Self-supply auxiliary steam starting method for combined cycle unit

Through the self-supply auxiliary steam start method of the combined cycle unit, the problem of lack of external auxiliary steam supply during peak shaving and stopping of the power grid is solved, and the rapid, safe and economical start of the unit is achieved, ensuring the self-supply auxiliary steam supply under different states is improved. The operating efficiency and reliability of the unit.

CN118896006APending Publication Date: 2024-11-05HEBEI HUADIAN SHIJIAZHUANG THERMOELECTRICITY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411032208.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

When the combined cycle unit lacks the supply of steam from outside the power grid peak-shaving start-stop task, it is difficult to ensure the supply of steam at sufficient temperature and pressure, which affects the rapid and safe start of the unit.

Method used

The self-supply auxiliary steam start method of combined cycle units is adopted, including pre-starting preparation, gas turbine pre-heating, auxiliary steam heating pipe and turbine flushing stage. By controlling the steam pressure and temperature, the unit is ensured without external auxiliary steam supply. Safe, economical and efficient start.

Benefits of technology

The dilemma of no external auxiliary steam supply was overcome, and the cold, temperature and hot start of the unit was achieved, which shortened the start time and improved the economic and safety of the unit.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118896006A_ABST
    Figure CN118896006A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of combined cycle unit starting, and provides a combined cycle unit self-supply auxiliary steam starting method which comprises the following steps: S101, conducting each drainage pipeline of an auxiliary steam system, and fully draining before a condenser establishes vacuum; s2, starting a pre-warming stage of the gas turbine for the first time: S201, starting the gas turbine at a constant speed of 3000rpm and then performing no-load operation, and not executing grid-connected operation; s3, an auxiliary steam pipe heating stage: S301, after pipe heating is carried out from the reheating cold section to the auxiliary steam pipe, qualified shaft seal and auxiliary steam pressure are gradually established, and the temperature and the shaft seal pressure are controlled to be 35 Kpa to 40 Kpa; and S4, the gas turbine is started to the stage before impulse rotation of the steam turbine, S401, it is guaranteed that the reheating cold section pipeline has steam with the pressure meeting the requirement to be supplied to the auxiliary steam commissioning shaft seal, and when the unit is started in the cold state and the temperature of the steam turbine is low, the steam turbine is warmed up. By means of the technical scheme, under the condition that no auxiliary steam is supplied by incoming steam of an old factory, auxiliary steam self-supply starting of the unit is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of combined cycle unit starting, and in particular to a combined cycle unit self-supply auxiliary steam starting method. Background Art

[0002] The company's Phase 9 units are two 9F-class "one-to-one" gas-steam combined cycle units. During the initial commissioning and production phase of the units, the company's Phase 8 coal-fired units can provide a stable supply of steam from the old plant through continuous operation. However, due to increasing environmental protection and operational pressures, after the Phase 8 units are shut down as emergency backup power sources, the combined cycle units will lose external auxiliary steam sources. The Phase 9 units are in the initial stage of infrastructure construction and have not yet started the construction of the start-up boilers. In addition, the start-up boilers have a long installation period, low return on investment, cumbersome operation, low reliability and high maintenance costs.

[0003] When there is steam supply from the old plant, during the unit startup, auxiliary steam can be supplied by the old plant, and the shaft seal can be put into operation through the auxiliary steam joint pipe. Finally, the steam temperature and pressure are adjusted to the specified start-up parameters, and the steam and water quality are waited for, and the steam turbine is started and connected to the grid. The startup time is relatively fast. However, when the steam supply from the old plant is lost, there is no external steam source that meets the requirements at any time, which seriously affects the rapid and safe startup of the unit.

[0004] When the unit is given the task of starting and stopping the power grid to regulate peak load, in the absence of external auxiliary steam from the old plant, it is a technical problem that needs to be solved urgently to ensure that the combined cycle unit has steam with sufficient temperature and pressure to meet the needs of shaft seal commissioning, vacuum pumping, bottom heating of the waste heat boiler, and turbine cylinder warming, so as to ensure the safe, economical and efficient startup of the unit. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide a combined cycle unit self-supplied auxiliary steam starting method in response to the above-mentioned technical deficiencies. The method solves the technical problem that when the unit is issued a power grid peak-shaving start-up and shutdown task and there is no external auxiliary steam supply from the old plant, the combined cycle unit can have steam with sufficient temperature and pressure to meet the requirements of shaft seal commissioning, vacuum pumping, bottom heating of waste heat boiler, turbine cylinder warming, etc., so as to ensure that the unit can complete the startup of the unit safely, economically and efficiently.

[0006] The technical solution adopted by the present invention is to provide a combined cycle unit self-supply auxiliary steam startup method, comprising the following steps:

[0007] Step S1, pre-startup preparation stage,

[0008] S101, open the auxiliary steam system drain pipes, and fully drain before the condenser establishes vacuum; when the combined cycle unit is cold-started, after step S101, add step S102,

[0009] S102, evacuate the condenser to -60kpa;

[0010] Step S2: The first start-up preheating phase of the gas turbine.

[0011] S201, start the gas turbine at a constant speed of 3000 rpm and then run it at no load, without performing grid connection operation;

[0012] S202, opening the high-pressure bypass valve and the reheat main steam start-up exhaust valve to control the high-pressure main steam pressure rising rate;

[0013] S203, control the temperature difference between the upper and lower walls of the high-pressure steam drum to not exceed the limit, and shut down the gas turbine when the temperature difference between the upper and lower walls of the high-pressure steam drum reaches 40°C-45°C;

[0014] S204, after the gas turbine is shut down, the steam pipeline is insulated and pressure maintained;

[0015] S205. Contact the chemical department to strengthen the water supply to the condenser;

[0016] Step S3, auxiliary steam pipe heating stage,

[0017] S301. After warming up the reheat cold section to the auxiliary steam pipeline, gradually establish qualified shaft seal and auxiliary steam pressure and temperature, and control the shaft seal pressure at 35Kpa-40Kpa;

[0018] S302, after the shaft seal steam supply is put into operation, the condenser vacuum drops to below -75kpa to meet the condenser steam inlet conditions;

[0019] S303, open the low-pressure drum oxygen exhaust door to strengthen the deoxidation of the waste heat boiler and reduce corrosion of the heating surface;

[0020] S304, waiting for the temperature difference between the upper and lower walls of the high-pressure steam drum to decrease;

[0021] Step S4: from the start of the gas turbine to the stage before the turbine starts running.

[0022] S401. Ensure that the reheat cold section pipeline has steam that meets the required pressure to supply the auxiliary steam operation shaft seal. When the unit is cold started and the turbine temperature is low, warm up the turbine;

[0023] S402, the temperature difference between the upper and lower walls of the high-pressure steam drum drops below 30°C before starting the gas turbine, at which time the lower wall temperature can rise to above 130°C;

[0024] S403, gas turbine connected to the grid with load, adjust the high-pressure bypass valve and medium-pressure bypass valve to control the rate of increase of steam temperature and pressure, and adjust the parameters of high-pressure main steam and medium-pressure main steam to meet the turbine start-up requirements.

[0025] To further optimize the technical solution, in step S203, the temperature difference between the upper and lower walls of the high-pressure steam drum is controlled not to exceed the limit, and the gas turbine is shut down when the temperature difference between the upper and lower walls of the high-pressure steam drum reaches 40°C.

[0026] To further optimize the technical solution, in step S301, after warming up the pipe from the reheat cold section to the auxiliary steam pipe, qualified shaft seal and auxiliary steam pressure and temperature are gradually established, and the shaft seal pressure is controlled at 35Kpa.

[0027] To further optimize this technical solution, when peak load regulation is started and the combined cycle unit is shut down, the steam pipeline shall be well insulated and pressure maintained. When the combined cycle unit is shut down, the high-pressure main steam pressure shall not be lower than 10Mpa, and the medium-pressure main steam pressure shall not be lower than 2Mpa.

[0028] To further optimize the technical solution, in step S401, when the combined cycle unit is cold-started or warm-started, the following method is used to ensure that the reheat cold section pipeline has steam that meets the required pressure to supply the auxiliary steam operation shaft seal:

[0029] After the high-pressure main steam is heated and pressurized, open the high-pressure bypass valve to put the auxiliary steam shaft seal into operation.

[0030] To further optimize the technical solution, in step S401, when the combined cycle unit is hot-started, the following method is used to ensure that the reheat cold section pipeline has steam that meets the required pressure to supply the auxiliary steam operation shaft seal:

[0031] Auxiliary steam and shaft seal are put into operation by using the reheat cold section pipeline and medium-pressure main steam surplus steam; when the medium-pressure main steam surplus steam is reduced to a level that cannot guarantee the shaft seal pressure, the high-pressure bypass valve is opened to supply steam.

[0032] The beneficial effects of the present invention are:

[0033] It has overcome unfavorable factors such as the shutdown of old coal machines in the old plant, the lack of starting boilers, and the inability to build starting boilers, and has overcome the production difficulties of the combined cycle unit without external auxiliary steam source. It can achieve self-supplied auxiliary steam start-up in different situations of cold start-up, warm start-up and hot start-up of the unit, and has reduced the starting parameter requirements, greatly shortened the starting operation time, and significantly improved the economy and safety of the unit. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is a schematic block diagram of the combined cycle unit piping system of the present invention;

[0035] Figure 2 It is a schematic block diagram of the cold and warm starting method of the unit of the present invention;

[0036] Figure 3 It is a schematic block diagram of the method for hot starting of a unit of the present invention;

[0037] Figure 4It is a schematic block diagram of the self-supply auxiliary steam starting method of the present invention;

[0038] Figure 5 A schematic diagram of monitoring application effect data of the startup method of the present invention;

[0039] Explanation of symbols in the figure: 101, gas turbine generator; 102, steam turbine generator; 201, gas turbine; 202, steam turbine; 2021, high-pressure cylinder; 2022, medium-pressure cylinder; 2023, low-pressure cylinder; 301, reheater; 302, reheat main steam pipeline; 303, exhaust valve; 304, medium-pressure bypass valve; 401, high-pressure drum; 402, high-pressure main steam pipeline; 403, high-pressure bypass valve; 50 1. Medium-pressure drum; 502. Reheat cold section pipeline; 503. Temperature and pressure reducing valve; 601. Low-pressure drum; 602. Oxygen exhaust valve; 603. Low-pressure main steam pipeline; 604. Low-pressure bypass valve; 701. Auxiliary steam manifold; 702. No-pressure drain pipeline; 703. Steam pipeline from adjacent machine; 704. Steam pipeline from old plant; 705. Shaft seal steam supply pipeline; 801. Condenser; 802. Condenser feed water pipeline. DETAILED DESCRIPTION

[0040] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0041] In order to simplify the drawings, only the parts related to the invention are schematically shown in each figure, and they do not represent the actual structure of the product. In addition, in order to simplify the drawings and facilitate understanding, in some figures, only one of the parts with the same structure or function is schematically shown, or only one of them is marked. In this article, "one" not only means "only one", but also means "more than one", and "several" includes "two" and "more than two".

[0042] In this document, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0043] In addition, in the description of the present application, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0044] like Figure 1-5 As shown, the combined cycle unit self-supply auxiliary steam startup method includes the following steps:

[0045] Step S1, pre-startup preparation stage,

[0046] S101, open the auxiliary steam system drain pipes, and fully drain before the condenser 801 establishes vacuum; when the combined cycle unit is cold-started, after step S101, add step S102,

[0047] S102, evacuate the condenser 801 to -60 kPa;

[0048] Step S2: The gas turbine 201 is started for the first time and then warmed up.

[0049] S201, start the gas turbine 201 at a constant speed of 3000 rpm and then run it at no load, without performing the grid connection operation;

[0050] S202, open the high-pressure bypass valve 403 and the reheat main steam start exhaust valve to control the high-pressure main steam pressure rising rate;

[0051] S203, controlling the temperature difference between the upper and lower walls of the high-pressure drum 401 not to exceed the limit, and shutting down the gas turbine 201 when the temperature difference between the upper and lower walls of the high-pressure drum 401 reaches 40°C-45°C;

[0052] S204, after the gas turbine 201 is shut down, the steam pipeline is insulated and pressure maintained;

[0053] S205, contact the chemical department to strengthen the water supply to condenser 801;

[0054] Step S3, auxiliary steam pipe heating stage,

[0055] S301. After warming up the reheat cold section to the auxiliary steam pipeline, gradually establish qualified shaft seal and auxiliary steam pressure and temperature, and control the shaft seal pressure at 35Kpa-40Kpa;

[0056] S302, after the shaft seal steam supply is put into operation, the vacuum of condenser 801 drops to below -75kpa to meet the steam inlet conditions of condenser 801;

[0057] S303, open the oxygen exhaust door 602 of the low-pressure drum 601 to strengthen the deoxidation of the waste heat boiler and reduce the corrosion of the heating surface;

[0058] S304, waiting for the temperature difference between the upper and lower walls of the high-pressure steam drum 401 to decrease;

[0059] Step S4: From the start of the gas turbine 201 to the pre-start stage of the steam turbine 202,

[0060] S401, ensure that the reheat cold section pipeline 502 has steam that meets the required pressure to supply the auxiliary steam operation shaft seal, and when the unit is cold started and the temperature of the steam turbine 202 is low, warm up the steam turbine 202;

[0061] S402, the temperature difference between the upper and lower walls of the high-pressure drum 401 drops below 30°C and then the gas turbine 201 is started, at which time the lower wall temperature can rise to above 130°C;

[0062] S403, gas turbine 201 is connected to the grid with load, and the high-pressure bypass valve 403 and the medium-pressure bypass valve 304 are adjusted to control the rate of increase of steam temperature and pressure, and the parameters of high-pressure main steam and medium-pressure main steam are adjusted to meet the start-up requirements of steam turbine 202.

[0063] Furthermore, in step S203, the temperature difference between the upper and lower walls of the high-pressure drum 401 is controlled not to exceed a limit, and the gas turbine 201 is shut down when the temperature difference between the upper and lower walls of the high-pressure drum 401 reaches 40°C.

[0064] Furthermore, in step S301, after warming up the pipe from the reheat cold section to the auxiliary steam pipe, qualified shaft seal and auxiliary steam pressure and temperature are gradually established, and the shaft seal pressure is controlled at 35Kpa.

[0065] Furthermore, when peak load regulation is started and the combined cycle unit is shut down, the steam pipeline shall be well insulated and pressure maintained. When the combined cycle unit is shut down, the high-pressure main steam pressure shall not be lower than 10Mpa, and the medium-pressure main steam pressure shall not be lower than 2Mpa.

[0066] Further, in step S401, when the combined cycle unit is cold-started or warm-started, the following method is used to ensure that the reheat cold section pipeline 502 has steam that meets the required pressure to supply the auxiliary steam operation shaft seal:

[0067] After the high-pressure main steam is heated and pressurized, the high-pressure bypass valve 403 is opened to put the auxiliary steam shaft seal into operation.

[0068] Further, in step S401, when the combined cycle unit is hot-started, the following method is used to ensure that the reheat cold section pipeline 502 has steam that meets the required pressure to supply the auxiliary steam operation shaft seal:

[0069] Auxiliary steam and shaft seal are put into operation using the reheat cold section pipeline 502 and the intermediate pressure main steam surplus steam; when the intermediate pressure main steam surplus steam is reduced to the point where the shaft seal pressure cannot be guaranteed, the high pressure bypass valve 403 is opened to supply steam.

[0070] In order to have an overall concept of the combined cycle unit and to understand the various steps of this startup method more clearly, Figure 1 The connection relationship is schematically explained (connection and communication refer to the connection or communication relationship between pipelines, equipment, etc. according to the use relationship. For the sake of simplicity, various pipeline structures and valve structures are omitted. Those skilled in the art are familiar with how to connect pipelines and use valves, etc.), such as Figure 1As shown, the combined cycle unit includes a waste heat boiler system, a gas turbine 201 connected to the waste heat boiler system, the gas turbine 201 is equipped with a gas turbine generator 101, and the high-temperature exhaust gas produced by the gas turbine 201 is sent to the waste heat boiler system. The waste heat boiler system includes a waste heat boiler and a reheater 301 system (including a reheater 301, a reheat main steam pipeline 302 to supply reheat main steam to act on the steam turbine 202, a branch of the reheat main steam pipeline 302 starts an exhaust valve 303 to connect the reheat main steam pipeline 302 with the external environment, and the reheat main steam pipeline 302 is connected to the condenser 801 through a medium-pressure bypass valve 304), a high-pressure system (including a high-pressure steam drum 401, a high-pressure main steam pipeline 402 to supply high-pressure main steam to act on the medium-pressure main steam pipeline or the steam turbine 202), medium-pressure system (including medium-pressure drum 501, connected with reheater 301 system through reheat cold section pipeline 502, connected with auxiliary steam manifold 701 through reheat cold section pipeline 502 and temperature reduction and pressure reducing valve 503, connected with condenser 801 through medium-pressure bypass valve 304), low-pressure system (including low-pressure drum 601, oxygen exhaust valve 602 connected with low-pressure drum 601, low-pressure main steam supplied to steam turbine 202 through low-pressure main steam pipeline 603, connected with condenser 801 through low-pressure bypass valve 604); high-pressure main steam pipeline 402 is connected with reheat cold section pipeline 502 through high-pressure bypass and high-pressure bypass valve 403, and waste heat boiler system acts on auxiliary steam system, condenser 801 and steam turbine 202. The auxiliary steam system includes an auxiliary steam header 701, a temperature-reducing and pressure-reducing valve 503, a non-pressure drain pipeline 702, a steam pipeline 703 from an adjacent machine, a steam pipeline 704 from an old plant, and a shaft seal steam supply pipeline 705 for the shaft seal of the steam turbine 202, which are respectively connected to the auxiliary steam header 701. The non-pressure drain pipeline 702 is used for non-pressure draining of the auxiliary steam system. The steam turbine 202 includes a high-pressure cylinder 2021, a medium-pressure cylinder 2022, and a low-pressure cylinder 2023 (the pipeline for auxiliary steam to act on the steam turbine 202 for shaft seal is the existing technology), and the steam turbine 202 is equipped with a steam turbine generator 102. The condenser 801 acts on the steam turbine 202 and has a desalted water condenser feed pipeline 802. The desalted water is fed to the condenser 801 through the condenser feed pipeline 802 to supplement the water vapor balance of the combined cycle system. The A point in the figure is the intersection of the reheat cold section pipeline 502, which can be controlled by changing the steam pressure. It is a prior art. After the gas turbine 201 is started, it is maintained at 3000rpm for about 20 minutes, so that the high-pressure system produces high-pressure main steam, and then the high-pressure bypass valve 403 is opened to make the reheat cold section (point A on the figure) have a pressure of more than 0.6Mpa, and then the auxiliary steam has enough steam. (The gas turbine 201 is referred to as the gas turbine, the steam turbine 202 is referred to as the steam turbine, and the combined cycle unit is referred to as the unit).

[0071] In the industry, cold start refers to start with cold furnace and cold engine, warm start refers to start with cold furnace and hot engine, and hot start refers to start with hot furnace and hot engine. The common point between cold start and warm start is that the system does not have enough residual steam with temperature and pressure to meet the start-up requirements. The start-up process requires the gas turbine 201 to start and preheat the waste heat boiler and shut it down once. The main flow chart is as follows Figure 2 As shown (waste furnace refers to waste heat boiler, bypass adjustment refers to the adjustment of high-pressure bypass valve 403 and medium-pressure bypass valve 304).

[0072] Hot start-up is faster, but the medium-pressure and high-pressure systems need to have sufficient residual steam at temperature and pressure before starting. This is the most common working condition for daily peak load regulation. Its main processes are as follows: Figure 3 As shown (Note, hot start also requires the gas turbine 201 to be started and preheated to achieve better working conditions). If the unit is shut down for a short time, or if insulation and pressure maintenance measures are taken, the hot start conditions can be achieved within a certain period of time. If the insulation and pressure maintenance are not in place, the gas turbine 201 can be preheated once without load, or wait for the adjacent unit to start and supply auxiliary steam. The adjacent unit refers to two sets of the same units in the plant, both of which are composed of a gas turbine 201 and a steam turbine 202. When one of the units is shut down and the auxiliary steam system has no steam for use, and the other unit is operating normally, the operating steam turbine 202 can supply its auxiliary steam to the shut down unit for use.

[0073] This startup method has a short preheating startup time and optimizes the operating time after ignition. By adjusting the ignition preheating shutdown time of gas turbine 201, the preheating effect is guaranteed, auxiliary steam with sufficient pressure is generated, the operation time of this stage is greatly shortened, and a certain amount of gas consumption is saved. Therefore, we optimized the temperature difference between the upper and lower walls of the high-pressure steam drum 401 during preheating shutdown from the early 50℃ to 40℃--45℃. Some experiments are shown in the following table:

[0074]

[0075] This startup method also optimizes the commissioning process of the auxiliary steam and shaft seal system. It effectively slows down the pressure and temperature drop of the high-pressure main steam before the engine ignition. The peak load start-up the next day can create good conditions for quickly reaching the startup parameters of the steam turbine 202. Before the hot start, the self-supplied auxiliary steam can maintain a relatively high temperature and pressure, which can reduce unnecessary drainage of the auxiliary steam and shaft seal system, thereby reducing pressure loss, and strictly implement the relevant regulations on the drainage of the steam turbine 202 body. The specific measures are as follows:

[0076] (1) The auxiliary steam header 701 drain and the shaft seal pipeline related drain are changed to normal steam traps to reduce the loss of unpressurized steam.

[0077] (2) Appropriately reduce the shaft seal pressure before starting the engine to 35Kpa-40Kpa.

[0078] (3) When the vacuum is drawn below -75Kpa, the gas turbine can be started to reduce the ineffective loss of the auxiliary steam system.

[0079] The following table shows the comparison of the high-pressure main steam pressure and temperature before the shaft seal and before the start of the gas turbine during a hot start of a self-supplied auxiliary steam in 2022 and a hot start in June 2023:

[0080]

[0081] This startup method also optimizes the insulation and pressure maintenance work of the unit during shutdown, creating good conditions for peak load start-up again within 24 hours. Before the unit is started with self-supplied auxiliary steam, if the steam temperature and pressure of the high and medium pressure systems are high, or the temperature of the turbine 202 cylinder is high, it can significantly shorten the startup time, quickly control the temperature difference between the upper and lower walls of the high-pressure drum 401, reduce the temperature difference of the turbine 202, and quickly load the load, which is crucial to the economy and safety of the unit; on the contrary, if the insulation and pressure maintenance are not good, the parameters are reduced to the point where the auxiliary steam and shaft seal cannot be put into operation, then the gas turbine needs to be ignited and preheated once to meet the unit startup requirements, which seriously prolongs the startup time and economy of the unit and increases the operation risk of the operator on duty.

[0082] Therefore, we have formulated technical measures for insulation and pressure maintenance after the unit is shut down. When the unit is shut down, the high-pressure main steam pressure is controlled at above 10Mpa, and the medium-pressure main steam pressure is controlled at above 2Mpa; turn off unnecessary drains and conduct regular drains; conduct comprehensive leak checks to reduce steam losses, etc. For insulation and pressure maintenance of steam pipelines, the steam pipelines shall at least include the high-pressure main steam pipeline 402 and the medium-pressure main steam pipeline, and may also include pipelines connected to the high-pressure main steam pipeline 402 and the medium-pressure main steam, especially those used for commissioning shaft seal auxiliary steam, to achieve better insulation and pressure maintenance effects. The following table compares the hot start-up status of a unit in February 2023 after the implementation of insulation and pressure maintenance measures after a self-supplied auxiliary steam hot start in 2022 without strict insulation and pressure maintenance the next day:

[0083]

[0084] After applying this startup method in the previous unit self-supplied auxiliary steam startup process, we retrieved the historical trend of the typical cold startup process without auxiliary steam (Units #1 and 2, 2023.10.16) (e.g. Figure 5 ) It can be seen that:

[0085] About 1.5 hours before the formal start of the gas turbine, the gas turbine runs the normal sequence, and after no-load preheating for about 20 minutes, when the temperature difference between the upper and lower walls of the high-pressure drum 401 reaches 42°C, the gas turbine is stopped. At this time, the auxiliary steam pressure gradually rises to about 0.7Mpa, and the temperature difference between the upper and lower walls of the high-pressure drum 401 rises to 68°C without exceeding the limit (the upper and lower walls of the high-pressure drum 401 temperature difference given by the boiler manufacturer is allowed to be 85°C), and the lower wall temperature of the high-pressure drum 401 can reach more than 100°C. Meet the requirements for the normal start of the gas turbine again.

[0086] It is to be understood that the present invention is described by some embodiments, and it is known to those skilled in the art that various changes or equivalent substitutions may be made to these features and embodiments without departing from the spirit and scope of the present invention. In addition, under the teachings of the present invention, these features and embodiments may be modified to adapt to specific circumstances and materials without departing from the spirit and scope of the present invention. Therefore, the present invention is not limited by the specific embodiments disclosed herein, and all embodiments falling within the scope of the claims of this application are within the scope of protection of the present invention.

Claims

1. A combined cycle unit self-supplied auxiliary steam startup method, characterized in that: The steps include: Step S1, pre-startup preparation stage, S101, open the auxiliary steam system drain pipes, and fully drain before the condenser (801) is vacuumed; when the combined cycle unit is cold-started, after step S101, add step S102, S102, evacuate the condenser (801) to -60 kPa; Step S2: The gas turbine (201) is started up for the first time and then warmed up. S201, starting the gas turbine (201) at a constant speed of 3000 rpm and then running it at no load, without performing a grid connection operation; S202, opening the high-pressure bypass valve (403) and the reheat main steam start-up exhaust valve to control the high-pressure main steam pressure rising rate; S203, controlling the temperature difference between the upper and lower walls of the high-pressure steam drum (401) not to exceed a limit, and shutting down the gas turbine (201) when the temperature difference between the upper and lower walls of the high-pressure steam drum (401) reaches 40° C.-45° C.; S204, after the gas turbine (201) is shut down, the steam pipeline is insulated and pressure maintained; S205, contact the chemical department to strengthen the water supply to the condenser (801); Step S3, auxiliary steam pipe heating stage, S301. After warming up the reheat cold section to the auxiliary steam pipeline, gradually establish qualified shaft seal and auxiliary steam pressure and temperature, and control the shaft seal pressure at 35Kpa-40Kpa; S302, after the shaft seal steam supply is put into operation, the vacuum of the condenser (801) drops to below -75kpa to meet the steam inlet conditions of the condenser (801); S303, opening the oxygen exhaust valve (602) of the low-pressure drum (601) to enhance the deoxidation of the waste heat boiler and reduce corrosion of the heating surface; S304, waiting for the temperature difference between the upper and lower walls of the high-pressure steam drum (401) to decrease; Step S4: from the start-up of the gas turbine (201) to the pre-start-up stage of the steam turbine (202); S401, ensuring that the reheat cold section pipeline (502) has steam with a required pressure to supply the auxiliary steam operation shaft seal, and when the unit is cold started and the temperature of the steam turbine (202) is low, warming up the steam turbine (202); S402, the temperature difference between the upper and lower walls of the high-pressure drum (401) drops below 30°C and then the gas turbine (201) is started, at which time the lower wall temperature can rise to above 130°C; S403, the gas turbine (201) is connected to the grid with load, and the high-pressure bypass valve (403) and the medium-pressure bypass valve (304) are adjusted to control the steam temperature and pressure rising rate, and the parameters of the high-pressure main steam and the medium-pressure main steam are adjusted to meet the start-up requirements of the steam turbine (202).

2. The combined cycle unit self-supplied auxiliary steam startup method according to claim 1, characterized in that: In step S203, the temperature difference between the upper and lower walls of the high-pressure drum (401) is controlled not to exceed a limit, and the gas turbine (201) is shut down when the temperature difference between the upper and lower walls of the high-pressure drum (401) reaches 40°C.

3. The combined cycle unit self-supplied auxiliary steam startup method according to claim 1, characterized in that: In step S301, after warming up the pipe from the reheat cold section to the auxiliary steam pipe, qualified shaft seal and auxiliary steam pressure and temperature are gradually established, and the shaft seal pressure is controlled at 35Kpa.

4. The combined cycle unit self-supplied auxiliary steam startup method according to claim 1, characterized in that: When peak load regulation is started and the combined cycle unit is shut down, the steam pipeline shall be well insulated and pressure maintained. When the combined cycle unit is shut down, the high-pressure main steam pressure shall not be lower than 10Mpa, and the medium-pressure main steam pressure shall not be lower than 2Mpa.

5. The combined cycle unit self-supplied auxiliary steam startup method according to claim 1, characterized in that: In step S401, when the combined cycle unit is cold-started or warm-started, the following method is used to ensure that the reheat cold section pipeline (502) has steam that meets the required pressure to supply the auxiliary steam operation shaft seal: After the high-pressure main steam is heated and pressurized, the high-pressure bypass valve (403) is opened to put the auxiliary steam shaft seal into operation.

6. The combined cycle unit self-supplied auxiliary steam startup method according to claim 1, characterized in that: In step S401, when the combined cycle unit is hot-started, the following method is used to ensure that the reheat cold section pipeline (502) has steam that meets the required pressure to supply the auxiliary steam operation shaft seal: Auxiliary steam and shaft seal are put into operation by using the reheat cold section pipeline (502) and the intermediate pressure main steam surplus steam; when the intermediate pressure main steam surplus steam is reduced to the point where the shaft seal pressure cannot be guaranteed, the high pressure bypass valve (403) is opened to supply steam.