Three-dimensional permeable reactive barrier for polluted groundwater remediation and construction method of three-dimensional permeable reactive barrier

Through the combination of an automated extraction system and composite sustained release functional materials, the problem of insufficient contact of PRB materials in well-in-well mode is solved, efficient remediation of polluted water is achieved, cost and environmental impact is reduced, and pollutant treatment effect is improved.

CN118908422AInactive Publication Date: 2024-11-08NANJING UNIV +1
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411205190.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-29
Publication Date
2024-11-08
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

When using the well-in-well mode of the existing three-dimensional permeable reaction wall, it is difficult for PRB materials to fully contact the contaminated groundwater, resulting in a small radius of extraction impact, the material needs to be replaced regularly, which increases project costs, and inconsistent groundwater flow direction in developed water systems affects the reaction. efficiency.

Method used

Adopt an automated extraction system, including a submersible pump, extraction pipe and return pipe, combined with a composite sustained release functional material and a mixed material of quartz sand, to achieve multiple cycle repairs of polluted water through vertical and horizontal reaction walls, and use plant coordinated repair to reduce Material waste and environmental impact.

Benefits of technology

It improves the contact efficiency of polluted water and PRB materials, reduces construction costs and energy consumption, achieves a more efficient pollutant repair effect, and avoids material replacement and environmental pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118908422A_ABST
    Figure CN118908422A_ABST
Patent Text Reader

Abstract

The invention discloses a three-dimensional permeable reactive barrier for polluted groundwater remediation and a construction method of the three-dimensional permeable reactive barrier. The three-dimensional permeable reactive barrier comprises an arranged automatic extraction system; the automatic extraction system comprises an extraction well, a submersible pump and an extraction pipe are installed in the extraction well, the output ends of the submersible pump and the extraction pipe are connected with a water return pipe, the water return pipe is installed on a clay layer, and a gravel layer is laid below the clay layer. A composite slow-release functional material and quartz sand mixed material is laid below the gravel layer, and a non-woven fabric is arranged below the composite slow-release functional material and quartz sand mixed material. According to the three-dimensional permeable reactive barrier for polluted groundwater remediation and the construction method of the three-dimensional permeable reactive barrier, the water pumping speed is controlled through the water pump, so that polluted water makes full contact with the PRB material, and the problems that a traditional pumping treatment project is large in occupied area, high in energy consumption and large in agent loss, and needs regular maintenance and monitoring are solved; and meanwhile, plants with a remediation effect on pollutants can be utilized for synergistic remediation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field related to contaminated groundwater remediation, and specifically to a three-dimensional permeable reaction wall for contaminated groundwater remediation and a construction method thereof. Background Art

[0002] In recent years, with the acceleration of urbanization, many industrial lands have been transformed into residential lands or lands for public management and public services. In particular, the transformation of land use properties of historically highly polluted plots such as pesticide and chemical industries has posed serious threats and challenges to sustainable development such as human health, food safety, drinking water safety, regional ecological environment, and even social stability. Therefore, the governance, restoration, and risk control of contaminated groundwater and soil pollution are imminent. The permeable reactive wall is a relatively mature in-situ remediation technology for removing pollutants from groundwater and soil. The PRB technology has the advantages of being able to treat a variety of pollutants in-situ, good treatment effects, and low operating costs. The PRB technology does not involve the extraction of groundwater and is an in-situ passive system that does not require external power, is universal in the removal of pollutants, and has little impact on the ecological environment. In actual operation, the existing three-dimensional permeable reaction wall and its construction method for contaminated groundwater remediation still have certain defects when used, such as; For example, a single-well built-in permeable reactor with publication number CN109516548A adopts an in-situ device of "well in well", in which PRB material is filled in the cylindrical space formed between the outer well pipe and the inner well pipe. The polluted water first enters the PRB coating through the outer well pipe, and the water flow path in the PRB coating is controlled, so that the contact time between the water and the PRB coating can be controlled in one wellbore; Another example is a PRB coupled circulation well system and a method for repairing groundwater with publication number CN114716066A. The circulating water flow formed inside and outside the main well unit of the circulation well based on the suction action of the pumping and injection water pump and combined with the gravity action can increase the vertical flow of groundwater to reduce the lateral diffusion of pollutants, so that the contaminated groundwater around the permeable reaction wall coupled circulation well system can flow through the permeable reaction wall unit multiple times through the circulating water flow, so as to achieve the groundwater purification standard through multiple cumulative repair effects. At the same time, reducing the lateral diffusion of pollutants can also avoid repeated repair work by drilling vertical wells in multiple places, thereby reducing the cost and the disturbance to the formation. The pumping and injection water pump draws up the contaminated groundwater and passes it through the horizontal permeable reaction wall area, so that the contaminated groundwater is fully in contact with the reaction wall, thereby improving the repair efficiency. The circulating water flow is formed by the pumping and injection water unit of the circulation well so that the contaminated groundwater actively reaches the horizontal PRB repair area, and the repair process occurs outside the circulation well. Both of the above patents utilize the technology of combining PRB technology with extraction wells. However, the outer side of the PRB material is affected by the outer well pipe wall and is difficult to fully contact with the contaminated groundwater in the well-in-well mode. Therefore, the groundwater extraction impact radius is small, and the PRB material used in the outer well pipe needs to be replaced regularly. Therefore, stricter requirements are put forward for the construction of extraction wells or circulation wells, which will cause waste of materials and increase project costs. In addition, in areas with relatively developed water systems, there is more interaction between groundwater and surface water, and there is inconsistency in the flow direction of groundwater during the dry season and the flood season, resulting in low reaction efficiency between the filler in the reaction wall and the contaminated groundwater flow, and the treatment effect does not achieve the expected goal.

[0003] In response to the above problems, it is urgently necessary to make innovative designs based on the original three-dimensional permeable reaction wall and its construction method for contaminated groundwater remediation. Therefore, we proposed a three-dimensional permeable reaction wall and its construction method for contaminated groundwater remediation, which can well solve the above problems. Summary of the invention

[0004] The purpose of the present invention is to provide a three-dimensional permeable reaction wall and a construction method thereof for the remediation of contaminated groundwater, so as to solve the problem proposed in the above-mentioned background technology that the outer side of the PRB material using the well-in-well mode on the market is affected by the outer well pipe wall and is difficult to fully contact with the contaminated groundwater, so the groundwater extraction impact radius is small, and the PRB material used in the outer well pipe needs to be replaced regularly, so stricter requirements are put forward for the construction of extraction wells or circulation wells, which will cause waste of materials and increase project costs. In addition, in areas with relatively developed water systems, there is more interaction between groundwater and surface water, and there is inconsistency in the flow direction of groundwater in the dry season and the flood season, resulting in low reaction efficiency between the filler in the reaction wall and the contaminated groundwater flow, and the treatment effect does not achieve the expected goal.

[0005] To achieve the above-mentioned object, the present invention provides the following technical solutions: a three-dimensional permeable reaction wall for contaminated groundwater remediation and a construction method thereof, including an automated extraction system; The automated extraction system includes an extraction well, a submersible pump and an extraction pipe are installed inside the extraction well, a return pipe is connected to the output end of the submersible pump and the extraction pipe, the return pipe is installed on a clay layer, a gravel layer is laid under the clay layer, a composite slow-release functional material and quartz sand mixed material is laid under the gravel layer, and a non-woven fabric is arranged under the composite slow-release functional material and quartz sand mixed material.

[0006] Preferably, the composite slow-release functional material and quartz sand mixed material is prepared by mixing backfill composite slow-release functional material and quartz sand, and the added volume ratio of backfill composite slow-release functional material and quartz sand is (0.5~1.0):1, and the backfill composite slow-release functional material is spherical particles prepared by compounding attapulgite, cement, sawdust and activated carbon materials, and the particle size is 0.5-1.0cm.

[0007] Preferably, the thickness of the composite slow-release functional material and quartz sand mixed material is 0.5-1.0m, the thickness of the gravel layer is 0.5m, the gravel layer is made of gravel particles, and the gravel particle size is 0.5-1.0m, and the thickness of the clay layer is 0.5~1.0m.

[0008] Preferably, the diameter of the extraction wellbore is 30-50 cm, and the diameter of the return pipe is 5-10 cm.

[0009] Preferably, the construction method steps are: S1: Construction preparation: land leveling and surveying; S2: Vertical reaction wall construction: Use a rotary full-set pipe pile driver for vertical PRB wall excavation and backfilling of reaction materials; S3: Horizontal reaction wall construction: excavate the foundation pit in the area where the horizontal wall is to be constructed according to the design, and fill the foundation pit with active reaction materials, gravel and clay in turn to complete the construction of the horizontal permeable reaction wall; S4: Construction of extraction system: Build an extraction well at the center of the vertical reaction wall and a return well at the horizontal reaction wall; S5: Planting of ground plants: Planting of cloned willow and alfalfa above the horizontal reaction wall; S6: Operation of the extraction system: Use an extraction pump to extract groundwater from the groundwater contaminated layer, and then recharge the groundwater into the ground through a return pipe to complete a cycle. Through the continuous operation of the system, the groundwater remediation reaches the target value.

[0010] Compared with the prior art, the invention has the following beneficial effects: the three-dimensional permeable reaction wall and construction method for contaminated groundwater remediation control the pumping speed through a water pump, so that the contaminated water is fully in contact with the PRB material, avoiding the problems of large floor space, high energy consumption, large amount of reagent loss, and regular maintenance and monitoring required for traditional extraction and treatment projects. At the same time, plants that have a repairing effect on pollutants can be used for coordinated repair. The specific contents are as follows: (1) The overall construction method can efficiently complete the construction of the PRB reaction wall in one go, and only simple extraction and reinjection are required afterwards, with low operating costs; (2) In order to ensure the stability of the excavated soil layer, vertical reaction walls were constructed and double sleeve supports were used to avoid landslides and water inrush; (3) The contaminated groundwater is drained to the vertical and horizontal PRBs for reaction through extraction pumps. The pumping speed is controlled by water pumps to ensure that the PRB materials are fully in contact with the contaminated water. If the PRB reaction wall fails to meet the standard in one treatment, it can be recycled multiple times until it meets the standard. This effectively solves the problem of seasonal interaction of groundwater flow fields and areas where groundwater flows slowly. (4) The process of combining circulation wells with PRBs is used to achieve contaminated groundwater remediation only on the vertical plane. The primary circulation system reacts with the PRB material only once, and a horizontal reaction wall is added to improve the treatment effect of contaminated groundwater. (5) The overall operation has low secondary pollution. The PRB material is environmentally friendly and does not need to be replaced. The contaminated soil and groundwater do not come into contact with the ambient air, reducing the impact on the environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a schematic diagram of the vertical cross-section structure of the three-dimensional PRB structure of the present invention; Figure 2 It is a schematic diagram of the plane layout structure of the three-dimensional PRB structure of the present invention; Figure 3 This is a schematic diagram of the pollutant removal effect of the three-dimensional PRB of the present invention after running for a period of time.

[0012] In the figure: 1. Automated extraction system; 2. Clay layer; 3. Gravel layer; 4. Composite slow-release functional material and quartz sand mixed material; 5. Non-woven fabric; 6. Return pipe; 7. Submersible pump and extraction pipe; 8. Extraction well. DETAILED DESCRIPTION

[0013] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0014] In this embodiment, in order to reduce the overall repair cost, the automated extraction system 1 is used, such as Figure 1-Figure 3The technical solution shown in the figure includes an automatic extraction system 1, which includes an extraction well 8, a submersible pump and an extraction pipe 7 are installed inside the extraction well 8, and the output ends of the submersible pump and the extraction pipe 7 are connected to a return pipe 6, which is installed on a clay layer 2, a gravel layer 3 is laid under the clay layer 2, a composite slow-release functional material and quartz sand mixed material 4 is laid under the gravel layer 3, a non-woven fabric 5 is arranged under the composite slow-release functional material and quartz sand mixed material 4, and the composite slow-release functional material and quartz sand mixed material 4 is made by mixing backfill composite slow-release functional material and quartz sand, and the added volume ratio of the backfill composite slow-release functional material to the quartz sand is (0.5~1.0):1, and the backfill composite slow-release functional material is a spherical particle prepared by compounding attapulgite, cement, sawdust, and activated carbon materials, and the particle size is 0.5-1 .0cm, the thickness of the composite slow-release functional material and quartz sand mixed material 4 is 0.5~1.0m, the thickness of the gravel layer 3 is 0.5m, the gravel layer 3 is made of gravel particles, and the gravel particle size is 0.5-1.0m, the thickness of the clay layer 2 is 0.5~1.0m, the diameter of the extraction well 8 hole is 30-50cm, and the diameter of the return pipe 6 is 5-10cm. The contaminated groundwater is drained to the vertical and horizontal PRB for reaction by the extraction pump, and the pumping speed is controlled by the water pump to make the contaminated water fully contact with the PRB material. If the PRB reaction wall is not up to standard in one treatment, it can be circulated multiple times until it meets the standard; it avoids the problems of large occupation of area, high energy consumption, large loss of reagents, and regular maintenance and monitoring in traditional extraction treatment projects. At the same time, plants that have a repair effect on pollutants can be used to achieve coordinated repair of soil and groundwater pollution.

[0015] The construction method steps are as follows: During the construction preparation stage, according to the distribution range of groundwater pollution determined by the survey results, the land is leveled and measured within the construction scope, and the center position of the planned infiltration reaction wall is determined; The vertical permeable reaction wall unit is constructed by excavating with a double-sleeve rotary drilling method, taking out the soil in the area where the permeable reaction wall is to be excavated, and backfilling the composite slow-release functional material and quartz sand mixture; The construction of the horizontal PRB unit is based on the horizontal distribution of groundwater pollution, with the heaviest groundwater pollution point as the center, and a circular foundation pit with a diameter of 10-15m and a depth of 1.5-2m is excavated. The foundation pit is backfilled with a mixture of composite slow-release functional materials and quartz sand, a gravel layer of 3, a permeable non-woven fabric of 5, and clay in sequence; Construction of the extraction system: an extraction well 8 is constructed at the center of the vertical reaction wall, and the extraction well 8 is screened at the depth of the groundwater pollution plume; an automated submersible pump is used to extract the polluted water, and the submersible pump water intake is set at the depth of the extraction well 8 screen, and the return pipe 6 is connected to the submersible pump through a hose, and the outlet of the return pipe 6 is set at the gravel layer 3 of the horizontal permeable reaction wall unit; Planting of surface plants, planting asexual willow and alfalfa in the clay layer, and allowing plant roots to enter the permeable reactive wall material to achieve synergistic remediation of contaminated soil and groundwater; System operation,After the system is built, a submersible pump is used to extract contaminated groundwater through the vertical permeable reaction wall, and then the groundwater is recharged into the underground through the return pipe 6. Under the action of gravity, the contaminated groundwater passes through the horizontal permeable reaction wall to complete the entire cycle.

[0016] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A three-dimensional permeable reaction wall for remediation of contaminated groundwater, comprising an automated extraction system (1); It is characterized in that Also includes: The automated extraction system (1) comprises an extraction well (8) which is provided with a submersible pump and an extraction pipe (7) installed inside the extraction well (8); the output ends of the submersible pump and the extraction pipe (7) are connected to a return pipe (6); the return pipe (6) is installed on a clay layer (2); a gravel layer (3) is laid under the clay layer (2); a composite slow-release functional material and a quartz sand mixed material (4) is laid under the gravel layer (3); and a non-woven fabric (5) is arranged under the composite slow-release functional material and the quartz sand mixed material (4).

2. A three-dimensional permeable reaction wall for contaminated groundwater remediation according to claim 1, characterized in that: The composite slow-release functional material and quartz sand mixed material (4) is prepared by mixing the backfill composite slow-release functional material and quartz sand, and the added volume ratio of the backfill composite slow-release functional material to the quartz sand is (0.5-1.0):1, and the backfill composite slow-release functional material is spherical particles prepared by compounding attapulgite, cement, wood chips, and activated carbon materials, and the particle size is 0.5-1.0 cm.

3. A three-dimensional permeable reaction wall for contaminated groundwater remediation according to claim 1, characterized in that: The composite slow-release functional material and quartz sand mixed material (4) has a thickness of 0.5-1.0 m, the gravel layer (3) has a thickness of 0.5 m, the gravel layer (3) is made of gravel particles, and the gravel particle size is 0.5-1.0 m, and the clay layer (2) has a thickness of 0.5-1.0 m.

4. A three-dimensional permeable reaction wall for contaminated groundwater remediation according to claim 1, characterized in that: The diameter of the extraction well (8) is 30-50 cm, and the diameter of the return pipe (6) is 5-10 cm.

5. The construction method of a three-dimensional permeable reaction wall for contaminated groundwater remediation according to claim 1, characterized in that: Construction method steps: S1: Construction preparation: land leveling and surveying; S2: Vertical reaction wall construction: Use a rotary full-set pipe pile driver for vertical PRB wall excavation and backfilling of reaction materials; S3: Horizontal reaction wall construction: excavate the foundation pit in the area where the horizontal wall is to be constructed according to the design, and fill the foundation pit with active reaction materials, gravel and clay in turn to complete the construction of the horizontal permeable reaction wall; S4: Construction of extraction system: Build an extraction well at the center of the vertical reaction wall and a return well at the horizontal reaction wall; S5: Planting of ground plants: Planting of cloned willow and alfalfa above the horizontal reaction wall; S6: Operation of the extraction system: Use an extraction pump to extract groundwater from the groundwater contaminated layer, and then recharge the groundwater into the ground through a return pipe to complete a cycle. Through the continuous operation of the system, the groundwater remediation reaches the target value.

Citation Information

Patent Citations

  • Groundwater organic pollutant restoration device and method

    CN103601280A

  • Underground water heavy metal pollution remediation device

    CN104692531A

  • Reinforced composite ecological filter bed for treating low-pollution mine water

    CN114605032A

  • Permeable reactive barrier coupling circulating well system and method for repairing underground water

    CN114716066A

  • Safe water taking well suitable for groundwater non -point source pollution area

    CN207919638U