Temporary locking construction method for closure of steel box girders of pier tower girder consolidation system

By using the steel box girder temporary locking device in the construction of cable-stayed bridges, using steel plates, fine-rolled rebars and nuts for uniform stress locking, the problems of large steel consumption and uneven stress consumption in traditional steel welding are solved, and the problem of The fast and economical locking effect improves construction efficiency and safety.

CN118911032APending Publication Date: 2024-11-08SICHUAN ROAD & BRIDGE CONSTRUCTION GROUP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411285273.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-13
Publication Date
2024-11-08

AI Technical Summary

Technical Problem

In the construction of cable-stayed bridge span joints, the traditional steel welding joints method consumes a lot of steel and costs high, and cannot control the uniform stress at the connection parts and has little stiffness.

Method used

The steel box beam mount temporary locking device adopts the pier tower beam consolidation system, uses steel plates, fine-rolled rebars and nuts for temporary locking. The pulling device ensures uniform stress and uses a torque wrench to control the same torque of the nut to achieve fast and accurate lock.

Benefits of technology

It significantly shortens the locking time, saves steel and construction costs, improves labour efficiency, ensures uniform stress and high stiffness of the Helongkou, and obtains good social benefits.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118911032A_ABST
    Figure CN118911032A_ABST
Patent Text Reader

Abstract

The invention discloses a pier tower beam consolidation system steel box beam closure temporary locking device and a construction method, and is characterized in that the temporary locking device comprises a U rib, a steel plate, a finish rolling deformed steel bar, a nut, a top plate and a bottom plate, blanking is performed according to the distance of a closure opening and the size of a steel box beam, and the shape size of the steel plate and the length of the finish rolling deformed steel bar are determined; the temporary locking device totally needs 34 pieces of PSB1080 finish rolling deformed steel bars with the diameter being 40 mm. The construction technology comprises the steps of construction preparation, positioning and lofting, locking device steel plate welding, opposite pulling of the opposite pulling device, finish rolling deformed steel bar installation, closure opening main welding seam welding and temporary locking device dismantling. According to the device and the method, on the premise of guaranteeing the closure quality and safety of the steel box girder, the problem of quickly and accurately locking the closure opening is well solved, and the economic benefit and the social benefit are obvious; and after implementation, each index meets the design and specification requirements.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a temporary locking device and a construction method for closure of steel box beams in a pier-tower-beam consolidation system, in particular to a device and a construction method for temporary locking using steel plates and precision-rolled threaded steel bars. Background Art

[0002] In the current construction of the middle span closure of a cable-stayed bridge, the conventional construction method is to use a large number of steel sections to weld the two ends of the closure to temporarily lock it. This construction method consumes a lot of steel, is costly, and has low efficiency; it is also impossible to control the uniform force on each connection part, and the rigidity is not high. Summary of the invention

[0003] Therefore, in order to solve the above-mentioned deficiencies, the present invention provides a temporary locking device and method for the closure construction of steel box girders in a pier-tower-beam consolidation system; the device and method solve the problem of quickly and accurately locking the closure mouth while ensuring the quality and safety of the closure of the steel box girders, and has obvious economic and social benefits; after implementation, all indicators meet the design and specification requirements.

[0004] The present invention is implemented by constructing a temporary locking device for the closure of steel box beams in a pier-tower-beam consolidation system; The temporary locking device includes U ribs, steel plates, finely rolled threaded steel bars, nuts and top and bottom plates. The shape and size of the steel plates and the length of the finely rolled threaded steel bars are determined according to the distance between the joints and the size of the steel box beam. The temporary locking device requires a total of 34 PSB1080 φ40mm finely rolled threaded steel bars. Arrange U ribs, steel plates, and fine-rolled threaded steel bars on the top and bottom plates. Weld the steel plates of temporary locking devices at the top and bottom plates D1, D2 and D3 areas; A tensioning device is designed on the top and bottom plates, located at the intersection of the two middle longitudinal webs and the transverse diaphragm. The tensioning device is arranged in 4 groups with a total of 8 tensioning points, and is composed of 8 13 φ15.2s steel strands and 8 200T jacks. During tensioning, the same central control system is used for synchronous lifting to ensure that the force is as consistent as possible. The tensioning force is initially designed to be 800T. During tensioning, the change in the width of the closure weld is synchronously observed, and the control is mainly based on the weld width and supplemented by the tensioning force; Insert the fine-rolled threaded steel into the welding steel plate and tighten the nuts with a torque wrench, ensuring that the nuts of all locking devices have the same torque to complete temporary locking.

[0005] The present invention also provides a temporary locking construction method for closure of steel box beams in a pier-tower-beam consolidation system, and the construction process is as follows: (1) Construction preparation: The temporary locking device is composed of steel plates, fine-rolled threaded steel bars and nuts. The shape and size of the steel plates and the length of the fine-rolled threaded steel bars are determined according to the distance between the joints and the size of the steel box girder. A total of 34 PSB1080 φ40mm fine-rolled threaded steel bars are required; (2) Positioning and layout: Locate the steel plate welding positions according to the design drawings and arrange them on the top and bottom plates, with a total of 10 locations in one section; (3) Welding of locking device steel plates: After positioning and layout, weld the steel plates of the temporary locking device at positions D1, D2, and D3 of the top and bottom plates; (4) Pulling with the tensioning device: After the joint mouth elevation matches, install the tensioning device. The tensioning device is designed on the top and bottom plates, at the intersection of the two middle longitudinal webs and the transverse partition. The tensioning device is arranged in 4 groups with a total of 8 pulling points, and is composed of 8 13 φ15.2s steel strands and 8 200T jacks. When pulling, the same central control system is used for synchronous lifting to ensure that the force is as consistent as possible. The tensioning force is initially designed to be 800T. When pulling, the change in the width of the joint mouth weld is observed synchronously, and the control is mainly based on the weld width and supplemented by the tensioning force; (5) Anchoring of fine-rolled threaded steel: After the tension is completed, insert the fine-rolled threaded steel into the welded steel plate and tighten the nut with a torque wrench, ensuring that the nuts of all locking devices have the same torque to complete temporary locking; (6) Welding of the closure weld: complete the welding work of the closure weld; (7) Removal of temporary locking device: After the closure welding is completed, remove the temporary locking device.

[0006] The invention has the advantages that after using the method, the problem of fast locking of steel box beam closure under low temperature conditions is effectively overcome, the locking time is greatly shortened, and the construction cost is saved.

[0007] The benefit analysis is reflected in the construction period and economic effect: this method is convenient and fast, the steel plate can be cut and blanked in advance, and the device can be welded in the corresponding position in advance. Compared with the traditional large-scale steel welding and fixing, a lot of welding time is reduced. This method only takes a few minutes to complete the locking, which greatly improves the work efficiency. Economically, it saves a lot of steel, and is easy to operate, reducing the investment in personnel and equipment. It only needs a few welding machines to complete it. It is economical and practical, and the effect is considerable.

[0008] Social effect: After using this method, the problem of fast and accurate temporary locking during the closure process is effectively solved. The temporary locking device is of excellent quality and has strong operability, which saves construction costs and achieves good social benefits. This method has been well received by the owner, design, and supervision company during the closure construction. This method has played a positive role in enriching and developing similar bridge construction technologies and has broad application prospects. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 Flow chart of temporary locking of mid-span closure; Figure 2 Three views of the temporary locking device; Figure 3 Layout of temporary locking device.

[0011] Among them: U rib 1, φ40mm finely rolled threaded steel bar 2, steel plate 3, tensioning device 4, middle longitudinal web 5, D1 area 6, D2 area 7, D3 area 8. DETAILED DESCRIPTION

[0012] The present invention will be described in detail below in conjunction with the accompanying drawings, and the technical solutions in the embodiments of the present invention will be clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0013] The present invention provides a temporary locking device and construction method for the closure of steel box girders in a pier-tower-beam consolidation system through improvement. The temporary locking device is composed of steel plates, fine-rolled threaded steel bars and nuts. The fine-rolled threaded steel bars are used as pull rods to bear force, and the nuts are tightened and locked. The torque of all locking parts is controlled by a torque wrench to make the force uniform at all places of the closure. In addition, the present invention has the advantages of simple process and fast connection, thereby breaking the traditional process of temporary locking of steel box girders during closure construction, and providing experience and technical reference for temporary locking of steel box girders in a pier-tower-beam consolidation system. Through the successful example of the new temporary locking process used in the closure project of the cable-stayed bridge in Sichuan Province, the construction technical measures and key points of attention of the process are introduced.

[0014] During implementation, the temporary locking device includes U rib 1, steel plate 3, finely rolled threaded steel bar 2, nuts and top and bottom plates. The shape and size of the steel plate and the length of the finely rolled threaded steel bar are determined according to the distance between the joints and the size of the steel box girder. The temporary locking device requires a total of 34 PSB1080 φ40mm finely rolled threaded steel bars 2; Arrange U rib 1, steel plate 3, and fine-rolled threaded steel 2 on the top and bottom plates. Weld the steel plates of temporary locking devices at the positions of D1 area 6, D2 area 7, and D3 area 8 of the top and bottom plates; A tensioning device 4 is designed on the top and bottom plates, which is located at the intersection of the two middle longitudinal webs 5 and the transverse partition. The tensioning device is arranged by 4 groups of 8 tensioning points, and is composed of 8 13 φ15.2s steel strands and 8 200T jacks. When pulling, the same central control system is used for synchronous lifting to ensure that the force is as consistent as possible. The tensioning force is initially designed to be 800T. When pulling, the change in the width of the joint weld is observed synchronously, and the control is mainly based on the weld width and supplemented by the tensioning force.

[0015] Insert the fine-rolled threaded steel bar 2 into the welding steel plate, tighten the nut with a torque wrench, and ensure that the nuts of all locking devices have the same torque to complete temporary locking.

[0016] The characteristics of the method of the present invention include: the method mainly adopts the construction process of temporary locking of fine-rolled threaded steel bars. Compared with the traditional process, the process has the following characteristics: (1) Small steel consumption, no need for large amounts of steel sections, saving costs.

[0017] (2) The temporary locking device has a simple structure, quick installation and high efficiency.

[0018] (3) Use a torque wrench to control the same torque to ensure uniform force and high rigidity.

[0019] Scope of application: The cable-stayed bridge steel box girder closure project that meets the following points can be constructed using the process of temporary locking of fine-rolled threaded steel bars: (1) Projects where the closure temperature does not reach the design temperature.

[0020] (2) It is applicable to full floating, semi-floating and pier-tower-beam consolidation systems.

[0021] Process principle: Use the fine-rolled threaded steel as the pull rod to bear the force, tighten the nut to lock it, and use the torque wrench to control the same torque in all locking parts to make the force even at all parts of the joint.

[0022] The construction process and operation points of the present invention, the temporary locking process of the steel box girder joint of the pier tower beam consolidation system is as follows Figure 1 : (1) Construction preparation: The temporary locking device consists of steel plates, fine-rolled threaded steel bars and nuts. The shape and size of the steel plates and the length of the fine-rolled threaded steel bars are determined according to the distance between the joints and the size of the steel box girder. A total of 34 PSB1080 φ40 mm fine-rolled threaded steel bars are required.

[0023] (2) Positioning and layout: The steel plate welding positions are laid out according to the design drawings and arranged on the top and bottom plates, with a total of 10 locations in one section.

[0024] (3) Welding of locking device steel plates: After positioning and layout, weld the steel plates of the temporary locking device at positions D1, D2, and D3 of the top and bottom plates.

[0025] (4) Tensioning device tensioning: After the joint mouth elevation matches, install the tensioning device. The tensioning device is designed on the top and bottom plates, at the intersection of the two middle longitudinal webs and the transverse diaphragm. The tensioning device is arranged in 4 groups with a total of 8 tensioning points, using 8 13 φ15.2s steel strands and 8 200T jacks. During tensioning, the same central control system is used for synchronous lifting to ensure that the force is as consistent as possible. The tensioning force is initially designed to be 800T. During tensioning, the change in the width of the joint mouth weld is observed synchronously, and the control is mainly based on the weld width and supplemented by the tensioning force.

[0026] (5) Anchoring of fine-rolled threaded steel: After the tensioning is completed, insert the fine-rolled threaded steel into the welded steel plate and tighten the nut with a torque wrench, ensuring that the nuts of all locking devices have the same torque to complete temporary locking.

[0027] (6) Welding of the joint weld: Complete the welding work of the joint weld.

[0028] (7) Removal of temporary locking device: After the closure welding is completed, remove the temporary locking device.

[0029] The benefit analysis is reflected in the construction period and economic effect: this method is convenient and fast, the steel plate can be cut and blanked in advance, and the device can be welded in the corresponding position in advance. Compared with the traditional large-scale steel welding and fixing, a lot of welding time is reduced. This method only takes a few minutes to complete the locking, which greatly improves the work efficiency. Economically, it saves a lot of steel, and is easy to operate, reducing the investment in personnel and equipment. It only needs a few welding machines to complete it. It is economical and practical, and the effect is considerable.

[0030] Social effect: After using this method, the problem of fast and accurate temporary locking during the closure process is effectively solved. The temporary locking device is of excellent quality and has strong operability, which saves construction costs and achieves good social benefits. This method has been well received by the owner, design, and supervision company during the closure construction. This method has played a positive role in enriching and developing similar bridge construction technologies and has broad application prospects.

[0031] Application example: Luzhou Shenbicheng Yangtze River Bridge, constructed by Sichuan Highway and Bridge Construction Group Co., Ltd., is located between Baisha Town and Daqiao Town in Hejiang County. The south bank of the bridge is connected to G353 (formerly S308), and the north bank is connected to S438. It crosses the Yangtze River in a north-south direction and is the main crossing channel in Hejiang County. This project is a double-tower, single-column, central parallel cable-plane hybrid beam cable-stayed bridge with a main span of 520m. The main bridge span is arranged as 44.2+56+59.8+520+59.8+56+44.2m, with a steel box girder in the middle span and a cast-in-place concrete box girder in the side span. The consolidation system of piers, towers and beams is adopted. The main pier has no support, and two auxiliary piers are set on each of the two side spans. 720 and 640 expansion joints are set at the junction piers and abutments. The middle span of the main bridge of Shenbicheng Yangtze River Bridge adopts a flat steel box girder, which is a flat streamlined section with a wind nozzle. The top width of the beam is 27.5m (excluding the wind nozzle), the bottom plate width is 17.2m, the beam height is 3.5m, and the wind nozzle length is 1.5m. Two middle longitudinal webs are set in the box girder with a spacing of 2.29m. The inclined cable is anchored on the inner side of the middle longitudinal web. The steel box girder of the whole bridge is divided into 9 types, A, A1, B, B1, C, C1, D, E, and F, with a total of 35 beam sections. Among them, E is a steel-concrete combined section; D is a beam section adjacent to the steel-concrete combined section; A, A1, B, B1, C, C1 are standard beam sections; F is a mid-span closure section. The standard segment length of the main beam is 15.5m, the maximum height of the bottom of the steel box girder from the river surface is 60m (dry season), the net weight of the E segment is 244T, and the maximum net weight segment is the C segment 330T. The locking was completed on January 6, 2023 using a new type of temporary locking construction technology for steel box girder closure, taking only half an hour.

[0032] After using this method, the problem of fast locking of steel box beam closure under low temperature conditions is effectively overcome, the locking time is greatly shortened, and the construction cost is saved.

[0033] Practice has proved that this construction method is highly operational, has great application prospects in the field of cable-stayed bridge closure construction, and has outstanding social and economic benefits.

[0034] Method content description: The temporary locking device is composed of steel plate, fine rolled threaded steel and nut. The fine rolled threaded steel is used as a pull rod to bear force, and the nut is tightened and locked. The torque of all locking parts is controlled by a torque wrench to make the force uniform at all parts of the closure. It has the advantages of simple process and quick connection, thus breaking the traditional process of temporary locking of steel box girder closure construction, and providing experience and technical reference for temporary locking of steel box girder closure in pier-tower-beam consolidation system.

[0035] Shenbicheng Yangtze River Bridge in Luzhou City is located between Baisha Town and Daqiao Town in Hejiang County. The south bank of the bridge is connected to G353 (formerly S308) and the north bank is connected to S438. It crosses the Yangtze River in a north-south direction. It is a double-tower, single-column, central parallel cable-plane hybrid beam cable-stayed bridge with a main span of 520m.

[0036] The middle span of the main bridge of Shenbicheng Yangtze River Bridge adopts a flat steel box girder, which is a flat streamlined section with a wind nozzle. The top width of the beam is 27.5m (excluding the wind nozzle), the bottom plate width is 17.2m, the beam height is 3.5m, and the wind nozzle length is 1.5m. Two middle longitudinal webs are set in the box girder with a spacing of 2.29m. The inclined cable is anchored on the inner side of the middle longitudinal web. The steel box girder of the whole bridge is divided into 9 types, A, A1, B, B1, C, C1, D, E, and F, with a total of 35 beam sections. Among them, E is a steel-concrete combined section; D is a beam section adjacent to the steel-concrete combined section; A, A1, B, B1, C, C1 are standard beam sections; F is a mid-span closure section. The standard segment length of the main beam is 15.5m, the maximum height of the bottom of the steel box girder from the river surface is 60m (dry season), the net weight of the E segment is 244T, and the maximum net weight segment is the C segment 330T.

[0037] The temporary locking device is composed of steel plates, fine-rolled threaded steel and nuts, and the fine-rolled threaded steel is used as a tension rod to bear the force. After positioning and lofting, the steel plates can be welded to the steel box girder in advance, divided into trapezoidal plates and rectangular plates, and arranged at the top and bottom plates, a total of 10 places; after the tension is completed, the fine-rolled threaded steel is inserted, the nuts are installed and tightened, and then the torque wrench is used to twist to the same torque for uniform force.

[0038] The innovation of the present invention is: 1. Compared with the traditional steel welding fixation, this method uses fine-rolled threaded steel for bolting, which is more convenient to install, consumes less steel, takes less time, and has high work efficiency.

[0039] 2. Use a torque wrench to control the same torque so that the connection parts are evenly stressed and have greater rigidity.

[0040] Technical level and technical difficulty (including comparison with similar technical levels at home and abroad): The temporary locking construction method for the steel box girder closure of the pier-tower-beam consolidation system mainly adopts a new type of temporary locking device. The locking device is designed on the top and bottom plates, arranged symmetrically, and reasonably distributed in various areas of the steel box girder section to ensure the stability of the overall locking.

[0041] In addition, this method also uses a torque wrench to tighten and control the torque of each connection part to be consistent, so that equal deformation can be guaranteed when shrinkage and deformation occur due to temperature changes, and the overall stability is more.

[0042] The temporary locking construction technology for the closure of the steel box girder of the cable-stayed bridge basically adopts the conventional locking method at home and abroad, using steel welding to lock. This project is the first to use fine-rolled threaded steel as a tie rod lock in the closure of the steel box girder of the pier tower beam consolidation system. The locking device has a simple structure, does not require a large amount of steel, is easy to install, can be quickly locked after the tension is completed, and has good integrity and controllable deformation. The efficiency of this locking process is significantly improved and is very valuable for promotion.

[0043] After using this method, the problem of fast and accurate locking in the process of steel box girder closure is effectively solved, and the locking process is applicable to various cable-stayed bridge systems, widely used, and the quality and safety can be fully guaranteed, and the construction cost is also saved. This method does not need to rely on a large amount of steel, which increases applicability and economy.

[0044] With the continuous development of my country's transportation industry, bridge projects are still being built in large quantities, and the scale of projects is constantly expanding. Cable-stayed bridge steel box girder closure will be widely used. The promotion and use of this method under similar bridge types will achieve good time efficiency and economic benefits.

[0045] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. A temporary locking device for the closure of steel box girders in a pier-tower-beam consolidation system, characterized in that: The temporary locking device includes U ribs, steel plates, finely rolled threaded steel bars, nuts and top and bottom plates. The shape and size of the steel plates and the length of the finely rolled threaded steel bars are determined according to the distance between the joints and the size of the steel box beam. The temporary locking device requires a total of 34 PSB1080 φ40mm finely rolled threaded steel bars. Arrange U ribs, steel plates, and fine-rolled threaded steel bars on the top and bottom plates. Weld the steel plates of temporary locking devices at the top and bottom plates D1, D2 and D3 areas; A tensioning device is designed on the top and bottom plates, located at the intersection of the two middle longitudinal webs and the transverse diaphragm. The tensioning device is arranged in 4 groups with a total of 8 tensioning points, and is composed of 8 13 φ15.2s steel strands and 8 200T jacks. During tensioning, the same central control system is used for synchronous lifting to ensure that the force is as consistent as possible. The tensioning force is initially designed to be 800T. During tensioning, the change in the width of the closure weld is synchronously observed, and the control is mainly based on the weld width and supplemented by the tensioning force; Insert the fine-rolled threaded steel into the welding steel plate and tighten the nuts with a torque wrench, ensuring that the nuts of all locking devices have the same torque to complete temporary locking.

2. A temporary locking construction method for closure of steel box beams in a pier-tower-beam consolidation system, characterized in that: The construction process is as follows; (1) Construction preparation: The temporary locking device is composed of steel plates, fine-rolled threaded steel bars and nuts. The shape and size of the steel plates and the length of the fine-rolled threaded steel bars are determined according to the distance between the joints and the size of the steel box girder. A total of 34 PSB1080 φ40mm fine-rolled threaded steel bars are required; (2) Positioning and layout: Locate the steel plate welding positions according to the design drawings and arrange them on the top and bottom plates, with a total of 10 locations in one section; (3) Welding of locking device steel plates: After positioning and layout, weld the steel plates of the temporary locking device at positions D1, D2, and D3 of the top and bottom plates; (4) Tensioning device: After the joint mouth elevation is matched, install the tensioning device; the tensioning device is designed on the top and bottom plates, at the intersection of the two middle longitudinal web plates and the transverse diaphragm; The tensioning device is arranged in 4 groups with 8 tensioning points, and is composed of 8 strands of 13 φ15.2s steel strands and 8 200T jacks. During the tensioning process, the same central control system is used for synchronous lifting to ensure that the force is as consistent as possible. The tensioning force is initially designed to be 800T. During the pulling process, the change of the weld width at the closure is observed simultaneously, and the control is mainly based on the weld width and supplemented by the pulling force; (5) Anchoring of fine-rolled threaded steel: After the tension is completed, insert the fine-rolled threaded steel into the welded steel plate and tighten the nut with a torque wrench, ensuring that the nuts of all locking devices have the same torque to complete temporary locking; (6) Welding of the closure weld: complete the welding work of the closure weld; (7) Removal of temporary locking device: After the closure welding is completed, remove the temporary locking device.