Full-process synchronous construction method and system for TBM (Tunnel Boring Machine) tunnel engineering construction

Through the full-process synchronization method of TBM tunnel engineering construction, the TBM fuselage, trailer rotating platform, emergency molding device, ultra-long off-road belt machine and lining intelligent work equipment are used to solve the problem of low construction efficiency of tunnel engineering in the existing technology, and realize the realization of the realization of the realization of the construction efficiency of tunnel engineering. Efficient and safe tunnel construction and quality assurance.

CN118895984APending Publication Date: 2024-11-05CHINA RAILWAY TUNNEL GROUP CO LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410950002.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-16
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

In the construction of railway engineering projects, the blasting and excavation method leads to problems such as compression of construction period, improvement of project quality, process connection and on-site organization, reducing the efficiency of tunnel engineering construction.

Method used

The full-process synchronous construction method of TBM tunnel engineering construction includes controlling the excavation of TBM fuselage, rear supporting trailer rotating platform, emergency molding device, ultra-long off-road belt machine and lining intelligent work equipment to achieve rapid synchronous construction and emergency support structure form.

Benefits of technology

It improves construction efficiency, ensures construction safety, and ensures project quality, achieves stability and safety of tunnel structure, reduces downtime, and ensures the smooth progress of underground tunnel construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118895984A_ABST
    Figure CN118895984A_ABST
Patent Text Reader

Abstract

The invention provides a full-process synchronous construction method and system for TBM tunnel engineering construction, and is applied to the technical field of civil engineering road engineering. The method comprises the steps that a TBM body is controlled to conduct tunneling on a tunnel; after the transport vehicle unloads, a rear matched trailer rotating platform behind the TBM body is controlled to turn around the transport vehicle; when TBM tunneling is interrupted, emergency molding devices arranged on the two sides of a TBM body are controlled to form an emergency supporting structure; when the TBM body carries out tunneling on the tunnel, the ultra-long cross-country belt conveyor is controlled to transport hole slag in the hole to the outside of the hole; and after the tunnel is tunneled by the TBM body, an intelligent lining tool arranged behind the TBM body is controlled to conduct lining construction on the tunnel wall of the tunnel. In this way, the overall construction efficiency of a project is improved, and TBM intelligent transportation whole-process synchronization is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of civil engineering and road engineering, and in particular to a full-process synchronous construction method and system for TBM tunnel engineering construction. Background Art

[0002] Tunnel boring machine (TBM for short) is a kind of engineering machinery used to dig tunnels underground. It is usually used to dig various types of underground passages, including road tunnels, railway tunnels, water conservancy tunnels, etc. TBM plays an important role in the engineering field because it can efficiently dig accurate tunnels, reduce manpower and time costs, and improve the safety of the project.

[0003] At present, the demand for long and large tunnels is increasing all over the country. At present, blasting excavation method is often used in China. However, the construction of railway projects is developing rapidly, the construction period is compressed again and again, and the requirements for project quality are repeatedly improved. Blasting excavation is not only affected by tooling, but also requires a lot of time on process connection and on-site organization issues, which greatly reduces the efficiency of tunnel construction. Summary of the invention

[0004] The object of the present invention is to provide a full-process synchronous construction method and system for TBM tunnel engineering construction in order to solve the above-mentioned problems.

[0005] The present invention achieves the above-mentioned purpose through the following technical solutions:

[0006] A full-process synchronous construction method for TBM tunnel engineering construction, characterized by comprising:

[0007] Control the TBM body to excavate the tunnel;

[0008] After the transport vehicle unloads, the rear trailer rotating platform behind the TBM body is controlled to turn the transport vehicle around;

[0009] When the TBM excavation is interrupted, the emergency molding devices arranged on both sides of the TBM body are controlled to form an emergency support structure;

[0010] When the TBM body excavates the tunnel, the super-long off-road belt conveyor is controlled to transport the slag in the tunnel to the outside of the tunnel;

[0011] After the TBM body excavates the tunnel, the lining intelligent tooling arranged behind the TBM body is controlled to perform lining construction on the tunnel wall.

[0012] Furthermore, when the TBM excavation is interrupted, the emergency molding devices arranged on both sides of the TBM body are controlled to form an emergency support structure, including:

[0013] When the TBM excavation is interrupted, judging the severity of the accident based on the on-site data;

[0014] If the severity of the accident is severe, the strong support shoes on both sides of the TBM body are activated to assist the TBM to step to the position of the emergency formwork device, and the emergency formwork device is activated to form an emergency support structure.

[0015] Furthermore, after the TBM body excavates the tunnel, the lining intelligent tooling arranged behind the TBM body is controlled to perform lining construction on the tunnel wall, including:

[0016] Control the new track-mounted material placing system to transport lining materials to the target lining position through a placing vehicle moving along the track;

[0017] Control the Feng Shui pipeline bracket to support and fix the Feng Shui pipeline on the cave wall of the cave;

[0018] Control the intelligent air duct to spray lining materials;

[0019] Control the conveyor belt bridge to transport the lining material from the placing vehicle to the target lining position.

[0020] A full-process synchronous construction system for TBM tunnel engineering construction, comprising:

[0021] The TBM body, used to excavate the tunnel;

[0022] The rear trailer rotating platform is arranged behind the TBM body and is used to control the transport vehicle to turn around after unloading;

[0023] Emergency molding devices are arranged on both sides of the TBM body and are used to form emergency support structures when excavation is interrupted;

[0024] Extra-long cross-country belt conveyors are installed inside and outside the cavern to transport the slag inside the cavern to outside the cavern;

[0025] The lining intelligent tooling is arranged behind the TBM body and is used for lining construction.

[0026] Further, the super-long off-road belt conveyor comprises: the super-long off-road belt conveyor arranged in the tunnel chamber, used to transport the tunnel slag generated during the excavation process from the rear of the TBM to the loading area outside the tunnel;

[0027] The super-long off-road belt conveyor arranged outside the cavern is used to transport the cave slag from the loading area to the target processing area.

[0028] Furthermore, the lining intelligent tooling includes: a new track-type material placing system, a wind and water pipeline bracket, an intelligent wind tube and a belt conveyor bridge, wherein:

[0029] The new track-type material placing system is used to transport the lining material to the target lining position by means of a material placing vehicle moving along the track;

[0030] The Feng Shui pipeline bracket is used to support and fix the Feng Shui pipeline on the cave wall of the cave;

[0031] The intelligent air cylinder is used for spraying lining materials;

[0032] The belt conveyor bridge is used to transport the lining material from the material placing vehicle to the target lining position.

[0033] Compared with the prior art, the beneficial effects of the present invention are as follows: by controlling the TBM body to excavate the tunnel, the excavation of the underground tunnel is realized; by controlling the rear supporting trailer rotating platform, the transport vehicle can quickly turn around after unloading, saving time and improving transportation efficiency, so that the transport vehicle can quickly return to continue transportation work; when the TBM excavation is interrupted, the emergency mold building device is controlled to form an emergency support structure, which can quickly form an emergency support structure to protect the safety of the tunnel construction area; by controlling the ultra-long off-road belt conveyor, the slag in the tunnel can be cleaned and transported in time, the construction site can be kept clean, and the accumulation in the tunnel can be avoided to affect the construction progress, thereby improving the construction efficiency; the lining intelligent tooling is controlled to perform lining construction on the tunnel wall, thereby realizing the lining construction of the tunnel wall, ensuring the stability and safety of the tunnel structure, and improving the overall quality and reliability of the project. The above operations can improve construction efficiency, ensure construction safety, ensure project quality, etc., can achieve synchronous construction, and ensure the smooth progress of underground tunnel construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

[0035] Figure 1 A schematic diagram of a tunnel cross section when the TBM of the present invention is used to excavate a tunnel is shown;

[0036] Figure 2 A flow chart of a full-process synchronous construction method for TBM tunnel engineering construction described in the present invention is shown. DETAILED DESCRIPTION

[0037] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and the like are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first", "second", and the like may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0038] In the description of the present invention, it should be noted that, unless otherwise clearly stipulated and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium. It can be the internal connection of two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0039] The present invention will be further described below in conjunction with the accompanying drawings:

[0040] The embodiment of the present invention provides a full-process synchronous construction system for TBM tunnel engineering construction, including:

[0041] The TBM body is used to dig tunnels; Figure 1 This is a schematic diagram of the tunnel section during TBM tunneling.

[0042] The rear trailer rotating platform is arranged behind the TBM body and is used to control the transport vehicle to turn around after unloading;

[0043] Emergency molding devices are arranged on both sides of the TBM body and are used to form emergency support structures when excavation is interrupted;

[0044] Extra-long cross-country belt conveyors are installed inside and outside the cavern to transport the slag inside the cavern to outside the cavern;

[0045] The lining intelligent tooling is arranged behind the TBM body and is used for lining construction.

[0046] The rear trailer rotating platform in this embodiment does not need to wait for the TBM body to move or adjust when the transport vehicle needs to return or turn around, which saves time. The rotating platform can be connected to the control system of the TBM to realize automatic control and ensure accurate and efficient operation; the emergency molding device forms an emergency support structure for emergency response when the excavation is interrupted. This improves the safety and reliability of the project and reduces the downtime caused by emergencies; by setting up an ultra-long off-road belt conveyor both inside and outside the cavern, the timely cleaning and transportation of the cave slag can be achieved, avoiding the TBM shutdown or project progress delay caused by untimely cleaning. This setting ensures the continuity and efficiency of the construction; the lining intelligent tooling and the TBM control system are linked to ensure the synchronization of lining construction and TBM excavation work. Through the setting of the above supporting equipment, the synchronization of the entire process of TBM intelligent transportation can be achieved, the overall construction efficiency of the project is improved, and the safety and continuity of the construction are ensured.

[0047] In one embodiment, the extra-long off-road belt conveyor comprises: the extra-long off-road belt conveyor arranged in the tunnel chamber, used to transport the tunnel slag generated during the excavation process from the rear of the TBM to the loading area outside the tunnel;

[0048] The super-long off-road belt conveyor arranged outside the cavern is used to transport the cave slag from the loading area to the target processing area.

[0049] In one embodiment, the lining intelligent tooling includes: a new track-type material distribution system, a wind and water pipeline bracket, an intelligent wind tube and a belt conveyor bridge, wherein:

[0050] The new track-type material placing system is used to transport the lining material to the target lining position by means of a material placing vehicle moving along the track;

[0051] The Feng Shui pipeline bracket is used to support and fix the Feng Shui pipeline on the cave wall of the cave;

[0052] The intelligent air cylinder is used for spraying lining materials;

[0053] The belt conveyor bridge is used to transport the lining material from the material placing vehicle to the target lining position.

[0054] The new track-type material distribution system of this embodiment transports the lining material to the target lining position, which can achieve accurate transportation and positioning of the lining material. The automated transportation system can improve work efficiency, reduce manpower input, and reduce construction inaccuracies caused by errors, thereby improving the quality and speed of lining construction; the Fengshui pipeline bracket effectively solves the support and fixation problems during pipeline layout; the intelligent air duct can perform precise spraying according to preset parameters and requirements, ensuring uniform coverage and bonding of the lining material and improving the quality of the lining; the bridge structure of the belt conveyor bridge can provide a stable support and transportation path, avoiding leakage or blockage of materials during transportation, ensuring continuous transportation and accurate positioning of the lining material, thereby improving the efficiency and quality of lining construction.

[0055] like Figure 2 As shown, the embodiment of the present invention also provides a full-process synchronous construction method for TBM tunnel engineering construction, including:

[0056] S11, controls the TBM body to excavate the tunnel;

[0057] S12, after the transport vehicle unloads, controlling the rear trailer rotating platform behind the TBM body to turn the transport vehicle around;

[0058] S13, when the TBM excavation is interrupted, controlling the emergency molding devices arranged on both sides of the TBM body to form an emergency support structure;

[0059] S14, when the TBM body is excavating the tunnel, controlling the super-long off-road belt conveyor to transport the slag in the tunnel to outside the tunnel;

[0060] S15, after the TBM body excavates the tunnel, controlling the lining intelligent tooling arranged behind the TBM body to perform lining construction on the tunnel wall.

[0061] This embodiment realizes the excavation of underground tunnels by controlling the TBM body to excavate the tunnel; by controlling the rear supporting trailer rotating platform, the transport vehicle can quickly turn around after unloading, saving time and improving transportation efficiency, so that the transport vehicle can quickly return to continue transportation work; when the TBM excavation is interrupted, the emergency mold building device is controlled to form an emergency support structure, which can quickly form an emergency support structure to protect the safety of the tunnel construction area; by controlling the ultra-long off-road belt conveyor, the slag in the tunnel can be cleaned and transported in time, the construction site can be kept clean, and the accumulation in the tunnel can be avoided to affect the construction progress, thereby improving the construction efficiency; the lining intelligent tooling is controlled to perform lining construction on the tunnel wall, thereby realizing the lining construction of the tunnel wall, ensuring the stability and safety of the tunnel structure, and improving the overall quality and reliability of the project. The above operations can improve construction efficiency, ensure construction safety, ensure project quality, etc., can achieve synchronous construction, and ensure the smooth progress of underground tunnel construction.

[0062] In one embodiment, when the TBM excavation is interrupted, emergency molding devices arranged on both sides of the TBM body are controlled to form an emergency support structure, including:

[0063] When the TBM excavation is interrupted, judging the severity of the accident based on the on-site data;

[0064] If the severity of the accident is severe, the strong support shoes on both sides of the TBM body are activated to assist the TBM to step to the position of the emergency formwork device, and the emergency formwork device is activated to form an emergency support structure.

[0065] This embodiment evaluates the interruption of TBM excavation by real-time monitoring and analysis of field data to determine the severity of the accident. This helps to accurately determine when the emergency support structure needs to be activated and to take appropriate measures to respond; and when the severity of the accident is severe, it may cause the TBM body to be unable to move normally or require additional support. By activating the strong support shoe, additional support force can be provided to help the TBM body move safely to the location of the emergency molding device, paving the way for subsequent emergency support preparations. Through rapid response and accurate judgment, accidents caused by TBM excavation interruptions can be effectively dealt with, the safety of the construction site and the project can be guaranteed, and the impact of accidents on the progress and quality of the project can be reduced.

[0066] In one embodiment, after the TBM body excavates the tunnel, the lining intelligent tooling arranged behind the TBM body is controlled to perform lining construction on the tunnel wall, including:

[0067] Controlling the new track-type material placing system to transport the lining material to the target lining position through the material placing vehicle moving along the track;

[0068] Controlling the Feng Shui pipeline bracket to support and fix the Feng Shui pipeline on the cave wall of the cave;

[0069] Control the intelligent air duct to spray lining material;

[0070] The belt conveyor bridge is controlled to transport the lining material from the material placing vehicle to the target lining position.

[0071] This embodiment can accurately transport the lining material to the target lining position by controlling the track-type material distribution system. This helps to ensure that the lining material reaches the construction position accurately and quickly, and improves the construction efficiency and accuracy; the control of the Feng Shui pipeline bracket ensures that the Feng Shui pipeline is firmly fixed on the cave wall of the cave, preventing it from loosening or shifting, ensuring the safe use of the pipeline, and helping to ensure the stable operation of the later system; by controlling the intelligent air duct, the lining material can be accurately sprayed, ensuring the uniform coverage and bonding of the lining material, improving the quality of the lining, and reducing manpower input and construction time; the control of the belt conveyor bridge ensures that the lining material is stably transported from the material distribution vehicle to the target lining position. This helps to avoid the problem of leakage or blockage of materials during the transportation process, ensures the continuous transportation and accurate positioning of the lining material, and improves the construction efficiency and quality. The above operations improve the automation, accuracy and efficiency of the lining construction, ensure the synchronization and smooth progress of the construction, and are conducive to improving the construction quality and safety of the project.

[0072] The basic principles, main features and advantages of the present invention are shown and described above. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for illustrating the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements all fall within the scope of the present invention to be protected.

Claims

1. A full-process synchronous construction method for TBM tunnel engineering construction, characterized in that: include: Control the TBM body to excavate the tunnel; After the transport vehicle unloads, the rear trailer rotating platform behind the TBM body is controlled to turn the transport vehicle around; When the TBM excavation is interrupted, the emergency molding devices arranged on both sides of the TBM body are controlled to form an emergency support structure; When the TBM body excavates the tunnel, the super-long off-road belt conveyor is controlled to transport the slag in the tunnel to the outside of the tunnel; After the TBM body excavates the tunnel, the lining intelligent tooling arranged behind the TBM body is controlled to perform lining construction on the tunnel wall.

2. The method for synchronous construction of a TBM tunnel engineering project according to claim 1, characterized in that: When the TBM excavation is interrupted, the emergency molding devices arranged on both sides of the TBM body are controlled to form an emergency support structure, including: When the TBM excavation is interrupted, judging the severity of the accident based on the on-site data; If the severity of the accident is severe, the strong support shoes on both sides of the TBM body are activated to assist the TBM to step to the position of the emergency formwork device, and the emergency formwork device is activated to form an emergency support structure.

3. The method for synchronous construction of a TBM tunnel engineering project according to claim 2, characterized in that: After the TBM body excavates the tunnel, the lining intelligent tooling arranged behind the TBM body is controlled to perform lining construction on the tunnel wall, including: Control the new track-mounted material placing system to transport lining materials to the target lining position through a placing vehicle moving along the track; Control the Feng Shui pipeline bracket to support and fix the Feng Shui pipeline on the cave wall of the cave; Control the intelligent air duct to spray lining materials; Control the conveyor belt bridge to transport the lining material from the placing vehicle to the target lining position.

4. A full-process synchronous construction system for TBM tunnel engineering construction, characterized in that: include: The TBM body, used to excavate the tunnel; The rear trailer rotating platform is arranged behind the TBM body and is used to control the transport vehicle to turn around after unloading; Emergency molding devices are arranged on both sides of the TBM body and are used to form emergency support structures when excavation is interrupted; Extra-long cross-country belt conveyors are installed inside and outside the cavern to transport the slag inside the cavern to outside the cavern; The lining intelligent tooling is arranged behind the TBM body and is used for lining construction.

5. The full-process synchronous construction system for TBM tunnel engineering construction according to claim 4 is characterized in that: The super-long cross-country belt conveyor comprises: the super-long cross-country belt conveyor arranged in the tunnel chamber, used to transport the tunnel slag generated during the excavation process from the rear of the TBM to the loading area outside the tunnel; The super-long off-road belt conveyor arranged outside the cavern is used to transport the cave slag from the loading area to the target processing area.

6. The full-process synchronous construction system for TBM tunnel engineering construction according to claim 4 is characterized in that: The lining intelligent tooling includes: a new track-type material placing system, a wind and water pipeline bracket, an intelligent wind tube and a belt conveyor bridge, among which: The new track-type material placing system is used to transport the lining material to the target lining position by means of a material placing vehicle moving along the track; The Feng Shui pipeline bracket is used to support and fix the Feng Shui pipeline on the cave wall of the cave; The smart air cylinder is used for spraying lining materials; The belt conveyor bridge is used to transport the lining material from the material placing vehicle to the target lining position.