step S4, the drain valve of the dehydration tower (3) is a solenoid valve, and the solenoid valve is controlled by an emergency switch in the system.
6. The method for preventing liquid backflow in a desulfurization system during biogas treatment according to claim 1, characterized in that: Pressure sensors are installed at the air inlet of the desulfurization induced draft fan (1), the air outlet of the desulfurization tower (2), and the air outlet of the booster fan (4).
7. The method for preventing liquid backflow in a desulfurization system during biogas treatment according to claim 1, characterized in that: The desulfurization induced draft fan (1) and the desulfurization tower (2) are connected via an inverted U-shaped pipe.
8. The method for preventing liquid backflow in a desulfurization system during biogas treatment according to claim 5, characterized in that: The solenoid valve is a normally open solenoid valve.
9. The method for preventing liquid backflow in a desulfurization system during biogas treatment according to claim 5, characterized in that: The desulfurization induced draft fan (1) and the booster fan (4) are Roots blowers.