Steeply inclined thin vein non-explosive mechanical rock breaking continuous mining method

By using non-explosion mechanical rock breaking technology of patio drilling rigs and reaming cutters in thin ore veins, the safety and mechanization problems of traditional drilling and blasting methods in thin ore veins are solved, and an efficient and safe mining process is achieved, which is particularly applicable. The thin ore veins are tilted sharply.

CN118895972APending Publication Date: 2024-11-05GUANGXI HUAXI MINING CO LTD COPPER PIT MINING BRANCH +1
View PDF 0 Cites 5 Cited by

Patent Information

Application Number
CN202411188301.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-28
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

The traditional drilling and blasting method has problems such as poor safety, poor operation continuity, high labor intensity and poor operating environment in thin veins mining. It is especially suitable for sharply inclined thin veins with thickness less than 2.0m, with low mechanization and complex mining technology.

Method used

The continuous mining method of rock-breaking by sharply inclined thin ore veins is adopted. The mining process is drilled in the ore body along the inclination direction through the patio drilling rig. The reaming cutter plate is used to follow the rock-breaking upwards to form a circular mining patio next to each other, and trackless equipment is used to carry out the rock-breaking process. Export mines, simplify mining projects, and reduce blasting operations.

Benefits of technology

It improves the mechanized mining level of thin ore veins, ensures field stability, improves operational safety and efficiency, and reduces mining costs. It is suitable for sharp-tilted thin ore veins with thickness less than 2.0m and inclination greater than 60º.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118895972A_ABST
    Figure CN118895972A_ABST
Patent Text Reader

Abstract

The invention discloses a steeply inclined thin vein non-explosive mechanical rock breaking continuous mining method, which is characterized in that a stope is arranged along the trend of an ore body, no stud is reserved, the stope height is the middle section height, and a rock drilling mining tunnel is arranged in the middle of the bottom of the stope along the trend of the ore body; according to the dip angle of the ore body, a raise boring machine is adopted for drilling upwards in advance to the previous middle section through a drill bit, meanwhile, a reaming cutter head is adopted for breaking rock upwards, broken ore rock debris falls to the ground by means of self weight, and ore removal is conducted through trackless equipment. After a certain number of mining raises are stoped, centralized filling is carried out, blasting is not needed in the whole stoping process, and continuous operation is carried out until stoping of the whole stope is completed. According to the method, the raise boring machine mechanical rock breaking is used for replacing a traditional blasting ore breaking mining technology, the thin vein mechanical mining level is greatly improved, and the method has the advantages of being safe in operation, simple in technology, high in efficiency and the like.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of underground mining, and in particular relates to a non-explosive mechanical rock breaking continuous mining method for steeply inclined thin ore veins. Background Art

[0002] Thin ore veins are widely distributed in underground nonferrous metal mines, and most of them are precious metals and rare metals, which have important strategic positions and mining value. For the mining of such ore bodies, traditionally, shallow hole mining, shallow hole ore retention, wall cutting and filling, and upward or downward layered filling methods are mostly used. Among them, the shallow hole ore retention method and the wall cutting and filling method account for as high as 70%. The above methods have low mechanization, large blasting clamping effect, difficult control of ore loss and dilution, multiple operation cycles, discontinuous mining, and poor safety.

[0003] With the development of mining machinery and equipment and mining technology, the mining method of thin ore veins has a tendency to develop towards medium-deep hole mining, but it is generally suitable for ore bodies with a thickness of 2~5m. At this time, high-efficiency medium-deep hole mining methods such as segmented open field method, bottom-pillar-free segmented collapse method and climbing tank ceiling medium-deep hole mining method are applied, but the difficulty of mining dilution control increases. Therefore, some scholars have proposed to use differentiated fine blasting technology to improve the formation of ores of different particle sizes and separate them from waste rocks to achieve dilution control. Although it has a certain effect, it also makes the mining process complicated and the operation cumbersome. Moreover, for thin ore veins with a thickness of less than 1m, especially extremely thin ore veins, limited by the thickness of the ore body and the working space, there are still a lot of constraints in technology and equipment to achieve high-efficiency mining in medium-deep holes. Summary of the invention

[0004] The main purpose of the present invention is to provide a non-explosive mechanical rock breaking continuous mining method for steeply inclined thin ore veins, aiming to solve the problems of poor safety, poor operation continuity, high labor intensity, poor working environment, etc. existing in the traditional drilling and blasting method of hard rock metal mines. At the same time, through innovation in engineering layout, the mining project is simplified, and the mechanical rock breaking advantages and efficiency of the shaft drilling rig are fully utilized.

[0005] To this end, the present invention provides a method for continuous mining of steeply inclined thin ore veins without explosive mechanical rock breaking, a method for continuous mining of steeply inclined thin ore veins without explosive mechanical rock breaking, characterized by comprising: The stope is arranged along the strike of the ore body, the stope width is the thickness of the ore body, no pillars are left in the stope, and continuous mining is carried out; The mining project includes the mining area ramp, stage transportation level road, ramp connecting road, stope connecting road and mining shaft; the cutting project is the bottom pulling project, that is, the rock drilling mining road at the bottom of the stope, and the shaft drilling rig is used to drill in the ore body along its inclination direction for mining. A hole expansion cutter head is added to the drill rod of the shaft drilling rig behind the drill bit, and the diameter of the hole expansion cutter head is slightly larger than the stope width; After the completion of the mining and cutting project, mining will begin. Mining and filling will be carried out continuously from one side along the direction of the ore body. The drill will be used to advance upward along the inclination direction of the ore body. At the same time, the reaming cutter on the mine drilling rig will follow the rock breaking upward. The broken ore and rock cuttings will fall to the ground by their own gravity and be discharged by trackless equipment. Mining once is the entire middle section height. The above mining process will be repeated to form a series of circular mining raises distributed side by side and closely adjacent to each other. After a certain number of mining raises are mined, centralized filling will be carried out. The operation will continue until the mining of the entire stope is completed. During mining, the shaft drill passes through the mining area ramp and the ramp connecting road into the stage transport level tunnel, and then enters the mining area through the mining field connecting road. Fresh air flows through the mining area ramp, the ramp connecting road, the stage transport level tunnel, and the mining field connecting road into the rock drilling mining tunnel, and the polluted air is discharged through the mining shaft and the upper and middle filling return air tunnels.

[0006] Specifically, the cross-section of the rock drilling mining tunnel at the bottom of the mining area is designed and constructed according to the working dimensions of the shaft drilling rig. After the construction is completed, the roof is managed and supported by single or combined support methods such as anchor cables, anchor rods, hanging nets, and shotcrete according to the surrounding rock conditions.

[0007] Specifically, when supporting a rock drilling mining tunnel, an area larger than the diameter of the mining shaft is reserved in the middle of the ore body on the tunnel roof without support.

[0008] Specifically, the trackless equipment is a mining truck or a shovel loader.

[0009] Specifically, the drill bit is a roller drill bit.

[0010] Specifically, when the mining area is filled, the upper middle section is filled through the return air tunnel, and waste rock filling or tailings cementation filling is selected according to the surrounding rock conditions. When waste rock is used for filling, the size of the waste rock should be controlled to ensure that the mining shaft is not blocked.

[0011] Specifically, ventilation and dust removal fans are used to remove dust from the mining operation surface.

[0012] Specifically, the ore cuttings are gathered and discharged to the ground through the converging and slag discharge mechanism on the raise drilling rig.

[0013] Specifically, the length of the mining area along the strike is determined according to the production capacity of the mine, and the mining area ramps, ramp connecting roads, stage transportation tunnels and rock drilling and mining tunnels are determined according to the working dimensions and walking dimensions of the shaft drilling rig and trackless equipment.

[0014] Compared with the prior art, the present invention has the following beneficial effects: (1) The use of mechanical rock breaking by a raise borer replaces the traditional blasting mining process. The cutterhead moves upward to break the rock, and the entire middle section is mined at one time, which greatly improves the level of mechanized mining of thin ore veins and effectively solves the problems of poor safety, poor operation continuity, high labor intensity, and poor working environment in the traditional drilling and blasting mining method.

[0015] (2) The goaf formed after mining is a series of circular mining shafts that are closely distributed side by side. The hole walls are smooth. After the cylindrical goaf is mined and filled, the filling body is highly stable, which can effectively ensure the stability of the mining area. The two adjacent circular mining shafts are not connected, which can ensure that the ore cuttings fall along the current mining shaft, and there will be no problem of cuttings splashing and causing difficulties in recovery.

[0016] (3) Non-explosive mechanical rock breaking uses mechanical cutting to drop ore. During the production process, no explosives or other pyrotechnics are used, no toxic or harmful gases are generated, and there is no blasting vibration. Mechanical cutting causes little disturbance to the surrounding rock mass, and the overall operation safety is greatly improved compared to the drilling and blasting method. In addition, due to the reduction of mining and approval engineering and the absence of blasting operations, the comprehensive mining cost of non-explosive mechanical rock breaking is lower than that of traditional drilling and blasting methods.

[0017] (4) The non-explosive mechanical rock breaking and recovery operation process is simple and continuous, with a high degree of mechanization, which is conducive to realizing automation and intelligence, and achieving the goal of reducing manpower and increasing efficiency.

[0018] In summary, this method uses the mechanical rock breaking of the raise drill to replace the traditional blasting mining process, greatly improving the level of mechanized mining of thin veins, and has the advantages of safe operation, simple process, and high efficiency. At the same time, through innovation in engineering layout, the mining project is simplified, and the efficiency of the raise drill is fully utilized. It is particularly suitable for the mining of steeply inclined thin veins with a thickness of less than 2.0m and an inclination angle greater than 60º. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0020] Figure 1 It is a front view of a non-explosive mechanical rock breaking continuous mining method for thin ore veins provided by an embodiment of the present invention; Figure 2 is along Figure 1 Sectional view along line II-II; Figure 3 is along Figure 1 Sectional view along line III-III; Figure 4 is along Figure 1 Sectional view along line IV-IV; Figure 5 yes Figure 2 A magnified view of area A; Figure 6 yes Figure 2 A magnified view of area B in FIG. Figure 7 yes Figure 3 Magnified view of area C.

[0021] Among them: 1-mining shaft; 2-filling return air tunnel; 3-ore body; 4-rock drilling mining tunnel; 5-scraper; 6-ore cuttings; 7-shaft drilling rig; 8-filling retaining wall; 9-waste rock; 10-mine connecting road; 11-stage transportation level tunnel; 12-ramp connecting road; 13-mining area ramp; 14-roller drill bit; 15-guide hole; 16-hole expansion cutter head; 17-drill rod; 18-stabilizing plate; 19-guide support mechanism; 20-convergence slag discharge mechanism; 21-top plate assembly; 22-manipulator assembly; 23-machine head assembly; 24-bottom plate assembly; 25-manipulator arm; 26-conduit. DETAILED DESCRIPTION

[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0023] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0024] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.

[0025] like Figure 1-Figure 7 As shown, a non-explosive mechanical rock breaking continuous mining method for steeply inclined thin ore veins comprises: (1) The stope is arranged along the strike of ore body 3. The length is determined according to the production capacity of the mine. The stope width is the thickness of ore body 3, which is 0.6 m in this case. No pillars are left in the stope. The inclination of the ore body is 75° and the middle section height is 50 m.

[0026] (2) Construction of the mining and cutting project: the mining area ramp 13, ramp connecting road 12, stage transportation tunnel 11, and stope connecting road 10 are constructed at the bottom of the ore body 3, the rock drilling mining tunnel 4 is constructed along the ore body at the bottom of the ore body, and the filling return air tunnel 2 is constructed in stages. The mining area ramp 13, ramp connecting road 12, stope connecting road 10 and stage transportation tunnel 11 are only used for the passage of the shaft drilling rig 7 and other equipment, personnel and materials. In terms of size, the mining area ramp 13 and stage transportation tunnel 11 are 4m×3.5m (width×height), the ramp connecting road 12 and stope connecting road 10 are 3.5m×3.2m (width×height), and the rock drilling mining tunnel 4 is 4m×4.5m (width×height) according to the working size of the blind shaft drilling rig 7. Among them, after the construction of the rock drilling mining tunnel 4 is completed, the anchor net combined support method is used to manage and support the roof according to the surrounding rock conditions. A reaming cutter head 16 is added to the drill rod of the shaft drilling rig 7 behind the drill bit. The diameter of the reaming cutter head 16 is slightly larger than the width of the mining area. As for the specific value, those skilled in the art can select it according to the specific ore depletion requirements, such as 0.7m in this embodiment.

[0027] (3) After the mining and cutting works are completed, mining begins. A raise drill 7 is used from one side along the direction of the ore body 3 to cut the ore in the ore body 3 without blasting and continuously mine the ore. The raise drill 7 can be a blind raise drill.

[0028] At this time, the skydrill rig 7 is placed in the rock drilling and mining tunnel 4 along the direction of the ore body 3, and the working mechanism is offset by 30° according to the inclination of the ore body to keep it consistent with the inclination of the ore body (60°). The guide support mechanism 19 of the blind skydrill rig 7 adopts four columns and two cylinders to form four groups of top support mechanisms that are telescoped to the top and bottom plates of the rock drilling and mining tunnel 4 to stabilize the working mechanism; the top plate assembly 21 is composed of a top plate assembly and front and rear slide plate assemblies, which are used to straighten the drill rod 17 and ensure its smooth passage when connecting and removing the roller drill bit 14 and the stabilizing plate 18. The bottom plate assembly 24 realizes the same function as the top plate assembly 21 when using downward positive expansion. This application only installs a hole expansion cutter head 16 with a diameter greater than the width of the mining field on the drill rod 17 of the skydrill rig 7. As for the guide support mechanism 18 and top plate assembly 21 of the skydrill rig 7, they are all existing technologies and have not been improved, so they will not be repeated here.

[0029] (4) During mining, a roller drill bit 14 is used to advance upward to form a guide hole 15, and a hole reaming cutter head 16 is used to follow upward to rotate and cut the rock below the roller drill bit 14. A stabilizing plate 18 is provided below the hole reaming cutter head 16 to ensure the stability of the drill rod 17 and the cutting accuracy of the hole cutter head 15. The drilling power, including torque and speed control, is provided by the motor of the machine head assembly 23. The drill rod 17 is grabbed by the robot arm 25 and loaded and unloaded by the robot assembly 22. During the construction of the raise drilling rig, high-pressure water enters from the middle of the drill rod, sprays out from the roller drill bit at the bottom, and then drives the slag back from the gap between the drill rod wall and the hole wall. After passing through the sedimentation tank, the ore cuttings 6 are precipitated and the water above is recycled.

[0030] (5) The ore and rock cuttings 6 cut and crushed by the roller drill bit 14 and the reaming cutter disc 16 fall down by their own gravity. The slag collecting and discharge mechanism 20 of the shaft drill 7 is arranged at the top of the current mining shaft 1 and is connected to the ground through the conduit 26. The ore and rock cuttings 6 falling from the mining shaft 1 are discharged to the ground through the slag collecting and discharge mechanism 20 and the conduit 26 of the shaft drill 7 and are then removed from the mine by the shovel loader 5.

[0031] (6) Drilling and cutting form a mining raise 1 as a mining cycle, then unloading the rods and moving the blind raise drill 7, each time moving forward 0.7 m, that is, a stope distance, and continuously mining along the direction of the ore body. Repeat the above mining process to form a series of circular mining raises distributed side by side and closely adjacent to each other. After a certain number of mining raises are mined, centralized filling is carried out, and the operation is continued until the entire stope is mined.

[0032] (7) During the mining process, fresh air flows through the mining area ramp 13, the ramp connecting road 12, the stage transportation level road 11, and the mining field connecting road 10 into the rock drilling mining road 4, and the polluted air is discharged through the mining shaft 1 and the upper and middle filling return air roadway 2.

[0033] (8) After 30 cycles of mining, the mining shaft 1 is filled with waste rock 7, and the size of the waste rock is controlled to be less than 0.5 m to ensure that the mining shaft 1 is not blocked.

[0034] The invention installs a reaming cutter head with a diameter larger than the width of the mining area on a raise drill, and then uses the raise drill to drill and mine in the ore body along its inclination direction, and uses the reaming cutter head to follow the rock breaking upwards, and the mining is carried out once for the entire middle section height. The mechanical rock breaking of the raise drill replaces the traditional blasting mining process, which greatly improves the mechanized mining level of thin ore veins and effectively solves the problems of poor safety, poor operation continuity, high labor intensity, and poor working environment in the traditional drilling and blasting mining. The goaf formed after mining is a series of circular mining raises distributed side by side and closely adjacent to each other. After the goaf is mined and filled, the filling body has high stability, which can effectively ensure the stability of the mining area.

[0035] Specifically, the raise drill rig 7 drills and mines in the ore body along its inclination direction. The position of the roller drill bit drilling forward should be located at the center of the ore body. The drilling and hole expansion accuracy are guaranteed by the drill rig's built-in intelligent anti-stuck and deep well anti-deviation functions, and the depletion and loss rate are controlled. The raise drill rig 7 can mine upward in a blind well or downward in a reverse well. The equipment has multiple operating modes, including remote wireless remote control, short-range line control and airborne control, and can select multiple gears to automatically match appropriate operating parameters according to different hole diameters and rock formation conditions. The working mechanism of the raise drill rig 7 can swing left and right, front and back at a certain angle to meet the mining of ore bodies with a certain inclination.

[0036] Specifically, the rock drilling mining tunnel section at the bottom of the stope is designed and constructed according to the working size of the raise drilling rig. After the construction is completed, the roof is managed and supported by anchor cables, bolts, mesh, shotcrete or a combination of support methods according to the surrounding rock conditions. When supporting the rock drilling mining tunnel, a range larger than the diameter of the mining raise is reserved in the middle of the ore body on the tunnel roof without support to meet the needs of equipment drilling.

[0037] This method uses raise boring machine to mechanically break rock instead of traditional blasting mining process, greatly improving the level of mechanized mining of thin veins, and has the advantages of safe operation, simple process and high efficiency. At the same time, through innovation in engineering layout, the mining project is simplified, and the mechanical rock breaking advantages and efficiency of the raise boring machine are fully utilized. It is particularly suitable for the mining of steeply inclined thin veins with a thickness of less than 2.0m and an inclination angle of more than 60º.

[0038] Unless otherwise stated, any technical solution disclosed in the present invention disclosed above, if it discloses a numerical range, then the disclosed numerical range is a preferred numerical range, and any technician in the field should understand that the preferred numerical range is only a numerical value with a more obvious technical effect or representative value among many implementable numerical values. Since there are too many numerical values ​​to be exhaustive, the present invention discloses some numerical values ​​to illustrate the technical solution of the present invention, and the numerical values ​​listed above should not constitute a limitation on the scope of protection of the present invention.

[0039] At the same time, if the above-mentioned invention discloses or involves components or structural parts that are fixedly connected to each other, then, unless otherwise stated, the fixed connection can be understood as: a detachable fixed connection (for example, connected by bolts or screws), and can also be understood as: a non-detachable fixed connection (for example, riveting, welding). Of course, the mutual fixed connection can also be replaced by an integrated structure (for example, manufactured by one-piece molding using a casting process) (except when it is obviously impossible to use an one-piece molding process).

[0040] In addition, the terms used in any technical solution disclosed in the present invention to indicate positional relationships or shapes include states or shapes that are similar, similar or close to them unless otherwise stated. Any component provided by the present invention may be assembled from multiple separate components or may be a separate component manufactured by an integrated molding process.

[0041] The above embodiments are merely examples for clearly illustrating the present invention, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the embodiments here. The obvious changes or modifications derived therefrom are still within the scope of protection of the present invention.

Claims

1. A method for continuous mining of steeply inclined thin ore veins without explosive mechanical rock breaking, characterized in that: include: The stope is arranged along the strike of the ore body, the stope width is the thickness of the ore body, no pillars are left in the stope, and continuous mining is carried out; The mining project includes the mining area ramp, stage transportation level, ramp connecting road, stope connecting road and mining shaft; the cutting project is the bottom pulling project, that is, the rock drilling mining road at the bottom of the stope, and the shaft drilling machine is used to drill in the ore body along its inclination direction for mining. There is a hole expansion cutter head on the drill rod of the shaft drilling machine behind the drill bit, and the diameter of the hole expansion cutter head is slightly larger than the stope width; After the completion of the mining and cutting project, mining will begin. Mining and filling will be carried out continuously from one side along the direction of the ore body. The drill will be used to advance upward along the inclination direction of the ore body. At the same time, the reaming cutter on the mine drilling rig will follow the rock breaking upward. The broken ore and rock cuttings will fall to the ground by their own gravity and be discharged by trackless equipment. Mining once is the entire middle section height. The above mining process will be repeated to form a series of circular mining raises distributed side by side and closely adjacent to each other. After a certain number of mining raises are mined, centralized filling will be carried out. The operation will continue until the mining of the entire stope is completed. During mining, the shaft drill passes through the mining area ramp and the ramp connecting road into the stage transport level tunnel, and then enters the mining area through the mining field connecting road. Fresh air flows through the mining area ramp, the ramp connecting road, the stage transport level tunnel, and the mining field connecting road into the rock drilling mining tunnel, and the polluted air is discharged through the mining shaft and the upper and middle filling return air tunnels.

2. The method for continuous mining of steeply inclined thin ore veins without explosive mechanical rock breaking according to claim 1 is characterized by: The cross-section of the rock drilling mining tunnel at the bottom of the mining area is designed and constructed according to the working dimensions of the shaft drilling rig. After the construction is completed, the roof management is carried out according to the surrounding rock conditions by using single or combined support methods such as anchor cables, anchor rods, hanging nets, and shotcrete.

3. The method for continuous mining of steeply inclined thin ore veins without explosive mechanical rock breaking according to claim 2 is characterized by: When supporting rock drilling mining tunnels, an area larger than the diameter of the mining shaft is reserved in the middle of the ore body on the tunnel roof without support.

4. The method for continuous mining of steeply inclined thin ore veins without explosive mechanical rock breaking according to claim 1 is characterized by: The trackless equipment is a mining truck or a scraper.

5. The method for continuous mining of steeply inclined thin ore veins without explosive mechanical rock breaking according to claim 1 is characterized by: The drill bit is a roller drill bit.

6. The method for continuous mining of steeply inclined thin ore veins without explosive mechanical rock breaking according to claim 1 is characterized by: When the stope is filled, the upper middle section is filled through the return air tunnel, and waste rock filling or tailings cementation filling is selected according to the surrounding rock conditions. When waste rock is used for filling, the size of the waste rock should be controlled to ensure that the mining shaft is not blocked.

7. The method for continuous mining of steeply inclined thin ore veins without explosive mechanical rock breaking according to claim 1 is characterized by: Use ventilation and dust removal fans to remove dust from the mining operation surface.

8. The method for continuous mining of steeply inclined thin ore veins without explosive mechanical rock breaking according to claim 1 is characterized by: The ore cuttings are collected and discharged to the ground through the collecting and slag discharge mechanism on the raise drilling rig.

9. The method for continuous mining of steeply inclined thin ore veins without explosive mechanical rock breaking according to claim 1, characterized in that: The length of the mining area along the strike is determined according to the production capacity of the mine, and the mining area ramps, ramp connecting roads, stage transportation level tunnels and rock drilling and mining tunnels are determined according to the working dimensions and walking dimensions of the shaft drilling rig and trackless equipment.

Citation Information

Cited By

  • Mechanical wall-cutting and filling mining method for steeply inclined thin vein

    CN119616484A

  • Crushed ore body first mining layer mechanical mining method

    CN119712112A

  • Automatic precise mining robot for thin vein and operation method of automatic precise mining robot

    CN121451954A

  • Group drilling-fracturing-moving-transporting-filling collaborative mining process for steeply inclined coal seam

    CN122148320A

  • Frame type mining method for crushing inclined thin to extremely thin vein

    CN122630163A