Full bare rock fracture sealing cover-free heavy consolidation grouting construction method
By using high-performance bedrock crack sealing materials and intelligent grouting systems, combined with circulating mechanical grouting plugs, the poor sealing effect and leaking problems in traditional consolidation grouting technology are solved, and more efficient grouting quality and pressure control are achieved, improving the improvement of Overall construction efficiency and safety.
Patent Information
- Application Number
- CN202411145111.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2024-11-05
AI Technical Summary
The existing consolidation grouting technology has problems such as poor sealing effect, serious leakage and inaccurate pressure control in the applications of high-performance bedrock crack sealing, circulating mechanical grouting plugs and intelligent grouting systems, which affect the grouting quality and efficiency.
High-performance bedrock crack sealing materials are used for rapid sealing, combined with circulating mechanical grouting plugs to reduce leakage, and an intelligent grouting system is introduced to achieve automatic pressure control and slurry quality optimization.
It improves grouting quality and efficiency, reduces leakage and manual operation errors, and reduces construction costs and risks.
Smart Images

Figure CN118895749A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of grouting construction, and in particular to a completely bare rock fissure sealing and uncapped consolidation grouting construction method. Background Art
[0002] As an important infrastructure construction project, the stability and bearing capacity of the dam foundation of water conservancy and hydropower projects are directly related to the safety and durability of the project. In the process of dam foundation construction, consolidation grouting is a key technical measure, which aims to fill cracks and improve the integrity and strength of the rock mass by injecting slurry into the bedrock, thereby ensuring the stability and bearing capacity of the dam foundation. With the continuous expansion of the scale of water conservancy and hydropower projects and the continuous advancement of technology, the requirements for consolidation grouting construction technology are also increasing.
[0003] Although the existing consolidation grouting methods have met the engineering needs to a certain extent, they all have obvious limitations. In particular, for the application of high-performance bedrock crack sealing materials, circulating mechanical grouting plugs and intelligent grouting systems, traditional technologies often fail to give full play to their advantages. When using high-performance bedrock crack sealing materials, traditional methods result in poor sealing effects due to improper material selection and backward construction technology, which in turn affects the grouting quality. In the use of circulating mechanical grouting plugs, traditional technologies cause serious leakage in the orifice section due to unreasonable design or improper operation. In the application of intelligent grouting systems, traditional methods are unable to achieve precise control of grouting pressure and optimization of slurry quality due to the lack of advanced control systems and automatic adjustment functions.
[0004] In view of the above problems, it is necessary to optimize the existing uncovered consolidation grouting construction method and overcome the disadvantages of the traditional grouting method by adopting the technical means of high-performance bedrock crack sealing materials, circulating mechanical grouting plugs and intelligent grouting systems. Therefore, it is of great significance to develop a fully bare rock crack sealing and uncovered consolidation grouting construction method that can comprehensively realize the above characteristics. Summary of the invention
[0005] The purpose of the present invention is to make up for the shortcomings of the prior art and to provide a construction method for completely bare rock fissure sealing without cover consolidation grouting. It can quickly and effectively seal the surface cracks of the bedrock by adopting high-performance bedrock crack sealing materials, thereby solving the problem of difficulty in sealing surface cracks. At the same time, combined with the use of circulating mechanical grouting plugs, it effectively reduces the leakage of the orifice section and improves the grouting quality. In addition, the introduction of the intelligent grouting system realizes the automatic control of the grouting pressure, further improving the grouting efficiency and the slurry configuration quality.
[0006] In order to solve the above technical problems, the present invention provides the following technical solutions: a method for consolidation grouting of completely bare rock fissures without cover, the method comprising the following specific steps:
[0007] S100, crack sealing: Use high-performance bedrock crack sealing materials to quickly and effectively seal cracks on the bedrock surface, solving the problem of difficulty in sealing surface cracks;
[0008] S200, drilling and hole washing: Use measuring instruments to accurately locate the drilling position, mark the center point and depth of the drilling hole, and wash the hole. At the same time, perform water pressure test to evaluate the grouting effect;
[0009] S300, using circulating mechanical grouting plug: Install circulating mechanical grouting plug at the grouting hole section, blocking the rock by 10-30cm to reduce the leakage phenomenon at the hole section, and inject the grouting material into the grouting hole through the grouting plug's circulation system;
[0010] S400, intelligent grouting: The intelligent grouting system is used to automatically control the grouting pressure stability through the automatic adjustment of the pressure operating valve, avoiding the risk of lifting and splitting caused by artificial overpressure;
[0011] S500, completion and inspection of grouting: After the grouting is completed, remove the water and dirt in the borehole, and conduct a grouting quality inspection according to the design requirements to ensure that the grouting effect can meet the design requirements.
[0012] Furthermore, the step S100 includes:
[0013] S101, use high-pressure water to wash away the floating stones, scum and soil debris on the surface of the foundation;
[0014] S102, apply high-performance polymer mortar material to the surface of the crack to seal the crack, use a putty knife to apply the sealing material along the crack, and apply it in layers from the inside to the outside when the crack is large;
[0015] S103, performing maintenance according to the requirements of the sealing material so that the sealing layer can reach sufficient strength.
[0016] Furthermore, the step S200 includes:
[0017] S201, determine the location of each grouting hole using measuring tools according to the construction drawings and design requirements;
[0018] S202, drilling with a drilling device, and controlling the drilling direction, hole diameter and hole depth during the drilling process;
[0019] S203: If drilling is difficult due to drill drop, hole collapse or drill jam, stop drilling and handle the problem. If no water return, serious water leakage or water gushing occurs, find out the surrounding caverns and geological structures and analyze the causes. Drilling can be resumed after handling.
[0020] S204, after drilling is completed, all grouting holes are flushed with large flow and cracks and a water pressure test is performed.
[0021] Furthermore, the step S300 includes:
[0022] S301, when there is no cover weight consolidation grouting, the circulating mechanical grouting plug is installed in the grouting hole according to the design requirements, and the blocking depth is 10-30cm into the rock;
[0023] S302, injecting grouting material into the grouting hole through the circulation system of the grouting plug, and using the intelligent grouting system to control the grouting pressure and grouting speed.
[0024] Furthermore, the step S301 uncapped consolidation grouting adopts a bottom-up segmented grouting method, and its working process is: drilling rig in place - drilling to the designed hole depth - hole depth acceptance - full hole one-time hole washing and water pressure test - hole bottom section grouting (water pressure plug stuck) - previous section grouting (water pressure plug stuck) - ... - first section grouting (replaced with mechanical plug stuck) - hole sealing.
[0025] Furthermore, when the step S301 adopts circulating grouting, the distance between the grouting pipe outlet and the bottom of the hole is not greater than 50 cm, and the grouting pipe is rotated and moved up and down during the grouting process to prevent the grouting pipe from being solidified by cement slurry in the hole.
[0026] Furthermore, the step S400 includes:
[0027] S401, setting various parameters of the intelligent grouting system according to the requirements of the grouting project;
[0028] S402, start the intelligent grouting system, the system automatically performs grouting operations according to preset parameters, and monitors various data during the grouting process in real time;
[0029] S403, the system performs real-time analysis on the grouting data, automatically optimizes the grouting parameters based on the analysis results, and issues an alarm signal when an abnormal situation is found.
[0030] Furthermore, the step S402 uses a PID control algorithm to monitor various parameters in the grouting process in real time, and the calculation formula is:
[0031]
[0032] Where u(t) is the output of the controller, i.e., the adjustment value of grouting pressure, grouting rate and other grouting parameters; K p is the proportional gain, which is used to control the influence of the error on the current output; e(t) is the error between the target value and the actual value, that is, the difference between the ideal state and the actual state during the grouting process; K iis the integral gain, used to eliminate the cumulative effect of errors; It represents the integral of the error from time 0 to time t, and the accumulation of errors during this period of time; K d It is the differential gain, which is used to predict the future trend of the error and make corrections in advance. It can realize precise control of the grouting process by real-time monitoring of various data in the grouting process and adjusting the grouting parameters according to the preset PID parameters. The derivative of the error, that is, the rate at which the error changes with time.
[0033] Furthermore, the step S403 uses the PSO algorithm to optimize the parameters of the PID controller, and continuously iterates and updates the speed and position of the particles to find the optimal PID parameter combination, thereby automatically adjusting the grouting parameters. For speed update, the formula is:
[0034] v id (t+1)=w·v id (t)+c1·r1·(pbest id (t)-x id (t))+c2·r2·(gbest d (t)-x id (t))
[0035] For location update, the formula is:
[0036] x id (t+1)=x id (t)+v id (t+1)
[0037] Among them, v id is the velocity of particle i in the tth generation in the dth dimension; v id (t+1) is the velocity of particle i at the next time step t+1; w is the inertia weight, which controls the influence of the current velocity of the particle; v id (t) is the velocity of particle i at the current time step t; c1 and c2 are learning factors, indicating the degree to which the particle learns its best position; pbest id (t) The best position of particle i at time step t, that is, the best solution found in the history of the particle; x id is the position of particle i in the tth generation in the dth dimension; x id (t) is the position of particle i at time step t; r1 and r2 are random numbers between [0, 1]; gbest d (t) is the position of the global extreme value of the entire population in the dth dimension; x id (t+1) is the position of particle i at the next time step t+1.
[0038] Furthermore, the step S500 includes:
[0039] S501, when the grouting material in the grouting hole reaches the design requirement, the grouting operation is stopped, and the grouting equipment and the grouting hole are closed;
[0040] S502, using materials to seal the grouting holes to prevent the grouting material from flowing out or foreign matter from entering;
[0041] S503, conduct a comprehensive inspection of the grouting quality through non-destructive testing and sampling testing methods;
[0042] S504, conduct acceptance according to the inspection results, and record in detail the various data and parameters during the grouting construction process to provide reference for subsequent work.
[0043] The beneficial effects of the present invention are:
[0044] Compared with the prior art, this method of consolidation grouting construction for sealing all bare rock fissures without cover has the following beneficial effects:
[0045] 1. The present invention achieves rapid and effective sealing of bedrock surface cracks by introducing high-performance bedrock crack sealing materials, which not only solves the problem of difficulty in sealing surface cracks, but also significantly improves the pressure stability during grouting, thereby ensuring the grouting quality of the surface rock mass. At the same time, combined with the use of circulating mechanical grouting plugs, it effectively reduces the leakage phenomenon in the orifice section, further improving the overall quality of grouting. In addition, the application of the intelligent grouting system realizes automatic control of grouting pressure and non-graded slurry and slurry variation functions, which not only improves the quality of the configured slurry, but also reduces the errors and waste caused by manual operation, and significantly improves the grouting efficiency.
[0046] Second, the present invention directly reduces the construction cost by reducing the amount of concrete drilling work. Secondly, the introduction of the intelligent grouting system realizes the automatic control of the grouting process, reduces the need for manual operation, and reduces the risk of overpressure and leakage caused by human errors. In addition, it avoids mutual interference with concrete pouring and reduces the risk of drilling through cooling water pipes and monitoring instrument lines, thereby reducing the additional repair costs caused by damage to these facilities.
[0047] Other advantages, objectives and features of the present invention will be set forth in part in the following description and, in part, will be apparent to those skilled in the art based on an examination of the following or may be taught from the practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0048] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention, and for ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0049] Figure 1 This is a flow chart of the operation of the method for consolidation grouting of completely bare rock fissures sealed without cover according to the present invention;
[0050] Figure 2 It is a flow chart of the construction method of completely bare rock fissure sealing and uncapped consolidation grouting of the present invention;
[0051] Figure 3 It is a schematic diagram of the construction of a circulating mechanical grouting plug in the method for consolidating grouting without covering weight to seal the entire bare rock fissure of the present invention;
[0052] Figure 4 It is a schematic diagram of the intelligent grouting system of the fully bare rock fissure sealing and uncapped consolidation grouting construction method of the present invention. DETAILED DESCRIPTION
[0053] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0054] Embodiment 1
[0055] This embodiment describes in detail the working process of a method for sealing bare rock fractures with uncapped consolidation grouting.
[0056] In the crack sealing stage (S100), high-pressure water or wind is used to wash away the floating stones, scum, soil and other debris on the surface of the foundation, and then the crack sketch is carried out. When the crack width is large, manual digging, chiseling and other measures can be used to remove and wash the crack filling. The crack cleaning depth is generally not less than 3 times its width. After the crack cleaning is completed and dried, high-performance polymer mortar material is scraped on the crack surface to seal the crack. The sealing material is scraped along the direction of the crack with a putty knife on site. When the crack is large, it should be scraped in layers from the inside to the outside to ensure that the gap in the crack is densely filled. The scraping width on both sides of the crack should be not less than 4cm, and the thickness should be not less than 3cm. The materials should be prepared on site in proportion. The amount of crack sealing material used each time should be based on the actual situation and follow Following the principle of "small amounts and multiple times", materials must be used up before initial setting. Materials that exceed the initial setting time will be regarded as waste materials and are prohibited from use. The manual mixing operation time of sealing materials should be controlled within 30 minutes. Curing should be carried out according to the requirements of the sealing materials so that the sealing layer can reach sufficient strength to ensure the smooth progress of subsequent grouting operations. For cracks that have not been sealed or leaking grout, use a grouting pump to pre-pressurize water. If there is leakage, stop pressurizing water and use sealing materials to seal the leaking part again in time. After the curing time is reached, pre-pressurize water again until there is no leakage. Only then can the water pressure test and grouting construction begin. If slurry is found in the grouting process, use caulking, surface sealing, low pressure, thick slurry, flow limiting, limited quantity, intermittent grouting, etc. to deal with it.
[0057] In the drilling and washing stage (S200), according to the construction drawings and design requirements, use measuring tools to accurately determine the position of each grouting hole and mark it. The pre-grouting test hole and the post-grouting inspection hole are drilled with an XY-2 geological drill rig. The lifting hole and consolidation grouting hole are drilled with SKQ100 down-the-hole drill (medium and low pressure) and JK590 down-the-hole drill (medium and low pressure). The diameter of the consolidation grouting hole is not less than φ56mm, the diameter of the quality inspection hole is generally φ76mm, and the diameter of the lifting deformation observation hole is generally φ91mm. The drilling hole position is strictly arranged according to the requirements of the construction drawings, and the hole position deviation is not more than 10cm. The hole direction is strictly controlled according to the construction parameter table. When the consolidation grouting hole direction is vertical or the top angle is less than 5°, the hole bottom deviation shall not be greater than 25cm. The bottom deviation of other consolidation grouting holes should not be greater than 1 / 40 of the hole depth. The maximum allowable deviation value of the drilling hole bottom is as follows:
[0058] Hole depth(m) 20 30 40 Maximum allowable deviation (m) 0.25 0.50 0.80
[0059] During the drilling process, if there are drill drops, hole collapses, drill jams, and other difficulties in drilling, the drilling should be stopped for processing. When no water return, serious leakage or water gushing occurs, the surrounding caverns, geological structures, etc., are identified, the causes are analyzed, and drilling is resumed after processing. After the drilling is completed, all grouting holes are flushed with large flows and fissures, and a water pressure test is performed to evaluate the grouting effect. Before consolidation grouting, no less than 5% of the drill holes and post-grouting inspection holes in each sequence are selected for single-point water pressure tests, and other consolidation grouting holes are subjected to simple water pressure tests. Simple water pressure tests can be combined with fissure flushing, and the total duration shall not exceed 30 minutes. For the single-point water pressure test: during grouting, 80% of the pressure, when the pressure exceeds 1MPa, use 1MPa, measure the pressure flow rate every 5 minutes, and the difference between the maximum and minimum values of 4 consecutive readings is less than 10% of the final value, or the difference between the maximum and minimum values is less than 1L / min. The final reading is used as the calculated value of the rock permeability q. For simple water pressure: at 80% of the grouting pressure, when the pressure exceeds 1MPa, use 1MPa, pressurize for 20 minutes, measure the pressure flow rate every 5 minutes, and take the final reading as the calculated value of the rock permeability q, where q=Q / PL, Q is the pressure flow rate, P is the total pressure of the grouting section, and L is the grouting section length.
[0060] In the stage of using the circulating mechanical grouting plug (S300): Figure 3 As shown, when there is no cover weight consolidation grouting, a circulating mechanical grouting plug is installed at the grouting hole section, and the blocking depth is 10-30cm into the rock to reduce the leakage of the hole section. The grouting section length is divided under the condition that the construction section length does not exceed 10m except for the contact section specified in the specification, which is not more than 3m. The hole depths of 11m, 13m, 15m, and 18m are divided into three sections for construction, and the section lengths are 3m-3m-5m; 3m-5m-5m; 3m-5m-7m; 3m-7m-8m respectively. The section lengths and grouting pressure parameter table of the uncapped consolidation grouting are shown in the following table:
[0061]
[0062]
[0063] The uncapped heavy consolidation grouting adopts the bottom-up segmented grouting method, and its working process is: drilling rig in place - drilling to the designed hole depth - hole depth acceptance - full hole one-time hole washing, water pressure test - hole bottom section grouting (water pressure plug stuck) - upper section grouting (water pressure plug stuck) - ... - first section grouting (replaced with mechanical plug stuck) - hole sealing, the grouting material is injected into the grouting hole through the circulation system of the grouting plug, and the grouting pressure and grouting speed are controlled by the circulation system at the same time. During grouting, the design pressure is reached as soon as possible in a graded pressurization manner, and the grouting pressure and injection rate are required to be compatible. However, when the injection rate is large, the pressure should be increased in stages on the basis of drilling flushing or water pressure test, and the pure grouting time of each stage of pressure increase should be not less than 10 minutes to prevent the rock mass or building from lifting deformation and damage. The grouting parameters are adjusted according to the monitoring results to ensure the grouting quality. The relationship between grouting pressure and injection rate is shown in the following table:
[0064]
[0065] During the grouting process, if the grouting pressure or injection rate changes suddenly and significantly, the cause should be immediately identified and reported to the supervisor in a timely manner. After approval by the supervisor, appropriate treatment measures may be taken.
[0066] In the intelligent grouting stage (S400), various parameters of the intelligent grouting system are set according to the requirements of the grouting project, and the intelligent grouting system is started, such as Figure 4 As shown, the system automatically performs grouting operations according to preset parameters, and monitors various data during the grouting process in real time. At the same time, the system analyzes the grouting data in real time, and automatically adjusts the grouting parameters and issues alarm signals based on the analysis results.
[0067] At the grouting end and inspection stage (S500), when the grouting material in the grouting hole meets the design requirements, the grouting operation is stopped, the grouting equipment and the grouting hole are closed, and the grouting hole opening is blocked with materials to prevent the grouting material from flowing out or foreign impurities from entering. The grouting quality is comprehensively inspected by ultrasonic detection and sampling detection methods to ensure that the grouting effect meets the design requirements. The qualified standards for single-hole ultrasonic inspection are shown in the following table:
[0068]
[0069] Acceptance is carried out based on the inspection results, and various data and parameters during the grouting construction process are recorded in detail to provide reference for subsequent work.
[0070] Embodiment 2
[0071] Based on the first embodiment, this embodiment describes in detail the workflow of the intelligent grouting stage in a construction method for consolidation grouting of completely bare rock fractures without cover.
[0072] First, a detailed survey is conducted on the grouting project site to evaluate the geological conditions, grouting requirements, expected effects, etc., and relevant data is collected as a basis for subsequent parameter setting.
[0073] According to the engineering design and geological survey results, a reasonable target grouting pressure range is set to ensure that the cracks can be effectively filled without damaging the surrounding structures. Considering the material properties, grouting hole size and geological conditions, an appropriate grouting rate is set to control the material fluidity and distribution uniformity during the grouting process. According to the project scale and grouting volume, a reasonable grouting time window is estimated and set to ensure that the grouting operation is completed within the planned time. Other parameters, such as slurry ratio, grouting hole spacing, grouting section length, etc., also need to be set in advance according to the project requirements. The above parameters are input into the control unit of the intelligent grouting system to initialize the system and ensure that all equipment is on standby.
[0074] After confirming that all parameter settings are correct, start the intelligent grouting system, and the system automatically performs the grouting operation. Through the sensors installed on the grouting equipment (such as pressure sensors, flow sensors, etc.), various data in the grouting process are collected in real time, including grouting pressure, grouting rate, grouting volume, slurry temperature, etc. The intelligent grouting system uses the built-in PID control algorithm to process the collected data in real time, calculate the deviation between the target value (such as set pressure, rate) and the actual value, and evaluate the impact of the deviation on the grouting effect. The calculation formula is:
[0075]
[0076] Where u(t) is the output of the controller, i.e., the adjustment value of grouting pressure, grouting rate and other grouting parameters; K p is the proportional gain, which is used to control the influence of the error on the current output; e(t) is the error between the target value and the actual value, that is, the difference between the ideal state and the actual state during the grouting process; K i is the integral gain, used to eliminate the cumulative effect of errors; It represents the integral of the error from time 0 to time t, and the accumulation of errors during this period of time; K d It is the differential gain, which is used to predict the future trend of the error and make corrections in advance. It can realize precise control of the grouting process by real-time monitoring of various data in the grouting process and adjusting the grouting parameters according to the preset PID parameters. The derivative of the error, that is, the rate at which the error changes with time.
[0077] On the basis of PID control, the particle swarm optimization (PSO) algorithm is introduced to optimize the parameters of the PID controller. The PSO algorithm simulates the foraging behavior of bird flocks and continuously iterates and updates the speed and position of particles to find the optimal PID parameter combination. Specifically, a group of particles is randomly generated, each particle represents a group of PID parameter combinations. According to the current PID parameter combination, the grouting process is simulated, and the deviation between the actual grouting effect and the target effect is calculated as the fitness value. According to the fitness value, the speed and position of each particle are updated to move to a better PID parameter combination. For speed update, the formula is:
[0078] v id (t+1)=w·v id (t)+c1·r1·(pbest id (t)-x id (t))+c2·r2·(gbest d (t)-x id (t))
[0079] For location update, the formula is:
[0080] x id (t+1)=x id (t)+v id (t+1)
[0081] Among them, v id is the velocity of particle i in the tth generation in the dth dimension; v id (t+1) is the velocity of particle i at the next time step t+1; w is the inertia weight, which controls the influence of the current velocity of the particle; v id (t) is the velocity of particle i at the current time step t; c1 and c2 are learning factors, indicating the degree to which the particle learns its best position; pbest id (t) The best position of particle i at time step t, that is, the best solution found in the history of the particle; x id is the position of particle i in the tth generation in the dth dimension; x id (t) is the position of particle i at time step t; r1 and r2 are random numbers between [0, 1]; gbest d (t) is the position of the global extreme value of the entire population in the dth dimension; x id (t+1) is the position of particle i at the next time step t+1. Repeat the iteration until the preset number of iterations is reached or the fitness value meets the requirements. At this time, the PID parameter combination obtained is the optimal solution.
[0082] According to the optimization results of the PSO algorithm, the intelligent grouting system automatically adjusts the parameters of the PID controller, and then adjusts key parameters such as grouting pressure and grouting rate to achieve more accurate grouting control. During the parameter adjustment process, the system continuously monitors the grouting status. Once an abnormal situation (such as a sudden increase in pressure, slurry leakage, etc.) is found, an alarm signal is immediately issued and corresponding measures are automatically taken (such as suspending grouting, adjusting parameters, etc.) to ensure the safety and quality of the grouting operation.
[0083] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
Claims
1. A method for consolidation grouting of completely bare rock fissures without covering weight, characterized in that: The method comprises the following specific steps: S100, crack sealing: Use high-performance bedrock crack sealing materials to quickly and effectively seal cracks on the bedrock surface, solving the problem of difficulty in sealing surface cracks; S200, drilling and hole washing: Use measuring instruments to accurately locate the drilling position, mark the center point and depth of the drilling hole, and wash the hole. At the same time, perform water pressure test to evaluate the grouting effect; S300, using circulating mechanical grouting plug: Install circulating mechanical grouting plug at the grouting hole section, blocking the rock by 10-30cm to reduce the leakage phenomenon at the hole section, and inject the grouting material into the grouting hole through the grouting plug's circulation system; S400, intelligent grouting: The intelligent grouting system is used to automatically control the grouting pressure stability through the automatic adjustment of the pressure operating valve, avoiding the risk of lifting and splitting caused by artificial overpressure; S500, completion and inspection of grouting: After the grouting is completed, remove the water and dirt in the borehole, and conduct a grouting quality inspection according to the design requirements to ensure that the grouting effect can meet the design requirements.
2. A method for consolidation grouting of completely bare rock fissures without covering according to claim 1, characterized in that: The step S100 includes: S101, use high-pressure water to wash away the floating stones, scum and soil debris on the surface of the foundation; S102, apply high-performance polymer mortar material to the surface of the crack to seal the crack, use a putty knife to apply the sealing material along the crack, and apply it in layers from the inside to the outside when the crack is large; S103, performing maintenance according to the requirements of the sealing material so that the sealing layer can reach sufficient strength.
3. The method for consolidation grouting of completely bare rock fissures without covering according to claim 1 is characterized in that: The step S200 includes: S201, determine the location of each grouting hole using measuring tools according to the construction drawings and design requirements; S202, drilling with a drilling device, and controlling the drilling direction, hole diameter and hole depth during the drilling process; S203: If drilling is difficult due to drill drop, hole collapse or drill jam, stop drilling and handle the problem. If no water return, serious water leakage or water gushing occurs, find out the surrounding caverns and geological structures and analyze the causes. Drilling can be resumed after handling. S204, after drilling is completed, all grouting holes are flushed with large flow and cracks and a water pressure test is performed.
4. The method for consolidation grouting of completely bare rock fissures without cover according to claim 1 is characterized in that: The step S300 includes: S301, when there is no cover weight consolidation grouting, the circulating mechanical grouting plug is installed in the grouting hole according to the design requirements, and the blocking depth is 10-30cm into the rock; S302, injecting grouting material into the grouting hole through the circulation system of the grouting plug, and using the intelligent grouting system to control the grouting pressure and grouting speed.
5. The method for consolidation grouting of completely bare rock fissures without covering weight according to claim 4 is characterized in that: The step S301 of uncapped consolidation grouting adopts a bottom-up segmented grouting method, and its working process is: drilling rig in place - drilling to the designed hole depth - hole depth acceptance - full hole one-time hole washing, water pressure test - hole bottom section grouting - upper section grouting - ... first section grouting - hole sealing.
6. The method for consolidation grouting of completely bare rock fissures without covering weight according to claim 4 is characterized in that: When the step S301 adopts the circulating grouting, the distance between the grouting pipe outlet and the bottom of the hole is not greater than 50 cm. During the grouting process, the grouting pipe is rotated and moved up and down to prevent the grouting pipe from being solidified by cement slurry in the hole.
7. The method for consolidation grouting of completely bare rock fissures without covering weight according to claim 1 is characterized in that: The step S400 includes: S401, setting various parameters of the intelligent grouting system according to the requirements of the grouting project; S402, start the intelligent grouting system, the system automatically performs grouting operations according to preset parameters, and monitors various data during the grouting process in real time; S403, the system performs real-time analysis on the grouting data, automatically optimizes the grouting parameters based on the analysis results, and issues an alarm signal when an abnormal situation is found.
8. The method for consolidation grouting of completely bare rock fissures without covering weight according to claim 7 is characterized in that: The step S402 uses a PID control algorithm to monitor various parameters in the grouting process in real time, and the calculation formula is: Where u(t) is the output of the controller, i.e., the adjustment value of grouting pressure, grouting rate and other grouting parameters; K p is the proportional gain, which is used to control the effect of the error on the current output; e(t) is the error between the target value and the actual value, that is, the difference between the ideal state and the actual state during the grouting process; K i is the integral gain, used to eliminate the cumulative effect of errors; It represents the integral of the error from time 0 to time t, and the accumulation of errors during this period of time; K d It is the differential gain, which is used to predict the future trend of the error and make corrections in advance. It can realize precise control of the grouting process by real-time monitoring of various data in the grouting process and adjusting the grouting parameters according to the preset PID parameters. The derivative of the error, that is, the rate at which the error changes with time.
9. The method for consolidation grouting of completely bare rock fissures without covering weight according to claim 7 is characterized in that: The step S403 uses the PSO algorithm to optimize the parameters of the PID controller, and continuously iterates and updates the speed and position of the particles to find the optimal PID parameter combination, thereby automatically adjusting the grouting parameters. For speed update, the formula is: v id (t+1)=w·v id (t)+c1·r1·(pbest id (t)-x id (t))+c2·r2·(gbest d (t)-x id (t)) For location update, the formula is: x id (t+1)=x id (t)+v id (t+1) Among them, v id is the velocity of particle i in the tth generation in the dth dimension; v id (t+1) is the velocity of particle i at the next time step t+1; w is the inertia weight, which controls the influence of the current velocity of the particle; v id (t) is the velocity of particle i at the current time step t; c1 and c2 are learning factors, indicating the degree to which the particle learns its best position; pbest id (t) The best position of particle i at time step t, that is, the best solution found in the history of the particle; x id is the position of particle i in the tth generation in the dth dimension; x id (t) is the position of particle i at time step t; r1 and r2 are random numbers between [0, 1]; gbest d (t) is the position of the global extreme value of the entire population in the dth dimension; x id (t+1) is the position of particle i at the next time step t+1.
10. The method for consolidation grouting of completely bare rock fissures without covering weight according to claim 1, characterized in that: The step S500 includes: S501, when the grouting material in the grouting hole reaches the design requirement, the grouting operation is stopped, and the grouting equipment and the grouting hole are closed; S502, using materials to seal the grouting holes to prevent the grouting material from flowing out or foreign matter from entering; S503, conduct a comprehensive inspection of the grouting quality through non-destructive testing and sampling testing methods; S504, conduct acceptance according to the inspection results, and record in detail the various data and parameters during the grouting construction process to provide reference for subsequent work.