Vacuum system of silicon carbide furnace

By using the superposition technology of rotary oil pump and molecular pump in the silicon carbide furnace vacuum system, combined with multi-layer valve control and detection pipelines, a high vacuum degree of ≤5x10^-4Pa is achieved, which solves the difficulty of realizing the existing technology. The problem of ^-4Pa level vacuum ensures the safe micro-positive pressure in the cavity and the stability of the crystal growth process.

CN118896496APending Publication Date: 2024-11-05SHANGHAI HANHONG PRECISION MACHINERY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410913617.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-11-05

AI Technical Summary

Technical Problem

It is difficult to realize a vacuum system of 10^-4Pa level in the prior art, and it is difficult to achieve a higher vacuum degree when superimposed by traditional dry pumps and rotary oil pumps.

Method used

The silicon carbide furnace vacuum system is adopted, and the superposition of rotary oil pump and molecular pump is combined with three-way connectors, vacuum evacuation pipelines, plug-in valves, molecular pumps and high vacuum angle valves to achieve high vacuum evacuation and pressure holding. Equipped with detection pipelines and vacuum gauge, multi-layer valve control is performed to achieve higher vacuum.

Benefits of technology

The vacuum degree is achieved to reach ≤5x10^-4Pa, ensuring the safe micro-positive pressure in the cavity and the stability of the crystal growth process, and meeting the higher vacuum degree requirements.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118896496A_ABST
    Figure CN118896496A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of machinery. A vacuum system of a silicon carbide furnace comprises a rotary vane oil pump, the rotary vane oil pump is in butt joint with a first vacuumizing pipeline and a second vacuumizing pipeline through a three-way connector, and the first vacuumizing pipeline and the second vacuumizing pipeline are both in butt joint and communicated with a silicon carbide furnace cavity. The first vacuumizing pipeline sequentially passes through an exhaust mechanism and a first high-vacuum angle valve from the silicon carbide furnace cavity to the rotary vane oil pump; the second vacuumizing pipeline sequentially passes through a gate valve, a molecular pump and a second high-vacuum angle valve from the silicon carbide furnace cavity to the rotary vane oil pump; the silicon carbide furnace cavity is connected with a detection pipeline, and a Pirani vacuum gauge and an ionization gauge vacuum gauge are installed on the detection pipeline. According to the vacuum system of the silicon carbide furnace, the rotary vane pump and the molecular pump are used in an overlapped mode, and the higher vacuum degree requirement can be met. The vacuum degree can be less than or equal to 5 * 10 <-4 > Pa.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of mechanical technology, in particular to a vacuum system. Background Art

[0002] Generally, the vacuum degree of traditional dry pump can only reach about 1x10^-2Pa level. It is difficult to achieve a higher vacuum degree. The combined use of rotary vane oil pump and molecular pump can achieve a higher vacuum degree, generally reaching above 1x10^-5Pa level.

[0003] There is currently a lack of vacuum systems that can achieve a vacuum level of 10^-4Pa. Summary of the invention

[0004] In view of the problems existing in the prior art, the present invention provides a vacuum system for a silicon carbide furnace, which solves at least one of the above technical problems.

[0005] The technical solution of the present invention is: a vacuum system of a silicon carbide furnace, comprising a rotary vane oil pump, characterized in that the rotary vane oil pump is connected to a first vacuum pumping pipeline and a second vacuum pumping pipeline through a three-way joint, and the first vacuum pumping pipeline and the second vacuum pumping pipeline are both connected to the silicon carbide furnace cavity;

[0006] The first vacuum pumping pipeline runs from the silicon carbide furnace chamber to the rotary vane oil pump, passing through the exhaust mechanism and the first high vacuum angle valve in sequence;

[0007] The second vacuum pumping pipeline runs from the silicon carbide furnace chamber to the rotary vane oil pump, passing through a gate valve, a molecular pump and a second high vacuum angle valve in sequence;

[0008] The silicon carbide furnace cavity is connected to a detection pipeline, and a Pirani vacuum gauge and an ionization gauge vacuum gauge are installed on the detection pipeline.

[0009] When vacuuming, first open the rotary vane oil pump, open the first high vacuum angle valve, and the gas in the silicon carbide furnace cavity is pumped out by the rotary vane oil pump through the first vacuum pipeline;

[0010] When the Pirani vacuum gauge reading reaches above 5Pa, close the first high vacuum angle valve; at the same time, open the gate valve, molecular pump, and second high vacuum angle valve, and the gas in the silicon carbide furnace cavity is pumped out through the second vacuum pipeline by the rotary vane oil pump. When the ionization gauge vacuum gauge reading is ≤5x10^-4Pa and tends to stabilize, close the gate valve, molecular pump and the second high vacuum angle valve.

[0011] Pressure maintenance method: after vacuuming, when the vacuum degree in the silicon carbide furnace chamber is stable within 5x10^-4Pa, close the gate valve, molecular pump, and the second high vacuum angle valve to maintain the pressure. Determine the leakage rate after 24 hours, which is required to be ≤10Pa / 24h;

[0012] If the leakage rate exceeds the range, use a vacuum leak detector to check whether there are leaks in each connection part. If there are leaks, check the cause. After the problem is solved, reassemble, repeat the vacuuming steps, re-vacuum, and re-maintain the pressure. If the value is within the specified range, it is qualified.

[0013] The vacuum system of the silicon carbide furnace needs to be tested for pressure maintenance after each machine is installed to check whether the leakage in the cavity is within the specified range. Generally, it is sufficient to test the pressure maintenance once after the machine is installed, and it is not necessary to test the pressure maintenance for each furnace.

[0014] The exhaust mechanism comprises a positive pressure detection valve, the positive pressure detection valve comprises an exhaust port, and the exhaust port is connected to an auxiliary vacuum cover plate for closing the exhaust port through an adjusting screw;

[0015] An adjusting spring is sleeved on the outer periphery of the adjusting screw, and the adjusting spring is clamped between the exhaust port and the auxiliary vacuum cover plate.

[0016] Micro-positive pressure test method: close the first high vacuum angle valve, the plug valve, the molecular pump and the second high vacuum angle valve; tighten the adjustment screw, and then fill the Ar gas from the Ar gas inlet at the bottom of the silicon carbide furnace chamber;

[0017] When the Pirani vacuum gauge reading is close to 120KPa, the accuracy requirement is ±1Kpa, and the auxiliary vacuum cover has not yet popped open, loosen the adjustment screw to evenly reduce the pressure of the adjustment spring so that the auxiliary vacuum cover just pops open and the excess pressure gas in the chamber leaks out from here. Generally, a micro-positive pressure test is sufficient after the machine is installed.

[0018] An exhaust needle valve is connected to the first vacuum pumping pipeline, and the exhaust port of the exhaust needle valve is connected to the main branch through a branch pipe;

[0019] The exhaust needle valve comprises a mounting flange mounted to the first vacuum pumping pipeline, one end of the exhaust needle valve adjacent to the inner cavity of the silicon carbide furnace is connected to the positive pressure detection valve, and one end of the exhaust needle valve away from the inner cavity of the silicon carbide furnace is connected to the first high vacuum angle valve;

[0020] The branch pipe is connected to an end of the first high vacuum angle valve adjacent to the rotary vane oil pump.

[0021] When the silicon carbide furnace cavity is growing crystals, the pressure control method in the silicon carbide furnace cavity is to evacuate to the specified vacuum pressure, and then fill Ar gas from the Ar gas inlet at the bottom of the silicon carbide furnace cavity, and open the exhaust needle valve. The Ar gas entering from the bottom of the cavity is pumped out by the rotary vane oil pump along the branch pipe through the main branch. At this time, the first high vacuum angle valve is closed. Since the opening size of the exhaust needle valve can be automatically adjusted, the system automatically controls and adjusts to the pressure size specified by the customer according to the process requirements. The pressure control accuracy is required to be ±0.2Kpa.

[0022] When the crystal growth is finished and before the furnace is taken out, open the pneumatic valve on the side wall of the silicon carbide furnace chamber to keep the pressure inside the silicon carbide furnace chamber consistent with the atmospheric pressure outside. In this way, the furnace cover will not be unable to be opened due to negative pressure, or will not be opened due to positive pressure.

[0023] A vacuum system for a silicon carbide furnace, comprising a rotary vane oil pump, wherein the rotary vane oil pump is connected to a first vacuum pumping pipeline and a second vacuum pumping pipeline through a three-way joint, and the first vacuum pumping pipeline and the second vacuum pumping pipeline are both connected to and communicated with the silicon carbide furnace cavity;

[0024] The first vacuum pumping pipeline runs from the silicon carbide furnace chamber to the rotary vane oil pump, passing through a positive pressure detection valve, an exhaust needle valve, and a first high vacuum angle valve in sequence;

[0025] The positive pressure detection valve comprises an exhaust port, the exhaust port is connected to an auxiliary vacuum cover plate for closing the exhaust port through an adjusting screw, an adjusting spring is sleeved around the outer periphery of the adjusting screw, and the adjusting spring is clamped between the exhaust port and the auxiliary vacuum cover plate;

[0026] The exhaust port of the exhaust needle valve is connected to the first main branch through a branch pipe; the exhaust needle valve includes a mounting flange installed on the first vacuum pipeline, one end of the exhaust needle valve adjacent to the inner cavity of the silicon carbide furnace is connected to the positive pressure detection valve, and one end of the exhaust needle valve away from the inner cavity of the silicon carbide furnace is connected to the first high vacuum angle valve; the branch pipe is connected to one end of the first high vacuum angle valve adjacent to the rotary vane oil pump;

[0027] The second vacuum pumping pipeline runs from the silicon carbide furnace chamber to the rotary vane oil pump, passing through a gate valve, a molecular pump and a second high vacuum angle valve in sequence;

[0028] The silicon carbide furnace cavity is connected to a detection pipeline, and a Pirani vacuum gauge and an ionization gauge vacuum gauge are installed on the detection pipeline;

[0029] When vacuuming, first open the rotary vane oil pump, open the first high vacuum angle valve, and the gas in the silicon carbide furnace cavity is pumped out by the rotary vane oil pump through the first vacuum pipeline;

[0030] When the Pirani vacuum gauge reading reaches above 5Pa, close the first high vacuum angle valve; at the same time, open the gate valve, molecular pump, and second high vacuum angle valve, and the gas in the silicon carbide furnace cavity is pumped out through the second vacuum pipeline by the rotary vane oil pump. When the ionization gauge vacuum gauge reading is ≤5x10^-4Pa and tends to stabilize, close the gate valve, molecular pump and the second high vacuum angle valve.

[0031] Compared with the prior art, the present invention has the following beneficial effects:

[0032] The vacuum system of this silicon carbide furnace uses a rotary vane pump and a molecular pump in combination, which can achieve higher vacuum requirements. The vacuum degree can be ≤5x10^-4Pa.

[0033] The slightly positive pressure requirement of the vacuum system of this silicon carbide furnace makes the pressure in the cavity relatively safe; the pressure control requirement of the vacuum system of this silicon carbide furnace makes the crystal growth process more stable. BRIEF DESCRIPTION OF THE DRAWINGS

[0034] Figure 1 It is a structural schematic diagram of a specific embodiment 1 of the present invention;

[0035] Figure 2 It is a structural schematic diagram of specific embodiment 1 of the present invention from another perspective.

[0036] In the figure, 1 is a rotary vane oil pump, 2 is a three-way joint, 3 is a first main branch, 4 is a first high vacuum angle valve, 5 is an exhaust needle valve, 6 is a branch pipe, 7 is a plug valve, 8 is a molecular pump, 9 is a second high vacuum angle valve, 10 is a second main branch, 11 is an Ar gas inlet, 12 is an adjusting spring, 13 is an adjusting screw, 14 is an auxiliary vacuum cover plate, 15 is an ionization gauge vacuum gauge, 16 is a Pirani vacuum gauge, and 17 is a pneumatic valve. DETAILED DESCRIPTION

[0037] See also Figure 1 to Figure 2 , Specific embodiment 1, a vacuum system of a silicon carbide furnace, including a rotary vane oil pump 1, characterized in that the rotary vane oil pump 1 is connected to a first vacuum pumping pipeline and a second vacuum pumping pipeline through a three-way joint 2, and the first vacuum pumping pipeline and the second vacuum pumping pipeline are both connected to the silicon carbide furnace cavity; the first vacuum pumping pipeline passes through an exhaust mechanism and a first high vacuum angle valve 4 in sequence from the silicon carbide furnace cavity to the rotary vane oil pump 1; the second vacuum pumping pipeline passes through a plug valve 7, a molecular pump 8 and a second high vacuum angle valve 9 in sequence from the silicon carbide furnace cavity to the rotary vane oil pump 1; the silicon carbide furnace cavity is connected to a detection pipeline, and a Pirani vacuum gauge 16 and an ionization gauge vacuum gauge 15 are installed on the detection pipeline.

[0038] The first vacuum angle valve is connected to the three-way joint 2 through the first main branch 3. The second vacuum angle valve is connected to the three-way joint 2 through the second main branch 10.

[0039] When evacuating, first open the rotary vane oil pump 1, open the first high vacuum angle valve 4, and the gas in the silicon carbide furnace cavity is pumped out by the rotary vane oil pump 1 through the first vacuum pipeline; when the reading of the Pirani vacuum gauge 16 reaches above 5Pa, close the first high vacuum angle valve 4; at the same time, open the plug valve 7, molecular pump 8, and the second high vacuum angle valve 9, and the gas in the silicon carbide furnace cavity is pumped out by the rotary vane oil pump 1 through the second vacuum pipeline. When the reading of the ionization gauge vacuum gauge 15 is ≤5x10^-4Pa and tends to be stable, close the plug valve 7, molecular pump 8 and the second high vacuum angle valve 9.

[0040] Pressure maintenance method: after vacuuming, when the vacuum degree in the silicon carbide furnace chamber is stable within 5x10^-4Pa, close the gate valve 7, molecular pump 8, and the second high vacuum angle valve 9 to maintain the pressure. After 24 hours, determine the leakage rate, which is required to be ≤10Pa / 24h;

[0041] If the leakage rate exceeds the range, use a vacuum leak detector to check whether there are leaks in each connection part. If there are leaks, check the cause. After the problem is solved, reassemble, repeat the vacuuming steps, re-vacuum, and re-maintain the pressure. If the value is within the specified range, it is qualified.

[0042] The vacuum system of the silicon carbide furnace needs to be tested for pressure maintenance after each machine is installed to check whether the leakage in the cavity is within the specified range. Generally, it is sufficient to test the pressure maintenance once after the machine is installed, and it is not necessary to test the pressure maintenance for each furnace.

[0043] The exhaust mechanism includes a positive pressure detection valve, which includes an exhaust port, which is connected to an auxiliary vacuum cover plate 14 for closing the exhaust port through an adjusting screw 13; an adjusting spring 12 is provided on the outer periphery of the adjusting screw 13, and the adjusting spring 12 is clamped between the exhaust port and the auxiliary vacuum cover plate 14.

[0044] Micro-positive pressure test method: close the first high vacuum angle valve 4, the plug valve 7, the molecular pump 8 and the second high vacuum angle valve 9; tighten the adjustment screw 13, and then fill the Ar gas from the Ar gas inlet 11 at the bottom of the silicon carbide furnace chamber;

[0045] When the reading of the Pirani vacuum gauge 16 is close to 120KPa, the accuracy requirement is ±1Kpa, and the auxiliary vacuum cover 14 has not yet popped open, loosen the adjusting screw 13 to evenly reduce the pressing force of the adjusting spring 12, so that the auxiliary vacuum cover 14 just pops open, and the excess pressure gas in the cavity leaks out from here. Generally, a micro-positive pressure test is sufficient after the machine is installed.

[0046] An exhaust needle valve 5 is connected to the first vacuum pipeline, and the exhaust port of the exhaust needle valve 5 is connected to the first main branch 3 through a branch pipe 6; the exhaust needle valve 5 includes a mounting flange installed to the first vacuum pipeline, and one end of the exhaust needle valve 5 adjacent to the inner cavity of the silicon carbide furnace is connected to the positive pressure detection valve, and the end of the exhaust needle valve 5 away from the inner cavity of the silicon carbide furnace is connected to the first high vacuum angle valve 4; the branch pipe 6 is connected to one end of the first high vacuum angle valve 4 adjacent to the rotary vane oil pump 1.

[0047] When the silicon carbide furnace cavity is undergoing crystal growth, the pressure control method in the silicon carbide furnace cavity is to evacuate to the specified vacuum pressure, and then fill Ar gas from the Ar gas inlet 11 at the bottom of the silicon carbide furnace cavity, and open the exhaust needle valve 5. The Ar gas entering from the bottom of the cavity is pumped out by the rotary vane oil pump 1 along the branch pipe 6 through the main branch. At this time, the first high vacuum angle valve 4 is closed. Since the opening size of the exhaust needle valve 5 can be automatically adjusted, the system automatically controls and adjusts to the pressure size specified by the customer according to the process requirements. The pressure control accuracy is required to be ±0 to 2Kpa.

[0048] When the crystal growth is finished and before the crystal is taken out of the furnace, the pneumatic valve 17 on the side wall of the silicon carbide furnace cavity is opened to keep the pressure inside the silicon carbide furnace cavity consistent with the atmospheric pressure outside. In this way, the furnace cover will not be unable to be opened due to negative pressure, or will not be opened due to positive pressure.

[0049] A vacuum system for a silicon carbide furnace, comprising a rotary vane oil pump 1, characterized in that the rotary vane oil pump 1 is connected to a first vacuum pumping pipeline and a second vacuum pumping pipeline through a three-way joint 2, and the first vacuum pumping pipeline and the second vacuum pumping pipeline are both connected to and communicated with a silicon carbide furnace cavity;

[0050] The first vacuum pumping pipeline runs from the silicon carbide furnace cavity to the rotary vane oil pump 1, passing through the positive pressure detection valve, the exhaust needle valve 5, and the first high vacuum angle valve 4 in sequence;

[0051] The positive pressure detection valve includes an exhaust port, which is connected to an auxiliary vacuum cover plate 14 for closing the exhaust port through an adjusting screw 13, and an adjusting spring 12 is sleeved around the outer periphery of the adjusting screw 13, and the adjusting spring 12 is clamped between the exhaust port and the auxiliary vacuum cover plate 14;

[0052] The exhaust port of the exhaust needle valve 5 is connected to the first main branch 3 through the branch pipe 6; the exhaust needle valve 5 includes a mounting flange installed to the first vacuum pipeline, one end of the exhaust needle valve 5 adjacent to the inner cavity of the silicon carbide furnace is connected to the positive pressure detection valve, and the end of the exhaust needle valve 5 away from the inner cavity of the silicon carbide furnace is connected to the first high vacuum angle valve 4; the branch pipe 6 is connected to one end of the first high vacuum angle valve 4 adjacent to the rotary vane oil pump 1;

[0053] The second vacuum pumping pipeline runs from the silicon carbide furnace chamber to the rotary vane oil pump 1, passing through the gate valve 7, the molecular pump 8 and the second high vacuum angle valve 9 in sequence;

[0054] The silicon carbide furnace cavity is connected to a detection pipeline, on which a Pirani vacuum gauge 16 and an ionization gauge vacuum gauge 15 are installed;

[0055] When evacuating the vacuum, first open the rotary vane oil pump 1, open the first high vacuum angle valve 4, and the gas in the silicon carbide furnace cavity is pumped out by the rotary vane oil pump 1 through the first vacuum pipeline;

[0056] When the reading of the Pirani vacuum gauge 16 reaches above 5Pa, close the first high vacuum angle valve 4; at the same time, open the gate valve 7, molecular pump 8, and the second high vacuum angle valve 9, and the gas in the silicon carbide furnace cavity is pumped out by the rotary vane oil pump 1 through the second vacuum pipeline. When the reading of the ionization gauge vacuum gauge 15 is ≤5x10^-4Pa and tends to be stable, close the gate valve 7, molecular pump 8 and the second high vacuum angle valve 9.

[0057] The above are only preferred embodiments of the present invention. It should be pointed out that, for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A vacuum system for a silicon carbide furnace, comprising a rotary vane oil pump, It is characterized in that The rotary vane oil pump is connected to a first vacuum pumping pipeline and a second vacuum pumping pipeline through a three-way joint, and the first vacuum pumping pipeline and the second vacuum pumping pipeline are both connected to the silicon carbide furnace cavity; The first vacuum pumping pipeline runs from the silicon carbide furnace chamber to the rotary vane oil pump, passing through the exhaust mechanism and the first high vacuum angle valve in sequence; The second vacuum pumping pipeline runs from the silicon carbide furnace chamber to the rotary vane oil pump, passing through a gate valve, a molecular pump and a second high vacuum angle valve in sequence; The silicon carbide furnace cavity is connected to a detection pipeline, and a Pirani vacuum gauge and an ionization gauge vacuum gauge are installed on the detection pipeline.

2. A vacuum system for a silicon carbide furnace according to claim 1, Features: When vacuuming, first open the rotary vane oil pump, open the first high vacuum angle valve, and the gas in the silicon carbide furnace cavity is pumped out by the rotary vane oil pump through the first vacuum pipeline; When the Pirani vacuum gauge reading reaches above 5Pa, close the first high vacuum angle valve; at the same time, open the gate valve, molecular pump, and second high vacuum angle valve, and the gas in the silicon carbide furnace cavity is pumped out through the second vacuum pipeline by the rotary vane oil pump. When the ionization gauge vacuum gauge reading is ≤5x10^-4Pa and tends to stabilize, close the gate valve, molecular pump and the second high vacuum angle valve.

3. The vacuum system of a silicon carbide furnace according to claim 1, Features: Pressure maintenance method: after vacuuming, when the vacuum degree in the silicon carbide furnace chamber is stable within 5x10^-4Pa, close the gate valve, molecular pump, and the second high vacuum angle valve to maintain the pressure. Determine the leakage rate after 24 hours, which is required to be ≤10Pa / 24h; If the leakage rate exceeds the range, use a vacuum leak detector to check whether there are leaks in each connection part. If there are leaks, check the cause. After the problem is solved, reassemble, repeat the vacuuming steps, re-vacuum, and re-maintain the pressure. If the value is within the specified range, it is qualified.

4. The vacuum system of a silicon carbide furnace according to claim 1, Features: The exhaust mechanism comprises a positive pressure detection valve, the positive pressure detection valve comprises an exhaust port, and the exhaust port is connected to an auxiliary vacuum cover plate for closing the exhaust port through an adjusting screw; An adjusting spring is sleeved on the outer periphery of the adjusting screw, and the adjusting spring is clamped between the exhaust port and the auxiliary vacuum cover plate.

5. The vacuum system of a silicon carbide furnace according to claim 1, Features: Micro-positive pressure test method: close the first high vacuum angle valve, the plug valve, the molecular pump and the second high vacuum angle valve; tighten the adjustment screw, and then fill the Ar gas from the Ar gas inlet at the bottom of the silicon carbide furnace chamber; When the Pirani vacuum gauge reading is close to 120KPa, the accuracy requirement is ±1Kpa, and the auxiliary vacuum cover has not popped open, loosen the adjusting screw to evenly reduce the clamping force of the adjusting spring so that the auxiliary vacuum cover just pops open and the excess pressure gas in the cavity leaks out from here.

6. The vacuum system of a silicon carbide furnace according to claim 1, Features: An exhaust needle valve is connected to the first vacuum pumping pipeline, and the exhaust port of the exhaust needle valve is connected to the first main branch through a branch pipe; The exhaust needle valve comprises a mounting flange mounted to the first vacuum pumping pipeline, one end of the exhaust needle valve adjacent to the inner cavity of the silicon carbide furnace is connected to the positive pressure detection valve, and one end of the exhaust needle valve away from the inner cavity of the silicon carbide furnace is connected to the first high vacuum angle valve; The branch pipe is connected to an end of the first high vacuum angle valve adjacent to the rotary vane oil pump.

7. The vacuum system of a silicon carbide furnace according to claim 1, Features: When the silicon carbide furnace cavity is undergoing crystal growth, the pressure control method in the silicon carbide furnace cavity is as follows: after the vacuum is evacuated to the specified vacuum pressure, Ar gas is filled in from the Ar gas inlet at the bottom of the silicon carbide furnace cavity, and the exhaust needle valve is opened. The Ar gas entering from the bottom of the cavity is pumped out by the rotary vane oil pump along the branch pipe through the main branch. At this time, the first high vacuum angle valve is closed. Since the opening size of the exhaust needle valve can be automatically adjusted, the system automatically controls and adjusts to the pressure specified by the customer according to the process requirements, and the pressure control accuracy is required to be ±0.2Kpa.

8. The vacuum system of a silicon carbide furnace according to claim 1, Features: When the crystal growth is completed and before the crystal is taken out of the furnace, the pneumatic valve on the side wall of the silicon carbide furnace cavity is opened to keep the pressure inside the silicon carbide furnace cavity consistent with the atmospheric pressure outside.

9. A vacuum system for a silicon carbide furnace, comprising a rotary vane oil pump, It is characterized in that The rotary vane oil pump is connected to a first vacuum pumping pipeline and a second vacuum pumping pipeline through a three-way joint, and the first vacuum pumping pipeline and the second vacuum pumping pipeline are both connected to the silicon carbide furnace cavity; The first vacuum pumping pipeline runs from the silicon carbide furnace chamber to the rotary vane oil pump, passing through a positive pressure detection valve, an exhaust needle valve, and a first high vacuum angle valve in sequence; The positive pressure detection valve comprises an exhaust port, the exhaust port is connected to an auxiliary vacuum cover plate for closing the exhaust port through an adjusting screw, an adjusting spring is sleeved around the outer periphery of the adjusting screw, and the adjusting spring is clamped between the exhaust port and the auxiliary vacuum cover plate; The exhaust port of the exhaust needle valve is connected to the first main branch through a branch pipe; the exhaust needle valve includes a mounting flange installed on the first vacuum pipeline, one end of the exhaust needle valve adjacent to the inner cavity of the silicon carbide furnace is connected to the positive pressure detection valve, and one end of the exhaust needle valve away from the inner cavity of the silicon carbide furnace is connected to the first high vacuum angle valve; the branch pipe is connected to one end of the first high vacuum angle valve adjacent to the rotary vane oil pump; The second vacuum pumping pipeline runs from the silicon carbide furnace chamber to the rotary vane oil pump, passing through a gate valve, a molecular pump and a second high vacuum angle valve in sequence; The silicon carbide furnace cavity is connected to a detection pipeline, and a Pirani vacuum gauge and an ionization gauge vacuum gauge are installed on the detection pipeline; When vacuuming, first open the rotary vane oil pump, open the first high vacuum angle valve, and the gas in the silicon carbide furnace cavity is pumped out by the rotary vane oil pump through the first vacuum pipeline; When the Pirani vacuum gauge reading reaches above 5Pa, close the first high vacuum angle valve; at the same time, open the gate valve, molecular pump, and second high vacuum angle valve, and the gas in the silicon carbide furnace cavity is pumped out through the second vacuum pipeline by the rotary vane oil pump. When the ionization gauge vacuum gauge reading is ≤5x10^-4Pa and tends to stabilize, close the gate valve, molecular pump and the second high vacuum angle valve.

10. A vacuum system for a silicon carbide furnace according to claim 9, Features: Pressure maintenance method: after vacuuming, when the vacuum degree in the silicon carbide furnace chamber is stable within 5x10^-4Pa, close the gate valve, molecular pump, and the second high vacuum angle valve to maintain the pressure. Determine the leakage rate after 24 hours, which is required to be ≤10Pa / 24h; if the leakage rate exceeds the range, use a vacuum leak detector to check whether there is leakage in each connection part. If there is leakage, check the cause. After the problem is solved, reassemble, repeat the vacuuming steps, re-vacuum, and re-maintain the pressure. If the value is within the specified range, it is qualified; Micro-positive pressure test method: close the first high vacuum angle valve, plug valve, molecular pump and the second high vacuum angle valve; tighten the adjusting screw, and then fill Ar gas from the Ar gas inlet at the bottom of the silicon carbide furnace chamber; when the Pirani vacuum gauge reading is close to 120KPa, the accuracy is required to be ±1Kpa, and the auxiliary vacuum cover has not popped open, loosen the adjusting screw to evenly reduce the clamping force of the adjusting spring, so that the auxiliary vacuum cover just pops open, and the excess pressure gas in the chamber leaks out from here; When the silicon carbide furnace cavity is undergoing crystal growth, the pressure control method in the silicon carbide furnace cavity is as follows: after the vacuum is evacuated to the specified vacuum pressure, Ar gas is filled in from the Ar gas inlet at the bottom of the silicon carbide furnace cavity, and the exhaust needle valve is opened. The Ar gas entering from the bottom of the cavity is pumped out by the rotary vane oil pump along the branch pipe through the main branch. At this time, the first high vacuum angle valve is closed. Since the opening size of the exhaust needle valve can be automatically adjusted, the system automatically controls and adjusts to the pressure specified by the customer according to the process requirements, and the pressure control accuracy is required to be ±0.2Kpa.