Method for identifying overstocked scene of single-line train and automatically changing route
By automatically identifying the backlog of single-line trains and changing the intersection, the problems of manual judgment and multiple commands in the existing technology are solved, the operational efficiency and automation level are improved, and the work pressure of dispatchers is reduced.
Patent Information
- Application Number
- CN202411184389.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-11-08
AI Technical Summary
When single-line trains are backlogged in the prior art, they rely on manual judgment and manual issuance of multiple commands, resulting in high working pressure and low efficiency of dispatchers, making it difficult to quickly respond to passenger demand during peak periods or special circumstances.
By identifying the abnormal parking time of the train or the station departure interval, the single-line backlog scenario is automatically judged, the rebate points and paths are determined, the execution commands are sent, and the train operation tasks are automatically changed, and manual intervention is reduced.
Reduces the work pressure of dispatchers, improves work efficiency, optimizes path selection, automation level and operational efficiency, and reduces dependence on experience.
Smart Images

Figure CN118907189A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of rail transit technology, and in particular to a method, electronic equipment and storage medium for identifying a single-line train backlog scenario and automatically changing routes. Background Art
[0002] In subway operation organization, under normal operation scenarios, trains run according to the day's schedule to ensure the intervals and departure order between trains, and provide efficient, safe and comfortable passenger services. However, in special circumstances, single-line trains may be blocked due to sudden incidents or emergencies, resulting in a backlog of single-line trains, while the other side of the backlog will be relatively idle, forming a large interval, causing passengers to be stranded on the platform, increasing the waiting time for passengers. This scenario reduces the capacity of passenger services.
[0003] In the existing technology, the control center's train dispatcher is mainly responsible for discovering and handling this scenario manually, and the handling is completed through multiple commands. The dispatcher needs to observe the distribution of trains on the station map, find the backlog of trains and areas with too large intervals, and judge the passenger flow. During peak hours or special circumstances, some stations may have a large number of passengers who need to get on or off the train. It is necessary to manually arrange some trains to change the train operation tasks to balance the density of trains in different sections and ensure that the travel needs of passengers are met. After confirming the congestion of a single line, the dispatcher selects the train turning point and executes multiple commands through the ATS system (Automatic Train Supervision System). Through the cooperation of station personnel and train drivers, the train task changes are completed together. The continuous attention undoubtedly increases the work pressure of the dispatcher and reduces the efficiency of train command.
[0004] Therefore, it is necessary to propose a more intelligent and automated method, electronic device and storage medium for identifying single-line train backlog scenarios and automatically changing routes. Summary of the invention
[0005] The purpose of the present invention is to provide a method, electronic device and storage medium for identifying a single-line train backlog scenario and automatically changing the route, so as to solve the problem in the prior art that when a single-line is backlogged, the dispatcher completely relies on manual experience and judgment, and manually issues multiple commands at different stages, which requires continuous attention to the processing situation, thereby greatly reducing the work pressure of the dispatcher and improving work efficiency.
[0006] In order to achieve the above-mentioned object of the invention, in a first aspect, the present invention provides a method for identifying a single-line train backlog scenario and automatically changing the route, comprising:
[0007] Identify backlog scenarios on single-line routes based on abnormal stop times of trains or abnormal departure intervals at platforms;
[0008] According to the preset conditions, it is necessary to start the adjustment of the single-line train route change.
[0009] The fault point is obtained, and a train turning point is determined based on the fault point, a turning path is selected from the train turning point to the terminal station in the operation direction based on the passenger flow and / or the number of covered platforms, and the turning train, the platform for clearing passengers, and the final destination of the turning train are confirmed based on the train turning point and the turning path;
[0010] Send an execution command to complete the change of the operating task of the return train.
[0011] Preferably, the step of identifying a backlog scenario of a single-line based on the abnormal stop duration of a train comprises:
[0012] Poll and calculate the abnormal parking time T of all trains with running tasks online k For trains parked in the section, based on the formula T k =T 当 -T 停 Calculate the abnormal parking time, where T 当 is the time point of polling calculation, T 停 is the time point when the train stops in the section; for the train stopped at the platform, based on the formula T k =T 当 -T 停 -T 站 Calculate the abnormal parking time, where T 当 is the time point of polling calculation, T 停 is the time when the train stops at the platform, T 站 The planned stop time of the train at the platform;
[0013] If the abnormal stop time of two or more consecutive trains is greater than 0, a single-line backlog scenario occurs.
[0014] Preferably, the step of determining the need to initiate adjustment of the single-track train route change according to preset conditions comprises:
[0015] For a train stopped in the section, if the abnormal stop time is longer than the planned stop time at the next platform, the adjustment of changing the route of the single-line train is initiated;
[0016] For a train stopped at a platform, if the abnormal stopping time is longer than the planned stopping time at the platform, the adjustment of changing the route of the single-line train is initiated.
[0017] Preferably, the step of identifying the backlog scenario of a single-line route based on the abnormal departure interval of the platform includes:
[0018] Get the current operating time period, the planned train intervals for the operating time period, and the historical departure time and current location of all trains with running tasks at each platform;
[0019] Assuming that the train runs normally, calculate the estimated departure time T of each train from the current position to the subsequent platform ik , T ik represents the estimated departure time of train k at platform i;
[0020] Based on the estimated departure time point and the historical departure time points at each platform, obtaining the estimated departure interval of each platform;
[0021] The predicted departure interval is compared with the planned driving interval. If the predicted departure interval of a certain platform first increases and then decreases compared with the planned driving interval, a backlog scenario of the single-line line occurs.
[0022] Preferably, the step of determining the need to initiate adjustment of the single-track train route change according to preset conditions comprises:
[0023] If the estimated departure interval of a certain platform is more than twice the planned train interval, the adjustment of the single-line train rerouting is initiated.
[0024] Preferably, the step of selecting a return path from the train return point to the terminal station in the operation direction based on the passenger flow and / or the number of covered platforms includes:
[0025] From the train turning point to the terminal station in the operating direction, the path covering the largest number of platforms is selected as the turning path.
[0026] Preferably, the step of selecting a return path from the train return point to the terminal station in the operation direction based on the passenger flow and / or the number of covered platforms includes:
[0027] The path with the largest passenger flow is selected as the turning path from the train turning point to the terminal station in the operating direction.
[0028] Preferably, the step of selecting a return path from the train return point to the terminal station in the operation direction based on the passenger flow and / or the number of covered platforms includes:
[0029] For each running route from the train turning point to the terminal station in the operating direction, the weight of each inter-station section in the path is configured based on the passenger flow, the total weight of each running route is obtained, and the path with the largest total weight is selected as the turning path.
[0030] Preferably, the step of determining the train turning point based on the fault point comprises:
[0031] Find the nearest platform in front of the fault point and behind the fault point as the train turning point.
[0032] Preferably, the step of confirming the return train based on the train return point and the return path includes:
[0033] For a path with a large gap ahead of the fault point, the train closest to the train turning point among the trains running in the opposite direction of the line where the fault point is located is set as the turning train;
[0034] For a path with a blockage behind the fault point, the train closest to the train turning point among the blocked trains on the line where the fault point is located is set as the turning train.
[0035] Preferably, the step of obtaining the fault point includes:
[0036] The position of the train with the longest abnormal parking time is obtained as the fault point.
[0037] Preferably, the step of obtaining the fault point includes:
[0038] The position of the train where the predicted departure interval has the largest difference from the planned departure interval is obtained as the fault point.
[0039] In a second aspect, the present invention provides an electronic device comprising a processor and a memory, wherein the memory stores a computer program, and when the computer program is executed by the processor, any of the above-mentioned methods for identifying a single-line train backlog scenario and automatically changing routes is implemented.
[0040] In a third aspect, the present invention provides a readable storage medium, in which a computer program is stored. When the computer program is executed by a processor, any of the above-mentioned methods for identifying a single-line train backlog scenario and automatically changing the route is implemented.
[0041] Compared with the prior art, the method, electronic device and storage medium provided by the present invention for identifying a single-line train backlog scenario and automatically changing the route have the following advantages:
[0042] 1. The above scheme is designed to automatically determine the status of line blockage and large interval according to the line operation status, reducing the workload of dispatchers for manual continuous monitoring;
[0043] 2. The above solution can automatically calculate the route change required for single-line trains based on the congestion points, optimize the route selection, and solve the dependence on experience;
[0044] 3. The above scheme can automatically find trains according to the routes that need to be changed, and automatically issue multiple commands, including setting up return trains and clearing passengers at the last passenger platform, which reduces the workload of dispatchers and improves the level of automation and operational efficiency.
[0045] 4. The above scheme can generate a command for changing the route of a single-line train. The dispatcher can make adjustments based on the on-site situation and replace the previous multiple commands with one command, which increases the flexibility of execution, reduces the workload of the dispatcher, and improves the level of automation and operational efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0046] Figure 1 A schematic flow chart of a method for identifying a single-line train backlog scenario and automatically changing routes according to an embodiment of the present invention;
[0047] Figure 2 The present invention is a flowchart of a method for identifying a single-line train backlog scenario and automatically changing routes according to an embodiment of the present invention. DETAILED DESCRIPTION
[0048] The following is a further detailed description of the method, electronic device and storage medium for identifying the single-line train backlog scene and automatically changing the route proposed by the present invention in combination with the accompanying drawings and specific embodiments. According to the following description, the advantages and features of the present invention will be clearer. It should be noted that the accompanying drawings are in a very simplified form and use non-precise proportions, which are only used to conveniently and clearly assist in explaining the purpose of the implementation method of the present invention. In order to make the purposes, features and advantages of the present invention more obvious and easy to understand, please refer to the accompanying drawings. It should be noted that the structure, proportion, size, etc. illustrated in the drawings of this specification are only used to match the contents disclosed in the specification for people familiar with this technology to understand and read, and are not used to limit the limiting conditions for the implementation of the present invention, so they have no technical substantive significance. Any modification of the structure, change of the proportional relationship or adjustment of the size, without affecting the effects that the present invention can produce and the purposes that can be achieved, should still fall within the scope of the technical content disclosed by the present invention.
[0049] In the prior art, when a single-line train is blocked due to an unexpected incident or emergency, the single-line trains will be piled up, and a large gap will appear in front of the backlog position (i.e., the direction of the single-line train's advance), causing passengers to be stranded on the platform. A jam will occur behind the backlog position (i.e., the opposite direction of the single-line train's advance). The dispatcher needs to observe the train distribution on the station map, determine the backlog position, the area with large gaps, and the area with jams, judge the passenger flow, arrange trains to change train operation tasks, and perform passenger clearance and reversal operations to balance the density of trains in different sections and ensure that passengers' travel needs are met. After confirming that a single-line train has a backlog, the dispatcher needs to rely on experience to manually select the train turning point and execute multiple commands through the ATS system, including changing the train to be turned back from the planned car to the first-station car to reach the train turning point, setting the train to clear passengers at the designated platform before the train turning point, and continuously paying attention to the operation of the train. After the train reaches the train turning point, a new operation task is set to carry passengers. During this period, the driver and station personnel need to be notified of changes in the train operation tasks and clearing passengers. The continuous attention increases the work pressure of the dispatchers and reduces the efficiency of train command.
[0050] In order to solve the above technical problems, the core idea of the present invention is to provide a method for identifying a single-line train backlog scenario and automatically changing the route. Figure 1 , Figure 1 The present invention is a flowchart of a method for identifying a single-line train backlog scenario and automatically changing routes according to an embodiment of the present invention, including:
[0051] Step S1: Identify the backlog scenario of a single-line based on the abnormal stop time of a train or the abnormal departure interval of a platform;
[0052] Step S2: judging whether it is necessary to start the adjustment of the single-line train route change according to the preset conditions;
[0053] Step S3: If yes, then obtain the fault point, and determine the train turning point based on the fault point, select a turning path from the train turning point to the terminal station in the operation direction based on the passenger flow and / or the number of covered platforms, and confirm the turning train, the platform for clearing passengers, and the final destination of the turning train based on the train turning point and the turning path;
[0054] Step S4: Send an execution command to complete the operation task change of the return train.
[0055] The method for identifying a single-line train backlog scenario and automatically changing routes provided in the present embodiment first identifies a single-line line backlog scenario based on the abnormal stop time of the train or the abnormal departure interval of the platform, and then determines whether it is necessary to start adjusting the single-line train route change based on preset conditions. If so, the location of the fault point is obtained, and then the train turning point is determined based on the fault point, and then the turning path is selected from the train turning point to the terminal station in the operating direction based on the passenger flow and / or the number of covered platforms, and then the turning train, the platform for clearing passengers, and the final destination of the turning train are confirmed based on the train turning point and the turning path. The method for identifying a single-line train backlog scenario and automatically changing routes provided in the present embodiment greatly reduces the workload of dispatchers and improves work efficiency.
[0056] In some embodiments, the identifying a backlog scenario of a single-line based on an abnormal stop duration of a train includes:
[0057] Poll and calculate the abnormal parking time T of all trains with running tasks online i For trains parked in the section, based on the formula T i =T 当 -T 停 Calculate the abnormal parking time, where T 当 is the time point of polling calculation, T 停 is the time point when the train stops in the section; for the train stopped at the platform, based on the formula T i =T 当 -T 停 -T 站 Calculate the abnormal parking time, where T 当 is the time point of polling calculation, T 停 is the time when the train stops at the platform, T 站 The planned stop time of the train at the platform;
[0058] If the abnormal stop time of two or more consecutive trains is greater than 0, a single-line backlog scenario occurs.
[0059] In the above embodiment, by calculating the abnormal stop times of all trains with running tasks on the line, when there are two or more consecutive trains with abnormal stop times greater than 0, it is determined that a single-line backlog has occurred.
[0060] For example, assuming the current time is 9:00, Train 1 departs from platform i+1 at 8:52 and leaves from platform i at 8:54; Train 2 departs from platform i+2 at 8:54 and arrives at platform i+1 at 8:56, but stops at platform i+1 due to a malfunction; Train 3 was originally scheduled to depart from platform i+2 at 8:58, but stayed at platform i+2 due to a malfunction of Train 2; therefore, the abnormal stop time of Train 2 is T i=T 当 -T 停 =9:00-8:56=4min, the abnormal stop time of train 3 is T i =T 当 -T 停 =9:00-8:58=2min. It can be seen that Train 2 and Train 3 are consecutive trains on the single-line, and their abnormal stop times are both greater than 0, so a single-line backlog occurs.
[0061] In some embodiments, the step of determining whether it is necessary to initiate the adjustment of the single-line train route change according to a preset condition includes:
[0062] For a train stopped in the section, if the abnormal stop time is longer than the planned stop time at the next platform, the adjustment of changing the route of the single-line train is initiated;
[0063] For a train stopped at a platform, if the abnormal stopping time is longer than the planned stopping time at the platform, the adjustment of changing the route of the single-line train is initiated.
[0064] In the above embodiment, whether it is necessary to start the adjustment of the single-line route change is determined based on the abnormal stop duration. For example, the abnormal stop duration of train 2 is 4 minutes, which is longer than its original planned stop duration at platform i+1. Therefore, it is necessary to start the adjustment of the single-line train route change.
[0065] In some embodiments, the identifying a backlog scenario of a single-line route based on abnormal departure intervals of platforms includes:
[0066] Get the current operating time period, the planned train intervals for the operating time period, and the historical departure time and current location of all trains with running tasks at each platform;
[0067] Assuming that the train runs normally, calculate the estimated departure time T of each train from the current position to the subsequent platform ik , T ik represents the estimated departure time of train k at platform i;
[0068] Based on the estimated departure time point and the historical departure time points at each platform, obtaining the estimated departure interval of each platform;
[0069] The predicted departure interval is compared with the planned driving interval. If the predicted departure interval of a certain platform first increases and then decreases compared with the planned driving interval, a backlog scenario of the single-line line occurs.
[0070] In the above embodiment, the historical departure time points of the platform are obtained, and the expected departure time of each platform is calculated, so as to obtain the expected departure interval of each platform, which is compared with the planned driving interval of the current operating time period. When the expected departure interval increases first and then decreases compared with the planned driving interval, it means that a backlog of the single-line has occurred.
[0071] For example: Assume that the current time is 9:00, which is the operating time period from 7:30 to 9:30. The scheduled interval of the current operating time period is 4 minutes. The historical departure time of platform i+2 is 8:54 when train 2 departs from platform i+2, the historical departure time of platform i+1 is 8:52 when train 1 departs from platform i+1, and the historical departure time of platform i is 8:54 when train 1 departs from platform i. Assuming that train 2 departs from platform i+1 at the current time, the expected departure time of train 2 at platform i+1 is The scheduled departure time is 9:00, and Train 3 departs from platform i+2. The estimated departure time of Train 3 at platform i+2 is 9:00; it can be seen that the historical departure time of platform i+1 is 8:54, and the estimated departure times are 9:00 and 9:02, so the estimated departure intervals of platform i+1 are 8 minutes and 2 minutes; it can be seen that the estimated departure interval of platform i+1 increases first and then decreases compared to the planned interval of 4 minutes, so a backlog scenario of the single-line occurs.
[0072] In some embodiments, the step of determining whether it is necessary to initiate the adjustment of the single-line train route change according to a preset condition includes:
[0073] If the estimated departure interval of a certain platform is more than twice the planned train interval, the adjustment of the single-line train rerouting is initiated.
[0074] In the above embodiment, whether it is necessary to start the adjustment of the single-line route change is determined based on the expected departure interval and the planned driving interval. For example, if the expected departure interval is 8 minutes and the planned driving interval is 4 minutes, and the expected departure interval is more than twice the planned driving interval, it is necessary to start the adjustment of the single-line train route change.
[0075] In some embodiments, obtaining the fault point includes:
[0076] The location of the train with the longest abnormal stop time is obtained as the fault point. For example, in this embodiment, the abnormal stop time of train 2 is 4 minutes, and the abnormal stop time of train 3 is 2 minutes, then the location of train 2 is selected as the fault point.
[0077] In some embodiments, obtaining the fault point includes:
[0078] The location of the train with the largest difference between the expected departure interval and the scheduled departure interval is obtained as the fault point. For example, in this embodiment, the expected departure interval of train 2 at platform i+1 is 8 minutes, and the expected departure interval of train 3 at platform i+2 is 6 minutes. The expected departure interval of train 2 at platform i+1 has the largest difference compared to the scheduled departure interval of platform i+1, so the location of train 2 is confirmed as the fault point.
[0079] In some embodiments, determining the train turning point based on the fault point includes:
[0080] Find the nearest platform in front of the fault point and behind the fault point as the train turning point.
[0081] In the above embodiment, the platforms closest to the area with a large interval in front of the fault point and the area with congestion behind the fault point are respectively obtained as the train turning points. For example, if the location of train 2 is platform i+1, then platform i+1 is confirmed as the fault point, platform i is used as the train turning point in front of the fault point, and platform i+2 is used as the train turning point behind the fault point.
[0082] In some embodiments, selecting a return path from the train return point to the terminal station in the operation direction based on the passenger flow and / or the number of covered platforms includes:
[0083] From the train turning point to the terminal station in the operating direction, the path covering the largest number of platforms is selected as the turning path.
[0084] In the above embodiment, a path is selected from the running route from the train turning point to the terminal station in the operating direction as the turning path, and the path is required to cover as many passing platforms as possible.
[0085] In some embodiments, selecting a return path from the train return point to the terminal station in the operation direction based on the passenger flow and / or the number of covered platforms includes:
[0086] The path with the largest passenger flow is selected as the turning path from the train turning point to the terminal station in the operating direction.
[0087] In the above embodiment, a path is selected from the running route from the train turning point to the terminal station in the operating direction as the turning path, and the passenger flow of the path is required to be the largest.
[0088] In some embodiments, selecting a return path from the train return point to the terminal station in the operation direction based on the passenger flow and / or the number of covered platforms includes:
[0089] For each running route from the train turning point to the terminal station in the operating direction, the weight of each inter-station section in the path is configured based on the passenger flow, the total weight of each running route is obtained, and the path with the largest total weight is selected as the turning path.
[0090] In the above embodiment, for the path from the train turning point to the terminal station in the operating direction, based on the calculation of the weight of each inter-station section, the number of platforms passed through each path is different, and the number of inter-station sections and passenger flow are also different. The total weight of each path is calculated, and the path with the largest total weight is selected as the turning path.
[0091] In some embodiments, the step of confirming the return train based on the train return point and the return path includes:
[0092] For a path with a large gap ahead of the fault point, the train closest to the train turning point among the trains running in the opposite direction of the line where the fault point is located is set as the turning train;
[0093] For a path with a blockage behind the fault point, the train closest to the train turning point among the blocked trains on the line where the fault point is located is set as the turning train.
[0094] In the above embodiment, the train closest to the train turning point among the trains running in the opposite direction to the line where the fault point is located is set as a turning train to make up for the large interval; the train closest to the train turning point among the trains blocked in the line where the fault point is located is set as a turning train to alleviate the congestion.
[0095] See also Figure 2 , Figure 2 The present invention is a flowchart of a method for identifying a single-line train backlog scenario and automatically changing routes according to an embodiment of the present invention. First, the current position and status of each train, the historical arrival and departure points of the platform, and the driving plans for different time periods are input (so that the planned driving interval for the current time period can be obtained according to the current time point). The abnormal parking time of the train (i.e., the abnormal parking duration) or the abnormal departure interval of the platform is polled and calculated to determine whether to start the single-line train route change. If not, the process ends; if necessary, a reversing path is selected, including: confirming the congestion point (i.e., the fault point), calculating the weight of the reversing path before the congestion point, calculating the weight of the reversing path after the congestion point, confirming the reversing path, and then calculating the single-line train route change command, including: confirming the reversing train, generating a reversing head code command, generating a passenger clearance command, generating a terminal station head code command, and finally executing the command to complete the single-line train route change.
[0096] To sum up, the method for identifying single-line train backlog scenarios and automatically changing routes provided in this embodiment can automatically identify single-line line backlog scenarios and initiate adjustments to single-line train route changes, reducing the workload of dispatchers who require continuous monitoring, automatically confirming train turning points, automatically selecting turning paths and turning trains, reducing dependence on experience, alleviating dispatch work pressure, and improving automation levels and operational efficiency.
[0097] This embodiment also provides a readable storage medium, in which a computer program is stored. When the computer program is executed by a processor, the method provided in this embodiment for identifying a single-line train backlog scenario and automatically changing routes is implemented.
[0098] This embodiment also provides an electronic device, including a processor and a memory, wherein a computer program is stored in the memory, and when the computer program is executed by the processor, the method for identifying a single-line train backlog scenario and automatically changing a route provided in this embodiment is implemented.
[0099] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.
[0100] It should be noted that the devices and methods disclosed in the embodiments of this article can also be implemented in other ways. The device implementation described above is only schematic. For example, the flowcharts and block diagrams in the accompanying drawings show the possible architecture, functions and operations of the devices, methods and computer program products according to multiple embodiments of this article. In this regard, each box in the flowchart or block diagram can represent a part of a module, program or code, and the module, program segment or part of the code contains one or more executable instructions for implementing the specified logical function, and the module, program segment or part of the code contains one or more executable instructions for implementing the specified logical function. It should also be noted that in some alternative implementations, the functions marked in the box can also occur in a different order from the order marked in the accompanying drawings. For example, two consecutive boxes can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each box in the block diagram and / or flowchart, and the combination of boxes in the block diagram and / or flowchart can be implemented by a dedicated hardware-based system for performing a specified function or action, or can be implemented by a combination of dedicated hardware and computer instructions.
[0101] In addition, the functional modules in the various embodiments of this document may be integrated together to form an independent part, or each module may exist independently, or two or more modules may be integrated to form an independent part.
[0102] Although the content of the present invention has been described in detail through the above preferred embodiments, it should be appreciated that the above description should not be considered as a limitation of the present invention. After reading the above content, it will be apparent to those skilled in the art that various modifications and substitutions of the present invention will occur. Therefore, the protection scope of the present invention should be limited by the appended claims.
Claims
1. A method for identifying a single-line train backlog scenario and automatically changing the route, It is characterized in that include: Identify backlog scenarios on single-line routes based on abnormal stop times of trains or abnormal departure intervals at platforms; According to the preset conditions, it is necessary to start the adjustment of the single-line train route change. The fault point is obtained, and a train turning point is determined based on the fault point, a turning path is selected from the train turning point to the terminal station in the operation direction based on the passenger flow and / or the number of covered platforms, and the turning train, the platform for clearing passengers, and the final destination of the turning train are confirmed based on the train turning point and the turning path; Send an execution command to complete the change of the operating task of the return train.
2. The method for identifying a single-line train backlog scenario and automatically changing the route according to claim 1, It is characterized in that The step of identifying a backlog scenario of a single-line based on the abnormal stop duration of a train comprises: Poll and calculate the abnormal parking time T of all trains with running tasks online k For trains parked in the section, based on the formula T k =T 当 -T 停 Calculate the abnormal parking time, where T 当 is the time point of polling calculation, T 停 is the time point when the train stops in the section; for the train stopped at the platform, based on the formula T k =T 当 -T 停 -T 站 Calculate the abnormal parking time, where T 当 is the time point of polling calculation, T 停 is the time when the train stops at the platform, T 站 The planned stop time of the train at the platform; If the abnormal stop time of two or more consecutive trains is greater than 0, a single-line backlog scenario occurs.
3. The method for identifying a single-track train backlog scenario and automatically changing the route according to claim 2, It is characterized in that The step of determining the need to start adjusting the route change of a single-track train according to a preset condition comprises: For a train stopped in the section, if the abnormal stop time is longer than the planned stop time at the next platform, the adjustment of changing the route of the single-line train is initiated; For a train stopped at a platform, if the abnormal stopping time is longer than the planned stopping time at the platform, the adjustment of changing the route of the single-line train is initiated.
4. The method for identifying a single-track train backlog scenario and automatically changing the route according to claim 1, It is characterized in that The step of identifying a backlog scenario of a single-line route based on abnormal departure intervals of a platform includes: Get the current operating time period, the planned train intervals for the operating time period, and the historical departure time and current location of all trains with running tasks at each platform; Assuming that the train runs normally, calculate the estimated departure time T of each train from the current position to the subsequent platform ik , T ik represents the estimated departure time of train k at platform i; Based on the estimated departure time point and the historical departure time points at each platform, obtaining the estimated departure interval of each platform; The predicted departure interval is compared with the planned driving interval. If the predicted departure interval of a certain platform first increases and then decreases compared with the planned driving interval, a backlog scenario of the single-line line occurs.
5. The method for identifying a single-track train backlog scenario and automatically changing the route according to claim 4, It is characterized in that The step of determining the need to start adjusting the route change of a single-track train according to a preset condition comprises: If the estimated departure interval of a certain platform is more than twice the planned train interval, the adjustment of the single-line train rerouting is initiated.
6. The method for identifying a single-track train backlog scenario and automatically changing the route according to claim 1, It is characterized in that The step of selecting a return path from the train return point to the terminal station in the operation direction based on the passenger flow and / or the number of covered platforms includes: From the train turning point to the terminal station in the operating direction, the path covering the largest number of platforms is selected as the turning path.
7. The method for identifying a single-line train backlog scenario and automatically changing the route according to claim 1, It is characterized in that The step of selecting a return path from the train return point to the terminal station in the operation direction based on the passenger flow and / or the number of covered platforms includes: The path with the largest passenger flow is selected as the turning path from the train turning point to the terminal station in the operating direction.
8. The method for identifying a single-track train backlog scenario and automatically changing the route according to claim 1, It is characterized in that The step of selecting a return path from the train return point to the terminal station in the operation direction based on the passenger flow and / or the number of covered platforms includes: For each running route from the train turning point to the terminal station in the operating direction, the weight of each inter-station section in the path is configured based on the passenger flow, the total weight of each running route is obtained, and the path with the largest total weight is selected as the turning path.
9. The method for identifying a single-track train backlog scenario and automatically changing routes as claimed in claim 1, It is characterized in that The step of determining the train turning point based on the fault point comprises: Find the nearest platform in front of the fault point and behind the fault point as the train turning point.
10. The method for identifying a single-line train backlog scenario and automatically changing the route according to claim 9, It is characterized in that The step of confirming the return train based on the train return point and the return path includes: For a path with a large gap ahead of the fault point, the train closest to the train turning point among the trains running in the opposite direction of the line where the fault point is located is set as the turning train; For a path with a blockage behind the fault point, the train closest to the train turning point among the blocked trains on the line where the fault point is located is set as the turning train.
11. The method for identifying a single-track train backlog scenario and automatically changing routes as claimed in claim 3, It is characterized in that The step of obtaining the fault point comprises: The position of the train with the longest abnormal parking time is obtained as the fault point.
12. The method for identifying a single-line train backlog scenario and automatically changing routes as claimed in claim 5, It is characterized in that The step of obtaining the fault point comprises: The position of the train where the predicted departure interval has the largest difference from the planned departure interval is obtained as the fault point.
13. An electronic device, It is characterized in that The method comprises a processor and a memory, wherein a computer program is stored in the memory, and when the computer program is executed by the processor, the method according to any one of claims 1 to 12 is implemented.
14. A readable storage medium, It is characterized in that The readable storage medium stores a computer program, and when the computer program is executed by a processor, the method according to any one of claims 1 to 12 is implemented.
Citation Information
Cited By
Train operation adjustment method for operation interruption based on train-to-train communication and related equipment
CN121180278A
Traffic change method and system based on train backlog and driving interval
CN121626218A