Tunnel engineering structure deformation monitoring device and monitoring system thereof

By designing movable vehicle body and inkjet marking system in tunnel engineering, the problem of tunnel deformation in the prior art cannot be accurately positioned, and monitoring efficiency and construction progress are improved.

CN118896561AInactive Publication Date: 2024-11-05JIANGXI RUNLIN ENG QUALITY INSPECTION CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411400005.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-09
Publication Date
2024-11-05
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing tunnel deformation detection system cannot achieve accurate positioning, making it difficult for staff to quickly find the deformation position, reducing monitoring efficiency and construction progress.

Method used

A tunnel engineering structure deformation monitoring device is designed, including a movable vehicle body, a rotating mechanism, a lifting component, a telescopic component, an inkjet component and a recording component. By marking the deformation position in the inkjet, the precise positioning and rapidity of the deformation position of the tunnel is achieved. Find.

Benefits of technology

Accurate positioning of the deformation position of the tunnel is achieved, allowing staff to follow up on the equipment to deal with deformation in a timely manner during monitoring, and improve monitoring efficiency and construction progress.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118896561A_ABST
    Figure CN118896561A_ABST
Patent Text Reader

Abstract

The invention relates to the field of engineering monitoring, and particularly discloses a tunnel engineering structure deformation monitoring device and a monitoring system thereof.The tunnel engineering structure deformation monitoring device comprises a movable vehicle body, a bearing block is arranged on the vehicle body, a rotating mechanism is arranged on the bearing block, a rotating cylinder is connected to the bearing block through a bearing, and the rotating mechanism is used for driving the rotating cylinder to rotate; a driving mechanism is arranged on the rotary drum, and a lifting assembly connected with the driving mechanism is arranged on the rotary drum. According to the tunnel deformation monitoring device, the ink jet assembly can be used for jetting ink to the deformation position for marking, accurate positioning of the tunnel deformation position is achieved, position locking of the deformation position can be achieved, a worker can quickly find the tunnel deformation position, the worker does not need to follow up equipment in time to deal with deformation during monitoring, man-machine separation is achieved, and the working efficiency is improved. The method is beneficial to unified treatment of deformation structures by workers in the later period, rapid and unified monitoring of tunnel structures is facilitated, the monitoring efficiency of the tunnel deformation structures is improved, and the construction progress is accelerated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of engineering monitoring, and in particular to a tunnel engineering structure deformation monitoring device and a monitoring system thereof. Background Art

[0002] A tunnel is a passage dug under the ground, in a mountain or under other obstacles. It is mainly used for transportation, water conservancy irrigation, pipeline laying and other purposes. Tunnel engineering is a complex civil engineering project. Due to the characteristics of tunnel engineering projects such as high concealment, complex technology, long construction period and limited working space, problems such as lining cracks, segment cracks and tunnel leakage may occur during the construction process. Some structural parts are more prone to deformation. Therefore, long-term and continuous monitoring of the tunnel is required to provide guidance and assistance for the design and construction of subsequent tunnels, which is of great engineering construction significance.

[0003] In the existing patent CN215261652U, a tunnel deformation detection system is disclosed, which includes an arc-shaped plate, on which multiple lasers are evenly arranged in an arc shape, and the extension lines of the lasers intersect at the center O of the arc formed by the lasers, and the center O is on the central axis of the arc-shaped plate; multiple cameras are arranged on the arc-shaped plate and on both sides of the lasers; the focal plane of each camera is perpendicular to the radius of the arc-shaped plate at the installation position. The radial distance from the tunnel wall to the central axis of the arc-shaped plate of the same tunnel section can be quickly and accurately tested, and the test value directly reflects the tunnel profile value of the tunnel section, making the tunnel section deformation fitting more accurate and less error-prone. Compared with the laser section scanner, the test accuracy and efficiency are higher.

[0004] In the above structure, tunnel deformation can be monitored, but accurate positioning of the tunnel monitoring position cannot be achieved, which is not conducive to the staff finding the tunnel deformation position. During monitoring, the staff is required to follow the equipment, and it is difficult to separate man and machine. The staff needs to deal with the deformation in time, otherwise it will be difficult to find the tunnel deformation position later, which reduces the monitoring efficiency of tunnel deformation and reduces the construction progress.

[0005] Therefore, how to provide a tunnel engineering structure deformation monitoring device and a monitoring system thereof is a problem that those skilled in the art need to solve urgently. Summary of the invention

[0006] An object of the present invention is to provide a tunnel engineering structure deformation monitoring device and a monitoring system thereof. The tunnel engineering structure deformation monitoring device of the present invention comprises a movable vehicle body, a load-bearing block is arranged on the vehicle body, a rotating mechanism is arranged on the load-bearing block, a rotating drum is connected to a bearing on the load-bearing block, and the rotating mechanism is used to drive the rotating drum to rotate; The rotating drum is provided with a driving mechanism, the rotating drum is provided with a lifting assembly connected to the driving mechanism, the output end of the lifting assembly is provided with a telescopic assembly, and the telescopic assembly is provided with a monitoring assembly for monitoring the inner wall structure of the tunnel; An inkjet assembly is arranged on the vehicle body, an output end of the inkjet assembly is arranged on the monitoring assembly, a pushing assembly is arranged between the telescopic assembly and the inkjet assembly, and a recording assembly is arranged on the vehicle body and the load-bearing block; Among them, when the monitoring component detects the deformation of the tunnel structure, the telescopic component compresses and drives the pushing component to move, forcing the inkjet component to spray ink at the deformed part of the tunnel. At the same time, the recording component records the position where the inkjet component sprays ink to achieve quick search.

[0007] Preferably, the rotating mechanism comprises a motor 1 mounted on the load-bearing block, the output shaft of the motor 1 is connected to a driving gear, and the outer ring fixed sleeve of the rotating drum is provided with a driven gear meshing with the driving gear.

[0008] Preferably, the lifting assembly includes a rotating sleeve connected to the rotating drum by a bearing, the rotating sleeve is symmetrically arranged on the rotating drum, a threaded rod is connected to the internal thread of the rotating sleeve, the threaded rod threads through the rotating sleeve, and the telescopic assembly is arranged on the threaded rod.

[0009] Preferably, the driving mechanism comprises a second motor mounted on the rotating drum, the output shaft of the second motor is connected to a rotating gear one, the outer ring fixed sleeve of the rotating sleeve is provided with a rotating gear two meshing with the rotating gear one, and the two rotating gears two are meshed with each other.

[0010] Preferably, the telescopic assembly includes a cylinder body slidably arranged on the rotating drum, the cylinder body is arranged on the threaded rod, a load-bearing piston is arranged in the cylinder body, a push rod is arranged on the load-bearing piston, the monitoring assembly is arranged on the push rod, and a spring is arranged between the cylinder body and the monitoring assembly and is sleeved on the outer ring of the push rod.

[0011] Preferably, the monitoring assembly includes a horizontal plate arranged on the top rod, the free end of the spring is arranged on the horizontal plate, the horizontal plate is provided with an arc plate, the arc plate is provided with a plurality of mounting blocks, the bearings on the mounting blocks are connected to a monitoring roller for monitoring the inner wall of the tunnel, and the monitoring roller is in contact with the inner wall of the tunnel.

[0012] Preferably, the inkjet assembly includes an ink storage tank arranged on the vehicle body, the ink storage tank is provided with an inlet pipe, the ink storage tank is provided with a push cylinder connected to the inlet pipe, the push cylinder is connected to an outlet pipe, the transverse plate is provided with an ink storage tube connected to the outlet pipe, and an inkjet head is installed on the ink storage tube.

[0013] Preferably, the pushing assembly includes a partition arranged in the pushing cylinder, the partition separates the pushing cylinder, a pushing rod passing through the partition is arranged on the partition, a pushing plug matched with the pushing cylinder is arranged at the end of the pushing rod, an ink pushing plug matched with the pushing cylinder is arranged at the other end of the pushing rod, and a connecting pipe connected with the cylinder body is arranged on the pushing cylinder near the pushing plug.

[0014] Preferably, the recording component includes a support rod arranged on the vehicle body and the load-bearing block, the support rod is provided with a photoelectric sensor, the support rod is connected to a shaft rod by a bearing located at the load-bearing block, the shaft rod and the wheel axle of the vehicle body are both fixedly sleeved with a signal gear compatible with the photoelectric sensor, wherein the signal gear located at the shaft rod is meshed with the driven gear.

[0015] A monitoring system for a tunnel engineering structure deformation monitoring device is also proposed. When monitoring the engineering structure of the tunnel, the vehicle body is moved into the tunnel to fully monitor the inner wall of the tunnel, the vehicle body is stopped, and the driving mechanism is started. The driving mechanism drives the lifting component to move, so that the lifting component drives the telescopic component and the monitoring component to move, so that the monitoring component contacts the inner wall of the tunnel; The rotating mechanism is started, and the rotating mechanism drives the rotating drum to rotate, and the rotating drum drives the driving mechanism, the lifting assembly, the telescopic assembly and the monitoring assembly to move, so that the monitoring assembly rotates to monitor the inner wall structure of the tunnel, and the recording assembly records the distance data of the vehicle body moving and the angle data of the monitoring assembly rotating; When the monitoring component detects that the inner wall structure of the tunnel is normal, the vehicle body continues to move forward to monitor the next location of the inner wall structure of the tunnel; when the monitoring component detects that the inner wall structure of the tunnel is deformed, unevenness will appear. When the monitoring component runs to the convex surface, the convex surface exerts a force on the monitoring component, so that the monitoring component drives the telescopic component to compress, and the telescopic component drives the pushing component to move, forcing the inkjet component to spray ink to the deformed location to form a mark. After the monitoring component passes the deformed location, the monitoring component returns to normal, the telescopic component drives the pushing component to return to normal, and the inkjet component prepares ink again to mark the next location, and the recording component records the position and angle data. Repeat the above steps to complete comprehensive monitoring of the structure at every location in the tunnel. At the same time, mark the deformed structure and record the location so that the staff can quickly find the deformed location.

[0016] The beneficial effects of the present invention are as follows: When the present invention monitors the engineering structure of the tunnel, the inner wall of the tunnel is fully monitored, the driving mechanism is started to drive the lifting assembly to move, so that the lifting assembly drives the telescopic assembly and the monitoring assembly to move, and the monitoring assembly contacts the inner wall of the tunnel; the inner wall of the tunnel is monitored at this position, the rotating mechanism is started to drive the rotating drum to rotate, and the rotating drum drives the driving mechanism, the lifting assembly, the telescopic assembly and the monitoring assembly to move, so that the monitoring assembly rotates to monitor the inner wall structure of the tunnel, and at the same time the recording assembly records the distance data of the movement of the vehicle body and the angle data of the rotation of the monitoring assembly; when the monitoring assembly detects that the structure of the inner wall of the tunnel is normal, the vehicle body continues to move forward to monitor the next location of the inner wall structure of the tunnel; when the monitoring assembly detects that the structure of the inner wall of the tunnel is deformed, the deformation causes an uneven structure to appear on the inner wall of the tunnel, and when the monitoring assembly moves to the convex surface, the convex surface exerts a force on the monitoring assembly, so that the monitoring assembly drives the telescopic assembly to compress, and the telescopic assembly drives the pushing assembly to move, forcing the inkjet assembly The monitoring component sprays ink to the deformation location to form a mark. When the monitoring component passes the deformation location, the monitoring component returns to normal, the telescopic component drives the pushing component to return to normal, and the inkjet component prepares ink again to mark the next location, and records the component recording position and angle data at the same time; repeat the above steps to complete the comprehensive monitoring of the structure of each location in the tunnel, and mark the deformed structure at the same time, and record the position, so that the staff can quickly find the deformation location; in summary, a tunnel engineering structure deformation monitoring device and its monitoring system of the present application can use the inkjet component to spray ink to the deformation location for marking, so as to realize the precise positioning of the tunnel deformation location, and can lock the position of the deformation location, which is beneficial for the staff to quickly find the tunnel deformation location, and during monitoring, there is no need for the staff to follow up the equipment in time to handle the deformation, so as to realize the separation of man and machine, which is beneficial for the later staff to uniformly handle the deformed structure, and is beneficial for the rapid and unified monitoring of the tunnel structure, so as to improve the monitoring efficiency of the tunnel deformation structure and improve the construction progress. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings: Figure 1 It is a three-dimensional structure entity diagram of the present invention; Figure 2 It is a structural entity diagram of the rotating mechanism of the present invention; Figure 3 It is a partial structural entity diagram of the present invention; Figure 4 It is a structural entity diagram of the driving mechanism of the present invention; Figure 5 A diagram showing the positional relationship between the telescopic assembly and the monitoring assembly of the present invention; Figure 6 For the present invention Figure 5 The front view structural entity diagram; Figure 7 A structural entity diagram of the inkjet assembly of the present invention; Figure 8 A three-dimensional half-section view of the push cylinder of the present invention; Fig. 9 It is a structural entity diagram of the driving assembly of the present invention; Fig.10 A structural entity diagram of the recording component of the present invention.

[0018] In the figure: 1, vehicle body; 2, load-bearing block; 3, rotating mechanism; 301, motor 1; 302, driving gear; 303, driven gear; 4, rotating drum; 5, driving mechanism; 501, motor 2; 502, rotating gear 1; 503, rotating gear 2; 6, lifting assembly; 601, rotating sleeve; 602, threaded rod; 7, telescopic assembly; 701, cylinder body; 702, load-bearing piston; 703, push rod; 704, spring; 8, monitoring assembly; 801, horizontal plate; 802, curved plate; 803, mounting block; 804, monitoring roller; 9, inkjet assembly; 901, ink storage box; 902, inlet pipe; 903, push cylinder; 904, outlet pipe; 905, ink storage tube; 906, inkjet head; 10, push assembly; 1001, partition; 1002, push rod; 1003, push plug; 1004, ink push plug; 1005, connecting pipe; 11, recording assembly; 1101, support rod; 1102, photoelectric sensor; 1103, shaft; 1104, signal gear. DETAILED DESCRIPTION

[0019] The present invention will now be described in further detail with reference to the accompanying drawings. These drawings are simplified schematic diagrams, which only illustrate the basic structure of the present invention in a schematic manner, and therefore only show the components related to the present invention.

[0020] Embodiment 1: like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 , Figure 8 , Fig. 9 and Fig.10 As shown, a tunnel engineering structure deformation monitoring device of the present invention comprises a movable vehicle body 1, a load-bearing block 2 is arranged on the vehicle body 1, a rotating mechanism 3 is arranged on the load-bearing block 2, a rotating drum 4 is connected to a bearing on the load-bearing block 2, and the rotating mechanism 3 is used to drive the rotating drum 4 to rotate; The rotating drum 4 is provided with a driving mechanism 5, and the rotating drum 4 is provided with a lifting assembly 6 connected to the driving mechanism 5, and the output end of the lifting assembly 6 is provided with a telescopic assembly 7, and the telescopic assembly 7 is provided with a monitoring assembly 8 for monitoring the inner wall structure of the tunnel; An inkjet assembly 9 is provided on the vehicle body 1, the output end of the inkjet assembly 9 is provided on the monitoring assembly 8, a pushing assembly 10 is provided between the telescopic assembly 7 and the inkjet assembly 9, and a recording assembly 11 is provided on the vehicle body 1 and the load-bearing block 2; Among them, when the monitoring component 8 detects the deformation of the tunnel structure, the telescopic component 7 compresses and drives the pushing component 10 to move, forcing the inkjet component 9 to spray ink at the deformed part of the tunnel. At the same time, the recording component 11 records the position where the inkjet component 9 sprays ink, realizing quick search.

[0021] Working principle: when monitoring the engineering structure of the tunnel, the vehicle body 1 is moved into the tunnel, the inner wall of the tunnel is fully monitored, the vehicle body 1 is stopped, and the driving mechanism 5 is started. The driving mechanism 5 drives the lifting component 6 to move, so that the lifting component 6 drives the telescopic component 7 and the monitoring component 8 to move, and the monitoring component 8 contacts the inner wall of the tunnel; the inner wall of the tunnel is monitored at this position, and the rotating mechanism 3 is started. The rotating mechanism 3 drives the rotating drum 4 to rotate, and the rotating drum 4 drives the driving mechanism 5, the lifting component 6, the telescopic component 7 and the monitoring component 8 to move, so that the monitoring component 8 rotates to monitor the inner wall structure of the tunnel, and at the same time, the recording component 11 records the distance data of the vehicle body 1 and the angle data of the rotation of the monitoring component 8; when the monitoring component 8 detects that the structure of the inner wall of the tunnel is normal, the vehicle body 1 continues to move forward and monitors the next location of the inner wall structure of the tunnel; when the monitoring component 8 detects that the structure of the inner wall of the tunnel is deformed, the deformation causes an uneven structure to appear on the inner wall of the tunnel. When the monitoring component 8 runs to the convex surface, the convex surface exerts a force on the monitoring component 8, so that the monitoring component 8 drives the telescopic component 7 to press The telescopic component 7 drives the pushing component 10 to move, forcing the inkjet component 9 to spray ink to the deformed part to form a mark. When the monitoring component 8 passes the deformed part, the monitoring component 8 returns to normal, the telescopic component 7 drives the pushing component 10 to return to normal, and the inkjet component 9 prepares ink again to mark the next part, and the recording component 11 records the position and angle data; repeat the above steps to complete the comprehensive monitoring of the structure of each part of the tunnel, and mark the deformed structure at the same time, and record the position, so that the staff can quickly find the deformation position; in summary, a tunnel engineering structure deformation monitoring device and its monitoring system of the present application can use the inkjet component 9 to spray ink to the deformation part for marking, realize the precise positioning of the tunnel deformation position, and can lock the position of the deformation part, which is beneficial for the staff to quickly find the tunnel deformation position, and during monitoring, there is no need for the staff to follow up the equipment in time to handle the deformation, so as to realize the separation of man and machine, which is beneficial for the later staff to uniformly handle the deformed structure, and is beneficial for the rapid and unified monitoring of the tunnel structure, so as to improve the monitoring efficiency of the tunnel deformation structure and improve the construction progress.

[0022] Embodiment 2: like Figure 1 and Figure 2 As shown, a tunnel engineering structure deformation monitoring device of the present invention, the rotating mechanism 3 includes a motor 301 installed on the load-bearing block 2, the output shaft of the motor 301 is connected to the driving gear 302, and the outer ring fixed sleeve of the rotating drum 4 is provided with a driven gear 303 meshing with the driving gear 302.

[0023] like Figure 3 and Figure 4 As shown, a tunnel engineering structure deformation monitoring device of the present invention, the lifting component 6 includes a rotating sleeve 601 connected to the rotating drum 4 by a bearing, the rotating sleeve 601 is symmetrically arranged on the rotating drum 4, the rotating sleeve 601 is internally threadedly connected to a threaded rod 602, the threaded rod 602 threads through the rotating sleeve 601, and the telescopic component 7 is arranged on the threaded rod 602.

[0024] like Figure 3 and Figure 4 As shown, a tunnel engineering structure deformation monitoring device of the present invention, the driving mechanism 5 includes a motor 2 501 installed on a rotating drum 4, the output shaft of the motor 2 501 is connected to a rotating gear 1 502, the outer ring fixed sleeve of the rotating sleeve 601 is provided with a rotating gear 2 503 meshing with the rotating gear 1 502, and the two rotating gears 2 503 are meshed.

[0025] like Figure 3 , Figure 5 , Figure 6 and Figure 8 As shown, a tunnel engineering structure deformation monitoring device of the present invention, the telescopic component 7 includes a cylinder body 701 slidably arranged on a rotating drum 4, the cylinder body 701 is arranged on a threaded rod 602, a load-bearing piston 702 is arranged in the cylinder body 701, a push rod 703 is arranged on the load-bearing piston 702, a monitoring component 8 is arranged on the push rod 703, and a spring 704 is arranged between the cylinder body 701 and the monitoring component 8 and is sleeved on the outer ring of the push rod 703.

[0026] like Figure 1 , Figure 3 , Figure 5 and Figure 6 As shown, a tunnel engineering structure deformation monitoring device of the present invention, the monitoring component 8 includes a horizontal plate 801 arranged on the top rod 703, the free end of the spring 704 is arranged on the horizontal plate 801, the horizontal plate 801 is provided with an arc plate 802, the arc plate 802 is provided with a plurality of mounting blocks 803, the mounting blocks 803 are connected to bearings with monitoring rollers 804 for monitoring the inner wall of the tunnel, and the monitoring rollers 804 are in contact with the inner wall of the tunnel.

[0027] like Figure 1 , Figure 3 , Figure 7 and Figure 8 As shown, a tunnel engineering structure deformation monitoring device of the present invention, the inkjet assembly 9 includes an ink storage box 901 arranged on the vehicle body 1, the ink storage box 901 is provided with an inlet pipe 902, the ink storage box 901 is provided with a push cylinder 903 connected with the inlet pipe 902, the push cylinder 903 is connected with an outlet pipe 904, the cross plate 801 is provided with an ink storage tube 905 connected with the outlet pipe 904, the ink storage tube 905 is installed with an inkjet head 906, and both the inlet pipe 902 and the outlet pipe 904 are installed with a one-way valve.

[0028] like Figure 8 and Fig. 9 As shown, a tunnel engineering structure deformation monitoring device of the present invention, the pushing component 10 includes a partition 1001 arranged in the pushing cylinder 903, the partition 1001 separates the pushing cylinder 903, a pushing rod 1002 penetrating the partition 1001 is arranged on the partition 1001, a pushing plug 1003 adapted to the pushing cylinder 903 is arranged at the end of the pushing rod 1002, and an ink pushing plug 1004 adapted to the pushing cylinder 903 is arranged at the other end of the pushing rod 1002, and a connecting pipe 1005 connected to the cylinder body 701 is arranged on the pushing cylinder 903 near the pushing plug 1003, and the connecting pipe 1005 is a hose.

[0029] like Figure 1 , Figure 2 and Fig.10 As shown, a tunnel engineering structure deformation monitoring device of the present invention, the recording component 11 includes a support rod 1101 arranged on the vehicle body 1 and the load-bearing block 2, a photoelectric sensor 1102 is arranged on the support rod 1101, and the photoelectric sensor 1102 is connected to the control system to realize data acquisition and recording, and a shaft 1103 is connected to the bearing at the load-bearing block 2 on the support rod 1101, and a signal gear 1104 compatible with the photoelectric sensor 1102 is fixedly sleeved on the shaft 1103 and the axle of the vehicle body 1, and a notch is opened on the signal gear 1104, wherein the signal gear 1104 located at the shaft 1103 is meshed with the driven gear 303.

[0030] Working principle: When monitoring the engineering structure of a tunnel, the vehicle body 1 is moved into the tunnel to fully monitor the inner wall of the tunnel, so that the vehicle body 1 runs from one end of the tunnel to the other end of the tunnel, monitors a certain position in the tunnel, and stops the vehicle body 1 at that position; The height of the horizontal plate 801, the arc plate 802, the mounting block 803 and the monitoring roller 804 is adjusted so that the monitoring roller 804 is adapted to the inner wall of the tunnel, and the motor 2 501 is started. The output shaft of the motor 2 501 rotates to drive the rotating gear 1 502 to rotate, and the rotating gear 1 502 drives the two rotating gears 2 503 to rotate, so that the two rotating sleeves 601 rotate, and the rotating sleeve 601 forces the threaded rod 602 to move up and down, so that the cylinder body 701 moves up and down in the rotating drum 4, and the cylinder body 701 drives the spring 704 and the push rod 703 to move up and down, forcing the horizontal plate 801, the arc plate 802, the mounting block 803 and the monitoring roller 804 to move up and down until the monitoring roller 804 contacts the inner wall of the tunnel, thereby achieving the adjustment of the monitoring roller 804; During monitoring, the motor 301 is started, the output shaft of the motor 301 rotates to drive the driving gear 302 to rotate, the driving gear 302 rotates to drive the driven gear 303 to rotate, the driven gear 303 drives the rotating drum 4 to rotate, the rotating drum 4 drives the driving mechanism 5, the lifting assembly 6, the telescopic assembly 7 and the monitoring assembly 8 to rotate synchronously, at this time, the monitoring roller 804 rolls on the inner wall of the tunnel, at this time, the photoelectric sensor 1102 collects data from the signal gear 1104, records the number of revolutions of the wheel axle of the vehicle body 1, i.e., the corresponding running distance of the vehicle body 1, and records the angle data of the rotating drum 4 and the monitoring roller 804 rotating at the same position; When the monitoring roller 804 is in normal contact with the inner wall of the tunnel, it indicates that the structure of the inner wall of the tunnel is normal and there is no deformation. The vehicle body 1 continues to move forward to monitor the next location of the inner wall structure of the tunnel. When the monitoring roller 804 detects that the inner wall structure of the tunnel is deformed, an uneven structure will appear due to the deformation. When the monitoring roller 804 runs to the convex surface, the convex surface exerts a force on the monitoring roller 804. The monitoring roller 804 transmits the force to the mounting block 803, the arc plate 802 and the cross plate 801, so that the cross plate 801 generates a force to compress the spring 704, forcing the spring 704 to compress. At the same time, the cross plate 801 generates a force on the push rod 703, and the push rod 703 drives the load-bearing piston 7 02 moves in the cylinder 701 to compress the gas in the cylinder 701, so that the gas in the cylinder 701 enters one end of the push cylinder 903 through the connecting pipe 1005, so that the gas pressure in the push cylinder 903 increases, forcing the gas to drive the push plug 1003 to move, and the push plug 1003 drives the push rod 1002 to slide on the partition 1001, forcing the push rod 1002 to drive the ink push plug 1004 to move, and the ink push plug 1004 drives the ink inside the push cylinder 903 to move, forcing the ink to enter the ink storage tube 905 through the outlet tube 904. Under the action of pressure, the excess ink in the ink storage tube 905 is ejected to the deformation of the tunnel structure through the inkjet head 906 to form a mark; As the monitoring roller 804 is rotating, after the monitoring roller 804 passes through the convex surface, the convex surface no longer acts on the monitoring roller 804, and the monitoring roller 804 contacts the inner wall of the tunnel normally. The cross plate 801, the arc plate 802, the mounting block 803 and the monitoring roller 804 retreat. Under the action of the spring 704, the cross plate 801 is forced to drive the push rod 703 to retreat. The spring 704 returns to its original state, forcing the push rod 703 to retreat, driving the load-bearing piston 702 to retreat, so that the load-bearing piston 702 moves in the cylinder body 701, so that the cylinder body 701 is The gas pressure decreases, so that the gas in the push cylinder 903 enters the cylinder body 701 through the connecting pipe 1005, so that the push plug 1003 in the push cylinder 903 retreats, and the push plug 1003 drives the push rod 1002 to retreat, so that the push rod 1002 drives the ink push plug 1004 to retreat, and the volume of the ink end in the push cylinder 903 increases, and the pressure decreases. Through the action of the introduction pipe 902 and the one-way valve, the ink in the ink storage box 901 enters the push cylinder 903, so as to prepare for the next ink marking and replenish the ink in time; Repeat the above steps to complete the monitoring of each structure of the tunnel, thereby realizing comprehensive and unified monitoring. At the same time, the photoelectric sensor 1102 and the signal gear 1104 are used to record the angle data and position data, so that the staff can quickly find the deformation position.

[0031] Embodiment three: like Figure 1 , Figure 2 , Figure 3 , Figure 4 , Figure 5 , Figure 6 , Figure 7 , Figure 8 , Fig. 9 and Fig.10 As shown, the present invention proposes a monitoring system for a tunnel engineering structure deformation monitoring device. When monitoring the engineering structure of the tunnel, the vehicle body 1 is moved into the tunnel to fully monitor the inner wall of the tunnel. The vehicle body 1 is stopped and the driving mechanism 5 is started. The driving mechanism 5 drives the lifting component 6 to move, so that the lifting component 6 drives the telescopic component 7 and the monitoring component 8 to move, so that the monitoring component 8 contacts the inner wall of the tunnel. The rotating mechanism 3 is started, and the rotating mechanism 3 drives the rotating drum 4 to rotate, and the rotating drum 4 drives the driving mechanism 5, the lifting assembly 6, the telescopic assembly 7 and the monitoring assembly 8 to move, so that the monitoring assembly 8 rotates to monitor the inner wall structure of the tunnel, and at the same time, the recording assembly 11 records the distance data of the vehicle body 1 and the angle data of the monitoring assembly 8; When the monitoring component 8 detects that the inner wall structure of the tunnel is normal, the vehicle body 1 continues to move forward and monitors the next location of the inner wall structure of the tunnel; when the monitoring component 8 detects that the inner wall structure of the tunnel is deformed, unevenness will appear. When the monitoring component 8 runs to the convex surface, the convex surface exerts a force on the monitoring component 8, so that the monitoring component 8 drives the telescopic component 7 to compress, and the telescopic component 7 drives the pushing component 10 to move, forcing the inkjet component 9 to spray ink to the deformed location to form a mark. After the monitoring component 8 passes the deformed location, the monitoring component 8 returns to normal, the telescopic component 7 drives the pushing component 10 to return to normal, and the inkjet component 9 prepares ink again to mark the next location, and the recording component 11 records the position and angle data at the same time; Repeat the above steps to complete comprehensive monitoring of the structure at every location in the tunnel. At the same time, mark the deformed structure and record the location so that the staff can quickly find the deformed location.

[0032] Working principle: When monitoring the engineering structure of a tunnel, the vehicle body 1 is moved into the tunnel to fully monitor the inner wall of the tunnel. The vehicle body 1 is stopped and the driving mechanism 5 is started. The driving mechanism 5 drives the lifting component 6 to move, so that the lifting component 6 drives the telescopic component 7 and the monitoring component 8 to move, so that the monitoring component 8 contacts the inner wall of the tunnel. The rotating mechanism 3 is started, and the rotating mechanism 3 drives the rotating drum 4 to rotate, and the rotating drum 4 drives the driving mechanism 5, the lifting assembly 6, the telescopic assembly 7 and the monitoring assembly 8 to move, so that the monitoring assembly 8 rotates to monitor the inner wall structure of the tunnel, and at the same time, the recording assembly 11 records the distance data of the vehicle body 1 and the angle data of the monitoring assembly 8; When the monitoring component 8 detects that the inner wall structure of the tunnel is normal, the vehicle body 1 continues to move forward and monitors the next location of the inner wall structure of the tunnel; when the monitoring component 8 detects that the inner wall structure of the tunnel is deformed, unevenness will appear. When the monitoring component 8 runs to the convex surface, the convex surface exerts a force on the monitoring component 8, so that the monitoring component 8 drives the telescopic component 7 to compress, and the telescopic component 7 drives the pushing component 10 to move, forcing the inkjet component 9 to spray ink to the deformed location to form a mark. After the monitoring component 8 passes the deformed location, the monitoring component 8 returns to normal, the telescopic component 7 drives the pushing component 10 to return to normal, and the inkjet component 9 prepares ink again to mark the next location, and the recording component 11 records the position and angle data at the same time; Repeat the above steps to complete comprehensive monitoring of the structure at every location in the tunnel. At the same time, mark the deformed structure and record the location so that the staff can quickly find the deformed location.

[0033] The setting of the rotating mechanism 3 provides a driving force to realize the rotation effect of the rotating drum 4, so that the rotating drum 4 drives the driving mechanism 5, the lifting assembly 6, the telescopic assembly 7 and the monitoring assembly 8 to move synchronously, so that the monitoring assembly 8 can fully monitor the inner wall of the tunnel top at a certain position; the setting of the lifting assembly 6 can realize the up and down movement of the cylinder 701, thereby realizing the height adjustment of the monitoring roller 804, so that the monitoring roller 804 contacts the inner wall of the tunnel, and realizes the monitoring effect on the inner wall of the tunnel. At the same time, the setting of the threaded rod 602 and the rotating sleeve 601 can make the cylinder 701 located at a certain position, so that the cylinder 701 is clamped at a certain position, and the cylinder 701 is improved. 01 stability; the setting of the driving mechanism 5 provides the rotational power of the rotating sleeve 601, so that the two threaded rods 602 move synchronously, thereby achieving the supporting effect on the cylinder body 701, improving the supporting capacity of the cylinder body 701, and making the cylinder body 701 move up and down stably, thereby improving the rationality of the device; the setting of the telescopic component 7 can transmit the force of the deformation to the monitoring component 8. When the tunnel structure is not deformed, the push rod 703 and the spring 704 do not work. When the tunnel structure is deformed, the push rod 703 drives the load-bearing piston 702 to compress the gas in the cylinder body 701, so that the pushing component 10 is in action. The setting of the spring 704 can make After monitoring the deformation, the push rod 703 and the load-bearing piston 702 are restored to their original positions, which improves the rationality of the device and prepares for the position monitoring of the next deformation. The setting of the monitoring component 8 can achieve contact with the inner wall of the tunnel, realize the monitoring of the inner wall of the tunnel, and transmit power when the inner wall of the tunnel is deformed. The setting of multiple monitoring rollers 804 can increase the monitoring area, improve the monitoring ability and monitoring range of the device, improve the monitoring efficiency, and realize comprehensive monitoring of the inner wall of the tunnel. The setting of the inkjet component 9 can realize the timely and rapid marking of the deformation position when the monitoring component 8 detects the deformation, which is conducive to the rapid detection of the staff. Quick search can be achieved to accurately locate the deformation position of the tunnel, and the position of the deformation can be locked. There is no need for staff to follow up the equipment in time to handle the deformation, so that the separation of man and machine is realized, which is conducive to the unified processing of the deformation structure by the staff in the later stage; the setting of the pushing component 10 can realize the ink spraying effect, realize the purpose of timely monitoring and timely marking, and at the same time, the ink in the ink storage box 901 can be introduced into the pushing cylinder 903, so that the ink can be replenished in time, and the continuous spraying ability of the ink is improved, so that the device forms a closed loop, and the deformation is continuously marked. When multiple deformations occur in the same area and the same position, the ink can be continuously sprayed to improve the marking ability;The setting of the recording component 11 can realize recording the distance traveled by the vehicle body 1, and at the same time record the rotation angle of the rotating drum 4 and the monitoring roller 804, thereby realizing the recording function of the position of the deformation, which is conducive to the staff to quickly find the deformation position of the tunnel, and can lock the position of the deformation, without the need for the staff to follow up the equipment to handle the deformation in time, realizing the separation of man and machine, and facilitating the unified processing of the deformation structure by the staff in the later stage, and facilitating the rapid and unified monitoring of the tunnel structure, improving the monitoring efficiency of the tunnel deformation structure, and improving the construction progress. ;

[0034] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A tunnel engineering structure deformation monitoring device, characterized in that: It comprises a movable vehicle body (1), the vehicle body (1) being provided with a load-bearing block (2), the load-bearing block (2) being provided with a rotating mechanism (3), a rotating drum (4) being connected to a bearing on the load-bearing block (2), and the rotating mechanism (3) being used to drive the rotating drum (4) to rotate; The rotating drum (4) is provided with a driving mechanism (5), the rotating drum (4) is provided with a lifting assembly (6) connected to the driving mechanism (5), the output end of the lifting assembly (6) is provided with a telescopic assembly (7), and the telescopic assembly (7) is provided with a monitoring assembly (8) for monitoring the inner wall structure of the tunnel; An inkjet assembly (9) is arranged on the vehicle body (1), an output end of the inkjet assembly (9) is arranged on the monitoring assembly (8), a pushing assembly (10) is arranged between the telescopic assembly (7) and the inkjet assembly (9), and a recording assembly (11) is arranged on the vehicle body (1) and the load-bearing block (2); When the monitoring component (8) detects deformation of the tunnel structure, the telescopic component (7) compresses and drives the pushing component (10) to move, forcing the inkjet component (9) to spray ink at the deformed part of the tunnel, while the recording component (11) records the position where the inkjet component (9) sprays ink, thereby achieving rapid search.

2. A tunnel engineering structure deformation monitoring device according to claim 1, characterized in that: The rotating mechanism (3) comprises a motor 1 (301) mounted on the load-bearing block (2), the output shaft of the motor 1 (301) being connected to a driving gear (302), and the outer ring fixed sleeve of the rotating drum (4) being provided with a driven gear (303) meshing with the driving gear (302).

3. A tunnel engineering structure deformation monitoring device according to claim 2, characterized in that: The lifting assembly (6) comprises a rotating sleeve (601) connected to the rotating drum (4) by a bearing, the rotating sleeve (601) being symmetrically arranged on the rotating drum (4), the rotating sleeve (601) being internally threadedly connected to a threaded rod (602), the threaded rod (602) threadedly passing through the rotating sleeve (601), and the telescopic assembly (7) being arranged on the threaded rod (602).

4. A tunnel engineering structure deformation monitoring device according to claim 3, characterized in that: The driving mechanism (5) comprises a second motor (501) mounted on the rotating drum (4); the output shaft of the second motor (501) is connected to a rotating gear (502); the outer ring fixed sleeve of the rotating sleeve (601) is provided with a second rotating gear (503) meshing with the first rotating gear (502); the two second rotating gears (503) are meshing with each other.

5. A tunnel engineering structure deformation monitoring device according to claim 4, characterized in that: The telescopic assembly (7) comprises a cylinder body (701) slidably arranged on the rotating drum (4); the cylinder body (701) is arranged on the threaded rod (602); a load-bearing piston (702) is arranged in the cylinder body (701); a push rod (703) is arranged on the load-bearing piston (702); the monitoring assembly (8) is arranged on the push rod (703); and a spring (704) sleeved on the outer ring of the push rod (703) is arranged between the cylinder body (701) and the monitoring assembly (8).

6. A tunnel engineering structure deformation monitoring device according to claim 5, characterized in that: The monitoring assembly (8) comprises a transverse plate (801) arranged on the top rod (703), the free end of the spring (704) being arranged on the transverse plate (801), an arc-shaped plate (802) being arranged on the transverse plate (801), a plurality of mounting blocks (803) being arranged on the arc-shaped plate (802), a monitoring roller (804) for monitoring the inner wall of a tunnel being connected to a bearing on the mounting block (803), and the monitoring roller (804) being in contact with the inner wall of the tunnel.

7. A tunnel engineering structure deformation monitoring device according to claim 6, characterized in that: The inkjet assembly (9) comprises an ink storage box (901) arranged on the vehicle body (1), the ink storage box (901) is provided with an inlet pipe (902), the ink storage box (901) is provided with a push cylinder (903) connected to the inlet pipe (902), the push cylinder (903) is connected to an outlet pipe (904), the transverse plate (801) is provided with an ink storage tube (905) connected to the outlet pipe (904), and an inkjet head (906) is installed on the ink storage tube (905).

8. The tunnel engineering structure deformation monitoring device according to claim 7, characterized in that: The pushing assembly (10) comprises a partition (1001) arranged in the pushing cylinder (903), the partition (1001) separating the pushing cylinder (903), a pushing rod (1002) penetrating the partition (1001) being arranged on the partition (1001), a pushing plug (1003) matching the pushing cylinder (903) being arranged at the end of the pushing rod (1002), an ink pushing plug (1004) matching the pushing cylinder (903) being arranged at the other end of the pushing rod (1002), and a connecting pipe (1005) connected to the cylinder body (701) being arranged on the pushing cylinder (903) near the pushing plug (1003).

9. A tunnel engineering structure deformation monitoring device according to claim 8, characterized in that: The recording assembly (11) comprises a support rod (1101) arranged on the vehicle body (1) and the load-bearing block (2), a photoelectric sensor (1102) being arranged on the support rod (1101), a shaft (1103) being connected to a bearing located at the load-bearing block (2) on the support rod (1101), a signal gear (1104) matching the photoelectric sensor (1102) being fixedly sleeved on the shaft (1103) and the axle of the vehicle body (1), wherein the signal gear (1104) located at the shaft (1103) is meshed with the driven gear (303).

10. The monitoring system of a tunnel engineering structure deformation monitoring device according to claim 9, characterized in that: When monitoring the engineering structure of a tunnel, the vehicle body (1) is moved into the tunnel to fully monitor the inner wall of the tunnel, the vehicle body (1) is stopped, and the driving mechanism (5) is started. The driving mechanism (5) drives the lifting component (6) to move, so that the lifting component (6) drives the telescopic component (7) and the monitoring component (8) to move, so that the monitoring component (8) contacts the inner wall of the tunnel; The rotating mechanism (3) is started, the rotating mechanism (3) drives the rotating drum (4) to rotate, and the rotating drum (4) drives the driving mechanism (5), the lifting assembly (6), the telescopic assembly (7) and the monitoring assembly (8) to move, so that the monitoring assembly (8) rotates to monitor the inner wall structure of the tunnel, and at the same time the recording assembly (11) records the distance data of the vehicle body (1) and the angle data of the rotation of the monitoring assembly (8); When the monitoring component (8) detects that the structure of the inner wall of the tunnel is normal, the vehicle body (1) continues to move forward and monitors the next location of the inner wall structure of the tunnel; when the monitoring component (8) detects that the structure of the inner wall of the tunnel is deformed, unevenness will appear. When the monitoring component (8) moves to a convex surface, the convex surface exerts a force on the monitoring component (8), so that the monitoring component (8) drives the telescopic component (7) to compress, and the telescopic component (7) drives the pushing component (10) to move, forcing the inkjet component (9) to spray ink to the deformed location to form a mark. When the monitoring component (8) passes the deformed location, the monitoring component (8) returns to normal, the telescopic component (7) drives the pushing component (10) to return to normal, and the inkjet component (9) prepares ink again to mark the next location, and at the same time the recording component (11) records the position and angle data; Repeat the above steps to complete comprehensive monitoring of the structure at every location in the tunnel. At the same time, mark the deformed structure and record the location so that the staff can quickly find the deformed location.

Citation Information

Patent Citations

  • Measurement method for tunnel deformation measurement and survey equipment thereof

    CN112525141A

  • Tunnel engineering deformation monitoring device

    CN113624155A

  • Movable tunnel section deformation monitoring device

    CN210833500U

  • Tunnel engineering deformation monitoring combined measuring point device

    CN210981172U

  • Tunnel engineering measuring device

    CN220398450U