Tunnel engineering supporting equipment
By first installing the main steel rope and wire mesh on the support steel beam in the tunnel engineering support equipment, and fixing the fixtures with the inner wall of the tunnel, the lateral friction problem between the support beam and the main steel rope is solved, and more stable is achieved support effect and convenient installation process.
Patent Information
- Application Number
- CN202411029353.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-30
- Publication Date
- 2024-11-05
AI Technical Summary
In tunnel construction, hard contact between the support beam and the installed main steel rope and the wire mesh causes lateral friction, reducing the stability of the main steel rope and may even cause instability in the inner wall of the tunnel.
Design a tunnel engineering support equipment, in which the main steel rope and steel wire mesh are first installed on the supporting steel beam and fixed with the inner wall of the tunnel through fixtures to avoid transverse friction between the supporting beam and the main steel rope, and use arc-shaped steel beams and connections The combined structure of the parts is easy to install and transport, providing a more stable support effect.
The stable installation of the support beam is achieved, lateral friction with the main steel rope is avoided, the tight fit between the main steel rope and the wire mesh is improved with the inner wall of the tunnel, the support effect is enhanced, and the installation process is simplified.
Smart Images

Figure CN118895992A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of tunnel engineering support and protection, and in particular relates to a tunnel engineering support device. Background Art
[0002] In order to ensure the safety and stability of the tunnel during construction and operation, prevent the collapse and deformation of the surrounding rock, and ensure the normal use of the tunnel, support equipment is generally installed in the tunnel.
[0003] The tunnel support equipment mainly includes steel arches, anchor rods and steel rope nets. These support equipment cooperate with each other during tunnel construction to ensure the stability and safety of the tunnel. Different tunnel projects will select appropriate support equipment and support solutions based on factors such as geological conditions, tunnel section size and construction methods.
[0004] At present, when installing the support equipment for the inner wall of the tunnel, generally, a protective net woven by steel wire is first fixed and laid on the inner wall of the tunnel, and then the main steel rope for pressing the protective net is laid on the surface of the protective net, and finally the arched support beam is installed in the tunnel, so that the outer wall of the support beam abuts against the main steel rope, and the support beam provides support for the main steel rope. However, when the support beam is installed, since the main steel rope and the wire mesh have been installed on the inner wall of the tunnel, when the support beam is subsequently installed, in order for the outer wall of the support beam to play a rigid supporting role for the main steel rope after being erected, the size of the support beam will be slightly larger than the preset installation space in the tunnel, so that when the support beam is lifted and installed, the outer wall of the support beam will continuously have horizontal hard friction with the main steel rope, forcing the main steel rope to deviate toward the inner wall of the tunnel, which will greatly reduce the stability of the main steel rope, and even the force generated by this hard contact is transmitted to the inner wall of the tunnel, which will cause the inner wall of the tunnel to become unstable. Summary of the invention
[0005] In view of the above problems, a tunnel engineering support device provided in an embodiment of the present application can install the main steel rope and the wire mesh on the supporting steel beam, and then further fix the main steel rope and the wire mesh to the inner wall of the tunnel, thereby avoiding lateral friction between the supporting steel beam and the main steel rope during the installation process, while ensuring that the main steel rope and the wire mesh can fit closely to the inner wall of the tunnel and have a supporting effect, which is convenient to install and provides better supporting effect on the inner wall of the tunnel.
[0006] In order to achieve the above-mentioned purpose, the embodiment of the present application provides the following technical solutions: The present invention provides a tunnel engineering support device, including a base, the number of the bases is two, a plurality of support steel beams are commonly inserted between the upper parts of the two bases, a plurality of main steel ropes are commonly connected between the outer walls of the plurality of support steel beams, a plurality of first fixing members for pressing the main steel ropes onto the inner wall of the tunnel are arranged on the support steel beam, a wire mesh is arranged between two adjacent support steel beams, and a plurality of connecting members are commonly connected between the sides of the two adjacent support steel beams close to each other, the plurality of connecting members are evenly distributed along the circumferential direction of the support steel beam, and a plurality of second fixing members capable of being attached to the surface of the wire mesh to provide support are arranged on the connecting member. The support steel beam is arranged in an arch shape, and the support steel beam includes a first arc steel beam and a second arc steel beam, a first extension block is arranged at the upper end of the first arc steel beam, a rectangular protrusion is arranged at the bottom of the first extension block, a second extension block is arranged at the upper end of the second arc steel beam to be attached to the first extension block, and a rectangular groove is opened on the upper part of the second extension block to cooperate with the protrusion.
[0007] According to an advantageous embodiment, a plurality of notch grooves are provided on the upper portion of the base, a stopper is movably provided in the notch groove, and two return springs are provided at the bottom of the stopper.
[0008] According to a favorable embodiment, a slide groove is provided at the bottom of both ends of the base, and two first adjusting screws are rotatably arranged in the slide groove. The bottom ends of the two first adjusting screws are commonly threadedly connected with an adjustment pad, and the top ends of the two first adjusting screws are connected through a gear set, and a rotating handle is connected to the gear set.
[0009] According to a favorable embodiment, a plurality of arc-shaped slots are provided on the outer walls of the first arc-shaped steel beam and the second arc-shaped steel beam, and the first fixing member includes two second adjusting screws rotatably arranged in the slots, and a clamping plate is rotatably connected between the top ends of the two second adjusting screws, and the surface of the clamping plate is arranged to be a concave arc surface, and a rotating handle is also arranged at the bottom end of the second adjusting screw.
[0010] According to a favorable embodiment, the connecting member includes a center plate, both ends of the center plate are threadedly connected to a sleeve, one end of the sleeve is fixedly connected to a threaded head, and multiple connecting seats are provided on the outer walls of both sides of the first arc-shaped steel beam and the second arc-shaped steel beam, and the surface of the connecting seat is threadedly connected to the threaded head.
[0011] According to a favorable embodiment, a rectangular through hole is opened on the surface of the center plate, and the second fixing member includes a top plate movably arranged in the through hole on the surface of the center plate, and the top plate is T-shaped, and a third adjusting screw is threadedly arranged on the top plate, and a claw is rotatably arranged at the other end of the third adjusting screw.
[0012] According to a favorable embodiment, the steel wire mesh is woven from a plurality of steel wires that cross each other horizontally and vertically, and the steel wire mesh is fixed to the main steel rope by steel wire binding.
[0013] Compared with the prior art, the tunnel engineering support device provided by the embodiment of the present invention has the following beneficial effects:
[0014] 1. In the present invention, the supporting steel beam is composed of a first arc-shaped steel beam and a second arc-shaped steel beam, which reduces the volume during transportation and is convenient for transportation. During installation, the first arc-shaped steel beam and the second arc-shaped steel beam can be directly lifted in sequence so that the two overlap each other, and the connection is made by the projection at the bottom of the first extension block and the groove on the upper surface of the second extension block, so that the whole arch support structure is formed. Compared with installing a complete supporting steel beam in a narrow tunnel, the first arc-shaped steel beam and the second arc-shaped steel beam are split and installed separately, which ensures stability while having the advantages of convenient transportation and low installation difficulty.
[0015] 2. In the present invention, a plurality of supporting steel beams are first installed at predetermined positions, and then the main steel rope and the wire mesh are installed on the plurality of supporting steel beams, and the first fixing member acts on the surface of the main steel rope to provide sufficient supporting force for the main steel rope to support the inner wall of the tunnel, ensuring that the wire mesh and the main steel rope are in close contact with the inner wall of the tunnel. Since the main steel rope and the wire mesh are not installed on the inner wall of the tunnel when the supporting steel beam is installed, lateral friction between the supporting steel beam and the main steel rope is avoided, which facilitates installation and has better stability.
[0016] 3. In the present invention, a plurality of connecting parts are threadedly connected between two adjacent supporting steel beams, which are convenient for assembly and disassembly, and can make the supporting steel beams interconnected to form a supporting whole. When the local pressure is too large, the adjacent supporting steel beams can provide auxiliary support, thereby further providing the compressive strength of a single supporting steel beam.
[0017] 4. In the present invention, when the wire mesh is woven, the steel wires in the wire mesh have bending properties and can be adjusted according to the convex and concave conditions of the inner wall of the tunnel, so that the wire mesh can be closely attached to the surface of the inner wall of the tunnel. At the same time, for the wire mesh attached to the depression of the inner wall of the tunnel, the wire mesh can be abutted against the inner wall of the tunnel through the claws in the second fixing member, and the center plate cooperates with the third adjusting screw to provide support for the claws, so that the wire mesh in the depression of the inner wall of the tunnel has stronger pressure resistance when subjected to pressure.
[0018] 5. In the present invention, both ends of the base can adjust the flatness according to the ground height of the construction area through the cooperation of the first adjusting screw and the adjusting pad, so that the leveling is more stable and convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 It is a schematic diagram of the external three-dimensional structure of the present invention.
[0020] Figure 2 It is a schematic diagram of the three-dimensional structure after two adjacent supporting steel beams in the present invention are connected.
[0021] Figure 3 It is a schematic diagram of the external three-dimensional structure of the supporting steel beam in the present invention.
[0022] Figure 4 It is a schematic diagram of the external three-dimensional structure after the supporting steel beams in the present invention are split.
[0023] Figure 5 It is a schematic diagram of the main plane structure of the supporting steel beam in the present invention.
[0024] Figure 6 for Figure 5 Schematic diagram of the enlarged structure of part A.
[0025] Figure 7 It is a schematic diagram of the external three-dimensional structure of the base in the present invention.
[0026] Figure 8 for Figure 7 Section B is a schematic diagram of the enlarged structure.
[0027] Fig. 9 It is a schematic diagram of the external three-dimensional structure of the connecting piece in the present invention.
[0028] Fig.10 for Fig. 9 Schematic diagram of the enlarged structure of part C.
[0029] 1. Base; 101. Notch; 102. Stop block; 103. Return spring; 104. First adjusting screw; 105. Adjusting pad; 106. Gear set; 2. Supporting steel beam; 201. First arc-shaped steel beam; 202. Second arc-shaped steel beam; 203. First extension block; 204. Bump; 205. Second extension block; 206. Groove; 3. Main steel rope; 4. First fixing piece; 401. Second adjusting screw; 402. Clamping plate; 5. Steel wire mesh; 6. Connecting piece; 601. Center plate; 602. Sleeve; 603. Threaded head; 7. Second fixing piece; 701. Top plate; 702. Third adjusting screw; 703. Claw; 8. Clamping groove; 9. Connecting seat. DETAILED DESCRIPTION
[0030] The following is combined with Figure 1-10 This application is further described in detail.
[0031] Please refer to Figure 1-10A tunnel engineering support device includes a base 1, a plurality of support steel beams 2 inserted on the base 1, a plurality of main steel ropes 3 laid on the support steel beams 2, a wire mesh 5 laid between two adjacent support steel beams 2, a plurality of first fixing members 4 arranged on the support steel beams, a plurality of connecting members 6 arranged between two adjacent support steel beams 2, and a second fixing member 7 arranged on the connecting member 6.
[0032] See also Figure 7 and Figure 8 , the number of bases 1 is two. A plurality of notched grooves 101 are provided on the upper part of the base 1, and a stopper 102 is movably provided in the notched groove 101. Two return springs 103 are provided at the bottom of the stopper 102. Slide grooves are provided at the bottom of both ends of the base 1, and two first adjustment screws 104 are rotatably provided in the slide grooves. The bottom ends of the two first adjustment screws 104 are threadedly connected with an adjustment pad 105, and the top ends of the two first adjustment screws 104 are connected by a gear set 106, and a rotating handle is connected to the gear set 106. When the ground inside the tunnel is uneven, the two first adjustment screws 104 can be rotated by rotating the handle to cooperate with the gear set 106, driving the adjustment pad 105 to extend or shorten to keep the base 1 level. At the same time, one end of the supporting steel beam 2 is inserted into the notched groove 101, and the supporting steel beam 2 is limited by the stopper 102 to prevent the supporting steel beam 2 from sliding.
[0033] See also Figure 3 and Figure 4 The bottom ends of the plurality of support steel beams 2 are respectively inserted into the notch grooves 101 of the corresponding base 1. The support steel beams 2 are arranged in an arch shape, and the support steel beams 2 include a first arc-shaped steel beam 201 and a second arc-shaped steel beam 202. A first extension block 203 is arranged at the upper end of the first arc-shaped steel beam 201, and a rectangular protrusion 204 is arranged at the bottom of the first extension block 203. A second extension block 205 which is fitted with the first extension block 203 is arranged at the upper end of the second arc-shaped steel beam 202, and a rectangular groove 206 which cooperates with the protrusion 204 is opened on the upper part of the second extension block 205.
[0034] In order to reduce the volume of the supporting steel beam 2 for convenient transportation and installation in a narrow tunnel, the supporting steel beam 2 is split into a first curved steel beam 201 and a second curved steel beam 202, so that the overall length is reduced and transportation is more convenient. The first curved steel beam 201 and the second curved steel beam 202 are lifted successively so that the two are overlapped with each other. During installation, due to the reduced length, it is easier to install in a narrow tunnel, and the single first curved steel beam 201 and the second curved steel beam 202 are lighter and easier to lift. The protrusion 204 at the bottom of the first extension block 203 is engaged with the groove 206 on the upper surface of the second extension block 205 at the connection, so that the overall arch support structure is formed. The first extension block 203 and the second extension block 205 are abutted against each other at the connection, and then the protrusion 204 is limited so that the two can be tightly and stably connected together to form a supporting steel beam 2, thereby ensuring that the combined supporting steel beam 2 also has good supporting performance.
[0035] See also Figure 5 and Figure 6 , multiple main steel ropes 3 are evenly laid along the circumferential direction of the outer wall of the supporting steel beam 2, and multiple first fixing members 4 for pressing the main steel ropes 3 onto the inner wall of the tunnel are arranged on the supporting steel beam 2. Multiple arc-shaped clamping grooves 8 are opened on the outer walls of the first arc-shaped steel beam 201 and the second arc-shaped steel beam 202, and the first fixing member 4 includes two second adjusting screws 401 rotatably arranged in the clamping grooves 8, and a clamping plate 402 is rotatably connected between the top ends of the two second adjusting screws 401, and the surface of the clamping plate 402 is arranged to be an inwardly concave arc surface, and a rotating handle is also arranged at the bottom end of the second adjusting screw 401. After the support steel beam 2 is installed, one end of the main steel rope 3 passes through the slots 8 on the outer walls of the multiple support steel beams 2, so that the main steel rope 3 is overlapped on the support steel beam 2 and is located between the inner wall of the tunnel and the outer wall of the support steel beam 2. By operating and turning the handle, the second adjusting screw 401 will drive the clamping plate 402 to move the main steel rope 3 toward the inner wall of the tunnel, thereby fitting the main steel rope 3 to the inner wall of the tunnel.
[0036] See also Figure 1 A steel mesh 5 is woven between two adjacent supporting steel beams 2. The steel mesh 5 is woven from a plurality of steel wires that cross each other horizontally and vertically, and the steel mesh 5 is fixed to the main steel rope 3 by steel wire binding. The steel mesh 5 is attached to the inner wall of the tunnel to increase the support area of the inner wall of the tunnel. When the steel mesh 5 is woven, when the inner wall of the tunnel in this area is concave, the steel mesh 5 in this area can be bent and designed to bulge outward. The convex surface formed locally on the steel mesh 5 can fill the concave part of the inner wall of the tunnel, and minimize the large gap between the concave part of the inner wall of the tunnel and the normal steel mesh 5.
[0037] In the prior art, the main steel rope 3 and the wire mesh 5 are pre-fixed and installed on the inner wall of the tunnel. When the supporting steel beam 2 is installed later, since the main steel rope 3 has been installed in place at this time, in order to ensure that the supporting steel beam 2 can provide good support for the main steel rope 3 after being installed in place, the installation between the two is an interference fit, which leads to the fact that before the supporting steel beam 2 is installed in place, the supporting steel beam 2 will inevitably rub against the main steel rope 3, causing the main steel rope 3 to deviate and loosen. In this solution, multiple main steel ropes 3 are installed and fixed through the slots 8 on the outer wall of the supporting steel beam 2. In the area between the two main steel ropes 3, steel wires are woven into a wire mesh 5 and tied together with the main steel ropes 3, so that the main steel rope 3 is fixed to the inner surface of the wire mesh 5. At the same time, the first fixing piece 4 on the supporting steel beam 2 is in contact with the main steel rope 3. The first fixing piece 4 can apply pressure to the main steel rope 3, so that the main steel rope 3 together with the wire mesh 5 are firmly supported on the inner wall of the tunnel, thereby avoiding friction between the supporting steel beam 2 and the main steel rope 3 when installing.
[0038] See also Figure 2 , Figure 3 and Fig. 9 A plurality of connectors 6 are commonly connected between the sides of two adjacent supporting steel beams 2 that are close to each other, and the plurality of connectors 6 are evenly distributed along the circumferential direction of the supporting steel beams 2. The connector 6 includes a center plate 601, both ends of the center plate 601 are threadedly connected to a sleeve 602, one end of the sleeve 602 is fixedly connected to a thread head 603, and a plurality of connection seats 9 are welded on the outer walls of both sides of the first arc-shaped steel beam 201 and the second arc-shaped steel beam 202, and the surface of the connection seat 9 is threadedly connected to the thread head 603.
[0039] In order to improve the lateral compressive resistance of the supporting steel beam 2, a plurality of connecting parts 6 are fixedly installed between two adjacent supporting steel beams 2 so that the two adjacent supporting steel beams 2 can interact with each other, thereby improving the compressive resistance of the supporting steel beam 2 when subjected to oblique pressure. Threaded connection is adopted between the connecting part 6 and the supporting steel beam 2, which makes disassembly and assembly more convenient.
[0040] See also Fig.10 The connecting member 6 is provided with a plurality of second fixing members 7 that can be attached to the surface of the steel mesh 5 to provide support. A rectangular through hole is provided on the surface of the center plate 601. The second fixing member 7 includes a top plate 701 movably arranged in the through hole on the surface of the center plate 601. The top plate 701 is in a T shape. A third adjusting screw 702 is threadedly arranged on the top plate 701. A claw 703 is rotatably arranged at the other end of the third adjusting screw 702.
[0041] In order to improve the supporting effect of the wire mesh 5 partially filled in the depression of the inner wall of the tunnel, the third adjusting screw 702 on the top plate 701 can be rotated. The third adjusting screw 702 will drive the claw 703 to approach the wire mesh 5 in the depression of the inner wall of the tunnel, and finally the claw 703 will abut against the wire mesh 5 at this position, thereby providing a supporting point for the wire mesh 5 in this area, so that the wire mesh 5 at this position can provide a better supporting and protective effect when it is subjected to pressure from the inner wall of the tunnel.
[0042] The method of using the device is as follows: during installation, the base 1 is placed at a preset installation position in the tunnel, and then all the first curved steel beams 201 and the second curved steel beams 202 are moved into the tunnel, and the first curved steel beams 201 are lifted by mechanical equipment or manually, and erected on the left side of the tunnel. At this time, the bottom end of the first curved steel beam 201 is inserted into the notch groove 101 on the base 1, and then the first curved steel beam 201 is kept stationary, and the second curved steel beam 202 is lifted and erected on the right side of the tunnel, overlapping with the first curved steel beam 201 to form a complete supporting steel beam 2. At this time, a certain space is reserved between the outer wall of the supporting steel beam 2 and the inner wall of the tunnel for the subsequent installation of the main steel rope 3 and the wire mesh 5, and all the supporting steel beams 2 are assembled and fixed in sequence. The main steel rope 3 is passed through the slots 8 on the outer walls of the plurality of supporting steel beams 2 so that the main steel rope 3 is overlapped on the card plate 402 in the slots 8, all the main steel ropes 3 are laid along the supporting steel beams 2, and then the wire mesh 5 is woven in the area between two adjacent supporting steel beams 2, and the woven wire mesh 5 is simultaneously tied together with the main steel ropes 3 at the corresponding positions, the main steel rope 3 and the wire mesh 5 are filled in the gap between the supporting steel beams 2 and the inner wall of the tunnel, and then the card plate 402 is driven to move by the second adjusting screw 401, and the card plate 402 applies pressure to the main steel rope 3, so that the wire mesh 5 and the main steel rope 3 can fit more closely to the inner wall of the tunnel, and the inner wall of the tunnel is protected by the wire mesh 5, thereby completing the installation of the supporting equipment.
[0043] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.
Claims
1. A tunnel engineering support device, comprising a base (1), characterized in that: The number of the bases (1) is two, a plurality of supporting steel beams (2) are commonly inserted between the upper parts of the two bases (1), a plurality of main steel ropes (3) are commonly connected between the outer walls of the plurality of supporting steel beams (2), a plurality of first fixing members (4) for pressing the main steel ropes (3) onto the inner wall of the tunnel are arranged on the supporting steel beams (2), a steel wire mesh (5) is arranged between two adjacent supporting steel beams (2), and a plurality of connecting members (6) are commonly connected between the sides of two adjacent supporting steel beams (2) that are close to each other, the plurality of connecting members (6) are evenly distributed along the circumferential direction of the supporting steel beams (2), and a plurality of second fixing members (7) that can fit on the surface of the steel wire mesh (5) to provide support are arranged on the connecting members (6); The support steel beam (2) is arranged in an arch shape, and the support steel beam (2) comprises a first arc-shaped steel beam (201) and a second arc-shaped steel beam (202), the upper end of the first arc-shaped steel beam (201) is provided with a first extension block (203), the bottom of the first extension block (203) is provided with a rectangular protrusion (204), the upper end of the second arc-shaped steel beam (202) is provided with a second extension block (205) which is fitted with the first extension block (203), and the upper part of the second extension block (205) is provided with a rectangular groove (206) which is matched with the protrusion (204).
2. A tunnel engineering support device according to claim 1, characterized in that: A plurality of notched grooves (101) are provided on the upper portion of the base (1), a stopper (102) is movably provided in the notched groove (101), and two return springs (103) are provided at the bottom of the stopper (102).
3. The tunnel engineering support equipment according to claim 1, characterized in that: The bottom of both ends of the base (1) is provided with a slide groove, and two first adjustment screws (104) are rotatably arranged in the slide groove. The bottom ends of the two first adjustment screws (104) are commonly threadedly connected with an adjustment pad (105), and the top ends of the two first adjustment screws (104) are transmission-connected via a gear set (106), and a rotating handle is connected to the gear set (106).
4. The tunnel engineering support equipment according to claim 1, characterized in that: A plurality of arc-shaped slots (8) are provided on the outer walls of the first arc-shaped steel beam (201) and the second arc-shaped steel beam (202); the first fixing member (4) comprises two second adjusting screws (401) rotatably arranged in the slots (8); a clamping plate (402) is rotatably connected between the top ends of the two second adjusting screws (401); the surface of the clamping plate (402) is arranged to be a concave arc surface; and a rotating handle is also arranged at the bottom end of the second adjusting screw (401).
5. The tunnel engineering support equipment according to claim 1, characterized in that: The connecting member (6) includes a center plate (601), both ends of the center plate (601) are threadedly connected to a sleeve (602), one end of the sleeve (602) is fixedly connected to a threaded head (603), and multiple connecting seats (9) are provided on the outer walls of both sides of the first arc-shaped steel beam (201) and the second arc-shaped steel beam (202), and the surface of the connecting seat (9) is threadedly connected to the threaded head (603).
6. A tunnel engineering support device according to claim 5, characterized in that: A rectangular through hole is provided on the surface of the center plate (601), and the second fixing member (7) includes a top plate (701) movably arranged in the through hole on the surface of the center plate (601), and the top plate (701) is T-shaped, and a third adjusting screw (702) is threadedly arranged on the top plate (701), and a claw (703) is rotatably arranged at the other end of the third adjusting screw (702).
7. The tunnel engineering support equipment according to claim 1, characterized in that: The steel wire mesh (5) is woven from a plurality of steel wires that cross each other horizontally and vertically, and the steel wire mesh (5) and the main steel rope (3) are fixed by steel wire binding.