Tree pit paving structure and operation method thereof

By designing a dynamically adjustable paving tree hole structure, the problem of traditional tree holes that need to destroy the paving structure when replacing plants is solved, the convenience and support flexibility of replacing plants are achieved, and the cost and environmental impact are reduced.

CN118901445AInactive Publication Date: 2024-11-08CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE
View PDF 7 Cites 0 Cited by

Patent Information

Application Number
CN202411166830.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When replacing plants, traditional paving tree hole structures need to destroy the surrounding paving structure, which covers a large area and lacks dynamic adjustment capabilities, resulting in uneconomic and unenvironmental protection.

Method used

A paving tree hole structure is designed, including paving units that can be closed or distant from each other, and dynamic adjustment is achieved through pulley tracks, allowing the area of ​​the plant hole to be adjusted without destroying the surrounding paving, making it easier to replace and support plants.

Benefits of technology

It realizes dynamic adjustment of the tree hole area without destroying the surrounding paving structure, which reduces the cost and environmental impact of plant replacement, and improves the flexibility and aesthetics of plant support.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118901445A_ABST
    Figure CN118901445A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of landscape design, and particularly discloses a paving plant pit structure, which comprises a planting pit and a plurality of paving units, the plurality of paving units can be mutually closed or far away from each other, and the inner side ends of the plurality of paving units are enclosed to form an opening. An operation method for paving the tree pit structure comprises the following steps that planting pits are dug, and trees are planted in the planting pits; a plurality of pulley rails are installed on the outer side of the top of the planting hole, and a plurality of paving units are installed on the pulley rails in a sliding mode; the paving units slide in the direction away from the center of the planting hole to expand the opening, tree planting or tree replacement is facilitated, and after tree planting or tree replacement is completed, the paving units slide in the direction close to the center of the planting hole to shrink the opening. According to the invention, the paving area range for paving the plant pits can be dynamically controlled according to actual requirements, and the occupied area is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of landscape design, and in particular to a paved tree pit structure and an operation method thereof. Background Art

[0002] Due to the requirements of the site and functions, large hard paved squares are required in urban paved sites, municipal squares and other places. However, due to the needs of people for sunshade and shade tolerance, large plants are often planted. At present, paved tree holes are mostly used to plant plants. However, due to different plant varieties, maintenance and other reasons, the survival rate of plants in paved tree holes is low, and plants often need to be replaced. However, traditional paved tree holes require the destruction of surrounding paved squares to replace plants, which requires a lot of manpower and material resources, is not economical, and is not environmentally friendly; new plants need to be supported, and the traditional support method of paved tree holes is relatively fixed, occupying a large area, and traditional tree holes are in a prohibited state and lack dynamic adjustment capabilities. Summary of the invention

[0003] The present invention provides a paved tree pit structure and an operation method thereof, aiming to dynamically control the area range of the paved tree pit according to actual needs and replace plants without damaging the surrounding paved structure.

[0004] The present invention is implemented by the following technical solutions: a paved tree pit structure, including a planting pit;

[0005] A paving unit, wherein the paving unit is located at the top of the planting hole, and a plurality of the paving units are provided. The plurality of paving units can be closed together or moved away from each other, and an opening is formed between the inner ends of the plurality of paving units, and the stem of the tree planted in the planting hole is located in the opening. When the plurality of paving units are closed together, the area of ​​the opening is reduced, and when the plurality of paving units are moved away from each other, the area of ​​the opening is expanded.

[0006] Compared with the prior art, the present invention has the following advantages and beneficial effects:

[0007] The multiple paving units in the present invention can be dynamically adjusted to close together and move away from each other. When it is necessary to plant plants, it is only necessary to move the multiple paving units away from each other. In this way, the visible area of ​​the planting hole is expanded without destroying the surrounding paving structure, which is convenient for excavating and replacing plants or planting plants. After the replacement or planting of plants is completed, the multiple paving units are closed together to achieve dynamic adjustment of the area range of the paved tree hole and reduce the exposed planting hole area. The area formed by the multiple paving units can also form an area that matches the ground after paving, and this area can be effectively used, such as as a shade area and as a road surface for pedestrians. In addition, this solution can avoid the increase in occupied area caused by excavating the planting hole, which affects the passage of people.

[0008] The present invention uses certain industrial designs and scientific combinations to dynamically control the tree hole structure according to site requirements. The construction organization is relatively simple and there is no need to consider whether to plant plants first or to pave the ground first. The present invention does not need to destroy the ground paving structure, but only needs to dynamically control the tree hole structure, that is, control the mutual closing or separation of multiple paving units, to adjust the size of the planting hole, thereby facilitating the planting, maintenance, replacement and other functions of the plants.

[0009] Furthermore, the paving unit includes a frame, and the inner side of the frame is a paving area.

[0010] Beneficial effects: The paving unit in this solution is a frame, which can reduce its own weight and facilitate transportation, and the inner side of the frame is a paving area, which is used to pave some materials in the paving area of ​​the frame according to actual needs, such as bricks, granite or poured concrete and other paving materials.

[0011] Furthermore, the inner side of the frame is a paving groove, the bottom of the frame is a closed end, and the paving groove is a paving area.

[0012] Beneficial effect: The paving groove in this solution is used to load paving materials, and the bottom of the frame is a closed end, which serves as a limit for the paving materials that are later installed on the inside of the frame, avoiding the paving materials from leaking out of the frame during on-site construction, thereby ensuring the tightness and stability of the connection between the paving materials and the frame.

[0013] Furthermore, when the plurality of paving units are closed together, the opening is in the shape of an opening that is closed on all sides.

[0014] Beneficial effect: In this solution, the opening formed after the multiple paving units are closed together is a closed opening, so that the planting area corresponding to the opening is closed, so that the area of ​​soil exposed outside is smaller, making the appearance of the entire paved tree pit structure more beautiful.

[0015] Furthermore, the opening is a rectangular opening, and four paving units are provided, and the four paving units are respectively located around the planting hole.

[0016] Beneficial effects: In this solution, the four paving units are located around the planting hole, which can make the structural shape of the paving unit simpler, easier to produce, and more beautiful.

[0017] Furthermore, a plurality of pulley tracks are arranged on the top and outside of the planting hole, and a plurality of the paving units are slidably matched with the pulley tracks.

[0018] Beneficial effect: The setting of the pulley track in this scheme can slide with the paving unit, thereby facilitating the sliding of the paving unit, allowing multiple paving units to move towards and away from each other, saving more effort when sliding the paving unit, and making the sliding position of the paving unit more precise.

[0019] Furthermore, a pulley unit is slidably fitted in the pulley track, and the pulley unit includes a rotating shaft, a connecting rod and two pulleys, the rotating shaft is located between the two pulleys and is rotatably connected to the pulleys, the connecting rod is vertically connected to the rotating shaft, the paving unit is connected to the connecting rod, the pulley is located in the pulley track and can slidably fit with the pulley track; flipping the paving unit can make the paving unit be in a vertical state or a horizontal state.

[0020] Beneficial effect: In this solution, the pulley and the pulley track slide together, which can drive multiple paving units to slide away from each other. Since the rotating shaft is rotatably connected to the two pulleys, and the paving unit is connected to the rotating shaft through a connecting rod, the paving unit can be flipped so that the paving unit can be flipped into a vertical or horizontal state.

[0021] In this solution, when construction is required, the paving unit is flipped into a vertical state and moved outward to expand the construction operation space. The paving unit flipped into a vertical state forms a protective fence, which can serve as a reminder and protection, and remind pedestrians not to enter the construction area.

[0022] Furthermore, a telescopic supporting rod is hingedly connected to the inner end of the paving unit, and the telescopic supporting rod can be rotated to support the tree trunk obliquely.

[0023] Beneficial effects: In this solution, the supporting telescopic rod can produce telescopic movement, and the extension length and flip angle of the supporting telescopic rod can be changed according to actual support needs, thereby playing an auxiliary supporting role for the plants planted in the planting hole.

[0024] Furthermore, it also includes a retaining wall, which is located inside the planting hole and is used to support the inner wall of the planting hole.

[0025] Beneficial effect: The setting of the retaining wall in this scheme can support and protect the side walls of the excavated planting holes, prevent the soil on the side walls of the planting holes from loosening and backfilling the planting holes, and further affect the excavation depth and area of ​​the planting holes, thereby ensuring that the trees can be planted smoothly in the planting holes.

[0026] An operating method of a paved tree pit structure comprises the following steps: excavating a planting hole and planting a tree in the planting hole; installing a plurality of pulley tracks on the outer side of the top of the planting hole, and slidingly installing a plurality of paving units in the paved tree pit structure on the pulley tracks respectively;

[0027] Slide the paving unit away from the center of the planting hole to expand the opening, which is convenient for planting or replacing trees. After the planting or replacing of trees is completed, slide multiple paving units toward the center of the planting hole to reduce the opening.

[0028] Beneficial effect: In an operating method of a paved tree pit structure in the present scheme, the paving units can be controlled to close together or move away from each other. When multiple paving units are moved away from each other, the exposed area of ​​the planting hole can be increased, thereby facilitating planting construction. When the planting is completed, the area can be reduced by closing the multiple paving units. In this way, the exposed area of ​​the planting hole is reduced. At this time, the area formed by the multiple paving units is convenient for pedestrians to pass or stand. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] The drawings described herein are used to provide a further understanding of the embodiments of the present invention, constitute a part of this application, and do not constitute a limitation of the embodiments of the present invention. In the drawings:

[0030] Figure 1 It is a plan view of a paved tree pit structure in a static state according to the present invention;

[0031] Figure 2 This is a vertical structural diagram of a paved tree pit structure in a static state according to the present invention;

[0032] Figure 3 This is an overall axonometric structural diagram of a paved tree pit structure in a static state according to the present invention;

[0033] Figure 4 A plan view of a paved tree pit structure in an open state according to the present invention;

[0034] Figure 5 This is a structural elevation diagram of a paved tree pit structure in an open state according to the present invention;

[0035] Figure 6 This is an overall axonometric structural diagram of a paved tree pit structure in an open state according to the present invention;

[0036] Figure 7 A plan view of a paved tree pit structure supporting state according to the present invention;

[0037] Figure 8 This is a structural elevation diagram of a paved tree pit structure in a supporting state according to the present invention;

[0038] Fig. 9 This is an overall axonometric structural diagram of a paved tree pit structure supporting state according to the present invention;

[0039] Fig.10 is a cross-sectional view of the border;

[0040] Fig.11 It is a structural schematic diagram of a frame, a pulley unit and a pulley track;

[0041] Fig.12 is a schematic structural diagram of a frame, a pulley unit and a pulley track in another embodiment;

[0042] Fig.13 A schematic diagram of the structure supporting the telescopic rod;

[0043] Fig.14 It is a top view of the cooperation between the clamp and the supporting telescopic rod.

[0044] Marks and corresponding parts names in the attached drawings:

[0045] Frame 1, paving groove 101, pulley 2, rotating shaft 201, connecting rod 202, nut 203, bracket 204, pulley track 3, supporting telescopic rod 4, supporting block 5, pile 501, retaining wall 6, planted trees 7, hoop 8, planting area a, paving area b, tree crown projection line c. DETAILED DESCRIPTION

[0046] In order to make the objectives, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with embodiments and drawings. The exemplary embodiments of the present invention and their description are only used to explain the present invention and are not intended to limit the present invention.

[0047] Example

[0048] like Figure 1 , Figure 2 and Figure 3 As shown, the present embodiment provides a paved tree hole structure, including a planting hole and a paving unit. The paving unit is located at the top of the planting hole, and a plurality of paving units are provided. The plurality of paving units can be closed together or moved away from each other. An opening is formed between the inner ends of the plurality of paving units, and the area corresponding to the bottom of the opening is the planting area a.

[0049] The stem of the tree planted in the planting hole is located in the opening. When a plurality of paving units are closed together, the opening area is reduced, and when a plurality of paving units are moved away from each other, the opening area is expanded.

[0050] In this embodiment, the paving unit includes a frame 1, the inner side of the frame 1 is a paving area b, and the paving area b inside the frame 1 can be paved with paving materials according to actual needs, such as Fig.10As shown, in one embodiment, the inner side of the frame 1 is a paving groove 101, the bottom of the frame 1 is a closed end, and the paving groove 101 is a paving area b. In this way, when paving materials in the paving area b on the inner side of the frame 1, it can limit the paving materials, which makes it easier to smoothly install paving materials in the paving area b and avoid material leakage.

[0051] In this embodiment, the paving material in the paving area b inside the frame 1 can be selected according to actual needs. For example, concrete can be poured in the paving area b, and bricks, granite, etc. can be laid in the paving area b. The paving material and the frame 1 can be formed into a whole by bonding or pouring.

[0052] like Figure 3 As shown, in this embodiment, when multiple paving units are closed together, the opening is an opening shape that is closed on all sides. The opening in this embodiment is a rectangular opening. There are four paving units, and the four paving units are respectively located around the planting hole. The paving units are all rectangular structures. In this way, after the paving units are closed together, the shape formed is relatively complete, and the shielding effect on the planting hole is better. In another embodiment, the paving unit can also be composed of two semicircular paving unit structures, so that the opening formed between the semicircular paving units is a circular opening. The paving unit can also be other polygonal structures, and the opening formed is a polygon.

[0053] Back to the present embodiment, a plurality of pulley tracks 3 are arranged at the top and outside of the planting hole, and a plurality of paving units are respectively slidably matched with the plurality of pulley tracks 3. In the present embodiment, six pulley tracks 3 are arranged, two pulley tracks 3 form a group, and six pulley tracks 3 form four groups. The four groups of pulley tracks 3 are respectively located around the planting hole. The length of the pulley track 3 can be made long or short according to actual needs.

[0054] like Fig.11 As shown, a pulley unit is slidably fitted in the pulley track 3. In this embodiment, the pulley unit includes a rotating shaft 201, a connecting rod 202 and two pulleys 2. The rotating shaft 201 is located between the two pulleys 2 and is rotatably connected to the pulleys 2. The connecting rod 202 is vertically connected to the rotating shaft 201. The connecting rod 202 and the rotating shaft 201 can be welded or threadedly fixed, and the paving unit is connected to the connecting rod 202.

[0055] In this embodiment, one end of the connecting rod 202 passes through one side of the frame 1 of the paving unit, and two nuts 203 are threadedly connected to the connecting rod 202. The two nuts 203 are respectively located on both sides of the frame 1. The frame 1 and the connecting rod 202 can be connected and fixed by locking the nuts 203. The pulley 2 is located in the pulley track 3 and can slide with the pulley track 3. In this embodiment, the top two sides of the pulley track 3 are mutually inclined inverted eight-shaped structures, which can limit the pulley 2 and prevent the pulley 2 from leaving the pulley track 3.

[0056] Combination Figure 4 , Figure 5 and Figure 6 As shown, by flipping the paving unit, the paving unit can be in a vertical state or a horizontal state as the rotating shaft 201 rotates.

[0057] like Figure 6 As shown, when the paving unit is turned over to a vertical state, it is in an open state, and the four paving units respectively act as fences around the planting hole, such as Figure 3 As shown, when the paving units are flipped down to a horizontal state, they are in a closed state, and the four paving units shield the top of the planting hole, leaving only a small portion of the opening, so that the four paving units can facilitate pedestrian passage or provide shade at the positions of the four paving units.

[0058] In actual application, after the paving unit is flipped to a vertical state, a support rod or other tool can be used at the construction site to support the paving unit, which can limit the position of the paving unit and prevent the paving unit from flipping back to a horizontal state. A limit block can also be connected to the frame 1 of the paving unit, so that the support rod is tilted, and one end of the support rod is against the corner between the limit block and the frame 1, and the other end of the support rod is against the ground.

[0059] In another embodiment, a brake is installed on the pulley. When the pulley drives the paving unit to move to a specified position, the pulley can be stopped by using the brake, thereby limiting the position of the pulley, thereby keeping the position of the paving unit stable.

[0060] like Fig.12As shown, in another embodiment, the pulley unit includes a pulley 2, a rotating shaft 201 and a bracket 204, the pulley 2 is located inside the bracket 204, and the pulley 2 is rotatably connected to the bracket 204 through the rotating shaft 201, the pulley 2 is located in the pulley track 3 and can slide with the pulley track 3, and the outer end of the paving unit is hinged with the bracket 204; flipping the paving unit can make the paving unit in a vertical state or a horizontal state. The pulley 2 in the pulley unit in this embodiment is used to achieve sliding cooperation with the pulley track, and the bracket 204 is convenient for being hinged with the paving unit, so that the paving unit can be flipped into a vertical state or a horizontal state, and can slide along the pulley track to achieve a closed or separated state.

[0061] Back to this embodiment, if Figure 2 As shown, after the plants are planted in the planting hole, it is necessary to fill the soil. Multiple groups of support blocks 5 are placed on the top of the filled soil. The multiple groups of support blocks 5 are used to support multiple paving units respectively. The support blocks 5 are movable prefabricated products with replaceable materials, such as concrete support blocks, steel support blocks, etc. In another embodiment, pile driving is first performed in the soil backfilled in the planting hole. Specifically: multiple groups of piles 501 are used to drive into the soil layer below the multiple paving units respectively, and until the bearing layer of the soil is reached. The support blocks 5 are located on the top of the piles 501 to support the paving units. The piles 501 can be pine piles or steel sheet piles. In this embodiment, adding piles 501 can support the support blocks 5, which can effectively prevent the support blocks 5 from sinking due to insufficient compaction of the backfilled soil, thereby ensuring effective support for the paving units.

[0062] In another embodiment, the support block 5 is connected to the top of the pile 501, and in this embodiment, the pile 501 and the support block 5 are connected to each other as a whole. During construction, the pile 501 is first driven into the bearing layer of the soil, and the support block 5 supports the paving unit.

[0063] In another embodiment, a paved tree pit structure also includes a retaining wall 6, which is located inside the planting pit and is used to support the inner wall of the planting pit. The retaining wall 6 is enclosed around to form a closed cavity, so that the planted plants can be placed normally in the cavity, and the retaining wall 6 can play a role in blocking and supporting the soil around the planting pit to prevent the soil from collapsing and falling after excavation. The retaining wall 6 can be a cast concrete retaining wall, a concrete steel retaining wall, a brick retaining wall or a steel plate retaining wall. The width and depth of the retaining wall 6 can be adjusted according to actual needs. The depth of the retaining wall 6 does not exceed three meters. In this embodiment, the depth of the retaining wall 6 is selected to be set to one meter.

[0064] In another embodiment, a water filtration module can be set on the top of the planting hole. For example, the water filtration module is composed of gravel, and a geotextile is provided at the bottom of the gravel. A drainage pipe is penetrated on one or more sides of the retaining wall 6. The drainage pipe can discharge the water on the upper part of the planting hole to a designated position, so as to avoid water accumulation on the upper part of the planting hole and affect the growth of plants.

[0065] In another embodiment, in combination Figure 7 , Figure 8 , Fig. 9 and Fig.13 As shown, the inner side end of the paving unit is hinged with a telescopic support rod 4, and the rotation of the telescopic support rod 4 can make it support the tree trunk obliquely. In actual use, different positions of the tree can be supported by changing the length and support angle of the telescopic support rod 4.

[0066] In another embodiment, the supporting telescopic rod 4 can be extended and rotated by a certain angle θ, and the paved tree hole is adjusted to a supporting state. The relationship between the supporting height H and the length L of the supporting telescopic rod after extension and contraction can be calculated according to the following formula:

[0067] H = L * Sinθ;

[0068] Among them, H is the support height of the planted tree 7, in m; L is the length of the supporting telescopic rod 4 after extension, in m; θ is the angle between the supporting telescopic rod 4 and the ground, in degrees; Sin is the sine function of the trigonometric function.

[0069] Among them, as the length and rotation angle of the rotating support telescopic rod 4 change, the support height of the planted trees 7 changes accordingly to meet the support height requirements of the planted trees 7 of different specifications and realize dynamic support changes.

[0070] In another embodiment, all the supporting telescopic rods 4 are provided with a Teflon coating on their surfaces. The coating is waterproof, heat-resistant and corrosion-resistant, and is suitable for outdoor use.

[0071] In another embodiment, one end of the supporting telescopic rod 4 away from the paving unit is supported behind the tree trunk, and the end of the supporting telescopic rod 4 can be fixed by tools such as wire to improve the supporting stability of the supporting telescopic rod 4.

[0072] In another embodiment, Fig.14 As shown, a clamp 8 is installed on the outside of the rod of the planted tree 7, and a clamping block is rotatably connected around the clamp 8, and a clamping groove is reserved at the end of the supporting telescopic rod 4, so that the extended end of the supporting telescopic rod 4 can be quickly limited by rotating the clamping block on the clamping clamp 8 and inserting the clamping block into the clamping groove at the end of the supporting telescopic rod 4, thereby effectively improving the supporting stability of the supporting telescopic rod 4.

[0073] In another embodiment, the frame 1 is a metal frame made of high-strength metal material, such as stainless steel, galvanized steel, iron, aluminum alloy and the like.

[0074] like Figure 1 As shown, c is the tree canopy projection line, and within the tree canopy projection line c, such a sunshade effect can be achieved. Figure 6 As shown, the frame 1 is flipped to a state perpendicular to the ground, that is, the paved tree hole is in an open state, and the design parameters of the planted tree 7 and the planting area a can be selected according to the following design equation:

[0075] D*γ≤La; D*γ≤Wa;

[0076] Among them, D is the diameter at breast height of the planted trees 7, in meters; γ is the standard coefficient of the soil ball, generally 6 to 10; La is the length of the planting area a, in meters; Wa is the width of the planting area a, in meters. The above design equations are used to select reasonable diameter at breast height, length, and width to meet the design requirements.

[0077] The present invention is different from many fixed structural forms. It adopts a dynamic adjustment mode, and can dynamically adjust the structure of the tree pit according to the site requirements to achieve multiple functional requirements. In addition, by adjusting the support angle and height of the telescopic rod 4, the effect of supporting the tree can also be achieved, which is relatively simpler, more economical and practical, and the area occupied by the telescopic rod 4 is small, which also meets the corresponding viewing needs. By controlling the structure of the tree pit, multiple effects such as quick construction, plant planting and replacement, and plant support can be achieved.

[0078] In another embodiment, an operation method for paving a tree pit structure is also disclosed, comprising the following steps: excavating a planting pit, constructing or installing a retaining wall 6 in the planting pit, so that the retaining wall 6 forms a closed cavity in the planting pit;

[0079] Then plant the tree 7 in the planting hole, backfill the soil into the planting hole to compact and fix the soil ball of the planted tree 7, and place a support block 5 on the top of the soil inside the planting hole for supporting the paving unit in the later stage. In another embodiment, a pile 501 is driven into the soil inside the planting hole, and then a support block 5 is placed on the top of the pile 501, so that the pile 501 supports the support block 5 to avoid the support block 5 from sinking when the backfilled soil is not compacted enough; install a plurality of pulley tracks 3 on the outside of the top of the planting hole. In this embodiment, two pulley tracks 3 are installed on each side of the planting hole, and the two pulley tracks 3 are centrally arranged in the middle of each side. During the construction, the pulley tracks 3 are paved and fixed on the road surface;

[0080] Then, the plurality of paving units in the above-mentioned paving tree pit structure are slidably installed on the pulley track 3 respectively, and the above-mentioned pulley unit is installed on the pulley track 3 during installation, and the frame 1 is connected to the pulley unit;

[0081] In this embodiment, the frame 1 can be prefabricated in a factory and assembled on site. Therefore, after the frame 1 is installed, paving materials can be constructed on the inner side of the frame 1 at the construction site. The paving materials can be reasonably selected according to different construction requirements. The paving materials are fixed to each other, and the paving materials and the frame 1 after paving form a paving unit as a whole.

[0082] Back to the operating method of a paved tree hole structure in the present embodiment, after the paving unit is slid toward the direction away from the center of the planting hole to expand the opening, the piles are taken out to facilitate planting trees 7 or replacing trees; after the planting of trees 7 or replacement of trees is completed, the soil is backfilled, and support blocks are placed after piling, and finally multiple paving units are slid toward the center of the planting hole to reduce the opening.

[0083] Due to the connection between the pulley track 3 and the pulley unit, as well as the frame 1 and the pulley unit, when it is necessary to open the tree pit for paving, Figure 6 As shown, the frame 1 can be flipped to be perpendicular to the ground. At this time, the planting hole is completely open, and the construction area is increased. In order to further expand the construction area and facilitate operation, the frame 1 flipped to a vertical state is slid in a direction away from the planting area a. In addition, the paving unit in the vertical state can serve as a protective fence, so that there is no need to build a protective fence separately during construction, thereby improving construction efficiency and cost. The paved tree hole structure of this scheme serves two purposes.

[0084] When the paving unit is turned over to be perpendicular to the ground, the trees 7 can be replaced and replanted in the area enclosed by the paving unit.

[0085] When the tree 7 is planted, the paving unit is flipped in the opposite direction to make it horizontal, and the paving unit is slid toward the planting area a, thereby reducing the size of the opening, so that the multiple paving units are assembled again, so that the paving unit can effectively cover most of the area of ​​the planting hole, leaving a small planting area a, which can be used to plant flowers and plants, thereby improving the aesthetics. When the paving unit returns to the state of covering the planting hole, it can be combined with the road surface, which is convenient for pedestrians to pass, reduces the occupied road surface area, and avoids affecting pedestrians.

[0086] In addition, the paved tree hole structure of the present invention is also suitable for use in viewing spots, squares and the like. It can be used to plant trees 7 without taking up too much site space. People can walk and stand freely on the paving unit without being affected by the traditional large planting hole area that affects the actual size of the space used.

[0087] Although, in the prior art, it may be chosen to lay pavement structures such as floor tiles on the planting holes, when the planted trees 7 do not survive and need to be replaced, the pavement structure needs to be destroyed, which is troublesome to operate and requires a lot of manpower and material resources, which is not economical and environmentally friendly. However, when the planted trees 7 need to be replaced, the present invention only needs to open multiple paving units and slide the paving units outward to expand the construction area for construction without destroying the ground structure.

[0088] In another embodiment, two supporting telescopic rods 4 are hingedly installed on one side of each frame 1 away from the pulley track 3, and when the paving unit is in a closed state, the supporting telescopic rods 4 are all located in the planting area a. When the supporting telescopic rods 4 are not needed, the supporting telescopic rods 4 are retracted to reduce their occupied volume. In this way, after the planting of the trees 7 is completed, the paving units are closed together, and then the supporting telescopic rods 4 are pulled to extend the supporting telescopic rods 4, and the supporting telescopic rods 4 are rotated to change the inclination angle of the supporting telescopic rods 4, so that the ends of the supporting telescopic rods 4 are supported on the tree trunk, which plays a role in assisting the planting of the trees 7.

[0089] It should be noted that the above description of the disclosed embodiments enables professionals and technicians in the field to implement or use the present application. Various modifications to these embodiments will be apparent to professionals and technicians in the field, and the general principles defined herein can be implemented in other embodiments without departing from the scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but should conform to the widest scope consistent with the principles and novel features disclosed herein.

[0090] In the description of the present invention, it should be noted that the terms "first", "second", "third", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0091] In the description of this document, terms such as "up", "down", "left", "right", "front", "back", "top", "bottom", "inside", "outside", "middle", "vertical", "horizontal", "lateral", and "longitudinal" indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only used to illustrate the relative positional relationships between the various components or components, and do not particularly limit the specific installation orientations of the various components or components.

[0092] In the description of this document, some terms may be used to express other meanings in addition to indicating orientation or positional relationship. For example, the term "on" may also be used to express a certain dependency or connection relationship in some cases. For those of ordinary skill in the art, the specific meanings of these terms in this application can be understood according to the specific circumstances.

[0093] In the description of this document, the terms "installed", "set", "provided with", "connected", and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral structure; it can be a mechanical connection, or an electrical connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be an internal connection between two devices, elements, or components. For those of ordinary skill in the art, the specific meanings of the above terms in this application can be understood according to specific circumstances.

[0094] The structures, proportions, sizes, etc. drawn in the drawings in this application are only used to match the contents disclosed in this technical briefing book for technical personnel in this field to understand and read, and are not used to limit the restrictive conditions for the implementation of this application. Therefore, they have no substantive technical significance. Any structural modification, change in proportional relationship or adjustment of size should still fall within the scope of the technical content disclosed in this application without affecting the effects and purposes that can be achieved by this application.

[0095] The terms used in this document are those common terms currently widely used in the art in consideration of the functions of the present disclosure, but these terms may vary according to the intention of a person of ordinary skill in the art, precedents, or new technologies in the art. In addition, specific terms may be selected by the applicant, and in this case, their detailed meanings will be described in the detailed description of the present disclosure. Therefore, the terms used in the document should not be understood as simple names, but rather as an overall description based on the meaning of the terms and the present disclosure.

[0096] Flowcharts or text are used in this document to illustrate the operating steps performed according to the embodiments of the present application. It should be understood that the operating steps in the embodiments of the present application are not necessarily accurately performed in the order of recording. On the contrary, various steps can be processed in reverse order or simultaneously as needed. At the same time, other operations can also be added to these processes, or a certain step or several steps can be removed from these processes.

[0097] The above are only preferred embodiments of the present application and are not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.

Claims

1. A paved tree pit structure, It is characterized in that Includes planting holes; A paving unit, wherein the paving unit is located at the top of the planting hole, and a plurality of the paving units are provided. The plurality of paving units can be closed together or moved away from each other, and an opening is formed between the inner ends of the plurality of paving units, and the stem of the tree planted in the planting hole is located in the opening. When the plurality of paving units are closed together, the area of ​​the opening is reduced, and when the plurality of paving units are moved away from each other, the area of ​​the opening is expanded.

2. A paved tree pit structure according to claim 1, It is characterized in that The paving unit comprises a frame, and the inner side of the frame is a paving area.

3. A paved tree pit structure according to claim 2, It is characterized in that The inner side of the frame is a paving groove, the bottom of the frame is a closed end, and the paving groove is a paving area.

4. A paved tree pit structure according to any one of claims 1 to 3, It is characterized in that When the plurality of paving units are folded together, the opening is in the shape of an opening that is closed on all sides.

5. A paved tree pit structure according to claim 4, It is characterized in that The opening is a rectangular opening, and four paving units are provided. The four paving units are respectively located around the planting hole.

6. A paved tree pit structure according to claim 1, It is characterized in that A plurality of pulley tracks are arranged on the top and outside of the planting hole, and the plurality of paving units are respectively slidably matched with the plurality of pulley tracks.

7. A paved tree pit structure according to claim 6, It is characterized in that A pulley unit is slidably fitted in the pulley track, and the pulley unit includes a rotating shaft, a connecting rod and two pulleys. The rotating shaft is located between the two pulleys and is rotatably connected to the pulleys. The connecting rod is vertically connected to the rotating shaft, and the paving unit is connected to the connecting rod. The pulley is located in the pulley track and can slidably fit with the pulley track. Flipping the paving unit can make the paving unit vertical or horizontal.

8. A paved tree pit structure according to claim 1, It is characterized in that The inner side end of the paving unit is hinged with a telescopic supporting rod, and the telescopic supporting rod can be rotated to support the tree trunk obliquely.

9. A paved tree pit structure according to claim 1, It is characterized in that It also includes a retaining wall, which is located inside the planting hole and is used to support the inner wall of the planting hole.

10. A method for paving a tree pit structure, It is characterized in that The following steps are involved: Digging a planting hole and planting a tree in the planting hole; installing a plurality of pulley tracks on the outer side of the top of the planting hole, and slidingly installing a plurality of paving units in a paved tree hole structure according to any one of claims 1 to 9 on the pulley tracks respectively; Slide the paving unit away from the center of the planting hole to expand the opening, which is convenient for planting or replacing trees. After the planting or replacing of trees is completed, slide multiple paving units toward the center of the planting hole to reduce the opening.

Citation Information

Patent Citations

  • Planting process and tree pit structure for prevention and control of urban street tree root damage

    CN117296617A

  • Concrete plant pit apron

    CN207227885U

  • Fixing device for green seedling cultivation

    CN208708309U

  • Supporting device for maintaining street trees of tree pool

    CN213246050U

  • Modularized tree grate convenient to assemble and disassemble

    CN215602277U