Unattended coal mine air mining gushing water reuse management system

Through the unattended coal mine air-surge water reuse management system, the combination of monitoring and treatment units is used to solve the high cost and environmental risks of underground water in coal mines, and automated processing and efficient water resource utilization are achieved.

CN118908375APending Publication Date: 2024-11-08SHAANXI SHANMEI HUANGLING MINING IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410889913.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-04
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

Due to the high mineralization and high salt content in the coal mine underground goaf water inlet, the processing cost is high and there is environmental protection risk. The existing water inlet reuse method requires a lot of labor costs and a low degree of automation.

Method used

An unattended coal mine air-rush water reuse management system is designed, including a monitoring unit, water-rush water quality detection unit, water-rush water treatment unit and water-rush water reuse unit, using a central control module, a monitoring camera, a water quality detector, and a flocculant automatic The discharge valve, RO reverse osmosis membrane and other components are processed through coagulation separation process and RO reverse osmosis process to achieve automated monitoring and processing.

Benefits of technology

Unattended automated monitoring and treatment have been realized, which reduces water resource waste and environmental pollution, saves labor costs, and treats water influx to drinking water standards for underground water supply, improving water resource utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118908375A_ABST
    Figure CN118908375A_ABST
Patent Text Reader

Abstract

The invention discloses an unattended coal mine goaf gushing water reuse management system, which comprises a management device body, a central control module, a monitoring unit, a gushing water quality detection unit and a gushing water treatment unit, and is characterized in that the central control module is mounted on the surface of a circuit board on one side of a heat conduction plate in the management device body; the monitoring unit and the gushing water quality detection unit are arranged on the surface of the circuit board on one side of the central control module, the gushing water treatment unit is arranged on the surface of the circuit board below the central control module, and the gushing water reuse unit is arranged on the surface of the circuit board on the other side of the gushing water treatment unit. The gushing water treatment unit comprises a first water pump, an automatic flocculant feeding valve, a separation tank, a second water pump and an RO (Reverse Osmosis) membrane. By adopting a treatment mode of combining a coagulation separation process and an RO (Reverse Osmosis) process, gushing water can be desalted and softened for reuse of underground water, and the whole process is unattended, so that the labor cost is saved, the automation degree is high, and the system is more intelligent.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of coal mine water inrush management systems, in particular to an unattended coal mine goaf water inrush reuse management system. Background Art

[0002] Mine water inrush refers to the groundwater (pore water source, fissure water source, karst water source) and surface water source in the pores of the ore body and surrounding rock, which gushes out under the action of pressure. It is called mine water inrush (the phenomenon that groundwater continuously flows into the site when mining, excavating foundation pits or underground chambers in the rock (soil) below the groundwater surface).

[0003] The water gushing out of the goaf in underground coal mines is highly mineralized mine water with high salt content and hardness. The cost of draining it to the ground for treatment is high, and there are environmental risks. In order to save water resources to the greatest extent and make full use of the water gushing out of the goaf in underground coal mines, the current water reuse treatment method requires a lot of manpower costs, and requires personnel on duty and management throughout the process, with a low degree of automation. We propose an unmanned coal mine goaf water reuse management system. Summary of the invention

[0004] The purpose of the present invention is to provide an unattended coal mine goaf water reuse management system to solve the problems raised in the above background technology.

[0005] To achieve the above-mentioned objectives, the present invention provides the following technical solutions: an unattended coal mine goaf water reuse management system, comprising a management device body, a central control module, a monitoring unit, a water quality detection unit and a water treatment unit, wherein the central control module is installed on the circuit board surface on one side of the heat conduction plate inside the management device body, the monitoring unit and the water quality detection unit are respectively arranged on the circuit board surface on one side of the central control module, the water treatment unit is arranged on the circuit board surface below the central control module, and the circuit board surface on the other side of the water treatment unit is provided with a water reuse unit, the monitoring unit comprises a first monitoring camera, a second monitoring camera, and a third monitoring camera, the water quality detection unit comprises a first water quality detector and a second water quality detector, and the water treatment unit comprises a first water pump, an automatic flocculant delivery valve, a separation tank, a second water pump, and an RO reverse osmosis membrane.

[0006] Preferably, heat dissipation windows are installed on the outer walls on both sides of the management device body, and heat dissipation fans are installed inside the heat dissipation windows to facilitate heat dissipation.

[0007] Preferably, a cold water box is installed inside the heat conduction plate, and a semiconductor refrigeration plate is installed on the outer wall of the cold water box away from the circuit board. The outer wall of the semiconductor refrigeration plate extends to the outside of the management device body and is installed with a fan to cool the circuit board.

[0008] Preferably, a wireless transmission module is installed on the surface of the circuit board on one side of the central control module.

[0009] Preferably, the monitoring unit is remotely connected to the first monitoring camera, the second monitoring camera, and the third monitoring camera through a monitoring module.

[0010] Preferably, the gushing water quality detection unit is remotely connected to the first water quality detector and the second water quality detector via a water quality analysis and processing module.

[0011] Preferably, the gushing water treatment unit adopts two processes, namely, a coagulation separation process and a RO reverse osmosis process.

[0012] Preferably, the water reuse unit includes a constant pressure water supply device and a downhole water supply system.

[0013] Compared with the prior art, the present invention has the following beneficial effects:

[0014] The management system is mainly composed of four parts: a monitoring unit, a gushing water quality detection unit, a gushing water treatment unit, and a gushing water reuse unit. The monitoring unit receives image data captured by the first monitoring camera, the second monitoring camera, and the third monitoring camera installed in the goaf of the coal mine through the monitoring module, and transmits the image data to the central control module for analysis and processing. The first monitoring camera monitors the gushing water generation link, the second monitoring camera monitors the gushing water treatment link, and the third monitoring camera monitors the gushing water reuse link. When gushing water is generated, the gushing water quality detection unit receives the data detected by the first water quality detector installed in the gushing water pool through the water quality analysis and processing module, and transmits the data to the central control module for analysis and processing. Then, the first water pump in the gushing water treatment unit pumps the gushing water into the separation pool, controls the automatic flocculant delivery valve to deliver flocculant into the separation pool, so that the colloidal matter in the gushing water is condensed and flocculated and separated, so as to achieve the purpose of preliminary purification. Next, the second water pump draws out the gushing water in the separation tank and delivers it to the RO reverse osmosis membrane for reverse osmosis purification. The gushing water is desalted and can effectively remove low-molecular organic matter, viruses and bacteria. At the same time, it can intercept calcium and magnesium ions in the water and reduce the hardness of the water. The second water quality detector detects the treated clean water. This system adopts a treatment method that combines coagulation separation technology and RO reverse osmosis technology, which can desalinate and soften the gushing water and transform it into reusable clean water. After treatment, the gushing water in the goaf can meet the drinking water standard. The gushing water reuse unit adopts a constant pressure water supply device to connect the clean water to the underground water supply system, and the treated clean water is used as a supplementary water source for the underground water supply system, which not only effectively saves water resources, reduces the discharge of mine water, and reduces pollution to the surrounding environment of the mining area, but also saves the cost of discharging the gushing water in the goaf to the ground for reprocessing. Moreover, the control system is unmanned throughout the process, saving labor costs, with a high degree of automation and greater intelligence. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the main structure of the present invention;

[0016] Figure 2 It is a schematic diagram of an enlarged cross-sectional side view of the heat conducting plate of the present invention;

[0017] Figure 3 is a system block diagram of the present invention;

[0018] Figure 4 is a system block diagram of a monitoring unit of the present invention;

[0019] Figure 5 It is a system block diagram of a water quality detection unit of the present invention;

[0020] Figure 6 It is a system block diagram of the water treatment unit of the present invention.

[0021] In the figure: 1. Management device body; 2. Heat conduction plate; 3. Circuit board; 4. Central control module; 5. Monitoring unit; 501. Monitoring module; 502. First monitoring camera; 503. Second monitoring camera; 504. Third monitoring camera; 6. Gushing water quality detection unit; 601. Water quality analysis and processing module; 602. First water quality detector; 603. Second water quality detector; 7. Gushing water treatment unit; 701. First water pump; 702. Automatic flocculant delivery valve; 703. Separation tank; 704. Second water pump; 705. RO reverse osmosis membrane; 8. Gushing water reuse unit; 9. Heat dissipation window; 10. Heat dissipation fan; 11. Wireless transmission module; 12. Cold water box; 13. Semiconductor refrigeration sheet; 14. Fan. DETAILED DESCRIPTION

[0022] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. All other embodiments obtained by ordinary technicians in the field without making creative work based on the embodiments of the present invention shall fall within the scope of protection of the present invention.

[0023] See also Figure 1-6 , an embodiment provided by the present invention: an unattended coal mine goaf water reuse management system, comprising a management device body 1, a central control module 4, a monitoring unit 5, a water quality detection unit 6 and a water treatment unit 7, wherein the central control module 4 is mounted on the surface of a circuit board 3 on one side of a heat conduction plate 2 inside the management device body 1;

[0024] The monitoring unit 5 and the water quality detection unit 6 are respectively arranged on the surface of the circuit board 3 on one side of the central control module 4;

[0025] The gushing water processing unit 7 is arranged on the surface of the circuit board 3 below the central control module 4, and the gushing water reuse unit 8 is arranged on the surface of the circuit board 3 on the other side of the gushing water processing unit 7;

[0026] The monitoring unit 5 includes a first monitoring camera 502, a second monitoring camera 503, and a third monitoring camera 504. The gushing water quality detection unit 6 includes a first water quality detector 602 and a second water quality detector 603. The gushing water treatment unit 7 includes a first water pump 701, an automatic flocculant delivery valve 702, a separation tank 703, a second water pump 704, and a RO reverse osmosis membrane 705.

[0027] Specifically, the monitoring unit 5 receives the image data captured by the first monitoring camera 502, the second monitoring camera 503, and the third monitoring camera 504 installed in the goaf of the coal mine through the monitoring module 501, and transmits it to the central control module 4 for analysis and processing. The first monitoring camera 502 monitors the water gushing generation link, the second monitoring camera 503 monitors the water gushing processing link, and the third monitoring camera 504 monitors the water gushing reuse link. When water gushing is generated, the water quality detection unit 6 receives the data detected by the first water quality detector 602 installed in the water gushing pool through the water quality analysis and processing module 601, and transmits it to the central control module 4 for analysis and processing. The control module 4 performs analysis and processing, and then the first water pump 701 in the gushing water treatment unit 7 pumps the gushing water into the separation tank 703, and controls the flocculant automatic delivery valve 702 to deliver the flocculant into the separation tank 703, so that the colloidal matter in the gushing water is condensed and flocculated and separated, so as to achieve the purpose of preliminary purification. Then, the second water pump 704 pumps the gushing water in the separation tank 703 and delivers it to the RO reverse osmosis membrane 705 for reverse osmosis purification, desalination treatment of the gushing water, and effective removal of low molecular organic matter, viruses and bacteria, etc. At the same time, calcium and magnesium ions in the water can be intercepted to reduce the hardness of the water. The second water quality detector 603 detects the treated clean water;

[0028] Heat dissipation windows 9 are installed on the outer walls of both sides of the management device body 1, and heat dissipation fans 10 are installed inside the heat dissipation windows 9;

[0029] A cold water box 12 is installed inside the heat conducting plate 2, and a semiconductor cooling sheet 13 is installed on the outer wall of the cold water box 12 away from the circuit board 3, and the outer wall of the semiconductor cooling sheet 13 extends to the outside of the management device body 1 and is installed with a fan 14;

[0030] Specifically, the cold end of the semiconductor refrigeration sheet 13 cools the coolant in the cold water box 12, and the coolant cools the circuit board 3. The hot end of the semiconductor refrigeration sheet 13 is located outside the management device body 1, and the fan 14 cools the hot end of the semiconductor refrigeration sheet 13. At the same time, the heat dissipation fan 10 inside the heat dissipation window 9 runs to speed up the air flow rate inside the management device body 1, so that the heat is quickly dissipated to the outside, thereby improving the heat dissipation effect, so that the management system runs stably and reliably.

[0031] A wireless transmission module 11 is installed on the surface of the circuit board 3 on one side of the central control module 4;

[0032] The monitoring unit 5 is remotely connected to the first monitoring camera 502, the second monitoring camera 503, and the third monitoring camera 504 through the monitoring module 501;

[0033] The gushing water quality detection unit 6 is remotely connected to the first water quality detector 602 and the second water quality detector 603 through the water quality analysis and processing module 601;

[0034] The gushing water treatment unit 7 adopts two processes, namely, coagulation separation process and RO reverse osmosis process;

[0035] The water reuse unit 8 includes a constant pressure water supply device and an underground water supply system;

[0036] Specifically, this system adopts a treatment method that combines coagulation separation technology and RO reverse osmosis technology, which can desalinate and soften the gushing water and convert it into reusable clean water. After treatment, the gushing water in the goaf can meet the drinking water standard. The gushing water reuse unit 8 uses a constant pressure water supply device to connect the clean water to the underground water supply system, and uses the treated clean water as a supplementary water source for the underground water supply system. It not only effectively saves water resources, reduces the discharge of mine water, and reduces pollution to the surrounding environment of the mining area, but also saves the cost of discharging the gushing water in the goaf to the ground for further treatment.

[0037] When the embodiment of the present application is in use: first, the management system is mainly composed of four parts: a monitoring unit 5, a gushing water quality detection unit 6, a gushing water treatment unit 7, and a gushing water reuse unit 8. Among them, the monitoring unit 5 receives the image data taken by the first monitoring camera 502, the second monitoring camera 503, and the third monitoring camera 504 installed in the goaf of the coal mine underground through the monitoring module 501, and transmits it to the central control module 4 for analysis and processing. The first monitoring camera 502 monitors the gushing water generation link, the second monitoring camera 503 monitors the gushing water treatment link, and the third monitoring camera 504 monitors the gushing water reuse link. When a gushing water is generated, When the water is collected, the gushing water quality detection unit 6 receives the data detected by the first water quality detector 602 installed in the gushing water pool through the water quality analysis and processing module 601, and transmits it to the central control module 4 for analysis and processing. Then, the first water pump 701 in the gushing water processing unit 7 pumps the gushing water into the separation pool 703, controls the flocculant automatic delivery valve 702 to deliver the flocculant into the separation pool 703, so that the colloidal particles in the gushing water are condensed and flocculated and separated, so as to achieve the purpose of preliminary purification. Then, the second water pump 704 draws the gushing water out of the separation pool 703 and delivers it to the RO reverse osmosis membrane 705 for reverse osmosis purification, desalination treatment of the gushing water, and also It can effectively remove low molecular organic matter, viruses and bacteria, and at the same time, it can intercept calcium and magnesium ions in the water and reduce the hardness of the water. The second water quality detector 603 detects the treated clean water. This system adopts a treatment method that combines coagulation separation technology and RO reverse osmosis technology. It can desalinate and soften the gushing water and transform it into reusable clean water. The gushing water in the goaf can meet the drinking water standard after treatment. The gushing water reuse unit 8 adopts a constant pressure water supply device to connect the clean water to the underground water supply system, and uses the treated clean water as a supplementary water source for the underground water supply system, which not only effectively saves water resources, reduces the discharge of mine water, and reduces the pollution to the surrounding environment of the mining area. At the same time, it also saves the cost of draining the water gushing from the goaf to the ground for further treatment. Moreover, the control system is unmanned throughout the process, which saves labor costs, has a high degree of automation and is more intelligent. In addition, the cold end of the semiconductor refrigeration chip 13 cools the coolant in the cold water box 12, and the coolant cools the circuit board 3. The hot end of the semiconductor refrigeration chip 13 is located outside the management device body 1, and the fan 14 cools the hot end of the semiconductor refrigeration chip 13. At the same time, the heat dissipation fan 10 inside the heat dissipation window 9 runs to speed up the air flow rate inside the management device body 1, so that the heat is quickly dissipated to the outside, thereby improving the heat dissipation effect, so that the management system runs stably and reliably.

[0038] Obviously, the above-described embodiments are only a part of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

Claims

1. An unattended coal mine goaf water reuse management system, It is characterized in that The invention comprises a management device body (1), a central control module (4), a monitoring unit (5), a gushing water quality detection unit (6) and a gushing water treatment unit (7), wherein the central control module (4) is mounted on the surface of a circuit board (3) on one side of a heat conduction plate (2) inside the management device body (1), the monitoring unit (5) and the gushing water quality detection unit (6) are respectively arranged on the surface of the circuit board (3) on one side of the central control module (4), the gushing water treatment unit (7) is arranged on the surface of the circuit board (3) below the central control module (4), and the gushing water treatment unit (7) is arranged on the surface of the circuit board (3) below the central control module (4). 7) A gushing water reuse unit (8) is arranged on the surface of the circuit board (3) on the other side, the monitoring unit (5) includes a first monitoring camera (502), a second monitoring camera (503), and a third monitoring camera (504), the gushing water quality detection unit (6) includes a first water quality detector (602) and a second water quality detector (603), and the gushing water treatment unit (7) includes a first water pump (701), an automatic flocculant delivery valve (702), a separation tank (703), a second water pump (704), and an RO reverse osmosis membrane (705).

2. The unattended coal mine water reuse management system according to claim 1, Features: Heat dissipation windows (9) are installed on the outer walls of both sides of the management device body (1), and heat dissipation fans (10) are installed inside the heat dissipation windows (9).

3. The unattended coal mine water reuse management system according to claim 1, Features: A cold water box (12) is installed inside the heat conduction plate (2), and a semiconductor cooling plate (13) is installed on the outer wall of the cold water box (12) away from the circuit board (3), and the outer wall of the semiconductor cooling plate (13) extends to the outside of the management device body (1) and is installed with a fan (14).

4. The unattended coal mine water reuse management system according to claim 1, Features: A wireless transmission module (11) is installed on the surface of the circuit board (3) on one side of the central control module (4).

5. The unattended coal mine water reuse management system according to claim 1, Features: The monitoring unit (5) is remotely connected to the first monitoring camera (502), the second monitoring camera (503), and the third monitoring camera (504) via the monitoring module (501).

6. The unattended coal mine water reuse management system according to claim 1, Features: The gushing water quality detection unit (6) is remotely connected to the first water quality detector (602) and the second water quality detector (603) via the water quality analysis and processing module (601).

7. The unattended coal mine water reuse management system according to claim 1, Features: The gushing water treatment unit (7) adopts two processes, namely a coagulation separation process and a RO reverse osmosis process.

8. The unattended coal mine water reuse management system according to claim 1, Features: The water reuse unit (8) comprises a constant pressure water supply device and an underground water supply system.